Bandwidth allocation device, subscriber line terminal device, and bandwidth allocation method

By implementing a pre-REPORT GAP to allow additional processing time for ONUs without a transmission reservation queue, the OLT ensures timely REPORT frame transmission, addressing the challenge of delayed data transmission and enhancing band utilization efficiency in PON systems.

JP7557159B2Active Publication Date: 2024-09-27NIPPON TELEGRAPH & TELEPHONE CORP
View PDF 5 Cites 0 Cited by

Patent Information

Application Number
JP2023529362
Authority / Receiving Office
JP · JP
Patent Type
Patents
Current Assignee / Owner
Filing Date
2021-06-24
Publication Date
2024-09-27
Estimated Expiration
2041-06-24

AI Technical Summary

Technical Problem

In PON systems, ONUs without a transmission reservation queue face challenges in completing data transmission and calculation processes within the required time frame, leading to delayed or incomplete REPORT frame transmissions, which can prevent uplink data transmission.

Method used

The OLT secures a pre-REPORT GAP to allow sufficient time for ONUs without a transmission reservation queue to complete data grant transmission reservation and REPORT calculations, ensuring timely transmission of REPORT frames.

Benefits of technology

This approach enables uplink data transmission even for ONUs without a transmission reservation queue, improving band utilization efficiency and ensuring seamless communication in PON systems.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 0007557159000009
    Figure 0007557159000009
  • Figure 0007557159000010
    Figure 0007557159000010
  • Figure 0007557159000008
    Figure 0007557159000008
Patent Text Reader

Abstract

According to the present invention, a bandwidth allocation device comprises a detection unit and a setting unit. The detection unit detects connection to a passive optical network by a subscriber line terminal device that does not have a transmission reservation queue for making uplink data that has been cleared to be transmitted stand by until a transmission start time. The setting unit sets a calculation time for the subscriber line terminal device within an operation period for uplink bandwidth control between the subscriber line terminal device and a subscriber line termination device, the calculation time being the time needed for calculation of the amount of uplink data that is to be transmitted of the amount of uplink data that has been cleared to be transmitted and calculation of the amount of uplink data that is to be requested to be transmitted.
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present invention relates to a bandwidth allocation device, a subscriber line termination device, and a bandwidth allocation method. [Background technology]

[0002] In response to the growing need for faster access services, FTTH (Fiber To The Home) has become widespread worldwide. In Japan, the main FTTH services include GE-PON (Gigabit Ethernet PON) and 10G-EPON (10 Gigabit Ethernet PON), which realize gigabit-class transmission speeds.

[0003] In GE-PON and 10G-EPON, TDMA (Time Division Multiple Access) technology is used for upstream communications from ONU to OLT. In addition, one of the functions required for GE-PON and 10G-EPON to operate as a system is the DBA (Dynamic Bandwidth Allocation) function. The DBA function is a bandwidth control function that dynamically allocates bandwidth for upstream communications according to the amount of traffic. The DBA function realizes efficient upstream bandwidth without generating unused bandwidth by appropriately switching the allocated bandwidth according to the status of the upstream communication traffic flowing to each ONU. [Prior art documents] [Patent documents]

[0004] [Patent Document 1] JP 2003-087283 A Summary of the Invention [Problem to be solved by the invention]

[0005] In the DBA function, the OLT uses a GATE frame to indicate the start time and amount of upstream data transmission so that each ONU can transmit upstream data without time collisions. Meanwhile, each ONU uses a REPORT frame to inform the OLT of the amount of upstream data waiting to be transmitted that is stored in its own buffer. The DBA function is realized by this exchange using the GATE and REPORT frames.

[0006] In upstream communication, if the interval between the end of data transmission and the start time of the REPORT frame transmission is short, the ONU must calculate the amount of data to be written in the REPORT frame during data transmission in the transmission reservation queue, which keeps the upstream data permitted to be transmitted waiting until the transmission start time. However, there may be ONUs that do not have a transmission reservation queue. An ONU that does not have a transmission reservation queue calculates the amount of reserved data permitted to be transmitted by the OLT and the remaining amount of data (i.e., the amount of upstream data waiting for a transmission request) in a normal queue, excluding the amount of reserved data from the accumulated data amount.

[0007] However, in an ONU that does not have a transmission reservation queue, data transmission and the above two calculations (i.e., calculation of the amount of data reserved for transmission and calculation of the amount of data waiting for transmission requests) must be processed sequentially, so it takes time to complete the calculations, and there is a possibility that the calculations will not be completed in time for the start time of the transmission of the REPORT frame. In this case, since the REPORT frame is not transmitted from the ONU, the OLT cannot give permission to transmit upstream data. This causes a problem that the ONU may not be able to transmit upstream data.

[0008] In view of the above circumstances, the present invention aims to provide a bandwidth allocation device, a subscriber line terminal device, and a bandwidth allocation method that enable upstream data transmission in a PON system even if the PON system includes an ONU that does not have a transmission reservation queue. [Means for solving the problem]

[0009] One aspect of the present invention is a bandwidth allocation device that includes a detection unit that detects that a subscriber line termination device that does not have a transmission reservation queue for waiting upstream data that has been permitted to be transmitted until a transmission start time has been connected to a passive optical network, and a setting unit that sets a calculation time, which is the time required for the subscriber line termination device to calculate the amount of upstream data to be transmitted out of the amount of upstream data that has been permitted to be transmitted, and to calculate the amount of upstream data to be requested to be transmitted, during an operation period of upstream bandwidth control between the subscriber line termination device and a subscriber line terminal device.

[0010] One aspect of the present invention is a bandwidth allocation device that includes an acquisition unit that acquires identification information that identifies a subscriber line terminal connected to a passive optical network, a judgment unit that judges based on the identification information whether the subscriber line terminal has a transmission reservation queue that keeps upstream data that has been permitted to be transmitted waiting until a transmission start time, and a setting change unit that, if it is determined that the subscriber line terminal does not have the transmission reservation queue, provides a predetermined calculation time between operating periods of upstream bandwidth control in the passive optical network.

[0011] One aspect of the present invention is a subscriber line terminal device comprising: a detection unit that detects that a subscriber line termination device that does not have a transmission reservation queue for keeping upstream data permitted to be transmitted waiting until the transmission start time is connected to a passive optical network; a setting unit that sets a calculation time during an operation period of upstream bandwidth control between the subscriber line termination device and the device itself, which is the time required for the subscriber line termination device to calculate the amount of upstream data to be transmitted out of the amount of upstream data permitted to be transmitted and to calculate the amount of upstream data to be requested to be transmitted; and a transmission / reception unit that transmits and receives data to and from the subscriber line termination device.

[0012] One aspect of the present invention is a subscriber line terminal device comprising: an acquisition unit that acquires identification information that identifies a subscriber line terminal connected to a passive optical network; a judgment unit that determines based on the identification information whether the subscriber line terminal device has a transmission reservation queue that keeps upstream data that has been permitted to be transmitted waiting until a transmission start time; a setting change unit that, if it is determined that the subscriber line terminal device does not have the transmission reservation queue, provides a predetermined calculation time between operating periods of upstream bandwidth control in the passive optical network; and a transmission / reception unit that transmits and receives data to and from the subscriber line terminal device.

[0013] One aspect of the present invention is a bandwidth allocation method having a detection step of detecting that a subscriber line termination device that does not have a transmission reservation queue for keeping upstream data permitted to be transmitted waiting until a transmission start time has been connected to a passive optical network, and a setting step of setting a calculation time, which is the time required for the subscriber line termination device to calculate the amount of upstream data to be transmitted out of the amount of upstream data permitted to be transmitted and the amount of upstream data to be requested to be transmitted, during an operation period of upstream bandwidth control between the subscriber line termination device and a subscriber line terminal device.

[0014] One aspect of the present invention is a bandwidth allocation method comprising: an acquisition step of acquiring identification information that identifies a subscriber line terminal connected to a passive optical network; a determination step of determining, based on the identification information, whether the subscriber line terminal has a transmission reservation queue that keeps upstream data that has been permitted to be transmitted waiting until a transmission start time; and a setting change step of setting a predetermined calculation time between operating periods of upstream bandwidth control in the passive optical network if it is determined that the subscriber line terminal does not have the transmission reservation queue. Effect of the Invention

[0015] According to the present invention, even if a PON system includes an ONU that does not have a transmission reservation queue, it is possible to transmit upstream data and improve the utilization efficiency of the bandwidth. [Brief description of the drawings]

[0016] [Figure 1] FIG. 1 is a block diagram showing the configuration of a typical PON. [Diagram 2] 13 is a diagram showing a flow of transmission of upstream data when there is only one ONU 20. FIG. [Diagram 3] 13 is a diagram showing a flow of upstream data transmission when there are two ONUs 20. FIG. [Figure 4] 11 is a schematic diagram for explaining a change in the amount of accumulated upstream data. FIG. [Diagram 5] FIG. 1 is a schematic diagram illustrating an example of the configuration of a granted queue. [Figure 6] 1 is a diagram showing a flow of upstream data transmission by PON1 in an embodiment of the present invention. [Figure 7] FIG. 1 is a diagram showing a flow of upstream data transmission by a conventional PON. [Figure 8] 2 is a block diagram showing a functional configuration of an OLT 10 according to an embodiment of the present invention. [Figure 9] FIG. 2 is a diagram showing an example of the configuration of a pre-REPORT GAP database 105. [Figure 10] 4 is a flowchart showing an operation of the OLT 1 ​​in the embodiment of the present invention. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0017] Hereinafter, an embodiment of the present invention will be described in detail with reference to the drawings.

[0018] PON (Passive Optical Network) is an optical access system that provides FTTH services at high speed and low cost. PON does not perform optical-electrical conversion, but splits optical signals into multiple signals using an optical splitter, which is a low-cost passive element. This allows multiple users to share a single optical fiber, making it possible to realize an economical network. The main FTTH services in Japan include, for example, GE-PON, which achieves gigabit-class transmission speeds, and 10G-EPON, which has 10 times the bandwidth of GE-PON.

[0019] Fig. 1 is a block diagram showing the configuration of a typical PON. As shown in Fig. 1, the PON 1 includes an OLT (Optical Line Terminal) 10, a plurality of (n in Fig. 1) ONUs (Optical Network Units) 20, an optical fiber 30, and an optical splitter 40.

[0020] The OLT 10 is installed in a telecommunications carrier's office, and the ONU 20 is installed in a user's home or premises. An optical fiber 30 is laid between the telecommunications carrier's office and the user's home or premises, and an optical splitter 40 branches the optical fiber 30. By installing the optical splitter 40 that multiplexes and splits optical signals between the OLT 10 and the ONU 20, multiple ONUs 20 are connected to one OLT 10.

[0021] The ONU 20 is responsible for converting optical signals from the OLT 10 into electrical signals, and for converting electrical signals from user terminal devices (e.g., PCs, etc.) into optical signals and transferring them to the OLT 10. The OLT 10 is responsible for transferring optical signals from the ONU 20 to a higher-level device / network (e.g., the Internet, etc.), transferring signals from the higher-level device / network to the ONU 20, and controlling and monitoring the PON section and the ONU 20.

[0022] In the PON1, TDM (Time Division Multiplexing) technology is used for communication from the OLT 10 to the ONU 20 (hereinafter referred to as "downstream communication"). TDM is a technology that multiplexes and transmits signals from multiple users so that they do not overlap in time.

[0023] In downstream communication, the same signal (hereinafter referred to as "downstream signal") is split by the optical splitter 40 and transferred to all ONUs 20 connected to the same OLT 10. Therefore, data other than data addressed to each ONU 20 is also transferred to each ONU 20. Therefore, each ONU 20 extracts only the data addressed to itself from the transferred data, and discards the other data (addressed to other ONUs 20).

[0024] Furthermore, in the PON1, TDMA technology is used for communication from the ONU 20 to the OLT 10 (hereinafter referred to as "upstream communication"). In upstream communication, signals from multiple ONUs 20 (hereinafter referred to as "upstream signals") are multiplexed by the optical splitter 40. Therefore, if the upstream signals from each ONU 20 are transmitted in a disorderly manner, there is a possibility that collisions will occur on the transmission path. Therefore, TDMA controls the transmission timing of the upstream signals from the ONU 20 and the transmission amount of the upstream data, so that the upstream signals from each ONU 20 are multiplexed without colliding on the transmission path.

[0025] The DBA function is one of the functions required for GE-PON and 10G-EPON to operate as a system. The DBA function is a bandwidth control function that dynamically allocates the bandwidth for upstream communication (hereinafter referred to as "upstream bandwidth") according to the amount of traffic. The DBA function can flexibly allocate the upstream bandwidth according to the upstream communication traffic (hereinafter referred to as "upstream traffic") from each ONU 20. The DBA function allocates the upstream bandwidth only to ONUs 20 through which upstream traffic is flowing, so that the upstream bandwidth can be used without waste. The DBA function appropriately switches the allocated bandwidth according to the status of the upstream traffic flowing through each ONU 20, thereby realizing efficient upstream bandwidth without generating unused bandwidth.

[0026] GE-PON and 10G-EPON use a protocol called MPCP (Multi Point Control Protocol) to control upstream signals. The OLT 10 uses a GATE frame to instruct each ONU 20 on the start time and amount of transmission so that each ONU 20 can transmit upstream signals without collisions.

[0027] Meanwhile, each ONU 20 notifies the OLT 10 by a REPORT frame of the amount of upstream data waiting to be transmitted that is stored in the buffer of the own ONU 20. The DBA function is realized by using the GATE frame and the REPORT frame.

[0028] Below is a brief explanation of how the DBA function works. When the ONU 20 receives upstream data, it first stores the upstream data in a buffer. The ONU 20 records the amount of stored upstream data in a REPORT frame and transmits the REPORT frame to the OLT 10.

[0029] From the received REPORT frame, OLT 10 ascertains the amount of upstream data stored in ONU 20. OLT 10 calculates the upstream bandwidth to be allocated to ONU 20 based on the amount of stored data in that ONU 20 and the bandwidths used by other ONUs 20. Specifically, OLT 10 calculates the transmission start time and transmission amount of upstream data of ONU 20. OLT 10 writes the calculated value in a GATE frame and transmits the GATE frame to ONU 20.

[0030] The ONU 20 transmits the upstream data at the specified transmission time according to the instructions written in the received GATE frame. At this time, the ONU 20 may notify the amount of upstream data stored in the buffer again for the next allocation of upstream bandwidth.

[0031] By repeating the above procedure, the OLT 10 can know the upstream traffic conditions in each ONU 20, and can appropriately allocate the upstream bandwidth according to the conditions.

[0032] In such upstream communication, if the interval between the transmission of the upstream data and the start time of transmitting the REPORT frame is short, it is desirable for ONU 20 to have a transmission reservation queue (hereinafter referred to as the "granted queue"), because in this case, ONU 20 can calculate the amount of data to be written in the REPORT frame (hereinafter referred to as the "REPORT calculation") in parallel while transmitting data from the granted queue.

[0033] However, there may be cases where there are ONUs 20 that do not have a granted queue. For example, the PON 1 may accommodate a mixture of ONUs 20 that have a granted queue and ONUs 20 that do not have a granted queue.

[0034] An ONU 20 that does not have a granted queue will calculate the amount of upstream data reserved for transmission (granted) based on the DATA grant of the GATE frame transmitted from the OLT 10 in a normal queue (for example, a priority queue), and will calculate (REPORT calculation) the amount of upstream data remaining excluding the amount of upstream data reserved for transmission (granted) (i.e., the amount of upstream data waiting for a transmission request). The Data grant indicates the amount of upstream data permitted to be transmitted by the OLT 10.

[0035] However, in an ONU 20 that does not have a granted queue, it takes time to complete the above REPORT calculations etc. due to sequential processing, and there is a possibility that the REPORT calculations will not be completed in time for the REPORT frame transmission start time. Sequential processing here means sequential processing of data transmission, calculation of the amount of data reserved for transmission, and calculation of the amount of data waiting for transmission requests. In this case, the ONU 20 cannot inform the OLT 10 of the amount of upstream data accumulated. As a result, the OLT 10 cannot grant the ONU 20 permission to transmit upstream data, and the ONU 20 may not be able to transmit upstream data.

[0036] The OLT 10 in this embodiment described below provides a vacant time (hereinafter referred to as "pre-REPORT GAP") between operation cycles of the upstream bandwidth control to ensure the time required for the ONU 20 to calculate the transmission reservation of the DATA grant and the amount of upstream data waiting for transmission requests. This allows the OLT 10 in this embodiment to complete these calculations in time for the transmission start time of the REPORT frame.

[0037] By providing the pre-REPORT GAP in this way, even if the ONU 20 does not have a granted queue, the completion of the REPORT calculation and the like can be completed in time for the transmission timing of the REPORT frame. Therefore, upstream communication becomes possible. Furthermore, according to the OLT 10 in this embodiment, even if the ONU 20 with the granted queue and the ONU 20 without the granted queue are mixed, the upstream communication becomes possible.

[0038] The flow of transmission of upstream data will be described below. For ease of understanding, a case where there is only one ONU 20 will be described first. Fig. 2 is a diagram showing the flow of transmission of upstream data when there is only one ONU 20.

[0039] The OLT 10 transmits, for example, a GATE frame g1 as shown in Fig. 2 to the ONU 20. The GATE frame g1 includes a Report block and a Data block.

[0040] 2, for example, the Report block of the GATE frame g1 describes "Grant length: ▲1TQ." This means that the OLT 10 instructs the ONU 20 to allow ▲1TQ to transmit the REPORT frame. The ONU 20 transmits the REPORT frame to the OLT 10 during the allowed transmission time ▲1TQ, in accordance with the instruction written in the GATE frame g1.

[0041] 2, for example, the Data block of the GATE frame g1 describes "Grant length: 01TQ." This means that the OLT 10 instructs the ONU 20 to allow 01TQ of transmission time for DATA (upstream data). The ONU 20 transmits DATA (upstream data) to the OLT 10 during the allowed transmission time of 01TQ, in accordance with the instruction described in the GATE frame g1.

[0042] 2, while DATA (upstream data) is being transmitted from the ONU 20 to the OLT 10 based on an instruction from the GATE frame g1, the OLT 10 transmits a GATE frame g2 to the ONU 20. The GATE frame g2 also includes a Report block and a Data block.

[0043] 2, for example, the Report block of GATE frame g2 describes "Grant length: ▲2TQ." This means that OLT 10 instructs ONU 20 to allow ▲2TQ to transmit the REPORT frame. ONU 20 transmits the REPORT frame to OLT 10 during the allowed transmission time ▲2TQ in accordance with the instruction written in GATE frame g2.

[0044] 2, for example, the Data block of the GATE frame g2 describes "Grant length: 02TQ." This means that the OLT 10 instructs the ONU 20 to allow 02TQ of transmission time for DATA (upstream data). The ONU 20 transmits DATA (upstream data) to the OLT 10 during the allowed transmission time of 02TQ, in accordance with the instruction described in the GATE frame g2.

[0045] Next, a description will be given of the flow of upstream data transmission when there are two ONUs 20. Fig. 3 is a diagram showing the flow of upstream data transmission when there are two ONUs 20. The flow of upstream data transmission when there are three or more ONUs 20 is basically the same as the flow of upstream data transmission shown in Fig. 3.

[0046] 3, it is assumed here that two ONUs 20 ("ONU#1" and "ONU#2") are connected to the OLT 10. The OLT 10 receives a transmission request message (REPORT frame) transmitted from ONU#1 and a transmission request message (REPORT frame) transmitted from ONU#2 together ((1) in FIG. 3).

[0047] In response to receiving the transmission request messages (REPORT frames) from ONU#1 and ONU#2, OLT 10 transmits transmission permission messages (GATE frames) to ONU#1 and ONU#2 together ((2) in FIG. 3).

[0048] Specifically, OLT 10 grasps the amount of upstream data stored in ONU#1 from a transmission request message (REPORT frame) received from ONU#1. OLT 10 determines the transmission start time and transmission amount of upstream data to be transmitted by ONU#1 in the next operating cycle based on the grasped data amount. OLT 10 writes the determined transmission start time and transmission amount of upstream data in ONU#1 in a transmission permission message (GATE frame).

[0049] Furthermore, OLT 10 grasps the amount of upstream data stored in ONU#2 from a transmission request message (REPORT frame) received from ONU#2. Based on the grasped data amount, OLT 10 determines the transmission start time and transmission amount of the upstream data to be transmitted by ONU#2 in the next operating cycle. OLT 10 writes the determined transmission start time and transmission amount of the upstream data in ONU#2 in a transmission permission message (GATE frame).

[0050] 3, the OLT 10 transmits the generated clear to send messages (GATE frames) to the ONUs #1 and #2 in a batch. The ONUs #1 and #2 each receive the clear to send messages (GATE frames) transmitted from the OLT 10.

[0051] From the contents described in the transmission permission message (GATE frame), ONU#1 and ONU#2 recognize the transmission start time and transmission amount of upstream data specified for their own ONU 20. ONU#1 and ONU#2 each transmit upstream data of the transmission amount specified by the transmission permission message (GATE frame) to OLT 10 at the transmission start time of the upstream data specified by the transmission permission message (GATE frame) ((3) in FIG. 3).

[0052] The following describes changes in the amount of upstream data stored in the queue of the ONU 20. Fig. 4 is a schematic diagram for explaining changes in the amount of stored upstream data.

[0053] As shown in Fig. 4, which will be described below, there are cases where the ONU 20 does not have a granted queue (transmission reservation queue). Fig. 5 is a schematic diagram showing an example of the configuration of a granted queue. As shown in Fig. 5, for example, the upstream data stored in queue #p and the upstream data stored in queue #q are sequentially transferred to the granted queue (transmission reservation queue) under appropriate control by the scheduler.

[0054] If the ONU 20 does not have a granted queue (transmission reservation queue), the ONU 20 cannot simultaneously process the transmission of the granted DATA and the above two calculations (i.e., the Data grant transmission reservation calculation and the REPORT calculation), and so performs sequential processing. This may result in the REPORT calculation not being completed in time for the transmission start time of the transmission request message (REPORT frame) specified by the Report grant of the transmission permission message (GATE frame).

[0055] If the REPORT calculation is not completed in time for the start time of the transmission of the transmission request message (REPORT frame), the transmission request message (REPORT frame) will not be transmitted from the ONU 20 to the OLT 10, and therefore no Data grant will be assigned in the next transmission permission message (GATE frame) transmitted from the OLT 10 to the ONU 20. This may result in the ONU 20 being unable to transmit upstream data.

[0056] Fig. 4 shows the amount of upstream data stored in the queue of ONU 20 at six points in time from time (a) to time (f). As shown in Fig. 4, it is assumed here that ONU 20 has two queues ("queue#p" and "queue#q"). Here, queue#p is a queue in which high-priority upstream data is stored, and queue#q is a queue in which low-priority upstream data is stored.

[0057] First, in the column for time point (a), queue#p shows the amount of upstream data for which a transmission request has been reported (reported) and, of that, the amount of upstream data for which transmission has been reserved (granted). Also, queue#q shows the amount of upstream data for which a transmission request has been reported (reported) and, of that, the amount of upstream data for which transmission has been reserved (granted).

[0058] The upstream data amount (reported) for which a transmission request has been reported here refers to the amount of upstream data that has already been reported by the ONU 20 to the OLT 10 by a transmission request message (REPORT frame). Also, the upstream data amount (granted) for which transmission has been reserved here refers to the amount of upstream data that has been granted transmission permission by a transmission permission message (GATE frame) transmitted from the OLT 10 to the ONU 20 in response to the above-mentioned transmission request message (REPORT frame).

[0059] The ONU 20 transmits the upstream data (granted DATA) of the data amount reserved for transmission to the OLT 10 at the transmission timing specified by the received transmission permission message (GATE frame). After that, the amount of the upstream data stored in queue #p and queue #q changes from the state at time (a) to the state at time (b) shown in FIG.

[0060] Next, in the column for time point (b), queue#p shows the amount of uplink data for which a transmission request has been reported (reported) and the amount of uplink data for which a transmission request has not yet been requested (i.e., the amount of newly added uplink data). Also, queue#q shows the amount of uplink data for which a transmission request has been reported (reported) and the amount of uplink data for which a transmission request has not yet been requested (i.e., the amount of newly added uplink data).

[0061] The amount of upstream data not requested for transmission here refers to the amount of upstream data that has newly occurred since the previous REPORT calculation was performed.

[0062] As shown in the column for time point (b) in Figure 4, the amount of upstream data (granted) that was reserved for transmission at time point (a) has been removed from queue #p and queue #q as the transmission of the upstream data to OLT 10 has been completed.

[0063] The ONU 20 calculates the amount of uplink data that can be transmitted in the relevant period in queue#p and queue#q (granted) from the amount of uplink data permitted to be transmitted (Data grant) written in the received transmission permission message (GATE frame), and reserves the amount of uplink data for transmission. The amount of uplink data stored in queue#p and queue#q changes from the state at time point (b) to the state at time point (c) shown in FIG. 4.

[0064] Next, in the column for time point (c), queue#p shows the amount of upstream data reserved for transmission (granted) and the amount of upstream data not requested for transmission (i.e., the amount of newly added upstream data). Also, queue#q shows the amount of upstream data reported for transmission requests (reported), and among that, the amount of upstream data reserved for transmission (granted) and the amount of upstream data not requested for transmission (i.e., the amount of newly added upstream data).

[0065] In addition, the time (c) column shows that, based on the amount of uplink data permitted to be transmitted (Data grant) written in the transmission permission message (GATE frame), the entire amount of uplink data for which a transmission request has been reported (Reported) shown in the time (b) column for queue#p has changed to the amount of uplink data for which transmission has been reserved (Granted). On the other hand, in the time (b) column for queue#q, a part of the amount of uplink data for which a transmission request has been reported (Reported) shown in the time (b) column has changed to the amount of uplink data for which transmission has been reserved (Granted).

[0066] That is, the column for time point (c) shows that for queue#p, which is a high-priority queue, all of the upstream data that has been requested to be sent has been reserved for transmission, but for queue#q, which is a low-priority queue, some of the upstream data that has been requested to be sent has not been reserved for transmission. This shows that the total amount of data (reported) of the upstream data for which a transmission request has been reported and that included in queue#p and the amount of data (reported) of the upstream data for which a transmission request has been reported and included in queue#q are greater than the amount of data (Data grant) of the upstream data that has been granted permission to be sent, which is written in the transmission permission message (GATE frame).

[0067] When the amount of upstream data reserved for transmission (granted) is determined, the ONU 20 calculates the amount of accumulated upstream data to be recorded in the next transmission request message (REPORT frame) (i.e., the amount of upstream data to be requested for transmission). The amount of upstream data accumulated in queue#p and queue#q changes from the state at time point (c) to the state at time point (d) shown in FIG. 4.

[0068] Next, in the column of time point (d), queue#p shows the amount of upstream data reserved for transmission (granted) and the amount of upstream data to be requested for transmission (i.e., the amount of upstream data waiting for transmission request). Queue#q also shows the amount of upstream data reserved for transmission (granted) and the amount of upstream data to be requested for transmission (i.e., the amount of upstream data waiting for transmission request).

[0069] As shown in the column for time (d) in Figure 4, the amount of upstream data to be requested for transmission contained in queue #p (for report in Figure 4) is the amount of data equivalent to the amount of upstream data that has not been requested for transmission at time (c) (i.e., the amount of newly added upstream data).

[0070] On the other hand, the amount of uplink data to be requested to be transmitted, which is included in queue#q (for report in Figure 4), is the total amount of data equivalent to the amount of uplink data that has not been requested to be transmitted at time (c) (i.e., the amount of newly added uplink data) and the amount of newly added uplink data for which a transmission request has been reported (reported), excluding the amount of uplink data that has been reserved for transmission (granted).

[0071] The ONU 20 generates a transmission request message (REPORT frame) indicating the total amount of upstream data (for report in FIG. 4) to be requested to be transmitted, which is included in the queue #p and queue #q calculated as above. The ONU 20 transmits the generated transmission request message (REPORT frame) to the OLT 10. The amount of upstream data stored in queue #p and queue #q changes from the state at time (d) to the state at time (e) shown in FIG. 4.

[0072] Next, in the column of time point (e), queue#p shows the amount of upstream data for which a transmission request has been reported (reported) and the amount of upstream data for which transmission has been reserved (granted). Also, queue#q shows the amount of upstream data for which a transmission request has been reported (reported) and the amount of upstream data for which transmission has been reserved (granted).

[0073] In addition, the amount of data obtained by subtracting the amount of upstream data for which a transmission request has been reported (reported) contained in queue #p and queue #q shown in the column at time (e) in Figure 4 from the amount of upstream data for which a transmission request has been reported (granted) corresponds to the amount of upstream data for which a transmission request should be made (for report in Figure 4) contained in queue #p and queue #q shown in the column at time (d), and is the amount of upstream data whose status has changed due to the transmission of a transmission request message (REPORT frame) from ONU 20 to OLT 10.

[0074] The ONU 20 transmits the upstream data (granted DATA) of the amount of data reserved for transmission to the OLT 10 at the transmission timing specified by the received transmission permission message (GATE frame). After that, the amount of upstream data stored in queue #p and queue #q changes from the state at time (e) to the state at time (f) shown in FIG.

[0075] Next, in the column of time point (f), queue #p shows the amount of uplink data (reported) for which a transmission request has been reported, and queue #q also shows the amount of uplink data (reported) for which a transmission request has been reported.

[0076] As shown in the column for time (f) in Figure 4, the amount of upstream data (granted) that had been reserved for transmission at time (d) has been removed from queue #p and queue #q as the transmission of the upstream data to OLT 10 has been completed.

[0077] Through the above-mentioned procedure, the upstream data stored in the queue of the ONU 20 is sequentially transmitted to the OLT 10.

[0078] As described above, ONU20 needs to calculate the amount of upstream data reserved for transmission (granted) contained in queue#p and queue#q and calculate the amount of upstream data to be requested to be transmitted (i.e., REPORT calculation) between receiving a transmission permission message (GATE frame) and transmitting a transmission request message (REPORT frame) (i.e., between time (b) and time (d) in Figure 4).

[0079] In the present embodiment, the OLT 10 provides a time (pre-REPORT GAP) for performing Data grant transmission reservation calculation and REPORT calculation between operation cycles of the upstream bandwidth control. This allows even an ONU 20 that does not have a granted queue (transmission reservation queue) to complete REPORT calculation etc. before the transmission start time of a transmission request message (REPORT frame).

[0080] In the above configuration, the operation cycle is changed by providing a pre-REPORT GAP between the operation cycles, but the present invention is not limited to this configuration. For example, if it is not desired to change the operation cycle, the operation cycle may be changed so that the time equivalent to the operation cycle minus the pre-REPORT GAP becomes the new operation cycle.

[0081] Fig. 6 is a diagram showing the flow of upstream data transmission by PON1 in an embodiment of the present invention. Fig. 6 shows the flow of upstream data transmission when there are two ONUs 20. Note that the flow of upstream data transmission when there are three or more ONUs 20 is basically the same as the flow of upstream data transmission shown in Fig. 3.

[0082] 6, it is assumed here that two ONUs 20 ("ONU#1" and "ONU#2") are connected to the OLT 10. The OLT 10 receives a transmission request message (REPORT frame) transmitted from ONU#1 and a transmission request message (REPORT frame) transmitted from ONU#2 together ((1) in FIG. 6).

[0083] In response to receiving the transmission request messages (REPORT frames) from ONU#1 and ONU#2, OLT 10 transmits transmission permission messages (GATE frames) to ONU#1 and ONU#2 together ((2) in FIG. 6).

[0084] Specifically, OLT 10 grasps the amount of upstream data stored in ONU#1 from a transmission request message (REPORT frame) received from ONU#1. Based on the grasped data amount, OLT 10 determines the transmission start time and transmission amount of the upstream data to be transmitted by ONU#1 in the next operating cycle. OLT 10 writes the determined transmission start time and transmission amount of the upstream data in a transmission permission message (GATE frame).

[0085] Furthermore, OLT 10 grasps the amount of upstream data stored in ONU#2 from a transmission request message (REPORT frame) received from ONU#2. Based on the grasped data amount, OLT 10 determines the transmission start time and transmission amount of the upstream data to be transmitted by ONU#2 in the next operating cycle. OLT 10 writes the determined transmission start time and transmission amount of the upstream data in a transmission permission message (GATE frame).

[0086] At this time, the OLT 10 writes in the transmission permission message (GATE frame) a transmission start time that takes into account the pre-REPORT GAP shown in Fig. 6. Specifically, the OLT 10 writes in the transmission permission message (GATE frame) the transmission start time of the REPORT frame and the transmission start time of the upstream data, which are delayed by the pre-REPORT GAP.

[0087] 6, OLT 10 transmits the above-mentioned generated permission-to-send messages (GATE frames) to ONU#1 and ONU#2 all at once. ONU#1 and ONU#2 each receive the permission-to-send messages (GATE frames) transmitted from OLT 10. ONU#1 and ONU#2 recognize the transmission start time and transmission amount value of the upstream data specified for their own ONU 20 from the contents described in the permission-to-send messages (GATE frames).

[0088] ONU#1 and ONU#2 transmit a transmission permission message (REPORT frame) at the transmission start time specified by the transmission permission message (GATE frame). As described above, since the pre-REPORT GAP is taken into consideration for the transmission start time specified by the transmission permission message (GATE frame), even ONU#1 and ONU#2 that do not have a granted queue can complete the transmission reservation calculation of Data grant and the REPORT calculation before the transmission start time of the transmission request message (REPORT frame).

[0089] ONU#1 and ONU#2 each transmit upstream data of the amount specified in the transmission permission message (GATE frame) to OLT10 at the transmission start time of the upstream data specified in the transmission permission message (GATE frame) ((3) in FIG. 6).

[0090] Fig. 7 is a diagram showing the flow of upstream data transmission by a conventional PON. As shown in Fig. 7, the pre-REPORT GAP is not taken into consideration in a conventional PON. Therefore, for example, in Fig. 7, the time from when a transmission permission message (GATE frame) is received in ONU#2 until the transmission start time of a transmission request message (REPORT frame) is much shorter than that in Fig. 6 described above.

[0091] As a result, if ONU#2 does not have a granted queue (transmission reservation queue), the REPORT calculation will not be completed in time for the transmission start time of the transmission request message (REPORT frame) specified by the Report grant of the transmission permission message (GATE frame). The Report grant indicates the transmission start time of the transmission request message (REPORT frame) permitted to be transmitted by OLT 10. If the REPORT calculation is not completed in time for the transmission start time, ONU#2 will not be able to transmit upstream data to OLT 10 in the next operating cycle.

[0092] [OLT configuration] The following describes an example of the functional configuration of the OLT 10. Fig. 8 is a block diagram showing the functional configuration of the OLT 10 in an embodiment of the present invention.

[0093] As shown in FIG. 8, the OLT 10 includes a signal transmission / reception unit 101, a MAC (Media Access Control) processing unit 102, an OAM (Operations, Administration, Maintenance) processing unit 103, an ONU (Optical Network Unit) identification and determination unit 104, a pre-REPORT GAP database 105, a dynamic bandwidth allocation operation unit 106, an MPCP (Multi-Point Control Protocol) processing unit 107, and a signal transmission / reception unit 108.

[0094] The signal transmission / reception unit 101 transmits and receives signals between each ONU and its own OLT 10. The MAC processing unit 102 performs priority control and transfer processing, etc. The OAM processing unit 103 executes maintenance and operation management functions. The OAM processing unit 103 also acquires ONU information.

[0095] The ONU identification determination unit 104 determines whether or not a pre-REPORT GAP is required based on the ONU identifier indicated by the ONU information. If the ONU identification determination unit 104 determines that a pre-REPORT GAP is required, the ONU identification determination unit 104 obtains a pre-REPORT GAP value corresponding to the ONU identifier from the pre-REPORT GAP database 105 and outputs the value to the dynamic bandwidth allocation operation unit 106.

[0096] Fig. 9 is a diagram showing an example of the configuration of the pre-REPORT GAP database 105. As shown in Fig. 9, for example, the pre-REPORT GAP database 105 is data in which an ONU identifier is associated with a pre-REPORT GAP value. For example, it shows that a pre-REPORT GAP is not required for an ONU 20 whose ONU identifier is A, a pre-REPORT GAP of 10 [μs] is required for an ONU 20 whose ONU identifier is B, and a pre-REPORT GAP of 15 [μs] is required for an ONU 20 whose ONU identifier is C.

[0097] The dynamic bandwidth allocation operation unit 106 changes the setting of the operation cycle so as to provide a pre-REPORT GAP based on the acquired value between the operation cycles of the upstream bandwidth control.

[0098] The MPCP processing unit 107 realizes functions such as recognizing the multiple ONUs 20 connected to the PON1, measuring the RTT (Round Trip Time: round trip delay time from the OLT 10 to the ONU 20) required for communication between each ONU 20 and its own OLT 10, assigning LLIDs (Logical Link IDs), a multiplexing control function that assigns time slots to each ONU 20 and multiplexes upstream burst signals from each ONU 20 on the time axis, and a time synchronization function between the ONU 10 and its own OLT 10.

[0099] The signal transmitting / receiving unit 108 transmits and receives signals between the service network and its own OLT 10 via an SNI (Service Node Interface) port.

[0100] [OLT operation] The following describes an example of the operation of the OLT 10. Fig. 10 is a flowchart showing the operation of the OLT 10 in the embodiment of the present invention.

[0101] The OAM processing unit 103 monitors the connection of a new ONU 20 to the PON 1 (step S01). When the OAM processing unit 103 detects that a new ONU 20 is connected to the PON 1 (step S01), the OAM processing unit 103 outputs ONU information of the newly connected ONU 20 to the ONU identification determination unit 104.

[0102] The ONU identification determination unit 104 acquires the ONU information output from the OAM processing unit 103. The ONU identification determination unit 104 identifies the newly connected ONU 20 by specifying an ONU identifier from the acquired ONU information (step S02).

[0103] The ONU identification and determination unit 104 determines whether the identified ONU 20 is an ONU 20 that requires a pre-REPORT GAP (step S03). Specifically, the ONU identification and determination unit 104 determines whether the identified ONU 20 is an ONU 20 that has a granted queue (transmission reservation queue). Note that information for specifying whether the identified ONU 20 is an ONU 20 that requires a pre-REPORT GAP is stored in advance in a storage medium (not shown) or the like that the OLT 10 has. Alternatively, information for specifying whether the identified ONU 20 is an ONU 20 that requires a pre-REPORT GAP may be stored in a pre-REPORT GAP database 105 shown in FIG. 9, for example.

[0104] If it is determined that the identified ONU 20 is not an ONU 20 that requires a pre-REPORT GAP (step S03: NO), the process returns to step S01, and the OAM processing unit 103 continues to monitor the connection of a new ONU 20 to the PON1.

[0105] If it is determined that the identified ONU 20 is an ONU 20 that requires a pre-REPORT GAP (step S03: YES), the ONU identification and determination unit 104 refers to the pre-REPORT GAP database 105 and acquires a pre-REPORT GAP value corresponding to the ONU identifier of the ONU 20 identified in step S02. The ONU identification and determination unit 104 compares the acquired pre-REPORT GAP value with the currently set pre-REPORT GAP value (step S04).

[0106] If the pre-REPORT GAP value corresponding to the ONU identifier of the identified ONU 20 is smaller than the currently set pre-REPORT GAP value (step S04: NO), the process returns to step S01 above, and the OAM processing unit 103 continues to monitor the connection of a new ONU 20 to PON1.

[0107] If the pre-REPORT GAP value corresponding to the ONU identifier of the identified ONU 20 is greater than the currently set pre-REPORT GAP value (step S04: YES), the ONU identification determination unit 104 outputs the pre-REPORT GAP value corresponding to the ONU identifier of the identified ONU 20 to the dynamic bandwidth allocation operation unit 106.

[0108] The dynamic bandwidth allocation operation unit 106 acquires the pre-REPORT GAP value output from the ONU identification and determination unit 104. The dynamic bandwidth allocation operation unit 106 changes the setting of the operation period so that the pre-REPORT GAP is suitable for the connected ONU 20. Specifically, the dynamic bandwidth allocation operation unit 106 changes the setting of the pre-REPORT GAP between operation periods of upstream bandwidth control so that the pre-REPORT GAP is the acquired value (step S05).

[0109] After that, the process returns to step S01, and the OAM processing unit 103 continues to monitor the connection of the new ONU 20 to the PON 1. Note that the operation of the OLT 10 shown in the flowchart of Fig. 10 ends, for example, when the PON 1 stops functioning.

[0110] As described above, the OLT 10 in this embodiment changes the setting of the operation cycle so as to provide a sufficient time (pre-REPORT GAP) between operation cycles of the upstream bandwidth control to perform transmission reservation calculation of the Data grant and REPORT calculation.

[0111] With the above-mentioned configuration, the OLT 10 in this embodiment can complete the calculations required to transmit upstream data before the transmission start time of the transmission request message (REPORT frame) even in the case of an ONU 20 that does not have a granted queue (transmission reservation queue), thereby improving the upstream throughput.

[0112] The calculations required to transmit upstream data here are, as described above, the calculation of the amount of upstream data reserved for transmission (granted) and the calculation of the amount of upstream data to be requested for transmission (i.e., REPORT calculation).

[0113] Furthermore, by having the above-described configuration, the OLT 10 in this embodiment can enable upstream communication even in a PON 1 that accommodates a mixture of ONUs 20 with granted queues and ONUs 20 without granted queues.

[0114] According to the above-described embodiment, the bandwidth allocation device includes a detection unit and a setting unit. For example, the bandwidth allocation device is the OLT 1 ​​in the embodiment, the detection unit is the OAM processing unit 103 in the embodiment, and the setting unit is the dynamic bandwidth allocation operation unit in the embodiment.

[0115] The detection unit detects that a subscriber line terminal that does not have a transmission reservation queue that keeps the upstream data permitted to be transmitted waiting until the transmission start time is connected to the passive optical network. For example, the passive optical network is PON1 in the embodiment, the upstream data permitted to be transmitted is granted DATA in the embodiment, the transmission reservation queue is a granted queue in the embodiment, and the subscriber line terminal is ONU20 in the embodiment.

[0116] The setting unit provides a calculation time, which is a time required for the subscriber line termination to calculate the amount of upstream data to be transmitted out of the amount of upstream data permitted to be transmitted and to calculate the amount of upstream data to be requested to be transmitted, during an operation period of the upstream bandwidth control between the subscriber line termination and the subscriber line termination. For example, the subscriber line termination is the OLT 10 in the embodiment, and the calculation time is the pre-REPORT GAP in the embodiment.

[0117] According to the above-described embodiment, the bandwidth allocation device includes an acquisition unit, a determination unit, and a setting change unit. For example, the bandwidth allocation device is the OLT 1 ​​in the embodiment, the acquisition unit is the OAM processing unit 103 in the embodiment, the determination unit is the ONU identification determination unit 104 in the embodiment, and the setting change unit is the dynamic bandwidth allocation operation unit 106 in the embodiment.

[0118] The acquisition unit acquires identification information for identifying a subscriber line terminal connected to the passive optical network. For example, the passive optical network is a PON1 in the embodiment, the subscriber line terminal is an ONU2 in the embodiment, and the identification information is an ONU identifier in the embodiment.

[0119] The determination unit determines whether the subscriber line termination device has a transmission reservation queue that keeps the upstream data that has been permitted to be transmitted waiting until the transmission start time based on the identification information. For example, the upstream data that has been permitted to be transmitted is the granted DATA in the embodiment, and the transmission reservation queue is the granted queue in the embodiment.

[0120] If it is determined that the subscriber line unit does not have a transmission reservation queue, the setting change unit provides a predetermined calculation time between operation periods of upstream bandwidth control in the passive optical network.

[0121] The setting change unit may change the operation period so as to include a calculation time, which is the time required for the subscriber line termination device to calculate the amount of upstream data to be transmitted out of the amount of upstream data permitted to be transmitted and to calculate the amount of upstream data to be requested to be transmitted. For example, the calculation time is the pre-REPORT GAP in the embodiment.

[0122] The bandwidth allocation device may further include a storage unit. For example, the storage unit is the pre-REPORT GAP database 105 in the embodiment. The storage unit stores calculation time information in which the identification information and the calculation time are associated with each other. The setting change unit may change the operation period so that the calculation time specified based on the identification information and the calculation time information is included.

[0123] A part or the whole of the OLT 10 in each of the above-mentioned embodiments may be realized by a computer. In that case, a program for realizing this function may be recorded in a computer-readable recording medium, and the program recorded in the recording medium may be read into a computer system and executed to realize the function. The term "computer system" as used herein includes hardware such as an OS and peripheral devices. The term "computer-readable recording medium" refers to portable media such as flexible disks, optical magnetic disks, ROMs, and CD-ROMs, and storage devices such as hard disks built into a computer system. The term "computer-readable recording medium" may also include a medium that dynamically holds a program for a short period of time, such as a communication line when a program is transmitted via a network such as the Internet or a communication line such as a telephone line, and a medium that holds a program for a certain period of time, such as a volatile memory inside a computer system that is a server or client in that case. The above-mentioned program may be a program for realizing a part of the above-mentioned functions, or may be a program that can realize the above-mentioned functions in combination with a program already recorded in the computer system, or may be a program that is realized using a programmable logic device such as an FPGA (Field Programmable Gate Array).

[0124] Although an embodiment of the present invention has been described in detail above with reference to the drawings, the specific configuration is not limited to this embodiment, and designs that do not deviate from the gist of the present invention are also included. [Explanation of symbols]

[0125] 1...PON, 30...optical fiber, 40...optical splitter, 101...signal transmission / reception unit, 102...MAC processing unit, 103...OAM processing unit, 104...ONU identification / determination unit, 105...pre-REPORT GAP database, 106...dynamic bandwidth allocation operation unit, 107...MPCP processing unit, 108...signal transmission / reception unit

Claims

1. a detection unit that detects that a subscriber line termination device that does not have a transmission reservation queue for making upstream data that has been permitted to be transmitted wait until a transmission start time has been connected to the passive optical network; a setting unit for setting a calculation time, which is a time required for calculating the amount of upstream data to be transmitted from the amount of upstream data permitted to be transmitted and the amount of upstream data to be requested to be transmitted, during an operation period of upstream bandwidth control between the subscriber line termination device and the subscriber line termination device; A bandwidth allocation device comprising:

2. an acquisition unit that acquires identification information that identifies a subscriber line unit connected to the passive optical network; a determination unit that determines, based on the identification information, whether or not the subscriber line termination device has a transmission reservation queue for storing upstream data that has been permitted to be transmitted and that is kept waiting until a transmission start time; a setting change unit that provides a predetermined calculation time between operation periods of upstream bandwidth control in the passive optical network when it is determined that the subscriber line terminal does not have the transmission reservation queue; A bandwidth allocation device comprising:

3. The setting change unit changes the operation cycle so as to include the calculation time, which is the time required for calculating the amount of upstream data to be transmitted out of the amount of upstream data permitted to be transmitted, and for calculating the amount of upstream data to be requested to be transmitted, in the subscriber line termination device.

3. The bandwidth allocation device according to claim 2.

4. a storage unit for storing calculation time information in which the identification information and the calculation time are associated with each other; Further equipped with The setting change unit changes the operation cycle so as to include the calculation time specified based on the identification information and the calculation time information.

4. The bandwidth allocation device according to claim 3.

5. a detection unit that detects that a subscriber line termination device that does not have a transmission reservation queue for making upstream data that has been permitted to be transmitted wait until a transmission start time has been connected to the passive optical network; a setting unit for setting a calculation time, which is a time required for calculating the amount of upstream data to be transmitted from the amount of upstream data permitted to be transmitted and the amount of upstream data to be requested to be transmitted, during an operation period of upstream bandwidth control between the subscriber line termination device and the own device, in the subscriber line termination device; a transmitting / receiving unit for transmitting and receiving data to and from the subscriber line termination device; A subscriber line terminal device comprising:

6. an acquisition unit that acquires identification information that identifies a subscriber line unit connected to the passive optical network; a determination unit that determines, based on the identification information, whether or not the subscriber line termination device has a transmission reservation queue for storing upstream data that has been permitted to be transmitted and that is kept waiting until a transmission start time; a setting change unit that provides a predetermined calculation time between operation periods of upstream bandwidth control in the passive optical network when it is determined that the subscriber line termination device does not have the transmission reservation queue; a transmitting / receiving unit for transmitting and receiving data to and from the subscriber line termination device; A subscriber line terminal device comprising:

7. a detection step of detecting that a subscriber line terminal not having a transmission reservation queue for making upstream data permitted to be transmitted wait until a transmission start time is connected to the passive optical network; a setting step of setting a calculation time required for calculating the amount of upstream data to be transmitted from the amount of upstream data permitted to be transmitted and the amount of upstream data to be requested to be transmitted, during an operation period of upstream bandwidth control between the subscriber line termination device and the subscriber line termination device; The bandwidth allocation method includes the steps of:

8. acquiring identification information identifying a subscriber line unit connected to the passive optical network; a determination step of determining whether or not the subscriber line termination device has a transmission reservation queue for holding the upstream data permitted for transmission until a transmission start time based on the identification information; a setting change step of providing a predetermined calculation time between operation periods of upstream bandwidth control in the passive optical network when it is determined that the subscriber line terminal does not have the transmission reservation queue; The bandwidth allocation method includes the steps of:

Citation Information

Patent Citations

  • Circuit, method and program for assigning dynamic band and recording medium

    JP2003087283A

  • Method for Dynamic Bandwidth Allocation and Queue Management in Ethernet Passive Optical Networks

    JP2005538645A

  • Bandwidth allocation device and method for guaranteeing QOS in ethernet passive optical access network (EPON)

    JP2007097112A

  • Communication device

    JP2009182440A

  • Parent station device, child station device, optical communication system, control device, and bandwidth allocation method

    WO2014178375A1