Information processing device, information processing method, and information processing program
The information processing device addresses the inefficiencies in human resource allocation by using relationship values and allocated cost values to optimize worker assignment, reducing calculation complexity and improving task assignment accuracy and worker satisfaction.
Patent Information
- Application Number
- JP2023532880
- Authority / Receiving Office
- JP · JP
- Patent Type
- Patents
- Current Assignee / Owner
- Filing Date
- 2021-07-05
- Publication Date
- 2024-10-08
- Estimated Expiration
- 2041-07-05
AI Technical Summary
Existing human resource allocation systems face challenges in efficiently assigning multiple workers to tasks due to the exponential increase in combinations as the number of workers grows, leading to unmanageable constraint equations and increased calculation times, and often result in overlapping tasks being assigned to a single worker.
An information processing device that incorporates relationship values between workers and per-worker allocated cost values to calculate a total value, using it as an objective function for solver calculations to assign workers without explicitly writing constraint expressions, allowing for efficient assignment of multiple workers to tasks.
This approach enables efficient solver calculations for worker assignment without increasing constraint expressions, reducing manual corrections, and improving worker satisfaction by assigning workers with good relationships to the same tasks, while maintaining calculation efficiency.
Smart Images

Figure 0007563601000001 
Figure 0007563601000002 
Figure 0007563601000003
Abstract
Description
[Technical field]
[0001] The present invention relates to an information processing device, an information processing method, and an information processing program. [Background technology]
[0002] In the case of human resource allocation, where people are assigned to tasks, an allocation table may be created. Due to the nature of assigning people, various items must be considered when creating an allocation table.
[0003] In recent years, in order to assist in the creation of allocation tables, techniques have been proposed for quantifying items such as worker skills, or for automating the creation of allocation tables using such quantification with a solver, etc. For example, Patent Document 1 discloses a technique for finding an optimal solution for human resource allocation that satisfies conditions including minimizing the time taken from the start to the end of a task, minimizing the number of people to be assigned, and minimizing the variance of processing time. [Prior art documents] [Patent documents]
[0004] [Patent Document 1] Japanese Patent Application Publication No. 2017-211921 Summary of the Invention [Problem to be solved by the invention]
[0005] However, when two or more people are to handle a task, automation using optimization calculations does not create a good allocation table. For example, the more people there are, the more combinations of workers there are, and the solver's constraints cannot write them all, or even if they can, the calculation time increases and a solution cannot be found in a realistic time frame. In addition, with conventional technology, there were cases where tasks were assigned to workers overlapped, i.e., one worker was assigned multiple tasks at the same time.
[0006] The present invention has been made in light of the above circumstances, and aims to provide a technique that enables workers to be assigned to a task assignment table without incorporating the relationships (relationship values) between workers into the assignment cost value and without the need to write a huge number of constraint equations for the solver. In addition, the present invention aims to provide a technique that realizes solver calculations that can be performed whether one or multiple workers are assigned to a task. [Means for solving the problem]
[0007] In order to solve the above problem, one aspect of the present invention is an information processing device comprising: an acquisition unit that acquires a task assignment table for assigning multiple workers to tasks; a relationship value indicating the quality of the relationship between the multiple workers; and a per-worker assignment cost value indicating the assignment cost value when each of the multiple workers is assigned to the task; a calculation unit that calculates a total value when the multiple workers are assigned to the task based on the relationship value and the per-worker assignment cost value; and a solver calculation unit that runs a solver using the total value as an objective function and assigns the multiple workers to each of the tasks in the task assignment table. Effect of the Invention
[0008] According to one aspect of the present invention, it is possible to provide a technology that enables workers to be assigned to a task assignment table without incorporating relationships between workers into the assignment cost value and without the need to write a large number of solver constraint equations, and to provide a solver calculation that can be performed whether one or multiple workers are assigned to a task. [Brief description of the drawings]
[0009] [Figure 1] FIG. 1 is a block diagram showing an example of a hardware configuration of an information processing device according to the first embodiment. [Diagram 2] FIG. 2 is a block diagram showing the software configuration of the information processing device in the first embodiment in association with the hardware configuration shown in FIG. [Diagram 3]FIG. 3 is a flowchart illustrating an example of an information processing operation of the information processing device. [Figure 4] FIG. 4 is a diagram showing an example of the task assignment table acquired by the task assignment table acquisition unit. [Diagram 5] FIG. 5 is a diagram showing an example of the relationship value acquired by the relationship value acquisition unit. [Figure 6] FIG. 6 is a diagram showing an example of the assigned cost value for each worker acquired by the assigned cost value for each worker acquisition unit. [Figure 7] FIG. 7 is a diagram showing an example of assigned cost values for a plurality of workers including relation values. [Figure 8] FIG. 8 is a diagram showing the relationship values between workers after being corrected by the relationship value correction unit. [Figure 9] FIG. 9 is a diagram showing an example of a case where workers are assigned to a task assignment table. [Figure 10] FIG. 10 is a block diagram showing the software configuration of an information processing device according to the second embodiment in relation to the hardware configuration shown in FIG. [Figure 11] FIG. 11 is a flowchart showing an example of the information processing operation of the information processing device according to the second embodiment. [Figure 12] FIG. 12 is a diagram illustrating an example of worker attribute information. [Figure 13] FIG. 13 is a diagram showing an example of work attribute information. [Figure 14] FIG. 14 is a diagram showing whether a combination of worker A and worker C can handle tasks (1) to (3). [Figure 15] FIG. 15 is a diagram showing an example of the assigned cost value for each worker. [Figure 16] FIG. 16 is a diagram showing an example of cost values allocated to a plurality of workers. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0010] Hereinafter, an embodiment of the present invention will be described with reference to the drawings. In the following, elements that are the same as or similar to elements already described will be given the same or similar reference numerals, and duplicated descriptions will basically be omitted.
[0011] [First embodiment] (composition) FIG. 1 is a block diagram showing an example of a hardware configuration of an information processing device 1 according to the first embodiment. The information processing device 1 is realized by a computer such as a PC (Personal Computer). The information processing device 1 includes a control unit 11, an input / output interface 12, and a storage unit 13. The control unit 11, the input / output interface 12, and the storage unit 13 are connected to each other via a bus so as to be able to communicate with each other.
[0012] The control unit 11 controls the information processing device 1. The control unit 11 includes a hardware processor such as a central processing unit (CPU).
[0013] The input / output interface 12 is an interface that enables transmission and reception of information between the input device 2 and the output device 3. The input / output interface 12 may include a wired or wireless communication interface. In other words, the information processing device 1 and the input device 2 and output device 3 may transmit and receive information via a network such as a LAN or the Internet.
[0014] The storage unit 13 is a storage medium. The storage unit 13 is configured by combining a nonvolatile memory that can be written and read at any time, such as a hard disk drive (HDD) or a solid state drive (SSD), a nonvolatile memory such as a read only memory (ROM), and a volatile memory such as a random access memory (RAM). The storage unit 13 has a program storage area and a data storage area in its storage area. The program storage area stores application programs required for executing various processes, in addition to an operating system (OS) and middleware.
[0015] The input device 2 includes, for example, a keyboard, a pointing device, etc., for a user (for example, an assignor, an administrator, or a supervisor) of the information processing device 1 to input instructions to the information processing device 1. The input device 2 may also include a reader for reading data to be stored in the storage unit 13 from a memory medium such as a USB memory, or a disk device for reading such data from a disk medium. Furthermore, the input device 2 may include an image scanner.
[0016] The output device 3 includes a display that displays output data to be presented to a user from the information processing device 1, a printer that prints the output data, etc. The output device 3 may also include a writer that writes data to be input to another information processing device 1 such as a PC or a smartphone onto a memory medium such as a USB memory, and a disk device that writes such data onto a disk medium.
[0017] FIG. 2 is a block diagram showing the software configuration of the information processing device 1 in the first embodiment in relation to the hardware configuration shown in FIG. The storage unit 13 includes an acquired data storage unit 131 , a correction value storage unit 132 , and an assignment table storage unit 133 .
[0018] The acquired data storage unit 131 stores various data acquired by the later-described acquisition unit 111 of the control unit 11. The data stored in the acquired data storage unit 131 are a task assignment table, relationship values, and each worker's assigned cost value. Each of these task assignment table, relationship values, and each worker's assigned cost value may be acquired by importing already-created data from the outside via the input device 2, or may include data generated by the control unit 11. The task assignment table, relationship values, and each worker's assigned cost value will be described later.
[0019] The modified value storage unit 132 stores the relationship value modified by a relationship value modifying unit 112 of the control unit 11, which will be described later.
[0020] The allocation table storage unit 133 stores an allocation table in which workers are assigned to tasks by a solver calculation unit 117 of the control unit 11, which will be described later.
[0021] The control unit 11 includes an acquisition unit 111, a relationship value modification unit 112, a total allocation cost value calculation unit 115, a total evaluation value calculation unit 116, a solver calculation unit 117, and an output control unit 118. These functional units are realized by the hardware processor executing an application program stored in the storage unit 13.
[0022] The acquisition unit 111 acquires necessary data, and stores it in the acquired data storage unit 131. The acquisition unit 111 includes a task assignment table acquisition unit 1111, a relationship value acquisition unit 1112, and an individual worker assigned cost value acquisition unit 1113.
[0023] The work assignment table acquisition unit 1111 acquires a work assignment table for assigning workers to tasks. The work assignment table includes an assignment of a combination of multiple workers to one task. Here, the work assignment table means a table in which no workers are assigned to tasks, and the assignment table means a table in which workers are assigned to tasks. The work assignment table may also include, for example, an assignment table (allocation proposal) created in the past by a user. The work assignment table may also include simulation data. The work assignment table includes, for example, information identifying a task and information identifying a worker to be assigned to the task.
[0024] The relationship value acquisition unit 1112 stores a relationship value that numerically indicates the quality of the relationship between the workers. The relationship value acquisition unit 1112 can acquire the set relationship value as matrix data between the workers.
[0025] The per-worker allocation cost value acquisition unit 1113 acquires per-worker allocation cost values that indicate an index of how much performance each worker can achieve for a task. The per-worker allocation cost value acquisition unit 1113 can acquire the acquired per-worker allocation cost values as matrix data of workers and tasks.
[0026] The relationship value correction unit 112 reads out the relationship values stored in the acquired data storage unit 131, and corrects them so that calculations can be performed by the solver. The read relationship values have no values for cells where the workers are the same. Therefore, for example, the relationship value correction unit 112 corrects the values by substituting 0 for cells where the workers are the same. Furthermore, the relationship value correction unit 112 stores the corrected relationship values in the correction value storage unit 132.
[0027] The total allocation cost value calculation unit 115 calculates a total value that can be calculated by the solver based on the relation value and the allocation cost value for each worker. The method of calculating the total value will be described later.
[0028] The total evaluation value calculation unit 116 calculates a total evaluation value that can be calculated by a solver based on the relation value and the assigned cost value for each worker. The total evaluation value may take into account the intention of the manager. The method of calculating the total evaluation value will be described later.
[0029] The solver calculation unit 117 performs a solver calculation using the total value calculated by the total assignment cost value calculation unit 115 or the total evaluation value calculation unit 116 as an objective function, and assigns workers to the work assignment table. The solver calculation unit 117 also stores the assignment table in which workers are assigned to the work assignment table in the assignment table storage unit 133.
[0030] The output control unit 118 outputs the allocation table stored in the allocation table storage unit 133 to the output device 3 via the input / output interface 12 in response to an operation by a user of the information processing device 1.
[0031] (operation) For the sake of convenience, the following describes an example in which two workers are combined and assigned to one task, but it is of course possible to assign one or more workers to one task.
[0032] As a prerequisite for the operation, it is assumed that the relationship values between the workers and the cost values for each worker are determined in advance. The method of determination will be described later.
[0033] 3 is a flowchart showing an example of the information processing operation of the information processing device 1. The control unit 11 of the information processing device 1 reads out and executes a program stored in the storage unit 13, thereby realizing the operation of this flowchart.
[0034] The operation starts when a user of the information processing device 1 (for example, an administrator, etc.) inputs predetermined information into the information processing device 1.
[0035] The work assignment table acquisition unit 1111 of the information processing device 1 acquires the work assignment table input to the input device 2 via the input / output interface 12 (step ST11). Here, the work assignment table includes the work and the number of people to be assigned to the work. The work assignment table may also include information on the workers to be assigned. Furthermore, the work assignment table acquisition unit 1111 stores the acquired work assignment table in the acquired data storage unit 131.
[0036] FIG. 4 is a diagram showing an example of a work assignment table acquired by the work assignment table acquisition unit 1111. As shown in FIG. In the example shown in FIG. 4, the task assignment table indicates that two workers need to be assigned to each of tasks (1) to (3).
[0037] The relationship value acquisition unit 1112 acquires the relationship value input to the input device 2 via the input / output interface 12 (step ST12). Here, the relationship value is a numerical representation of the quality of the relationship between the currently assigned workers. For example, the larger the relationship value, the better the relationship between the workers. Furthermore, the relationship value acquisition unit 1112 stores the acquired relationship value in the acquired data storage unit 131.
[0038] FIG. 5 is a diagram showing an example of the relationship value acquired by the relationship value acquisition unit 1112. As shown in FIG. In the example shown in FIG. 5, it is indicated that workers C and E have a good relationship, whereas workers A and B have a bad relationship.
[0039] Here, (1) the relationship value may be a value manually input by a user or the like, taking into consideration the closeness between the workers. (2) The relationship value may be manually or automatically created by a user or the like based on the amount of work performed by workers who have worked together in the past. Alternatively, (3) the number of times that they have been combined in the past may be taken into consideration. For example, the average value of the relationship values used in the past work may be used as the relationship value to be used this time. That is, in the case of (3), the relationship value is created as (relationship value between the specified workers in the first allocation table + relationship value between the specified workers in the second allocation table + ··· + relationship value between the specified workers in the Nth allocation table) / number of input allocation tables (N). In this case, the accuracy of the relationship value between the two can be higher as the number of input allocation tables increases. In addition, the relationship value between workers who have never been combined in the past may be set to "0", "1", or a specified logarithm. In the example shown in FIG. 5, it is set to "0".
[0040] The worker-specific allocation cost value acquisition unit 1113 acquires the worker-specific allocation cost value input to the input device 2 via the input / output interface 12 (step ST13). Here, the worker-specific allocation cost value is an index that numerically indicates the degree of work suitability of each worker for the work shown in the assigned work table. The worker-specific allocation cost value acquisition unit 1113 also stores the acquired worker-specific allocation cost value in the acquired data storage unit 131.
[0041] FIG. 6 is a diagram showing an example of the worker-specific allocated cost value acquired by the worker-specific allocated cost value acquisition unit 1113. As shown in FIG. The example shown in FIG. 6 indicates that Worker F has the highest work aptitude for every task, while Worker A has the lowest work aptitude for every task.
[0042] Here, steps ST11 to ST13 may be performed in a different order or in parallel. That is, these pieces of information may be acquired by a single information input from the administrator. Also, steps ST11 to ST13 may be acquired before the flowchart of Fig. 3 is started. In this case, the flowchart shown in Fig. 3 starts from step ST14, which will be described below, in accordance with the administrator's input, for example.
[0043] Now consider an example of how relationship values can be incorporated into assigned cost values to create assigned cost values for multiple workers.
[0044] FIG. 7 is a diagram showing an example of assigned cost values for a plurality of workers including relation values. 7 shows the assigned cost values acquired by the per-worker assigned cost value acquisition unit 1113 in step ST12. That is, table (a) is the same as the diagram shown in FIG.
[0045] For example, the allocation cost value is calculated according to the following formula. Allocation Cost Value (i,j,z) =(X (i,j) +Y (i,z) )*α (j,z) where X (i,j) represents the allocation cost value of worker j for task i, and Y (i,z) represents the allocation cost value of worker z for task i, and α (j,z) represents the relationship value between worker j and worker z.
[0046] Table (b) in Fig. 7 shows a calculation example when the above formula is applied between each worker, and table (c) in Fig. 7 shows the calculation results using the above formula. Here, the relational values are assumed to be the values shown in Fig. 6. Referring to table (c), it is shown that the allocation cost value when worker A and worker C perform task (1) is 8, and the allocation cost value when worker A and worker D perform task (2) is 18.
[0047] Table (d) in FIG. 7 is a diagram showing allocation cost values including allocation cost values for multiple workers including relational values. Table (d) shows allocation cost values when workers A, B, and C work alone, and allocation cost values when two workers work as shown in table (c) above. For example, even if you try to perform a solver calculation on the allocation cost values shown in table (d), the calculation cannot be performed. This is because the solver cannot determine whether the allocation cost value is a value for multiple workers or an individual value, and because the conventional technology cannot perform a solver calculation when there is overlap in the tasks assigned to each worker (two or more tasks cannot be assigned to one worker).
[0048] Therefore, instead of assigning multiple tasks to one worker, multiple workers are assigned to one task (or a set of tasks).
[0049] 3 again, the relationship value correction unit 112 corrects the relationship value stored in the acquired data storage unit 131 (step ST14). In the relationship value shown in FIG. 5, if the worker is the same, it is shown as "-", that is, there is no value, but the relationship value correction unit 112 corrects this relationship value to "0". Then, the relationship value correction unit 112 stores the corrected relationship value in the correction value storage unit 132.
[0050] Fig. 8 is a diagram showing the relationship values between workers after being corrected by the relationship value correction unit 112. As shown in Fig. 8, the relationship value correction unit 112 corrects the relationship values between the same workers to be "0".
[0051] The total allocation cost value calculation unit 115 or the total evaluation value calculation unit 116 calculates the total value (step ST15). Here, it is acceptable for either the total allocation cost value calculation unit 115 or the total evaluation value calculation unit 116 to calculate the total value.
[0052] When the total allocation cost value calculation unit 115 calculates the total value, the total allocation cost value calculation unit 115 reads the allocation cost value for each worker from the acquired data storage unit 131, and reads the corrected relation value from the correction value storage unit 132. Then, the total allocation cost value calculation unit 115 calculates the total allocation cost value of each task using the following formula. Total allocation cost value for operation i = (X(i,j,t)+Y(i,z,t))*α(j,z) Here, X(i,j,t) indicates the allocation cost value of worker j for task i in time frame t, Y(i,z,t) indicates the allocation cost value of worker z for task i in time frame t, and α(j,z) indicates the relationship value between worker j and worker z). The time frame t indicates a unit into which the working time of one day is divided. For example, t=1 indicates the morning time frame of 9:00 to 12:00, and t=2 indicates the afternoon time frame of 13:00 to 17:30. It is needless to say that the time frame t can indicate a time frame into which the working time of one day is arbitrarily divided. From the above, the total allocation cost value calculation unit 115 calculates the total allocation cost value of each task based on the relationship value and the allocation cost value for each worker. The total allocation cost value of each task is the sum of the allocation cost values of each of the multiple workers corresponding to the relationship value multiplied by the relationship value. Furthermore, the total allocation cost value calculation unit 115 calculates a total value, which is a value obtained by adding up the total allocation cost values of each task calculated for each task for all tasks. Also, by using the time frame t, the total percentage cost value can inform the solver calculation unit 117 of which time period the worker is to be assigned to the task. The total allocation cost value calculation unit 115 outputs the calculated total value to the solver calculation unit 117.
[0053] When the total evaluation value calculation unit 116 calculates a total value for executing the solver, the total evaluation value calculation unit 116 reads the assigned cost value for each worker from the acquired data storage unit 131, and reads the corrected relation value from the corrected value storage unit 132. Then, the total evaluation value calculation unit 116 calculates the total evaluation value using the following formula.
[0054] Total evaluation value = α * total allocation cost (of all workers) + β * total relationship value (of all workers) Here, α is a weighting coefficient for the allocation cost value, and β is a weighting coefficient for the relational value. Of course, α and β can be set to any value. Of course, if there are other items (values) to be considered, those values can be incorporated into the total evaluation value. Then, the total evaluation value calculation unit 116 outputs the calculated total evaluation value to the solver calculation unit 117 as a total value.
[0055] The solver calculation unit 117 calculates an allocation table by the solver based on the total value calculated in step ST15 (step ST16). For example, the solver calculation unit 117 calculates a combination that has the highest allocation cost value when two workers are assigned to each of three tasks, as in the task allocation table shown in Fig. 3. Then, the solver calculation unit 117 stores the calculated allocation table in the allocation table storage unit 133.
[0056] For example, when a total value is received from the total allocation cost value calculation unit 115, the solver calculation unit 117 performs a solver to maximize an objective function f(x) using two constraint equations, "one person must be assigned to one task" and "a worker cannot perform multiple tasks", and the received total value as the objective function f(x).
[0057] Furthermore, for example, when a total evaluation value is received as a total value from the total evaluation value calculation unit 116, the solver calculation unit 117 performs a solver to maximize an objective function f(x) using two constraint equations, "one person must be assigned to one task" and "a worker cannot perform multiple tasks", and the received total value as the objective function. As a result, the solver calculation unit 117 assigns workers to the task assignment table. The solver calculation unit 117 stores the assignment table to which the workers are assigned in the assignment table storage unit 133.
[0058] FIG. 9 is a diagram showing an example of a case where workers are assigned to a task assignment table. As shown in FIG. 9, the solver calculation unit 117 executes the solver to calculate the result that the objective function f(x) is maximized when workers A and D are assigned to task (1), workers B and E are assigned to task (2), and workers C and F are assigned to task (3).
[0059] The output control unit 118 outputs the allocation table to the output device 3 via the input / output interface 12 (step ST17). The output control unit 118 reads out the allocation table stored in the allocation table storage unit 133, and outputs it to the output device 3 via the input / output interface 12, thereby displaying the allocation table on the display if the output device 3 is a display, for example. Based on the displayed allocation table, the manager can determine the allocation of workers to each task.
[0060] (Action and effect) According to the first embodiment, it is possible to perform a solver calculation that can assign one or more workers to a task without incorporating the relationships between workers into the allocation cost value and without increasing the number of constraint equations when running the solver.
[0061] In addition, because the combination of workers is taken into consideration, the allocation table calculated by the solver becomes closer to the allocation table actually used. This reduces the frequency with which the user of the information processing device 1, who is the allocator, manually modifies the allocation table. In addition, workers who have a strong relationship with each other are often assigned to the same work, which improves the satisfaction of the workers.
[0062] [Second embodiment] (composition) The hardware configuration of the information processing device 1 in the second embodiment is the same as that in the first embodiment, and therefore a description thereof will be omitted here.
[0063] FIG. 10 is a block diagram showing the software configuration of the information processing device 1 according to the second embodiment in relation to the hardware configuration shown in FIG.
[0064] The difference from the first embodiment is that the acquisition unit 111 includes an attribute information acquisition unit 1114, and the control unit 11 includes a work possibility determination unit 113 and an individual worker assigned cost value correction unit 114.
[0065] The acquired data storage unit 131 includes attribute information in addition to the information stored in the first embodiment. The attribute information may be acquired by importing created data from the outside via the input device 2, or may include data generated by the control unit 11. The attribute information will be described later.
[0066] The modified value storage unit 132 stores the relationship value modified by the relationship value modifying unit 112, as well as the each worker assigned cost value modified by the each worker assigned cost value modifying unit 114 of the control unit 11, which will be described later.
[0067] The attribute information acquisition unit 1114 acquires attribute information including worker attribute information (first attribute information) indicating what attributes a worker has and task attribute information (second attribute information) indicating what attributes a task has. The attributes are, for example, tasks such as "working at a height" and "working inside the home", age, whether a vehicle is used, whether tools are used, etc. That is, the attributes may be any attributes required for the task. In addition, whether each worker corresponds to each attribute is represented by a bit value. For example, if the attribute corresponds, the bit value is set to "1", and if the attribute does not correspond, the bit value is set to "0" or blank. Similarly, whether each task corresponds to each attribute is represented by a bit value. The attribute information acquisition unit 1114 can acquire worker attribute information as matrix data of each worker and attribute, and can acquire task attribute information as matrix data of each task and attribute.
[0068] The work feasibility determination unit 113 determines whether a specific task can be performed by a predetermined worker (one or more workers) based on the worker attribute information and task attribute information stored in the acquired data storage unit 131. For example, it determines whether task (1) can be performed by worker A and worker B. A specific example of the determination process of the work feasibility determination unit 113 will be described later.
[0069] The per-worker allocation cost value correction unit 114 corrects the per-worker allocation cost value based on the result of the determination by the work feasibility determination unit 113 as to whether the work can be performed. For example, the per-worker allocation cost value correction unit 114 corrects so as to increase the allocation cost value of the cell corresponding to the work and worker determined to be able to perform by the work feasibility determination unit 113. A specific example of the per-worker allocation cost value correction unit 114 will be described later. The per-worker allocation cost value correction unit 114 also stores the corrected per-worker allocation cost value in the correction value storage unit 132.
[0070] (operation) 11 is a flowchart showing an example of the information processing operation of the information processing device 1. The control units 11 of the information processing device 1 read out and execute programs stored in the storage units 13, thereby implementing the operation of this flowchart.
[0071] First, as a premise for the operation, it is assumed that the relationship values between workers, the cost values for each worker, and the attribute information have been determined in advance.
[0072] Steps ST11 to ST13 shown in FIG. 11 are the same as steps ST11 to ST13 described with reference to FIG. 3, and therefore will not be described again.
[0073] The attribute information acquisition unit 1114 of the information processing device 1 acquires the attribute information input to the input device 2 via the input / output interface 12 (step ST21). Here, the attribute information includes worker attribute information (first attribute information) for each worker and task attribute information (second attribute information) for each task. In addition, the attribute information acquisition unit 1114 stores the acquired attribute information in the acquired data storage unit 131.
[0074] FIG. 12 is a diagram showing an example of worker attribute information, and FIG. 13 is a diagram showing an example of work attribute information. As shown in FIG. 12, for example, the attributes of workers indicate that they are "capable of working at heights," "capable of working inside the home," "holds a fiber connector," "capable of working with an aerial work vehicle," and "capable of setting up a network (in FIG. 12, indicated as NW)." Also, as shown in FIG. 12, the attribute information of worker A indicates that they are "capable of working at heights," "capable of working inside the home," and "capable of working with an aerial work vehicle." The attribute information of worker B indicates that they are "capable of working inside the home" and "capable of setting up a network." Similarly, the attribute information of worker C indicates that they are "capable of working inside the home" and "holds a fiber connector."
[0075] As shown in FIG. 13, the attributes of the work are "work at a height," "work inside the home," "work requiring a fiber connector," "work requiring a high-altitude work vehicle," and "work to set up a network (referred to as NW in FIG. 13)." Also, as shown in FIG. 13, the attribute information of work (1) is "work at a height," "work inside the home," "work requiring a fiber connector," and "work requiring a high-altitude work vehicle." The attribute information of work (2) is "work inside the home," "work requiring a fiber connector," and "work to set up a network." Similarly, the attribute information of work (3) is "work inside the home" and "work requiring a fiber connector."
[0076] Step ST14 shown in FIG. 11 is the same as step ST14 described with reference to FIG. 3, and therefore will not be described again.
[0077] The work possibility determination unit 113 determines whether the work can be performed when the workers are combined (step ST22). The work possibility determination unit 113 reads out the attribute information stored in the acquired data storage unit 131. Then, when the attribute information of the combination of each worker satisfies the attribute information of the work, the work possibility determination unit 113 determines that the work can be performed. For example, when the attribute information of the combination of worker A and worker B satisfies the attribute information of work (1), that is, when the parts where the bit value of the attribute information of the combination of worker A and worker B is 1 include all the parts where the bit value of the attribute information of work (1) is 1, the work possibility determination unit 113 determines that the combination of worker A and worker B can perform work (1). Furthermore, if the combination of each worker does not satisfy the task attribute information, that is, if the bit value of the attribute information of the combination of worker A and worker B is 1 does not include any of the bit values of the attribute information of task (1) that is 1, the task capability determination unit 113 determines that task (1) is not possible when worker A and worker B are combined. Furthermore, the task capability determination unit 113 outputs the determination result to the per-worker assigned cost value correction unit 114.
[0078] Fig. 14 is a diagram showing whether a combination of worker A and worker C can handle tasks (1) to (3). Although only the combination of worker A and worker C is explained in Fig. 14, the task capability determination unit 113 naturally makes a determination for all combinations of workers.
[0079] 12 and 13, the attributes that can be handled when worker A and worker C are combined are "work at high places," "work inside the house," and "work of network settings." Therefore, as shown in Fig. 14, the work capability determination unit 113 determines that workers A and C can handle the tasks (1) and (3), and determines that workers A and C cannot handle the task (2).
[0080] The per-worker allocation cost value correction unit 114 corrects the per-worker allocation cost value (step ST23). The per-worker allocation cost value correction unit 114 reads out the per-worker allocation cost value stored in the acquired data storage unit 131. Then, the per-worker allocation cost value correction unit 114 corrects the per-worker allocation cost value based on the result received from the work feasibility determination unit 113. Then, the per-worker allocation cost value correction unit 114 stores the corrected per-worker allocation cost value in the correction value storage unit 132.
[0081] For example, when the judgment result of a combination of workers indicates that the task is "capable" and the assigned cost value per worker of each of the combined workers is "0", it is assumed that the task requires two workers to work as one person. The assigned cost value per worker correction unit 114 then sets the assigned cost value of each of the combined workers to half the assigned cost value of the worker with the smallest assigned cost value among the workers with assigned cost values greater than "0" for the task. If any of the assigned cost values is not "0", the assigned cost value is not corrected as it is assumed that the task can be performed by one person. If it is determined that the task is not available, the assigned cost value of the worker determined to be unable to work is corrected to "0". If the assigned cost value was "0" from the beginning, the assigned cost value is not corrected.
[0082] FIG. 15 is a diagram showing an example of the assigned cost value for each worker. Table (a) in FIG. 15 shows an example of the per-worker allocation cost value read by the per-worker allocation cost value correction unit 114 from the acquired data storage unit 131, that is, before correction. For example, as shown in FIG. 14, the work possibility determination unit 113 determines that the work (1) can be performed when the worker A and the worker C are combined. As shown in table (a), the allocation cost value of the work (1) for the workers A and C is "0". Furthermore, the worker having the smallest value among the allocation cost values other than "0" is the worker B, and the allocation cost is "4". Therefore, the per-worker allocation cost value correction unit 114 corrects the per-worker allocation cost value so that the per-worker allocation cost value for the workers A and C is "2", which is half the value of "4", as shown in table (b) in FIG. 15.
[0083] Also, it is output that the task (2) cannot be handled for the combination of worker A and worker C shown in Fig. 14. Here, since the allocation cost values of worker A and worker C are "0", per-worker allocation cost value correction unit 114 does not correct the per-worker allocation cost value.
[0084] Furthermore, it is output that the task (3) in the combination of worker A and worker C shown in Fig. 14 can be handled. However, since the allocation cost values of worker A and worker C are not "0", the per-worker allocation cost value correction unit 114 does not correct the allocation cost values of worker A and worker C in the task (3).
[0085] It should be noted that the worker-specific allocation cost value correction unit 114 can also calculate the allocation cost value for multiple workers. If the determination result indicates that the work can be handled, the allocation cost value for multiple workers is calculated by the following formula.
[0086] Allocation Cost Value (i,j,z) = Average of the allocation cost values of workers excluding those with an allocation cost value of "0" for task i) × α (j,z) In addition, if the determination result is that the response is not possible, the assigned cost value (i,j,z) =0.
[0087] FIG. 16 is a diagram showing an example of cost values allocated to a plurality of workers. Table (a) in Fig. 16 shows the same allocation cost values for each worker as Table (a) in Fig. 15. Table (b) in Fig. 16 shows the allocation cost values between each worker when the above formula is applied, and Table (c) in Fig. 16 shows the allocation cost values as a result of applying the above formula. Each value shown in Table (c) is the allocation cost value between multiple workers.
[0088] 11 are the same as steps ST15 to ST17 described with reference to Fig. 3, and therefore will not be described again. However, in step ST15, the total allocation cost value calculation unit 115 or the total evaluation value calculation unit 116 does not read out the allocation cost value for each worker stored in the acquired data storage unit 131, but reads out the allocation cost value for each worker corrected in step ST23 from the correction value storage unit 132 and uses it.
[0089] (Action and effect) According to the second embodiment, it is possible to output an allocation table that takes attribute information into consideration by reflecting the determination result of the attribute information in the allocation cost value for each worker.
[0090] [Other embodiments] It should be noted that the present invention is not limited to the above embodiment. For example, the present invention can be applied to a case where a plurality of workers are assigned to a plurality of tasks. For example, the tasks may be combined by optimization calculation, and the combined tasks may be regarded as one task to which the present invention can be applied.
[0091] The method described in the above embodiment can be stored as a program (software means) that can be executed by a calculator (computer) in a storage medium such as a magnetic disk (floppy (registered trademark) disk, hard disk, etc.), optical disk (CD-ROM, DVD, MO, etc.), semiconductor memory (ROM, RAM, flash memory, etc.), and can also be distributed by transmitting it via a communication medium. The program stored on the medium side also includes a setting program that configures the software means (including not only execution programs but also tables and data structures) that the calculator executes in the computer. The computer that realizes this device reads the program stored in the storage medium, and in some cases, configures the software means by the setting program, and executes the above-mentioned processing by controlling the operation of the software means. The storage medium referred to in this specification is not limited to a storage medium for distribution, but also includes a storage medium such as a magnetic disk or semiconductor memory provided inside the computer or in a device connected via a network.
[0092] In short, this invention is not limited to the above-mentioned embodiment, and various modifications can be made in the implementation stage without departing from the gist of the invention. Moreover, each embodiment may be implemented in combination as appropriate as possible, in which case the combined effect can be obtained. Furthermore, the above-mentioned embodiment includes inventions at various stages, and various inventions can be extracted by appropriate combinations of the disclosed constituent elements. [Explanation of symbols]
[0093] 1...Information processing device 11...Control section 111…Acquisition Department 1111...Work assignment table acquisition section 1112...Relationship value acquisition unit 1113: worker-specific allocation cost value acquisition unit 1114…Attribute information acquisition unit 112…Relationship value correction section 113...Work availability determination unit 114...Worker-specific allocation cost value correction unit 115...Total allocation cost value calculation unit 116...Total evaluation value calculation unit 117…Solver calculation section 118...Output control section 131...Acquired data storage unit 132…Correction value memory section 133... Allocation table storage unit 12... Input / Output Interface 13...Storage section 2. Input device 3. Output device
Claims
1. an acquisition unit that acquires a task assignment table for assigning a plurality of workers to tasks, a relationship value indicating whether a relationship between the plurality of workers is good or bad, and an assignment cost value for each worker indicating an assignment cost value when each of the plurality of workers is assigned to the task; a calculation unit that calculates a total value when the plurality of workers are assigned to the task based on the relationship value and the assigned cost value for each worker; a solver calculation unit that executes a solver using the total value as an objective function and assigns the plurality of workers to each of the tasks in the task assignment table; wherein the total value is a value obtained by adding up total allocation cost values of each task of all tasks, and the total allocation cost value of each task is a value obtained by multiplying the relationship value by a value obtained by adding up the allocation cost values of each of the multiple workers corresponding to the relationship value.
2. an acquisition unit that acquires a task assignment table for assigning a plurality of workers to tasks, a relationship value indicating whether a relationship between the plurality of workers is good or bad, and an assignment cost value for each worker indicating an assignment cost value when each of the plurality of workers is assigned to the task; a calculation unit that calculates a total value when the plurality of workers are assigned to the task based on the relationship value and the assigned cost value for each worker; a solver calculation unit that executes a solver using the total value as an objective function and assigns the plurality of workers to each of the tasks in the task assignment table; wherein the total value is a sum of a total of assigned cost values of all of the plurality of workers multiplied by a first coefficient and a total of relationship values of the plurality of workers multiplied by a second coefficient.
3. The information processing apparatus according to claim 1 , further comprising a relationship value correction unit that corrects a relationship value of a same worker among the plurality of workers to 0.
4. The acquisition unit further acquires first attribute information representing attributes of the plurality of workers and second attribute information representing attributes of the work, The information processing apparatus according to claim 1 , further comprising a determination unit configured to output a determination result of whether or not an attribute obtained by combining the first attribute information satisfies an attribute of the second attribute information.
5. The information processing apparatus according to claim 4 , further comprising a correction unit that corrects the worker-specific assigned cost value based on the determination result.
6. An information processing method executed by an information processing device having a processor and a memory, the processor acquires a task assignment table for assigning a plurality of workers to tasks, a relationship value indicating the quality of relationships between the plurality of workers, and a worker-specific assignment cost value indicating an assignment cost value when each of the plurality of workers is assigned to the task, and stores the acquired table in the memory; the processor calculates a total value when the plurality of workers are assigned to the task based on the relationship value and the assigned cost value for each worker stored in the memory; The processor executes a solver using the total value as an objective function for each of the tasks in the task assignment table stored in the memory, and assigns the plurality of workers to each of the tasks in the task assignment table; wherein the total value is a value obtained by adding up total allocation cost values of each task of all the tasks, and the total allocation cost value of each task is a value obtained by multiplying the relationship value by a value obtained by adding up the allocation cost values of each of the plurality of workers corresponding to the relationship value.
7. An information processing method executed by an information processing device having a processor and a memory, the processor acquires a task assignment table for assigning a plurality of workers to tasks, a relationship value indicating the quality of relationships between the plurality of workers, and a worker-specific assignment cost value indicating an assignment cost value when each of the plurality of workers is assigned to the task, and stores the acquired table in the memory; the processor calculates a total value when the plurality of workers are assigned to the task based on the relationship value and the assigned cost value for each worker stored in the memory; The processor executes a solver using the total value as an objective function for each of the tasks in the task assignment table stored in the memory, and assigns the plurality of workers to each of the tasks in the task assignment table; wherein the total value is a sum of a total of the assigned cost values of all of the plurality of workers multiplied by a first coefficient and a total of the relationship values of the plurality of workers multiplied by a second coefficient.
8. An information processing program that causes a processor to function as each of the units of the information processing device according to claim 1 .
Citation Information
Patent Citations
Worker allocation system, worker allocating method and storage medium readable by computer in which worker allocation program is recorded
JP2000250989A
Personnel management system and personnel management method
JP2014211766A
Plan management system and plan management system
JP2017062656A
Scheduling method, scheduling device and scheduling program
JP2017211921A