Passenger conveyor utilization management device and passenger conveyor utilization management method

The passenger conveyor usage management device addresses exit congestion by providing users with recommended routes, improving user convenience and reducing crowding without compromising system usage.

JP7562890B1Active Publication Date: 2024-10-07TOSHIBA ELEVATOR KK
View PDF 4 Cites 0 Cited by

Patent Information

Application Number
JP2024011459
Authority / Receiving Office
JP · JP
Patent Type
Patents
Current Assignee / Owner
Filing Date
2024-01-30
Publication Date
2024-10-07
Estimated Expiration
2044-01-30

AI Technical Summary

Technical Problem

Existing passenger conveyor systems face congestion issues at exits, leading to user accumulation and reduced convenience when users avoid using the system due to perceived crowding.

Method used

A passenger conveyor usage management device that includes a congestion status acquisition unit, route identification unit, and output information generation unit to provide users with recommended routes and guidance to avoid congested areas, ensuring smooth exit without reducing user convenience.

Benefits of technology

Reduces exit congestion by guiding users to less crowded routes, enhancing user convenience and preventing falls, while maintaining system occupancy rates.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 0007562890000001_ABST
    Figure 0007562890000001_ABST
Patent Text Reader

Abstract

To provide a passenger conveyor utilization management device for reducing congestion at the exit of the passenger conveyor without reducing the convenience for users. [Solution] According to an embodiment, a passenger conveyor usage management device is communicatively connected to an output device that outputs information to users boarding the passenger conveyor, and includes a congestion status acquisition unit, a route identification unit, an output information generation unit, and an output control unit. The congestion status acquisition unit acquires congestion status information indicating the congestion status within an area that a passenger conveyor user enters after disembarking from the passenger conveyor. The route identification unit identifies a recommended travel route for the passenger conveyor user after disembarking from the passenger conveyor based on the congestion status information. The output information generation unit generates output information including information on the travel route identified by the route identification unit. The output control unit causes the output information generated by the output information generation unit to be output from the output device.
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] An embodiment of the present invention relates to a passenger conveyor utilization management device and a passenger conveyor utilization management method. [Background technology]

[0002] When passenger conveyors installed in commercial facilities or stations become very crowded, passengers may become stuck at the exits, preventing them from getting off the passenger conveyor, or even if they are able to get off at the exits, they may be unable to move forward from there.

[0003] In view of this, a technology has been developed to inform users of the congestion situation at the exit side of the passenger conveyor (for example, Patent Document 1). By using this technology, users can check the congestion situation at the exit side before boarding the passenger conveyor and consider whether or not to use the passenger conveyor. [Prior art documents] [Patent documents]

[0004] [Patent Document 1] JP 2022-94709 A Summary of the Invention [Problem to be solved by the invention]

[0005] When the above-mentioned technology is used, some passengers may realize that the exit is crowded and give up on using the passenger conveyor, which can reduce congestion by decreasing the occupancy rate of the passenger conveyor. However, there is a problem in that convenience is reduced for those passengers who give up on using the conveyor.

[0006] The present invention has been made in consideration of the above circumstances, and has an object to provide a passenger conveyor usage management device and a passenger conveyor usage management method that reduce congestion at the exits of the passenger conveyor without reducing convenience for users. [Means for solving the problem]

[0007] According to an embodiment for achieving the above object, a passenger conveyor usage management device is communicatively connected to an output device that outputs information to users boarding the passenger conveyor, and includes a congestion status acquisition unit, a route identification unit, an output information generation unit, and an output control unit. The congestion status acquisition unit acquires congestion status information indicating the congestion status within an area into which a user of the passenger conveyor enters after disembarking from the passenger conveyor. The route identification unit identifies a travel route recommended to the user of the passenger conveyor after disembarking from the passenger conveyor based on the congestion status information. The output information generation unit generates output information including information on the travel route identified by the route identification unit. The output control unit causes the output device to output the output information generated by the output information generation unit. [Brief description of the drawings]

[0008] [Figure 1] 1 is an overall view showing the configuration of an escalator system using a passenger conveyor usage management device according to an embodiment. [Diagram 2] 1 is a block diagram showing a configuration of a usage management device according to an embodiment; [Diagram 3] 10 is a flowchart showing an information output process executed by the utilization management device according to an embodiment with respect to each floor. [Figure 4A] 13 is an example of second display information displayed on a display device by the usage management device according to an embodiment. [Figure 4B] 13 is an example of second display information displayed on a display device by the usage management device according to an embodiment. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0009] Hereinafter, an escalator system that manages an escalator, which is an example of a passenger conveyor, will be described as an embodiment of the present invention.

[0010] Configuration of an escalator system using a usage management device according to an embodiment 1 is an overall view showing the configuration of an escalator system 1 according to this embodiment. The escalator system 1 includes an escalator 10, a camera device 101 and a display device 102 installed near the escalator 10, and a usage management device 20. The usage management device 20 is connected to the camera device 101 and the display device 102 so as to be able to communicate with each other.

[0011] The escalator 10 is an upward escalator that allows users to board from an entrance E1 on the first floor of a building and travel to an exit E2 on the second floor. The escalator 10 has steps 11 for moving from the first floor, which is the boarding floor, to the second floor, which is the disembarking floor, and an escalator control panel 12 for controlling the steps 11.

[0012] Camera device 101 is composed of, for example, a security camera device, and captures area AR2 on the second floor, which is the area that users of escalator 10 enter after getting off escalator 10. Display device 102 is installed at the top near entrance E1 so as to be visible to users getting on escalator 10, and outputs display information transmitted from usage management device 20, which will be described later.

[0013] 2 is a block diagram showing a detailed configuration of the usage management device 20. The usage management device 20 has a storage unit 21 and a CPU 22. The storage unit 21 has a building information storage unit 211, a congestion information storage unit 212, and a congestion-related information storage unit 213.

[0014] The building information storage unit 211 stores building information including map information for each floor of the building in which the escalator 10 is installed and guidance information for stores, etc. The congestion information storage unit 212 stores past congestion degree information, for example, for each day of the week and each time period. The congestion-related information storage unit 213 stores in advance information on the date, time, and location of events that are expected to cause congestion in the building, such as events held in the building in which the escalator 10 is installed or in facilities adjacent to the building.

[0015] The location of the memory unit 21 is not limited to within the usage management device 20, but may be provided in another device, such as a management device installed in a management room of a building, and the usage management device 20 may obtain information from this device via a wireless or wired connection.

[0016] The CPU 22 is, for example, a CPU (Central Processing Unit) provided in a general-purpose microcomputer, and configures one or more information processing units described below by installing and executing a predetermined escalator usage management program. The CPU 22 has a congestion status acquisition unit 221, a route identification unit 222, an output information generation unit 223, and an output control unit 224.

[0017] The congestion status acquisition unit 221 acquires image information captured by the camera device 101 as congestion status information indicating the congestion status within the second floor, which is an area that users of the escalator 10 enter after getting off the escalator 10. The route identification unit 222 identifies a recommended route for users of the escalator 10 after getting off the escalator 10, based on the congestion status information acquired by the congestion status acquisition unit 221. The output information generation unit 223 generates output information including information on the route identified by the route identification unit. The output control unit 224 causes the display device 102 to output the output information generated by the output information generation unit 223.

[0018] Operation of the Escalator System According to an Embodiment The operation of the escalator system 1 according to the embodiment will be described below. Fig. 3 is a flowchart showing the information output process executed by the utilization management device 20 while the escalator system 1 is in operation.

[0019] While the escalator system 1 is in operation, the congestion status acquisition unit 221 of the usage management device 20 sequentially acquires image information captured by the camera device 101 of the area AR2, analyzes the acquired image information, and determines whether there is an area portion within the area AR2 whose congestion level is equal to or higher than a predetermined value (S1).

[0020] When the congestion status acquisition unit 221 determines that there is no area within the area AR2 with a congestion degree equal to or greater than a predetermined value ("NO" in S1), the output information generation unit 223 acquires guidance information for stores and the like on the second floor, which is the disembarking floor, from the building information storage unit 211, and generates first display information as output information including the acquired guidance information. The output control unit 224 causes the display device 102 to display the first display information generated by the output information generation unit 223 (S2).

[0021] Thereafter, when the congestion status acquisition unit 221 determines based on the acquired imaging information that an area portion with a congestion degree equal to or greater than a predetermined value has occurred within the area AR2 ("YES" in S3), it acquires position information of this area portion as current congestion status information (S4). When the congestion status acquisition unit 221 determines that there are multiple area portions with a congestion degree equal to or greater than a predetermined value within the area AR2, it acquires congestion status information for each area portion.

[0022] The route specification unit 222 specifies a route to be taken after the user of the escalator 10 gets off the escalator 10, based on the congestion status information acquired by the congestion status acquisition unit 221 (S5). Specifically, the route specification unit 222 specifies a route from the exit E2 in a direction that avoids areas where the congestion level is equal to or higher than a predetermined value, or an optimal route to the exit, as the route to be recommended to the user of the escalator 10.

[0023] At this time, the route identification unit 222 may also take into consideration the event information stored in the congestion-related information storage unit 213 and identify, as the travel route, a route that avoids the direction of the location where the event is being held during the time period corresponding to the date and time when the event is being held.

[0024] The output information generating unit 223 acquires map information for the second floor, which is the disembarking floor, from the building information storage unit 211, and generates second display information in which the route portion identified by the route identifying unit 222 is highlighted within the map information. The output information generating unit 223 may include, in the second display information, the imaging information acquired by the congestion status acquiring unit 221. The output control unit 224 causes the display device 102 to display the second display information generated by the output information generating unit 223 (S6).

[0025] 4A and 4B are examples of second display information generated by the output information generating unit 223 and displayed on the display device 102. In the second display information shown in Fig. 4A, imaging information A1 acquired by the congestion status acquiring unit 221, map information A2 in which a route heading left after getting off the vehicle is highlighted with an arrow R1 as a recommended travel route, and message information A3 indicating that a detour route heading left is recommended because the route heading right after getting off the vehicle is congested. The output information generating unit 223 may highlight the arrow R1 by performing an animation display in which a predetermined mark or a blinking display part or the like moves smoothly on the arrow R1 shown as the recommended route in the map information A2.

[0026] 4B, the second display information displays the imaging information B1 acquired by the congestion status acquisition unit 221, the map information B2 in which the route toward the left exit after getting off the vehicle is highlighted with an arrow R2 as a recommended travel route, and the message information B3 indicating that the route toward the left exit is recommended because the route going straight after getting off the vehicle is congested. The output information generation unit 223 may highlight the arrow R2 by displaying an animation in which a predetermined mark or a blinking display part or the like moves smoothly over the arrow R2 shown as the recommended route in the map information B2.

[0027] The output information generating section 223 may add a circle or the like to correspond to the position of the crowded area portion in the captured image information of the second display information.

[0028] Furthermore, the output information generating unit 223 may obtain information about an event having opening date and time information corresponding to the current time from the congestion-related information storage unit 213, and include the information as information indicating the reason for the congestion on the escalator 10 in the second display information.

[0029] In addition, if the escalator control panel 12 changes the movement speed of the steps 11 depending on the congestion level of the escalator 10, the output information generation unit 223 may obtain information regarding this change in movement speed from the escalator control panel 12 and include it in the second display information.

[0030] By displaying this information on the display device 102, the user can grasp information about the route to be taken after disembarking and related information before boarding the escalator 10, and can move smoothly while minimizing congestion at exit E2 of the disembarking floor.

[0031] During operation of the escalator system 1, the utilization management device 20 repeats the processes of steps S1 to S4 described above.

[0032] According to the above embodiment, the escalator usage management device includes a congestion status acquisition unit that acquires congestion status information indicating the congestion status within an area that an escalator user enters after getting off the escalator, a route identification unit that identifies a recommended route for the escalator user after getting off the escalator based on the acquired congestion status information, and an output information generation unit that generates output information including information on the route identified by the route identification unit.

[0033] This provides route information so that users can proceed smoothly after getting off the escalator, reduces congestion at the exit and prevents falls, without reducing the convenience of using the escalator for users.

[0034] In the above embodiment, the congestion status acquisition unit 221 acquires, as the congestion status information, information indicating the current congestion status of the area AR2 based on the imaging information of the area AR2 captured by the camera device 101. However, the present invention is not limited to this, and the congestion status acquisition unit 221 may acquire, as the congestion status information, predicted information on the congestion status after a predetermined time has elapsed from the present.

[0035] In this case, congestion status information for each day of the week and each time period is generated in advance by analyzing image capture information of area AR2 previously acquired by the congestion status acquisition unit 221, and stored in the congestion information storage unit 212. Then, while the escalator system 1 is in operation, congestion status information for the day of the week and the time period corresponding to a time a predetermined time after the present is acquired from the congestion information storage unit 212, and used as predicted congestion status information for this time.

[0036] This makes it possible to provide the user with information on a recommended route according to the congestion situation before boarding the escalator 10, when the user uses the escalator 10 to get off at the disembarking floor, or when the user travels through the area AR2 after getting off.

[0037] The congestion status acquisition unit 221 may acquire, as the congestion status information, both the current congestion status in the area AR2 and predicted information on the congestion status after a predetermined time has elapsed from the present.

[0038] In the above-described embodiment, the congestion status acquisition unit 221 may analyze the imaging information of the area AR2 and acquire location information and congestion level as congestion status information for each area portion whose congestion level is equal to or higher than a predetermined value. At this time, the route identification unit 222 displays the recommended route by lowering the recommendation level as the congestion level increases among the area portions whose congestion level is equal to or higher than a predetermined value, based on the congestion status information acquired by the congestion status acquisition unit 221. For example, a route passing through a first area portion having the highest congestion level among the area portions whose congestion level is equal to or higher than a predetermined value may be displayed in red to indicate that the recommendation level is low, a route passing through a second area portion whose congestion level is equal to or higher than a predetermined value but lower than the first area may be displayed in yellow to indicate that the recommendation level is medium, and a route passing through an area whose congestion level is less than a predetermined value may be displayed in blue to indicate that the recommendation level is high.

[0039] By displaying the information in this manner, the user can appropriately select a direction of travel based on the displayed information and the direction to the destination.

[0040] In the above embodiment, the case where one display device 102 is communicatively connected to the usage management device 20 has been described, but the present invention is not limited to this, and multiple display devices (not shown) installed near the escalator 10 may be connected to the usage management device 20. This allows the usage management device 20 to display information on a recommended route for users on the multiple display devices 102, allowing more users to recognize the information on the route. The display information displayed on the multiple display devices may be the same or different. For example, there may be a display device that displays information on a recommended route for users and a display device that displays guidance information for stores and the like at the disembarking floor.

[0041] Also, in the above-described embodiment, a case has been described in which the output information generating unit 223 generates display information as output information, and displays the information on a display device installed in a position visible to users getting on the escalator 10. However, this is not limited to this, and the output information generating unit 223 may generate, for example, audio information such as "After getting off, please proceed to the left" as output information, and output the information from a speaker device (not shown), which is an output device installed near the entrance E1 of the escalator 10. This allows the user to recognize the direction to proceed after getting off the escalator 10 when getting on the escalator 10.

[0042] In the above embodiment, the passenger conveyor is an escalator, but the present invention is not limited to this and may be applied to a moving walkway.

[0043] Although some embodiments of the present invention have been described, these embodiments are presented as examples and are not intended to limit the scope of the invention. These novel embodiments can be implemented in various other forms, and various omissions, substitutions, and modifications can be made without departing from the spirit of the invention. These embodiments and their modifications are included in the scope and spirit of the invention, and are included in the scope of the invention and its equivalents described in the claims. [Explanation of symbols]

[0044] 1... escalator system, 10... escalator, 11... steps, 12... escalator control panel, 20... usage management device, 21... memory unit, 22... CPU, 101... camera device, 102... display device, 211... building information memory unit, 212... congestion information memory unit, 213... congestion related information memory unit, 221... congestion status acquisition unit, 222... route identification unit, 223... output information generation unit, 224... output control unit

Claims

1. A communication device is connected to an output device that outputs information to users who board the passenger conveyor. a congestion status acquisition unit that acquires congestion status information indicating a congestion status within an area into which a user of the passenger conveyor enters after getting off the passenger conveyor; a route specification unit that specifies a route to be recommended to a user of the passenger conveyor after disembarking from the passenger conveyor based on the congestion status information; an output information generating unit that generates output information including information on the travel route identified by the route identifying unit; an output control unit that causes the output device to output the output information generated by the output information generation unit; A passenger conveyor utilization management device comprising:

2. The passenger conveyor utilization management device according to claim 1 , wherein the output information generating unit generates the output information by further including the congestion status information.

3. 2. The passenger conveyor usage management device according to claim 1, wherein the congestion status acquisition unit acquires, as the congestion status information, image information of the area, location information of each area portion within the area having a congestion level equal to or higher than a predetermined value, or information indicating the location information and the congestion level of each area portion.

4. 2. The passenger conveyor usage management device according to claim 1, wherein the congestion status acquisition unit acquires, as the congestion status information, at least one of information indicating a current congestion status in the area and predicted congestion status after a predetermined time has elapsed from the present.

5. 2. The passenger conveyor utilization management device according to claim 1, wherein the output information generation unit generates the output information further including at least one of information regarding a reason for congestion of the passenger conveyor, guidance information regarding a building in which the passenger conveyor is installed, or information regarding a change in a moving speed of the steps of the passenger conveyor depending on a congestion state of the passenger conveyor.

6. A communication device connected to a plurality of the output devices; The utilization management device according to claim 1 , wherein the output control unit causes the output information to be output from the plurality of output devices.

7. Acquire congestion status information indicating a congestion status within an area into which a user of the passenger conveyor enters after getting off the passenger conveyor; Identifying a recommended route for a user of the passenger conveyor after disembarking from the passenger conveyor based on the congestion status information; generating output information including information on the identified travel route; A passenger conveyor usage management method, comprising: outputting the output information from an output device that outputs information to users who board the passenger conveyor.

Citation Information

Patent Citations

  • Man conveyor monitoring device and man conveyor system

    JP2010168126A

  • Congestion rate predicting system and method

    JP2018002037A

  • Escalator and floor congestion status display system using escalator

    JP2022094709A

  • Traffic management system for building

    WO2021245886A1