Starting control system

The starting control system for construction machinery ensures safety checks are reliably performed by using a user-carried communication device and control system to verify safety actions, reducing accident risks by only allowing start-up after completion of safety checks.

JP2026086380APending Publication Date: 2026-05-26SERITA KENSETSU
View PDF 2 Cites 0 Cited by

Patent Information

Authority / Receiving Office
JP Β· JP
Patent Type
Applications
Current Assignee / Owner
SERITA KENSETSU
Filing Date
2025-11-12
Publication Date
2026-05-26

AI Technical Summary

Technical Problem

Existing systems for construction machinery starting operations do not reliably ensure that safety checks are performed before the machinery is started, leading to potential accidents due to driver negligence or blind spots.

Method used

A starting control system that includes a communication device carried by the user and a control device that controls the construction machine based on communication history, ensuring a predetermined safety check is performed within a specified time before starting, using short-range wireless communication and multiple antennas or readers to verify the user's actions.

Benefits of technology

The system reliably prompts and confirms that a safety check has been performed, ensuring the construction machine can only be started after the user completes the necessary safety actions, thereby reducing the risk of accidents.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 2026086380000001_ABST
    Figure 2026086380000001_ABST
Patent Text Reader

Abstract

The present invention provides a starting control system that controls the starting operation of construction machinery so that safety checks are reliably performed immediately before starting the machine. [Solution] The system includes a communication unit 20 that is carried by the user who will be using the construction machine 10 and has a communication element capable of communicating with external devices, and a control device 30 that controls the starting operation of the construction machine 10 based on communication history information regarding the history of communication by the communication unit 20. The control device 30 controls the construction machine 10 from a locked state where it cannot start to an unlocked state where it can start if the communication unit 20 has made a predetermined communication within a predetermined time immediately before the starting operation of the construction machine 10.
Need to check novelty before this filing date? Find Prior Art