Precipitation forecasting system, precipitation forecasting method, program, base station selection system, and base station selection method
The precipitation prediction system uses machine-learning models to accurately forecast precipitation timing and intensity, addressing communication challenges by enhancing base station selection for improved communication quality.
Patent Information
- Application Number
- JP2024502886
- Authority / Receiving Office
- JP · JP
- Patent Type
- Patents
- Current Assignee / Owner
- Priority Date
- 2022-02-25
- Filing Date
- 2023-01-06
- Publication Date
- 2024-10-08
- Estimated Expiration
- 2043-01-06
AI Technical Summary
Existing communication systems face challenges in accurately predicting precipitation intensity and timing at specific locations, which affects communication quality, especially in satellite communications using high-frequency radio waves, and selecting suitable ground stations for stable communication.
A precipitation prediction system utilizing machine-learning models to combine image and numerical data from past precipitation conditions to accurately forecast precipitation timing and intensity, integrating U-Net and graph convolution networks for enhanced prediction accuracy.
Enables precise prediction of precipitation timing and intensity, allowing for efficient selection of suitable base stations for communication, thereby improving communication quality and operational efficiency.
Smart Images

Figure 0007563822000001 
Figure 0007563822000002 
Figure 0007563822000003
Abstract
Description
[Technical field]
[0001] The present invention relates to a precipitation forecasting system, a precipitation forecasting method, a program, a base station selection system, and a base station selection method. [Background technology]
[0002] For example, Patent Document 1 (JP 2013-130419 A) discloses a precipitation prediction method in which, in order to predict the position of a localized heavy precipitation area with high accuracy, the position of the precipitation area after a predetermined time has passed is identified based on the precipitation area indicating the overall precipitation location and the movement vector of the precipitation area, and within the precipitation area, the position of the local precipitation area after a predetermined time has passed is identified based on a local precipitation area indicating a horizontal scale smaller than the precipitation area and the movement vector of the local precipitation area, and the precipitation area after the predetermined time has passed and the local precipitation area are combined. [Prior art documents] [Patent documents]
[0003] [Patent Document 1] JP 2013-130419 A Summary of the Invention [Problem to be solved by the invention]
[0004] In the field of satellite communications, for example, it is desirable to select from among multiple ground stations a ground station that has optimal link quality for communications with a communications satellite in order to maintain and improve communication quality. In this regard, in communications using radio waves with frequencies above Ka band, link quality is affected by precipitation intensity, so it is important to pinpoint the timing and intensity of rainfall at a specific location where a ground station is located. Similar problems can also arise when moving bodies such as vehicles (land vehicles, rail vehicles, etc.) and ships communicate with satellites, or when flying bodies such as aircraft, drones, and flying cars communicate with ground stations (i.e., when communications downlinked from a communications satellite to a ground station are uplinked from the ground station to the flying body).
[0005] Therefore, an object of the present invention is to pinpoint the timing and intensity of precipitation in a specific location. [Means for solving the problem]
[0006] In order to solve the above-mentioned problems, the first aspect of the present invention is a first prediction unit that uses a first prediction model that has been machine-learned using image data that indicates past precipitation conditions in an area surrounding a predetermined point, and outputs image data that indicates a precipitation forecast for the area after a predetermined time from image data that indicates a current precipitation condition in the area; a second prediction unit that uses a second prediction model that has been machine-learned using numerical data indicating past precipitation intensities at a plurality of observation points in the vicinity of the location to output a predicted value of the precipitation intensity at the plurality of observation points after the predetermined time from the numerical data indicating the current precipitation intensity at the plurality of observation points; A third prediction unit that combines the prediction result of the first prediction unit with the prediction result of the second prediction unit and predicts the timing and intensity of precipitation at the location based on the combined result; The present invention provides a precipitation forecasting system comprising:
[0007] In the precipitation prediction system of the present invention, it is preferable that the machine learning for generating the first prediction model learns the precipitation area and changes in precipitation intensity over time from image data showing past precipitation conditions.
[0008] In addition, in the precipitation prediction system of the present invention, it is preferable that the machine learning for generating the second prediction model learns features between past precipitation intensities at the multiple observation points.
[0009] In addition, in the precipitation prediction system of the present invention, it is preferable that the third prediction unit corrects the prediction result of the first prediction unit using the prediction result of the second prediction unit, and predicts the timing and intensity of precipitation at the location based on the corrected prediction result of the first prediction unit.
[0010] In addition, the second aspect of the present invention is For computers, a first prediction step of outputting image data showing a precipitation forecast for a predetermined time period in an area surrounding a predetermined point from image data showing a current precipitation condition in the area using a first prediction model trained by machine learning using image data showing past precipitation conditions in the area; a second prediction step of outputting a predicted value of the precipitation intensity at the plurality of observation points after the predetermined time from the numerical data indicating the current precipitation intensity at the plurality of observation points using a second prediction model that has been machine-learned using numerical data indicating the past precipitation intensity at the plurality of observation points in the vicinity of the location; a third prediction step of combining the prediction result in the first prediction step with the prediction result in the second prediction unit, and predicting the timing and intensity of precipitation at the location based on the combined result; The present invention provides a precipitation forecasting method, which comprises executing the steps of:
[0011] In addition, the third aspect of the present invention is For computers, a first prediction step of outputting image data showing a precipitation forecast for a predetermined time period in an area surrounding a predetermined point from image data showing a current precipitation condition in the area using a first prediction model trained by machine learning using image data showing past precipitation conditions in the area; a second prediction step of outputting a predicted value of the precipitation intensity at the plurality of observation points after the predetermined time from the numerical data indicating the current precipitation intensity at the plurality of observation points using a second prediction model that has been machine-learned using numerical data indicating the past precipitation intensity at the plurality of observation points in the vicinity of the location; a third prediction step of combining the prediction result in the first prediction step with the prediction result in the second prediction unit, and predicting the timing and intensity of precipitation at the location based on the combined result; A program for executing the above is provided.
[0012] Moreover, a fourth aspect of the present invention is a first prediction unit that uses a first prediction model that is machine-learned using image data that indicates past precipitation conditions in an area surrounding a location of each of a plurality of base stations to output image data that indicates a precipitation forecast for the area after a predetermined time from image data that indicates a current precipitation condition in the area; a second prediction unit that uses a second prediction model that is machine-learned using numerical data indicating past precipitation intensities at a plurality of observation points in the vicinity of a location where the base station is located, to output, for each of the plurality of base stations, a predicted value of precipitation intensity at the plurality of observation points after the predetermined time from numerical data indicating current precipitation intensity at the plurality of observation points; a third prediction unit that combines a prediction result of the first prediction unit with a prediction result of the second prediction unit for each of the plurality of base stations, and predicts the timing and intensity of precipitation at a location where the base station is located based on the combined result; a selection unit that selects, from among the plurality of base stations, a base station that is to communicate with a satellite or an aircraft after the predetermined time based on a prediction result of the third prediction unit; The present invention provides a base station selection system including: Here, the base station includes a base station that communicates with a satellite (e.g., a geostationary satellite), as well as a base station that communicates with an air vehicle such as an airplane, a drone, or a flying car. In addition, the base station includes a ground station, as well as a mobile station installed in a moving object such as a vehicle (e.g., a land vehicle, a rail vehicle, etc.) or a ship.
[0013] Moreover, the fifth aspect of the present invention is For computers, a first prediction step of outputting, for each of a plurality of base stations, image data showing a precipitation forecast for a predetermined time period in an area surrounding a location of the base station from image data showing a current precipitation situation in the area, using a first prediction model trained by machine learning using image data showing past precipitation situations in the area surrounding the location of the base station; a second prediction step of outputting, for each of the plurality of base stations, a predicted value of the precipitation intensity at the plurality of observation points after the predetermined time from the numerical data indicating the current precipitation intensity at the plurality of observation points, using a second prediction model that has been machine-learned using numerical data indicating the past precipitation intensity at the plurality of observation points in the vicinity of a point where the base station is located; a third prediction step of combining a prediction result in the first prediction step with a prediction result in the second prediction step for each of the plurality of base stations, and predicting the timing and intensity of precipitation at a location where the base station is located based on the combined result; a selection step of selecting, from among the plurality of base stations, a base station that is to communicate with the satellite or the aircraft after the predetermined time based on a result of the prediction in the third prediction step; The present invention provides a base station selection method for performing the above. Effect of the Invention
[0014] According to the present invention, it is possible to pinpoint the timing and intensity of precipitation at a specific location, such as the location of a base station, etc. Therefore, based on the predicted precipitation conditions, it is possible to select a base station suitable for communication with a satellite from among multiple base stations, and to operate the communication satellite efficiently. [Brief description of the drawings]
[0015] [Figure 1] FIG. 2 is a flowchart showing a procedure for precipitation forecasting according to the embodiment. [Diagram 2] This is a schematic diagram of area precipitation forecast. [Diagram 3] This is a conceptual diagram of U-net. [Figure 4]This is a schematic diagram of network-based precipitation forecasting. [Diagram 5] FIG. 1 is a conceptual diagram of a graph convolution network. [Figure 6] FIG. 2 is a schematic diagram showing the relationship between a satellite 30 and a base station. [Figure 7] FIG. 2 is a schematic diagram of a base station selection technique; [Figure 8] FIG. 2 is a block diagram showing the software configuration of the precipitation prediction and base station selection system 10. [Figure 9] 1 is a block diagram showing a hardware configuration of a computer 100 constituting a system 10. FIG. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0016] Representative embodiments of the precipitation forecasting system, precipitation forecasting method, program, base station selection system, and base station selection method according to the present invention will be described in detail below with reference to the drawings. However, the present invention is not limited to these drawings. In addition, since the drawings are intended to conceptually explain the present invention, dimensions, ratios, or numbers may be exaggerated or simplified as necessary for easy understanding.
[0017] As the present embodiment, a method of precipitation forecasting will be described, and then a method of base station selection will be described as an application example of the method. Here, precipitation is used as a concept including rainfall, snowfall, fog, and hailfall.
[0018] 1. About precipitation forecast methods As shown in FIG. 1, the precipitation forecasting method in this embodiment performs (1) area-wide precipitation forecasting in an area surrounding a certain point (first prediction step; step S1), and (2) network-wide precipitation forecasting in observation points near the point (second prediction step; step S2), and (3) predicts the timing and intensity of precipitation at the point based on these prediction results (third prediction step; step S3). Below, the above (1) to (3) will be explained in order, and then an example configuration of a precipitation forecasting system and a base station selection system for implementing this method will be explained.
[0019] (1) Area-wide precipitation forecast With reference to Figure 2, area-wide precipitation forecast will be explained. In area precipitation forecasting, past area weather data in an area (e.g., 10 km square) surrounding a preset point is collected, and a database is constructed. An example of the preset point is the location of a base station, which will be described later, but is not limited to this. In addition, the preset point may be fixed on the ground, or may be movable, such as the current location of a mobile object.
[0020] Here, surface weather data refers to mesh-like observation data (image data) that shows the weather conditions in the area, and an example is image data obtained from observations by ground-based weather radar or weather satellites. This type of data displays the precipitation conditions (precipitation levels) for each grid point in different colors. This type of data can be obtained from the server 20 of the Japan Meteorological Agency or a weather information provider (see FIG. 8).
[0021] The surface weather data is collected at preset time intervals (e.g., every 30 minutes or every hour) and stored in a database in association with the collection time. When the image data provided from the server 20 covers a certain region (e.g., the Kanto region, the Kansai region, etc.) or the whole of Japan, a necessary region may be extracted or cut out from the original image data and then stored in the database.
[0022] Therefore, the observation time and the mesh-shaped observation data (image data) are stored in association with each other in the database, and the database is updated at the above-mentioned time intervals.
[0023] Next, a prediction model (first prediction model) for predicting precipitation in the region is created based on the past surface meteorological data recorded in the database.
[0024] This prediction model is generated by machine learning, particularly deep learning. In this embodiment, the prediction model is generated by U-Net, which is a type of deep learning using images, but the present invention is not limited to this.
[0025] Here, an overview of U-net will be explained with reference to FIG. U-net is a type of convolutional neural network (CNN) and is a model consisting of an encoder and a decoder.
[0026] That is, the U-Net encoder convolves the input image several times to extract the image features, then performs downsampling such as pooling to reduce the resolution, and repeats this operation several times. The decoder receives the features extracted by the encoder, performs deconvolution, and outputs a feature map of approximately the same size as the input image.
[0027] However, simply enlarging the feature map by deconvolution (upsampling) is not enough to capture the object's position information. Therefore, in U-Net, the encoder's feature map is linked to the decoder's feature map at each layer (the layer that is symmetrical to the turnaround point) (see the arrows in Figure 3). This allows the information from the large feature map on the encoder side to be transmitted to the decoder side, making it easier to capture the object's position information when upsampling.
[0028] In this embodiment, past surface weather data recorded in a database is input into U-net to learn the transitions or changes over time in precipitation areas (grid points) and precipitation intensity, thereby obtaining a U-net algorithm (prediction model) that can predict precipitation areas (grid points) and precipitation intensity.
[0029] Then, real-time or current surface weather data for the relevant area is acquired and input into the prediction model obtained by the above-mentioned learning, thereby obtaining a weather forecast for a predetermined time ahead (for example, about 30 minutes to 1 hour).
[0030] The obtained prediction result is, for example, image data showing the precipitation conditions after a certain time, and includes, for example, information on the precipitation conditions for each grid point in the region. For example, grid points on a map representing the region are colored in different colors depending on the level of precipitation (mm / h).
[0031] Therefore, to grasp the precipitation conditions at a given point, it is sufficient to check the precipitation conditions (eg, the presence or absence of coloring indicating precipitation) at the grid point corresponding to that point on the obtained image data.
[0032] The above prediction result has the advantage that it can accurately predict the timing of rainfall onset at the location. However, it cannot be said that it is sufficient in terms of accurately grasping the precipitation intensity. Therefore, in this embodiment, from the viewpoint of accurately grasping the precipitation intensity, the prediction of surface weather data is supplemented by network prediction.
[0033] (2) Network-based prediction Network-based precipitation forecasting will now be described with reference to FIG. Suppose there are several meteorological observation points near a certain point (for example, a satellite ground station). Select several observation points from among them (observation points a, b, c, and d in the example in Figure 4). Accurate precipitation intensity data (time series data) observed at each of the selected observation points is collected and a database is constructed.
[0034] Here, the observation point is preferably located on the ground, such as a rain gauge at a meteorological station, etc. In addition, when selecting the observation point, observation points located to the north, south, east and west of the site may be selected in a balanced manner, or many observation points located in a specific direction (for example, the west side) may be used depending on the geographical or meteorological characteristics of the site.
[0035] Moreover, it is desirable to select each observation point so that the distance between adjacent observation points is about 10 to 30 km, and especially about 15 to 25 km. In this case, discrete data with an interval of about 20 km is obtained as observation data. This sense of distance is suitable for accurately predicting precipitation intensity about 30 minutes to 1 hour later from real-time observation data of each observation point. However, if there are not enough observation points within about 10 to 30 km around the point, observation points closer or farther away from the point may be added. Therefore, the "nearby observation points" in this case may also be called the "surrounding observation points" of the point.
[0036] The observation data is collected at a preset time interval. For example, it may be every 30 minutes or every hour, like the collection interval for surface weather data, or it may be shorter, for example, every 5 minutes or 10 minutes. This type of observation data can also be obtained from a server 20 of the Japan Meteorological Agency or a weather information provider (see FIG. 8).
[0037] Therefore, the observation point, the observation time, and the observed precipitation intensity are stored in association with each other in the database, and the database is updated at the above-mentioned time intervals.
[0038] Then, a prediction model (second prediction model) is created based on the feature amount (e.g., correlation) of the observation data at multiple locations. In this embodiment, the prediction model is a network model, for example, a learning model using a graph convolution network, which is a type of graph neural network, but the present invention is not limited to this.
[0039] Here, an overview of a graph convolution network (GCN) will be explained with reference to FIG. GCN is a type of deep learning, a neural network that handles problems on graphs. A graph is a data structure that consists of nodes (shown as circles in the example of Figure 5) that hold some state (node features) and links (shown as lines connecting two circles in the example of Figure 5) that show the relationships between the nodes.
[0040] While GCN repeats convolutions in the same way as CNN (Convolutional Neural Network), GCN convolves information around the target node. In other words, convolution in graph data is the process of adding weighted features of adjacent nodes (shown by circles in the example of Figure 5) to the features of a target node in the graph (shown by circles in the example of Figure 5) (Aggregate and Combine). Through this process, the features of the target node include not only the features of the target node itself, but also information about the adjacent relationships and the features of the surrounding nodes.
[0041] In this embodiment, a prediction model (second prediction model) can be obtained by applying GCN to a plurality of observation points as nodes, precipitation intensities as node features, and relationships between observation points as links.
[0042] Then, real-time precipitation intensity data at each observation point is input into the above-mentioned prediction model to obtain a prediction result of precipitation intensity at each observation point after a predetermined time (e.g., 30 minutes or 1 hour). The prediction result is given as numerical data, which makes it possible to obtain a highly accurate prediction of precipitation intensity at each observation point.
[0043] (3) Combining prediction results Next, the forecast calculated in (1) above is combined with the forecast calculated in (2) above to predict the timing and intensity of precipitation at the target location.
[0044] Specifically, the results of the area-based prediction are corrected from the perspective of precipitation intensity (i.e., using the results of the network-based prediction), and the timing and intensity of precipitation at the location are predicted based on the corrected results of the area prediction section.
[0045] For example, the amount of precipitation at each observation point obtained by network prediction is plotted in the corresponding pixel (grid point corresponding to the position of the observation point) on the image data obtained by area prediction.The plotted image data is then input into a correction model (a prediction model that has learned the relationship between precipitation intensity between grid points using U-net or the like) to obtain image data corrected for precipitation intensity. In this corrected image data, the amount of precipitation around the observation point (including the observation point) is corrected according to the amount of precipitation at the observation point, making it more accurate. Therefore, by reading the timing and intensity of precipitation at the prediction target point from the corrected image data, it is possible to accurately predict the timing and intensity of precipitation at the prediction target point. Note that even if precipitation cannot be confirmed in the most recent observation data, if some precipitation (for example, precipitation of 1 mm / h or more) is predicted on the grid point corresponding to the prediction target point in the prediction result, it can be determined that rain, etc. will start falling after a specified time.
[0046] In this way, by taking advantage of the advantages of the forecasting methods (1) and (2) above, it is possible to pinpoint the timing and intensity of precipitation at the target location. The above-mentioned machine learning algorithms may be incorporated into an automated pipeline. That is, when real-time rainfall data is acquired, the following processes may be executed in sequence: (a) data pre-processing, (b) data training, (c) calculation of prediction (prediction using the trained prediction model), (d) evaluation of the prediction results, and (e) output of the prediction results. The output of the prediction results may be output via an application programming interface (API).
[0047] 2.Base Station Selection Method As one form of utilization of the precipitation forecast described in 1 above, a method of selecting a base station will be described. Here, the base station mainly communicates with a satellite (e.g., a geostationary satellite), but may communicate with an air vehicle such as an aircraft, a drone, or a flying car. Also, here, a satellite ground station will be described as an example of a base station, but the base station may be a mobile station installed in a moving object such as a vehicle (e.g., a land vehicle, a rail vehicle, etc.) or a ship.
[0048] As shown in Figure 6, in the field of satellite communications, multiple base stations (satellite ground stations), namely Station A, Station B, Station C, etc., are established to ensure stable communication with satellites.
[0049] From the viewpoint of maintaining and improving communication quality, it is desirable to select a base station that has the best link quality for communication with a communication satellite from among multiple base stations. In particular, in communications using radio waves in the Ka band or higher, link quality is affected by precipitation intensity, so it is important to pinpoint the timing and intensity of precipitation at a specific location where a base station is located.
[0050] Therefore, in this embodiment, precipitation forecast is performed for the location of each base station using the process described in 1 above. Then, based on the obtained precipitation forecast, a base station that should communicate with the satellite after a predetermined time is selected (see FIG. 7).
[0051] Specifically, the obtained precipitation forecasts are compared, and the base station located in a location with better conditions is selected as the base station to communicate with the satellite.
[0052] For example, between a location where precipitation is predicted and a location where precipitation is predicted, the former may be considered to be a location with better conditions. Also, between locations where precipitation is predicted, a location where the predicted precipitation intensity and amount is low and the predicted precipitation start time is later may be considered to be a location with better conditions. Also, between locations where precipitation is not predicted, a location where fewer clouds are expected may be considered to be a location with better conditions.
[0053] Based on the above criteria, the base station is selected from the location with the best conditions, preferably the location with the best conditions. However, differences in conditions that do not affect communication quality may be treated as being the same.
[0054] Therefore, a base station suitable for communication with the satellite can be selected from among a plurality of base stations, and the communication satellite can be operated efficiently.
[0055] 3. Precipitation forecast system and base station selection system A precipitation forecast and base station selection system (hereinafter simply referred to as system 10) for realizing the above items 1 and 2 will be described with reference to FIGS.
[0056] The system 10 is a computer connected to a server 20 via a communication network. As described above, the server 20 is a computer that provides various observation data, and is under the control of, for example, the Japan Meteorological Agency or a weather information provider.
[0057] The computer 100 constituting the system 10 may be one or more computers equipped with various hardware such as a CPU 101, a RAM 103, a ROM 105, a communication interface 107, an input device 109, and an output device 111 (see FIG. 9).
[0058] The CPU 101 is a processor or circuit that functions as an acquisition unit 11, a model generation unit 13, a prediction unit 15, and a selection unit 17, which will be described later, by loading various data and programs from the ROM 105 into the RAM 103 and executing them. The ROM 105 is, for example, a hard disk drive, a solid state drive, or a flash memory that stores various data and programs. The communication interface 107 is an interface for connecting to a communication network (not shown), and is, for example, an adapter for connecting to Ethernet (registered trademark), a modem for connecting to a public telephone line network, a wireless communication device for wireless communication, a USB (Universal Serial Bus) connector or an RS232C connector for serial communication, etc. The input device 109 is, for example, a keyboard, a mouse, a touch panel, a button, a microphone, etc., for inputting data. The output device 111 is, for example, a display, a printer, a speaker, etc., for outputting data. Note that the system 10 may omit the input device 109 and the output device 111, for example.
[0059] As shown in FIG. 8, the system 10 has a software configuration including an acquisition unit 11, a model generation unit 13, a prediction unit 15, a selection unit 17, and a storage unit 19. That is, the acquisition unit 11 receives various data such as observation data (performance data) from an external computer such as a server 20, and stores it in the storage unit 19. The model generation unit 13 generates the prediction models (for example, the first and second prediction models) described in 1(1) and (2) above, and may include a program for model generation. The prediction unit 15 inputs real-time data into the prediction model and obtains a precipitation forecast after a predetermined time. That is, the prediction unit 15 functions as the first to third prediction units. The selection unit 17 selects an appropriate base station based on the precipitation forecast of the prediction unit 15. The storage unit 19 stores the performance data acquired by the acquisition unit 11, the prediction model generated by the model generation unit 13, various programs, the prediction result of the prediction unit 15, the selection result of the selection unit 17, and the like.
[0060] The functional units of the model generating unit 13, the predicting unit 15, and the selecting unit 17 do not need to be configured as a single computer, and each functional unit may be configured as a separate computer. Therefore, a system including the predicting unit 15 is a precipitation prediction system, and a system including the selecting unit 17 is a base station selection system. The base station selection system may include the predicting unit 15.
[0061] Representative embodiments of the present invention have been described above, but the present invention is not limited to these, and various design modifications are possible, which are also included in the present invention.
[0062] For example, to generate a learning model for areal prediction, U-net is used in this embodiment, but convolutional LSTM can also be used. Here, convolutional LSTM is a learning method in which the weight multiplication in LSTM (long short-term memory) is changed to convolution.
[0063] In this embodiment, GCN is used to generate a learning model for network-based prediction, but GNN and LSTM can also be used. [Explanation of symbols]
[0064] 10. System 11 Acquisition Department 13 Model Generation Unit 15 Prediction Department 17 Selection section 19 Memory section 20 Servers 30 satellites
Claims
1. a first prediction unit that uses a first prediction model that has been machine-learned using image data that indicates past precipitation conditions in an area surrounding a predetermined point, and outputs image data that indicates a precipitation forecast for the area after a predetermined time from image data that indicates a current precipitation condition in the area; a second prediction unit that uses a second prediction model trained by machine learning using numerical data indicating past precipitation intensities at a plurality of observation points in the vicinity of the location to output a predicted value of precipitation intensity at the plurality of observation points after the predetermined time from numerical data indicating current precipitation intensities at the plurality of observation points; a third prediction unit that combines a prediction result of the first prediction unit with a prediction result of the second prediction unit and predicts a timing and intensity of precipitation at the location based on the combined result; Including, the third prediction unit corrects the prediction result of the first prediction unit using the prediction result of the second prediction unit, and predicts the timing and intensity of precipitation at the location based on the corrected prediction result of the first prediction unit; A precipitation forecasting system that features:
2. The machine learning for generating the first prediction model learns a precipitation area and a change in the precipitation intensity over time from image data showing past precipitation conditions; The precipitation forecasting system according to claim 1 .
3. The machine learning for generating the second prediction model learns feature values between past precipitation intensities at the plurality of observation points; The precipitation forecasting system according to claim 1 or 2,
4. the third prediction unit predicts the timing and intensity of precipitation at the point from image data corrected for precipitation intensity, the image data being obtained by plotting the amount of precipitation at each observation point obtained by the second prediction unit within a corresponding pixel (a grid point corresponding to the position of the observation point) on the image data obtained by the first prediction, and inputting the plotted image data into a correction model (a prediction model that has learned the relationship between precipitation intensity between grid points); The precipitation forecasting system according to claim 1 or 2,
5. For computers, a first prediction step of outputting image data showing a precipitation forecast for a predetermined time period in an area surrounding a predetermined point from image data showing a current precipitation condition in the area using a first prediction model trained by machine learning using image data showing past precipitation conditions in the area; a second prediction step of outputting a predicted value of the precipitation intensity at the plurality of observation points after the predetermined time from the numerical data indicating the current precipitation intensity at the plurality of observation points using a second prediction model machine-learned using numerical data indicating the past precipitation intensity at the plurality of observation points in the vicinity of the location; a third prediction step of combining a prediction result in the first prediction step with a prediction result in the second prediction unit, and predicting a timing and intensity of precipitation at the location based on the combined result; Run the command, the third prediction step correcting the prediction result of the first prediction step using the prediction result of the second prediction step, and predicting the timing and intensity of precipitation at the location based on the corrected prediction result of the first prediction step; A precipitation forecasting method comprising:
6. For computers, a first prediction step of outputting image data showing a precipitation forecast for a predetermined time period in an area surrounding a predetermined point from image data showing a current precipitation condition in the area using a first prediction model trained by machine learning using image data showing past precipitation conditions in the area; a second prediction step of outputting a predicted value of the precipitation intensity at the plurality of observation points after the predetermined time from the numerical data indicating the current precipitation intensity at the plurality of observation points using a second prediction model machine-learned using numerical data indicating the past precipitation intensity at the plurality of observation points in the vicinity of the location; a third prediction step of combining a prediction result in the first prediction step with a prediction result in the second prediction unit, and predicting a timing and intensity of precipitation at the location based on the combined result; Run the command, the third prediction step corrects the prediction result of the first prediction step using the prediction result of the second prediction step, and predicts the timing and intensity of precipitation at the location based on the corrected prediction result of the first prediction step; Program for.
7. a first prediction unit that uses a first prediction model that is machine-learned using image data that indicates past precipitation conditions in an area surrounding a location of each of a plurality of base stations to output image data that indicates a precipitation forecast for the area after a predetermined time from image data that indicates a current precipitation condition in the area; a second prediction unit that uses a second prediction model that is machine-learned using numerical data indicating past precipitation intensities at a plurality of observation points in the vicinity of a location where the base station is located, to output, for each of the plurality of base stations, a predicted value of precipitation intensity at the plurality of observation points after the predetermined time from numerical data indicating current precipitation intensity at the plurality of observation points; a third prediction unit that combines a prediction result of the first prediction unit with a prediction result of the second prediction unit for each of the plurality of base stations, and predicts a timing and intensity of precipitation at a location where the base station is located based on the combined result; a selection unit that selects, from among the plurality of base stations, a base station that is to communicate with a satellite or an aircraft after the predetermined time based on a prediction result of the third prediction unit; Including, the third prediction unit corrects the prediction result of the first prediction unit using the prediction result of the second prediction unit, and predicts the timing and intensity of precipitation at the location based on the corrected prediction result of the first prediction unit; Base station selection system.
8. For computers, a first prediction step of outputting, for each of a plurality of base stations, image data showing a precipitation forecast for a predetermined time period in an area surrounding a location of the base station from image data showing a current precipitation situation in the area, using a first prediction model trained by machine learning using image data showing past precipitation situations in the area surrounding the location of the base station; a second prediction step of outputting, for each of the plurality of base stations, a predicted value of the precipitation intensity at the plurality of observation points after the predetermined time from the numerical data indicating the current precipitation intensity at the plurality of observation points, using a second prediction model machine-learned using numerical data indicating the past precipitation intensity at the plurality of observation points in the vicinity of a point where the base station is located; a third prediction step of combining a prediction result in the first prediction step with a prediction result in the second prediction step for each of the plurality of base stations, and predicting the timing and intensity of precipitation at a location where the base station is located based on the combined result; a selection step of selecting, from among the plurality of base stations, a base station that is to communicate with a satellite or an aircraft after the predetermined time based on a result of the prediction in the third prediction step; Run the command, the third prediction step corrects the prediction result of the first prediction step using the prediction result of the second prediction step, and predicts the timing and intensity of precipitation at the location based on the corrected prediction result of the first prediction step; Base station selection method.
Citation Information
Patent Citations
Fusion rainfall forecasting method based on multi-model integration
CN113267834A
Weather forecasting device
JP1996106448A
Rainfall prediction method
JP2013130419A
Rainfall prediction system
JP2017003416A
Prediction system, prediction method, and prediction program
JP2019105979A
