Research and testing system for factors influencing the efficiency of rock-breaking slag discharge in vertical well hob drilling method

The system optimizes rock fracture and slag discharge efficiency in vertical well drilling by integrating a comprehensive testing system for hob selection, mechanical parameters, and slurry performance, addressing inefficiencies in existing drilling methods for soft rocks.

JP7557636B2Active Publication Date: 2024-09-27ANHUI UNIV OF SCI & TECH
View PDF 9 Cites 0 Cited by

Patent Information

Application Number
JP2023550004
Authority / Receiving Office
JP · JP
Patent Type
Patents
Current Assignee / Owner
Priority Date
2022-06-13
Filing Date
2023-04-13
Publication Date
2024-09-27
Estimated Expiration
2043-04-13

AI Technical Summary

Technical Problem

Existing drilling methods for vertical wells in soft rocks like chalk and Jurassic sandstones face challenges in optimizing rock fracture slag discharge efficiency due to the lack of integrated research on rock cutter type, mechanical parameters, and slurry performance, leading to inefficiencies in rock fracture and slag discharge processes.

Method used

A research and testing system is developed to study the influencing factors of drilling method vertical well hob rock fracture slag discharge efficiency, incorporating a spare box, rock fracture slag discharge device, slurry residue separation device, metering device, and monitoring assembly to simulate and optimize slurry performance parameters, hob type selection, mechanical parameters, and drilling conditions.

Benefits of technology

The system enhances the efficiency of rock fracture slag discharge by simulating actual drilling conditions indoors, allowing for comprehensive testing of different rock samples, cutters, and parameters, thereby improving the matching of rock fracture and slag discharge processes, and reducing environmental impact.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 0007557636000007
    Figure 0007557636000007
  • Figure 0007557636000002
    Figure 0007557636000002
  • Figure 0007557636000001
    Figure 0007557636000001
Patent Text Reader

Abstract

The present invention provides a research and testing system for the impact factors of rock slag discharge efficiency in a wellbore hob drilling process, comprising a reserve box, a rock slag discharge device, a slurry residue separation device, a weighing device, a monitoring assembly, and a control device, the reserve box is connected to the rock slag discharge device through a slurry transport pipe, the rock slag discharge device is connected to the slurry residue separation device through an external slag discharge pipe, the rock slag liquid generated by the rock slag discharge device is transported into the slurry residue separation device through the external slag discharge pipe, and the rock slag can be dried and weighed by the weighing device, and the monitoring assembly is connected to the control device. Using this test system, the influence of influencing factors such as slurry performance parameters arranged according to different rock facies, selection of hob type and mechanical parameters, drill pressure, cutter head rotation speed, hob rotation speed, optimized arrangement of hob blade pitch, and arrangement of slag outlet position can be studied on the influence of hob rock breaking slag discharge efficiency in vertical well drilling method, and the rock breaking slag discharge efficiency can be improved.
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present invention relates to the research field of coal mine shaft well drilling construction technology, and particularly to a research and testing system for the influencing factors of the drilling shaft well hob rock breaking slag discharge efficiency. [Background technology]

[0002] In the process of mineral resources development, a wealth of experience has been accumulated in the implementation of drilling methods, but there are still many problems in well drilling by full-section drilling method for large amounts of interlocking weakly bonded sandstones in soft rocks such as chalk and Jurassic sandstones. Chalk and Jurassic sandstones are structurally polymorphous, the particles of mineral composition are mainly in a weakly bonded state, with low strength, high porosity, and easy to muddy under the action of water, and their engineering mechanical properties are complex and diverse. These problems are closely related to the entire process of rock breaking slag discharge, such as the mud tank phenomenon of the drill bit and how to solve the problem of "reaching the bottom when expanding". In addition, there are many factors that affect the efficiency of rock breaking slag discharge. For example, the research on suitable hobs to deal with rocks with different mechanical performance, the rationality of the number and arrangement of hobs and the compatibility of the number, location and size of slag discharge ports, the selection of slurry performance parameters, and the optimization of the drilling parameters of rock breaking drill bits.

[0003] Up to now, for well drilling by indoor drilling method, there has been little research on the suitability of rock cutter type and the system equipment of the matching of mechanical parameters of hob rock breaking test bench and slurry performance parameters. Therefore, it is urgent to research the rock breaking slag discharge efficiency of well drilling by drilling method, such as the selection of rock cutter type and mechanical parameters, such as the row pitch of wedge tooth hob, tooth pitch, penetration, drill pressure, the rotation speed of the cutter head of the drill cutter, the rotation speed of the cutter and the optimized arrangement of the blade pitch, the position, quantity and slurry performance parameters of the slag discharge port, etc., and it is important to guide the matching research of rock breaking mechanism and various sandstones, especially the weakly bonded sandstones and slurries in the west, which has important engineering practical significance. Summary of the Invention [Problem to be solved by the invention]

[0004] The objective of the present invention is to provide a research and testing system for the influencing factors of hob rock breaking slag discharge efficiency in drilling vertical wells, which can study the influence of influencing factors such as slurry performance parameters arranged according to different rock facies, hob type selection and mechanical parameters, drill pressure, cutter head rotation speed, hob rotation speed, optimized arrangement of hob blade pitch, and arrangement of slag discharge port position on the efficiency of hob rock breaking slag discharge in drilling vertical wells, solve the matching problem of hob rock breaking slag discharge in drilling wells, and improve the efficiency of rock breaking slag discharge. [Means for solving the problem]

[0005] In order to achieve the above object, the present invention provides the following technical solutions:

[0006] A research and testing system for factors influencing the efficiency of a hob rock breaking slag discharge in a drilling vertical well, comprising: a spare box, a rock breaking slag discharge device, a slurry residue separation device, a metering device, a monitoring assembly, and a control device; The spare box contains slurry and is connected to the rock breaking and slag discharge device through a slurry transport pipe, and provides the rock breaking and slag discharge device with the slurry required for the test; The rock slag discharge device can discharge rock slag, and the rock slag discharge device is connected to the slurry residue separation device through an external slag discharge pipe, and during the test process, the rock slag liquid generated by the rock slag discharge device is transported into the slurry residue separation device through the external slag discharge pipe; The rock breaking slag discharge device includes a frame body, the frame body includes a base, a vertical pillar, and a top plate, the vertical pillars are installed in four pieces, the lower ends of the four vertical pillars are fixed to the base, and the top plate is connected to the upper ends of the four vertical pillars, respectively, the base, the four vertical pillars, and the top plate form a frame body structure, a plurality of side panels are installed around the lower ends of the vertical pillars, the side panels are connected to both the vertical pillars and the base, and the base is fixed to the ground foundation by anchor bolts; The rock breaking slag discharge device includes a test box, a first Hydraulic Pressure Further comprising a cylinder, a drill rod, a drill, a cutter head, a cutter holder and a rock sample; The test box is installed within the frame and has a tub-like structure with an open top, the rock sample is installed within the test box, the outlet of the slurry transport pipe is located above the test box, and the rock sample is installed at the bottom of the test box; The first Hydraulic Pressure An output end of a cylinder is connected to an upper end of the drill rod, a lower end of the drill rod extends into the test box, the drill is attached to the lower end of the drill rod, an upper end of the cutter head is connected to the lower end of the drill, the cutter holder is attached to the lower surface of the cutter head and is used to mount a hob, and the first Hydraulic Pressure The cylinder drives the drill to move up and down and rotate via the drill rod, and the drill is positioned above the rock sample, and the drill moves up and down and rotates the hob in conjunction with the hob to break the rock sample; A groove is provided on the underside of the cutter head along the radial direction of the cutter head, the cutter holder is slidably connected to the cutter head through the groove, and a fixing bolt is provided on the cutter holder, and the fixing bolt can fix the position of the cutter holder on the cutter head; A total of six grooves are installed, and two of the grooves form a set. The grooves of each set are installed along the radial direction of the cutter head, and the included angle between two adjacent sets of the grooves is 60°. Two to four cutter holders are installed in each set of the grooves according to test requirements, and each cutter holder is fitted with one of the hobs; The hob is one of a scraper, an insert tooth wedge hob, or a ball tooth hob, and the cutter holder is matched with the hob; The rock breaking slag discharge device further includes a base and a lifting mechanism, a pit is installed in the ground foundation within the frame body, the lifting mechanism is installed in the pit, the base is installed on the lifting mechanism, the base has a cylindrical structure, the test box is installed on the base, the diameter of the base is larger than the outer diameter of the test box, and the lifting mechanism can adjust the height of the test box; The rock slag liquid entering the slurry residue separation device can be separated into rock slag and slurry in the slurry residue separation device; The rock slag separated in the slurry residue separation device can be dried and weighed by the weighing device; The monitoring assembly is connected to the controller and is capable of collecting data during testing.

[0007] It can be seen from the analysis that the present invention discloses a research and test system for the influencing factors of the hob rock breaking slag discharge efficiency of the well drilling method. The embodiment of the present invention is focused on the research and test of the influencing factors of the hob rock breaking slag discharge efficiency of the well drilling method for the slurry performance parameters arranged according to different rock facies, the selection of the type of rock breaking cutter and mechanical parameters, such as the row pitch, tooth pitch, penetration, drill pressure, the rotation speed of the cutter head, the rotation speed of the cutter, and the optimized arrangement of the blade pitch, the location of the slag discharge port, etc. of the well drilling method, so as to solve the matching problem of the rock breaking slag discharge of the hob of the well drilling method, and to improve the rock breaking slag discharge efficiency. By weighing and comparing the separated residue of the slurry residue under the same conditions, a laboratory simulation research and test can be carried out on the influencing factors of the rock breaking efficiency of the well drill bit of various slag suction ports in various hob modes. This test system has a very strong test simulation property or "micro-work scenario" that can simulate the actual scene of rock breaking slag discharge by drilling hob in the room to the maximum extent, and the conclusions obtained by analyzing, evaluating and studying the efficiency of rock breaking slag discharge are irreplaceable because they are close to the "original". It avoids the disadvantages of only studying slag discharge or only studying rock breaking, and establishes the organic relationship of rock breaking slag discharge. It avoids the disadvantages of the single research situation of rock breaking or slag discharge, and can test different rock samples with weak bonds, select different cutters and their parameters for testing, select different drilling parameters for testing, set different slurry performance parameters for testing, select different slag outlets and air pressures for testing, and set different confining pressures for rock samples for testing, thereby maximizing and expanding the multi-functional effect of the test stand. In the current drilling method in China, the type of construction hob is fixed, the slag discharge port is fixed, the rock body rotates and the drill does not rotate, and only rock breaking or rock slag discharge is studied, which leads to the current situation of testing with a single working situation and a single parameter index, so it is necessary to improve the difference in the inconsistency model caused by the inconsistency between the indoor test and the field working environment. [Brief description of the drawings]

[0008] The explanatory drawings forming a part of this disclosure are intended to provide a further understanding of the present invention, and the schematic embodiments of the present invention and their explanations are intended to interpret the present invention and are not intended to unduly limit the present invention. [Figure 1] FIG. 2 is a structural schematic diagram of an embodiment of the present invention. [Diagram 2] FIG. 2 is a structural schematic diagram of a spare box according to an embodiment of the present invention. [Diagram 3] FIG. 2 is a structural schematic diagram of an embodiment of the rock breaking and slag discharge device of the present invention. [Figure 4] FIG. 2 is a structural schematic diagram of a slurry residue separating device and a measuring device according to an embodiment of the present invention. [Diagram 5] FIG. 2 is a structural schematic diagram of a vertical cross section of a test box according to an embodiment of the present invention. [Figure 6] FIG. 2 is a schematic diagram of the three-dimensional structure of a test box according to an embodiment of the present invention. [Figure 7] FIG. 2 is a schematic diagram of the structure distributed in the cutter head of the hob according to one embodiment of the present invention. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0009] The present invention will now be described in detail by way of examples with reference to the drawings. Each example is provided to illustrate the present invention and is not intended to limit the present invention. In fact, it will be apparent to those skilled in the art that modifications and variations can be made to the present invention without departing from the scope or spirit of the present invention. For example, features illustrated and described as part of one embodiment can be used in another embodiment to form another embodiment. It is therefore desirable that the present invention includes such modifications and variations within the scope of the appended claims and their equivalents.

[0010] In the description of the present invention, the orientation or positional relationship indicated by the terms "longitudinal", "lateral", "upper", "lower", "front", "rear", "left", "right", "vertical", "horizontal", "top", "bottom" and the like is based on the orientation or positional relationship shown in the drawings, and does not require the present invention to be constructed and operated in a specific orientation in order to facilitate the description of the present invention, and therefore cannot be understood as limiting the present invention. The terms "contact", "connection", and "installation" used in the present invention should be understood in a broad sense, for example, may be fixed connection, detachable connection, direct connection, indirect connection via an intermediate member, wired electrical connection or wireless electrical connection, or wireless communication signal connection, and those skilled in the art can understand the specific meaning of the above terms according to the specific situation.

[0011] The drawings show one or more examples of the present invention. The features of the drawings are described in detail using numbers and alphabets. In the drawings and description, the same or similar parts of the present invention are designated by the same or similar reference numerals. As used herein, the terms "first", "second" and "third" are used interchangeably to distinguish one member from another member and are not intended to indicate the position or importance of a single member.

[0012] As shown in Figures 1 to 7, according to an embodiment of the present invention, as shown in Figure 1, a research and test system for factors influencing the efficiency of rock breaking slag discharge in a vertical well hob for drilling includes a reserve box 1, a rock breaking slag discharge device, a slurry residue separation device, a measuring device, a monitoring assembly, and a control device. The reserve box 1 contains slurry, and the reserve box 1 is connected to the rock breaking slag discharge device via a slurry transport pipe 11. The reserve box 1 provides the rock breaking slag discharge device with the slurry required for the test, and the rock breaking slag discharge device can discharge the rock breaking slag. The rock breaking slag discharge device is connected to the rock breaking slag discharge device via an external slag discharge pipe 20. The rock slag discharge device is connected to the slurry residue separation device through the external slag discharge pipe 20, and during the test process, the rock slag liquid generated by the rock breaking slag discharge device is transported into the slurry residue separation device through the external slag discharge pipe 20, and the rock slag liquid entering the slurry residue separation device can be separated into rock slag and slurry in the slurry residue separation device through the weighing device, and the rock slag separated in the slurry residue separation device can be dried and weighed through the weighing device, and the monitoring assembly is connected to the control device and can collect data during the test, providing a research test system for the influencing factors of the efficiency of rock breaking slag discharge in a vertical well hob drilling method. This test system reduces the outdoor actual working environment of rock breaking in a wellbore drilling method indoors, and is particularly suitable for the study of the influencing factors of rock breaking slag discharge efficiency in a wellbore drilling method under different restraint conditions for soft rocks such as chalk and Jurassic sandstone. The axial compressive strength of weakly bonded rocks such as chalk and Jurassic sandstone is not high, and the power equipment required for rock breaking is lower than that required for other hard rocks, which is convenient for the realization of the technical solution of the present invention. The technical solution of the present invention designs a series of closed-loop systems from the preparation of slurry prepared for slag discharge to the completion of the measurement and statistics of slag discharge, preventing the pollution of the environment by the "discarded" slurry, and establishing a truly complete series of test and research systems for rock breaking slag discharge, providing indoor simulation research to solve many of the difficult problems faced by rock breaking slag discharge in weakly bonded sandstone, saving costs, protecting the environment, and having engineering practical significance.

[0013] 2, the spare box 1 has a box structure with an open top, the upper end of the spare box 1 is covered with a box lid 10, the box lid 10 has the capacity to support the power equipment above it, the slurry equipment capacity of the spare box 1 needs to meet the demand for one test, a slurry suction pump 12 is installed on the box lid 10, one end of the slurry transport pipe 11 is connected to the slurry suction pump 12, the lower end of the slurry suction pump 12 passes through the box lid 10 and extends below the slurry liquid level in the spare box 1, a wash water outlet 13 is installed on the bottom of the spare box 1, and the wash water outlet 13 is provided with a first gate bar. After the test is completed, the first gate valve 14 can be opened to pour water into the spare box 1 to clean the spare box 1, which is convenient for cleaning the spare box 1 after each test is completed. Preferably, an agitator 15 is further installed on the box cover 10, and the agitator shaft 150 of the agitator 15 extends into the spare box 1 after passing through the box cover 10. A stirring blade 151 is further installed on the agitator shaft 150. The agitator 15 is driven by the agitator shaft 150 to rotate the stirring blade 151. The rotation of the stirring blade 151 can stir the slurry in the spare box 1. The agitator 15 The slurry is stirred non-periodically to make the slurry "flowing" and ensure the smooth progress of the test. Preferably, a level tube 16 is installed on one side of the spare box 1, the lower end of the level tube 16 is connected to the bottom of the spare box 1, the upper end of the level tube 16 is higher than the liquid level of the slurry in the spare box 1, and a measuring scale line is installed on the level tube 16. The level tube 16 indicates the amount of slurry dispensed in the spare box 1, making it easy for the tester to observe the real-time storage amount of the slurry. When the slurry is insufficient, it can be re-prepared and the slurry can be replenished through the slurry adding port 100. Preferably, The spare box 1 is of reinforced concrete structure or steel structure, and the material of the level tube 16 is organic glass, which makes it easy to monitor the volume of the slurry in the spare box 1. Preferably, the box cover 10 is further provided with a slurry addition port 100 and a detection sampling port 101, and the slurry addition port 100 is used to add slurry to the spare box 1, and the detection sampling port 101 is used to sample the slurry in the spare box 1. Preferably, the bottom of the spare box 1 is in an inverted cone shape, and the slope of the bottom of the spare box 1 that constitutes the inverted cone shape is 8% to 12%, which makes it possible to smoothly drain the washing water.Rollers 17 are installed at the four corners of the bottom of the spare box 1. The rollers 17 are multi-directional rollers equipped with fixing buttons, which allow the spare box 1 to be moved flexibly and fixed by the fixing buttons. The rollers 17 make it convenient to move the spare box 1 and maintain an appropriate distance between the spare box 1 and the rock breaking slag discharge device, making it easy for the spare box 1 to transport slurry that meets the test requirements to the rock breaking slag discharge device.

[0014] Preferably, the test system further includes a detector, which can detect the performance of the slurry obtained by the detection sampling port 101, and the slurry performance includes indicators such as slurry density, water loss, mud skin, colloid rate, sand content, PH value, viscosity, thixotropy, static cutting force, etc., the method for detecting the performance of the slurry adopts the current relevant standard operation, and the detector adopted for detecting the performance of the slurry is a commercially available product corresponding to the performance of the slurry, for example, the slurry density is detected by the 1002 type slurry specific gravity meter, the water loss is detected by the 1009 type slurry water loss measuring instrument, the sand content of the slurry is detected by the 1004 type slurry sand content measuring instrument, the slurry viscosity is detected by the 1006 type funnel viscometer, and the static cutting force of the slurry is detected by the 1007 type slurry cutting force device, and the indicators such as mud skin, colloid rate, PH value, thixotropy, etc. are measured by the method of the prior art. Before the test, the slurry performance index is designed according to the test requirements, and the slurry is detected according to the specifications. During the test process, the slurry is sampled through the detection sampling port 101, and the performance of the slurry is re-detected. If the performance of the slurry does not meet the test requirements, the slurry performance index is corrected through the slurry addition port 100 and the slurry return port 102. By conducting tests using different slurry performance parameters, the influence of the drilling method of the well hob rock breaking slag discharge efficiency is studied.

[0015] Further, as shown in Figures 1 and 3, the rock breaking slag discharge device includes a frame body 2, which includes a base 25, a vertical pillar 21, and a top plate 22, the vertical pillar 21 is cylindrical, four vertical pillars 21 are installed, and the lower ends of the four vertical pillars 21 are fixed to the base 25, the top plate 22 is a steel structure, and the top plate 22 is connected to the upper ends of the four vertical pillars 21, respectively, the base 25, the four vertical pillars 21, and the top plate 22 form a frame structure, and preferably, a plurality of side panels 23 are installed around the lower ends of the vertical pillars 21, and the side panels 23, the vertical pillars 21, and the base 25 are all connected by welding, the test system is erected on a ground foundation, and the base 25 is fixedly connected to the ground foundation by anchor bolts 24. The frame structure consisting of the base 25, the upright column 21 and the top plate 22 is fixedly connected to the concrete foundation, effectively transmitting the load of the rock breaking slag discharge device to the ground foundation, and the first Hydraulic Pressure The cylinder 33 and the air pump 47 can be mounted thereon, and the entire rock breaking and slag discharge apparatus can be guaranteed to be in a safe state.

[0016] The rock breaking slag discharge device further includes a test box 3, a first hydraulic cylinder 33, a drill rod 34, a drill 35, a cutter head 37, a cutter holder 40, and a rock sample 42. The test box 3 is used to simulate a well. The test box 3 is installed in the frame 2. The test box 3 has a tub-like structure with an open top. The rock sample 42 is installed in the test box 3. The outlet of the slurry transport pipe 11 is located above the test box 3. The rock sample 42 is installed at the bottom of the test box 3. During the test, the slurry is transported into the test box 3 by the slurry transport pipe 11, and the liquid level of the slurry in the test box 3 is higher than the upper end of the rock sample 42. The output end of the first hydraulic cylinder 33 is connected to the upper end of the drill rod 34. The lower end of the drill rod 34 extends into the test box 3. The drill 35 is attached to the lower end of the drill rod 34. The cutter head 37 is attached to the lower end of the drill 35, the upper end of the cutter head 37 is connected to the lower end of the drill 35, the cutter holder 40 is attached to the lower surface of the cutter head 37, the cutter holder 40 is used to attach the hob 41, the first hydraulic cylinder 33 drives the drill 35 to move up and down and rotate through the drill rod 34, so as to realize the vertical feed rotational motion of the hob 41, and is interlocked to rotate the hob 41 on its axis, the drill 35 is located above the rock sample 42, and the drill 35 is interlocked to move up and down and rotate the hob 41 to break the rock sample 42, the rock sample 42 is circular and has a diameter larger than the diameter of the cutter head 37, the height of the rock sample 42 is determined based on the test method, and the rock sample 42 can be prepared in proportion to the samples of different sandstone layers with weak bonds according to the similarity test.Preferably, a groove 400 is provided on the underside of the cutter head 37 along the radial direction of the cutter head 37, the cutter holder 40 is slidably connected to the cutter head 37 through the groove 400, and a fixing bolt 401 is provided on the cutter holder 40, which can fix the position of the cutter holder 40 on the cutter head 37. Preferably, as shown in FIG. 7, a total of six grooves 400 are provided, and each pair of the grooves 400 is a set. The grooves 400 are arranged along the radial direction of the cutter head 37, the pitch of the two grooves 400 in each set is determined according to the dimensions of the cutter holder 40, the groove depth of the grooves 400 meets the requirements of the fixing bolt 401, the included angle between two adjacent sets of grooves 400 is 60°, 2 to 4 cutter holders 40 are installed in each set of grooves 400 according to the test requirements, and each cutter holder 40 is fitted with a hob 41, and the grooves 400 are connected to the cutter head 37. The position of the cutter holder 40 is adjusted in the well, and the position of the hob 41 is further adjusted to adjust the blade pitch of the hob 41. Preferably, the hob 41 is one of scraper, insert tooth wedge hob or ball tooth hob. The cutter holder 40 is matched with the hob 41. In the test process, different types and specifications of hobs 41 are selected to perform tests under different blade pitches, and the installation of the hob 41 has an effect on the efficiency of the hob breaking and slag discharge in the well drilling method. It has been studied to give, preferably, the rock breaking slag discharge device further includes a base 43 and a lifting mechanism 44, a pit 51 is installed on the ground foundation in the frame body 2, the lifting mechanism 44 is installed in the pit 51, the diameter of the pit 51 is larger than the diameter of the test box 3, the base 43 is installed on the lifting mechanism 44, the base 43 has a cylindrical structure, the test box 3 is installed on the base 43, the diameter of the base 43 is larger than the outer diameter of the test box 3, and the lifting mechanism 44 can adjust the height of the test box 3. The test box 3 is cylindrical and has a circular base 43 at the bottom, and the test box 3 has a certain height, weight and volume, so there is a certain difficulty in installation and removal, so that in order to facilitate the installation of the test box 3 containing the rock sample 42 and the cleaning work at the later stage of the test, a lifting mechanism 44 is installed that can move the test box 3 up and down freely into an operating state, making the installation and removal of the test box 3 easier.During the rock breaking test, the height of the rock sample 42 can be adjusted by the lifting mechanism 44, thereby reducing the downward movement width of the drill 35.

[0017] Furthermore, the rock breaking slag discharge device further includes a connector 45, a connection member 46, an air pump 47, an air pipe 39, an internal slag discharge main pipe and an internal slag discharge branch pipe 48, the air pump 47 and the connector 45 are both installed on the top plate 22, the drill rod 34 has a hollow cylindrical structure, the internal slag discharge main pipe and the air pipe 39 are both installed in the drill rod 34, and the first Hydraulic PressureThe cylinder 33 is connected to the drill rod 34 via a connector 45, the upper end of the internal slag discharge main pipe is connected to one end of the external slag discharge pipe 20 via the connector 45, and the other end of the external slag discharge pipe 20 is connected to the slurry residue separation device. The connector 45 is a dynamic / static conversion device used to connect the internal slag discharge main pipe in the drill rod 34 and the external slag discharge pipe 20, which can ensure that no leakage occurs at the connection point between the internal slag discharge main pipe and the external slag discharge pipe 20 when the drill rod 34 rotates. The drill rod 34 is connected to the drill 35 via a connecting member 46, an enlarged head 49 is installed in the connecting member 46, a slag suction port 38 is installed in the cutter head 37, the upper end of the internal slag discharge branch pipe 48 is connected to the lower end of the internal slag discharge main pipe by the enlarged head 49, the lower end of the internal slag discharge branch pipe 48 passes through the drill 35 and connects to the slag suction port 38 in the cutter head 37, the upper end of the air supply pipe 39 is connected to an air supply pump 47, an air supply port is installed in the internal slag discharge branch pipe 48, and the lower end of the air supply pipe 39 connects to the internal slag discharge branch pipe 48 through the air supply port, and the air supply pump 47 transports high-pressure air through the air supply pipe 39 to the internal slag discharge branch pipe 48 to complete the slag discharge function.Preferably, three slag suction ports 38 are installed, the cutter head 37 is a disk-shaped steel plate, the three slag suction ports 38 are respectively located at the center A of the cutter head 37, at a position B of 1 / 2 the radius of the cutter head 37, and at a peripheral position C close to the cutter head 37, each slag suction port 38 is installed with a sliding cover plate, which can close the slag suction port 38, the three slag suction ports 38 are provided for testing slag suction ports 38 in different positions to study the reasonable position of the slag suction port 38, three internal slag discharge branch pipes 48 are installed, and each internal slag discharge branch pipe 48 is connected to one slag suction port 38. Each internal slag discharge branch pipe 48 is connected to an air supply pipe 39, and when in use, depending on the test method, one of slag suction port A 38, slag suction port B 38, or slag suction port C 38 can be selected for the slag suction port 38, and one of slag suction port AB 38, slag suction port AC 38, or BC slag suction port 38 can be selected, and all of slag suction ports ABC 38 can be selected. If a certain slag suction port 38 is not used in the test, air is not supplied to the air supply pipe 39 connected to this internal slag discharge branch pipe 48, and at the same time, the slag suction port 38 is closed using a sliding cover plate. Preferably, the connecting member 46 includes a truncated cone portion 460 and a cylindrical portion 461, the diameter of the upper surface of the truncated cone portion 460 is smaller than the diameter of the lower surface, the upper end of the truncated cone portion 460 is fixedly connected to the drill rod 34 by the connecting flange 36 and the flange bolt, the lower end of the truncated cone portion 460 is connected to the upper end of the cylindrical portion 461, and the lower end of the cylindrical portion 461 is fixedly connected to the drill 35. The drill rod 34 is a hollow steel structural circular pipe, and one large (internal slag discharge branch pipe) and two small (air supply pipes 39) hollow pipes are built in the hollow portion, and the structure is tight. In the test process, different positions of the slag discharge port 71 are selected and the air supply pump 47 is adjusted to generate different air pressures to study the effect of the drilling method of the vertical well hob rock breaking slag discharge efficiency.

[0018] 5 and 6, the test box 3 includes an upper section 30, a lower section 31 and a bottom plate 32, the upper section 30 and the lower section 31 are all cylindrical structures, the inner diameter of the upper section 30 is the same as the inner diameter of the lower section 31, the bottom plate 32 covers the lower end of the lower section 31, there is a hermetically sealed connection between the upper section 30 and the lower section 31, and there is a hermetically sealed connection between the lower section 31 and the bottom plate 32, the material of the upper section 30 is high-strength tempered glass, which is white and transparent, making it easy to see the working state of the slurry in the test box 3, the lower section 31 is made of reinforced concrete, a number of preliminary holes 310 are provided in the lower section 31, and a circular ring-shaped surrounding plate 52 is provided in close contact with the inner wall of the lower section 31, the material of the surrounding plate 52 is a steel plate, and the height of the surrounding plate 52 is 100 mm. The length of the rock sample 42 is equal to the height of the lower stage 31, the rock sample 42 has a cylindrical structure, the outer diameter of the rock sample 42 is equal to the inner diameter of the enclosing plate 52, the height of the rock sample 42 is higher than the height of the lower stage 31, the rock sample 42 is installed in the enclosing plate 52, the outer wall of the rock sample 42 is in close contact with the enclosing plate 52, an annular second hydraulic cylinder 50 is installed on the outer periphery of the lower stage 31, the second hydraulic cylinder 50 is fitted into the outer wall of the lower stage 31, the second hydraulic cylinder 50 has a plurality of output ends, the output end of each second hydraulic cylinder 50 abuts against the enclosing plate 52 through one spare hole 310 on the lower stage 31, the second hydraulic cylinder 50 applies a radial restraining pressure to the rock sample 42 through the enclosing plate 52, and the monitoring assembly is a pressure sensor. - pressure sensor - is connected to the control device, and the pressure sensor - is installed in the second hydraulic cylinder 50, and a pressure sensor - can collect data on the second hydraulic cylinder 50 exerting pressure on the rock sample 42, and the controller can include a pressure sensor - The second hydraulic cylinder 50 can be controlled based on the pressure data collected by the second hydraulic cylinder 50. Hydraulic Pressure The cylinder 50 is a pressure sensor -The confining pressure is controlled by the second hydraulic cylinder 50, and the actual real force-bearing state of rock at a certain depth downhole is simulated. The test box 3 has sufficient pressure-bearing capacity and sealing effect, and the upper section 30 of the test box 3 adopts high-strength reinforced glass to ensure transparency, so that the rock breaking slag discharge effect can be observed in real time. In the test process, the effect of the drilling method of the vertical well hob rock breaking slag discharge efficiency is studied by selecting different rock samples 42 and generating different confining pressures by the second hydraulic cylinder 50. Preferably, the preliminary holes 310 are uniformly installed in three rows from top to bottom in the lower section 31, and 12 preliminary holes 310 are installed in each row, and the preliminary holes 310 in each row are uniformly distributed along the circumferential direction of the lower section 31, so that the second hydraulic cylinder 50 can apply the confining pressure to the rock samples 42 uniformly, so that the rock samples 42 are more uniformly pressure-bearing. Preferably, the height of the lower section 31 is 1m to 1.5m, and the upper section 30 is composed of a plurality of mounting units 300 installed from top to bottom, and each mounting unit 300 of each section is annular, and each mounting unit 300 of each section is made by joining three pieces of high-strength tempered glass, and the space between two adjacent mounting units 300 of each section is filled with an elastic water-repellent material and connected by a mortise and tenon structure, and the space between two adjacent pieces of high-strength tempered glass in each mounting unit 300 of each section is filled with an elastic water-repellent material and connected by a mortise and tenon structure. By installing in this way, it is easy to remove and install, and the connection is strong and reliable, and it is possible to ensure that no leakage occurs. Preferably, the height of each mounting unit 300 of each section is 1m, and two adjacent mounting units 300 are installed with a staggered installation to avoid the formation of through slits above and below. Preferably, an anchor groove 311 is provided along the circumferential direction at the upper end of the lower stage 31, the depth of the anchor groove 311 is 150 mm, the lower end of the upper stage 30 is located within the anchor groove 311, and an elastic water-repellent material is filled between the lower end of the upper stage 30 and the side wall of the anchor groove 311 to prevent leakage and avoid damage caused by rigid contact during installation.

[0019] Furthermore, as shown in FIG. 4, the slurry residue separation device includes a slurry residue filter cylinder 6, a first cylinder 65, a second cylinder 66, and a vibration rod motor. - 67, the first cylinder 65 and the second cylinder 66 are located on both sides of the slurry residue filtration cylinder 6, the upper end of the slurry residue filtration cylinder 6 is covered with a cover plate 60, and a slurry residue inlet 61 is provided on the cover plate 60. A first strainer 68 and a second strainer 69 are provided in the slurry residue filtration cylinder 6 from top to bottom, and a first discharge port 62 and a second discharge port 63 are provided on both side walls of the slurry residue filtration cylinder 6, respectively. The first strainer 68 and the second strainer 69 are both installed at an incline, and one end of the first strainer 68 is connected to one side wall of the slurry residue filtration cylinder 6, and the other end of the first strainer 68 is connected to the slurry residue filtration cylinder 6. The first strainer 68 extends outside the slurry residue filtration tube 6 from a first discharge outlet 62 installed on the other side wall of the tube 6, and the other end of the first strainer 68 is located above the first cylinder 65, and the height of one end of the first strainer 68 is greater than the height of the other end. The slurry residue inlet 61 in the cover plate 60 is installed above one end of the first strainer 68, and the other end of the external slag discharge pipe 20 is connected to the slurry residue inlet 61. The first strainer 68 performs a first filtration of the rock slag liquid transported by the external slag discharge pipe 20, and the coarse rock slag particles filtered by the first strainer 68 fall into the first cylinder 65 from the first strainer 68 extending outside the first discharge outlet 62. One end of the second strainer 69 is connected to the other side wall of the slurry residue filter cylinder 6, and the other end of the second strainer 69 extends outside the slurry residue filter cylinder 6 from the second discharge port 63 installed on one side wall of the slurry residue filter cylinder 6, and the other end of the second strainer 69 is located above the second cylinder 66, and the height of one end of the second strainer 69 is greater than the height of the other end, so that the second strainer 69 filters the rock slag liquid filtered by the first strainer 68 for a second time, and the medium-coarse rock slag particles filtered by the second strainer 69 fall from the second strainer 69 extending outside the second discharge port 63 into the second cylinder 66. Vibration rod motor - 67 is installed on the cover plate 60, and is a vibration rod motor - 67 is connected to both the first strainer 68 and the second strainer 69, and is a vibration rod motor. -67 can be driven to vibrate the first strainer 68 and the second strainer 69, and the vibration of the first strainer 68 and the second strainer 69 is advantageous for the effective separation of the rock slag and slurry in the rock slag liquid, and preferably, a net-shaped exhaust port 64 is installed on the cover plate 60, and the exhaust port 64 is used for the water vapor flow of the rock slag liquid, the gas in the rock slag liquid rises and is discharged from the exhaust port 64, and the rock slag slurry is discharged downward by the action of gravity. Preferably, in order to contribute to the rapid discharge of the slurry residue, the bottom of the slurry residue filter tube 6 is inverted cone shape, and the slope of the bottom of the slurry residue filter tube 6 forming the inverted cone shape is 45°. One end of the slurry discharge pipe 73 is connected to the bottom of the slurry residue filter tube 6, and the other end of the slurry discharge pipe 73 is connected to the cyclone 70. The rock slag liquid containing only the ultrafine abrasive grains filtered by the first strainer 68 and the second strainer 69 is transported to the cyclone 70 by the slurry discharge pipe 73. Preferably, the included angle between the first strainer 68 and the horizontal plane is 30°, and the included angle between the second strainer 69 and the horizontal plane is 30°. By installing in this way, the first strainer 68 and the second strainer 69 are relatively gentle, and the rock slag does not roll down from the first strainer 68 and the second strainer 69 quickly. The hole diameter of the first strainer 68 is 20mm to 30mm, and the hole diameter of the second strainer 69 is 4mm to 6mm. The hole diameter setting of the first strainer 68 and the second strainer 69 is determined based on the difficulty of rock breaking and the test method. In one embodiment of the present invention, the hole diameter of the first strainer 68 is 25mm, and the hole diameter of the second strainer 69 is 5mm. Preferably, the slurry residue filter cylinder 6 is equipped with a door for convenient management. Preferably, the test system further includes a test stand 8, and the slurry residue separation device is installed on the test stand 8 to regulate orderly.

[0020] Further, as shown in FIG. 4, the slurry residue separation device further includes a cyclone 70 and a third cylinder 72, the other end of the slurry discharge pipe 73 is connected to the cyclone 70, the rock slag liquid in the slurry discharge pipe 73 enters the cyclone 70 along a tangential direction, the second gate valve 730 and the pressure pump 731 are installed in the slurry discharge pipe 73, the second gate valve 730 controls the on / off of the slurry discharge pipe 73, and the pressure pump 731 provides sufficient pressure to the slurry discharge pipe 73 so that the rock slag liquid can be smoothly introduced into the cyclone 70. The cyclone 70 is inserted into the slag discharge pipe 76, and the upper end of the cyclone 70 is connected to one end of the slurry discharge pipe 76. The box cover 10 of the spare box 1 is provided with a slurry return port 102, and the other end of the slurry discharge pipe 76 is connected to the slurry return port 102 of the spare box 1. The lower end of the cyclone 70 is provided with a slag discharge port 71, and the slag discharge pipe 74 is connected to the slag discharge port 71. The third cylinder 72 is located below the slag discharge pipe 74, and the third cylinder 72 collects the ultra-fine rock slag particles filtered by the cyclone 70. The slag discharge pipe 74 is provided with an outlet valve 75. The entire cyclone 70 is placed on the workbench, and the height is appropriate, which shortens the transport height of the rock slag liquid and relieves the transport pressure of the pressure pump 731.

[0021] The slurry residue separation device includes a slurry residue filter cylinder 6 and a cyclone 70, and separates rock slag and slurry from rock slag liquid. The slurry residue filter cylinder 6 is equipped with two layers of a first strainer 68 and a second strainer 69 that can separate different particle sizes. The first strainer 68 filters the coarse rock slag, and the second strainer 69 filters the medium-coarse rock slag. The first strainer 68 and the second strainer 69 are both installed at an inclination of 30°, and the inclination directions are opposite. One end of the first strainer 68 and one end of the second strainer 69 are firmly connected to the side wall of the slurry residue filter cylinder 6, and the weight of the rock slag causes the vibration rod motor to vibrate. -The rock slag liquid is rolled from a high place into the first cylinder 65 and the second cylinder 66 by the vibration force of 67. The rock slag liquid filtered by the second strainer 69 passes through the inverted cone-shaped cylinder bottom of the slurry residue filtering cylinder 6 and flows into the slurry discharge pipe 73, and the rock slag liquid enters the cyclone 70 through the slurry discharge pipe 73 by the action of the pressure pump 731. After the rock slag liquid containing fine rock slag enters the cyclone 70 along the tangential direction from the other end of the slurry discharge pipe 73 under pressure, a rotational motion is generated in the rock slag liquid, and because the density of the fine rock slag and the water are different, the slurry with low density rises and is discharged from the slurry discharge pipe 76, and the fine rock slag with high density is discharged from the ultra-fine rock slag outlet at the bottom and falls into the third cylinder 72. The slurry in the slurry discharge pipe 76 is returned to the spare box 1 through the slurry return port 102 of the spare box 1, realizing a closed loop for the slurry and preventing the "discarded" slurry from contaminating the environment.

[0022] 4, the weighing device includes a drying box 81 and an electronic balance 82, the drying box 81 dries the coarse rock slag, medium coarse rock slag and very fine rock slag separated and washed by the slurry residue separation device, the electronic balance 82 has a display screen, the electronic balance 82 weighs the weight of each group of materials and displays the weight on the display screen, the electronic balance 82 is equipped with a material tray 83, the dried coarse rock slag, medium coarse rock slag and very fine rock slag are placed on the material tray 83 through the fixture respectively, the drying box 81 is weighed by the electronic balance 82, and the tester records the weight. Preferably, the slurry residue separation device and the weighing device are both installed on the test table 8, adjacent to the rock slag discharge device and the spare box 1, the drying box 81, the electronic balance 82 and the display screen are all arranged on one side of the slurry residue separation device, and the layout of the entire test system is compact, closely connected, easy to use and harmonious.

[0023] The monitoring assembly further includes a three-way force sensor, a rotational speed sensor and a displacement sensor, all of which are mounted on the cutter holder 40, and all of which are connected to the control device, the three-way force sensor collecting pressure data applied by the first hydraulic cylinder 33, the rotational speed sensor collecting rotational speed data of the drill 35, and the displacement sensor collecting vertical displacement data of the drill 35, and the control device controls the first hydraulic cylinder 33 based on the data collected by the three-way force sensor, the rotational speed sensor and the displacement sensor.

[0024] The monitoring assembly includes a three-way force sensor, a rotational speed sensor, a displacement sensor and a pressure sensor. - The time history of each directional force, the rotation speed of the drill 35, the vertical displacement of the drill 35, and the torque performance of the drill rod 34 during the rock breaking process can be monitored by the above-mentioned. The time history of each directional force is a graph in which the normal force of the hob 41, the tangential force of the hob 41, and the lateral force of the hob 41 (ordinate) change according to time (abscissa) under specific drilling parameters, which reflects an undulating dynamic relationship curve. The control device performs a first calculation based on the pressure data, the rotation speed data of the drill 35, the displacement data of the drill 35, and the confining pressure data collected by the monitoring assembly. Hydraulic Pressure Cylinder 33 and second Hydraulic Pressure It controls the cylinder 50 and stores the data collected by the monitoring assembly.

[0025] This test system performs tests on hobs 41 of different types and specifications when selecting different cutting edge pitches, different drill pressures, different rotation speeds, and different rock samples 42, different slurry performance parameters, different positions of slag outlet 71, different air pressures generated by air pump 47, and different confining pressures, and the control device generates experimental reports and experimental curves, and the experimental reports and experimental curves are used to study the influencing factors of the hob rock breaking slag discharge efficiency of the drilling method vertical well. Tests are performed on hobs 41 of different types and specifications, and the tooth pitch, row pitch, penetration rate, and cutter rotation speed of the hob 41 can be studied. The tooth pitch and row pitch are attributes of the hob 41, which are determined by the test research plan and can be customized by the manufacturer according to relevant requirements. The penetration rate is a drilling parameter set before the test, and the rock breaking efficiency can be evaluated by setting other parameters or test data obtained thereby. The tooth pitch, row pitch, penetration rate, and cutter rotation speed are all prerequisites for studying the rock breaking mechanism and are the main factors affecting the rock breaking efficiency. The cutter holder 40 of the hob 41 rotates together with the cutter head 37, and the hob 41 is forced to rotate about the cutter shaft. The rotational force of the hob 41 depends on the rotational speed of the cutter head 37. The rotational speed of the cutter head 37 is determined by the first Hydraulic Pressure Depending on the power of the cylinder 33 , the cutter rotation speed of the hob 41 can be estimated according to the rotation speed of the cutter head 37 coupled by the drill 35 , given the radius of the hob 41 and the position of the cutter holder 40 .

[0026] As can be seen from the above description, the above embodiments of the present invention achieve the following technical advantages.

[0027] 1. Rock breaking slag discharge is a closely related system problem in the construction of drilling method, and "rock breaking" and "discharge" influence each other and complement each other. The embodiment of the present invention is based on the slurry performance parameters arranged according to different rock facies, the selection of the type of rock breaking cutter and mechanical parameters, such as the tooth pitch, row pitch, penetration, drill pressure, the rotation speed of the cutter head 37 (drill 35), the optimized arrangement of the cutter rotation speed and blade pitch, the position of the slag discharge port 71, etc., to study the influencing factors of the rock breaking slag discharge efficiency of the hob of the well drilling method by drilling method, solve the matching problem of the rock breaking slag discharge of the hob 41 of the well drilling method by drilling method, and focus on improving the rock breaking slag discharge efficiency.

[0028] 2. By weighing and comparing the rock slag slurry separation residue (coarse rock slag particles filtered by the first strainer 68, medium-coarse rock slag particles filtered by the second strainer 69, and very fine rock slag particles filtered by the cyclone 70) under the same conditions, a laboratory simulation research test can be carried out on the influencing factors of the rock breaking efficiency of the vertical well drill bit hob of various slag suction ports 38 in various hob 41 modes. This test system can maximize the simulation of the actual rock breaking slag discharge scenario by the drilling hob 41 in the room, and has a very strong test simulation property or "micro-work scenario", and the conclusions obtained by analyzing, evaluating and researching the rock breaking slag discharge efficiency are irreplaceable because they are close to the "original".

[0029] 3. Avoid the disadvantages of only studying slag discharge or only studying rock breaking, and establish the organic association of rock breaking slag discharge. Avoid the disadvantages of the single research situation of rock breaking or slag discharge, can test on different rock samples 42 with weak bonds, can select different cutters and their parameters to test, can select different drilling parameters to test, can set different slurry performance parameters to test, can select different slag discharge ports 71 and air pressure to test, can set different confining pressures for rock samples 42 to test, and can maximize and expand the multi-function effect of the test bench 8. In the current drilling method in China, the type of the construction hob 41 is fixed, the slag discharge port 71 is fixed, the rock body rotates and the drill 35 does not rotate, and only rock breaking or only rock slag discharge is studied, which leads to the current situation of testing with a single working situation and a single parameter indicator, so as to improve the difference in inconsistency model caused by the inconsistency between indoor testing and outdoor working environment.

[0030] Although the preferred embodiments of the present invention have been described above, the present invention is not limited to the above embodiments, and various modifications and variations are possible. Any amendments, equivalent replacements, improvements, etc. made within the spirit and principle of the present invention should be included within the protection scope of the present invention. [Explanation of symbols]

[0031] 1 spare box 10 box lids 100 Slurry supply port 101 Detection sampling port 102 Slurry return port 11 Slurry transport pipe 12 Slurry suction pump 13 Wash water outlet 14 First Gate Valve 15 Mixer 150 Agitator shaft 151 Mixing blade 16 Level tube 17. Lola 2 frame 20 External slag discharge pipe 21 Standing Pillar 22 Tabletop 23 Sideboard 24 Anchor bolt 25 Pedestal 3 Test box 30 Upper 300 Mounting unit 31 Lower 310 Spare hole 311 Anchor groove 32 Bottom plate 33 First hydraulic cylinder 34 Drill Rod 35 Drill 36 Connection flange 37 Cutter Head 38 Slag suction port 39 Air pipe 40 Cutter holder 400 Groove 401 Fixing bolt 41 Hob 42 Rock samples 43 Base 44 Lifting mechanism 45 Connector 46 Connection parts 460 Cone truncated part 461 Cylinder 47 Air Pump 48 Internal slag discharge branch 49 Enlarged Head 50 Second hydraulic cylinder 51 Pit 52 Enclosure plate 6. Slurry residue filter tube 60 Lid plate 61 Slurry residue inlet 62 First outlet 63 Second outlet 64 Exhaust port 65 First Cylinder 66 Second Cylinder 67 Vibration rod motor - 68 First Strainer 69 Second Strainer 70 Cyclone 71 Slag discharge port 72 Third Cylinder 73 Slurry discharge pipe 730 Second Gate Valve 731 Pressure Pump 74 Slag discharge pipe 75 Outlet Valve 76 Slurry discharge pipe 8 Test bench 81 Drying box 82 Electronic balance 83 Material Tray

Claims

1. A research and testing system for influencing factors of rock breaking slag discharge efficiency of a well drilling method, comprising: a reserve box, a rock breaking slag discharge device, a slurry residue separation device, a metering device, a monitoring assembly, and a control device; The spare box contains slurry and is connected to the rock breaking and slag discharge device through a slurry transport pipe, and provides the rock breaking and slag discharge device with the slurry required for the test; The rock slag discharge device can discharge rock slag, and the rock slag discharge device is connected to the slurry residue separation device through an external slag discharge pipe, and during the test process, the rock slag liquid generated by the rock slag discharge device is transported into the slurry residue separation device through the external slag discharge pipe; The rock breaking slag discharge device includes a frame body, the frame body includes a base, a vertical pillar, and a top plate, the vertical pillars are installed in four pieces, the lower ends of the four vertical pillars are fixed to the base, and the top plate is connected to the upper ends of the four vertical pillars, respectively, the base, the four vertical pillars, and the top plate form a frame body structure, a plurality of side panels are installed around the lower ends of the vertical pillars, the side panels are connected to both the vertical pillars and the base, and the base is fixed to the ground foundation by anchor bolts; The rock breaking slag discharge apparatus further includes a test box, a first hydraulic cylinder, a drill rod, a drill, a cutter head, a cutter holder, and a rock sample; The test box is installed within the frame and has a tub-like structure with an open top, the rock sample is installed within the test box, the outlet of the slurry transport pipe is located above the test box, and the rock sample is installed at the bottom of the test box; The output end of the first hydraulic cylinder is connected to the upper end of the drill rod, the lower end of the drill rod extends into the test box, the drill is attached to the lower end of the drill rod, the upper end of the cutter head is connected to the lower end of the drill, the cutter holder is attached to the lower surface of the cutter head and is used to attach a hob, the first hydraulic cylinder drives the drill to move up and down and rotate via the drill rod, the drill is located above the rock sample, and the drill can move up and down and rotate the hob in conjunction with the hob to break the rock sample; A groove is provided on the underside of the cutter head along the radial direction of the cutter head, the cutter holder is slidably connected to the cutter head through the groove, and a fixing bolt is provided on the cutter holder, and the fixing bolt can fix the position of the cutter holder on the cutter head; A total of six grooves are provided, and two of the grooves form a set. The grooves of each set are provided along the radial direction of the cutter head, and the included angle between two adjacent sets of the grooves is 60°. Two to four cutter holders are provided in each set of the grooves according to test requirements, and each cutter holder is provided with one of the hobs; The hob is one of a scraper, an insert tooth wedge hob, or a ball tooth hob, and the cutter holder matches the hob; The rock breaking slag discharge device further includes a base and a lifting mechanism, a pit is installed in the ground foundation within the frame body, the lifting mechanism is installed in the pit, the base is installed on the lifting mechanism, the base has a cylindrical structure, the test box is installed on the base, the diameter of the base is larger than the outer diameter of the test box, and the lifting mechanism can adjust the height of the test box; The rock slag liquid entering the slurry residue separation device can be separated into rock slag and slurry in the slurry residue separation device; The rock slag separated in the slurry residue separation device can be dried and weighed by the weighing device; The monitoring assembly is connected to the control device and can collect data during testing by the research test system for the impact factors of drilling method vertical well hob rock breaking slag discharge efficiency; The present invention relates to a research and testing system for the factors influencing the efficiency of rock breaking and slag discharge in vertical well drilling.

2. The spare box has a box structure that opens upward, a box lid is covered at the upper end of the spare box, a slurry suction pump is installed on the box lid, one end of the slurry transport pipe is connected to the slurry suction pump, and a lower end of the slurry suction pump passes through the box lid and then extends below the liquid level of the slurry in the spare box, A cleaning water outlet is provided at the bottom of the spare box, and a first gate valve is provided at the cleaning water outlet; An agitator is further installed on the box lid, and the agitator shaft extends into the preliminary box after passing through the box lid, and an agitator blade is installed on the agitator shaft. The agitator is driven by the agitator shaft to rotate the agitator blade, and the rotation of the agitator blade can agitate the slurry in the preliminary box; a level tube is provided on one side of the spare box, the lower end of the level tube is connected to the bottom of the spare box, the upper end of the level tube is higher than the liquid level of the slurry in the spare box, and a measurement scale line is provided on the level tube; The spare box is made of reinforced concrete or steel, and the liquid level tube is made of organic glass. The box lid is further provided with a slurry addition port for refilling the box lid with a slurry and a detection sampling port for sampling the slurry in the spare box, The bottom of the spare box has an inverted cone shape, and the gradient of the bottom of the spare box forming the inverted cone shape is 8% to 12%, and a roller is installed on the bottom of the spare box; The research testing system further comprises a detector capable of detecting the performance of the slurry obtained by the detection sampling port. The research and testing system for influencing factors of hob rock breaking and slag discharge efficiency in a vertical well drilling method according to claim 1.

3. The rock breaking slag discharge device further includes a connector, a connection member, an air pump, an air pipe, an internal slag discharge main pipe, and an internal slag discharge branch pipe, the air pump and the connector are all installed on the top plate, the drill rod has a hollow cylindrical structure, the internal slag discharge main pipe and the air pipe are all installed in the drill rod, the first hydraulic cylinder is connected to the drill rod through the connector, the upper end of the internal slag discharge main pipe is connected to one end of the external slag discharge pipe through the connector, and the other end of the external slag discharge pipe is connected to the slurry residue separation device, the drill rod is connected to the drill through the connection member, and an enlarged head is installed in the connection member, The cutter head is provided with a slag suction port, the upper end of the internal slag discharge branch pipe is connected to the lower end of the internal slag discharge main pipe through the enlarged head, the lower end of the internal slag discharge branch pipe is connected to the slag suction port of the cutter head through the drill, the upper end of the air supply pipe is connected to the air supply pump, the internal slag discharge branch pipe is provided with an air supply port, and the lower end of the air supply pipe is connected to the internal slag discharge branch pipe through the air supply port, The cutter head has three slag suction ports, the cutter head has a circular cross section, and the three slag suction ports are located at the center of the cutter head, at a position that is half the radius of the cutter head, and at a peripheral position close to the cutter head, respectively; the cutter head has three internal slag discharge branch pipes, each of the internal slag discharge branch pipes is connected to one of the slag suction ports, and each of the internal slag discharge branch pipes is connected to one of the air pipes; the connecting member includes a truncated cone portion and a cylindrical portion, the diameter of the upper surface of the truncated cone portion is smaller than the diameter of the lower surface, the upper end of the truncated cone portion is fixedly connected to the drill rod by a connecting flange and a flange bolt, the lower end of the truncated cone portion is connected to the upper end of the cylindrical portion, and the lower end of the cylindrical portion is fixedly connected to the drill; The research and testing system for influencing factors of hob rock breaking and slag discharge efficiency in a vertical well drilling method according to claim 1.

4. the test box includes an upper stage, a lower stage and a bottom plate, the upper stage and the lower stage are all cylindrical structures, the inner diameter of the upper stage is the same as the inner diameter of the lower stage, the bottom plate covers the lower end of the lower stage, the upper stage and the lower stage are connected in a sealed manner, and the lower stage and the bottom plate are connected in a sealed manner; the upper stage is made of high-strength reinforced glass, the lower stage is made of reinforced concrete, the lower stage is provided with a number of preliminary holes, a ring-shaped surrounding plate is installed on the inner wall in close contact with the lower stage, the surrounding plate is made of a steel plate, the height of the surrounding plate is the same as the height of the lower stage, the rock sample has a cylindrical structure, the outer diameter of the rock sample is equal to the inner diameter of the surrounding plate, the height of the rock sample is higher than the height of the lower stage, and the rock sample is placed within the surrounding plate; A ring-shaped second hydraulic cylinder is installed on the outer periphery of the lower stage, and the second hydraulic cylinder has a plurality of output ends, and the output ends of the second hydraulic cylinders abut against the surrounding pressure plate through one of the preliminary holes on the lower stage, and the second hydraulic cylinder applies a confining pressure to the rock sample through the surrounding pressure plate; the monitoring assembly includes a pressure sensor, the pressure sensor being connected to the controller; the pressure sensor is installed in the second hydraulic cylinder, the pressure sensor is capable of collecting data on the second hydraulic cylinder exerting pressure on the rock sample, and the controller is capable of controlling the second hydraulic cylinder based on the pressure data collected by the pressure sensor; The spare holes are uniformly arranged in three rows from top to bottom in the lower stage, with 12 spare holes in each row, and the spare holes in each row are uniformly distributed in a circumferential direction of the lower stage; The height of the lower stage is 1 m to 1.5 m, the upper stage is composed of a plurality of mounting units installed from top to bottom, the mounting units of each stage are all annular, the mounting units of each stage are formed by joining three sheets of high-strength tempered glass, the space between the mounting units of two adjacent stages is filled with an elastic water-repellent material and connected by a tenon joint structure, and the space between two adjacent sheets of high-strength tempered glass within the mounting unit of each stage is filled with an elastic water-repellent material and connected by a tenon joint structure, The height of the mounting unit of each section is 1m, An anchor groove is provided along a circumferential direction at an upper end of the lower stage, the depth of the anchor groove is 150 mm, and the lower end of the upper stage is located within the anchor groove. The research and testing system for influencing factors of hob rock breaking and slag discharge efficiency in a vertical well drilling method according to claim 1.

5. The slurry residue separation device includes a slurry residue filtration cylinder, a first cylinder, a second cylinder, and a vibration rod motor, the first cylinder and the second cylinder are respectively located on both sides of the slurry residue filtration cylinder, the upper end of the slurry residue filtration cylinder is covered with a cover plate, and a slurry residue inlet is installed on the cover plate; a first strainer and a second strainer are installed in the slurry residue filtration cylinder from top to bottom, a first discharge port and a second discharge port are installed on both side walls of the slurry residue filtration cylinder, the first strainer and the second strainer are both installed at an incline, one end of the first strainer is connected to one side wall of the slurry residue filtration cylinder, the other end of the first strainer extends from the first discharge port to the outside of the slurry residue filtration cylinder, the other end of the first strainer is located above the first cylinder, the height of one end of the first strainer is greater than the height of the other end, the slurry residue inlet is installed above one end of the first strainer, and the other end of the external slag discharge pipe is connected to the slurry residue inlet; one end of the second strainer is connected to the other side wall of the slurry residue filtration cylinder, the other end of the second strainer extends from the second discharge port to the outside of the slurry residue filtration cylinder, the other end of the second strainer is located above the second cylinder, and the height of the one end of the second strainer is higher than the height of the other end; The vibrating rod motor is installed on the cover plate, and the vibrating rod motor is connected to both the first strainer and the second strainer, and the vibrating rod motor can be driven to vibrate the first strainer and the second strainer, The cover plate is provided with an exhaust port, The bottom of the slurry residue filtration tube has an inverted cone shape, and the inclination of the bottom of the slurry residue filtration tube forming the inverted cone shape is 45°; The angle between the first strainer and a horizontal plane is 30°, the angle between the second strainer and a horizontal plane is 30°, the hole diameter of the first strainer is 20 mm to 30 mm, and the hole diameter of the second strainer is 4 mm to 6 mm; The research test system further includes a test stand on which the slurry residue separation apparatus is installed. The research and testing system for influencing factors of hob rock breaking and slag discharge efficiency in a vertical well drilling method according to claim 1.

6. The slurry residue separation device further includes a cyclone and a third cylinder, one end of a slurry discharge pipe is connected to the bottom of the slurry residue filter cylinder, the other end of the slurry discharge pipe is connected to the cyclone, and a second gate valve and a pressure pump are installed in the slurry discharge pipe; One end of a slurry discharge pipe is connected to the upper end of the cyclone, a slurry return port is provided in the reserve box, and the other end of the slurry discharge pipe is connected to the slurry return port of the reserve box, A slag discharge port is provided at the bottom end of the cyclone, and a slag discharge pipe is connected to the slag discharge port. The third cylinder is located below the slag discharge pipe, and an outlet valve is provided on the slag discharge pipe. The research and testing system for influencing factors of hob rock breaking slag discharge efficiency in a vertical well drilling method according to claim 5.

7. The weighing device includes a dry box and an electronic balance, the dry box dries the rock slag separated in the slurry residue separation device; The electronic balance has a display screen, a material tray is placed on the electronic balance, and the electronic balance can weigh the rock slag dried by the drying box; The weighing device is mounted on the test stand. The research and testing system for influencing factors of hob rock breaking slag discharge efficiency in a vertical well drilling method according to claim 5.

8. the monitoring assembly includes a three-way force sensor, a rotational speed sensor, and a displacement sensor, the three-way force sensor, the rotational speed sensor, and the displacement sensor are all mounted on the cutter holder, and the three-way force sensor, the rotational speed sensor, and the displacement sensor are all connected to the control device; the three-way force sensor collects pressure data applied by the first hydraulic cylinder, the rotational speed sensor collects rotational speed data of the drill, and the displacement sensor collects vertical displacement data of the drill; and the controller controls the first hydraulic cylinder based on the data collected by the three-way force sensor, the rotational speed sensor, and the displacement sensor. The research and testing system for influencing factors of hob rock breaking and slag discharge efficiency in a vertical well drilling method according to claim 1.

Citation Information

Patent Citations

  • Method for detecting and evaluating reinforcing effect on weak surrounding rock grouting during underground construction

    CN104880544A

  • Slurry shield tunneling machine circulation system simulation experiment table

    CN109406092A

  • Horizontal jet-mechanical combined rock breaking test device and method

    CN111624087A

  • TBM hob and high-pressure water jet coupling rock breaking simulation test system and method

    CN111624088A

  • A many functional test and experiment platform for indoor research of jet drilling

    CN207377495U