Chiller
The chiller addresses size and cost increases by implementing multiple cooling water circuits with shared filtration and DI filters, ensuring efficient ionic substance removal and reduced energy consumption.
Patent Information
- Application Number
- JP2020124650
- Authority / Receiving Office
- JP · JP
- Patent Type
- Patents
- Current Assignee / Owner
- Filing Date
- 2020-07-21
- Publication Date
- 2024-10-02
- Estimated Expiration
- 2040-07-21
AI Technical Summary
Existing chillers require additional filtration pipes, DI filters, and solenoid valves for higher purity cooling water, increasing size, cost, and energy consumption, contradicting user demands for space, energy, and cost savings.
A chiller design with multiple cooling water circuits, each connected to a heat exchanger, incorporating a DI filter in one circuit and a shared filtration system, controlled by a conductivity sensor and solenoid valve to maintain purity and reduce overall size and costs.
The chiller effectively removes ionic substances while minimizing size and energy consumption, achieving cost savings and operational stability by integrating a shared filtration system with DI filters and solenoid valves.
Smart Images

Figure 0007559396000001
Abstract
Description
[Technical field]
[0001] The present invention relates to a chiller for controlling the temperature of a heat load by supplying temperature-controlled cooling water to the heat load. [Background technology]
[0002] Patent Document 1 describes a chiller that controls the temperatures of multiple heat loads by supplying temperature-controlled cooling water to the multiple heat loads and exchanging heat therewith. The chiller described in Patent Document 1 has multiple coolant circuits that supply cooling water to each of multiple devices, one refrigeration circuit that controls the temperature of the cooling water, and a control device that controls the entire chiller. Two heat exchangers are connected in parallel to the refrigeration circuit, and each of these heat exchangers is connected to each of the multiple coolant circuits. Therefore, the cooling water that has cooled the devices is temperature-controlled by the heat exchanger in the refrigeration circuit and supplied to the devices again.
[0003] In addition, in the coolant circuit described in Patent Document 1, a filtration pipe that branches off from a supply pipe that supplies the coolant that has been heat exchanged by the heat exchanger of the coolant circuit to the equipment and is connected to a return pipe that returns the coolant supplied to the equipment to a tank is provided with an ion removal filter (DI filter) that removes ionic substances in the coolant. This DI filter removes ionic substances in the coolant to produce pure water with higher purity. By connecting this DI filter to the coolant circuit, metal corrosion can be suppressed, and the electrical insulation of the coolant is improved to suppress leakage between the equipment and metal piping, etc., thereby improving the stability of the operation of the equipment and chillers. [Prior art documents] [Patent documents]
[0004] [Patent Document 1] WO2020 / 100206 issue Summary of the Invention [Problem to be solved by the invention]
[0005] Incidentally, in the chiller described in Patent Document 1, a filtration pipe and a DI filter are provided in only one of the two cooling liquid circuits. Therefore, if the other cooling liquid circuit also requires pure water of higher purity, it is conceivable to provide a filtration pipe, a DI filter, and a solenoid valve for opening and closing the filtration pipe in the other cooling liquid circuit. However, adding a filtration pipe, a DI filter, and a solenoid valve in this way makes the entire chiller larger, and increases in costs and energy consumption are unavoidable. On the other hand, with the trend toward space-saving, energy-saving, and cost-saving, users are demanding a chiller that is smaller in size and can suppress increases in energy and costs.
[0006] The technical problem of the present invention is to provide a DI filter capable of removing ionic substances contained in cooling water for controlling the temperature of each of a plurality of heat loads, and to provide a compact consumption The present invention provides a chiller capable of suppressing increases in energy consumption and costs. [Means for solving the problem]
[0007] In order to solve the above problems, a chiller of the present invention is a chiller that controls the temperatures of a plurality of heat loads by circulating cooling water, and includes a plurality of cooling water circuits that separately supply the cooling water to the plurality of heat loads, and a refrigeration circuit through which a primary refrigerant flows to control a temperature of the cooling water, the refrigeration circuit is configured by connecting in parallel the same number of heat exchange path sections as the cooling water circuits, and a heat exchanger is provided in each of these heat exchange path sections, and each of the plurality of cooling water circuits is connected to the heat exchanger of a corresponding one of the plurality of heat exchange path sections, and each of the plurality of cooling water circuits includes a tank that contains the cooling water, a first supply pipe that supplies the cooling water in the tank to the heat exchanger of the corresponding one of the plurality of heat exchange path sections, a pump provided in the first supply pipe, a second supply pipe that delivers the cooling water that has been temperature controlled by the heat exchanger to the heat load, and a return pipe that leads the cooling water returned from the heat load to the tank, and further the chiller includes a plurality of cooling water circuits that connect the plurality of cooling water circuits to the heat exchanger, and a return pipe that delivers the cooling water returned from the heat load to the tank. Of Either one In the cooling water circuit Branching off from the second supply line , the remaining The other cooling water circuit In The cooling water supply system includes a filtration pipe connected to the return pipe, and a DI filter for purifying the cooling water is provided in the filtration pipe.
[0008] In this case, a communication line is preferably connected between the tanks provided in each of the plurality of cooling water circuits for keeping the amount of the cooling water stored in each of the tanks constant. Also, it is preferable that the flow rate of the cooling water flowing from the filtration line through the return line into the tank is the same as the flow rate of the cooling water flowing out of the tank and through the communication line into the tank provided in the cooling water circuit in which the filtration line is connected to the second supply line.
[0009] More preferably, the chiller has a control device that controls the entire chiller, the filtration pipeline is provided with a solenoid valve that allows or blocks the flow of the cooling water from the second supply pipeline to the filtration pipeline, and the return pipeline is provided with a conductivity sensor that measures the electrical conductivity of the cooling water flowing through the return pipeline, and the control device controls the opening and closing of the solenoid valve in accordance with the electrical conductivity measured by the conductivity sensor. Effect of the Invention
[0010] The chiller of the present invention is equipped with a DI filter capable of removing ionic substances contained in the cooling water that controls the temperature of each of a plurality of heat loads, and is compact. consumption It is possible to provide a chiller that can suppress increases in energy consumption and costs. [Brief description of the drawings]
[0011] [Figure 1] FIG. 2 is a circuit diagram of a chiller according to an embodiment of the present invention. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0012] A chiller according to an embodiment of the present invention will be described below. In this embodiment, the cooling water is clean water, and the thermal load is a laser oscillator and a probe that irradiates a laser beam in a laser welding device. The laser oscillator is a low-temperature load, and the probe is a load that is hotter than the laser oscillator.
[0013] 1 controls the temperatures of two devices, a first device 5 (heat load) and a second device 6 (heat load), and has two first and second cooling water circuits 3 (cooling water circuits) and 4 (cooling water circuits), one refrigeration circuit 2, and a control device 10 that controls the entire chiller 1. The first cooling water circuit 3 supplies a first cooling water 7 to the first device 5, and the second cooling water circuit 4 supplies a second cooling water 8 to the second device 6, so that the first device 5 and the second device 6 are cooled separately.
[0014] On the other hand, the refrigeration circuit 2 has a primary refrigerant for controlling the temperature of each of the first cooling water 7 in the first cooling water circuit 3 and the second cooling water 8 in the second cooling water circuit 4, and the primary refrigerant controls the temperatures of the first cooling water 7 and the second cooling water 8 by heat exchange with each of the first cooling water 7 and the second cooling water 8, thereby controlling the temperatures of the first cooling water 7 and the second cooling water 8 to set temperatures. Note that, for example, hydrofluorocarbon (HFC) or natural refrigerant (ammonia, carbon dioxide, etc.) can be used as the primary refrigerant.
[0015] In this embodiment, the first device 5 is a laser oscillator in a laser welding device and is a low-temperature device, while the other second device 6 is a probe that irradiates laser light and is a high-temperature device. The first device 5 is cooled by a first cooling water 7 in the first cooling water circuit 3, and the second device 6 is cooled by a second cooling water 8 in the second cooling water circuit 4.
[0016] In this case, for example, fresh water is used as the first cooling water 7 supplied to the first device 5. The temperature of the fresh water is set to an optimum temperature in the range of 10-30° C., preferably in the range of 15-25° C. The flow rate of the fresh water is set to an optimum flow rate in the range of 20-80 L / min.
[0017] On the other hand, pure water is used as the second cooling water 8 supplied to the second device 6, and the temperature of the pure water is set to an optimum temperature within the range of 10-50° C., preferably within the range of 20-40° C. The flow rate of the pure water is set to an optimum flow rate within the range of 2-10 L / min. However, it is necessary that the set temperature of the second cooling water 8 is equal to or higher than the set temperature of the first cooling water 7.
[0018] The refrigeration circuit 2 and the two first and second coolant circuits 3 and 4 are housed inside one housing 9, and the two first devices 5 and second devices 6 are disposed outside the housing 9. On the outer surface of the housing 9, two device connection ports 11, 12 for connecting the first device 5 to the first coolant circuit 3 and two device connection ports 13, 14 for connecting the second device 6 to the second coolant circuit 4 are provided.
[0019] (Refrigeration circuit) The refrigeration circuit 2 is formed by connecting the following in series and in a loop shape with piping: a compressor 16 that compresses the primary refrigerant to convert it into a high-temperature, high-pressure gaseous state; a condenser 17 that cools the high-temperature, high-pressure gaseous primary refrigerant discharged from the compressor 16 to convert it into a low-temperature, high-pressure liquid state; a first main expansion valve 18 and a second main expansion valve 19 that expand the low-temperature, high-pressure primary refrigerant sent from the condenser 17 to convert it into a low-temperature, low-pressure liquid state; and a first heat exchanger 21 and a second heat exchanger 22 that separately exchange heat between the low-temperature, low-pressure liquid primary refrigerant sent from the first main expansion valve 18 and the second main expansion valve 19 and the first cooling water 7 and the second cooling water 8 of the two first cooling water circuits 3 and the second cooling water circuits 4 to convert it into a low-pressure gaseous primary refrigerant.
[0020] The first main expansion valve 18 and the first heat exchanger 21 are connected in series to each other to form a first heat exchange passage portion 23, and the second main expansion valve 19 and the second heat exchanger 22 are also connected in series to each other to form a second heat exchange passage portion 24. The first heat exchange passage portion 23 and the second heat exchange passage portion 24 are connected in series to each other through the outlet of the condenser 17. 17d The first and second heat exchangers 21, 22 are connected in parallel to each other so that they branch off midway along the flow path from the intake port 21a, 22a of the first heat exchanger 21 and the intake port 16a of the compressor 16, and then merge into each other in the flow path between the outlets 21b, 22b of the first heat exchanger 21 and the outlet 22b of the second heat exchanger 22 and the intake port 16a of the compressor 16.
[0021] Inside the case 21c of the first heat exchanger 21, there are provided a primary refrigerant circulating section 21d through which the primary refrigerant flows, and a cooling water circulating section 21e through which the first cooling water 7 flows, so that heat exchange is performed between the primary refrigerant flowing in the primary refrigerant circulating section 21d and the first cooling water 7 flowing in the cooling water circulating section 21e. Similarly, inside the case 22c of the second heat exchanger 22, there are provided a primary refrigerant circulating section 22d through which the primary refrigerant flows, and a cooling water circulating section 22e through which the second cooling water 8 flows, so that heat exchange is performed between the primary refrigerant flowing in the primary refrigerant circulating section 22d and the second cooling water 8 flowing in the cooling water circulating section 22e.
[0022] The flow rate of the primary refrigerant flowing through the primary refrigerant flow section 21d of the first heat exchanger 21 and the primary refrigerant flow section 22d of the second heat exchanger 22 is increased or decreased by increasing or decreasing the opening of the first main expansion valve 18 and the second main expansion valve 19, and accordingly, the cooling capacity of the first heat exchanger 21 and the second heat exchanger 22 is controlled. The first main expansion valve 18 and the second main expansion valve 19 are expansion valves for cooling, and supply low-temperature primary refrigerant to the first heat exchanger 21 and the second heat exchanger 22.
[0023] In the refrigeration circuit 2, a flow path connecting the discharge port 16b of the compressor 16 and the inlet 17a of the condenser 17 is provided with a first branch flow path 25 branched from this flow path and connected between the first heat exchanger 21 and the first main expansion valve 18 of the first heat exchange flow path section 23, and a second branch flow path 26 branched from the flow path and connected between the second heat exchanger 22 and the second main expansion valve 19 of the second heat exchange flow path section 24. A first sub-expansion valve 27 is connected to the first branch flow path 25, and a second sub-expansion valve 28 is connected to the second branch flow path 26.
[0024] The first branch flow path 25 and the second branch flow path 26 supply a part of the high-temperature primary refrigerant discharged from the compressor 16 as a heating refrigerant to the first heat exchange flow path portion 23 and the second heat exchange flow path portion 24. The supply of the heating refrigerant controls the temperature of the cooling water flowing in the first heat exchanger 21 and the second heat exchanger 22.
[0025] The flow rate of the heating refrigerant is increased or decreased by increasing or decreasing the opening of the first sub-expansion valve 27 and the second sub-expansion valve 28, and accordingly, the temperatures of the cooling water flowing through the first heat exchanger 21 and the second heat exchanger 22 are controlled. Therefore, the first sub-expansion valve 27 and the second sub-expansion valve 28 are expansion valves for heating.
[0026] In this embodiment, the first main expansion valve 18, the second main expansion valve 19, the first sub-expansion valve 27, and the second sub-expansion valve 28 are electronic expansion valves whose opening degree can be arbitrarily controlled by a stepping motor, and are electrically connected to the control device 10, so that the opening degree of each of them is controlled by the control device 10.
[0027] Condenser 17 is an air-cooled condenser that cools the primary refrigerant by a fan 17c driven by an electric motor 17b. Fan 17c is disposed in a fan housing 9a formed on the side surface of housing 9, and fan housing 9a is provided with an intake port 9c that draws in outside air as cooling air toward condenser 17. The cooling air drawn in from intake port 9c cools the primary refrigerant as it passes through condenser 17, and is then discharged to the outside of housing 9 from exhaust port 9b that opens at the top of housing 9. Condenser 17 is not limited to being air-cooled, and may be water-cooled.
[0028] A control device 10 that controls the overall operation of the chiller 1 is provided within the housing 9. The compressor 16 and the fan 17c are electrically connected to the control device 10, and are inverter-controlled by the control device 10 to control the rotation speed, output, and the like of each of them.
[0029] In addition, in the refrigeration circuit 2, a first temperature sensor 31 is connected to a flow path from the discharge port 16b of the compressor 16 to the inlet 17a of the condenser 17 in order to measure the temperature of the primary refrigerant discharged from the compressor 16. In addition, a filter 32 for filtering impurities in the primary refrigerant and a first pressure sensor 33 for measuring the pressure of the primary refrigerant are sequentially connected to a flow path from the outlet 17d of the condenser 17 to the first heat exchange flow path section 23 and the second heat exchange flow path section 24. In addition, a second temperature sensor 34 for measuring the temperature of the primary refrigerant flowing out from the first heat exchanger 21 is connected to a flow path from the first heat exchange flow path section 23 to the suction port 16a of the compressor 16, and further, a second pressure sensor 35 for measuring the pressure of the primary refrigerant sucked into the compressor 16 and a third temperature sensor 36 for measuring the temperature of the primary refrigerant are connected downstream of the second temperature sensor 34 in the flow path. The first temperature sensor 31, the second temperature sensor 34, the third temperature sensor 36 and the first pressure sensor 33, the second pressure sensor 35 are electrically connected to the control device 10, and based on their measurement results, the control device 10 controls the rotation speed and output of the compressor 16 and the electric motor 17b of the condenser 17, etc.
[0030] In the refrigeration circuit 2, the section from the discharge port 16b of the compressor 16 through the condenser 17 to the first main expansion valve 18 and the second main expansion valve 19 is a high-pressure side section where the pressure of the primary refrigerant is high, while the section from the outlets of the first main expansion valve 18 and the second main expansion valve 19 through the first heat exchanger 21 and the second heat exchanger 22 to the suction port 16a of the compressor 16 is a low-pressure side section where the pressure of the primary refrigerant is low.
[0031] (1st cooling water circuit) The first cooling water circuit 3 includes a first tank 40 containing the first cooling water 7, a first pump 41 installed outside the first tank 40, a first supply pipe 43 connecting the discharge port 41a of the first pump 41 and the inlet of the cooling water flow section 21e of the first heat exchanger 21, a second supply pipe 44 connecting the outlet of the cooling water flow section 21e and the supply side equipment connection port 11, a return pipe 45 connecting the return side equipment connection port 12 and the first tank 40, and a return communication pipe 46 that guides the first cooling water 7 flowing out of the first tank 40 to the suction port 41b of the first pump 41. The supply side equipment connection port 11 and the return side equipment connection port 12 are connected to the supply side equipment piping 5a and the return side equipment piping 5b of the first equipment 5.
[0032] As a result, the first cooling water circuit 3 is configured to send the first cooling water 7 in the first tank 40 to the cooling water circulation section 21e of the first heat exchanger 21 by the first pump 41, and after controlling the first cooling water 7 to a set temperature by heat exchange with the primary refrigerant flowing in the primary refrigerant circulation section 21d in this cooling water circulation section 21e, the first cooling water 7 is immediately sent to the first equipment 5 through the second supply pipe 44.
[0033] The first tank 40 is formed in a hollow box shape. An inlet 40a through which the first cooling water 7 can be injected is provided at the top of the first tank 40, and a lid 40b is detachably provided on the inlet 40a. When the lid 40b is attached to the inlet 40a, the internal space of the first tank 40 is blocked from the outside air. A level switch 48 for detecting the liquid level of the first cooling water 7 is provided in the first tank 40. A drain pipe 50 communicating with a drain port 49 provided on the outer surface of the housing 9 is connected to the first tank 40.
[0034] Also, a supply-side temperature sensor 51 that measures the temperature of the first cooling water 7 that has been temperature-controlled by the first heat exchanger 21 and is heading toward the first device 5, and a supply-side pressure sensor 52 that measures the pressure of the first cooling water 7 are connected to the second supply pipe 44. The supply-side temperature sensor 51 and the supply-side pressure sensor 52 are electrically connected to the control device 10, and the control device 10 controls the first pump 41 and the expansion valves 18, 19, 27, 28 of the refrigeration circuit 2, etc., based on the measured temperature, pressure, etc. of the first cooling water 7.
[0035] (2nd cooling water circuit) The second coolant circuit 4 includes a second tank 60 containing the second coolant 8, a second pump 61 installed outside the second tank 60, a first supply pipe 63 connecting a discharge port 61a of the second pump 61 and an inlet of the coolant flow section 22e of the second heat exchanger 22, a second supply pipe 64 connecting an outlet of the coolant flow section 22e and a supply side equipment connection port 13, and a return pipe 65 connecting a return side equipment connection port 14 and the second tank 60. The supply side equipment connection port 13 and the return side equipment connection port 14 are connected to the supply side equipment piping 6a and the return side equipment piping 6b of the second equipment 6.
[0036] As a result, the second coolant circuit 4 is configured to send the second coolant 8 in the second tank 60 to the coolant circulation section 22e of the second heat exchanger 22 by the second pump 61, where it is heat exchanged with the primary refrigerant flowing in the primary refrigerant circulation section 22d to control the temperature to a set value, and then immediately send the second coolant to the second equipment 6 through the second supply pipe 64.
[0037] The second tank 60, like the first tank 40, is formed in a hollow box shape. An inlet 60a through which the second cooling water 8 can be injected is provided at the top of the second tank 60, and a lid 60b is removably attached to the inlet 60a. When the lid 60b is attached to the inlet 60a, the internal space of the second tank 60 is blocked from the outside air. The second tank 60 is provided with a level switch 68 for detecting the liquid level of the second cooling water 8 stored in the second tank 60, and is connected to a drain pipe 70 that is provided on the outer surface of the housing 9 and communicates with a drain port 69.
[0038] Further, a temperature sensor 73 is connected to the first supply pipe 63, which measures the temperature of the second cooling water 8 supplied from the second pump 61 to the second heat exchanger 22. A supply-side temperature sensor 71 is connected to the second supply pipe 64, which measures the temperature of the second cooling water 8 that is temperature-controlled by the second heat exchanger 22 and flows to the second device 6, and a supply-side pressure sensor 72 is connected to the second supply pipe 64. The supply-side temperature sensor 71, the temperature sensor 73, and the supply-side pressure sensor 72 are electrically connected to the control device 10, and the second pump 61 and the expansion valves 18, 19, 27, 28, etc. of the refrigeration circuit 2 are controlled by the control device 10 based on the measured temperature, pressure, etc. of the second cooling water 8.
[0039] Furthermore, the first coolant circuit 3 and the second coolant circuit 4 are provided with a filtration pipe 76 that branches off from the second supply pipe 44 of the first coolant circuit 3 and is connected to the return pipe 65 of the second coolant circuit 4. In this embodiment, the connection position of the filtration pipe 76 to the second supply pipe 44 is upstream of the supply side pressure sensor 52 provided in the second supply pipe 44. A solenoid valve 77 that opens and closes the filtration pipe 76, and a DI filter 78 (deionized filter) that purifies the first coolant 7 are connected to the filtration pipe 76. In this embodiment, the solenoid valve 77 is a two-way solenoid valve that opens and closes the second supply pipe 44 and the return pipe 65 to communicate with each other or to block communication therebetween.
[0040] The DI filter 78 includes an ion exchange resin filter through which the first cooling water 7 can pass. The ion exchange resin filter has a function of adsorbing and removing ionic substances in the first cooling water 7 when the first cooling water 7 flows. Therefore, when the first cooling water 7, which is clean water, is caused to flow through the DI filter 78, the clean water can be made into pure water. A conductivity sensor 79 that measures the electrical conductivity in the purified first cooling water 7 is provided at the junction 76a connected to the return pipe 65 of the filtration pipe 76. The solenoid valve 77 and the conductivity sensor 79 are electrically connected to the control device 10, and the solenoid valve 77 is controlled by the control device 10 based on the measured electrical conductivity.
[0041] In this way, the filtration pipe 76 is a pipe for removing ionic substances in the first cooling water 7 (clean water) to convert the clean water into pure water, and the filtration pipe 76 is usually blocked by closing the solenoid valve 77. On the other hand, when the amount of ionic substances in the second cooling water 8 increases and the conductivity sensor 79 detects an increase in the electrical conductivity of the second cooling water 8, the solenoid valve 77 is opened and the filtration pipe 76 is closed. 2 supply line 44 The first cooling water 7 is passed through a DI filter 78 and returned to the second tank 60 via a filtration line 76 and a return line 65. At that time, ionic substances in the first cooling water 7 are removed by the DI filter 78, and the first cooling water 7 becomes pure water.
[0042] In the illustrated embodiment, the DI filter 78 is disposed inside the housing 9, but the DI filter 78 may be disposed outside the housing 9. In this case, the DI filter 78 is provided detachably with respect to the filtration pipe 76, which makes it possible to easily replace the DI filter 78.
[0043] A communication pipe 80 is connected between the first tank 40 and the second tank 60 provided in the first coolant circuit 3 and the second coolant circuit 4, respectively, for keeping the liquid levels (amounts) of the first coolant 7 and the second coolant 8 stored in the first tank 40 and the second tank 60 constant. In this embodiment, one end of the communication pipe 80 is connected to a position below the liquid level of the first coolant 7 stored in the first tank 40, and the other end of the communication pipe 80 is connected to a position below the liquid level of the second coolant 8 stored in the second tank 60. For this reason, the first tank 40 and the second tank 60 are connected via a connecting pipe 80, and when the purified first cooling water 7 flows into the second tank 60 from the filtration pipe 76, the liquid level in the second tank 60 rises, and the second cooling water 8 (pure water) stored in the second tank 60 flows into the first tank 40 via the connecting pipe 80.
[0044] In this case, the first tank 40 and the second tank 60 are in communication with the outside air and are installed at the same height. Therefore, when the first cooling water 7 flows into the second tank 60 through the filtration pipe 76 and the liquid level in the second tank 60 rises, the second cooling water 8 corresponding to the rise in the liquid level flows into the first tank 40 through the communication pipe 80. That is, the cooling water that flows into the second tank 60 returns to the first tank 40. Therefore, the liquid levels (amounts) of the first tank 40 and the second tank 60 can be kept constant.
[0045] Furthermore, by increasing the amount of the purified first cooling water 7 supplied to the second tank 60, it is possible to reduce the electrical conductivity of the second cooling water 8 stored in the second tank 60. As a result, it is also possible to reduce the electrical conductivity of the first cooling water 7 stored in the first tank 40 that is in communication with the second tank 60.
[0046] Next, an operation in the case where the chiller 1 controls the temperatures of the first device 5 and the second device 6 will be described. In the refrigeration circuit 2, the high-temperature, high-pressure primary refrigerant discharged from the compressor 16 is cooled by the condenser 17 to a low-temperature, high-pressure state, and then flows into the first heat exchange passage section 23 and the second heat exchange passage section 24. The primary refrigerant that flows into the first heat exchange passage section 23 is brought to a low-temperature, low-pressure state by the first main expansion valve 18, and then the first heat exchanger 21 cools the first cooling water 7 of the first cooling water circuit 3, thereby raising the temperature, and evaporates to a low-pressure state. On the other hand, the primary refrigerant that flows into the second heat exchange passage section 24 is brought to a low-temperature, low-pressure state by the second main expansion valve 19, and then the second heat exchanger 22 cools the second cooling water 8 of the second cooling water circuit 4, thereby raising the temperature, and evaporates to a low-pressure state. The primary refrigerant that flows out of the first heat exchanger 21 and the second heat exchanger 22 join together and flow into the suction port 16a of the compressor 16.
[0047] In addition, a part of the high-temperature, high-pressure primary refrigerant discharged from the compressor 16 is supplied as a heating refrigerant to the first heat exchange passage section 23 and the second heat exchange passage section 24 through the first branch passage 25 and the second branch passage 26. By supplying this heating refrigerant, the temperatures of the first cooling water 7 and the second cooling water 8 flowing toward the first heat exchanger 21 and the second heat exchanger 22 are controlled, and as a result, the cooling capacities of the first heat exchanger 21 and the second heat exchanger 22 are controlled.
[0048] Meanwhile, in the first coolant circuit 3, the first coolant 7 in the first tank 40 is sent from the first pump 41 through the first supply pipe 43 to the coolant circulation section 21e of the first heat exchanger 21, where it is controlled to a set temperature by heat exchange with the primary refrigerant of the refrigeration circuit 2 by the first heat exchanger 21, and then sent from the second supply pipe 44 through the supply-side equipment connection port 11 to the first equipment 5 to cool the first equipment 5. The first coolant 7, whose temperature has been increased by cooling the first equipment 5, is returned to the first tank 40 through the return pipe 45 from the return-side equipment connection port 12.
[0049] The temperature of the first cooling water 7 is constantly measured by the supply side temperature sensor 51, and the opening of the first main expansion valve 18 and the first sub-expansion valve 27 of the refrigeration circuit 2 is controlled based on the measured temperature of the first cooling water 7, thereby precisely controlling the temperature of the first cooling water 7 and maintaining it at a set temperature.
[0050] For example, when the temperature of the first cooling water 7 measured by the supply-side temperature sensor 51 is higher than the set temperature, it is necessary to increase the cooling capacity of the first heat exchanger 21 to lower the temperature of the first cooling water 7, so the opening of the first main expansion valve 18 in the refrigeration circuit 2 is enlarged to increase the flow rate of the low-temperature primary refrigerant flowing through the first heat exchange passage section 23, and the opening of the first sub-expansion valve 27 is decreased to reduce the flow rate of the high-temperature heating refrigerant flowing from the first branch passage 25 into the first heat exchange passage section 23. As a result, the temperature of the primary refrigerant flowing into the first heat exchanger 21 is reduced and the cooling capacity of the first heat exchanger 21 is increased, so that the first cooling water 7 is cooled and its temperature is reduced and controlled to the set temperature.
[0051] Conversely, when the temperature of the first cooling water 7 is lower than the set temperature, it is necessary to heat the first cooling water 7 in the first heat exchanger 21 to increase its temperature, so the opening of the first main expansion valve 18 is decreased to decrease the flow rate of the low-temperature primary refrigerant flowing through the first heat exchange passage section 23, and the opening of the first sub-expansion valve 27 is increased to increase the flow rate of the high-temperature heating refrigerant flowing from the first branch passage 25 into the first heat exchange passage section 23. As a result, the temperature of the primary refrigerant flowing into the first heat exchanger 21 rises, and the first cooling water 7 is heated by the heated primary refrigerant, so that the temperature of the first cooling water 7 rises and is controlled to the set temperature.
[0052] In the second coolant circuit 4, the second coolant 8 in the second tank 60 is sent from the second pump 61 through the first supply pipe 63 to the coolant circulation section 22e of the second heat exchanger 22, where it is controlled to a set temperature by heat exchange with the primary refrigerant of the refrigeration circuit 2 in the second heat exchanger 22, and then sent from the second supply pipe 64 through the supply-side equipment connection port 13 to the second equipment 6 to cool the second equipment 6. The second coolant 8, whose temperature has been increased by cooling the second equipment 6, is returned to the second tank 60 through the return pipe 65 from the return-side equipment connection port 14.
[0053] The temperature of the second cooling water 8 is constantly measured by the supply side temperature sensor 71 and the temperature sensor 73, and the opening of the second main expansion valve 19 and the second sub-expansion valve 28 of the refrigeration circuit 2 is controlled based on the measured temperature of the second cooling water 8, thereby precisely controlling the temperature of the second cooling water 8 to a set temperature.
[0054] For example, when the temperature of the second cooling water 8 measured by the supply-side temperature sensor 71 is higher than the set temperature, it is necessary to increase the cooling capacity of the second heat exchanger 22 to lower the temperature of the second cooling water 8, so that the aperture of the second main expansion valve 19 in the refrigeration circuit 2 is enlarged to increase the flow rate of low-temperature refrigerant flowing through the second heat exchange passage portion 24, and the aperture of the second sub-expansion valve 28 is decreased to reduce the flow rate of high-temperature heating refrigerant flowing from the second branch passage 26 into the second heat exchange passage portion 24. As a result, the temperature of the primary refrigerant flowing into the second heat exchanger 22 is reduced and the cooling capacity of the second heat exchanger 22 is increased, so that the second cooling water 8 is cooled and its temperature is reduced and controlled to the set temperature.
[0055] Conversely, when the temperature of the second cooling water 8 is lower than the set temperature, it is necessary to heat the second cooling water 8 in the second heat exchanger 22 to raise the temperature, so the opening of the second main expansion valve 19 is decreased to reduce the flow rate of the low-temperature primary refrigerant flowing through the second heat exchange passage section 24, and the opening of the second sub-expansion valve 28 is increased to increase the flow rate of the high-temperature heating refrigerant flowing from the second branch passage 26 into the second heat exchange passage section 24. As a result, the temperature of the primary refrigerant flowing into the second heat exchanger 22 rises, and the second cooling water 8 is heated by the heated primary refrigerant, so that the temperature of the second cooling water 8 rises and is controlled to the set temperature.
[0056] Furthermore, when the amount of ionic substances in the second cooling water 8 increases, the electrical conductivity of the second cooling water 8 measured by the conductivity sensor 79 increases, so that the solenoid valve 77 is opened to connect the filtration pipe 76, and the first cooling water 7 flows through the filtration pipe 76, whereby the ionic substances in the first cooling water 7 are removed by the DI filter 78, and the first cooling water 7 becomes pure water and is supplied to the second tank 60. At the same time, a part of the second cooling water 8 that has been stored in the second tank 60 and turned into pure water flows into the first tank 40 through the connecting pipe 80. For this reason, it is possible to reduce the electrical conductivity of the second cooling water 8 flowing through the second cooling water circuit 4, and also to reduce the electrical conductivity of the first cooling water 7 flowing through the first cooling water circuit 3.
[0057] Furthermore, by opening and closing the solenoid valve 77 based on the measurement of the second cooling water 8 by the conductivity sensor 79, the amount of the first cooling water 7 (pure water) flowing into the second tank 60 can be increased or decreased, so that the electrical conductivity of the second cooling water 8 and the first cooling water 7 can be controlled to a predetermined low state. Therefore, when the temperature of the first device 5 and the second device 6 is controlled by the flow of the first cooling water 7 and the second cooling water 8, it is possible to prevent, for example, a leakage current from occurring, which may cause the operation of the first device 5 and the second device 6 to become unstable.
[0058] As described above, by providing the filtration pipe 76 branching off from the second supply pipe 44 of the first coolant circuit 3 and connected to the return pipe 65 of the second coolant circuit 4, and providing this filtration pipe 76 with the solenoid valve 77 for opening and closing the flow path and the DI filter 78 for purifying the coolant, it is possible to share the filtration pipe 76, the solenoid valve 77, and the DI filter 78 in the first coolant circuit 3 and the second coolant circuit 4. Therefore, compared with a case in which the filtration pipe 76, the DI filter 78, and the solenoid valve 77 are provided in each of the first coolant circuit 3 and the second coolant circuit 4, it is possible to provide a chiller 1 that is smaller in overall size and that can achieve cost and energy savings.
[0059] In the above-described embodiment, two coolant circuits, the first coolant circuit 3 and the second coolant circuit 4, are provided, but three coolant circuits may be provided. In this case, the refrigeration circuit 2 is provided with three coolant circuits, the same number as the coolant circuits, that is, a first heat exchange passage section 23 having the first main expansion valve 18 and the first heat exchanger 21, a second heat exchange passage section 24 having the second main expansion valve 19 and the second heat exchanger 22, a first branch passage 25 having the first sub-expansion valve 27, and a second branch passage 26 having the second sub-expansion valve 28.
[0060] In addition, when three cooling water circuits are provided, the filtration pipe 76 branches off from the second supply pipe of any one of the three cooling water circuits and is connected to any one of the return pipes of the other two cooling water circuits. Also, the communication pipe 80 is connected in communication with the lower parts of each of the three tanks.
[0061] Furthermore, ethylene glycol may be added to the first cooling water 7 and the second cooling water 8 in order to decrease the electrical conductivity (increase the electrical resistivity) of the first cooling water 7 and the second cooling water 8. [Explanation of symbols]
[0062] 1 Chiller 2 Refrigeration circuit 3 1st cooling water circuit (cooling water circuit) 4 2nd cooling water circuit (cooling water circuit) 5 1st equipment (heat load) 5a, 6a Supply side equipment piping 5b, 6b Return side equipment piping 6 Second equipment (heat load) 7 1st cooling water (cooling water) 8 2nd cooling water (cooling water) 9. Cabinet 9a Fan housing 9b Exhaust port 9c Air Intake 10 Control device 11,13 Supply side equipment connection port 12,14 Return equipment connection port 16 Compressor 16a, 21a, 22a, 41b inlet 16b, 41a, 61a outlet 17 Condenser 17a Entrance 17b Electric motor 17c Fan 17d, 21b, 22b exits 18 First main expansion valve 19 Second main expansion valve 21 1st heat exchanger (heat exchanger) 21c, 22c case 21d, 22d Primary refrigerant flow section 21e, 22e Cooling water distribution section 22 Second heat exchanger (heat exchanger) 23 First heat exchange passage portion (heat exchange passage portion) 24 Second heat exchange passage section (heat exchange passage section) 25 First branch channel 26 Second branch flow channel 27 First sub-expansion valve 28 Second sub-expansion valve 31 First temperature sensor 32 Filters 33 First pressure sensor 34 Second temperature sensor 35 Second pressure sensor 36 3rd Temperature Sensor 40 First Tank (Tank) 40a, 60a inlet 40b, 60b lid part 41 First pump (pump) 43 1st supply pipeline 44 2nd supply pipe 45, 65 Return line 46 Return connection pipe 48, 68 Level switch 49, 69 Drain port 50, 70 Drain pipe 51, 71 Supply side temperature sensor 52, 72 Supply side pressure sensor 60 Second Tank (Tank) 61 Second pump (pump) 63 1st supply pipe 64 2nd supply pipe 73 Temperature Sensor 76 Filtration line 76a Confluence 77 Solenoid valve 78 DI Filter 79 Conductivity Sensor 80 Communication pipeline
Claims
1. A chiller that controls the temperature of a plurality of heat loads by circulating cooling water, a plurality of cooling water circuits for separately supplying the cooling water to the plurality of heat loads; a refrigeration circuit through which a primary refrigerant flows to control the temperature of the cooling water, The refrigeration circuit is configured by connecting heat exchange passage parts, the number of which is the same as the number of the cooling water circuits, in parallel with each other, and a heat exchanger is provided in each of the heat exchange passage parts, Each of the plurality of coolant circuits is connected to the heat exchanger of a corresponding one of the plurality of heat exchange passage portions, Each of the plurality of cooling water circuits includes a tank for storing the cooling water, a first supply pipe for supplying the cooling water in the tank to the heat exchanger of a corresponding one of the plurality of heat exchange flow passage portions, a pump provided in the first supply pipe, a second supply pipe for sending the cooling water whose temperature has been controlled by the heat exchanger to the heat load, and a return pipe for guiding the cooling water returned from the heat load to the tank, Further, the chiller has a filtering pipe branching from the second supply pipe in any one of the plurality of cooling water circuits and connected to the return pipe in the remaining cooling water circuit, The filtration pipe is provided with a DI filter for purifying the cooling water. A chiller characterized by:
2. A communication pipe is connected between the tanks provided in each of the plurality of cooling water circuits in order to keep the amount of the cooling water stored in each of the tanks constant. The chiller of claim 1 .
3. The flow rate of the cooling water flowing from the filtration pipe to the tank through the return pipe is equal to the flow rate of the cooling water flowing out of the tank and through the communication pipe into the tank provided in the cooling water circuit in which the filtration pipe is connected to the second supply pipe. The chiller of claim 2 .
4. A control device for controlling the entire chiller is provided, a solenoid valve that allows or blocks the inflow of the cooling water from the second supply pipe to the filtering pipe, a conductivity sensor that measures the electrical conductivity of the cooling water flowing through the return pipe is provided in the return pipe; The control device controls the opening and closing of the solenoid valve in response to the electrical conductivity measured by the conductivity sensor.
4. The chiller according to claim 2 or 3.
Citation Information
Patent Citations
Heat pump type air-conditioning hot-water supply device
JP1986186770A
Electromagnetic induced conductivity meter
JP1993017535U
Heat exchanger having stacked coil sections
JP2017207274A
Multi-chiller
WO2020100206A1