Air conditioning control system and air conditioning control method

The air conditioning control system addresses inefficiencies in demand response by reducing the number of air conditioners needing commands, ensuring timely adjustments by prioritizing those with significant power consumption differences, enhancing power demand management.

JP7551428B2Active Publication Date: 2024-09-17HITACHI GLOBAL LIFE SOLUTIONS INC
View PDF 5 Cites 0 Cited by

Patent Information

Application Number
JP2020163331
Authority / Receiving Office
JP · JP
Patent Type
Patents
Current Assignee / Owner
Filing Date
2020-09-29
Publication Date
2024-09-17
Estimated Expiration
2040-09-29

AI Technical Summary

Technical Problem

Conventional methods struggle to issue control commands to hundreds to hundreds of thousands of air conditioners within a short time frame due to the small electric power consumption of each unit, leading to inefficiencies in demand response processes.

Method used

An air conditioning control system that reduces the number of air conditioners issuing control commands by prioritizing those with the largest power consumption differences between operation modes, allowing for adjustments to be made within monitoring time periods.

Benefits of technology

The system effectively manages power demand by minimizing the number of air conditioners requiring commands, ensuring timely adjustments even with large numbers, particularly effective in small time units of one minute to less than ten minutes.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 0007551428000016
    Figure 0007551428000016
  • Figure 0007551428000011
    Figure 0007551428000011
  • Figure 0007551428000008
    Figure 0007551428000008
Patent Text Reader

Abstract

To provide an air conditioning control system capable of ending adjustment processing within a monitoring time period by reducing the number of air conditioners to which a control command is output in a case where a power demand total value is out of a target value.SOLUTION: An air conditioning control system 1 comprises: a transmission / reception unit 51 for receiving a demand adjustment instruction value and a designated time with respect to total power consumption of a user facility; a power information acquisition unit 54 for acquiring present power information of each user facility; an air conditioning system information acquisition unit 55 for acquiring power information of each air conditioning system; an operation command transmission unit 56 for transmitting a demand response instruction DR of either a first operation mode of small power consumption or a second operation mode of large power consumption to each air conditioning system; a storage unit 57 for storing a history of power consumption of each air conditioning system on an operation mode basis; and an operation command creation unit 52 by which, in a case where a total of power consumption of each user facility is out of a target power value of the demand adjustment instruction value, the DR is created successively from the air conditioning system in which a differential of power consumption on the operation mode basis is large.SELECTED DRAWING: Figure 1
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present invention relates to an air conditioning control system and an air conditioning control method for performing demand response (hereinafter sometimes referred to as DR) that reduces the imbalance between power supply and demand by controlling multiple air conditioners to reduce power consumption in accordance with instructions from a power grid manager, an electricity retailer, or an upper aggregator that relays instructions from them. [Background technology]

[0002] A technology has been disclosed that issues control instructions to air conditioners owned by multiple consumers, and performs demand response by reducing power consumption. Patent Document 1 discloses a technology that targets a group of apartment buildings, sets priorities for each attribute of areas such as common areas and residential areas, and calculates the reduction amount of demand equipment according to the priorities. The controlled objects are lighting and air conditioning. [Prior art documents] [Patent documents]

[0003] [Patent Document 1] JP 2016-214084 A Summary of the Invention [Problem to be solved by the invention]

[0004] When using DR to ensure frequency stability in power grids, such as supply and demand adjustment markets, it is necessary to monitor the total power demand of the managed air conditioners in precise time units of less than one minute to several tens of minutes, and if the total power demand deviates from the target value, it is necessary to immediately issue a command to each air conditioner to adjust the demand. However, when using air conditioners for control, the power consumed by each unit is small, so hundreds to hundreds of thousands of air conditioners must be controlled in a short period of time. Issuing individual commands to many air conditioners requires a lot of communication time, and there was an issue that the processing could not keep up with the conventional method.

[0005] Patent Document 1 does not take into consideration reducing the number of air conditioners that issue control commands and performing necessary control within a certain time frame.

[0006] The present invention aims to provide an air conditioning control system and an air conditioning control method that can reduce the number of air conditioners that issue control commands for adjustment when the total power demand value of multiple air conditioners deviates from the target, and can complete the adjustment process within the monitoring time period. [Means for solving the problem]

[0007] The present application includes multiple means for solving the above problems. To give an example of the "air conditioning control system" of the present invention, an air conditioning control system for controlling a plurality of air conditioning systems each consisting of an outdoor unit and an indoor unit, the air conditioning control system including a transmission / reception unit for receiving from an external source a supply and demand adjustment instruction value and a designated time for a total power consumption of one or more consumer facilities including the air conditioning systems; a power information acquisition unit for acquiring current power information of each consumer facility; an air conditioning system information acquisition unit for acquiring power information of each air conditioning system; an operation command transmission unit for transmitting a demand response instruction to each air conditioning system for either a first operation mode with low power consumption or a second operation mode with high power consumption; a memory unit for storing a history of actual power consumption in the two operation modes of each air conditioning system; until the total power consumption of each of the consumer facilities substantially matches the target power value. and an operation command creation unit that creates the demand response command for switching between the two operation modes. The operation command transmission unit transmits a demand response command to each air conditioning system only when the demand response command is a command to switch an operation mode. This is what we have in mind.

[0008] Moreover, as an example of the "air conditioning control method" of the present invention, An air conditioning control method for controlling a plurality of air conditioning systems consisting of outdoor units and indoor units by receiving a supply and demand adjustment instruction value for the total power consumption of one or more consumer facilities, transmitting a demand response instruction for either a first operation mode with low power consumption or a second operation mode with high power consumption, the method comprising the steps of: acquiring and updating a supply and demand adjustment instruction value from an external source; calculating a target power value based on the supply and demand adjustment instruction value; collecting power values ​​consumed in the consumer facilities in which each air conditioning system is installed and calculating a total power value; the step of obtaining the consumed power and updating an air conditioning power history table; when the total power value of each of the consumer facilities deviates from the target power value, the step of storing in an air conditioning instruction table a demand response instruction for switching the operation mode of each air conditioning system in order from the air conditioning system having the largest difference in power consumption between the two operation modes based on the air conditioning power history table until the total power value of each of the consumer facilities approximately matches the target power value; and the step of reading out the demand response instruction of each air conditioning system from the air conditioning instruction table, and transmitting the demand response instruction to each air conditioning system only when the demand response instruction is an instruction to switch the operation mode. Effect of the Invention

[0009] According to the present invention, the total power demand value of multiple air conditioners is monitored, and when the total power demand value deviates from the target, the number of air conditioners for which control commands for adjustment are issued is reduced, and the adjustment process can be completed within the monitoring time period. This is particularly effective when making adjustments in small time units of less than one minute to several tens of minutes for hundreds to hundreds of thousands of air conditioners.

[0010] Other objects, configurations and effects than those described above will become apparent from the following description of the embodiments. [Brief description of the drawings]

[0011] [Figure 1] FIG. 1 is a functional configuration diagram of an air conditioning control system according to a first embodiment. [Diagram 2] FIG. 1 is a connection configuration diagram of an air conditioning control system according to a first embodiment. [Diagram 3] 1 is a hardware configuration diagram of an air conditioning control system according to a first embodiment. [Figure 4] 4 is a flowchart showing the operation of the air conditioning control system of the first embodiment. [Diagram 5] 4 is a flowchart relating to a calculation method for air conditioner instructions in the first embodiment. [Figure 6] 4 is an example of a reference value table according to the first embodiment. [Figure 7] 13 is an example of a total power history table according to the first embodiment. [Figure 8] 4 is an example of an air conditioning power history table according to the first embodiment. [Figure 9] 4 is an example of an air conditioning power prediction table according to the first embodiment. [Figure 10] 4 is an example of an air conditioning instruction table according to the first embodiment. [Figure 11] 4 is an example of an air conditioning instruction table according to the first embodiment. [Figure 12] FIG. 11 is a functional configuration diagram of an air conditioning control system according to a second embodiment. [Figure 13] 13 is an example of an air conditioning power history table according to the second embodiment. [Figure 14] 13 is a flowchart relating to a calculation method for air conditioner instructions in the second embodiment. [Figure 15] 13 is an example of an air conditioning instruction table B according to the second embodiment. [Figure 16] FIG. 11 is a functional configuration diagram of an air conditioning control system according to a third embodiment. [Figure 17] 13 is a diagram showing a total power reduction value and a change over time in a reduction instruction in the third embodiment. FIG. [Figure 18] 13 is a flowchart of air conditioning power prediction table correction in the third embodiment. [Figure 19] 13 is a flowchart of a preparatory operation in the third embodiment. [Figure 20] 23 is an example of an air conditioning power history table according to the fourth embodiment. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0012] Hereinafter, embodiments of the present invention will be described with reference to the drawings. In each drawing for explaining the embodiments, the same components are given the same names and reference numerals, and the repeated description will be omitted. EXAMPLES

[0013] 1 shows a functional configuration diagram of an air conditioning control system 1 according to a first embodiment of the present invention. The air conditioning control system 1 includes a transmitter / receiver 51, a power information acquisition unit 54 and an air conditioning system information acquisition unit 55 that receive information from consumer facilities such as buildings 5 ​​and 6, an operation command transmission unit 56 that transmits operation commands to consumer facilities such as buildings 5 ​​and 6, a memory unit 57, a reference value creation unit 53, and an operation command creation unit 52 that creates operation commands.

[0014] The transmitter / receiver 51 receives from the outside a supply and demand adjustment instruction value and a designated time for the total power consumption of customer facilities in which an air conditioning system managed by the air conditioning control system 1 is installed. The power information acquisition unit 54 acquires current power information of each customer facility. The air conditioning system information acquisition unit 55 acquires power information of each air conditioning system. The operation command transmission unit 56 transmits, to each air conditioning system, a demand response instruction for one of two operation modes: a first operation mode with low power consumption and a second operation mode with high power consumption. The reference value creation unit 53 creates a reference value table 60 . When the total power consumption of each consumer facility deviates from the target power value calculated from the supply and demand adjustment instruction value, the operation command creation unit 52 creates a demand response instruction to switch between the two operating modes in order of the air conditioning system with the largest difference in power consumption between the two operating modes of each air conditioning system.

[0015] The storage unit 57 stores a reference value table 60, a total power history table 61, an air conditioning power history table 62, an air conditioning power prediction table 63, an air conditioning instruction table 64, and the like. The reference value table 60 stores information on predicted values ​​of the total power consumption of the building in the case where a supply and demand adjustment instruction such as a power reduction command is not issued to any of the air conditioning systems under management. The total power history table 61 stores the time history of the total value of power for the building in which each air conditioning system is installed. The air conditioning power history table 62 stores past power consumption history information for each air conditioning system. The air conditioning power prediction table 63 stores the power consumption prediction for each air conditioning system when there is and is not an instruction to reduce power for each air conditioning system. The air conditioning instruction table 64 stores DR instructions to be issued to each air conditioning system.

[0016] The transmitter / receiver 51 exchanges data with the aggregation coordinator system 2. It mainly receives and stores notifications of demand response start times, requests to create reference values, and notifications of supply and demand adjustment instruction values, and transmits reference values, actual building power values, etc. Note that the actual building power values ​​may also be notified from the aggregation coordinator system 2.

[0017] FIG. 6 shows an example of the reference value table 60. The reference value table 60 is composed of time and reference value power at that time. The reference value power is a predicted value of the total value of the average power of each building in which each air conditioning system managed by the air conditioning control system 1 is installed, and is created in advance by the reference value creation unit 53 in a time period prior to the operation of the flowchart shown in FIG. 4. The length of one time period and the total time length are notified in advance by the aggregation coordinator system 2. In this embodiment, the reference value power is set by dividing the entire three hours from 11:00 to 14:00 on May 1, 2020 into 30-minute intervals.

[0018] In Fig. 6, the average power is recorded every 30 minutes, but it may be every 5 minutes or every minute depending on the specifications of the corresponding demand response. Depending on the specifications of the corresponding demand response, a report of the amount of power may be requested from a power grid manager, a power retailer, or a higher-level aggregator that relays instructions from them, which is a higher-level aggregator of the air conditioning control system. It is assumed that the average power is recorded in the reference value table 60 and converted to the amount of power when reporting and transmitted. The reference value recorded here is calculated by the reference value creation unit 53 in Fig. 1 before the demand response is started based on the past temperature and power usage record when control by demand response is not performed, the predicted temperature during the time period when the demand response is performed, the scheduled use of the room, etc., and the calculated reference value is transmitted to the aggregation coordinator system 2 by the transmission / reception unit 51 in Fig. 1.

[0019] In Japan's "tertiary control reserve (2)," a form of supply and demand adjustment market, it is stipulated that demand response is registered in the power grid management system via an aggregation coordinator one hour before the demand response is performed. Depending on the specifications of the demand response, the air conditioning control system 1 may not create the reference value, and the reference value may be transmitted from a higher level.

[0020] An example of the total power history table 61 is shown in Fig. 7. The total power history table 61 is composed of time and the total power at that time. The total power is the actual value of the total average power of each building in which each air conditioning system managed by the air conditioning control system 1 is installed, and data is added in step S3 of the flowchart shown in Fig. 4. Fig. 7 shows an example in which actual values ​​for the time period from 11:00 to 11:03 are recorded, and no values ​​are recorded after 11:03.

[0021] Fig. 8 shows an example of the air conditioning power history table 62. The air conditioning power history table 62 is composed of a date and time, an air conditioning system number, a DR operation mode M_DR_n of a specified air conditioning system at a specified date and time, and power consumption information P_vrf_n. The DR operation mode M_DR_n is recorded as DR_on when there is a power reduction instruction, and as DR_off when there is no instruction. Note that the power consumption of each air conditioning system is smaller when the DR operation mode M_DR_n is DR_on than when it is DR_off.

[0022] 9 shows an example of the air conditioning power prediction table 63. The air conditioning power prediction table 63 is made up of an air conditioning system number, a predicted value P_DR_on of the power consumption of the air conditioning system when a power reduction instruction is given, and a predicted value P_DR_off of the power consumption of the air conditioning system when a power reduction instruction is not given.

[0023] 10 and 11 show examples of the air conditioning instruction table 64. The air conditioning instruction table 64 is made up of the air conditioning system number, Δp which is the difference between the predicted power consumption value P_DR_on when there is a power reduction instruction for the specified air conditioning system and the predicted power consumption value P_DR_off when there is no power reduction instruction, and the operation instruction DR_Order to be given to the specified air conditioning system. Although Figs. 10 and 11 are the same, the contents are updated successively according to the step stage. How the updates are performed will be explained in the explanation of the flowchart in Fig. 5 regarding the calculation method for air conditioner instructions.

[0024] 2 shows a connection configuration diagram of various systems related to this embodiment. Power supply and demand information from smart meters 11 connected to each consumer and power resource is collected in a meter data management system 7 via a communication network 100, and then sent to a power system management system 4 via a communication network 105. The smart meters 11 are also connected to an in-building control device 12 via a separate communication network 107.

[0025] The power system management system 4 monitors the supply and demand information of the entire power system or the frequency of the power system, and when the balance of power supply and demand is lost or is predicted to be lost, it issues a command to adjust supply and demand via a communication network 101 to the aggregation coordinator system 2, other aggregation coordinators (not shown), and other power resources (not shown). The aggregation coordinator system 2 integrates and controls multiple types of power resources. The aggregation coordinator system 2 issues a command to adjust supply and demand via a power network 102 to the air conditioning control system 1 and other power resource management systems (not shown).

[0026] The air conditioning control system 1 collects the power values ​​P_k of buildings, which are consumer facilities, from smart meters 11 in the buildings in which each managed air conditioning system is installed, via a building control device 12 or an aggregation coordinator system 2. The information from the smart meter 11 may be obtained via another information device, or measurements may be taken using a power meter installed separately from the smart meter 11. Although not shown, the building power values ​​P_k are also collected from buildings in which other managed air conditioners are installed, such as building 6.

[0027] Each air conditioner in building 5 is connected to building control device 12 via building communication network 106. Each air conditioner has two DR operation modes, DR_on mode and DR_off mode, with different power consumption for each air conditioning system consisting of a combination of outdoor units and indoor units connected by refrigerant piping. Outdoor unit 13 and indoor units 14-16 are connected by refrigerant piping 33 to constitute air conditioning system 31. Outdoor unit 17 and indoor units 18-20 are connected by refrigerant piping 34 to constitute air conditioning system 32.

[0028] The DR operation modes may be divided according to the set temperature of each indoor unit, and the set temperature for DR_on during cooling may be set to a predetermined temperature of 27°C and the set temperature for DR_off may be set to 25°C (for example, 18°C ​​and 21°C, respectively, during heating), or the set temperature for DR_off may be set to a set temperature preset by the user for each indoor unit, and the set temperature for DR_on may be set to the set temperature for DR_off -3°C (for example, +3°C in winter). In the latter case, control is more complicated than in the former case, but it has the advantage of being able to operate effectively even if the original temperature settings differ for each indoor unit. The set temperatures for DR_on and DR_off should preferably be selected within the upper and lower limits of the range of human comfort.

[0029] Also, the settings for each DR operation mode may be registered as designated values ​​for the power consumption of each air conditioning system, rather than the set temperature of each indoor unit. For example, the power consumption for DR_on may be set to 5 kW, and the power consumption for DR_off may be set to 8 kW. In this case, it is assumed that the air conditioner has the function to operate with the power specified from outside.

[0030] The communication networks 100 to 103 and 105 may be the Internet, a dedicated communication line, or a network that functions as a VPN (Virtual Private Network) on the Internet. The communication networks 106 and 107 may be a TCP / IP intranet or a dedicated communication network such as RS-485.

[0031] Fig. 3 shows a hardware configuration diagram of the air conditioning control system 1. The CPU 42 loads a program from a non-volatile storage medium 41 via the bus 40 into a memory 43 and executes it. Communication with the outside is performed via a communication unit 44. The communication unit 44 is a TCP / IP-based communication I / F. The CPU 42 records information in the non-volatile storage medium 41 as necessary. The above is an example in which the air conditioning control system 1 is built on a server, but it may also be built on the cloud and the processing divided among multiple servers.

[0032] Next, the operation of the air conditioning control system 1 after a specified demand response start time is reached will be explained using the flowchart in Figure 4. Figure 4 shows an example of a case where power consumption is adjusted according to "tertiary adjustment power (2)", which is one form of Japan's supply and demand adjustment market. There are several other methods of "tertiary adjustment power (2)" in Japan's supply and demand adjustment market, but they basically operate in the same way, with only differences in the time interval of the demand response command and the duration of the demand response. Similar systems exist overseas, and are called balancing markets or ancillary markets. In these cases, too, the same basic operation occurs.

[0033] In step S1, the latest value of the supply and demand adjustment instruction value received from the aggregation coordinator system 2 is obtained from the transmitter / receiver 51. The instruction to be received is, for example, 11:00, 100 kW reduction. If the supply and demand adjustment instruction value is in units of power energy, it is converted to a power value. Note that if a new supply and demand adjustment instruction value is received from the aggregation coordinator system 2 during the processing of steps S2 to S9, the supply and demand adjustment instruction value used in steps S2 to S9 is not updated immediately, but is updated the next time step S1 is executed.

[0034] In step S2, the target power P_target at the current time is calculated from the supply and demand adjustment instruction value O obtained in S1, the reference value table 60 recorded in the storage unit 57, and the current time. The target power P_target at a certain time is calculated as the difference between the reference value average power and the supply and demand adjustment instruction value at the same time.

[0035] In step S3, the power value P_k of the building, which is the consumer facility in which each air conditioning system is installed, is obtained, and the total building power value, which is the sum of the values ​​of each building, is calculated and recorded in the total power history table 61 together with the time information. At this time, the average value of the total building power value in the time period including the current time in the predetermined time division shown in the reference value table of FIG. 6 is set as P_k_sum. If the current time is 11:03 among 11:00 to 11:30 on 5 / 1 / 2020 shown in FIG. 7, the average of 11:00 to 11:30 on 5 / 1 / 2020 is the average value of the three points from 11:00 to 11:03 on 5 / 1 / 2020, which has measurement history, and is 1300 kW.

[0036] In step S4, the DR operation mode M_DR_n and power consumption P_vrf_n of each air conditioning system at that time are obtained via the building control device 12, and the air conditioning power history table 62 is updated. If the power consumption P_vrf_n cannot be obtained directly from each air conditioning system, current information of the outdoor units belonging to each air conditioning system, or current information of the compressor that consumes the most power among the outdoor units, is collected, and P_vrf_n is calculated. Although not shown in FIG. 2, the air conditioning control system 1 obtains each power consumption information P_vrf_n from all the air conditioning systems to be managed that are installed in the building 6 and other buildings, and calculates the total air conditioning power consumption P_vrf_sum. In addition, the predicted value of power consumption corresponding to the value of the DR operation mode M_DR_n of each air conditioning system in the air conditioning power prediction table 63 is written by averaging the newly obtained power consumption and the power consumption in the same DR operation mode M_DR_n for the most recent few minutes, for example 5 minutes, recorded in the air conditioning power history table 62. In addition, as an embodiment, the power consumption read in step S4 may be directly written as a predicted value in the air conditioning power consumption prediction table 63. In the latter case, the accuracy of the power consumption decreases, but the processing speed is faster.

[0037] In step S5, a surplus or shortage is calculated from the target power P_target and the total building power value P_k_sum, and instructions are generated for each air conditioner to eliminate the surplus or shortage.

[0038] Figure 5 shows how the air conditioner instructions are calculated. In step S21, the DR operation mode M_DR_n of each air conditioning system is read, and the number of air conditioning systems for which M_DR_n is 1 is set as OnDRNumber, and the number of air conditioning systems for which M_DR_n is 0 is set as OffDrNumber. In step S22, the target power P_target is compared with the actually measured total building power value P_k_sum, and if P_k_sum is smaller, proceed to step S23 to issue an instruction to increase power, and if P_target is greater, proceed to step S30 to issue an instruction to reduce power.

[0039] In step S23 in the power increase direction, the predicted power consumption values ​​P_DR_on and P_DR_off of the air conditioning systems whose current DR operation mode M_DR_n is DR_on are read from the air conditioning power prediction table 63, and these are sorted in descending order of the difference Δp and assigned numbers. At this time, the air conditioning system number, DR operation mode M_DR_n, and Δp values ​​are used to create an air conditioning instruction table 64. An example of the air conditioning instruction table 64 is shown in FIG. 10. The initial value "Num" is entered for all air conditioning systems so that no instruction is given to DR_Order. To make the operation easier to understand, it is assumed here that only five air conditioning systems are in the DR_on state. In step S24, the processing counter i is set to 0, and the temporary total power consumption value P_sum_Temp is set to the total building power value P_k_sum. In step S25, the process counter i is compared to see if it is greater than the number of air conditioning systems for DR_on, OnDRNumber, and if it is greater, the process ends and returns to step S6. If it is less, the process continues to step S26. The process here means that the process loop is repeated up to OnDRNumber.

[0040] In step S26, the target power P_target is compared with the value obtained by adding Δp(i), which is the i-th Δp, to the provisional air conditioning power consumption total P_sum_Temp, and if the target power P_target is greater, that is, adding Δp(i) does not reach the target increase, the process proceeds to S27, and if the target power P_target is smaller, that is, adding Δp(i) would exceed the target, the process proceeds to S29. In step S27, the DR instruction DrOrder(i) is set to DR_off in order to switch the DR operation mode M_DR_n of the i-th air conditioning system from DR_on to DR_off. The set value is recorded in the air conditioning instruction table 64. In step S28, the temporary air conditioning power consumption total value P_sum_Temp is updated by adding Δp(i) to the new value P_sum_Temp. In step S29, i is incremented by 1 and the process returns to S25.

[0041] An example of the air conditioning instruction table 64 after the loop from S25 to S29 has been completed is shown in Fig. 11. Fig. 11 assumes that the difference between the target power P_target and the total building power value P_k_sum is 23 kW. In this case, the total of Δp is 22.2 kW, which is a value close to but not exceeding 23 kW.

[0042] In step S30 in the power reduction direction, the latest P_DR_on and P_DR_off of the air conditioning system whose current DR operation mode M_DR_n is DR_off are read from the air conditioning power prediction table 63, and these are sorted in descending order of the difference Δp and numbered. At this time, an air conditioning instruction table 64 is created using the air conditioning system number, DR operation mode M_DR_n, and Δp values. The air conditioning instruction table 64 created here is the same as that shown in Figure 10, but differs in that only air conditioning systems with DR_off are recorded. In step S31, a processing counter i is set to 0, and a temporary total value P_sum_Temp of air-conditioning power consumption is set to a total value P_k_sum of air-conditioning power consumption. In step S32, the process counter i is compared to see if it is greater than the number of air conditioning systems OffDRNumber for DR_off, and if it is greater, the process ends and returns to step S6. If it is less, the process continues to step S33. The process here means that the process loop is repeated up to OffDRNumber.

[0043] In step S33, the value obtained by subtracting Δp(i), which is the i-th Δp, from the provisional air conditioning power consumption total P_sum_Temp is compared with the target power P_target, and if the target power P_target is greater, that is, if the reduction target is not reached even if Δp(i) is subtracted, the process proceeds to S34, and if it is smaller, that is, if the target is exceeded by subtracting Δp(i), the process proceeds to S36. In step S34, the DR instruction DrOrder(i) is set to DR_on in order to switch the DR operation mode M_DR_n of the i-th air conditioning system from DR_off to DR_on. In step S35, the temporary air conditioning power consumption total value P_sum_Temp is updated by subtracting Δp(i) from the temporary air conditioning power consumption total value P_sum_Temp as a new P_sum_Temp. In step S36, i is incremented by 1 and the process returns to S32.

[0044] Returning to the flowchart of FIG. 4, in step S6, the DR command DrOrder of each air conditioning system is read from the air conditioning command table 64 created in S5, and a DR command is sent to each air conditioning system only if DrOrder is DR_on or DR_off. If DrOrder is "Num", the status quo is maintained, so no DR command is sent. At this time, for building 5, the DR command is transmitted to the outdoor unit 13 and indoor units 14-16 of the air conditioning system 31, and the outdoor unit 17 and indoor units 18-20 of the air conditioning system 32, via the communication network 103 and the building control device 12. The building control device 12 changes the temperature setting of each indoor unit or transmits the power consumption setting of each outdoor unit according to the DR command DrOrder. Depending on the configuration, the operation command transmission unit 56 may directly transmit the temperature setting of each indoor unit or transmit the power consumption setting of each outdoor unit. In step S7, it is determined whether one minute has elapsed, and if one minute has elapsed, the process proceeds to step S8. In step S8, it is determined whether 30 minutes have passed, and if 30 minutes have not passed, the process returns to S3 and steps S3 to S7 are repeated, and if 30 minutes have passed, the process proceeds to the next step S8. In step S9, it is determined whether or not three hours have passed. If three hours have not passed, the process returns to S1 and steps S1 to S8 are repeated; if three hours have passed, the process ends. The determination times in steps S7, S8, and S9 can be changed as appropriate.

[0045] According to this embodiment, the air conditioning control system monitors the total power demand of multiple air conditioners that generate operation commands, and when the total power demand deviates from the target, it switches the operation mode preferentially from the air conditioning system with the largest difference in power consumption due to the DR mode of each air conditioning system, so that it is possible to reduce the number of air conditioners that issue control commands for adjustment and complete the adjustment process within the monitoring time period. This is particularly effective when making adjustments in small time units of less than one minute to a dozen minutes for a large number of air conditioners, from several hundred to several hundred thousand. EXAMPLES

[0046] Fig. 12 shows a functional configuration diagram of an air conditioning control system 1 of Example 2. It is generally similar to Fig. 1 of Example 1, but air conditioning instruction table B (second air conditioning instruction table) 65 is added. The connection configuration diagram of various systems related to this example is similar to Fig. 2 of Example 1. The hardware configuration diagram of the air conditioning control system 1 in this example is similar to Fig. 3 of Example 1.

[0047] An example of the air conditioning power history table 62 in this embodiment is shown in Fig. 13. In addition to the elements of the first embodiment shown in Fig. 8, the air conditioning power history table 62 further includes a DR operation mode continuation count Number_DR_n indicating how many times the current DR operation mode has continued in succession in the past.

[0048] The operation of the air conditioning control system 1 after it reaches the specified demand response start time is generally the same as that of the first embodiment shown in the flowchart of Fig. 4. However, in step S6, the DR instruction DrOrder of each air conditioning system is read not only from the air conditioning instruction table (first air conditioning instruction table) 64 but also from the air conditioning instruction table B (second air conditioning instruction table) 65, and a DR instruction is sent to each air conditioning system only if DrOrder is DR_on or DR_off. If DrOrder is "Num", the status quo is maintained and so a DR instruction is not sent.

[0049] FIG. 14 shows a calculation method for air conditioner instructions in this embodiment. In step S41, the DR operation mode M_DR_n of each air conditioning system is read, and the number of air conditioning systems for which M_DR_n is 1 is set as OnDRNumber, and the number of air conditioning systems for which M_DR_n is 0 is set as OffDrNumber. In step S42, the operation mode continuation counts Number_DR_n of all air conditioning systems in the air conditioning power history table 62 shown in FIG. 13 are incremented by one.

[0050] In step S43, the predicted power consumption value P_DR_on of the air conditioning system whose current DR operation mode M_DR_n is DR_on and the predicted power consumption value P_DR_off of the air conditioning system whose current DR operation mode M_DR_n is P_DR_off are read from the air conditioning power prediction table 63, and the values ​​are sorted in descending order of the difference Δp between them and assigned numbers. At this time, the air conditioning instruction table 64 is created using the air conditioning system number, the DR operation mode M_DR_n, and the values ​​of Δp. An example of the air conditioning instruction table 64 is the same as that shown in FIG. 10 in the first embodiment. The initial value "Num" is input for all air conditioning systems so that no instruction is given to DR_Order. In order to make the operation easier to understand, it is assumed here that only five air conditioning systems are in the DR_on state. In step S44, a processing counter i is set to 0.

[0051] In step S45, the processing counter i is compared to see if it is greater than the number of air conditioning systems for DR_on OnDRNumber, and if it is greater, the loop processing of S46 to S50 is ended and the process proceeds to step S51. If it is less, the process proceeds to step S46. The process here means that the processing loop is repeated up to VRF_Number. In step S46, it is determined whether the number of times the operation mode of the i-th air conditioning system continues, Number_DR_n(i), is greater than 30 times. If it is greater than 30, it is determined that the DR_ON state has continued for 30 times, and the processes of S47 to S49 are carried out, but if it is less, the processes of S47 to S49 are skipped and the process proceeds to S50. The upper limit of Number_DR_n is set to 30 here, but it may be freely set to 15 or 60 according to the wishes of the resident or facility manager. However, it cannot be changed during the operation of the processing loop of FIG. 4. In step S47, the DR instruction DrOrder(i) is set to DR_off. That is, the air conditioning system that has had DR_on for 30 or more consecutive times is changed to DR_off. The set value is recorded in the air conditioning instruction table 64. In step S48, the total building power value P_k_sum is corrected by adding the difference Δp between the predicted value P_DR_on of the power consumption of the air conditioning system when DR_on and the predicted value P_DR_off of the power consumption of the air conditioning system when DR_off. In step S49, the operation mode continuation count Number_DR_n(i) is reset to zero. In step S50, i is incremented by 1 and the process returns to S45.

[0052] In step S51, the target power P_target is compared with the total building power value P_k_sum corrected by the processing of S45 to S50, and if P_k_sum is smaller, the process proceeds to step S52, where an instruction to increase power is issued, and if P_target is larger, the process proceeds to step S59, where an instruction to reduce power is issued. The operations in steps S52 to S58 are similar to those in steps S24 to S29 in the first embodiment shown in FIG.

[0053] The operation of steps S59 to S65 is the same as steps S30 to S36 of the first embodiment shown in Figure 5, but here, instead of air conditioning instruction table 64, air conditioning instruction table B (second air conditioning instruction table) 64 prepared separately from air conditioning instruction table 64 is used. An example of air conditioning instruction table B 64 is shown in Figure 15. In Figure 15, only the "Num" value, which means an unset state, is entered in DR_Order, but this is an initial example when the loop processing of steps S61 to S65 begins. After the loop processing of steps S61 to S65 ends, DR_on is input to some air conditioning systems as necessary.

[0054] When the processing loop in Fig. 4 runs at a one-minute cycle, the value 30 of the operation mode continuation count Number_DR_n in the air conditioning power history table 62 shown in Fig. 13 corresponds to 30 minutes. If DR_on continues for a long period of time, the temperature environment in the room where the air conditioning system is installed will become hot in cooling mode and cold in heating mode, resulting in a significant deterioration in comfort for the occupants. Therefore, by limiting the length of time that DR_on continues in this way, this embodiment has the effect of reducing the impact on the occupants.

[0055] According to this embodiment, when the low power consumption control mode DR_on continues for a predetermined period of time or more, the control mode DR_off is switched to the high power consumption control mode, so that the deterioration of comfort for the occupants is minimal and the impact on the occupants can be reduced. EXAMPLES

[0056] Fig. 16 shows a functional configuration diagram of an air conditioning control system 1 of Example 3. Compared to the functional configuration diagram of Example 1 shown in Fig. 1, an air conditioning power prediction table correction unit 58 is added.

[0057] A connection configuration diagram of various systems related to this embodiment is similar to that of Fig. 2 of embodiment 1. A hardware configuration diagram of an air conditioning control system 1 in this embodiment is similar to that of Fig. 3 of embodiment 1. Examples of the reference value table 60, total power history table 61, air conditioning power history table 62, air conditioning power prediction table 63, and air conditioning instruction table 64 in this embodiment are similar to those in the first embodiment shown in Figs. In this embodiment, the operation of the air conditioning control system 1 after the predetermined demand response start time is reached is the same as that in the flowchart of the first embodiment shown in Fig. 4. Also, the method of calculating the air conditioner instructions is the same as that in the flowchart of the first embodiment shown in Fig. 5.

[0058] In this embodiment, air conditioning power prediction table correction section 58 performs the operations shown in Figs. 17 and 18 at a time prior to a predetermined demand response start time.

[0059] FIG. 17 is a diagram showing the total reduced power of all air conditioners when the air conditioning power prediction table correction unit 58 is operating and after the start of demand response, and the changes over time in the reduction instructions for each air conditioning system when the air conditioning system number is odd and even.

[0060] FIG. 18 is a flowchart showing the air conditioning power prediction table correction performed by the air conditioning power prediction table correcting unit 58. In S61, it is determined whether the time for correcting the air conditioning power prediction table has arrived, and if so, the process proceeds to S62. In S62, a DR_on command is issued to the odd-numbered air conditioning systems and a DR_off command is issued to the even-numbered air conditioning systems. In S64, it is determined whether one minute has passed, and in S65, it is determined whether ten minutes have passed, and S63 to S65 are repeated until ten minutes have passed. In S66, a DR_off command is issued to the odd-numbered air conditioning systems, and a DR_on command is issued to the even-numbered air conditioning systems. In S68, it is determined whether one minute has passed, and in S69, it is determined whether ten minutes have passed, and S67 to S69 are repeated until ten minutes have passed.

[0061] That is, 45 minutes before the demand response start time, the air conditioning power prediction table correction unit 58 issues a DR_on command to air conditioners with odd-numbered air conditioning system numbers and a DR_off command to even-numbered air conditioners. As a result, half of the air conditioners are in the DR_on state, and the total power reduction amount of all the air conditioners indicates half the maximum power reduction. Thereafter, the power status of each air conditioner is monitored at one-minute intervals, and the air conditioning power history table 62 is updated. After 15 minutes have passed since the previous command, a DR_off command is issued to air conditioners with odd-numbered air conditioning system numbers and a DR_on command is issued to even-numbered air conditioners. Thereafter, the power status of each air conditioner is monitored at one-minute intervals, and the air conditioning power history table 62 is updated.

[0062] The above operation updates the air conditioning power history table for all air conditioners when DR_on and DR_off are set, and it is expected that the accuracy of the demand response to be executed thereafter will be improved. The reason for allocating half of the air conditioners to DR_on and DR_off is to reduce the deterioration of comfort in the place where the air conditioners are installed, compared to when all the air conditioners are set to DR_on or DR_off at once. For example, when two or more air conditioning systems are installed in one room, the comfort of the entire room will deteriorate if DR_on is set at the same time, but if only half of them are set to DR_on, the degree of deterioration will be half of the former. There is also a method of grasping the installation environment of the air conditioners and issuing instructions individually, but the processing becomes complicated. The method of this embodiment is simpler.

[0063] When 15 minutes have passed since the second instruction, the air conditioning power prediction table correction unit 58 ends the flow of air conditioning power prediction table correction in FIG. 18, and executes preliminary operation until the demand response start time. FIG. 19 shows a flowchart of the preliminary operation. Basically, the operation is the same as the operations S1 to S8 in FIG. 4, but in S88, which corresponds to S8, the end condition of the cycle is determined based on whether the demand response start time has been reached. The effect of the preliminary operation is that the target power can be stably maintained at the start of the demand response. If the target power is changed significantly, it takes several minutes for the power to stabilize, so it is preferable to have a preliminary operation as in this embodiment.

[0064] It should be noted that the start time in FIG. 18, the time for switching between DR_on and DR_off, and the time for the preparatory operation do not necessarily have to be the values ​​mentioned above, and may be freely designed by the designer.

[0065] According to this embodiment, the power status of each air conditioner is monitored and the air conditioning power history is updated prior to the start of demand response, thereby improving the operational accuracy of the demand response that is subsequently executed. Also, by allocating half of the air conditioners to DR_on and half to DR_off, it is possible to reduce the deterioration of comfort in the areas where the air conditioners are installed. EXAMPLES

[0066] The functional configuration diagram, connection configuration diagram, and hardware configuration diagram of the air-conditioning control system of the fourth embodiment are similar to those of the first embodiment shown in Figs. Examples of the reference value table 60, total power history table 61, air conditioning power prediction table 63, and air conditioning instruction table 64 in this embodiment are similar to those in the first embodiment shown in FIGS. 6 to 7 and FIGS. 9 to 10, respectively.

[0067] In this embodiment, the operation of the air conditioning control system 1 after it reaches a predetermined demand response start time is almost the same as the flowchart of the first embodiment shown in Figure 4. Also, the calculation method of the air conditioner instructions is almost the same as the flowchart of the first embodiment shown in Figure 5. Specific differences will be explained below.

[0068] FIG. 20 shows an example of the air conditioning power history table 62 in this embodiment. In this embodiment, the air conditioning power history table is stored in association with the outside air temperature of the location where each air conditioning system is installed. The outside air temperature is acquired from each air conditioning system when collecting the air conditioning operation state in step S4 of FIG. 4. In addition, in step S4, when calculating the predicted value of power consumption, the newly acquired power consumption and the most recent data of the same outside air temperature recorded in the air conditioning power history table 62 are averaged over several minutes, for example, 5 minutes, of the power consumption in the same DR operation mode M_DR_n, and written as a prediction of power consumption corresponding to the value of the DR operation mode M_DR_n of each air conditioning system in the air conditioning power prediction table 63.

[0069] If there is no information on the relevant outdoor temperature, the calculation may be made by extrapolating or interpolating from the data on the temperatures before and after. Also, if information other than the outdoor temperature that may affect the air conditioning power consumption, such as the day of the week, time, whether it is a holiday or weekday, and the number of people in the room, is available, the predicted power consumption value may be calculated in relation to some or all of these.

[0070] Because the power consumption of an air conditioner is greatly affected by factors such as the outside temperature, the method of this embodiment, which uses this information to calculate a predicted power consumption value, has the advantage of providing a more accurate power consumption prediction than if this information is not used.

[0071] According to this embodiment, since the power consumption of an air conditioner is significantly affected by factors such as the outside temperature, the predicted power consumption value can be calculated using this information, thereby improving the accuracy of the power consumption prediction.

[0072] The present invention is not limited to the above-mentioned embodiment, but includes various modified examples. For example, the above-mentioned embodiment describes the configuration in detail to easily explain the present invention, and the present invention is not necessarily limited to the configuration including all the described configurations. Also, it is possible to add, delete, or replace a part of the configuration of each embodiment with another configuration. [Explanation of symbols]

[0073] 1. Air conditioning control system 2. Aggregation coordinator system 5,6…Building 51...Transmitter / receiver 52...Operation Command Creation Department 53...Reference value creation section 54…Power information acquisition unit 55…Air conditioning system information acquisition section 56...Operation command transmission unit 57...Storage section 58...Air conditioning power prediction table correction section 60...Reference value table 61…Total Power History Table 62…Air conditioning power history table 63…Air conditioning power consumption forecast table 64…Air conditioning control table 65…Air conditioning instruction table B

Claims

1. In an air conditioning control system that controls multiple air conditioning systems consisting of outdoor units and indoor units, a transceiver unit that receives from an external device a supply and demand adjustment instruction value and a designated time for a total power consumption of one or more consumer facilities including the air conditioning system; A power information acquisition unit that acquires current power information of each customer facility; an air conditioning system information acquisition unit that acquires power information of each air conditioning system; an operation command transmission unit that transmits a demand response command to each air conditioning system for either a first operation mode with low power consumption or a second operation mode with high power consumption; A storage unit that stores a history of actual power consumption in two operation modes of each air conditioning system; an operation command creation unit that creates, when a total power consumption of each consumer facility deviates from a target power value calculated from the supply and demand adjustment command value, the demand response command for switching between the two operation modes in order from an air conditioning system having a largest difference in power consumption between the two operation modes of each air conditioning system based on a history of power consumption in the two operation modes of each air conditioning system, until the total power consumption of each consumer facility substantially matches the target power value; Equipped with The operation command transmission unit transmits a demand response instruction to each air conditioning system only when the demand response instruction is an instruction to switch an operation mode.

2. In the air conditioning control system according to claim 1, an operation command creation unit that issues an instruction to change to a second operation mode when a first operation mode continues for a predetermined period of time or longer in an air conditioning system, and thereafter does not issue an instruction to the air conditioning system to switch to the first operation mode for a predetermined period of time.

3. In the air conditioning control system according to claim 1, The air conditioning system information acquisition unit acquires actual power consumption information corresponding to the two operation modes of each air conditioning system, the storage unit stores the acquired power consumption record information in an air conditioning power history table in association with each operation mode of each air conditioning system; an operation command creation unit that creates, based on the stored performance information, a demand response instruction for instructing a first operation mode and a second operation mode so that the total power consumption approximately matches the target total power consumption within a range that does not exceed the target total power consumption when the total power of each air conditioning system is smaller than a target total power consumption and when the total power of each air conditioning system is greater than the target total power consumption, based on the stored performance information.

4. In the air conditioning control system according to claim 1, the operation command creation unit sets a first operation mode for a part of each air conditioning system and a second operation mode for the other air conditioning systems at a time prior to a preset start time at which the target power must be maintained; The air conditioning system information acquisition unit acquires power consumption of each air conditioning system before a start time, an air conditioning control system, characterized in that the storage unit updates the stored air conditioning power history table based on the acquired power consumption of each air conditioning system.

5. In the air conditioning control system according to claim 1, The power consumption history stored in the storage unit stores actual power consumption values ​​in association with outdoor air temperatures at locations where each air conditioning system is located; The air conditioning control system according to claim 1, wherein the operation command creation unit creates the demand response command based on a predicted value of power consumption predicted from the outside air temperature and an actual power consumption value.

6. 2. The air conditioning control system according to claim 1, An air conditioning control system according to claim 1, wherein the target power value is calculated based on a supply and demand adjustment instruction value as well as an average value of the total power of each customer facility in a specified time segment.

7. An air conditioning control method for receiving a supply and demand adjustment instruction value for a total power consumption of one or more consumer facilities, transmitting a demand response instruction for either a first operation mode with low power consumption or a second operation mode with high power consumption, and controlling a plurality of air conditioning systems each consisting of an outdoor unit and an indoor unit, comprising: acquiring and updating a supply and demand adjustment instruction value from an external source; calculating a target power value based on the supply and demand adjustment instruction value; collecting values ​​of power consumed in customer facilities in which each air conditioning system is installed and calculating a total power value; obtaining the operation mode and power consumption of each air conditioning system and updating an air conditioning power history table; when the total power value of each of the consumer facilities deviates from the target power value, storing in an air conditioning instruction table a demand response instruction for switching operation modes in order from the air conditioning system having the largest difference in power consumption between the two operation modes of each of the air conditioning systems based on the air conditioning power history table until the total power value of each of the consumer facilities approximately matches the target power value; reading out a demand response instruction for each air conditioning system from the air conditioning instruction table, and transmitting the demand response instruction to each air conditioning system only when the demand response instruction is an instruction to switch an operation mode; An air conditioning control method comprising:

8. The air conditioning control method according to claim 7, an air conditioning control method comprising: in the step of storing in the air conditioning instruction table, if a first operation mode continues for a predetermined period of time or more in a certain air conditioning system, storing a demand response instruction to change to a second operation mode, and thereafter not storing a demand response instruction to change to the first operation mode for that air conditioning system for a predetermined period of time.

9. The air conditioning control method according to claim 7, At a time before a preset start time at which the target power must be maintained, a first operation mode is set for a part of each air conditioning system and a second operation mode is set for the other air conditioning systems; Obtain the power consumption corresponding to each operating mode of each air conditioning system, An air conditioning control method comprising the step of updating the air conditioning power history table.

10. an aggregation coordinator system that transmits a supply and demand adjustment instruction value and a designated time; an air conditioning control system that receives a supply and demand adjustment instruction value and a designated time from the aggregation coordinator system, and transmits a demand response instruction to one or more customer facilities having air conditioning systems, thereby controlling a plurality of air conditioning systems of the customer facilities; A system comprising: The air conditioning control system includes: a transceiver unit that receives, from the aggregation coordinator system, a supply and demand adjustment instruction value and a designated time for the total power consumption of one or more consumer facilities including the air conditioning system; A power information acquisition unit that acquires current power information of each customer facility; an air conditioning system information acquisition unit that acquires power information of each air conditioning system; an operation command transmission unit that transmits a demand response command to each air conditioning system for either a first operation mode with low power consumption or a second operation mode with high power consumption; A storage unit that stores a history of actual power consumption in two operation modes of each air conditioning system; an operation command creation unit that creates the demand response command to switch between the two operation modes of each air conditioning system in descending order of a difference in power consumption between the two operation modes of each air conditioning system, in the case where the total power consumption of each consumer facility deviates from a target power value calculated from the supply and demand adjustment command value, based on a history of power consumption in the two operation modes of each air conditioning system, until the total power consumption of each consumer facility approximately matches the target power value; Equipped with The operation command transmission unit transmits a demand response command to each air conditioning system only when the demand response command is a command to switch an operation mode. system.

Citation Information

Patent Citations

  • Energy management device and energy management method

    JP2015154595A

  • Energy management system and energy management method

    JP2016214084A

  • Management device for plural air conditioners

    JP2016217599A

  • Demand controller

    JP2017131074A

  • Control device, air conditioner, air conditioning system, control method and program

    JP2020124062A