Business management device and business management program

The system addresses the risk of advance payments in SES contracts by calculating a credit limit based on project and technical risks, enabling controlled partial prepayments to contracting business owners, thus managing financial uncertainties.

JP7558570B2Active Publication Date: 2024-10-01CASLEY DEEP INNOVATIONS INC
View PDF 5 Cites 0 Cited by

Patent Information

Application Number
JP2021105074
Authority / Receiving Office
JP · JP
Patent Type
Patents
Current Assignee / Owner
Filing Date
2021-06-24
Publication Date
2024-10-01
Estimated Expiration
2041-06-24

AI Technical Summary

Technical Problem

The challenge in SES business management systems is the risk associated with advance payments to contracting business owners, as clients may face uncertainties in fulfilling their obligations, necessitating a method to evaluate and set appropriate advance payment amounts.

Method used

A business management system that calculates a credit limit based on risk factors, including project progress, technical difficulty, and customer creditworthiness, allowing partial advance payments to be made to contracting business owners.

Benefits of technology

This system enables clients to assess and manage the risk of advance payments effectively, providing a credit limit for partial prepayments while ensuring timely financial obligations are met.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 0007558570000001
    Figure 0007558570000001
  • Figure 0007558570000002
    Figure 0007558570000002
  • Figure 0007558570000003
    Figure 0007558570000003
Patent Text Reader

Abstract

To set a credit limit according to a risk related to prepayment, and provide a financial function to accommodate partially prepaid funds to a contractor business operator, in an SES business management system.SOLUTION: A business management system according to the present invention is a business management device that executes prepayment processing for at least a portion of a billing amount to be paid in the future from an orderer to a contractor business operator, and includes: contractor business operator information storage means for storing an hourly unit price of labor work contracted between the orderer and the contractor business operator; track record management storage means for storing track record hours of the labor work by a contract worker input by the contract worker who has an employment relationship with the contractor business operator; first amount calculation means for calculating a first amount based on the track record hours and the hourly unit price; risk degree calculation means for calculating a risk degree related to prepayment; and second amount calculation means for calculating a second amount that can be prepaid to the contractor business operator based on the risk degree and the first amount.SELECTED DRAWING: Figure 9
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present invention relates to a service management device and a service management program. [Background technology]

[0002] SES (System Engineering Service) is a contract type that has become popular in recent years, especially in the IT industry. For example, if a company's system manager wants to hire an IT engineer for system development and operation, he or she will request a company that employs engineers (contractor) to provide the technical skills and labor of the engineer (contract worker) to the company to which the system manager belongs.

[0003] SES contracts differ from dispatch contracts in terms of the chain of command and the contents of the contract, for example, engineers of a company are to perform their work according to the instructions of the contractor company to which they belong. In addition, the contractor company to which the engineer belongs manages the engineers' attendance, and the engineers are paid for the hours they work based on attendance management, regardless of their technical ability or deliverables.

[0004] In this context, cloud-based SES business management tools have started to become popular in recent years. SES business management tools make it possible to centrally manage a series of SES business operations, such as information management for contractor companies and engineers, quotation and order processing, SES contract processing, engineer attendance management, billing to client companies, and deposit and withdrawal processing.

[0005] As a related technology, for example, Patent Document 1 describes a technique for calculating the amount billed by the dispatching agency to the destination for the dispatch of a dispatched employee based on contract information indicating the terms of the contract between the destination and the dispatching agency and work performance information indicating the work performance of the dispatched employee at the destination, and generating invoice information for the dispatched employee based on the calculated billing amount. Furthermore, for example, Patent Document 2 describes a system for managing the work and labor of staff S who are dispatched or seconded to a destination 30 such as a company or business office, which comprises a management server 10 and staff terminals 31, 32 connected to each other via a network 20 so as to be able to communicate with each other, and the management server 10 describes a work and labor management system having an attendance information input means 1 for inputting the attendance of staff S from the staff terminals 31, 32, an attendance management means 2 for managing the input attendance information, a task information input means 3 for inputting the work performance of staff S from the staff terminals 31, 32, a task management means 4 for managing the input task information, and a storage means for storing the attendance information and task information. [Prior art documents] [Patent documents]

[0006] [Patent Document 1] JP 2006-235948 A [Patent Document 2] JP 2007-004360 A Summary of the Invention [Problem to be solved by the invention]

[0007] Here, the contractor may request that the client pay in advance the amount due in the future, for example for reasons of cash flow. However, from the perspective of the payer, there is a problem that making payments for an unexecuted contract at present entails a certain amount of risk. For this reason, even if the payer agrees to a request for advance payment, it is necessary to properly evaluate the risks associated with advance payments and set the amount of the advance payment appropriately.

[0008] The present invention has been proposed in consideration of the above points, and one aspect of the present invention aims to provide a financial function in an SES business management system to set a credit limit based on the risks associated with advance payments and to lend partial advance funds to contracting business owners. [Means for solving the problem]

[0009] In order to solve the above problems, the business management system according to the present invention is a business management device that executes advance payment processing for at least a portion of the billing amount to be paid in the future from the client to the contracting business owner, and includes a contracting business owner information storage means that stores the hourly rate of the labor work contracted between the client and the contracting business owner, a performance management storage means that stores the actual hours of labor work by contracted workers inputted by contracted workers who have an employment relationship with the contracting business owner, a first amount calculation means that calculates a first amount based on the actual hours and the hourly rate, a risk degree calculation means that calculates a risk level relating to the advance payment, and a second amount calculation means that calculates a second amount that can be paid in advance to the contracting business owner based on the risk level and the first amount. The risk degree calculation means calculates the risk degree to be higher the longer the actual time exceeds the scheduled time based on the scheduled time of a work task and the actual time associated with the scheduled time. Effect of the Invention

[0010] According to an embodiment of the present invention, the SES business management system can set a credit limit based on the risks associated with advance payments and provide financial functions for providing partial advance payments to contracting business owners. [Brief description of the drawings]

[0011] [Figure 1] 1 is a diagram illustrating an example of a network configuration of an SES business management system according to an embodiment of the present invention. [Diagram 2] FIG. 2 is a diagram illustrating an example of a hardware configuration of a management server according to the present embodiment. [Diagram 3] FIG. 2 is a diagram illustrating an example of a software configuration of a management server according to the present embodiment. [Figure 4] 11A to 11C are diagrams illustrating examples of data in a project management table, a project WBS table, and a partner management table according to the embodiment. [Diagram 5] FIG. 4 is a diagram showing an example of data in a work hour management table according to the embodiment; [Figure 6] 11 is a diagram illustrating an example of data in an actual man-hour management table according to the embodiment; FIG. [Figure 7]FIG. 13 is a diagram showing an example of an attendance management screen according to the embodiment; [Figure 8] FIG. 13 is a diagram showing an example of a man-hour management screen according to the embodiment; [Figure 9] FIG. 13 is a diagram showing an example of a prepayment request screen according to the present embodiment. [Figure 10] 13 is a flowchart illustrating the calculation process of the advance payment possible settlement amount according to this embodiment. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0012] DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS An embodiment of the present invention will be described in detail with reference to the drawings.

[0013] <System configuration> (Network Configuration) 1 is a diagram showing an example of a network configuration of an SES business management system according to the present embodiment. The SES business management system 100 in FIG. 1 includes a management server 10, a customer terminal 20, and a partner terminal 30, which are connected via a network 50.

[0014] The management server 10 is a so-called cloud-type SES business management server device. It provides a series of SES business management services to clients and partners, such as engineer (laborer) information management, quotation and order processing, SES contract processing, engineer attendance management, billing to client companies, and deposit and withdrawal processing.

[0015] The customer terminal 20 and the partner terminal 30 are, for example, smartphones, tablet terminals, or personal computers, and are user information terminals for customers and partners to use the SES business management service provided by the management server 10. In order to access the management server 10, a specific application program (a general-purpose web browser or a dedicated application) is installed in advance on the customer terminal 20 and the partner terminal 30.

[0016] The network 50 is a communication network including wired and wireless networks, and includes, for example, the Internet, a public line network, WiFi (registered trademark), Bluetooth (registered trademark), and the like.

[0017] Here, the relationships between the administrator, customers, and partners will be described. The administrator is an operation management company that operates and manages the management server 10 and provides cloud-based SES business management services to customers and partners.

[0018] A customer is a company that places an order under an SES contract. When a customer wants to hire IT engineers for system development or operation, they request a partner (a contracting business owner company) to develop the system, and the partner company's engineers (contract workers who have an employment relationship with the contracting business owner company) provide the technical skills and labor.

[0019] A partner is a contractor under an SES contract. They provide technical skills and labor to clients. Contractors are not limited to corporations, but include sole proprietors (e.g. individual engineers). In addition, because partners must meet the legal requirements of an SES contract (quasi-agency contract), they are responsible for managing the attendance of their engineers.

[0020] (Hardware configuration) 2 is a diagram showing an example of a hardware configuration of a management server according to this embodiment. The management server 10 includes a central processing unit (CPU) 11, a read only memory (ROM) 12, a random access memory (RAM) 13, a hard disk drive (HDD) 14, and a communication device 15.

[0021] The CPU 11 executes various programs and performs arithmetic processing. The ROM 12 stores programs required at startup. The RAM 13 is a work area for temporarily storing the processing by the CPU 11 and storing data. The HDD 14 stores various data and programs. The communication device 15 communicates with other devices via a network 50.

[0022] (Software configuration) 3 is a diagram showing an example of the software configuration of the management server according to this embodiment. The management server 10 has, as main functional units, a face value settlement amount calculation unit 101, a risk coefficient calculation unit 102, a prepayment possible settlement amount calculation unit 103, a prepayment processing unit 104, and a storage unit 105.

[0023] The nominal settlement amount calculation unit 101 has the function of calculating the nominal settlement amount based on the actual hours of work performed by a contracted worker who has an employment relationship with the contracting business owner, input by the contracted worker, and the hourly rate of the work contracted between the client and the contracting business owner.

[0024] The risk coefficient calculation unit 102 has a function of calculating the degree of risk associated with advance payment.

[0025] The advance payable settlement amount calculation unit 103 has a function of calculating an advance payable settlement amount that can be paid in advance to the contractor based on the degree of risk and the face value settlement amount.

[0026] The advance payment processing unit 104 has a function of executing advance payment processing of the desired advance settlement amount to the contractor, within the range of the advance settlement amount that can be paid in advance.

[0027] Needless to say, each of these functional units is a functional unit according to the present invention, and the management server 10 is provided with a functional unit for providing the SES business management service. Each functional unit is realized by a computer program and an application program executed on hardware resources such as the CPU, ROM, and RAM of the computer constituting the management server 10. These functional units may be read as "means," "module," "unit," or "circuit." Each table of the storage unit 105 in the management server 10 may also be placed in an external storage device on the network 50. The computer program and application program may be stored in a computer-readable storage medium.

[0028] (Various table information) 4 is a diagram showing example data of the project management table, project WBS table, and partner management table according to this embodiment. Information in the project management table is registered by a project manager, for example, when a project is launched. The project management table has data items such as "client ID," "project code," "project name," "technology tag," "manager code," "start date," and "expected completion date."

[0029] "Client ID" indicates a unique identifier assigned to each client (client company) who clients the project. "Project code" indicates a unique identifier assigned to each project. "Project name" indicates an arbitrary name given to the project. "Technology tag" indicates the tag / keyword that indicates the technology related to the project. For example, it is entered when registering the project. "Administrator code" is the code for the administrator / leader of the project. "Start date" and "Scheduled completion date" are the start date and scheduled completion date of the project.

[0030] Regarding the "Administrator Code," if the SES contract is a direct delegation contract between the customer and partner, the "Administrator Code" will be either of the two depending on whether the customer or the partner is in charge of managing the project. On the other hand, if the SES contract is a delegation contract between the customer and the management company or a sub-delegation contract between the management company and partner, and the management company is in charge of the entire project management, the "Administrator Code" will be 0000, which indicates the management company. In the latter case, for example, the customer will be in charge of system planning and upstream system processes, the management company will be in charge of project progress management and labor-hour management, and the partner will be in charge of system design, programming, testing, and engineer attendance management.

[0031] Furthermore, the project WBS table has data items such as "WBS code," "task name," "partner ID," and "planned man-hours" linked to the "project code." For example, when a project is launched, the project manager structures and breaks down the work content of the project into tasks, and for each task in the project WBS table, registers, for example, the "WBS (Work Breakdown Structure) code," "task name (work name)," the "partner ID" of the worker who will perform the task, and the "planned man-hours" required for each task.

[0032] In addition, partner information is preregistered in the partner management table, and includes data items such as "Partner ID", "Partner name", "Location", "Person in charge", and "Hourly rate (JPY / Hour)". "Partner ID" is a unique identifier assigned to each partner (contractor company) who is the contractor of the project. "Partner name" is the name of the partner. "Person in charge" is the person in charge of the partner. If the partner is a sole proprietor, "Partner name" and "Person in charge" may be the same. "Hourly rate (JPY / Hour)" is the hourly rate per hour of work for each partner, determined between the client and partner (direct commission contract) or between the operation management company and partner (re-commission contract). As mentioned above, in an SES contract, engineers are paid for their working hours based on attendance management.

[0033] FIG. 5 is a diagram showing an example of data in a working hours management (attendance management) table according to this embodiment. The working hours management table has data items such as "Partner ID", "Employee ID", "Name", "Date", "Day of the week", "Attendance", "Clock in time", "Clock out time", "Break", "Working hours", and "Remarks" for linking with the working hours and operation hours of an engineer spent on a project, for example. As described above, under the SES contract, it is the partner's responsibility to manage the attendance of engineers, so the information in the working hours management table is registered by the engineer himself, for example, every day. The "Partner ID" is used to link with the working hours of an engineer belonging to a partner spent on each project.

[0034] 6 is a diagram showing an example of data in an actual man-hours management table according to this embodiment. The actual man-hours management table has data items such as "date", "partner ID", "project code", "WBS code", and "actual man-hours (H)". The information in the actual man-hours management table is registered by an engineer himself every day, for example, with the details of the work content and work time of that day.

[0035] Here, the information in the actual man-hours management table is registered by the engineer himself every day in a manner consistent with the working hours management table. For example, if the engineer worked from 9:00 to 18:00 on 7 / 2, starting at 8:00, the engineer would enter the actual man-hours of the tasks spent on the project as the upper limit of the working hours, for example, 4 hours of "actual man-hours (H)" for WBS code "0001" of project code "P0001" and 2 hours of "actual man-hours (H)" for WBS code "0001" of project code "P0002". Note that, for example, since the engineer is an employee of a contractor company, the remaining 2 hours of the 8-hour working time may be spent on "headquarters work" that is unrelated to the project, and the working hours may not necessarily match the total working hours of each task.

[0036] <Screen example> (Attendance management screen) 7 is a diagram showing an example of an attendance management screen according to this embodiment. For example, when an engineer (e.g., General Taro) belonging to a partner (partner ID: BP0001) finishes work every day, he accesses the management server 10 using the partner terminal 30 and inputs attendance information such as the "start time" and "end time" for that day. This allows the engineer's attendance management to be carried out as a responsibility of the partner side.

[0037] (Man-hour management screen) 8 is a diagram showing an example of a man-hour management screen according to this embodiment. In a similar manner to attendance management, for example, an engineer (for example, General Taro) belonging to a partner (partner ID: BP0001) accesses the management server 10 using the partner terminal 30 when finishing work every day, and inputs man-hour management information. As described above, the man-hour management information is input for each task work (WBS code) of a project (project code) with its working time (actual results) being consistent with the attendance information.

[0038] "Contracted labor hours" is the total number of hours the engineer spent working on project tasks in the current month. "Contracted labor hours" can also be tabulated and displayed by project code or WBS code. Partners will create invoices for the current month based on these "contracted labor hours" and "hourly rate (¥ / H)" (Partner management table in Figure 4).

[0039] (Prepayment request screen) 9 is a diagram showing an example of an advance payment request screen according to this embodiment. When a partner (contractor company) wishes to have a customer (operation management company in the case of subcontracting) pay in advance (prepayment) the amount due in the future for reasons such as cash flow, the partner can access the management server 10 using the partner terminal 30 and submit a request for advance payment from the advance payment request screen.

[0040] In normal cases, after the partner issues an invoice, for example 30 days after the invoice is issued, the management company receives the payment, and then the management company processes the payment into the partner's account. Because there is a certain time lag between the partner's issuance of the invoice and the payment, there are times when the partner wants to expedite the payment, i.e., request payment in advance.

[0041] When making a prepayment request, the partner first selects and inputs the "Prepayment Request Destination (Orderer ID)" 111 for which the prepayment request is being made, as well as the "Project Code" 112 on the prepayment request screen. Next, the partner selects and inputs the "Prepayment Period" 113. The period that is subject to prepayment is the period for which payment has not yet been made, so it is advisable to make it impossible to select periods for which payment has already been made. In this example, the prepayment period is the current month for which payment has not yet been made, from 7 / 1 / 2021 to 7 / 20 / 2021. After selecting and inputting the "Prepayment Request Destination (Orderer ID)" 111, "Project Code" 112, and "Prepayment Period" 113, the partner presses "Calculate" 114.

[0042] When “Calculate” 114 is pressed, “Contracted labor hours” 115, “Hourly rate (¥ / H)” 116, “Nominal settlement amount (A)” 117, “Risk type” 118, “Risk coefficient” 119, “Deduction amount” 120, “Total deduction amount (B)” 121, and “Advance settlement amount: (A)-(B)” 122 are displayed on the screen.

[0043] "Contracted labor hours" 115 is the total labor hours (total operating hours) spent by engineers belonging to the partner identified by "Partner ID" on the project identified by "Project Code" 112 during the "Advance Payment Period." "Hourly rate (¥ / Hour)" 116 is the hourly rate for labor work of the "Partner ID." Therefore, "Fair Value Settlement Amount (A)" 117 is calculated by multiplying "Contracted labor hours" 115 and "Hourly rate (¥ / Hour)" 116.

[0044] Specifically, between 7 / 1 and 7 / 20, 2021, as of 7 / 21, the engineer has already provided 60 hours of work for the project. In other words, the amount of 60 hours currently confirmed as the billing amount for this month is multiplied by the "hourly rate (¥ / H)" 116, which can be calculated as the "face value settlement amount (A)" 117.

[0045] On the other hand, from the payer's perspective, payment at the current time during the month involves a certain amount of risk, so in this embodiment, the amount of advance payment is appropriately set by subtracting the risk associated with the advance payment from the “face value settlement amount (A)” 117.

[0046] Specifically, regarding the risk associated with advance payment, a "risk coefficient" 119 is set for each "risk type" 118, and a "deduction amount" 120 corresponding to the "risk coefficient" 119 is calculated. The "risk type" 118 includes, for example, "project risk," "technical risk," and "customer credit risk." In this example, the "risk coefficient" 119, which indicates the degree of risk for each type, is 10%, 5%, and 3%. The "risk coefficient" will be described in detail later, but by multiplying each "risk coefficient" 119 by the "face value settlement amount (A)" 117, the "deduction amount" 120 corresponding to the "risk coefficient" 119 is calculated as 36,000 yen, 18,000 yen, and 10,800 yen, respectively. The total of each "deduction amount" 120 becomes the "total deduction amount (B)" 121.

[0047] The amount obtained by dividing the "face value settlement amount (A)" 117, calculated based on the actually performed working hours, by the "total deduction amount (B)" 121, which takes into account the risk, is the "advance payment possible settlement amount: (A) - (B)" 122. In other words, the "advance payment possible settlement amount: (A) - (B)" 122, which takes into account the bill amount to be paid in the future and the risk of the payer, is calculated as the advance payment possible settlement amount (so-called credit limit) to the partner (contractor company).

[0048] The partner (contractor company) refers to "Advance payment amount: (A)-(B)" 122 on the screen, inputs "Desired advance payment amount" 123 within the range of the amount, and presses "Apply" 124. When the partner makes an advance payment request, the operation management company promptly processes the advance payment of the "Desired advance payment amount" to the partner. Needless to say, the partner will deduct the amount equivalent to "Desired advance payment amount" 123 from the next invoice.

[0049] Next, the risk types and risk coefficients according to this embodiment will be described. As described above, the risk types related to advance payment include, for example, "project risk," "technical risk," and "customer credit risk," and for each risk type, a risk coefficient (minimum 0 to maximum 1) is set that indicates the degree of risk according to the magnitude of the risk.

[0050] (Project Risk) If the project progress is significantly delayed, there is a risk that the customer will delay or reduce payment. In particular, if the delay is caused by the engineer, there is a high possibility that the payment amount (invoice amount) will be adjusted.

[0051] For example, referring to the project management table and project WBS table in Figure 4, the "planned man-hours (H)" is registered for each task in the project. Also, the "actual man-hours (H)" is registered for each task in the project in the actual man-hours management table in Figure 6. For example, if a task requires 40 hours of "planned man-hours (H)" but the "actual man-hours (H)" takes 52 hours, then the "actual man-hours (H)" exceeds the "planned man-hours (H)" by 12 hours.

[0052] Therefore, since it can be said that the smaller the overtime a (per task) of the project, the less delay there will be, and the higher it is, the greater the delay, a risk coefficient is set according to the overtime. More specifically, the smaller the overtime, the smaller the risk coefficient is set, and the larger the overtime, the larger the risk coefficient is set. Also, if the overtime is less than 0 hours, the risk coefficient can be set to 0.

[0053] For example, if the progress of each project task is measured by dividing "actual man-hours (H)" by "planned man-hours (H)," the progress is calculated as 1.3, which means that the project is significantly behind schedule, 1.3 times faster than planned. In this case, there is a risk that payment from the customer will be delayed (a risk equivalent to the interest rate during the delay period) and that the payment amount will be reduced due to reasons such as delivery delays and labor cost overruns.

[0054] Therefore, since it can be said that the smaller the progress of the project (for each task), the less delay there will be, and the greater the progress, the greater the delay, a risk coefficient is set according to the progress. More specifically, the smaller the progress, the smaller the risk coefficient is set, and the greater the progress, the larger the risk coefficient is set.

[0055] Also, while an engineer's working hours (working hours) are usually 8 hours per day, if the number of days in a given period (e.g. one month) in which the working hours exceed the given number of hours b (e.g. 12 hours) is more than the given number of days c (e.g. 10 days), it is presumed that the development schedule is being strained due to continued overtime work, or that the project work is running into difficulties. In such cases, there is a risk that payments from customers will be delayed or the amount of payment will be reduced due to reasons such as a decline in the quality of the delivered product, heavy work, delivery delays, and labor costs exceeding.

[0056] In addition, if an engineer has been working on the same task for a certain number of consecutive days (e.g., 30 days) or more, it is assumed that the task is difficult. In such cases, there is a risk that the customer will delay payment or reduce the payment amount due to reasons such as a decline in the quality of the delivered product, a delay in delivery, or excessive labor costs.

[0057] In addition, if the number of days that the daily working hours are less than the specified number b (e.g. 4 hours) is equal to or greater than the specified number c (e.g. 10 days), it is estimated that there is a delay in the upstream process, and the work of the engineer's process cannot be started. In such a case, there is a risk that the customer's payment will be delayed or the payment amount will be reduced due to reasons such as delivery date delays.

[0058] In addition, if an engineer performs more than a certain number d (e.g. 10) of different task work contents in a certain number of days c (e.g. 30 days), it is estimated that the engineer is performing the work in an extremely scattered manner, that is, there is a shortage of manpower and the engineer is working on multiple tasks in parallel. In such cases, there is a risk that the customer will delay payment or reduce the payment amount due to reasons such as a decline in the quality of the delivered product and a delay in delivery.

[0059] In either case, the higher the values ​​of a through d, the higher the risk associated with prepayment, so the risk coefficient is set according to these values. More specifically, the smaller the values ​​of a through d, the smaller the risk coefficient is set, and the greater the progress, the larger the risk coefficient is set.

[0060] (Technology risk) For example, a project that uses a technology (such as a traditional development language) with a relatively large number of engineers and a stable track record of development for a certain period of time (such as 10 years) or more has low technical risk (also called development risk), but a technology that has a development track record for less than a certain period of time (such as 10 years) has a somewhat high technical risk. Furthermore, a technology (such as a new development language) with a small number of engineers and a development track record for less than a certain period of time (such as 5 years) has a high technical risk. Furthermore, even if a technology has a stable development track record, if the technology itself is difficult, the relative technical risk is high.

[0061] In projects that use highly difficult technologies like this, there is a risk that payments from customers will be delayed or reduced due to reasons such as a decline in the quality of the deliverables, delays in delivery, or excessive labor costs.

[0062] Therefore, the smaller the technical risk of the project (for each task), the smoother the development will be, and the greater the technical risk, the more difficult the development may be, so a risk coefficient is set according to the technical risk. More specifically, the smaller the technical risk, the smaller the risk coefficient is set, and the greater the technical risk, the larger the risk coefficient is set.

[0063] For example, by referring to the project management table in Figure 4, a risk coefficient corresponding to the "technology tag" used in the current project is set from a database (not shown) in which the "technology tag" indicating the development language used in the project is associated with a risk coefficient previously determined for each technology tag.

[0064] (Customer credit risk) Depending on the private credit rating obtained from a general credit investigation company or the proprietary credit rating of the management company based on the customer's past payment performance, the higher the credit rating, the smaller the risk coefficient is set, and the lower the credit rating, the larger the risk coefficient is set. If a customer's credit rating is low, there is a risk that the customer will delay payment, the payment amount will be reduced, or the payment will not be made.

[0065] <Information Processing> 10 is a flowchart explaining the calculation process of the prepayment possible settlement amount according to the present embodiment. The CPU of the management server 10 reads and executes a program capable of implementing this flowchart, thereby realizing each step (hereinafter, abbreviated as "S").

[0066] S1: The management server 10 judges whether or not a calculation request for the settlement amount payable in advance has been received from the partner terminal 30. The calculation request for the settlement amount payable in advance includes the "Advance payment request destination (orderer ID)", "Project code", "Advance payment target period", and "Partner ID" (login information) selected and input by the partner, and is transmitted from the partner terminal 30 to the management server 10 when "Calculate" 114 is pressed (FIG. 9). If the management server 10 receives a calculation request for the settlement amount payable in advance, the process proceeds to S2.

[0067] S2: Next, the management server 10 calculates the nominal settlement amount ("Nominal settlement amount (A)" 117 in FIG. 9). Specifically, the management server 10 refers to the actual man-hours management table (FIG. 6) and obtains the total actual man-hours spent by the partner's engineers identified by "partner ID" on the project identified by "project code" 112 during the "advance payment period". The management server 10 also refers to the partner management table (FIG. 4) and obtains the "hourly rate (¥ / H)" corresponding to the "partner ID". The management server 10 can then multiply the total actual man-hours by the "hourly rate (¥ / H)" to calculate the nominal settlement amount.

[0068] S3: Next, the management server 10 calculates a risk coefficient for each of the risk types "project risk", "technical risk", and "customer credit risk" ("risk type" 118 and "risk coefficient" 119 in FIG. 9).

[0069] S4: Next, the management server 10 calculates the deduction amount for each risk type ("Deduction amount" 120 in FIG. 9). Specifically, the management server 10 multiplies the risk coefficient for each risk type calculated in S3 by the face value settlement amount calculated in S2, thereby calculating the deduction amount according to each risk type.

[0070] S5: Next, the management server 10 calculates the settlement amount that can be paid in advance ("Settlement amount that can be paid in advance: (A)-(B)" 122 in FIG. 9). Specifically, the management server 10 can calculate the settlement amount that can be paid in advance (so-called credit limit) by dividing the face amount settlement amount calculated in S2 by the total of the deduction amounts according to the risk types calculated in S4 ("Total deduction amount (B)" 121 in FIG. 9).

[0071] <Summary> As described above, the SES business management system 100 according to this embodiment has SES business management service functions that allow for client (client) project management, partner (contractor) management, and engineer (contract worker) work hour management. The SES business management system 100 also has a financial function that allows for partial advance financing, and when a partner requests an advance payment (prepayment) of a billing amount to be paid by a client in the future, the prepayment risk related to the project, technology, and credit is calculated to set the prepayment settlement amount. This allows the payer to appropriately evaluate the risk associated with advance payment and appropriately set the advance payment amount while responding to the partner's request for advance payment.

[0072] In other words, according to this embodiment, in one aspect, the SES business management system can provide a financial function for setting a credit limit based on the risks associated with advance payment and lending a portion of the funds to the contracting business owner for advance payment.

[0073] Although the present invention has been described by showing specific examples according to the preferred embodiment of the present invention, it is apparent that various modifications and changes can be made to these examples without departing from the broad spirit and scope of the present invention as defined in the claims. In other words, the details of the examples and the accompanying drawings should not be construed as limiting the present invention.

[0074] The present invention can also be realized by supplying a program that realizes one or more functions of the above-described embodiments to a system or device via a network or a recording medium, and having one or more processors in a computer of the system or device read and run the program.

[0075] (Appendix 1) A business management device (management server) that executes advance payment processing for at least a portion of an invoice amount to be paid in the future from an ordering party (customer) to a contractor (partner), A contractor information storage means (partner management table) that stores the hourly rate of labor contracted between the client and the contractor; A performance management storage means (a working hours management table and an actual man-hours management table) for storing the actual time (actual man-hours) of work (task work) by contracted workers (engineers) who have an employment relationship with a contract business owner; A first amount calculation means for calculating a first amount (face value settlement amount) based on the actual time and the hourly rate; A risk degree calculation means for calculating a risk degree (risk coefficient) relating to the advance payment; A second amount calculation means for calculating a second amount (advance settlement amount) that can be paid in advance to the contractor based on the risk level and the first amount; A business management device comprising: [Explanation of symbols]

[0076] 10 Management Server 20 Customer terminal 20 30 Partner Terminals 30 50 Network 100 SES Business Management System 101 Face value settlement amount calculation section 102 Risk Coefficient Calculation Section 103 Advance payment settlement amount calculation unit 104 Advance payment processing section 105 Storage section

Claims

1. A business management device that performs advance payment processing for at least a portion of an invoice amount to be paid in the future from an ordering party to a contractor, A contractor information storage means for storing the hourly rate of the labor work contracted between the client and the contractor; a performance management storage means for storing the performance hours of work performed by contract workers inputted by the contract workers who have an employment relationship with the contract business owner; a first amount calculation means for calculating a first amount based on the actual time and the hourly rate; a risk degree calculation means for calculating a risk degree associated with advance payment; and a second amount calculation means for calculating a second amount that can be paid in advance to the contractor based on the degree of risk and the first amount, The risk degree calculation means includes: calculating the risk level to be higher as the actual time exceeds the scheduled time based on the scheduled time of the work task and the actual time associated with the scheduled time; A business management device comprising:

2. A business management device that performs advance payment processing for at least a portion of an invoice amount to be paid in the future from an ordering party to a contractor, A contractor information storage means for storing the hourly rate of the labor work contracted between the client and the contractor; a performance management storage means for storing the performance hours of work performed by contract workers inputted by the contract workers who have an employment relationship with the contract business owner; a first amount calculation means for calculating a first amount based on the actual time and the hourly rate; a risk degree calculation means for calculating a risk degree associated with advance payment; and a second amount calculation means for calculating a second amount that can be paid in advance to the contractor based on the degree of risk and the first amount, The risk degree calculation means includes: When the number of days on which the actual time per day exceeds a prescribed time is equal to or greater than a prescribed number during a prescribed period, the greater the number of days, the higher the calculated risk level is; A business management device comprising:

3. A business management device that performs advance payment processing for at least a portion of an invoice amount to be paid in the future from an ordering party to a contractor, A contractor information storage means for storing the hourly rate of the labor work contracted between the client and the contractor; a performance management storage means for storing the performance hours of work performed by contract workers inputted by the contract workers who have an employment relationship with the contract business owner; a first amount calculation means for calculating a first amount based on the actual time and the hourly rate; a risk degree calculation means for calculating a risk degree associated with advance payment; and a second amount calculation means for calculating a second amount that can be paid in advance to the contractor based on the degree of risk and the first amount, The risk degree calculation means includes: When the number of days during a specified period during which the actual time per day falls below a specified time is equal to or greater than a specified number of days, the greater the number of days, the higher the calculated risk level is; A business management device comprising:

4. A business management device that performs advance payment processing for at least a portion of an invoice amount to be paid in the future from an ordering party to a contractor, A contractor information storage means for storing the hourly rate of the labor work contracted between the client and the contractor; a performance management storage means for storing the performance hours of work performed by contract workers inputted by the contract workers who have an employment relationship with the contract business owner; a first amount calculation means for calculating a first amount based on the actual time and the hourly rate; a risk degree calculation means for calculating a risk degree associated with advance payment; and a second amount calculation means for calculating a second amount that can be paid in advance to the contractor based on the degree of risk and the first amount, The risk degree calculation means includes: When the same work is performed by a contract worker for a specified number of consecutive days or more, the risk level is calculated to be higher the longer the specified number of days is. A business management device comprising:

5. A business management device that performs advance payment processing for at least a portion of an invoice amount to be paid in the future from an ordering party to a contractor, A contractor information storage means for storing the hourly rate of the labor work contracted between the client and the contractor; a performance management storage means for storing the performance hours of work performed by contract workers inputted by the contract workers who have an employment relationship with the contract business owner; a first amount calculation means for calculating a first amount based on the actual time and the hourly rate; a risk degree calculation means for calculating a risk degree associated with advance payment; and a second amount calculation means for calculating a second amount that can be paid in advance to the contractor based on the degree of risk and the first amount, The risk degree calculation means includes: If a contract worker performs more than a specified number of different work tasks over a specified number of days, the greater the number of days, the higher the calculated risk level will be. A business management device comprising:

6. A business management device that performs advance payment processing for at least a portion of an invoice amount to be paid in the future from an ordering party to a contractor, A contractor information storage means for storing the hourly rate of the labor work contracted between the client and the contractor; a performance management storage means for storing the performance hours of work performed by contract workers inputted by the contract workers who have an employment relationship with the contract business owner; a first amount calculation means for calculating a first amount based on the actual time and the hourly rate; a risk degree calculation means for calculating a risk degree associated with advance payment; and a second amount calculation means for calculating a second amount that can be paid in advance to the contractor based on the degree of risk and the first amount, A degree of risk according to the difficulty level of a given technique is stored in advance in correspondence with each technique, The risk degree calculation means includes: Calculating the degree of risk associated with the technology used in the work performed by the contract laborer; A business management device comprising:

7. Computer, A contractor information storage means for storing the hourly rate of the labor work contracted between the client and the contractor; a performance management storage means for storing the performance hours of work performed by contract workers inputted by the contract workers who have an employment relationship with the contract business owner; a first amount calculation means for calculating a first amount based on the actual time and the hourly rate; a risk degree calculation means for calculating a risk degree associated with advance payment; A second amount calculation means for calculating a second amount that can be paid in advance to the contractor based on the degree of risk and the first amount; and make it work. The risk degree calculation means includes: If there are a predetermined number of days or more during a predetermined period on which the actual time per day exceeds a specified time, the greater the number of days, the higher the calculated risk level. Business Management Programs.

8. A computer comprising: A contractor information storage means for storing the hourly rate of the labor work contracted between the client and the contractor; a performance management storage means for storing the performance hours of work performed by contract workers inputted by the contract workers who have an employment relationship with the contract business owner; a first amount calculation means for calculating a first amount based on the actual time and the hourly rate; a risk degree calculation means for calculating a risk degree associated with advance payment; A second amount calculation means for calculating a second amount that can be paid in advance to the contractor based on the degree of risk and the first amount; and make it work. The risk degree calculation means includes: If there are a predetermined number of days or more during a predetermined period on which the actual time per day exceeds a specified time, the greater the number of days, the higher the calculated risk level. Business Management Programs.

9. A computer comprising: A contractor information storage means for storing the hourly rate of the labor work contracted between the client and the contractor; a performance management storage means for storing the performance hours of work performed by contract workers inputted by the contract workers who have an employment relationship with the contract business owner; a first amount calculation means for calculating a first amount based on the actual time and the hourly rate; a risk degree calculation means for calculating a risk degree associated with advance payment; A second amount calculation means for calculating a second amount that can be paid in advance to the contractor based on the degree of risk and the first amount; and make it work. The risk degree calculation means includes: When the number of days during a specified period during which the actual time per day falls below a specified time is equal to or greater than a specified number of days, the greater the number of days, the higher the calculated degree of risk.

10. A computer comprising: A contractor information storage means for storing the hourly rate of the labor work contracted between the client and the contractor; a performance management storage means for storing the performance hours of work performed by contract workers inputted by the contract workers who have an employment relationship with the contract business owner; a first amount calculation means for calculating a first amount based on the actual time and the hourly rate; a risk degree calculation means for calculating a risk degree associated with advance payment; A second amount calculation means for calculating a second amount that can be paid in advance to the contractor based on the degree of risk and the first amount; and make it work. The risk degree calculation means includes: A work management program that calculates the degree of risk to be higher when the same work task is performed by a contracted worker for a specified number of consecutive days or more.

11. A computer comprising: A contractor information storage means for storing the hourly rate of the labor work contracted between the client and the contractor; a performance management storage means for storing the performance hours of work performed by contract workers inputted by the contract workers who have an employment relationship with the contract business owner; a first amount calculation means for calculating a first amount based on the actual time and the hourly rate; a risk degree calculation means for calculating a risk degree associated with advance payment; A second amount calculation means for calculating a second amount that can be paid in advance to the contractor based on the degree of risk and the first amount; and make it work. The risk degree calculation means includes: A work management program that calculates the degree of risk to be higher when a contract worker performs a specified number of different work tasks over a specified number of days.

12. A computer comprising: A contractor information storage means for storing the hourly rate of the labor work contracted between the client and the contractor; a performance management storage means for storing the performance hours of work performed by contract workers inputted by the contract workers who have an employment relationship with the contract business owner; a first amount calculation means for calculating a first amount based on the actual time and the hourly rate; a risk degree calculation means for calculating a risk degree associated with advance payment; A second amount calculation means for calculating a second amount that can be paid in advance to the contractor based on the degree of risk and the first amount; and make it work. A degree of risk according to the difficulty level of a given technique is stored in advance in correspondence with each technique, The risk degree calculation means includes: A work management program that calculates the degree of risk associated with the technology used in the work performed by contract workers.

Citation Information

Patent Citations

  • Staffing service management device, system, method and program

    JP2006235948A

  • Task and work management system

    JP2007004360A

  • Method and system to backup house completion and house completion escrow system

    JP2011054085A

  • Salary advance payment server, salary advance payment program, salary advance payment system, and salary advance payment method

    JP2021064245A

  • Wage prepayment system

    JP2021072093A