Information processing device, work evaluation method, and work evaluation program

The information processing device addresses individual worker differences and plant tension by evaluating task execution using brain wave data, ensuring safe and objective monitoring of plant operations.

JP7559700B2Active Publication Date: 2024-10-02YOKOGAWA ELECTRIC CORP
View PDF 6 Cites 0 Cited by

Patent Information

Application Number
JP2021120838
Authority / Receiving Office
JP · JP
Patent Type
Patents
Current Assignee / Owner
Filing Date
2021-07-21
Publication Date
2024-10-02
Estimated Expiration
2041-07-21

AI Technical Summary

Technical Problem

Existing technologies fail to account for individual differences among workers and the unique sense of tension in plant operations, making it difficult to monitor and support both the safety of workers and the safety of the work target.

Method used

An information processing device that identifies worker tasks, acquires brain wave data, and evaluates task execution results by comparing the data against pre-defined standards, providing feedback and alerts for abnormal operations.

Benefits of technology

Ensures safe plant operation by detecting unconscious errors and latent discomfort, supporting both worker safety and operational safety through objective evaluation.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 0007559700000001
    Figure 0007559700000001
  • Figure 0007559700000002
    Figure 0007559700000002
  • Figure 0007559700000003
    Figure 0007559700000003
Patent Text Reader

Abstract

To support a safe operation of a plant.SOLUTION: An information processor specifies a work which a worker does for operating a plant. The information processor acquires brain wave data of a worker who does the work. The information processor evaluates the result of the work done, on the basis of the work and the brain wave data of the worker.SELECTED DRAWING: Figure 1
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present invention relates to an information processing device, an activity evaluation method, and an activity evaluation program. [Background technology]

[0002] In order to prevent accidents involving workers performing dangerous tasks or monitoring large-scale systems, and to ensure the safe operation of the systems they are working on, various efforts are being made regardless of industry or field. For example, a technology is known that acquires and monitors the electroencephalogram data of workers to detect abnormalities in the workers. [Prior art documents] [Patent documents]

[0003] [Patent Document 1] JP 2020-99019 A [Patent Document 2] JP 2011-180873 A [Patent Document 3] JP 2017-200632 A [Patent Document 4] JP 2016-148882 A Summary of the Invention [Problem to be solved by the invention]

[0004] However, the above-mentioned technology cannot respond to individual differences among workers or the sense of tension that is particular to plants, making it difficult to properly monitor both the safety aspects of preventing worker accidents and the safety aspects of safely operating the work targets, and to support safe operation.

[0005] Therefore, in one aspect, an object of the present invention is to provide an information processing device, a work evaluation method, and a work evaluation program that can support safe operation of a plant. [Means for solving the problem]

[0006] An information processing device according to one aspect has an identification unit that identifies work to be performed by a worker in relation to plant operation, an acquisition unit that acquires electroencephalogram data of the worker performing the work, and an evaluation unit that evaluates a result of execution of the work based on the work and the electroencephalogram data of the worker.

[0007] In one aspect of the work evaluation method, a computer performs processing to identify work to be performed by workers in relation to plant operation, acquire electroencephalogram data of the worker performing the work, and evaluate a result of execution of the work based on the work and the electroencephalogram data of the worker.

[0008] A work evaluation program according to one aspect causes a computer to execute a process of identifying work to be performed by workers in connection with plant operations, acquiring electroencephalogram data of the workers performing the work, and evaluating results of performance of the work based on the work and the electroencephalogram data of the workers. Effect of the Invention

[0009] According to one embodiment, safe operation of a plant can be supported. [Brief description of the drawings]

[0010] [Figure 1] 1 is a diagram illustrating an example of the overall configuration of a system according to a first embodiment. [Diagram 2] 1 is a functional block diagram showing a functional configuration of an information processing device according to a first embodiment. [Diagram 3] FIG. 11 is a diagram showing an example of information stored in a work process DB. [Figure 4] FIG. 13 is a diagram illustrating an example of information stored in a correspondence DB. [Diagram 5] FIG. 13 is a diagram for explaining an example in which a value is evaluated as normal. [Figure 6] FIG. 13 is a diagram illustrating an example in which an abnormality is possibly evaluated. [Figure 7] 4 is a flowchart showing a flow of evaluation processing by the information processing device according to the first embodiment. [Figure 8]FIG. 11 is a diagram for explaining evaluation indexes according to the second embodiment. [Figure 9] FIG. 11 is a diagram for explaining an example of evaluation of a task according to the second embodiment. [Figure 10] FIG. 11 is a functional block diagram showing the functional configuration of an information processing device according to a third embodiment. [Figure 11] FIG. 13 is a diagram for explaining an example of evaluation of a task using the state of a worker according to the third embodiment. [Figure 12] FIG. 13 is a diagram for explaining task evaluation based on associations between multiple workers according to the fourth embodiment. [Figure 13] FIG. 13 is a diagram for explaining task evaluation based on the relevance of simultaneous tasks according to the fourth embodiment. [Figure 14] FIG. 2 is a diagram illustrating an example of a hardware configuration. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0011] Hereinafter, the information processing device, the task evaluation method, and the task evaluation program disclosed in the present application will be described in detail with reference to the drawings. Note that the present invention is not limited to these embodiments. In addition, the same elements are given the same reference numerals, and duplicated descriptions are omitted as appropriate. Each embodiment can be appropriately combined within a range that does not cause inconsistency.

[0012] [Embodiment 1] (Overall configuration example) Fig. 1 is a diagram showing an example of the overall configuration of a system according to embodiment 1. As shown in Fig. 1, this system supports safe operation of a plant by monitoring the work results of workers who work in a plant 1, and the plant 1, a monitoring room 2, a database 3, and an information processing device 10 are connected via the Internet, a dedicated line, or the like, regardless of whether they are wired or wireless.

[0013] The plant 1 is an example of various plants that use petroleum, petrochemicals, chemicals, gas, etc., and includes factories and the like equipped with various facilities for obtaining products. Examples of products are LNG (liquefied natural gas), resins (plastics, nylon, etc.), chemical products, etc. Examples of facilities are factory facilities, machine facilities, production facilities, power generation facilities, storage facilities, facilities at wellheads for extracting petroleum, natural gas, etc., etc.

[0014] The plant 1 is constructed using a distributed control system (DCS) etc. For example, although not shown in the figure, the control system in the plant 1 uses process data used in the plant 1 to execute various controls on control devices such as field devices installed in the equipment to be controlled and operation devices corresponding to the equipment to be controlled.

[0015] In such a plant 1, workers grasp the operating trends of the plant 1 based on actual plant measurements such as temperature and pressure obtained from various sensors such as temperature sensors and flow meters installed in the plant 1, and operate control devices such as valves and heaters installed in the plant 1, thereby ensuring safe operation of the plant. Here, each worker is equipped with a measuring device that measures and transmits brainwave data.

[0016] The monitoring room 2 is equipped with a computer device that displays the state of the plant 1 in real time, and an operator or the like monitors the operating state of the plant 1. For example, in the monitoring room 2, monitoring is performed based on process data that indicates the operating state of equipment installed in the plant 1. Here, the process data includes measured values ​​(Process Variables: PV), setting values ​​(Setting Variables: SV), manipulated variables (Manipulated Variables: MV), and the like. The process data also includes information on the types of measured values ​​to be output (e.g., pressure, temperature, flow rate, and the like). The monitoring room 2 may be installed near the plant 1, or in a completely different location.

[0017] The database 3 stores the evaluation results of the work of the workers evaluated by the information processing device 10. The database 3 may be installed as a database server near the plant 1, and is installed in a place accessible to the monitoring room 2 and the information processing device 10.

[0018] The information processing device 10 is an example of a computer that evaluates various tasks performed in the plant 1. Specifically, the information processing device 10 identifies tasks performed by workers in relation to the operation of the plant 1, acquires electroencephalogram data of the workers performing the tasks, and evaluates the results of the tasks based on the tasks and the electroencephalogram data of the workers.

[0019] For example, the information processing device 10 stores, in association with each other, plant-specific tasks related to the operation of the plant 1 and electroencephalogram data that is assumed to be generated when the tasks are performed normally. Here, the electroencephalogram data stored in advance indicates electroencephalogram data after normal operation, and may be, for example, electroencephalogram data measured in the past when the same task was performed normally, electroencephalogram data measured when the worker's condition was stable, or electroencephalogram data that is theoretically assumed to be normal through simulation or the like.

[0020] In this state, the information processing device 10 identifies the work to be performed in the plant 1 and the worker who will perform the work from a work schedule or the like, and acquires the electroencephalogram data of the worker after the time for performing the work has elapsed. Then, when the degree of agreement or similarity between the electroencephalogram data acquired after the work and the electroencephalogram data serving as a reference for determining whether the work has been performed properly is equal to or greater than an arbitrarily set threshold, the information processing device 10 evaluates that there is a high possibility that the work has been performed properly. The reference electroencephalogram data may be stored in advance, or may be input or set by an administrator or the like each time a determination is made. It is to be noted that the method is not limited to comparison with a threshold, and a "determination of whether or not the work is similar" based on "similarity" using a known method may also be adopted.

[0021] On the other hand, when the degree of agreement or similarity between the electroencephalogram data acquired after the task and the reference electroencephalogram data is less than a threshold, the information processing device 10 evaluates that the task may have been performed abnormally. At this time, for example, the information processing device 10 provides feedback to the worker requesting a review of the task, issues an alert to the monitoring room 2, or accumulates information in the database 3.

[0022] In this way, the information processing device 10 can evaluate the work of the worker based on the electroencephalogram data after the worker's work. Therefore, the information processing device 10 can detect all the worker's unconscious errors, operational mistakes believed to be normal, and work mistakes due to assumptions due to familiarity, etc., and can support the safe operation of the plant. Note that in this embodiment, an example using electroencephalogram data itself will be described, but this is not limited to this, and a power spectrum obtained from the analysis of electroencephalogram data can also be used, and electroencephalogram analysis results such as frequency intensity, ratio, occurrence time of event-related potential, and amplitude can be used as examples of frequency analysis results.

[0023] (Functional configuration of information processing device 10) Next, a description will be given of the functional configuration of the above-mentioned information processing device 10. Fig. 2 is a functional block diagram showing the functional configuration of the information processing device 10 according to the embodiment 1. As shown in Fig. 2, the information processing device 10 includes a communication unit 11, a storage unit 12, and a control unit 20.

[0024] The communication unit 11 is a processing unit that controls communication with other devices, and is realized by, for example, a communication interface. For example, the communication unit 11 acquires brainwave data from a worker. The communication unit 11 also transmits various types of information to the worker, the monitoring room 2, the database 3, and the like.

[0025] The storage unit 12 is an example of a storage device that stores various data and programs executed by the control unit 20, and is realized by, for example, a memory, a hard disk, etc. The storage unit 12 stores a collection DB 13, a work process DB 14, and a correspondence DB 15.

[0026] The collection DB 13 is a database that stores collected electroencephalogram data of workers. For example, the collection DB 13 stores, for each worker, the collection date and time and the collected electroencephalogram data in association with each other.

[0027] The work process DB14 is a database that stores work processes executed in the plant 1. FIG. 3 is a diagram showing an example of information stored in the work process DB14. As shown in FIG. 3, the work process DB14 stores "work time", "work process", and "worker" in association with each other. The "work time" stored here indicates the time when the work is performed. The "work process" indicates plant-specific work executed in the plant 1, such as various types of work related to plant operation, such as operating various devices, pressing switches, monitoring alarms, and operating field devices. The "worker" indicates the worker who performs the work (process). The example in FIG. 3 shows that "worker A1" performs the work process "process A" at "11:00".

[0028] The work process DB 14 can store work processes in any unit, such as work processes for the entire plant 1, work processes for each worker, or work processes for each work group. The work processes stored in the work process DB 14 can be periodically updated by a manager or the like.

[0029] The correspondence DB15 is a database that stores electroencephalogram data that is expected to be generated when a task is normally performed. Specifically, the correspondence DB15 stores electroencephalogram data that can be used to evaluate whether a task has been performed normally for each task. FIG. 4 is a diagram showing an example of information stored in the correspondence DB15. As shown in FIG. 4, the correspondence DB15 stores "task steps" and "electroencephalogram data" in association with each other. The "task steps" stored here correspond to each step included in the task. The "electroencephalogram data" indicates electroencephalogram data that is generated when a step is normally performed. The example of FIG. 4 shows that after task A is normally performed, electroencephalogram data AA is measured as the electroencephalogram data of the worker.

[0030] The control unit 20 is a processing unit that controls the entire information processing device 10, and is realized by, for example, a processor. The control unit 20 has an identifying unit 21, an acquiring unit 22, and an evaluating unit 23. Note that the identifying unit 21, the acquiring unit 22, and the evaluating unit 23 can be realized as an example of an electronic circuit such as a processor, or can be realized as an example of a process executed by a processor.

[0031] The identifying unit 21 is a processing unit that identifies work to be performed by workers in relation to plant operation. For example, the identifying unit 21 identifies work to be performed on equipment in the plant 1 by using a work process chart stored in the work process DB 14. As one example, the identifying unit 21 identifies that at "11:00", "Process A" will be performed by "Worker A1", and notifies the acquiring unit 22 of the identified information.

[0032] The acquisition unit 22 is a processing unit that acquires electroencephalogram data of a worker performing work. In the above example, the acquisition unit 22 acquires electroencephalogram data from the electroencephalogram measuring device of "Worker A1" without delay after "11:00". The acquisition unit 22 stores the acquired electroencephalogram data in the collection DB 13 and outputs it to the evaluation unit 23.

[0033] The evaluation unit 23 is a processing unit that evaluates the result of the execution of a task based on the task and the electroencephalogram data of the worker. Specifically, the evaluation unit 23 evaluates whether the task was executed normally based on the correspondence between the task and the electroencephalogram data of the worker after the task, and outputs the evaluation result to a display, the monitoring room 2, or the like. For example, the evaluation unit 23 evaluates that the task was executed normally when expected first electroencephalogram data is acquired after the task, and evaluates that there is a possibility that the task was executed abnormally when the first electroencephalogram data is not acquired after the task.

[0034] Fig. 5 is a diagram for explaining an example of an evaluation as normal. As shown in Fig. 5, the evaluation unit 23 acquires electroencephalogram data of the worker A1 who performed the process A at time t1. Then, the evaluation unit 23 compares "electroencephalogram data AA" associated with "process A" in the correspondence DB 15 with the "electroencephalogram data" of the worker A1, and if the degree of agreement or similarity is equal to or greater than a threshold, evaluates that there is a high possibility that the work (operation) performed by the worker A1 was normal. The threshold can be set arbitrarily.

[0035] Fig. 6 is a diagram illustrating an example of an evaluation that there is a possibility of an abnormality. As shown in Fig. 6, the evaluation unit 23 acquires electroencephalogram data of the worker A1 who performed the process A at time t1. Then, the evaluation unit 23 compares "electroencephalogram data AA" corresponding to "process A" stored in the correspondence DB 15 with the "electroencephalogram data" of the worker A1, and if the degree of coincidence or similarity is less than a threshold, evaluates that there is a high possibility that the work (operation) performed by the worker A1 is abnormal.

[0036] At this time, the evaluation unit 23 calculates the degree of discrepancy between the "EEG data AA" and the "EEG data" of the worker A1, and can change the type of alarm, etc., depending on the degree of discrepancy. For example, when the degree of discrepancy is equal to or greater than a threshold or when the degree of similarity is less than a lower limit, the evaluation unit 23 issues an alarm indicating that the possibility of a fault occurring is high or the impact of the fault is large. On the other hand, when the degree of discrepancy is less than a threshold or when the degree of similarity is equal to or greater than a lower limit, the evaluation unit 23 issues an alarm indicating that the possibility of a fault occurring is low or the impact of the fault is small.

[0037] The lower limit is a threshold value set for determining the type of alarm. The degree of agreement, the degree of similarity, the degree of deviation, etc. can be calculated using a known method such as wavelength analysis or frequency analysis, or a known method generally used in statistics or analysis.

[0038] (Processing flow) Fig. 7 is a flowchart showing the flow of the evaluation process by the information processing device 10 according to the embodiment 1. As shown in Fig. 7, the identification unit 21 of the information processing device 10 refers to the work process, and when it is time to work (S101: Yes), identifies the work that has been performed (S102).

[0039] Next, the acquisition unit 22 acquires electroencephalogram data of the worker who performed the work (S103). Then, the evaluation unit 23 compares the electroencephalogram data stored in the correspondence DB 15 with the acquired electroencephalogram data of the worker (S104), and if the degree of agreement is equal to or greater than a threshold (S105: Yes), evaluates that the work was performed normally (S106).

[0040] On the other hand, if the degree of coincidence is less than the threshold (S105: No), the evaluation unit 23 evaluates that the task may be abnormally performed (S107). Then, the evaluation unit 23 calculates the degree of deviation between the electroencephalogram data stored in the correspondence DB 15 and the acquired electroencephalogram data (S108), and issues an alarm according to the degree of deviation (S109).

[0041] (effect) As described above, the information processing device 10 can evaluate the work of the worker by indexing the potential consciousness of the worker, and can perform evaluation based on minute changes that are difficult to grasp only by the presence or absence of the work. As a result, the information processing device 10 can ensure the safe operation of the plant and prevent accidents involving the worker himself.

[0042] Furthermore, by using the post-work electroencephalogram data, the information processing device 10 can detect potential discomfort after the worker actually performs the work, and can detect the worker's anxiety at an early stage. As a result, the information processing device 10 can achieve safe operation from the perspectives of both safe operation of the plant 1 and safety of the workers.

[0043] Moreover, the information processing device 10 can realize evaluation based on objective indicators by storing electroencephalogram data indicating normal work in advance, so that accurate evaluation can be performed without relying on workers. Moreover, the information processing device 10 can specify work from a work process chart, so that overlooking of work to be evaluated can be suppressed.

[0044] [Embodiment 2] In the first embodiment, an example of using electroencephalogram data after the task has been described, but the present invention is not limited to this example, and the evaluation can be performed using electroencephalogram data before and after the task. Therefore, in the second embodiment, an example of using electroencephalogram data before and after the task will be described. Here, an example of using an evaluation index generated from the electroencephalogram data, rather than the electroencephalogram data itself, will be described.

[0045] Fig. 8 is a diagram for explaining the evaluation index according to the embodiment 2. As shown in Fig. 8, the information processing device 10 acquires electroencephalogram data of each worker who has normally executed the process A in the past, and generates and holds an evaluation index from the electroencephalogram data.

[0046] For example, the information processing device 10 acquires electroencephalogram data of a worker who normally performed the work of process A on January 1, electroencephalogram data of a worker who normally performed the work of process A on January 5, and electroencephalogram data of a worker who normally performed the work of process A on February 1. Next, the information processing device 10 performs electroencephalogram analysis of frequency intensity, ratio, spectrum, occurrence time of event-related potential, amplitude, etc. on each piece of electroencephalogram data to generate a characteristic evaluation index α indicating a normal state. Then, the information processing device 10 generates a correspondence DB 15 that associates the process A with the evaluation index α.

[0047] Thereafter, the information processing device 10 performs evaluation using the generated correspondence DB 15. FIG. 9 is a diagram illustrating an example of evaluation of work according to the second embodiment. As shown in FIG. 9, the information processing device 10 acquires electroencephalogram data before and after the work of worker A1 who performed process A on February 5. Then, the information processing device 10 generates an evaluation index from the electroencephalogram data before and after the work by the same analysis method as in FIG. 8. Thereafter, the information processing device 10 compares the generated evaluation index with the evaluation index α described in FIG. 8 to evaluate the work of worker A1.

[0048] In this way, the information processing device 10 can evaluate the validity of a task based on the change in electroencephalogram data before and after the task. As a result, the information processing device 10 can perform an accurate evaluation that takes into consideration tasks that continued under tension and tasks that transitioned from a tension state to a normal state. In addition, the information processing device 10 can perform evaluation using an evaluation index generated from the electroencephalogram data of multiple people, so that evaluation based on an objective index can be performed and appropriate operational support can be provided.

[0049] [Embodiment 3] Meanwhile, the information processing device 10 can also use the state of the worker for the evaluation. Therefore, in the third embodiment, an example will be described in which the state of the worker is detected based on a time series change in electroencephalogram data of the worker acquired from the first task to the second task, and the detected state of the worker is further used to evaluate the execution result of the tasks.

[0050] Fig. 10 is a functional block diagram showing a functional configuration of an information processing device 10 according to embodiment 3. As shown in Fig. 10, the information processing device 10 according to embodiment 3 includes a communication unit 11, a storage unit 12, and a control unit 20, similar to Fig. 2 described in embodiment 1. The difference from embodiment 1 is that it includes a detection unit 24, and therefore the detection unit 24 will be described here.

[0051] The detection unit 24 is a processing unit that detects the state of the worker based on a time-series change in the electroencephalogram data of the worker acquired from the first task to the second task. Specifically, the detection unit 24 performs an electroencephalogram analysis on the time-series electroencephalogram data acquired from the first task to the second task, and judges the worker's state of tension, poor physical condition, etc., according to the analysis result.

[0052] For example, when α waves are detected, the detection unit 24 judges the state to be relaxed, and when β waves are detected, the detection unit 24 judges the state to be tense. Note that the detection target is not limited to α waves and β waves. For example, the setting can be changed arbitrarily by acquiring, by analysis or the like, a feature quantity that characterizes the state of the detection target, such as a characteristic waveform indicating an abnormal physical condition, or a power spectrum that occurs with a particularly high probability in a certain state.

[0053] Then, the evaluation unit 23 further uses the detected state of the worker to evaluate the execution result of the work. Fig. 11 is a diagram for explaining an example of evaluation of a work using the state of the worker according to the third embodiment. Fig. 11 explains an example in which worker A1 performs process A at time t1 and subsequently performs process B at time t2.

[0054] As shown in Figure 11, the evaluation unit 23 evaluates the work of process A based on the electroencephalogram data of worker A1 acquired after the work of process A, while re-evaluating the work of process A based on the time-series changes in the electroencephalogram data from process A to process B.

[0055] For example, if the evaluation unit 23 evaluates that the process A has been performed normally based on the electroencephalogram data after the process A and alpha waves are also detected, the evaluation unit 23 determines that it is unlikely that worker A is anxious about his or her work and evaluates that it is highly likely that the work of process A has been performed normally.

[0056] On the other hand, even if the electroencephalogram data after process A is evaluated as having been performed normally, if beta waves are also detected, the evaluation unit 23 determines that there is a high possibility that worker A is anxious about his or her work, and evaluates that there is a possibility that the work of process A was performed abnormally.

[0057] In this way, the information processing device 10 can detect psychological changes of the worker by using the time-series changes in the electroencephalogram data and use them for evaluation. As a result, the information processing device 10 can detect even small dangers as much as possible in a system that requires safe operation, such as the plant 1, which has a large impact on the surrounding area if a failure occurs, and can effectively provide support for safe operation.

[0058] [Embodiment 4] Incidentally, the state of the plant 1 is generally monitored in real time in a monitoring room 2 or the like. Therefore, the state of the plant 1 after a worker has performed work is also monitored in the monitoring room 2 or the like. Therefore, by monitoring the linkage between the electroencephalogram data of the worker who actually performs work in the plant 1 and the electroencephalogram data of the monitor who performs real-time monitoring in the monitoring room, it is possible to realize monitoring from both the aspects of work and monitoring.

[0059] Therefore, in embodiment 4, an example is described in which multiple tasks that are related to each other are identified, electroencephalogram data of each worker performing the multiple tasks is obtained, and the multiple tasks are evaluated based on the linkage of the electroencephalogram data of each worker.

[0060] 12 is a diagram for explaining task evaluation based on the correlation between multiple workers according to the fourth embodiment. Here, process A indicates a task in the plant 1, and process B indicates a task of monitoring an alarm in the plant 1 after the execution of process A, and both tasks are related to each other. Also, it is assumed that the information processing device 10 stores in a correspondence DB 15 the correspondence relationships between process A and the electroencephalogram data, and between process B and the electroencephalogram data.

[0061] In this state, as shown in FIG. 12, the information processing device 10 acquires electroencephalogram data of the worker A1 who performed the process A at time T1, and performs an evaluation by comparing this electroencephalogram data with the electroencephalogram data stored in the correspondence DB 15.

[0062] Similarly, after the process A is performed, the information processing device 10 acquires electroencephalogram data of the worker B1 performing the process B, and compares the electroencephalogram data with the electroencephalogram data stored in the correspondence DB 15 to perform evaluation.

[0063] Then, when the electroencephalogram data of worker A1 is normal and the electroencephalogram data of worker B1 is normal, the information processing device 10 evaluates that process A has been performed normally. When the electroencephalogram data of worker A1 is normal and the electroencephalogram data of worker B1 is abnormal, the information processing device 10 evaluates that process A may have been performed abnormally, but the risk of a large-scale failure or the like is small (low risk). When the electroencephalogram data of worker A1 is abnormal and the electroencephalogram data of worker B1 is normal, the information processing device 10 evaluates that process A may have been performed abnormally, and the risk of a large-scale failure or the like is relatively high (medium risk). When the electroencephalogram data of worker A1 is abnormal and the electroencephalogram data of worker B1 is abnormal, the information processing device 10 evaluates that process A is highly likely to have been performed abnormally, and the risk of a large-scale failure or the like is also high (high risk).

[0064] In this way, the information processing device 10 can evaluate the work using not only the electroencephalogram data of the worker A1 who actually performs the work, but also the electroencephalogram data of the worker B1 who monitors the results of the work. As a result, the information processing device 10 can realize early detection of abnormalities by monitoring related works collectively, rather than a single work.

[0065] In the above embodiment, the example in which the process A is given more importance has been described, but the present invention is not limited to this and can be changed as desired depending on the work content and the capabilities of the workers. For example, the information processing device 10 can prioritize the evaluation of worker B1 when worker B1 who performs monitoring is a more experienced worker than worker A1 or is a good worker who makes fewer mistakes. For example, when the electroencephalogram data of worker B1 is evaluated as normal, the information processing device 10 evaluates the worker as normal or as having a low risk.

[0066] Incidentally, the interlocking of related tasks is not limited to two, nor is it limited to evaluation using electroencephalogram data at a certain moment. For example, when multiple tasks are performed simultaneously, each task can be evaluated using the electroencephalogram data of each worker. Note that "simultaneous" includes both the same time, such as time T, and a certain time span, such as between time T1 and time T2.

[0067] Here, an example of evaluating a plurality of mutually related tasks performed between time T1 and time T2 will be described. Fig. 13 is a diagram illustrating task evaluation based on the correlation between simultaneous tasks according to embodiment 4. As shown in Fig. 13, between time T1 and time T2, process A is performed by worker A1, process B of alarm monitoring of process A by monitor B1, and related process C using the result of process A by worker C1 are performed. Furthermore, it is assumed that the information processing device 10 stores in the correspondence DB 15 the correspondence relationships between process A and the electroencephalogram data, process B and the electroencephalogram data, and related process C and the electroencephalogram data.

[0068] 13, in this state, the information processing device 10 acquires, between time T1 and time T2, electroencephalogram data of worker A1 who performed process A, electroencephalogram data of supervisor B1 who performed process B, and electroencephalogram data of worker C1 who performed related process C. Then, when each of the electroencephalogram data is normal, the information processing device 10 evaluates that each process has been normally performed.

[0069] As described above, the information processing device 10 can evaluate a series of tasks composed of multiple tasks, rather than evaluating multiple related tasks separately. As a result, the information processing device 10 can provide not only the evaluation results, but also detailed information for examining which tasks have problems, which tasks affect other tasks, and so on.

[0070] [Embodiment 5] Although the embodiment of the present invention has been described above, the present invention may be embodied in various different forms other than the above-described embodiment.

[0071] [Numbers, etc.] The thresholds, the number of computers, the number of workers, the processes, the names of the processes, and the like used in the above embodiment are merely examples and can be changed as desired. The electroencephalogram data stored in the correspondence DB 15 may be electroencephalogram data indicating an abnormality, may be numerical values, or may be information indicating a predetermined change for identifying an abnormality or normality. In the above embodiment, an example using electroencephalogram data after work has been described, but the present invention is not limited to this, and for example, the same processing can be used to perform evaluation using electroencephalogram data before, during, and after work.

[0072] [Time series evaluation] The above-mentioned information processing device 10 can also evaluate the work based on the change in the electroencephalogram data before and after the work. Specifically, the information processing device 10 performs an evaluation based on the electroencephalogram data of the worker A1 after the work of the process A, and then monitors the time-series change in the electroencephalogram data of the worker A1, performs a further evaluation based on the monitoring result, and displays the evaluation result on a display or in the monitoring room 2.

[0073] For example, if the information processing device 10 detects no abnormality in the time series change in the electroencephalogram data of the worker A1 within a certain time after the evaluation of normal execution, the information processing device 10 evaluates that the possibility of a fault is extremely small and displays the result. Also, if the information processing device 10 detects an abnormality in the time series change in the electroencephalogram data of the worker A1 within a certain time after the evaluation of normal execution, the information processing device 10 evaluates that although there is a possibility of a fault, the magnitude of the fault is small and displays the result.

[0074] Furthermore, if no abnormality is detected in the time series change in the electroencephalogram data of worker A1 within a certain time period after the performance is evaluated as abnormal, the information processing device 10 evaluates that there is a possibility of a malfunction, but that the magnitude of the malfunction is small, and displays the result. Furthermore, if a further abnormality is detected in the time series change in the electroencephalogram data of worker A1 within a certain time period after the performance is evaluated as abnormal, the information processing device 10 evaluates that there is a possibility of a major malfunction, and displays the result.

[0075] The abnormality can be determined by a known method such as determining whether pre-stored electroencephalogram data indicating an abnormal state is detected. In this way, the information processing device 10 can estimate and notify the degree of the disability by further evaluating the work based on the change in the electroencephalogram data before and after the work.

[0076] The information processing device 10 can also acquire electroencephalogram data for each worker performing each process in the plant 1 while performing each process, and evaluate each task based on the time-series changes in the electroencephalogram data of each worker. For example, the information processing device 10 can monitor the time-series changes in the electroencephalogram data of workers for each task performed in the plant operation, and identify and collect the tasks, task locations, task positions, and task contents in which abnormalities have been detected, thereby generating a risk map showing locations where many tasks are made.

[0077] [system] The information including the processing procedures, control procedures, specific names, various data and parameters shown in the above documents and drawings can be changed arbitrarily unless otherwise specified.

[0078] In addition, each component of each device shown in the figure is a functional concept, and does not necessarily have to be physically configured as shown in the figure. In other words, the specific form of distribution and integration of each device is not limited to that shown in the figure. In other words, all or part of them can be functionally or physically distributed and integrated in any unit according to various loads, usage conditions, etc.

[0079] Furthermore, each processing function performed by each device may be realized, in whole or in part, by a CPU (Central Processing Unit) and a program analyzed and executed by the CPU, or may be realized as hardware using wired logic.

[0080] [Hardware] Next, a hardware configuration example of the information processing device 10 will be described. Note that other devices may have a similar hardware configuration. FIG. 14 is a diagram for explaining a hardware configuration example. As shown in FIG. 14, the information processing device 10 has a communication device 10a, a HDD (Hard Disk Drive) 10b, a memory 10c, and a processor 10d. Moreover, each unit shown in FIG. 14 is connected to each other by a bus or the like.

[0081] The communication device 10a is a network interface card or the like, and communicates with other servers. The HDD 10b stores programs and DBs that operate the functions shown in FIG.

[0082] The processor 10d reads out a program that executes the same processes as the respective processing units shown in Fig. 2 from the HDD 10b etc. and loads it in the memory 10c, thereby operating a process that executes each function described in Fig. 2 etc. For example, this process executes a function similar to that of each processing unit possessed by the information processing device 10. Specifically, the processor 10d reads out a program having functions similar to those of the identification unit 21, the acquisition unit 22, the evaluation unit 23 etc. from the HDD 10b etc. Then, the processor 10d executes a process that executes the same processes as the identification unit 21, the acquisition unit 22, the evaluation unit 23 etc.

[0083] In this way, the information processing device 10 operates as an information processing device that executes the task evaluation method by reading and executing the program. The information processing device 10 can also realize functions similar to those of the above-mentioned embodiment by reading the program from a recording medium using a medium reading device and executing the read program. Note that the program in these other embodiments is not limited to being executed by the information processing device 10. For example, the present invention can be similarly applied to cases where another computer or server executes the program, or where these cooperate to execute the program.

[0084] This program can be distributed via a network such as the Internet. This program can also be recorded on a computer-readable recording medium such as a hard disk, a flexible disk (FD), a CD-ROM, a magneto-optical disk (MO), or a digital versatile disk (DVD), and can be executed by being read out from the recording medium by a computer. [Explanation of symbols]

[0085] 10. Information processing device 11 Communications Department 12 Storage section 13 Collection DB 14 Work process DB 15 Correspondence DB 20 Control section 21 Specific section 22 Acquisition Department 23 Evaluation Department 24 Detection unit

Claims

1. an identification unit that identifies work to be performed by workers regarding the operation of the plant; an acquisition unit for acquiring electroencephalogram data of the worker performing the work; an evaluation unit that evaluates a result of execution of the work based on the work and electroencephalogram data of the worker; a storage unit that stores work performed by a worker in relation to the operation of the plant in association with electroencephalogram data that serves as a reference for determining whether the work has been performed normally; The identification unit identifies an operation to be performed on a device in the plant, The acquisition unit acquires electroencephalogram data of the worker after the work, The evaluation unit evaluates whether the task was performed normally based on the similarity between the reference electroencephalogram data stored in the memory unit in correspondence with the identified task and the electroencephalogram data of the worker after the task.

2. An identification unit that identifies work to be performed by workers regarding plant operation; an acquisition unit for acquiring electroencephalogram data of the worker performing the work; and an evaluation unit that evaluates a result of the work based on the work and electroencephalogram data of the worker, The evaluation unit evaluates that the task has been performed normally when first electroencephalogram data is acquired after the task, and evaluates that the task may have been performed abnormally when first electroencephalogram data is not acquired after the task.

3. An identification unit that identifies work to be performed by workers regarding plant operations; an acquisition unit for acquiring electroencephalogram data of the worker performing the work; and an evaluation unit that evaluates a result of the work based on the work and electroencephalogram data of the worker, The information processing device wherein the evaluation unit visualizes the possibility of an injury occurring due to the task or identifies the extent of the impact of the injury based on changes in electroencephalogram data acquired before and after the task.

4. An identification unit that identifies work to be performed by workers regarding plant operations; an acquisition unit for acquiring electroencephalogram data of the worker performing the work; an evaluation unit that evaluates a result of execution of the work based on the work and electroencephalogram data of the worker; a detection unit that detects a state of the worker based on a time series change in electroencephalogram data of the worker acquired from a first task to a second task, The information processing device, wherein the evaluation unit further uses the detected state of the worker to evaluate a result of execution of the first task.

5. An identification unit that identifies work to be performed by workers regarding plant operations; an acquisition unit that acquires electroencephalogram data of the worker performing the work, and acquires time-series electroencephalogram data of each of a plurality of workers performing a work process in the plant, the work process including a plurality of tasks, while the worker is performing the work process; an evaluation unit that evaluates a result of the work based on the work and the electroencephalogram data of the workers, and evaluates the work process based on the time-series electroencephalogram data of each of the plurality of workers, The identification unit identifies a plurality of tasks related to each other, The acquisition unit acquires electroencephalogram data of each worker performing the plurality of tasks, The information processing device, wherein the evaluation unit evaluates the multiple tasks based on the results of comparing each of the electroencephalogram data acquired for each of the multiple tasks with each of the reference electroencephalogram data for determining whether each of the multiple tasks has been performed normally.

6. the acquisition unit acquires electroencephalogram data of a first worker performing the work at a site of the plant, and acquires electroencephalogram data of a second worker monitoring the plant where the work is performed; The information processing apparatus according to claim 5 , wherein the evaluation unit evaluates the plurality of tasks based on a link between the electroencephalogram data of the first worker and the electroencephalogram data of the second worker.

7. 7. The information processing device according to claim 6, wherein the evaluation unit evaluates that there is a possibility that the work has been performed abnormally when a predetermined change occurs in either the electroencephalogram data of the first worker or the electroencephalogram data of the second worker.

8. The computer Identifying the tasks that workers will perform in relation to operating the plant; Acquire electroencephalogram data of the worker performing the work; evaluating a result of the execution of the work based on the work and the electroencephalogram data of the worker; Execute the process, The process of identifying includes identifying an operation to be performed on equipment in the plant, The acquiring process acquires electroencephalogram data of the worker after the work, The evaluation process is a work evaluation method in which the evaluation process evaluates whether the work performed by a worker in relation to the operation of the plant is performed based on the similarity between the reference electroencephalogram data associated with an identified work and the electroencephalogram data of the worker after the work, the reference electroencephalogram data being stored in a memory unit that associates and stores the work performed by the worker in relation to the operation of the plant with the reference electroencephalogram data for determining whether the work was performed properly.

9. On the computer, Identifying the tasks that workers will perform in relation to operating the plant; Acquire electroencephalogram data of the worker performing the work; evaluating a result of the execution of the work based on the work and the electroencephalogram data of the worker; Execute the process, The process of identifying includes identifying an operation to be performed on equipment in the plant, The acquiring process acquires electroencephalogram data of the worker after the work, The evaluation process is a work evaluation program that evaluates whether the work was performed normally based on the similarity between the reference electroencephalogram data associated with an identified work and the electroencephalogram data of the worker after the work, the reference electroencephalogram data being stored in a memory unit that associates and stores the work performed by a worker in connection with the operation of the plant with the reference electroencephalogram data for determining whether the work was performed normally.

10. A computer comprising: Identifying the tasks that workers will perform in relation to operating the plant; Acquire electroencephalogram data of the worker performing the work; Executing a process of evaluating a result of execution of the work based on the work and the electroencephalogram data of the worker; The evaluation process evaluates that the task has been performed normally if first electroencephalogram data is acquired after the task, and evaluates that the task may have been performed abnormally if first electroencephalogram data is not acquired after the task, in this task evaluation method.

11. A computer comprising: Identifying the tasks that workers will perform in relation to operating the plant; Acquire electroencephalogram data of the worker performing the work; Executing a process for evaluating a result of the execution of the work based on the work and the electroencephalogram data of the worker; The evaluation process evaluates that the task has been performed normally if first electroencephalogram data is acquired after the task, and evaluates that the task may have been performed abnormally if first electroencephalogram data is not acquired after the task.

12. A computer comprising: Identifying the tasks that workers will perform in relation to operating the plant; Acquire electroencephalogram data of the worker performing the work; Executing a process of evaluating a result of execution of the work based on the work and the electroencephalogram data of the worker; The evaluation process is a task evaluation method in which the possibility of an injury occurring due to the task is visualized or the extent of the impact of the injury is determined based on changes in electroencephalogram data obtained before and after the task.

13. A computer comprising: Identifying the tasks that workers will perform in relation to operating the plant; Acquire electroencephalogram data of the worker performing the work; Executing a process for evaluating a result of the execution of the work based on the work and the electroencephalogram data of the worker; The evaluation process is a task evaluation program that visualizes the possibility of an injury occurring due to the task or identifies the extent of the impact of the injury based on changes in electroencephalogram data obtained before and after the task.

14. A computer comprising: Identifying the tasks that workers will perform in relation to operating the plant; Acquire electroencephalogram data of the worker performing the work; Evaluating a result of the execution of the work based on the work and the electroencephalogram data of the worker; detecting a state of the worker based on a time series change in electroencephalogram data of the worker acquired from a first task to a second task; The evaluation process further uses the detected state of the worker to evaluate a result of execution of the first task.

15. A computer comprising: Identifying the tasks that workers will perform in relation to operating the plant; Acquire electroencephalogram data of the worker performing the work; Evaluating a result of the execution of the work based on the work and the electroencephalogram data of the worker; Executing a process of detecting a state of the worker based on a time series change in electroencephalogram data of the worker acquired from a first task to a second task; The evaluating process further uses the detected state of the worker to evaluate a result of execution of the first task.

16. A computer comprising: Identifying the tasks that workers will perform in relation to operating the plant; acquiring electroencephalogram data of the worker performing the work, and acquiring time-series electroencephalogram data for each of a plurality of workers performing a work process in the plant including a plurality of tasks while the worker is performing the work process; Executing a process of evaluating an execution result of the work based on the work and the electroencephalogram data of the workers, and evaluating the work process based on the time-series electroencephalogram data of each of the plurality of workers; The process of identifying includes identifying a plurality of tasks related to each other, The acquiring process acquires electroencephalogram data of each worker performing the plurality of tasks, A task evaluation method in which the evaluation process evaluates the multiple tasks based on the results of comparing each of the electroencephalogram data acquired for each of the multiple tasks with each of the reference electroencephalogram data for determining whether each of the multiple tasks has been performed normally.

17. A computer comprising: Identifying the tasks that workers will perform in relation to operating the plant; Acquire electroencephalogram data of the worker performing the work, and acquire time-series electroencephalogram data for each of a plurality of workers performing a work process in the plant including a plurality of tasks while performing the work process; executing a process of evaluating an execution result of the work based on the work and the electroencephalogram data of the workers, and evaluating the work process based on the time-series electroencephalogram data of each of the plurality of workers; The process of identifying includes identifying a plurality of tasks related to each other, The acquiring process acquires electroencephalogram data of each worker performing the plurality of tasks, The evaluation process is a task evaluation program that evaluates the multiple tasks based on the results of comparing each of the electroencephalogram data acquired for each of the multiple tasks with each of the reference electroencephalogram data for determining whether each of the multiple tasks has been performed normally.

Citation Information

Patent Citations

  • Driving support device and driving support method

    JP2011180873A

  • Operator management device and operator management program

    JP2016148882A

  • Operator state determination device and operator state determination method

    JP2017200632A

  • Estimation system, learning device, learning method, estimation device, and estimation method

    JP2019159941A

  • Apparatus control device and apparatus control system

    JP2020099019A