Power Conversion Equipment

The power conversion device efficiently determines capacitor replacement needs by measuring communication times, addressing the inefficiencies of conventional methods and maintaining device performance.

JP7559285B1Active Publication Date: 2024-10-01TMEIC CORP (100 00)
View PDF 4 Cites 0 Cited by

Patent Information

Application Number
JP2024501147
Authority / Receiving Office
JP · JP
Patent Type
Patents
Current Assignee / Owner
Filing Date
2023-08-07
Publication Date
2024-10-01
Estimated Expiration
2043-08-07

AI Technical Summary

Technical Problem

Conventional power conversion devices face issues with capacitors deteriorating over time, leading to decreased performance, and existing methods for replacing degraded capacitors are time-consuming and inefficient.

Method used

A power conversion device with a control device that includes a control unit, communication circuits, and an inspection section to quickly determine the need for capacitor replacement by measuring communication establishment and cutoff times between communication circuits.

Benefits of technology

Enables easy and rapid identification of capacitors that need replacement, preventing performance degradation and ensuring timely preparation for capacitor swaps.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 0007559285000001
    Figure 0007559285000001
  • Figure 0007559285000002
    Figure 0007559285000002
  • Figure 0007559285000003
    Figure 0007559285000003
Patent Text Reader

Abstract

This power conversion device (1) includes arms (A1-A3) including a plurality of unit converters (5) connected in series and connected to an AC power source (8), and a control device (7) that controls the arms. Each unit converter includes a capacitor (15). The control device is provided corresponding to each unit converter and includes an inspection unit (52) that inspects the corresponding capacitor. The inspection unit measures the time (Tc) from when charging of the corresponding capacitor begins to when communication is established between the first and second communication circuits (31, 41), and when the measured time is shorter than a judgment time (TcL), it judges that the capacitor needs to be replaced with a new one. Therefore, it can be easily and quickly judged whether or not each of the plurality of capacitors needs to be replaced with a new one.
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present disclosure relates to a power conversion device, and more particularly to a power conversion device including a plurality of unit converters connected in series. [Background technology]

[0002] For example, International Publication No. 2018 / 193606 (Patent Document 1) discloses a power conversion device including a power converter connected to an AC power source and a control device that controls the power converter. The power converter includes a plurality of unit converters connected in series. Each unit converter includes a capacitor that stores DC power, a rectifier element that converts AC power supplied from the AC power source into DC power and supplies it to the capacitor, and a switching element that converts the DC power of the capacitor into AC power and supplies it to the AC power source. [Prior art documents] [Patent documents]

[0003] [Patent Document 1] International Publication No. 2018 / 193606 Summary of the Invention [Problem to be solved by the invention]

[0004] However, conventional power conversion devices have a problem in that the multiple capacitors included in the multiple unit converters deteriorate over time, resulting in a decrease in device performance.

[0005] One solution to this problem is to periodically stop the operation of the power conversion device, measure the capacitance of each capacitor, and replace deteriorated capacitors with new ones. However, this method has the problem that it takes a long time to measure the capacitance of multiple capacitors, which results in a long downtime of the device.

[0006] Therefore, a primary object of the present disclosure is to provide a power conversion device that can easily and quickly determine whether each of a plurality of capacitors included in a plurality of unit converters needs to be replaced with a new one. [Means for solving the problem]

[0007] The power conversion device of the present disclosure includes a power converter and a control device. The power converter includes a plurality of unit converters connected in series and is connected to an AC power source. The control device transmits a control signal to each of the plurality of unit converters.

[0008] Each unit converter includes a main circuit, a first communication circuit, and a drive circuit. The main circuit includes a capacitor that stores DC power, a rectifier element that converts AC power supplied from an AC power source into DC power and supplies it to the capacitor, and a switching element that converts the DC power of the capacitor into AC power and supplies it to the AC power source. The first communication circuit is driven by the DC voltage supplied from the capacitor and receives a control signal. The drive circuit drives the switching element according to the control signal received by the first communication circuit.

[0009] The control device includes a control unit that generates a control signal, a second communication circuit that transmits the control signal generated by the control unit to the first communication circuit, and an inspection unit that is provided corresponding to each unit converter and inspects a capacitor included in the corresponding unit converter. The inspection unit includes a timer unit and a determination unit.

[0010] The timing unit measures at least one of a first time from when power supply from the AC power source to the power converter is started to when communication is established between the first and second communication circuits, and a second time from when power supply from the AC power source to the power converter is stopped to when communication between the first and second communication circuits is cut off.

[0011] The judgment unit judges that the corresponding capacitor needs to be replaced with a new one in at least one of a first case in which the first time is shorter than a first judgment time and a second case in which the second time is shorter than a second judgment time. Effect of the Invention

[0012] In the power conversion device of the present disclosure, at least one of a first time from when charging of the capacitor starts to when communication between the first and second communication circuits is established and a second time from when discharging of the capacitor starts to when communication between the first and second communication circuits is cut off is measured. Then, in at least one of a first case in which the first time is shorter than a first determination time and a second case in which the second time is shorter than a second determination time, it is determined that the capacitor needs to be replaced with a new one. Therefore, it is possible to easily and quickly determine whether each of the multiple capacitors included in the multiple unit converters needs to be replaced with a new one. [Brief description of the drawings]

[0013] [Figure 1] 1 is a circuit block diagram showing a configuration of a power conversion device according to a first embodiment of the present disclosure. [Diagram 2] 2 is a circuit block diagram showing a configuration of a unit converter shown in FIG. 1. [Diagram 3] 3 is a block diagram showing a configuration of a power supply shown in FIG. 2. [Figure 4] FIG. 2 is a block diagram showing a configuration of a control device shown in FIG. [Diagram 5] 5 is a block diagram showing a configuration of a control circuit shown in FIG. 4. [Figure 6] 3 is a circuit block diagram for explaining the initial charging of the capacitor shown in FIG. 2. FIG. [Figure 7] FIG. 6 is a block diagram showing the configuration of an inspection unit shown in FIG. 5. [Figure 8] 8 is a time chart for explaining the operation of the timing unit shown in FIG. 7. [Figure 9]9 is a time chart showing the change over time in the waveform of the DC voltage shown in FIG. 8. [Figure 10] 8 is a time chart for explaining the operation of the estimation unit shown in FIG. 7. [Figure 11] 11 is a flowchart showing the operation of the control circuit shown in FIGS. 4 to 10. [Figure 12] FIG. 11 is a circuit block diagram showing a modification of the first embodiment. [Figure 13] FIG. 11 is a circuit block diagram showing a main part of a power conversion device according to a second embodiment of the present disclosure. [Figure 14] 14 is a time chart for explaining the operation of the timing unit shown in FIG. 13. [Figure 15] 15 is a time chart showing the change over time in the waveform of the DC voltage shown in FIG. 14. [Figure 16] 14 is a time chart for explaining the operation of the estimation unit shown in FIG. 13. [Figure 17] 14 is a flowchart showing the operation of a control circuit including an inspection unit shown in FIG. 13. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0014] [Embodiment 1] Fig. 1 is a circuit block diagram showing a configuration of a power conversion device 1 according to a first embodiment of the present disclosure. In Fig. 1, the power conversion device 1 is connected to power transmission lines 9u, 9v, and 9w for supplying three-phase AC power from a commercial AC power source 8 to a load, and is used as a reactive power compensator that compensates for reactive power generated by the load or the like.

[0015] This power conversion device 1 includes switches S1 to S6, transformers 2, 3, current-limiting resistors R1 to R3, AC lines UL, VL, WL, current transformers C1 to C3, reactors L1 to L3, arms A1 to A3, an operation unit 6, and a control device .

[0016] One terminal of each of the switches S1 to S3 is connected to the power transmission lines 9u, 9v, 9w, and the other terminals are connected to the three primary windings of the transformer 2. The switches S1 to S3 are controlled by the control device 7, and are turned on during normal operation and turned off during inspection and maintenance of the power conversion device 1. The transformer 2 includes three primary windings and three secondary windings, and supplies and receives three-phase AC power.

[0017] One terminal of each of the current-limiting resistors R1 to R3 is connected to the three secondary windings of the transformer 2, and the other terminal is connected to one end of each of the AC lines UL, VL, and WL. The current-limiting resistors R1 to R3 limit the current flowing from the commercial AC power supply 8 to each of the arms A1 to A3 when the power conversion device 1 is started up.

[0018] The switches S4 to S6 are connected in parallel to the current-limiting resistors R1 to R3, respectively. The switches S4 to S6 are controlled by the control device 7, and are turned on after the currents flowing through the arms A1 to A3 are stabilized when the power conversion device 1 is started up. The transformer 3 feeds back to the control device 7 three-phase AC voltages Vu, Vv, and Vw having values ​​corresponding to the AC voltages of the AC lines UL, VL, and WL.

[0019] The reactor L1 and the arm A1 are connected in series between the AC line UL and the AC line VL. The reactor L2 and the arm A2 are connected in series between the AC line VL and the AC line WL. The reactor L3 and the arm A3 are connected in series between the AC line WL and the AC line UL. That is, the arms A1 to A3 are delta connected. The arms A1 to A3 (power converters) are controlled by the control device 7 and generate three-phase AC power.

[0020] Each of the arms A1 to A3 includes N unit converters 5 connected in series. Each of the N unit converters 5 generates AC power in accordance with a control signal from the control device 7. N is an integer equal to or greater than 2, for example, 60.

[0021] A first terminal 5a of the first-stage unit converter 5 of arm A1 is connected to one terminal of reactor L1. In arm A1, second terminals 5b of each unit converter 5 except the last-stage unit converter 5 are connected to the first terminals 5a of the adjacent unit converter 5. A second terminal 5b of the last-stage unit converter 5 of arm A1 is connected to one terminal of reactor L2.

[0022] The first terminal 5a of the first-stage unit converter 5 of arm A2 is connected to the other terminal of reactor L2. In arm A2, the second terminal 5b of each unit converter 5 except the last-stage unit converter 5 is connected to the first terminal 5a of the adjacent unit converter 5. The second terminal 5b of the last-stage unit converter 5 of arm A2 is connected to one terminal of reactor L3.

[0023] The first terminal 5a of the first-stage unit converter 5 of arm A3 is connected to the other terminal of reactor L3. In arm A3, the second terminal 5b of each unit converter 5 except the last-stage unit converter 5 is connected to the first terminal 5a of the adjacent unit converter 5. The second terminal 5b of the last-stage unit converter 5 of arm A3 is connected to the other terminal of reactor L1.

[0024] The reactors L1 to L3 suppress the circulating currents flowing through the arms A1 to A3, respectively. The reactors L1 to L3 may be provided separately from the arms A1 to A3, or may be inductance components of the arms A1 to A3. The current transformers C1 to C3 detect the AC currents Iuv, Ivw, Iwu flowing through the arms A1 to A3, respectively, and feed them back to the control device 7.

[0025] The operation unit 6 includes a plurality of buttons operated by a user of the power conversion device 1, an image display unit that displays various information, and the like. By operating the operation unit 6, the user can set various information and start and stop the power conversion device 1. The operation unit 6 outputs a signal indicating the operation content to the control device 7.

[0026] The control device 7 turns on and off the switches S1 to S3 in accordance with signals from the operation unit 6. The control device 7 also controls each of the three arms A1 to A3 (i.e., each of the 3×N unit converters 5) by generating control signals GC, GB, and an on command Son, which will be described later, based on a reactive power command value Qr, three-phase AC voltages Vu, Vv, and Vw, AC currents Iuv, Ivw, and Iwu, a DC voltage VDC, which will be described later, and the like.

[0027] The reactive power command value Qr is given, for example, from a central control room (not shown) of a power system including a commercial AC power source 8. The power conversion device 1 supplies reactive power of a value according to the reactive power command value Qr to the power transmission lines 9u, 9v, and 9w.

[0028] Fig. 2 is a circuit block diagram showing the configuration of the unit converter 5 shown in Fig. 1. In Fig. 2, the unit converter 5 includes a main circuit 10, a resistive element R4, a power source 20, and a control circuit 30. The main circuit 10 is formed of a full-bridge circuit equipped with a capacitor.

[0029] Specifically, the main circuit 10 includes switching elements 11-14, diodes (rectifier elements) D1-D4, and a capacitor 15. The main circuit 10 converts DC power into AC power by outputting a voltage pulse having an amplitude corresponding to the inter-terminal voltage VDC of the capacitor 15 between the first terminal 5a and the second terminal 5b by turning on and off the switching elements 11-14.

[0030] Each of the switching elements 11 to 14 is a self-extinguishing power semiconductor element, and is formed of, for example, an IGBT (Insulated Gate Bipolar Transistor). The switching elements 11 and 13 are connected in series between the DC line PL and the DC line NL. The switching elements 12 and 14 are connected in series between the DC line PL and the DC line NL. The collectors of the switching elements 11 and 12 are both connected to the DC line PL, and the emitters of the switching elements 13 and 14 are both connected to the DC line NL. The connection point between the emitter of the switching element 11 and the collector of the switching element 13 is connected to the first terminal 5a. The connection point between the emitter of the switching element 12 and the collector of the switching element 14 is connected to the second terminal 5b.

[0031] The diodes D1 to D4 are connected in anti-parallel to the switching elements 11 to 14. The capacitor 15 is connected between the DC line PL and the DC line NL, and stores DC power.

[0032] The conductive states (on and off) of the switching elements 11 to 14 are controlled by a control circuit 30. The switching elements 11 and 13 are turned on and off in a complementary manner. The switching elements 12 and 14 are turned on and off in a complementary manner. As shown in FIG. 2, if the voltage from the second terminal 5b to the first terminal 5a is defined as a cell voltage Vcell, the cell voltage Vcell is controlled by turning on and off each of the switching elements 11 to 14.

[0033] Specifically, when switching elements 11 and 14 are both on and switching elements 12 and 13 are both off, the cell voltage Vcell is equal to the terminal voltage VDC of capacitor 15. When switching elements 11 and 12 are both on and switching elements 13 and 14 are both off, the cell voltage Vcell is 0V. When switching elements 11 and 12 are both off and switching elements 13 and 14 are both on, the cell voltage Vcell is 0V. When switching elements 11 and 14 are both off and switching elements 12 and 13 are both on, the cell voltage Vcell is equal to a voltage obtained by inverting the polarity of the terminal voltage VDC of capacitor 15.

[0034] The total voltage of each of the arms A1 to A3 is the sum of the cell voltages Vcell of the N unit converters 5 included in each of the arms A1 to A3. Therefore, by controlling the on / off states of each of the switching elements 11 to 14 of each unit converter 5, the total voltage of each of the arms A1 to A3 can be controlled.

[0035] The main circuit 10 further includes a switch S7. The switch S7 is connected between the first terminal 5a and the second terminal 5b. The switch S7 is configured to be able to short-circuit the first terminal 5a and the second terminal 5b by closing in response to a command from the control circuit 30.

[0036] The resistive element R4 is connected between the DC line PL and the input terminal 20a of the power source 20. The resistive element R4 steps down the inter-terminal voltage VDC of the capacitor 15 and supplies it to the power source 20, and also limits the current flowing from the capacitor 15 to the power source 20.

[0037] An input terminal 20b of the power supply 20 is connected to the DC line NL. The power supply 20 further steps down the DC voltage Vin supplied from the capacitor 15 via a resistor element R4 to generate a power supply voltage for the control circuit 30. That is, each unit converter 5 forms a self-contained cell capable of supplying power from the main circuit 10 to the control circuit 30.

[0038] The control circuit 30 includes a communication circuit 31 (first communication circuit), drive circuits 32 and 33, a switch operation circuit 34, and a voltage sensor 35. The control circuit 30 is driven by a power supply voltage supplied from the power supply 20, and transmits and receives signals to and from the control device 7 and controls the main circuit 10.

[0039] Fig. 3 is a block diagram showing the configuration of power supply 20 shown in Fig. 2. In Fig. 3, power supply 20 includes an input voltage monitoring circuit 21, power supply units 22-26, and a control unit 27. Input voltage monitoring circuit 21 detects DC voltage Vin between input terminals 20a and 20b, and outputs a signal indicating the detected value to control unit 27.

[0040] The first power supply unit 22 steps down the DC voltage Vin to generate a power supply voltage VC1 for the control unit 27. The control unit 27 is driven by the power supply voltage VC1, and generates a startup command signal CMD based on the DC voltage Vin indicated by the output signal of the input voltage monitoring circuit 21. When the DC voltage Vin is lower than the first threshold voltage Vt1, the startup command signal CMD is set to the "L" level, which is an inactivation level.

[0041] When the DC voltage Vin rises and exceeds the first threshold voltage Vt1, the startup command signal CMD is raised from the inactivation level "L" to the activation level "H". When the DC voltage Vin falls and becomes lower than the second threshold voltage Vt2, the startup command signal CMD is lowered from the activation level "H" to the inactivation level "L". The first threshold voltage Vt1 is set to a voltage higher than the second threshold voltage Vt2.

[0042] The startup command signal CMD is provided to the power supply units 23 to 26. When the startup command signal CMD is at an "H" level, which is an activation level, the power supply units 23 to 26 are activated to output the power supply voltages VC2 to VC5, respectively. When the startup command signal CMD is at an "L" level, which is a deactivation level, the power supply units 23 to 26 are deactivated to stop outputting the power supply voltages VC2 to VC5.

[0043] Specifically, when the signal CMD is at "H" level, the second power supply unit 23 steps down the DC voltage Vin to generate a power supply voltage VC2 and supplies it to the drive circuits 32, 33. When the signal CMD is at "H" level, the third power supply unit 24 steps down the DC voltage Vin to generate a power supply voltage VC3 and supplies it to the switch operation circuit 34. When the signal CMD is at "H" level, the fourth power supply unit 25 steps down the DC voltage Vin to generate a power supply voltage VC4 and supplies it to the voltage sensor 35.

[0044] When the signal CMD is at the “H” level, the fifth power supply unit 26 steps down the DC voltage Vin to generate a power supply voltage VC5 and supplies it to the communication circuit 31. When the signal CMD is set to the “L” level, which is the inactivation level, the power supply units 23 to 26 stop outputting the power supply voltages VC2 to VC5, respectively.

[0045] 2 again, the communication circuit 31 is driven by a power supply voltage VC5 provided by the fifth power supply unit 26, and communicates with the control device 7 via a communication line (not shown). When the supply of the power supply voltage VC5 from the fifth power supply unit 26 begins, the communication circuit 31 raises the signal EN from the "L" level to the "H" level. The "H" level signal EN is a signal indicating that communication between the communication circuit 31 and the control device 7 has been established.

[0046] When the supply of the power supply voltage VC5 from the fifth power supply unit 26 is stopped, the communication circuit 31 drops the signal EN from the “H” level to the “L” level. The “L” level signal EN is a signal indicating that the communication between the communication circuit 31 and the control device 7 has been cut off.

[0047] During the period when the power supply voltage VC5 is supplied from the fifth power supply unit 26, the communication circuit 31 receives a control signal GC for controlling the switching elements 11-14 and a control signal GB for turning off all of the switching elements 11-14, and provides the received control signals GC and GB to the drive circuits 32 and 33. The communication circuit 31 also receives an on-command signal Son for turning on the switch S7, and provides the received on-command signal Son to the switch operation circuit 34.

[0048] The drive circuit 32 is driven by a power supply voltage VC2 supplied from the second power supply unit 23, and turns on or off each of the switching elements 11, 13 in response to a control signal GC. The drive circuit 32 also turns off the switching elements 11, 13 in response to a control signal GB.

[0049] The drive circuit 33 is driven by a power supply voltage VC2 supplied from the second power supply unit 23, and turns on or off each of the switching elements 12, 14 in response to a control signal GC. The drive circuit 33 also turns off the switching elements 12, 14 in response to a control signal GB.

[0050] The switch operation circuit 34 is driven by the power supply voltage VC3 supplied from the third power supply unit 24, and supplies a current to the exciting coil 18 in response to the on-command signal Son to turn on the switch S7. During normal operation, the current supply to the exciting coil 18 is stopped, and therefore the switch S7 is kept in the off (open) state.

[0051] The voltage sensor 35 is driven by the power supply voltage VC4 supplied from the fourth power supply unit 25, detects the voltage VDC between the terminals of the capacitor 15, and outputs a signal indicating the detected value to the communication circuit 31. The communication circuit 31 transmits a signal indicating the detected value of the DC voltage VDC to the control device 7.

[0052] Fig. 4 is a block diagram showing the configuration of the control device 7. In Fig. 4, the control device 7 includes a power source 40, a communication circuit 41 (second communication circuit), and a control circuit 42. When the power conversion device 1 is connected to the power transmission lines 9u, 9v, and 9w (Fig. 1), the power source 40 constantly generates a power supply voltage VC11 for the communication circuit 41 and a power supply voltage VC12 for the control circuit 42. Therefore, the communication circuit 41 and the control circuit 42 are operable even when the power conversion device 1 is stopped.

[0053] The communication circuit 41 is driven by a power supply voltage VC11 supplied from a power supply 40, and transmits and receives signals between the 3×N unit converters 5 included in the three arms A1-A3 (FIG. 1) and a control circuit 42. That is, the communication circuit 41 receives a signal EN and a signal indicating a DC voltage VDC transmitted from each unit converter 5, and provides these received signals to the control circuit 42. The communication circuit 41 also transmits 3×N sets of signals GC, GB, Son generated by the control circuit 42 to each of the 3×N unit converters 5.

[0054] Fig. 5 is a block diagram showing the configuration of the control circuit 42. In Fig. 5, the control circuit 42 includes control units 50, 51, 3 × N inspection units 52, and an image display unit 53. The control unit 50 controls the switches S1 to S3 in accordance with a signal from the operation unit 6. That is, when the user of the power conversion device 1 operates the operation unit 6 (Fig. 1) and instructs the start-up of the power conversion device 1, the operation unit 6 outputs a signal commanding the start-up of the power conversion device 1.

[0055] In response to this signal, the control unit 50 raises the signal φ50 from the "L" level to the "H" level. When the signal φ50 is at the "L" level, the switches S1 to S3 are turned off, and when the signal φ50 is set to the "H" level, the switches S1 to S3 are turned on. When the switches S1 to S3 are turned on, AC power is supplied from the commercial AC power source 8 via the switches S1 to S3, the transformer 2, the current-limiting resistors R1 to R3, and the reactors L1 to L3 to the arms A1 to A3, and initial charging of the capacitor 15 begins.

[0056] Fig. 6 is a circuit block diagram for explaining the initial charging of the capacitor 15. Fig. 6 shows two adjacent unit converters 5. The unit converter 5 on the left side in Fig. 6 is the unit converter 5 in the first stage of the arm A1, and the unit converter 5 on the right side in Fig. 6 is the unit converter 5 in the second stage of the arm A1. During the initial charging, the switch S7 is opened and the switching elements 11 to 14 are turned off.

[0057] When the AC voltage Vu of the AC line UL (Fig. 1) is higher than the AC voltage Vv of the AC line VL, a current Ic flows through a path from the first terminal 5a of the left-side unit converter 5 via diode D1, capacitor 15, and diode D4 to the second terminal 5b, as shown by the arrow in Fig. 6. This current Ic charges capacitor 15, and the inter-terminal voltage VDC of capacitor 15 rises.

[0058] This current Ic flows from the second terminal 5b of the left unit converter 5 to the first terminal 5a of the right unit converter 5, and flows to the second terminal 5b via diode D1, capacitor 15, and diode D4. This current Ic charges capacitor 15 of the right unit converter 5, and the terminal voltage VDC of capacitor 15 rises.

[0059] Conversely, when the AC voltage Vu of the AC line UL is lower than the AC voltage Vv of the AC line VL, a current Ic flows through a path from the second terminal 5b of the right-side unit converter 5 to the first terminal 5a via the diode D2, the capacitor 15, and the diode D3. The current Ic charges the capacitor 15, and the inter-terminal voltage VDC of the capacitor 15 rises.

[0060] This current Ic flows from the first terminal 5a of the unit converter 5 on the right side to the second terminal 5b of the unit converter 5 on the left side, and then flows through a path to the first terminal 5a via diode D2, capacitor 15, and diode D3. This current Ic charges capacitor 15 of the unit converter 5 on the left side, and the inter-terminal voltage VDC of capacitor 15 rises. In this way, capacitors 15 of all unit converters 5 in arms A1 to A3 are charged.

[0061] Since N unit converters 5 are connected in series in each of arms A1 to A3, the voltage VDC of capacitor 15 of each unit converter 5 rises to a value obtained by dividing the peak value of the voltage (inter-phase voltages Vuv, Vvw, Vwu) applied to each of arms A1 to A3 by the number N of unit converters 5 included in each of arms A1 to A3.

[0062] 5, when the initial charging of capacitor 15 is completed, control unit 50 turns on switches S4 to S6, whereby terminals of current-limiting resistors R1 to R3 (FIG. 1) are short-circuited, and the three secondary windings of transformer 2 are directly connected to AC lines UL, VL, and WL, respectively.

[0063] Furthermore, when a user of the power conversion device 1 operates the operation unit 6 (FIG. 1) to instruct the power conversion device 1 to be stopped, the operation unit 6 outputs a signal commanding the stopping of the power conversion device 1. In response to the signal, the control unit 50 turns off the switches S1 to S6. This stops the power supply from the commercial AC power source 8 to the arms A1 to A3.

[0064] In addition, when the initial charging of capacitor 15 is completed, control unit 51 generates 3×N sets of control signals GC, GB based on the three-phase AC voltages Vu, Vv, Vw from transformer 3, the three-phase AC currents Iuv, Ivw, Iwu detected by current transformers C1 to C3, and signals indicating 3×N DC voltages VDC provided from the 3×N unit converters 5 via communication circuit 41, and outputs the signals to communication circuit 41.

[0065] That is, the control unit 51 determines three-phase AC currents Iu, Iv, Iw at levels corresponding to the AC currents flowing through the AC lines UL, VL, WL, based on the AC currents Iuv, Ivw, Iwu from the current transformers C1 to C3, where Iu=Iuv-Iwu, Iv=Ivw-Iuv, and Iw=Iwu-Ivw.

[0066] The control unit 51 calculates reactive power Q based on the three-phase AC voltages Vu, Vv, Vw from the transformer 3 and the above-mentioned three-phase AC currents Iu, Iv, Iw, and calculates the deviation ΔQ=Qr−Q between the reactive power command value Qr and the reactive power Q.

[0067] The control unit 51 generates 3×N voltage command values ​​VDCr corresponding to the 3×N unit converters 5 based on the AC currents Iuv, Ivw, Iwu from the current transformers C1 to C3, the three-phase AC voltages Vu, Vv, Vw from the transformer 3, etc.

[0068] The control unit 51 obtains a deviation ΔVDC between each voltage command value VDCr and the corresponding DC voltage VDC. The control unit 51 generates three-phase AC voltage command values ​​Vuvr, Vvwr, and Vwur so that the integral value of the voltage deviation ΔVDC becomes zero and the integral value of the reactive power deviation ΔQ becomes zero.

[0069] In other words, the control unit 51 performs active current control of each unit converter 5 so that the integral value of the voltage deviation ΔVDC becomes 0, and also performs reactive current control of each unit converter 5 so that the integral value of the reactive power deviation ΔQ becomes 0. Based on the three-phase AC voltage command values ​​Vuvr, Vvwr, Vwur, each unit converter 5 of arms A1 to A3 is operated, the DC voltage VDC is set to the voltage command value VDCr, and the reactive power Q is set to the reactive power command value Qr.

[0070] Specifically, the control unit 51 generates 3×N sets of control signals GC and GB for causing the power conversion device 1 to output voltages corresponding to the three-phase AC voltage command values ​​Vuvr, Vvwr, and Vwur in accordance with, for example, PWM (Pulse Width Modulation) control.

[0071] The communication circuit 41 transmits 3×N sets of control signals GC, GB generated by the control unit 51 to the 3×N unit converters 5 included in the arms A1-A3. In each unit converter 5, the control signals GC, GB are received by the communication circuit 31 and provided to the drive circuits 32, 33. The drive circuits 32, 33 turn the switching elements 11-14 on and off in accordance with the control signals GC, GB. This converts the inter-terminal voltage VDC of the capacitor 15 into an AC voltage.

[0072] Furthermore, when the control unit 51 detects an abnormality, such as a short-circuit failure of a switching element, in any of the 3×N unit converters 5 based on the 3×N DC voltages VDC or the like, it outputs an on-command signal Son for the switch S7 to the failed unit converter 5. This on-command signal Son is provided to the switch operation circuit 34 of the failed unit converter 5 via the communication circuits 41, 31.

[0073] In response to the on-command signal Son, the switch operation circuit 34 supplies current to the exciting coil 18 to turn on the switch S7. This shorts the first terminal 5a and the second terminal 5b of the faulty unit converter 5. In addition, information identifying the faulty unit converter 5 is displayed on, for example, the image display unit of the operation unit 6.

[0074] Furthermore, when a user of the power conversion device 1 operates the operation unit 6 (FIG. 1) to instruct the power conversion device 1 to be stopped, the operation unit 6 outputs a signal commanding the stopping of the power conversion device 1. In response to the signal, the operation of the control unit 51 is stopped, and the switching elements 11 to 14 of all the unit converters 5 are turned off.

[0075] When the operation time of the power conversion device 1 reaches a predetermined time (for example, one year), the operation is stopped, and after inspection and maintenance, the power conversion device 1 is restarted. That is, the power conversion device 1 repeats starting and stopping at predetermined time intervals. Every time the power conversion device 1 is started, the inspection unit 52 inspects the corresponding capacitor 15 based on the output signal φ50 of the control unit 50 and the signal EN from the corresponding unit converter 5, and determines whether or not the capacitor 15 needs to be replaced with a new one.

[0076] Fig. 7 is a block diagram showing the configuration of the inspection unit 52. In Fig. 7, the inspection unit 52 includes a timer unit 61, a judgment unit 62, a storage unit 63, and an estimation unit 64. The timer unit 61 starts measuring time in response to an output signal φ50 of the control unit 50 rising from an "L" level to an "H" level, stops measuring time in response to a signal EN from the corresponding unit converter 5 rising from an "L" level to an "H" level, and outputs a signal DTc indicating the measured time Tc.

[0077] In other words, the timer 61 measures the time Tc from when the switches S1 to S3 are turned on and charging of the capacitor 15 begins to when communication is established between the communication circuits 31 and 41, and outputs a signal DTc indicating the measured time Tc.

[0078] Fig. 8 is a time chart for explaining the operation of the timer unit 61. In Fig. 8, (A) shows the waveform of the output signal φ50 of the control unit 50, (B) shows the conductive states of the switches S1 to S3, (C) shows the waveform of the DC input voltage Vin (Fig. 3) of the power supply 20, and (D) shows the waveform of the output signal EN of the communication circuit 31.

[0079] When the power conversion device 1 is stopped (time t0), the signal φ50 is set to the “L” level, the switches S1 to S3 are turned off, the DC voltage Vin is set to 0 V, and the signal EN is set to the “L” level.

[0080] When a command is issued to start up the power conversion device 1 at time t1, the signal φ50 rises to the “H” level and the switches S1 to S3 are turned on, whereby charging of the capacitor 15 begins, the inter-terminal voltage VDC of the capacitor 15 increases, and the DC input voltage Vin of the power supply 20 increases.

[0081] When the DC input voltage Vin of the power supply 20 increases and exceeds the first threshold voltage Vt1, a power supply voltage VC5 is supplied from the fifth power supply unit 26 (FIG. 3) to the communication circuit 31, and the communication circuit 31 raises the signal EN from the "L" level to the "H" level. The timer unit 61 measures the time Tc from time t1 to time t2, and outputs a signal DTc indicative of the measured time Tc.

[0082] Fig. 9 is a time chart showing the aging of the waveform of DC voltage Vin shown in Fig. 8. In Fig. 9, curve A1 shows the waveform when the deterioration level of capacitor 15 is small, curve A2 shows the waveform when the deterioration level of capacitor 15 is medium, and curve A3 shows the waveform when the deterioration level of capacitor 15 is large.

[0083] As the degradation level of the capacitor 15 increases, the capacitance value of the capacitor 15 decreases, the terminal voltage VDC of the capacitor 15 rises faster, and the DC voltage Vin rises faster. Therefore, as the degradation level of the capacitor 15 increases, the time Tc until the DC voltage Vin exceeds the first threshold voltage Vt1 becomes shorter.

[0084] 9, the times Tc1, Tc2, and Tc3 measured from the curves A1, A2, and A3 are shown to be successively shorter (Tc1>Tc2>Tc3). Therefore, the deterioration level of the capacitor 15 can be determined from the time Tc.

[0085] 7 again, the judgment unit 62 compares the time Tc indicated by the signal DTc with a judgment time TcL, and outputs a signal φ62 indicating the comparison result. If the time Tc is longer than the judgment time TcL, the signal φ62 is set to an "L" level. If the time Tc is shorter than the judgment time TcL, the signal φ62 is set to an "H" level. The judgment time TcL is obtained in advance by experiment.

[0086] The signal φ62 at the “L” level indicates that the deterioration level of the corresponding capacitor 15 is small and there is no need to replace the corresponding capacitor 15 with a new one. The signal φ53 at the “H” level indicates that the deterioration level of the corresponding capacitor 15 is large and there is no need to replace the corresponding capacitor 15 with a new one.

[0087] When the power conversion device 1 is new, the capacitor 15 is also new, so that the signal φ62 indicating the result of the first determination should be at the "L" level. The signal φ62 is set to the "H" level from the second determination onwards. The signal φ62 is provided to the estimation unit 64 and the image display unit 53.

[0088] The storage unit 63 stores the signal DTc every time the signal DTc is output from the timer unit 61. When the power conversion device 1 is started and stopped multiple times, multiple signals DTc are sequentially output from the timer unit 61, and the multiple signals DTc are sequentially stored in the storage unit 63.

[0089] When the output signal φ62 of the judgment unit 62 is at the “L” level, i.e., when it is determined that the corresponding capacitor 15 does not need to be replaced with a new one, the estimation unit 64 estimates the replacement time of the capacitor 15 based on the multiple signals DTc stored in the memory unit 63, and outputs a signal indicating the estimation result.

[0090] Fig. 10 is a diagram for explaining the operation of the estimation unit 64. It is assumed that the power conversion device 1 is started and stopped m times, the capacitor 15 is inspected m times, and m signals DTc1 to DTcm are stored in the storage unit 54. m is an integer equal to or greater than 2. Fig. 10 shows the case where m=3.

[0091] The estimation unit 64 reads out m signals DTc1-DTcm from the storage unit 63, and converts the read out signals DTc1-DTcm into times Tc1-Tcm. Next, the estimation unit 64 writes the times Tc1-Tcm into Fig. 10, in which the horizontal axis indicates the number of tests and the vertical axis indicates the time Tc.

[0092] Next, the estimation unit 64 draws an approximation curve B1 passing through times Tc1 to Tcm, and obtains the number of inspections X at which the curve B1 falls below the judgment time TcL. The estimation unit 64 estimates that the stop time before the Xth inspection, i.e., the (X-1)th stop time, is the time to replace the capacitor 15 with a new one. FIG. 10 shows the case where X=5. The estimation unit 64 outputs a signal φ64 indicating the estimation result to the image display unit 53.

[0093] The image display unit 53 displays the determination result indicated by the output signal φ62 of the determination unit 62 and the estimation result indicated by the output signal φ64 of the estimation unit 64. The image display unit 53 displays the determination result and the estimation result for each of the 3×N capacitors 15.

[0094] Information identifying the capacitor 15 that has been determined to need to be replaced with a new one, or information identifying the capacitor 15 that is estimated to need to be replaced at the next stoppage, may be displayed on the image display unit 53. Also, the image display unit 53 may be included in the operation unit 6 (FIG. 1).

[0095] Figure 11 is a flowchart showing the operation of the control circuit 42 shown in FIGS. 4 to 10. When the operation unit 6 commands the start of the power conversion device 1, in step ST1, the control unit 50 raises the signal φ50 from the "L" level to the "H" level. When the signal φ50 is set to the "H" level, the switches S1 to S3 are turned on to start charging the capacitor 15, and in step ST2, the timer unit 61 starts measuring the time Tc (FIG. 8).

[0096] In step ST3, the timer unit 61 waits until the signal EN from the corresponding unit converter 5 is set to the "H" level. The "H" level signal EN indicates that communication has been established between the communication circuit 31 (FIG. 2) of the unit converter 5 and the communication circuit 41 (FIG. 4) of the control device 7.

[0097] When the signal EN is set to the "H" level, in step ST4, the timer unit 61 ends the measurement of the time Tc and outputs a signal DTC indicating the measured time Tc. In step ST5, the storage unit 63 stores the signal DTC.

[0098] In step ST6, the determination unit 62 determines whether the time Tc is shorter than the determination time TcL. If Tc < TcL, in step ST7, the signal φ62 is set to the "H" level. The "H" level signal φ62 indicates that the corresponding capacitor 15 needs to be replaced with a new one.

[0099] If Tc > TcL, in step ST8, the signal φ62 is set to the "L" level. The "L" level signal φ62 indicates that there is no need to replace the corresponding capacitor 15 with a new one.

[0100] In step ST9, based on the plurality of signals DTC stored in the storage unit 63, the estimation unit 64 estimates the timing at which the corresponding capacitor 15 should be replaced with a new one. In step ST10, the determination result of the determination unit 62 and the estimation result of the estimation unit 64 are displayed by the image display unit 53.

[0101] The user of the power conversion device 1 judges whether or not to replace the capacitor 15 based on the display result of the image display unit 53. That is, if it is judged that the capacitor 15 should be replaced with a new one, the user replaces the capacitor 15 with a new one the next time the device is stopped. Since the power conversion device 1 has already been started when the judgment result is displayed, the capacitor 15 is not replaced immediately, but is replaced the next time the device is stopped. Also, if the user estimates the time to replace the capacitor 15 with a new one, the user prepares a new capacitor 15 that will be required at that time.

[0102] As described above, in the first embodiment, the time Tc from when charging of capacitor 15 starts to when communication is established between communication circuits 31 and 41 is measured, and if the measured time Tc is shorter than the determination time TcL, it is determined that capacitor 15 needs to be replaced with a new one. Therefore, it can be easily and quickly determined whether or not each of the 3×N capacitors 15 included in the 3×N unit converters 5 needs to be replaced with a new one.

[0103] Even if it is determined that the capacitor 15 does not need to be replaced with a new one, the timing for replacing the capacitor 15 with a new one is estimated. Therefore, a new capacitor 15 can be prepared at the estimated time, and a shortage of new capacitors 15 can be prevented.

[0104] Fig. 12 is a circuit block diagram showing a modification of the first embodiment, and is to be compared with Fig. 2. Referring to Fig. 12, this modification differs from the first embodiment in that in each unit converter 5, main circuit 10 and control circuit 30 are replaced with main circuit 10A and control circuit 30A, respectively.

[0105] The main circuit 10A is obtained by removing the switching elements 12 and 14 and the diodes D2 and D4 from the main circuit 10 and connecting the second terminal 5b to the DC line NL. The main circuit 10A is composed of a half-bridge circuit equipped with a capacitor. The control circuit 30A is obtained by removing the drive circuit 33 for the switching elements 12 and 14 from the control circuit 30.

[0106] The main circuit 10A converts DC power into AC power by outputting a voltage pulse having an amplitude corresponding to the inter-terminal voltage VDC of the capacitor 15 between the first terminal 5a and the second terminal 5b by turning on and off the switching elements 11 and 13. The cell voltage Vcell between the first terminal 5a and the second terminal 5b is controlled by turning on and off the switching elements 11 and 13, respectively.

[0107] Specifically, when the switching element 11 is on and the switching element 13 is off, the cell voltage Vcell is equal to the voltage VDC across the terminals of the capacitor 15. When the switching element 11 is off and the switching element 13 is on, the cell voltage Vcell is 0V.

[0108] The total voltage of each of the arms A1 to A3 is the sum of the cell voltages Vcell of the N unit converters 5 included in each of the arms A1 to A3. Therefore, by controlling the on and off of each of the switching elements 11, 13 of each unit converter 5, the total voltage of each of the arms A1 to A3 can be controlled.

[0109] During the initial charging of the capacitor 15, the switch S7 is opened and the switching elements 11 and 13 are turned off. It is assumed that the unit converter 5 in Fig. 12 is the first-stage unit converter 5 of the arm A1.

[0110] When the AC voltage Vu of the AC line UL (FIG. 1) is higher than the AC voltage Vv of the AC line VL, a current flows through a path from the first terminal 5a to the second terminal 5b via the diode D1 and the capacitor 15. This current charges the capacitor 15, and the inter-terminal voltage VDC of the capacitor 15 increases.

[0111] Conversely, when the AC voltage Vu of the AC line UL is lower than the AC voltage Vv of the AC line VL, a current flows through a path from the second terminal 5b to the first terminal 5a via the diode D3, the capacitor 15 is not charged, and the inter-terminal voltage VDC of the capacitor 15 does not change. In this way, the capacitors 15 of all the unit converters 5 of the arms A1 to A3 are charged.

[0112] Since N unit converters 5 are connected in series in each of arms A1 to A3, the voltage VDC of capacitor 15 of each unit converter 5 rises to a value obtained by dividing the peak value of the voltage (inter-phase voltages Vuv, Vvw, Vwu) applied to each of arms A1 to A3 by the number N of unit converters 5 included in each of arms A1 to A3.

[0113] The other configurations and operations are the same as those of the first embodiment, and therefore description thereof will not be repeated. In this modification, the same effects as those of the first embodiment can be obtained.

[0114] [Embodiment 2] In the first embodiment, whether or not to replace capacitor 15 with a new one is determined based on the charging time of capacitor 15 when power conversion device 1 is started up. In contrast, in the second embodiment, whether or not to replace capacitor 15 with a new one is determined based on the discharging time of capacitor 15 when power conversion device 1 is stopped.

[0115] Fig. 13 is a block diagram showing a main part of a power conversion device according to a second embodiment of the present disclosure, and is to be compared with Fig. 7. Referring to Fig. 13, this power conversion device differs from power conversion device 1 of the first embodiment in that each inspection unit 52 is replaced with an inspection unit 70.

[0116] The inspection unit 70 includes a timer unit 71, a judgment unit 72, a memory unit 73, and an estimation unit 74. The timer unit 71 starts measuring the time Td in response to the output signal φ50 of the control unit 50 falling from the “H” level to the “L” level, stops measuring the time Td in response to the signal EN from the corresponding unit converter 5 rising from the “H” level to the “L” level, and outputs a signal DTd indicating the measured time Td.

[0117] In other words, the timing unit 71 measures the time Td from when the switches S1 to S3 are turned off and the discharge of the capacitor 15 begins to occur until the communication between the communication circuits 31 and 41 is cut off, and outputs a signal DTd indicating the measured time Td.

[0118] Fig. 14 is a time chart for explaining the operation of the timer unit 71. In Fig. 14, (A) shows the waveform of the output signal φ50 of the control unit 50, (B) shows the conductive states of the switches S1 to S3, (C) shows the waveform of the DC input voltage Vin (Fig. 3) of the power supply 20, and (D) shows the waveform of the output signal EN of the communication circuit 31.

[0119] When the power conversion device is operating (time t0), the signal φ50 is set to the “H” level, the switches S1 to S3 are turned on, the DC voltage Vin is set to a predetermined voltage, and the signal EN is set to the “H” level.

[0120] When a command to stop the power conversion device is issued at time t1, the signal φ50 falls to the "L" level and the switches S1 to S3 are turned off. This causes the capacitor 15 to start discharging, the terminal voltage VDC of the capacitor 15 to drop, and the DC input voltage Vin of the power supply 20 to drop. The DC power of the capacitor 15 is consumed by the power supply 20 and the control circuit 30 (FIG. 2).

[0121] When the DC input voltage Vin of the power supply 20 drops and becomes lower than the second threshold voltage Vt2, the supply of the power supply voltage VC5 from the fifth power supply unit 26 (FIG. 3) to the communication circuit 31 is stopped, and the output signal EN of the communication circuit 31 falls from the "H" level to the "L" level. The timer unit 71 measures the time Td from time t1 to time t2, and outputs a signal DTd indicative of the measured time Td.

[0122] Fig. 15 is a time chart showing the aging of the waveform of DC voltage Vin shown in Fig. 14. In Fig. 15, curve A11 shows the waveform when the deterioration level of capacitor 15 is small, curve A12 shows the waveform when the deterioration level of capacitor 15 is medium, and curve A13 shows the waveform when the deterioration level of capacitor 15 is large.

[0123] As the degradation level of the capacitor 15 increases, the capacitance value of the capacitor 15 decreases, the terminal voltage VDC of the capacitor 15 falls faster, and the DC voltage Vin falls faster. Therefore, as the degradation level of the capacitor 15 increases, the time Td during which the DC voltage Vin becomes lower than the second threshold voltage Vt2 becomes shorter.

[0124] 15, the times Td1, Td2, and Td3 measured from the curves A11, A12, and A13 are shown to be successively shorter (Td1>Td2>Td3). Therefore, the deterioration level of the capacitor 15 can be determined from the time Td.

[0125] The judgment unit 72 compares the time Td indicated by the signal DTd with a judgment time TdL, and outputs a signal φ72 indicating the comparison result. If the time Td is longer than the judgment time TdL, the signal φ72 is set to an "L" level. If the time Td is shorter than the judgment time TdL, the signal φ72 is set to an "H" level. The judgment time TdL is previously determined by an experiment.

[0126] The signal φ72 at the “L” level indicates that the deterioration level of the corresponding capacitor 15 is small and that there is no need to replace the corresponding capacitor 15 with a new one. The signal φ72 at the “H” level indicates that the deterioration level of the corresponding capacitor 15 is large and that the corresponding capacitor 15 needs to be replaced with a new one. The signal φ72 is provided to the estimation unit 74 and the image display unit 53.

[0127] The storage unit 73 stores the signal DTd every time the signal DTd is output from the timer unit 71. When the power conversion device 1 is started and stopped multiple times, multiple signals DTd are sequentially output from the timer unit 71, and the multiple signals DTd are sequentially stored in the storage unit 73.

[0128] When the output signal φ72 of the judgment unit 72 is at the “L” level, i.e., when it is judged that the corresponding capacitor 15 does not need to be replaced with a new one, the estimation unit 74 estimates the replacement time of the capacitor 15 based on the multiple signals DTd stored in the memory unit 73, and outputs a signal φ74 indicating the estimation result.

[0129] Fig. 16 is a diagram for explaining the operation of the estimation unit 74. It is assumed that the power conversion device is started and stopped m times, the capacitor 15 is inspected m times, and m signals DTd1 to DTdm are stored in the storage unit 73. m is an integer equal to or greater than 2. Fig. 16 shows the case where m=3.

[0130] The estimation unit 74 reads out m signals DTd1 to DTdm from the storage unit 73, and converts the read signals DTd1 to DTdm into times Td1 to Tdm. Next, the estimation unit 74 writes the times Td1 to Tdm into Fig. 16, in which the horizontal axis indicates the number of tests and the vertical axis indicates the time Td.

[0131] Next, the estimation unit 74 draws an approximation curve B11 passing through times Td1 to Tdm, and obtains the number of inspections Y at which the curve B11 falls below the judgment time TdL. The estimation unit 74 estimates that the Yth inspection is the time to replace the capacitor 15 with a new one. Fig. 16 shows the case where Y = 5. The estimation unit 74 outputs a signal φ74 indicating the estimation result to the image display unit 53.

[0132] The image display unit 53 displays the determination result indicated by the output signal φ72 of the determination unit 72 and the estimation result indicated by the output signal φ74 of the estimation unit 74. The image display unit 53 displays the determination result and the estimation result for each of the 3×N capacitors 15.

[0133] Information for identifying the capacitor 15 determined to need to be replaced with a new one or information for identifying the capacitor 15 estimated to need to be replaced at the next stoppage may be displayed on the image display unit 53. Furthermore, the image display unit 53 may be included in the operation unit 6.

[0134] Fig. 17 is a flowchart showing the operation of the control circuit 42 including the inspection unit 70 shown in Fig. 13. When the operation unit 6 issues a command to stop the power conversion device, the control unit 50 causes the signal φ50 to fall from the "H" level to the "L" level in step ST11. When the signal φ50 is set to the "L" level, the switches S1 to S3 are turned off to start discharging the capacitor 15, and the timer unit 71 starts measuring the time Td (Fig. 14) in step ST12.

[0135] In step ST13, the timer unit 71 waits until the signal EN from the corresponding unit converter 5 is set to the "L" level. The "L" level signal EN indicates that communication between the communication circuit 31 (FIG. 2) of the unit converter 5 and the communication circuit 41 (FIG. 4) of the control device 7 has been cut off.

[0136] When the signal EN is at the "L" level, in step ST14, the timer unit 71 finishes measuring the time Td and outputs a signal DTd indicating the measured time Td. In step ST15, the signal DTd is stored by the storage unit 73.

[0137] In step ST16, the determination unit 72 determines whether the time Td is shorter than the determination time TdL. If Td < TdL, in step ST17, the signal φ72 is set to the "H" level. The "H" level signal φ72 indicates that the corresponding capacitor 15 needs to be replaced with a new one.

[0138] If Td > TdL, in step ST18, the signal φ72 is set to the "L" level. The "L" level signal φ72 indicates that there is no need to replace the corresponding capacitor 15 with a new one.

[0139] In step ST19, based on the plurality of signals DTd stored in the storage unit 73, the estimation unit 74 estimates the timing when the corresponding capacitor 15 should be replaced with a new one. In step ST20, the determination result of the determination unit 72 and the estimation result of the estimation unit 74 are displayed by the image display unit 53.

[0140] The user of the power conversion device determines whether to replace the capacitor 15 based on the display result of the image display unit 53. That is, when it is determined that the capacitor 15 should be replaced with a new one, the user replaces the capacitor 15 with a new one. Also, when the timing when the capacitor 15 should be replaced with a new one is estimated, the user prepares a new capacitor 15 required at that time. Since other configurations and operations are the same as those in the first embodiment, the description thereof will not be repeated.

[0141] As described above, in the second embodiment, the time Td from when the discharge of capacitor 15 starts to when the communication between communication circuits 31 and 41 is cut off is measured, and if the measured time Td is shorter than the determination time TdL, it is determined that capacitor 15 needs to be replaced with a new one. Therefore, it can be easily and quickly determined whether or not each of the 3×N capacitors 15 included in the 3×N unit converters 5 needs to be replaced with a new one.

[0142] Even if it is determined that the capacitor 15 does not need to be replaced with a new one, the timing for replacing the capacitor 15 with a new one is estimated. Therefore, a new capacitor 15 can be prepared at the estimated time, and a shortage of new capacitors 15 can be prevented.

[0143] Needless to say, the first and second embodiments may be appropriately combined. For example, both inspection units 52 and 70 may be provided in control device 7, and capacitor 15 may be replaced with a new one only when both inspection units 52 and 70 determine that capacitor 15 needs to be replaced with a new one.

[0144] The embodiments disclosed herein should be considered as illustrative and not restrictive in all respects. The present disclosure is defined by the claims rather than the above description, and is intended to include all modifications within the meaning and scope of the claims. [Explanation of symbols]

[0145] 1 power conversion device, S1 to S6 switches, 2, 3 transformer, R1 to R3 current limiting resistors, UL, VL, WL AC lines, C1 to C3 current transformers, L1 to L3 reactors, A1 to A3 arms, 5 unit converter, 6 operation unit, 7 control device, 8 commercial AC power source, 9u, 9v, 9w transmission lines, 10, 10A main circuit, 11 to 14 switching elements, PL, NL DC lines, 15 capacitor, 18 exciting coil, R4 resistive element, 20, 40 power source, 21 input voltage monitoring circuit, 22 to 26 power source unit, 27, 50, 51 control unit, 30, 30A, 42 control circuit, 31, 41 communication circuit, 32, 33 drive circuit, 34 switch operation circuit, 35 voltage sensor, 52, 70 inspection unit, 53 Image display section, 61,71 Timing section, 62,72 Judgment section, 63,73 Storage section, 64,74 Estimation section.

Claims

1. a power converter including a plurality of unit converters connected in series and connected to an AC power source; a control device that transmits a control signal to each of the plurality of unit converters; Each unit converter is a main circuit including a capacitor for storing DC power, a rectifying element for converting AC power supplied from the AC power source into DC power and supplying the DC power to the capacitor, and a switching element for converting the DC power of the capacitor into AC power and supplying the AC power to the AC power source; a first communication circuit that is driven by a DC voltage supplied from the capacitor and receives the control signal; a drive circuit that drives the switching element in accordance with the control signal received by the first communication circuit; The control device includes: A control unit that generates the control signal; a second communication circuit that transmits the control signal generated by the control unit to the first communication circuit; an inspection unit provided in correspondence with each unit converter and configured to inspect the capacitor included in the corresponding unit converter; The inspection unit includes: a timer unit that measures at least one of a first time from when power supply from the AC power source to the power converter is started to when communication between the first and second communication circuits is established, and a second time from when power supply from the AC power source to the power converter is stopped to when communication between the first and second communication circuits is interrupted; a determination unit that determines that the corresponding capacitor needs to be replaced with a new one in at least one of a first case in which the first time is shorter than a first determination time and a second case in which the second time is shorter than a second determination time.

2. Each of the unit converters is a power supply that generates a power supply voltage based on the DC voltage when the DC voltage increases and exceeds a first threshold voltage, and stops generating the power supply voltage when the DC voltage decreases and becomes lower than a second threshold voltage; the first communication circuit is driven by the power supply voltage; when the power supply voltage is generated by the power supply, communication is established between the first and second communication circuits; The power conversion device according to claim 1 , wherein communication between the first and second communication circuits is interrupted when the power source stops generating the power source voltage.

3. Each of the unit converters is a voltage sensor that detects a voltage between the terminals of the capacitor and outputs a signal indicative of the detected voltage; the first communication circuit transmits an output signal of the voltage sensor to the second communication circuit; The power conversion device according to claim 1 , wherein the control unit generates the control signal based on an output signal of the voltage sensor received by the second communication circuit.

4. The power conversion device according to claim 1 , further comprising a display unit that displays the determination results of the plurality of determination units.

5. The power supply from the AC power source to the power converter is started and stopped a plurality of times; The inspection unit includes: a memory unit that sequentially stores a plurality of measurement results of the timing unit; 2. The power conversion device according to claim 1, further comprising an estimation unit that estimates a time to replace the corresponding capacitor with a new one based on the contents stored in the memory unit in at least one of a third case in which the first time is longer than the first judgment time and a fourth case in which the second time is longer than the second judgment time.

6. The power conversion device according to claim 5 , further comprising a display unit that displays the estimation results of the plurality of estimators.

7. 2. The power conversion device according to claim 1, further comprising a switch connected between the AC power supply and the power converter, the switch being turned on when starting power supply from the AC power supply to the power converter, and being turned off when stopping power supply from the AC power supply to the power converter.

Citation Information

Patent Citations

  • Power conversion device

    JP2021087244A

  • Power conversion device

    WO2018216208A1

  • Power conversion device

    WO2020202468A1

  • Power conversion device

    WO2018193606A1