Method and system for real-time recommendations for optimized operations - Patents.com
The connected warehouse system addresses real-time worker visibility and reactive issues by using edge and gateway systems with IoT devices and predictive analytics to optimize worker performance and operations, enhancing productivity and preventing delays.
Patent Information
- Application Number
- JP2023127852
- Authority / Receiving Office
- JP · JP
- Patent Type
- Patents
- Current Assignee / Owner
- Priority Date
- 2022-12-06
- Filing Date
- 2023-08-04
- Publication Date
- 2024-10-01
- Estimated Expiration
- 2043-08-04
AI Technical Summary
Existing warehouse systems lack real-time worker visibility, fail to predict bottlenecks, and are unable to react effectively to unforeseen labor issues, leading to production delays and performance declines.
A connected warehouse system with edge and gateway systems that facilitate real-time data collection and communication among workers, managers, and third parties, using IoT devices and predictive analytics to optimize worker performance and warehouse operations.
Enhances real-time worker visibility, prevents bottlenecks, and allows for dynamic adjustments to optimize worker performance and warehouse operations, improving productivity and reducing delays.
Smart Images

Figure 0007559161000001 
Figure 0007559161000002 
Figure 0007559161000003
Abstract
Description
[Technical field]
[0001] The present disclosure relates generally to methods and systems for optimizing operations in workplaces such as warehouses, distribution centers, airport ground operations, and retail businesses in general. [Background technology]
[0002] Warehouses and distribution centers, where employees are often involved in multiple tasks, can benefit from receiving real-time and historical data from other sources. Additionally, overall operations can benefit from transmitting real-time and historical data to optimize employee operations. Data patterns and trends can be determined from the received data, and recipients can utilize the data patterns and trends to take meaningful action. In practice, optimization of employee tasks is often lacking, as a significant amount of optimization benefit remains unrealized. Thus, there is a need for a system for collecting and analyzing real-time data from employees, and for sharing critical data over a streamlined communication network.
[0003] The description of the background art provided herein is intended to generally provide a context for the present disclosure. Unless otherwise indicated herein, the material described in this section is not prior art to the claims of this application and is not admitted to be prior art or an indication of prior art by inclusion in this section. Summary of the Invention
[0004] One embodiment provides a computer-implemented method for operating a warehouse by executing on at least one processor, the method including: connecting a gateway device to a data ingestion pipeline, the data ingestion pipeline in communication with a plurality of worker computing devices and a plurality of sensor devices, each of the worker computing devices relating to one or more of a plurality of workers; connecting the gateway device to a plurality of process safety suit (PSS) devices in communication with a system integration framework, the PSS devices comprising one or more voice devices, mobility devices, handheld devices, printers, and / or scanners, the system integration framework including a plurality of event manager modules; and, based on information received from the data ingestion pipeline and the system integration framework, determining whether the warehouse is operational or not. of Energy and Emissions of calculation result of calculation Things to do and warehouse of Energy and Emissions of calculation result Key warehouse performance calculations by aggregating over one or more reporting periods based on result of calculation and key warehouse performance calculations result and detecting one or more event exceptions based on one or more performance conditions, the one or more performance conditions including predetermined performance limits, one or more fault symptoms, and / or key warehouse performance indicator target deviations based on the one or more event exceptions.
[0005] In some embodiments, the key warehouse performance indicator target deviations include one or more bottlenecks associated with the warehouse, workers, and / or warehouse processes.
[0006] In some embodiments, the one or more fault symptoms include downed equipment (eg, equipment that is broken or otherwise in a fault state) and / or blocked off areas of a warehouse.
[0007] In some embodiments, the method includes measuring, by a plurality of worker computing devices, a plurality of worker performance parameters associated with at least one or a combination of a task, an event, and a worker.
[0008] In some aspects, the method includes presenting a first task of the shift on a user interface; in response to a first change in conditions of the first task, presenting a first unexpected sub-task associated with the first task; in response to progress or completion of the first unexpected sub-task, updating a status of the first unexpected sub-task and assigning a second task of the shift on the user interface; in response to a second change in conditions of the second task, presenting a second unexpected sub-task associated with the second task; and in response to progress or completion of the second unexpected sub-task, updating a status of the second unexpected sub-task.
[0009] In some aspects, the method includes determining a real-time status of all task operations based on the status of the first and second tasks, and calculating a task performance metric based on the real-time status.
[0010] In some aspects, the method includes determining a corrective action in response to monitoring a plurality of worker performance parameters (e.g., uploaded data such as photos, videos, other media, and worker performance metrics) by a task monitoring engine of an application programming interface (API), where the corrective action includes moving a first worker or team of workers of the plurality of workers from one location to a second location.
[0011] In some embodiments, the method includes determining, by a task monitoring engine of an application programming interface (API), a corrective action in response to monitoring the plurality of worker performance parameters, the corrective action including scheduling a corrective task, updating a current task, and / or presenting one or more task recommendations on a user interface.
[0012] In some embodiments, the plurality of worker computing devices each operate one or more user applications operable to communicate with the gateway device through an API, the one or more user applications including a plan execution module bidirectionally coupled to the labor management module, the plan execution module including a database of worker digital task performance and task level granularity.
[0013] In some embodiments, the one or more user applications include a multi-tier workforce analysis module including an identification and reporting layer, an assignment layer downstream of the identification and reporting layer, an execution layer downstream of the assignment layer, and a worker records layer downstream of the execution layer.
[0014] In some embodiments, the method includes determining a corrective action in response to detecting one or more event exceptions, the corrective action including scheduling a corrective task, updating a current task, and / or presenting one or more task recommendations on a user interface.
[0015] In some aspects, the method includes obtaining task-related information from a plurality of worker computing devices; identifying one or more underperforming workers among the plurality of workers in response to detecting one or more event exceptions; and triggering performance of a corrective action in response to identifying and detecting the one or more event exceptions, the corrective action including scheduling a corrective task, updating a current task, assigning a new task that is different from a previous task, and / or presenting one or more task recommendations on a user interface.
[0016] In some embodiments, the method includes connecting a plurality of sensor devices to one or more Internet-of-Things (IoT) devices connected to a gateway device, where the plurality of sensor devices include one or a combination of leak detection sensors, vibration sensors, and process sensors.
[0017] In some embodiments, the method includes connecting one or more PSS operational intelligence systems to the PSS device, where the PSS operational intelligence systems are cloud-based and / or on-premise and in bidirectional communication with the PSS device.
[0018] In some embodiments, the method includes connecting a data ingestion pipeline and / or a system integration framework to an analytical model, where the analytical model is trained using the set of learned task operation parameters to predict one or more performance parameters, and predicting, with the analytical model, one or more performance parameters including predictive asset maintenance, asset health management, asset maintenance optimization, worker downtime reporter, equipment asset management, vertical specific extensions, and worker performance for the connected warehouse.
[0019] One embodiment is a system for exchanging real-time data in a connected warehouse, comprising one or more processors and a non-transitory computer readable medium storing instructions that, when executed by the one or more processors, cause the one or more processors to: connect a gateway device to a data ingestion pipeline, the data ingestion pipeline in communication with a plurality of worker computing devices and a plurality of sensor devices, each of the worker computing devices relating to one or more workers of a plurality of workers; connect the gateway device to a plurality of Process Safety Suite (PSS) devices in communication with a system integration framework, the PSS devices comprising one or more voice devices, mobility devices, handheld devices, printers, and / or scanners, the system integration framework including a plurality of event manager modules; and, based on information received from the data ingestion pipeline and the system integration framework, configure a warehouse of Energy and Emissions of calculation result of calculation Things to do and warehouse of Energy and Emissions of calculation result Key warehouse performance calculations by aggregating over one or more reporting periods based on result of calculation and key warehouse performance calculations result and detecting one or more event exceptions based on one or more performance conditions, the one or more performance conditions including predetermined performance limits, one or more fault symptoms, and / or key warehouse performance indicator target deviations based on the one or more performance conditions.
[0020] In some embodiments, a connected warehouse includes one or more warehouses (e.g., regionally, area, or globally, at the same work site or at different work sites) connected to a number of third party assets (e.g., couriers, suppliers, distributors, contract labor, etc.) and a number of worker computing devices.
[0021] One embodiment provides a non-transitory computer readable medium for operating a connected warehouse, the non-transitory computer readable medium, when executed by one or more processors, includes the steps of: connecting a gateway device to a data ingestion pipeline, the data ingestion pipeline in communication with a plurality of worker computing devices and a plurality of sensor devices, each of the worker computing devices relating to one or more workers of a plurality of workers; connecting the gateway device to a plurality of process safety suite (PSS) devices in communication with a system integration framework, the PSS devices comprising one or more voice devices, mobility devices, handheld devices, printers, and / or scanners, the system integration framework including a plurality of event manager modules; and, based on information received from the data ingestion pipeline and the system integration framework, determining whether the warehouse is operational or not. of Energy and Emissions of calculation result of calculation Things to do and warehouse of Energy and Emissions of calculation result Key warehouse performance calculations by aggregating over one or more reporting periods based on result of calculation and key warehouse performance calculations result and detecting one or more event exceptions based on one or more performance conditions, the one or more performance conditions including predetermined performance limits, one or more fault symptoms, and / or key warehouse performance indicator target deviations based on the one or more event exceptions based on the one or more performance conditions, the one or more performance conditions including predetermined performance limits, one or more fault symptoms, and / or key warehouse performance indicator target deviations.
[0022] To the accomplishment of the foregoing and related ends, certain illustrative aspects are described herein in connection with the following description and the annexed drawings, including an appendix that accompanies this disclosure containing other embodiments of the solutions disclosed herein, and which is incorporated by reference in its entirety as if set forth verbatim herein. These aspects are indicative, however, of but a few of the various ways in which the principles of the claimed subject matter may be employed and it is intended that the claimed subject matter include all such aspects and their equivalents. Other advantages and novel features may become apparent from the following detailed description when considered in conjunction with the drawings. [Brief description of the drawings]
[0023] Embodiments of the present disclosure will now be described, by way of example only, with reference to the accompanying drawings, in which: [Figure 1] FIG. 1 is a schematic diagram illustrating an exemplary environment for implementing the methods and systems of the present disclosure. [Diagram 2] 2-1 and 2-2 are diagrams of the architecture of the connected warehouse system of the present disclosure. [Diagram 3] 1 is a flow chart illustrating a method for monitoring safety. [Figure 4A] 1 depicts an exemplary user interface dashboard in one mode, according to an exemplary embodiment. [Figure 4B] 1 depicts an exemplary user interface dashboard in another mode, according to an exemplary embodiment. [Figure 4C] 1 depicts an exemplary user interface summary dashboard in another mode, according to an exemplary embodiment. [Diagram 5] 5-1 through 5-4 depict an example user interface including multiple dashboards according to an example embodiment. [Figure 6A] 1 depicts an exemplary user interface, according to an exemplary embodiment. [Figure 6B]4 depicts an exemplary warning message, according to an exemplary embodiment. [Figure 7] 1 depicts an exemplary user interface dashboard in a first mode, according to an exemplary embodiment. [Figure 8] 1 is a flowchart illustrating a method for managing unplanned tasks in accordance with an illustrative embodiment. [Figure 9] 9-1 and 9-2 are diagrams of the architecture of the connected warehouse system of the present disclosure. [Figure 10] 10-1 to 10-4 are diagrams of the architecture of the connected warehouse system of the present disclosure. [Figure 11] 11-1 and 11-2 depict schematic block diagrams of a platform framework for a connected warehouse system. [Figure 12] 12-1 and 12-2 depict schematic block diagrams of a platform framework for a connected warehouse system. [Figure 13] 1 depicts an example diagram of data flow in a connected warehouse, according to one or more embodiments. [Figure 14] 1 illustrates an example device in which one or more embodiments may be implemented. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0024] The following embodiments describe systems and methods for facilitating connected warehouses, such as between employees, managers, and other users, as well as inter-warehouse and intra-warehouse edge communication systems.
[0025] Previous warehouse systems included workers, such as employees, as well as operations managers and shift supervisors. Operations managers can be responsible for meeting production quotas, managing labor fluctuations, and quickly identifying restrictions and bottlenecks. Shift supervisors can be responsible for worker performance, overseeing specific work sites and / or warehouse areas, and generally being "hands-on" on the warehouse floor. Taken together, each can prevent bottlenecks, ensure order quality and timeliness are met, improve throughput, maximize utilization, monitor and manage each site, and balance warehouse staffing to ensure smooth operation of the warehouse.
[0026] That said, the current approach used to date suffers from various shortcomings. For example, the current approach is disconnected from seeing worker productivity until the end of a shift or workday. Real-time worker visibility is also lacking, making it difficult to track and / or predict bottlenecks. In addition, unexpected workforce issues commonly lead to production and maintenance delays. The current approach also fails to provide sufficient tools to react to such unexpected issues, such as unplanned events, to properly reallocate workers or take any corrective action. Furthermore, the root cause of the problem is not currently tracked, and thus the problem reoccurs. Worker attrition then increases and performance declines.
[0027] A dynamic and distributed technique for implementing a connected warehouse system is provided. An embodiment or implementation described herein as "dynamic" is intended to reflect or indicate that the embodiment is or can be marked by continuous and productive activity or modification, although not necessarily constantly changing. The system and corresponding technique facilitates communication within one or more warehouses, between users (e.g., workers, teams of workers, managers, etc.), and between warehouses, third parties associated therewith, and data centers. Such communication may be facilitated by edge systems and gateway systems. The edge and gateway systems may be located within the warehouse (i.e., on-site) as embedded or fixed systems and / or other user devices such as tablet PCs and mobile phones. Each edge system may be coupled to a warehouse system from which warehouse operation data may be collected and may communicate with other edge systems and gateway systems. Each gateway system may communicate with a warehouse operation system and edge systems of the warehouse where the gateway system resides, and may also communicate with gateway systems located in other warehouses, all or some of which may provide data to the gateway system. By facilitating communication with gateway systems located in other warehouses, the gateway system may enable the exchange of data between edge systems located in different warehouses. Independent user computing devices, such as tablet PCs and mobile phones, may be directly coupled to and / or communicate with the edge systems and / or gateway systems to request, filter, view, and / or analyze data.
[0028] All or part of the hardware of the edge system and the gateway system may be installed in the warehouse. Thus, the software may be installed on the corresponding warehouse hardware. The software implemented in the edge system and the gateway system may include computer executable code for performing various data functions, including but not limited to data request, data query, data retrieval, data transmission, and data analysis. The edge system and the gateway system each identify the source of the relevant data and request that the data be provided dynamically (as needed) or statically (always) from the identified source, such as other edge systems coupled to the warehouse system in the warehouse or other warehouses, gateway systems in the warehouse or other warehouses, distributed systems such as cloud computing centers, and centralized systems such as dedicated server farms. The distributed and centralized systems may be owned by the warehouse operator, by a third party such as a government or commercial entity.
[0029] Each edge system in a warehouse may be coupled to a sensor of a corresponding warehouse system in the same warehouse, allowing data captured by the sensor to be provided directly to the edge system. Also, a gateway system in a warehouse may be coupled to one or more sensors of a warehouse system in the same warehouse, allowing data captured by the one or more sensors to be provided directly to the gateway system. In another embodiment, each edge system in a warehouse may be coupled to a warehouse system of a corresponding warehouse system in the same warehouse. Also, a gateway system in a warehouse may be coupled to a warehouse system machine of a warehouse system in the same warehouse. In some aspects, a warehouse system machine may be configured to collect data from one or more coupled sensors, perform calculations and / or analyses on the collected data, store the collected / or analyzed data in a memory, and provide the collected and / or analyzed data to one or more connected edge systems and / or gateway systems. In some embodiments, a warehouse system may not be implemented or may not be coupled to one or more sensors of a warehouse system. If a warehouse system machine is not implemented or is not coupled to one or more sensors, data captured by one or more sensors may be provided directly to one or more connected edge systems and / or gateway systems.
[0030] Each warehouse system may communicate with the gateway system with or without going through an edge system. Edge systems within a warehouse may communicate directly with each other. For example, any data held by one edge system may be transmitted directly to another edge system within the same warehouse without a gateway system acting as an intermediary. In another embodiment, an edge system may send data to or receive data from another edge system located within the same warehouse through a gateway system. Communications between edge systems and between edge systems and gateway systems may be via wired or wireless connections.
[0031] The gateway system of a warehouse may communicate with the gateway systems of other warehouses. Through this communication path, the edge system or gateway system of a warehouse may transmit data to and receive data from the edge system or gateway system of the other warehouses. The communication path between the gateway systems of different warehouses may be through satellite communication (e.g., SATCOM), cellular networks, Wi-Fi (e.g., IEEE 802.11 compliant), WiMAX (e.g., AeroMACS), optical fiber, and / or air-to-ground (ATG) networks, and / or any other communication link now known or later developed. An edge system in a warehouse may communicate with another edge system in a different warehouse through the gateway system of the respective warehouse. For example, an edge system in a warehouse may transmit data to one or more edge systems in other warehouses through the gateway systems of the respective warehouses that communicate over the above-mentioned communication path.
[0032] Each edge system and gateway system may include a state machine, such as a processor coupled to a memory. Both edge systems and gateway systems may be configured with a common operating system to support a portable, system-wide edge software implementation. In other words, each edge system and gateway system may include standard software to facilitate interoperability between the edge and gateway systems. In the following discussion, such software is referred to as edge software. The edge software may enable each edge or gateway system to perform various functions (non-exhaustive) listed below to enable data analysis and data exchange between the various systems illustrated herein (e.g., edge systems, gateway systems, warehouse operations centers, remote systems). -Filtering and analyzing real-time and stored data collected from other edge systems, warehouse systems, gateway systems, and / or operations centers and generating events based on the analysis; - Identifying dynamic (i.e., as needed) and static (i.e., at all times) data transmission targets (e.g., edge systems in the same warehouse, edge systems in other warehouses, operations centers); -Transmitting the data to the operations center via an Internet connection; -Transmitting data and events to other edge and gateway systems within the work site (e.g., a warehouse) connected via wired / wireless networks, or to other edge and gateway systems outside the work site connected via the Internet; -Providing a request / response interface for other edge / gateway systems, warehouse-mounted computer systems, operations centers, and remote systems connected via wired / wireless networks or the Internet to query stored data and dynamically select / change data filters; -using request / response interfaces provided by other edge systems, gateway systems, and operations centers connected via wired / wireless networks or the Internet to obtain data and dynamically select / change data filters; -Receive events from other edge systems, gateway systems, and operations centers; -Specify and communicate general intent (i.e., the type of data the edge / gateway system is interested in) to other edge systems, gateway systems, and operations centers.
[0033] Each edge system or gateway system may autonomously select one or more transmission targets, which may be other edge systems in the same warehouse, edge systems in other warehouses, gateway systems in the same warehouse, gateway systems in other warehouses, or an operations center, and deliver data to the one or more transmission targets. Each of the receiving edge or gateway systems (i.e., transmission targets) may be configured to filter the received data using predefined filters, overriding the autonomous decision made by the edge system transmitting the data. In some embodiments, each receiving edge or gateway system may inform the other system of the type of data and / or analysis (i.e., general "purpose") that the receiving system desires to receive prior to data transmission. Each edge or gateway system may also maintain a list including static data transmission targets (transmission targets that always require data) and dynamic data transmission targets (transmission targets that require data as needed).
[0034] The warehouse gateway system may also communicate with one or more operations centers, which may be located remotely (i.e., off-site) from the warehouse. However, in some embodiments, the operations center may be located on-site at the warehouse. Each of the warehouse systems of the present disclosure may be implemented in a dedicated location, such as in a server system, or may be implemented in a distributed manner, for example, as part of a cloud system. The communication path between the gateway system and the operations center may be through satellite communications (e.g., SATCOM), cellular networks, Wi-Fi (e.g., IEEE 802.11 compliant), WiMAX (e.g., AeroMACS), fiber optics, and / or air-to-ground (ATG) networks, and / or any other communication link now known or later developed.
[0035] The subject matter is described more fully hereinafter with reference to the accompanying drawings, which form a part of this specification and which show, by way of example, certain exemplary embodiments. An embodiment or implementation described herein as "exemplary" is not intended to be construed as preferred or advantageous over other embodiments or implementations, for example, but rather is intended to reflect or indicate that the embodiment is an "exemplary" embodiment. The subject matter may be embodied in a variety of different forms, and thus, it is intended that the subject matter encompassed or claimed be construed as not being limited to any exemplary embodiment described herein, which exemplary embodiments are provided for illustration only. Likewise, a reasonably broad scope of the subject matter claimed or encompassed is intended. Among other things, for example, the subject matter may be embodied as a method, device, component, or system. Thus, the embodiments may take the form of, for example, hardware, software, firmware, or any combination thereof (other than software itself). Moreover, the methods presented in the drawings and specification should not be construed as limiting the order in which the individual steps may be performed. Thus, the following detailed description is not intended to be taken in a limiting sense.
[0036] Throughout this specification and the claims, terms may have subtle meanings that are suggested or implied in the context beyond the meaning explicitly stated. Similarly, the phrase "in one embodiment" as used herein does not necessarily refer to the same embodiment, and the phrases "in another embodiment" or "in some embodiments" as used herein do not necessarily refer to different embodiments. For example, the claimed subject matter is intended to include combinations of the example embodiments in whole or in part.
[0037] FIG. 1 illustrates an example warehouse and / or distribution center environment 100 having certain components, including a delivery transport 105 (e.g., supply chain delivery truck) for loading inventory 108. An operational control tower 112 may monitor and / or otherwise control operations 110 within the environment 100. The operations 110 may be performed and / or managed by labor 109. The operations 110 may include loading 101 and assembly machines 107. Once assembled, packaged, and otherwise processed for delivery, the transport 116 (e.g., cargo truck) may be loaded by labor 109 and depart for a subsequent destination. The environment 100 is configured to optimize worker performance by selectively scheduling and allocating tasks and worker equipment, as discussed in more detail below.
[0038] 2 is a diagram of an architecture associated with a connected warehouse system 200 of the present disclosure. System 200 can include enterprise performance management (EPM) towers 210a-n, including components and databases such as, but not limited to, global operations, labor optimization, field operations, asset performance, and worker performance. System 200 can also include networked warehouse system records 220a-n, including components and databases such as, but not limited to, field (e.g., locations, benchmarks, performance service levels, etc.), labor (e.g., schedules, shifts, qualifications, skills, etc.), operations (e.g., plans, equipment, inventory types, throughput, etc.), assets (e.g., sorters, palletizers, robots, etc.), and labor (e.g., trends, profiles, task performance of sorters, pickers, maintenance labor, etc.). The EPM control tower 210a-n and networked warehouse system records 220a-n can reside in a cloud-based computing system 242 (e.g., a cloud computing network, one or more remote servers) and can be communicatively coupled to the counterfeit data conversion and integration layer 230.
[0039] System 242 may be communicatively coupled to edge computing system 244. System 244 may be an edge computing system or node having a dedicated unit on-site at a work site (e.g., a factory, a distribution center, a warehouse, etc.). System 244 may be configured to process data and information from labor database 238, asset control system 236 (e.g., components related to control of robots, material handling, etc.), and worker task database 232. Database 238 may include databases for a warehouse management service (WMS) and a warehouse execution system (WES).
[0040] The database 232 may include one or more telemetry components operatively coupled to features of the distribution center environment 100 to process and transmit control information generated by subscribing to incoming control information for consumption by one or more controllers of the system 240 over a network. The database 232 may be configured for data validation and refinement on the incoming telemetry or attributes before storing in the database, aggregate telemetry, e.g., copy telemetry or attributes from devices to associated assets so that data from multiple subsystems can be aggregated to associated assets, create / update / clear alerts based on defined conditions, trigger actions based on edge lifecycle events, e.g., create alerts if a device is online / offline, load additional data required for processing, e.g., load thresholds for devices defined with user, device, and / or employee attributes, raise alerts / alerts when complex events occur, use attributes of other entities in email templates, and / or consider user preferences during event processing. In some embodiments, messages transmitted from database 232, such as triggers and / or alerts, can be configured to transmit information to end users (e.g., on-site lead, aircrew in a control tower, etc.) for optimal purposes. System 200 can also be configured to detect near-accidents or other mistakes to build trend models for early detection of anomalies before a failure or malfunction occurs, thereby increasing safety.
[0041] The database 232 can include mobile warehouse solutions focused on picking, sorting, and other such tasks. The database 232 can include a maintenance component configured to provide one or more checklists having standard operating procedures (SOPs), maintenance processes, etc. The database 232 can include guided work and voice maintenance components configured when hands-free labor is required by an employee to complete a task.
[0042] FIG. 3 is a flow chart illustrating a method 300 for optimizing worksite operations. In step 310, the method can include providing visibility into real-time workforce productivity before problems occur. In step 320, the method can include looking at worker productivity by location across functional areas. In step 330, the method can include providing worker recommendations for returning to workforce planning. In step 340, the method can include providing tools to reallocate workers, assign tasks, and react to unplanned events. In step 350, the method can include measuring the impact of changes to bring about sustained improvement and trending towards an optimized worksite (e.g., a golden site).
[0043] 4A is an example user interface dashboard 410 associated with a workforce performance database of an EPM tower 210a-n. As shown, the dashboard 410 can present information related to overall workforce utilization, including utilization from multiple locations (e.g., picking locations, shipping locations, packing locations, etc.) for a work site and / or multiple work sites. The dashboard 410 can present inferences from the processed data associated with the multiple locations, including operational status for current and planned events, total workforce, labor efficiency rates (e.g., labor / cartons per minute), and effective throughput metrics (e.g., cartons / labor or some other labor-specific metric for measuring performance). The information presented within the dashboard 410 can be presented in any number of ways, including color-coded (e.g., red for events requiring immediate attention, green for metrics exceeding objective goals, gray for events that are neutral or within compliance with objective goals, etc.).
[0044] FIG. 4B is an exemplary user interface dashboard 420 associated with the EPM tower 210a-n's workforce performance database. As shown, the dashboard 420 can present information related to workforce performance. Through the dashboard 420, a user can observe real-time performance, how current performance measures against objective planned performance goals, objective measures of workforce engagement, and the like. In some embodiments, one or more alerts can be presented or otherwise pushed onto the dashboard 420 instructing a user (e.g., employee, manager, etc.) to take one or more corrective actions to improve the productivity of one or more operational disruptions (e.g., return to task, improve one criterion of a missing task, improve engagement in an area of engagement, etc.). In some embodiments, the one or more messages include workplace hazard avoidance, employee efficiency, work area efficiency, workforce performance metrics, and workforce performance safety. In some embodiments, messages transmitted within or by the dashboard 420, such as triggers and / or alerts, can be configured to transmit information to remote computing systems, locations, and / or other interested users. The dashboard 420 can also be configured to detect performance near misses, trends, or other performance related events to build trend models for early detection of anomalies before performance failures or malfunctions occur to increase workforce engagement and performance.
[0045] The dashboard 420 can present a workforce performance summary from the processed data associated with a worker or workers, including operational status regarding whether the worker or workers are below standard, at standard, above standard, etc. Other metrics and / or alerts can be presented in the dashboard 420, including information related to locations or worker areas and metrics associated therewith regarding workers performing below standard, at standard, or above standard (e.g., a message can indicate that 10 workers at a location are performing below standard, a message can recommend moving a particular employee to another location, etc.). The information presented in the dashboard 420 can be presented in any number of ways, including color coded (e.g., red for workers performing below standard, green for workers performing above standard, blue for workers performing at standard, etc.).
[0046] FIG. 4C is an exemplary user interface summary dashboard 430 associated with the EPM tower 210a-n's workforce performance database. As shown, the dashboard 430 can be in communication with an insight module to present summary information related to the workforce scorecard. Through the dashboard 430, a user can observe or otherwise track performance metrics of interest, including but not limited to workforce productivity, and match each workforce's preferences to work-related tasks. By such dynamic matching, churn or wasted time allocation can be minimized and insight into workforce coaching-related needs can be determined. As can be seen, the dashboard 430 can present information such as workforce name, workforce address, workforce status (e.g., on duty, off duty, etc.), schedule summary (e.g., at location on Monday, Wednesday, and Friday), how long the workforce has been active in the system, workforce preferences, and workforce position.
[0047] In some aspects, the user can toggle dashboard 435 to explore more information related to the user previously summarized in dashboard 430 to initiate presentation of dashboard 430. Dashboard 435 can include more real-time task-related performance metrics, such as specific metrics (e.g., minutes or percentage of shift time) that each worker devoted to performing a specific task (e.g., picking, shipping, packing, etc.) over a period of time (e.g., a shift, a day, a week, a year, the totality of the worker's time spent at the company, etc.). In some aspects, dashboards 430 and 435 facilitate tracking the performance of top performing workers, as well as outlier poor performers, by certain metrics (e.g., worker area, specific task, time allocation management, etc.). The information presented in dashboards 430 and 435 can be presented in any number of ways, including color-coded, similar to other previous dashboards of the present disclosure.
[0048] FIG. 5 depicts an exemplary user enterprise warehouse management interface 500 including any of the dashboards 410, 420, 430, 435 disclosed herein positioned within a single frame. In certain embodiments, each of the dashboards of the interface 500 can be positioned as a tile that can be toggled or otherwise accessed by the user to expand. The interface 500 can also present sub-dashboards such as those configured to present a labor risk summary (e.g., with name, risk percentage, and worker area), total number of workers, performance status indicators, overall labor, labor utilization, and / or the like. The interface 500 can also include a dashboard directed to summarizing labor opportunities by area and recommendations for potential workers within the respective areas. The interface 500 can also include a notification dashboard with filter options, an event log, and presentation of notifications conforming to user-selected or system-selected notification filters and / or notification settings.
[0049] FIG. 6A depicts an exemplary user interface 610 for optimizing worker performance. Specifically, the user interface 610 can be used to generate real-time task instructions for employees (e.g., crew members) or any associated user based on operational feedback, including human and analytical feedback related to one or more work sites. As can be seen, the interface 610 can include automatically and / or manually generating tasks with task-related information such as templates for task creation, work site location (e.g., Zone 1, Zone 2, etc.), worker pull-down menus (e.g., Team 1, Team 2, Individual 1, Individual 2, etc.), and priority pull-down menus (e.g., objective classification of the task, such as move up, urgent, non-urgent, etc.). In some embodiments, the user interface 610 can be used to supervise worker execution of work-related plans (e.g., daily plans, weekly plans, monthly plans, quarterly plans, etc.) and keep encouraging employees to be present to advise and address issues that prevent them from completing tasks. In some embodiments, the user interface 610 is used to optimize workplace performance by automatically assigning and / or scheduling the right tasks for the right employees at the right times (e.g., based on one or more relationships determined between detected criteria, such as employee skills, availability, experience, history, and / or the like).
[0050] 6B depicts an exemplary alert message 620 notifying an event of interest that may affect employee performance. For example, a notification associated with the alert message 620 can be pushed to a user interface (e.g., interface 610) to inform the user that an event of interest has occurred that may affect performance. As can be seen, the alert message 620 indicates that a trouble has been reported, e.g., a device such as a printer 622 is out of media, the time of the event of interest that an associated work task has been assigned for resolution, and an associated button for user intervention. For example, the message 620 can include buttons to close and / or snooze the message 620. The message 620 can also be configured to reallocate a task associated with the event of interest or otherwise control performance of a task associated with the event of interest.
[0051] 7 depicts an example user interface 710 of an example computing device 722. As can be seen, via the user interface 710, one or more tasks can be assigned and / or otherwise communicated to one or more users (e.g., crew members). Such notifications related to newly assigned tasks, or feedback related to already assigned tasks, can include information controls for users to accept, snooze, and / or otherwise interact with the respective tasks (e.g., suggest or make improvements to the tasks, work plans, and / or the like).
[0052] FIG. 8 is a flow chart illustrating a method 800 for managing unplanned tasks (e.g., tasks for a work site, an area of a work site, an employee, a group of employees, etc.). In step 810, the method can include viewing, by an employee user (e.g., a ramp agent), a list of tasks for a shift (e.g., an upcoming shift). In step 820, the method can include presenting an assigned first task to the user, where the assigned task is unexpected (e.g., a tag operator employee can receive the first task after inspecting the tag). In step 830, the method can include updating a status of the assigned task based on the employee completing a first subtask (e.g., arriving at the work site associated with the assigned task) and the status of the first subtask (e.g., the employee has arrived at the work site). In some aspects, the tag operator employee can arrive at a warehouse (e.g., the work site), and the status of the first subtask can be that the tag operator employee has arrived at the warehouse. The status may be automatically updated and / or communicated based on information detected or tracked by the employee from the employee's computing device (e.g., GPS data automatically transmitted from a location tracker on the employee's computing device). In some aspects, the status may be manually updated and / or communicated (e.g., the employee may manually input into a computing device that he or she has arrived at the work site).
[0053] In step 840, the method may include the employee completing the second subtask (e.g., arriving at the second work site associated with the assigned task) and updating the status of the assigned task based on the status of the second subtask (e.g., the employee has arrived at the second work site for sorting). In some aspects, the tag operator employee may return with the load from the first work site and the status of the second subtask may be that the tag operator employee has returned from the warehouse with the load for sorting or that the load has already been sorted. The status of the second subtask may be automatically updated and / or communicated based on data of the employee's computing device and / or any items associated with the second subtask (e.g., GPS data automatically transmitted from the employee's computing device, tracking information of any items associated with the second subtask, etc.). In some aspects, the status may be manually updated and / or communicated (e.g., the employee may manually enter into a computing device that he or she has returned, that the load has been sorted, etc.).
[0054] In some aspects, completion of the first and second subtasks may automatically mark the assigned task as completed. In this regard, in step 850, the method may include automatically assigning a second assigned task to the employee upon completion of the first assigned task (e.g., the tag operator employee receives a new task now that the shipment has been removed from the warehouse, sorted, and returned).
[0055] In step 860, the method may include viewing, by a second employee (e.g., an employee other than a tag operator, such as a ramp agent), the real-time status of all other employees on a team associated with the first employee (e.g., other tag operators on the first tag operator's team).
[0056] In step 870, the method may include reviewing the real-time status of all task operations at the work site and employee task performance metrics by a third employee (e.g., an employee who is a supervisor or OPS lead other than the tag operator).
[0057] 9 is a diagram of an architecture associated with a connected warehouse system 900 of the present disclosure. The system 900 can include a workforce analytics module 915, including, but not limited to, modules for dynamic labor allocation, real-time worker performance metrics, worker satisfaction, and the like. The workforce analytics module 915 can also include one or more workforce performance dashboards 923 and improvement recommendations 925.
[0058] In certain aspects, the worker performance dashboard 923 and improvement recommendations 925 can be updated (e.g., in real time) by a system of records 917 for worker activity and performance. The system 917 can be in communication with a workforce analytics module 915. The system 917 can improve schedule labor productivity via a labor management module 910 and a planning system module 920. In particular, the management module 910 can include one or more individual components (e.g., components for managing manufacturing operations management (MOM) labor, third party activities, and home grown activities) in real time communication with the comprehensive data model of the system 917. The comprehensive data model of the system 917 can include a plan execution module bidirectionally coupled to the labor management module 910. The comprehensive data model of the system 917 can also include a module with digital task performance and task level granularity. In some aspects, the plan execution module can include a database of worker digital task performance and task level granularity (e.g., showing granular performance metrics for individual subtasks of a task or each worker task).
[0059] In practice, a layer 926 for identifying and reporting adverse conditions can be included in the system 917. The layer 926 can include an asset performance manager (APM) and a system for managing labor orders. In some embodiments, the layer 926 can include an operations intel manager and trouble finding reporting systems that work collectively to enable the layer 926 to communicate with its downstream aspects of the allocation layer 924. The layer 926 can include planning systems bidirectionally coupled to the planning system module 920, including but not limited to warehouse management systems (WMS), third party systems, and the like. The operations intel manager and trouble finding of the allocation layer 926 can communicate with the digital task creation and digital task assignment systems of the allocation layer 924. The allocation layer 924 can then communicate with its downstream aspects of the execution layer 922.
[0060] Tier 922 can include or be coupled to one or more mobile devices (e.g., mobile devices of users and / or personnel associated therewith, including employees, managers, and third party personnel). Tier 922 can also include a guided work software (GWS) system. In some aspects, the digital task creation system and digital task assignment system of assignment tier 924 can communicate with the mobile devices of tier 922, as well as the digital task execution system of tier 922. In some implementations, the mobile devices of tier 922, as well as the digital task execution system of tier 922 can communicate with the task level granularity system, planning performance system, and digital task performance system of the comprehensive data model of system 917 to dynamically update the worker performance dashboard 923 and improvement recommendations 925.
[0061] 10 is an architecture diagram of a connected warehouse system 1000 of the present disclosure. The system 1000 can be a multi-tier system including an application layer 1010, a platform services layer 1020, a common services layer 1052a-n, a standards and process layer 1054a-n, a connectivity services layer 1040, a data source layer 1048a-n, and an enterprise systems layer 1050a-n.
[0062] The applications layer 1010 can include multiple components such as applications for portfolio operations, field operations, asset performance management, predictive asset maintenance, asset health management, asset maintenance optimization, downtime reporter, equipment asset management, vertical specific extensions, and workforce performance.
[0063] The platform services layer 1020 may communicate with the application layer 1010 and may include a number of system components including domain services 1022a-n, application services 1024a-n, data services 1026a-n, managed storage 1028a-n, and data ingestion 1030a-n. The domain services 1022a-n may include modules and / or components for asset model services, asset digital services, asset key performance indicator (KPI) services, event management services, asset data services, asset annotation services, downtime management services, asset analytics services, task / activity services, and personnel worker services. Preferably, the domain services 1022a-n include an asset analytics service system, a task / activity service system, and a personnel worker service system.
[0064] Application services 1024a-n may include modules and / or components for portal navigation services, dashboard builder, report writer, content search, analytical workbench, notification services, execution scheduler, event handling, rules engine, business workflow services, analytical model services, and location services. Some or all of the components of application services 1024a-n may communicate with applications in tier 1010.
[0065] Data services 1026a-n can include modules and / or components for time series, events, activities and states, configuration models, knowledge graphs, data search, data dictionaries, application settings, and personal identifying information (PII) services. Managed storage services 1028a-n can include databases for time series, relational, document, blob storage, graph databases, file systems, real-time analytics databases, batch analytics databases, and data caches. Managed storage services 1030a-n can include modules and / or components for device registration, device management, telemetry, command and control, data pipelines, file upload / download, data pre-processing, messaging, and IoT V3 connectors.
[0066] The connectivity services layer 1040 may include edge services 1042a-n, edge connectors 1044a-n, and enterprise integration 1046a-n. The edge services 1042a-n may include modules and / or components for connection management, device management, edge analytics, and execution runtime. The edge connectors 1044a-n may include OPC unified architecture (OPC UA), file collector, and domain connector. The enterprise integration 1046a-n may include modules and / or components for streaming, events, and / or files. The data source layer 1048a-n may include modules and / or components for streaming, events, and / or files, and time series.
[0067] In some aspects, common services 1052a-n may include one or more API gateways, as well as components for logging and monitoring, application hosting, identity management, access management, tenant management, rights catalogs, licensing, metering, subscription billing, user profiles, and / or secret stores.
[0068] In some embodiments, the standards and processes 1054a-n can include one or more UX libraries, as well as components for cybersecurity, IP protection, data governance, usage analytics, tenant provisioning, localization, app lifecycle management, deployment models, mobile app development, and / or marketplaces.
[0069] FIG. 11 depicts a schematic block diagram of a platform framework for a connected warehouse system 1100. The system 1100 can include an asset management system 1110, an operations management system 1112, a worker insights and task management system 1114, and a configuration builder system 1116. Each of the systems 1110, 1112, 1114, and 1116 can be in communication with an API 1120, whereby the API 1120 can be configured to read / write tasks, events, and otherwise coordinate work with workers of the system 1100. The API 1120 can include a task monitoring engine configured to track status, schedule, and facilitate task creation. For example, but not limited to, the task monitoring engine can track status, schedule, and facilitate task creation based on worker performance metrics such as uploaded photos, videos, and other objective information related to worker performance. The API 1120 can be presented or otherwise accessed via a worker mobile application (e.g., a graphical user interview on a computing device) to similarly present and manage operations related to task, event, and asset information.
[0070] The API 1120 can communicate with a model store 1126, which can include models such as worker models, asset models, operational models, task models, event models, workflow models, etc. The API 1120 can communicate with time series databases 1124a-n and business transaction databases 1122a-n. The time series databases 1124a-n can include knowledge databases, graph databases, and extensible object models (EOMs). The business transaction databases 1122a-n can include components and / or modules for work orders, labor, training data, predicted results, events, faults, costs, reasons, status, tasks, events, and reasons.
[0071] Each of the databases 1124a-n, 1122a-n can be in communication with an analytical model 1134, which can be a machine learning model for effectively processing, analyzing, and classifying the operations of the system 1100. The model 1134 can be a trained machine learning system trained using a set of learned parameters to predict one or more learned performance parameters of the system 1100. The learned parameters can include, but are not limited to, predictive asset maintenance, asset health management, asset maintenance optimization, worker downtime reporter, equipment asset management, vertical specific extension, and worker performance of the connected warehouse. One or more corrective actions can be taken in response to the prediction rendered by the model 1134. The model 1134 can be trained with a regression loss (e.g., mean squared error loss, Huber loss, etc.) and, for binary index values, with a classification loss (e.g., hinge, logarithmic loss, etc.). Machine learning systems that may be trained include, but are not limited to, convolutional neural networks (CNNs) directly trained with an appropriate loss function, CNNs with layers with appropriate loss functions, capsule networks with appropriate loss functions, Transformer networks with appropriate loss functions, (for binary resistance index values), multiple instance learning with CNNs, (for continuous resistance index values), multiple instance regression with CNNs, etc.
[0072] In certain aspects, databases 1124a-n and 1122a-n can work together to perform exception event detection 1128. Exception event detection 1128 can utilize data from one or more data sources to detect lower limit violations, fault symptoms, KPI target deviations, etc. In certain aspects of exception event detection 1128, data ingestion pipeline 1136 and enterprise integration framework 1138 collect and analyze energy and emissions data per asset / unit of system 1100. ofThe pipeline 1136 can utilize context data and data pre-processing, while the framework 1138 can include extensible integration services with standard and custom connectors.
[0073] In certain aspects, an IoT gateway 1140 can be communicatively coupled to the pipeline 1136. The IoT gateway 1140 can be communicatively coupled to IoT devices 1154, such as sensors 1158a-n, including leak detection sensors, vibration sensors, process sensors, and / or the like. The IoT gateway 1140 can also communicate with a data historian 1156 that contains historical data related to the warehouse.
[0074] The framework 1138 can communicate with event manager modules 1142a-n, including a workflow module, a labor order integration module, a workforce performance module, an asset event module, and the like. For events, the workflow module can be configured to bidirectionally communicate with the framework 1138 and components of process workflow data 1152a-n, including process safety suite (PSS) maintenance and inspection (M&I) and PSS GWS. For event streaming, both the labor order integration module and the workforce performance module can be configured to bidirectionally communicate with the framework 1138 and the labor management system (LMS) 1150. In some aspects, for event streaming, the asset event module can also be configured to bidirectionally communicate with the PSS operational intelligence system 1146 and the framework 1138. The PSS operational intelligence system 1146, in turn, can be cloud-based and / or on-premise and can bi-directionally communicate with devices 1148a-n including voice devices, mobility devices, handheld devices, printers, scanners, and / or the like. The framework 1138 can also communicate with the start talk module 1144 for corresponding APIs and event control. Figure 12 depicts a second embodiment of the system 1100 in which an IoT gateway 1140 of the pipeline 1136 is configured to bi-directionally communicate with the devices 1148a-n of the framework 1138.
[0075] In an embodiment of the system 1100, the pipeline 1136 and framework 1138 may be configured to communicate energy and emissions for the asset and / or associated units. of calculation resultThe model 1134 can be used in executing step 1132, as well as other native and / or external models connected thereto, such that step 1132 can utilize data received from the pipeline 1136 and framework 1138.
[0076] Upon completion of step 1132, key performance monitoring calculations can be performed in step 1130. Step 1130 calculates the energy and emissions data from step 1132 by aggregating and rolling up over one or more reporting periods. of calculation result Upon performing step 1130, the event exception detection step 1128 described above may be performed to detect the exception event. In some aspects, step 1128 may be performed based on the key performance monitor calculation of step 1130. result Based on this, the following can be performed:
[0077] FIG. 13 is a diagram of data flow 1300 of a connected warehouse system, including one with a connected labor and performance management (EPM) service system. In FIG. 13, an example diagram of data flow 1300 is depicted, according to one or more embodiments. In step 1304, an operator and / or engineer may use a computing device 1306 to manage system performance through a user interface (e.g., a web-based or browser-based application) using a system gateway 1310, which may be cloud-based. In step 1302, a user (e.g., a laborer, a manager, and / or the like) may use an app in a computing device 1308 (e.g., a mobile device such as a tablet or smartphone or any personal computing device) via an API to communicate with the gateway 1310 and exchange data.
[0078] The warehouse system services 1312a-n can be configured to communicate with the gateway 1310 (e.g., receive data from the gateway 1310 from steps 1302 and 1304). The services 1312a-n can be configurable to communicate and / or update functions such as identify and access management (IAM), system extensible object model (EOM), notification, fire and gas instrumented functions (FIF) in real time. The performance management system 1314a-n can be configured to transmit data to the warehouse system services 1312a-n while receiving data from the LMS 1316. Real time adjustments to labor management plans associated with the warehouse and / or workers based on the data from the LMS 1316. In some aspects, the labor management plans can be updated by the systems 1314a-n in bidirectional communication with the gateway 1310. The systems 1314a-n may include or otherwise communicate with corresponding web apps, asset performance management (APM) services, connected workforce services, LMS integration applications, field operations services, and global operations services. The systems 1314a-n may be connected to one or more cloud-based databases (e.g., Azure SQL 1316). One or more components of the systems 1314a-n may be part of computing devices and / or sensors associated with a worker connected to the system.
[0079] The LMS 1316 can be configured to control labor costs, track performance, forecast one or more parameters associated with performance (e.g., project delivery execution), and transmit and / or otherwise present such information (e.g., using FIF) in an LMS system integration application. The systems 1314a-n can then be configured to consume data from the LMS 1316, the gateway 1310, the devices 1308 and 1306, and the services 1312a-n and deliver one or more inferences to end users (e.g., one or more actions that an end user can take, or a corresponding one or more employees associated with one or more tasks) to effect changes in warehouse operations, such as warehouse operation savings. The warehouse operation savings can be directed to safety, maintenance, performance, resource conservation, deliverables management, inventory management, etc. Actionable updates (e.g., synchronization) can then be made to the data flow 1300.
[0080] Various embodiments of the present disclosure (e.g., edge system, gateway system, operation center, remote system, warehouse system, connected worker system, etc.) described above with reference to FIGS. 1-13 may be implemented using device 1400 in FIG. 14. After reading this specification, it will become apparent to one of ordinary skill in the art how to implement embodiments of the present disclosure using other computer systems and / or computer architectures. Although operations may be described as sequential processes, some of the operations may actually be performed in parallel, simultaneously, and / or in a distributed environment, with program code stored locally or remotely for access by single or multiple processor machines. Additionally, in some embodiments, the order of operations may be rearranged without departing from the spirit of the disclosed subject matter.
[0081] As shown in FIG. 14, device 1400 may include a central processing unit (CPU) 1420. CPU 1420 may be any type of processor device, including, for example, any type of dedicated or general-purpose microprocessor device. As will be appreciated by those skilled in the art, CPU 1420 may also be a single processor in a multi-core / multi-processor system, such systems operating alone or within a cluster of computing devices operating within a cluster or server farm. CPU 1420 may be connected to a data communications infrastructure 1410, such as a bus, message queue, network, or multi-core message passing scheme.
[0082] The device 1400 may also include a main memory 1440, e.g., random access memory (RAM), and may also include a secondary memory 1430. The secondary memory 1430, e.g., read-only memory (ROM), may be, for example, a hard disk drive or a removable storage drive. Such a removable storage drive may comprise, for example, a floppy disk drive, a magnetic tape drive, an optical disk drive, a flash memory, or the like. The removable storage drive in this example reads from and / or writes to the removable storage unit in a well-known manner. The removable storage unit may comprise a floppy disk, a magnetic tape, an optical disk, or the like that is read from and written to by the removable storage drive. As will be appreciated by those skilled in the art, such removable storage units generally include computer usable storage media having computer software and / or data stored thereon.
[0083] In alternative implementations, secondary memory 1430 may include other similar means for allowing computer programs or other instructions to be loaded into device 1400. Examples of such means may include program cartridges and cartridge interfaces (such as those found in video game devices), removable memory chips (such as EPROMs or PROMs) and associated sockets, and other removable storage units and interfaces that allow software and data to be transferred from removable storage units to device 1400.
[0084] Device 1400 may also include a communications interface ("COM") 1460. Communications interface 1460 allows software and data to be transferred between device 1400 and external devices. Communications interface 1460 may include a modem, a network interface (such as an Ethernet card), a communications port, a PCMCIA slot and card, or the like. The software and data transferred through communications interface 1460 may be in the form of signals, which may be electronic, electromagnetic, optical, or other signals capable of being received by communications interface 1460. These signals may be provided to communications interface 1460 over a communications path of device 1400, which may be implemented using, for example, wire or cable, fiber optics, a phone line, a cellular phone link, an RF link, or other communications channel.
[0085] The hardware elements, operating systems, and programming languages of such equipment are conventional in nature, and those skilled in the art are presumed to be sufficiently familiar with them. The device 1400 may also include input / output ports 1450 for connecting input / output devices such as a keyboard, mouse, touch screen, monitor, display, etc. Of course, the various server functions may be implemented in a distributed manner on several similar platforms to distribute the processing load. Alternatively, the server may be implemented by suitable programming of one computer hardware platform.
[0086] The systems and methods of the present disclosure can be a cloud-based, multi-tenant solution configured to deliver optimized work instructions tailored to specific vertical workflows utilizing an easy-to-deploy, scalable, and configurable data model and software suite to deliver performance insights and improve workforce productivity.
[0087] Other embodiments of the present disclosure will be apparent to those skilled in the art from consideration of the specification and practice of the invention disclosed herein. It is intended that the specification and examples be considered as exemplary only, with a true scope and spirit of the invention being indicated by the following claims.
Claims
1. 1. A computer-implemented method of operating a warehouse by performing operations by at least one processor, the operations comprising: connecting a gateway device to a data ingestion pipeline, the data ingestion pipeline in communication with a plurality of worker computing devices and a plurality of sensor devices, each of the worker computing devices associated with one or more workers of a plurality of workers; connecting the gateway device to a plurality of Process Safety Suite (PSS) devices in communication with a system integration framework, the PSS devices comprising one or more voice devices, mobility devices, handheld devices, printers, and / or scanners, the system integration framework including a plurality of event manager modules; calculating energy and emissions calculations for warehouse assets and associated units based on information received from the data ingestion pipeline and the system integration framework; calculating key warehouse performance calculations based on the calculated energy and emission calculations for the warehouse assets and associated units by aggregating the calculated energy and emission calculations over one or more reporting periods; and detecting one or more event exceptions based on the calculated critical warehouse performance calculations, the one or more performance conditions including predetermined performance limits, one or more fault symptoms, and / or critical warehouse performance indicator target deviations based on the calculated critical warehouse performance calculations.
2. 1. A system for exchanging real-time data in a connected warehouse, comprising: one or more processors; A non-transitory computer-readable medium storing instructions that, when executed by the one or more processors, cause the one or more processors to: connecting a gateway device to a data ingestion pipeline, the data ingestion pipeline in communication with a plurality of worker computing devices and a plurality of sensor devices, each of the worker computing devices associated with one or more workers of a plurality of workers; connecting the gateway device to a plurality of Process Safety Suite (PSS) devices in communication with a system integration framework, the PSS devices comprising one or more voice devices, mobility devices, handheld devices, printers, and / or scanners, the system integration framework including a plurality of event manager modules; calculating energy and emissions calculations for warehouse assets and associated units based on information received from the data ingestion pipeline and the system integration framework; calculating key warehouse performance calculations based on the calculated energy and emission calculations for the warehouse assets and associated units by aggregating the calculated energy and emission calculations over one or more reporting periods; and detecting one or more event exceptions based on one or more performance conditions based on the calculated key warehouse performance calculations, the one or more performance conditions including predetermined performance limits, one or more fault symptoms, and / or key warehouse performance indicator target deviations.
3. A non-transitory computer-readable medium storing instructions that, when executed by one or more processors, cause the one or more processors to: connecting a gateway device to a data ingestion pipeline, the data ingestion pipeline in communication with a plurality of worker computing devices and a plurality of sensor devices, each of the worker computing devices associated with one or more workers of a plurality of workers; connecting the gateway device to a plurality of Process Safety Suite (PSS) devices in communication with a system integration framework, the PSS devices comprising one or more voice devices, mobility devices, handheld devices, printers, and / or scanners, the system integration framework including a plurality of event manager modules; calculating energy and emissions calculations for warehouse assets and associated units based on information received from the data ingestion pipeline and the system integration framework; calculating key warehouse performance calculations based on the calculated energy and emission calculations for the warehouse assets and associated units by aggregating the calculated energy and emission calculations over one or more reporting periods; and detecting one or more event exceptions based on one or more performance conditions based on the calculated critical warehouse performance calculations, the one or more performance conditions including predetermined performance limits, one or more fault symptoms, and / or critical warehouse performance indicator target deviations based on the calculated critical warehouse performance calculations.
Citation Information
Patent Citations
Method / System for diagnostic work efficiency
JP1995254024A
Information processing device
JP2020109576A
Hypothesis evaluation system, and hypothesis evaluation method
JP2021174112A
Personal protective equipment and safety management systems for comparative safety event evaluation.
JP2021523466A
Computer system and plan evaluation method
JP2022068441A
