Hot water supply equipment
The water heater uses a control unit to stabilize thermal efficiency determinations by setting judgment conditions for fuel flow rate, combustion regions, and feed water temperature, effectively preventing blockage failures and false detections in the heat exchange section.
Patent Information
- Application Number
- JP2020212285
- Authority / Receiving Office
- JP · JP
- Patent Type
- Patents
- Current Assignee / Owner
- Filing Date
- 2020-12-22
- Publication Date
- 2024-10-09
- Estimated Expiration
- 2040-12-22
AI Technical Summary
Existing combustion-type water heaters face challenges in accurately detecting blockage failures and false detections in the heat exchange section due to fluctuations in thermal efficiency caused by factors such as inlet water temperature and combustion amount, especially during the initial stages of heating operations.
The water heater is configured with a control unit that determines the closed state of the heat exchange section based on thermal efficiency under specific judgment conditions, excluding factors that cause fluctuations by ensuring stable combustion and water supply parameters, including fuel flow rate, number of combustion regions, and feed water temperature.
This approach prevents blockage failures and false detections by accurately determining the blockage state of the heat exchange section, reducing the risk of sudden heater inoperability and minimizing erroneous communications to maintenance services.
Smart Images

Figure 0007564440000001 
Figure 0007564440000002 
Figure 0007564440000003
Abstract
Description
[Technical field]
[0001] The present invention relates to a combustion-type hot water heater, and in particular to a hot water heater configured to detect signs of a malfunction in heat exchange of a fin-and-tube heat exchanger that uses combustion heat to heat hot water before the malfunction occurs. [Background technology]
[0002] Conventionally, there are known techniques for detecting early symptoms (signs) of a malfunction by comparing the calculated energy efficiency with a reference value, such as the water heater in Patent Document 1. Before the malfunction symptoms worsen, countermeasures such as replacing parts or replacing the water heater can be taken, thereby avoiding the inconvenient situation of being unable to use the water heater. [Prior art documents] [Patent documents]
[0003] [Patent Document 1] JP 2019-163871 A Summary of the Invention [Problem to be solved by the invention]
[0004] In combustion-type hot water heaters, as in Patent Document 1, it has been considered to detect blockage failures and signs of blockage in the heat exchanger that uses combustion heat to heat hot water by comparing the thermal efficiency of the heating operation that uses combustion heat to heat hot water with a reference value. Since the thermal efficiency corresponds to the blockage state of the heat exchanger (reduction in heat exchange capacity due to the adhesion of soot, oxidation products, and scale), it becomes possible to detect blockage failures and signs of blockage in the heat exchanger.
[0005] Thermal efficiency is the ratio of the amount of heat used to heat the water to the amount of heat input, so it can be calculated during heating operation. However, thermal efficiency varies depending on the inlet water temperature and the amount of combustion, as well as the blockage state of the heat exchanger. Also, immediately after starting heating operation, the amount of combustion fluctuates to adjust the outlet water temperature, making it unstable. Therefore, there is a risk of false detection of a blockage failure or a sign of blockage in the heat exchanger.
[0006] An object of the present invention is to provide a water heating apparatus capable of preventing erroneous detection of a blockage failure or a sign of blockage in a heat exchanger. [Means for solving the problem]
[0007] The hot water heater of the invention of claim 1 comprises a combustion section divided into a plurality of combustion regions so that the region in which combustion is performed can be changed according to a required combustion amount, a fuel supply section which adjusts the supply flow rate of fuel to the combustion section according to the required combustion amount, a combustion fan which supplies combustion air to the combustion section, a heat exchange section having a fin-and-tube type heat exchanger, a water supply section which supplies hot water to the heat exchange section, a hot water outlet section which outputs hot water from the heat exchange section, a water supply temperature detection means which detects the water supply temperature of the water supply section, an outlet water temperature detection means which detects the outlet water temperature of the hot water outlet section, and a control section which controls a heating operation which uses the combustion heat of the combustion section to output hot water heated in the heat exchange section, wherein the control section detects a predetermined judgment condition a determination condition including that the temperature detected by the supply water temperature detection means is equal to or lower than a reference temperature; The heating operation is characterized by having a blockage state determination function for determining a blockage state of the heat exchange section based on the thermal efficiency of the heating operation under the above-mentioned condition.
[0008] According to the above configuration, during heating operation under a predetermined judgment condition, the blocked state of the heat exchanger is judged based on the thermal efficiency of the heating operation. Therefore, by limiting the execution of the blocked state judgment function to the heating operation that satisfies the judgment condition, it is possible to eliminate factors that cause fluctuations in the thermal efficiency. Therefore, since the blocked state of the heat exchanger can be judged based on the thermal efficiency calculated under certain judgment conditions, it is possible to prevent erroneous detection of a blocked failure or a sign of a blocked heat exchanger caused by factors that cause fluctuations in the thermal efficiency.
[0009] In addition, the judgment conditions are as follows: The temperature detected by the supply water temperature detection means is equal to or lower than the reference temperature. So, It is possible to exclude cases where the feedwater temperature before heating is higher than the judgment reference temperature. Generally, the higher the feedwater temperature, the smaller the required combustion amount and the lower the heat exchange capacity of the heat exchange section, but since it is possible to exclude the factor of variation in thermal efficiency due to this feedwater temperature, it is possible to prevent erroneous detection of blockage failures and signs of blockage caused by the factor of variation in thermal efficiency.
[0010] Claim 2 The hot water supply device of the invention is 1 In the invention, the judgment conditions include that combustion is performed in the combustion region equal to or greater than the judgment reference number, and that the fluctuation range of the fuel supply flow rate by the fuel supply unit is within the judgment reference range. According to the above configuration, it is possible to exclude cases where the combustion amount is small, that is, the number of combustion regions to be burned is less than the judgment reference number, and cases where the combustion amount varies greatly depending on the fluctuation of the fuel supply flow rate. When the combustion amount is small, the heat exchange capacity of the heat exchange section decreases, and the thermal efficiency varies depending on the fluctuation of the combustion amount. Therefore, by excluding these factors of fluctuation of the thermal efficiency, it is possible to prevent erroneous detection of a blockage failure or a blockage sign caused by the factors of fluctuation of the thermal efficiency.
[0011] Claim 3 The hot water supply device of the invention is 1 or 2 In the invention, an instant hot water circulation unit is equipped for returning the hot water that has been dispensed to the water supply section and circulating it, and the control section is characterized in that it executes the blockage state determination function during the heating operation for heating the hot water to be circulated. According to the above configuration, the blockage state determination function is also executed during the heating operation of hot water circulated by the instant hot water circulation unit. During this heating operation, the blockage state of the heat exchanger can be determined based on the thermal efficiency calculated under certain determination conditions, so that it is possible to prevent erroneous detection of blockage failures and signs of blockage in the heat exchanger caused by factors that cause fluctuations in thermal efficiency. In particular, when an instant hot water circulation unit is installed and heating operations in which the amount of combustion is low due to a high feed water temperature are performed very frequently, it is possible to effectively prevent erroneous detection of blockage signs and signs of blockage in the heat exchanger. Effect of the Invention
[0012] According to the water heater of the present invention, it is possible to prevent clogging failures and erroneous detection of signs of clogging caused by factors that cause fluctuations in thermal efficiency. [Brief description of the drawings]
[0013] [Figure 1] FIG. 1 is an explanatory diagram of a combustion type hot water supply device according to a first embodiment of the present invention. [Diagram 2] 2 is an explanatory diagram of a configuration and communication paths of a control unit of the water heating apparatus; FIG. [Diagram 3] FIG. 4 is a process explanatory diagram of the heating operation of the water heater. [Figure 4] 4 is a flowchart of a heat exchange unit failure sign detection control according to an embodiment. [Diagram 5] FIG. 11 is an explanatory diagram of a combustion-type hot water supply device equipped with a hot water instant circulation unit according to a second embodiment of the present invention. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0014] Hereinafter, the mode for carrying out the present invention will be described based on examples. EXAMPLES
[0015] Combustion type hot water heater 1 is usually installed outdoors. As shown in Fig. 1, hot water heater 1 has a combustion section 2, a heat exchange section 3, a water supply section 4, and a hot water outlet section 5, and is configured to perform a heating operation in which hot water supplied from the water supply section 4 is heated in heat exchange section 3 using the combustion heat generated in combustion section 2 and then discharged to the hot water outlet section 5. A fuel supply section 6 for supplying fuel gas (natural gas or propane gas) is connected to combustion section 2.
[0016] A combustion fan 8 is provided near the combustion section 2 to supply combustion air to the combustion section 2 and to send the combustion gas, which is a medium for the combustion heat generated by combustion, to the heat exchange section 3 and exhaust it to the outside from the exhaust port 7. The combustion section 2 is divided into a plurality of combustion regions, for example, first to fourth combustion regions 2a to 2d, in which the fuel gas supplied from the fuel supply section 6 is mixed with the combustion air and combusted, and the region in which combustion is performed is changed according to the required combustion amount to generate the required amount of heat.
[0017] The fuel supply unit 6 has first to fourth gas electromagnetic valves 6a to 6d corresponding to the first to fourth combustion regions 2a to 2d, and a fuel flow rate adjustment valve 6e that adjusts the flow rate of fuel supplied to the combustion unit 2. The fuel supply unit 6 adjusts the fuel flow rate and is configured to be able to individually switch between supplying and stopping the fuel gas to these first to fourth combustion regions 2a to 2d.
[0018] The heat exchange section 3 has a first fin-and-tube heat exchanger 3a and a second heat exchanger 3b consisting of multiple hot and cold water passages. The first heat exchanger 3a recovers the sensible heat of the high-temperature combustion gas immediately after combustion to heat hot and cold water. The second heat exchanger 3b recovers the latent heat of the combustion gas (combustion exhaust) whose temperature has been reduced by recovering the sensible heat to heat the clean water.
[0019] In the second heat exchanger 3b, the moisture contained in the combustion gas condenses to produce condensed water. This condensed water contains components of the combustion gas and is highly acidic. Therefore, it is inappropriate to drain it as is, so it is introduced into a neutralization tank 9a that contains, for example, calcium carbonate granules as a neutralizing agent, and is neutralized before being drained. The combustion gas whose temperature has been reduced by recovering latent heat in the second heat exchanger 3b is exhausted to the outside from an exhaust port 7.
[0020] An introduction passage 9b that introduces condensed water that has fallen into a drain pan 3c disposed below the second heat exchanger 3b to the neutralization tank 9a, and a drain passage 9c that drains the neutralized condensed water to the outside of the hot water supply device 1 are connected to the neutralization tank 9a to form a neutralization section 9. A pair of electrodes 9d is provided at the upper end of the neutralization tank 9a as a water level detection means for detecting the water level of the condensed water (predetermined water level). A voltage is applied between the pair of electrodes 9d, and when the water level reaches the predetermined level, a current flows between the pair of electrodes 9d through the condensed water, thereby detecting the predetermined water level.
[0021] The water supply section 4 has a water supply passage 4a that supplies clean water supplied from a clean water source to the second heat exchanger 3b, and a water supply branch passage 4b that branches off from the water supply passage 4a and is equipped with a flow rate adjustment valve 10. The hot water heated in the second heat exchanger 3b is introduced into the first heat exchanger 3a and is further heated to a high temperature. The hot water heated in the first heat exchanger 3a is supplied to the hot water outlet passage 5a. In the hot water outlet section 5 formed by connecting the hot water outlet passage 5a to the water supply branch passage 4b, the heated hot water and clean water are mixed and the temperature is adjusted, and the hot water is supplied to a hot water supply destination of the hot water supply passage 11, for example, a hot water tap 11a.
[0022] The first combustion region 2a of the combustion section 2 is the region that is ignited and burned first when the heating operation is started. An ignition device 14 that generates sparks by discharge and a first flame rod 15a that detects the flame of the first combustion region 2a to confirm ignition are disposed at a position corresponding to the first combustion region 2a.
[0023] The second combustion area 2b adjacent to the first combustion area 2a is a flame-transfer area that first expands the combustion area from the first combustion area 2a in order to increase the amount of combustion and increase the generation of combustion heat. A second flame rod 15b for detecting the flame in the second combustion area 2b is disposed at a position corresponding to this second combustion area 2b. The amount of combustion can be increased by expanding the combustion area to the third and fourth combustion areas 2c and 2d. Note that flame rods corresponding to the third and fourth combustion areas 2c and 2d may be disposed in order to detect the flames in the third and fourth combustion areas 2c and 2d.
[0024] A feed water flow rate sensor 4c that detects the feed water flow rate of clean water supplied to the heat exchange section 3, and a feed water temperature sensor 4d (feed water temperature detection means) that detects the feed water temperature are disposed in the feed water passage 4a. A discharge water temperature sensor 5b (discharge water temperature detection means) that detects the discharge temperature of hot water heated in the heat exchange section 3 is disposed in the hot water outlet passage 5a. A supply water temperature sensor 5c that detects the supply temperature of hot water that has been mixed with clean water and has had its temperature adjusted is disposed downstream of the connection of the supply water passage 5a with the branched water supply passage 4b.
[0025] The hot water supply device 1 includes a control unit 16 that controls a heating operation to supply hot water at a set hot water supply temperature based on the water supply flow rate, the water supply temperature, and the hot water outlet temperature. The set hot water supply temperature is set by operating an operation terminal 17 connected to the control unit 16. In the heating operation, the control unit 16 calculates the required combustion amount (required heat amount) based on, for example, the set hot water supply temperature, the water supply flow rate, and the water supply temperature. Then, in order to generate the required heat amount, the control unit 16 sets the combustion area to be burned by the combustion unit 2, the target rotation speed of the combustion fan 8, and the fuel flow rate of the fuel supply unit 6. The control unit 16 also adjusts the opening of the flow rate adjustment valve 10 so that the hot water supply temperature approaches the set hot water supply temperature, and adjusts the mixing ratio of the clean water and the heated hot water.
[0026] 2, control unit 16 has calculation unit 16a that executes various control programs, storage unit 16b that stores various control programs, control parameters, etc., and communication unit 16c. Calculation unit 16a controls flow rate control valve 10, valves of fuel supply unit 6, and combustion fan 8 via communication unit 16c that communicates with built-in devices of water heating apparatus 1 and operation terminal 17, and receives detection signals from sensors such as water supply temperature sensor 4d and operation details of operation terminal 17.
[0027] Operation terminal 17 is connected to an external communication network 19 (Internet) via a communication gateway 18 equipped with, for example, a home network construction function. A management server 20 installed by a service shop that installs and maintains water heating apparatus 1 or a manufacturer is connected to this communication network 19 in order to manage information relating to currently installed water heating apparatuses including water heating apparatus 1 and other devices. This enables control unit 16 to communicate with management server 20. Note that communication unit 16c or operation terminal 17 may be directly connected to communication network 19.
[0028] When the water supply flow rate detected by the water supply flow rate sensor 4c becomes equal to or exceeds a predetermined minimum flow rate due to the start of hot water supply use, heating operation is started. As shown in Fig. 3, the heating operation is divided into a pre-purge process, an ignition process, a combustion process, and a post-purge process. In the pre-purge process, the target rotation speed of the combustion fan 8 is set to the scavenging rotation speed (e.g., 3000 rpm), and the combustion fan 8 is driven at the scavenging rotation speed for a predetermined pre-purge time (e.g., 5 seconds). As a result, air remaining in the combustion section 2 and the heat exchange section 3 is exhausted from the exhaust port 7, and the rotation speed of the combustion fan 8, which was stopped, is increased to about the scavenging rotation speed.
[0029] Next, the process moves to the ignition process, in which the first gas solenoid valve 12a corresponding to the first combustion region 2a (ignition region) is opened, the target rotation speed is set to the ignition rotation speed (e.g., 2500 rpm), and the combustion fan 8 is driven at the ignition rotation speed. Then, the ignition device 14 is driven to ignite the first combustion region 2a. When the flame in the first combustion region 2a is detected (ignition is confirmed) by the first flame rod 15a, the process moves to the combustion process.
[0030] Next, in the combustion process, the combustion region of the combustion unit 2, the target rotation speed of the combustion fan 8, and the fuel flow rate of the fuel supply unit 6 are set so that the calculated required heat amount can be supplied. Then, the combustion fan 8 is driven at the target rotation speed, and the fuel gas solenoid valve corresponding to the combustion region is opened to supply fuel at the set fuel flow rate, generating the required heat amount and supplying hot water at the set hot water supply temperature.
[0031] When the water supply flow rate falls below a predetermined minimum flow rate due to the end of hot water supply use, the system transitions to the post-purge process. In the post-purge process, all open gas solenoid valves are closed to stop combustion in the combustion section 2, the target rotation speed is set to the scavenging rotation speed, and the combustion fan 8 is driven at the scavenging rotation speed for the post-purge time (e.g., 10 seconds). This exhausts the combustion gas so that it does not remain in the combustion section 2 and the heat exchange section 3. Finally, the combustion fan 8 is stopped, and the heating operation ends.
[0032] When installing water heating apparatus 1, a trial run is performed to confirm that water heating apparatus 1 operates normally. Control unit 16 stores heating operation data from the trial run in storage unit 16b or a storage area of management server 20 as initial data at the time of installation.
[0033] During heating operation, soot and oxidation products, for example, gradually adhere to the outside (combustion gas passage) of the heat exchange section 3, particularly the first heat exchanger 3a, and minerals contained in the hot water gradually adhere to the inside (hot water passage). This inhibits heat exchange between the combustion gas and the hot water, gradually reducing the thermal efficiency of the heating operation.
[0034] For example, when the thermal efficiency falls to a preset blockage failure standard thermal efficiency (e.g., 50%), it is determined that a blockage failure has occurred in the heat exchange unit 3, combustion is prohibited, and this fact is notified to the user and, for example, a service shop via the management server 20. The user or service shop that has learned of the occurrence of this failure will arrange for inspection and repair.
[0035] For the user of water heating apparatus 1, the prohibition of combustion suddenly makes it impossible to use water heating apparatus 1, which is undesirable. Therefore, when control unit 16 detects a sign of a blockage failure in heat exchange unit 3 before determining that a blockage failure has occurred in heat exchange unit 3, it notifies a service shop via management server 20 that there is a sign of a blockage failure in heat exchange unit 3, and prompts the service shop to inspect the unit. The detection of a sign of a blockage failure in heat exchange unit 3 is determined based on the thermal efficiency of the heating operation under certain preset determination conditions.
[0036] To detect a clogging failure or a sign of clogging in the heat exchanger 3, it is required to calculate an accurate thermal efficiency that reflects the state of the heat exchanger 3 so as to prevent erroneous detection. Therefore, the judgment conditions include that the fluctuation width of the fuel flow rate is within a judgment reference range, that the number of combustion regions in combustion in the combustion section 2 is equal to or greater than the judgment reference number, and that the feedwater temperature before heating is equal to or less than the judgment reference temperature. The clogging state judgment function that detects a clogging failure or a sign of clogging in the heat exchanger 3 will be explained based on the flowchart of the heat exchanger clogging failure sign detection control by the control section 16 in FIG. 4. Si (i=1, 2, . . .) in the figure represents a step.
[0037] When the heating operation starts, the air that has been stagnating in the pre-purge process is exhausted and fresh air is introduced, and in the next ignition process, the combustion section 2 is ignited by the ignition device 14, after which the combustion process is started and heat exchange section blockage failure prediction control is started.
[0038] In S1, the process waits until a predetermined time has elapsed from the start of the combustion process while acquiring data on various flow rates and temperatures, and then proceeds to S2. Since the amount of combustion fluctuates to adjust the outlet hot water temperature immediately after the start of heating operation, this is a step to wait until the amount of combustion stabilizes. The predetermined time is set in advance based on experiments, for example, 20 seconds. The acquired data includes, for example, the water supply flow rate, fuel flow rate, water supply temperature, and hot water supply temperature, and is stored in memory unit 16b.
[0039] Next, in S2, data for calculating the thermal efficiency within the thermal efficiency calculation period is acquired, and the process proceeds to S3. The data acquired at this time are the feed water flow rate, fuel flow rate, feed water temperature, outlet hot water temperature, fluctuation range of the fuel flow rate, and the number of combustion regions during combustion, for example, for the last 5 seconds of the predetermined time in S1 as the thermal efficiency calculation period.
[0040] In S3, it is determined whether the fluctuation range of the fuel flow rate is within the judgment reference range. Since a stable combustion amount is necessary for accurate calculation of thermal efficiency, this is the step to determine whether the fuel flow rate is stable. If the judgment in S3 is No, the heating operation does not satisfy the judgment conditions, so the process returns to S1. If the judgment in S3 is Yes, the process proceeds to S4.
[0041] In S4, it is determined whether the number of combustion regions in the combustion unit 2 is equal to or greater than the judgment reference number. The number of combustion regions in operation is smaller as the combustion amount is smaller, and when the number of combustion regions in operation is small, the thermal efficiency tends to decrease. Therefore, this is a step for excluding cases where the number of combustion regions in operation is small (for example, 2 or less). If the judgment in S4 is No, the heating operation does not satisfy the judgment condition, so the process returns to S1. If the judgment in S4 is Yes, the process proceeds to S5.
[0042] In S5, it is determined whether the temperature (feedwater temperature) detected by the feedwater temperature sensor 4d is equal to or lower than the reference temperature. As the higher the feedwater temperature, the smaller the temperature to be raised (the temperature difference before and after heating) and the lower the thermal efficiency, this step is for excluding cases where the feedwater temperature is higher than the reference temperature (e.g., 25°C). If the determination in S5 is No, the heating operation does not satisfy the determination conditions, and the feedwater temperature is unlikely to fluctuate during this heating operation. Therefore, this heat exchange unit blockage failure sign detection control is terminated without determining whether a blockage failure or a blockage sign has been detected in the heat exchange unit 3. If the determination in S5 is Yes, proceed to S6.
[0043] In S6, the thermal efficiency is calculated based on the hot water outlet temperature, the water supply temperature, the water supply flow rate, and the fuel flow rate, and the process proceeds to S7. The thermal efficiency is calculated as the ratio of the amount of heat used for heating, calculated by multiplying the difference in temperature (the increased temperature) between the hot water outlet temperature and the water supply temperature by the water supply flow rate, to the amount of heat input, calculated based on the fuel flow rate. For example, in a water heater 1 having first and second heat exchangers 3a and 3b as the heat exchange section 3, the thermal efficiency of the water heater 1 at the beginning of installation is about 95%.
[0044] In S7, it is determined whether the thermal efficiency calculated in S6 is less than the clogging failure reference thermal efficiency. The clogging failure reference thermal efficiency is set to a higher thermal efficiency (e.g., 60%) than the clogging failure reference thermal efficiency that results in a clogging failure of the heat exchange unit 3, so that countermeasures can be taken before a clogging failure of the heat exchange unit 3 occurs. If the determination in S7 is No, it is determined that a clogging failure has not been detected, and the heat exchange unit clogging failure detection control is terminated while continuing the heating operation. If the determination in S7 is Yes, the process proceeds to S8.
[0045] In S8, it is determined whether the thermal efficiency calculated in S6 is less than the reference thermal efficiency for a clog failure. If the determination in S8 is Yes, the process proceeds to S9, where a notification is issued in S9 that a clog failure in the heat exchange unit 3 has been detected, the heating operation is terminated, and the heat exchange unit clog failure prediction control is terminated. On the other hand, if the determination in S8 is No, the process proceeds to S10, where a notification is issued in S10 that a clog failure in the heat exchange unit 3 has been detected, and the heat exchange unit clog failure prediction control is terminated while the heating operation is continued.
[0046] The detection of a blockage failure and a blockage sign detection is notified, for example, to a service shop via the management server 20, to prompt the customer to take action such as inspection or repair. If the heating operation ends before the heat exchange unit blockage failure sign detection control ends, the heat exchange unit blockage failure sign detection control ends at that point in time. EXAMPLES
[0047] A description will be given of a water heater 1 which is a partial modification of the above-mentioned embodiment 1. The same parts as those in embodiment 1 are given the same reference numerals as those in embodiment 1, and the description will be omitted. As shown in Fig. 5, the hot water supply device 1 is equipped with an instant hot water circulation unit 21 so that heated hot water is supplied as soon as the hot water tap 11a is opened. The instant hot water circulation unit 21 has a circulation pump 22, a check valve 23, an air separator 24, and an expansion tank 25. The circulation pump 22 circulates the hot water by supplying (returning) the hot water in the hot water supply passage 11 connected to the hot water outlet passage 5a to the water supply passage 4a of the water supply section 4. The air separator 24 separates air mixed in the circulating hot water. The expansion tank 25 absorbs the thermal expansion of the circulating hot water.
[0048] For example, when hot water is not being supplied, the control unit 16 drives the circulation pump 22 to circulate hot water between the hot water supply device 1 and the instant hot water circulation unit 21, and when the water supply flow rate reaches or exceeds a predetermined minimum flow rate, the heating operation is started. This circulating hot water is heated in the heat exchange unit 3 by utilizing the combustion heat of the combustion unit 2 during the heating operation and is supplied to the hot water supply passage 11, and the hot water in the hot water supply passage 11 is maintained at a constant temperature.
[0049] In the heating operation for heating the circulating hot water, the blockage state determination function is executed in the same way as in the case of supplying hot water in Example 1. For example, when there is no opportunity to supply hot water because the user is away for an extended period of time, such as on a trip, the operation of instant hot water circulation unit 21 is turned OFF, and when the operation of instant hot water circulation unit 21 is turned ON after returning home, the hot water is circulated and heating operation is performed. In this case, since the temperature of the hot water at the start of circulation is not high, it is possible to detect signs of blockage and blockage failures in heat exchanger 3 based on the thermal efficiency of the heating operation, in the same way as in the case of supplying hot water from hot water tap 11a.
[0050] On the other hand, when hot water instant circulation unit 21 circulates hot water continuously or intermittently and water heater 1 is performing heating operation, the temperature of the hot water (supply water temperature) in water supply passage 4a is high, so the amount of combustion decreases and the thermal efficiency drops. Since this thermal efficiency does not accurately reflect the actual blocked state of heat exchange section 3, there is a risk of falsely detecting a sign of blockage or a blockage failure of heat exchange section 3.
[0051] However, since the detection of the signs of blockage and blockage failure is based on the thermal efficiency of the heating operation when the judgment criteria are met for the fuel flow rate fluctuation range S3, the number of combustion regions during combustion S4, and the feed water temperature S5 as preset certain judgment conditions, false detection can be avoided. In particular, when the instant hot water circulation unit 21 is installed and heating operation in which the amount of combustion is small because the feed water temperature is high is performed very frequently, false detection of the signs of blockage and blockage failure of the heat exchanger 3 based on the thermal efficiency can be effectively prevented.
[0052] The operation and effect of the hot water supply device 1 will be described. The control unit 16 of the water heating device 1 judges the blocked state of the heat exchange unit 3 based on the thermal efficiency of the heating operation during heating operation under predetermined judgment conditions. Therefore, by limiting the execution of the blocked state judgment function to the heating operation during which the judgment conditions are satisfied, it is possible to eliminate factors that cause fluctuations in the thermal efficiency. Therefore, since it is possible to judge the blocked state of the heat exchange unit 3 based on the thermal efficiency calculated under certain judgment conditions, it is possible to prevent erroneous detection of a blocked failure or a sign of a blocked state of the heat exchange unit 3 caused by factors that cause fluctuations in the thermal efficiency.
[0053] Generally, the higher the feedwater temperature, the smaller the required combustion amount and the lower the heat exchange capacity of the heat exchange section 3. By excluding cases in which the feedwater temperature before heating is higher than the reference temperature, it is possible to exclude fluctuation factors of thermal efficiency due to feedwater temperature, thereby preventing erroneous detection of clogging failures and signs of clogging due to fluctuation factors of thermal efficiency.
[0054] Generally, when the amount of combustion is small, the heat exchange capacity of the heat exchange section 3 decreases, and the thermal efficiency varies according to the variation in the amount of combustion. By excluding the cases where the amount of combustion is small, that is, the number of combustion regions to be burned is less than the judgment reference number, and the cases where the amount of combustion varies greatly according to the variation in the fuel supply flow rate, it is possible to exclude the factors that cause the variation in thermal efficiency, and therefore it is possible to prevent erroneous detection of a blockage failure or a sign of blockage caused by the factors that cause the variation in thermal efficiency.
[0055] The control unit 16 also executes the blockage state determination function during heating operation of hot water circulated by the instant hot water circulation unit 21. During this heating operation, the blockage state of the heat exchange unit 3 can be determined based on the thermal efficiency calculated under certain determination conditions, so that it is possible to prevent erroneous detection of blockage failures and signs of blockage in the heat exchange unit 3 caused by factors that cause fluctuations in the thermal efficiency. In particular, when the instant hot water circulation unit 21 is installed and heating operation in which the amount of combustion is low due to a high feed water temperature is performed very frequently, it is possible to effectively prevent erroneous detection of blockage signs and signs of blockage failure in the heat exchange unit 3. Furthermore, it is possible to reduce communication volume by preventing the transmission of erroneous detection information of signs of failure to the management server 20.
[0056] The reference thermal efficiency for a blockage failure may be set to a predetermined percentage of the initial data during trial operation (for example, 50% of the initial data), and the reference thermal efficiency for a sign of blockage may be set to a predetermined percentage of the initial data during trial operation (for example, 60% of the initial data), so that a blockage failure or a sign of blockage in the heat exchange section 3 may be detected based on the initial data. In addition, a person skilled in the art may implement the present invention in a form in which various modifications are added to the above embodiment without departing from the spirit of the present invention, and the present invention includes such modifications. [Explanation of symbols]
[0057] 1: Hot water supply equipment 2: Combustion section 2a: 1st combustion area (ignition area) 2b: Secondary combustion zone (fire spread zone) 2c: Third combustion zone 2d: 4th combustion zone 3:Heat exchange part 3a: 1st heat exchanger 3b:Second heat exchanger 3c: Drain pan 4: Water supply section 4a: Water supply passage 4b: Water supply branch passage 4c: Water supply flow sensor 4d: Water supply temperature sensor (water supply temperature detection means) 5: Tap area 5a: Hot water passage 5b: Outlet water temperature sensor (outlet water temperature detection means) 5c: Hot water temperature sensor 6:Fuel supply section 6a to 6d: 1st to 4th gas solenoid valves 6e: Fuel flow control valve 7: Exhaust port 8: Combustion fan 9: Neutralization section 9a: Neutralization tank 9b: Entry passage 9c: Drain passage 10: Flow control valve 11: Hot water passage 11a: Hot water tap 14:Ignition device 15a: First frame rod 15b: 2nd frame rod 16: Control section 16a: Arithmetic section 16b: Storage section 16c: Communications Department 17: Operation terminal 18: Communication Gateway 19: Communication network 20: Management server 21: Instant hot water circulation unit 22: Circulation pump 23: Check valve 24: Air separator 25: Expansion tank
Claims
1. A hot water supply device comprising: a combustion section divided into a plurality of combustion regions so that the region in which combustion is performed can be changed according to the required combustion amount; a fuel supply section which adjusts the supply flow rate of fuel to the combustion section according to the required combustion amount; a combustion fan which supplies combustion air to the combustion section; a heat exchange section having a fin-and-tube type heat exchanger; a water supply section which supplies hot water to the heat exchange section; a hot water outlet section which outputs hot water from the heat exchange section; a water supply temperature detection means which detects the water supply temperature of the water supply section; a hot water outlet temperature detection means which detects the hot water outlet temperature of the hot water outlet section; and a control section which controls a heating operation which uses the combustion heat of the combustion section to output hot water heated in the heat exchange section, The control unit is characterized in that it has a blockage state determination function that determines the blockage state of the heat exchange unit based on the thermal efficiency of the heating operation under predetermined determination conditions including that the detection temperature of the water supply temperature detection means is below a determination reference temperature.
2. The water heating apparatus described in Claim 1, characterized in that the judgment conditions include burning in the combustion area equal to or greater than the judgment criterion number, and the fluctuation range of the fuel supply flow rate by the fuel supply unit being within the judgment criterion range.
3. A water heating device as described in claim 1 or 2, characterized in that it is equipped with an instant hot water circulation unit for returning the hot water dispensed to the water supply section and circulating it, and the control section executes the blockage state determination function during the heating operation for heating the hot water to be circulated.
Citation Information
Patent Citations
JP1989172663U
Soot blower safety device for burner appliance
JP1993196229A
Gas water heater with combustion abnormality-detecting function
JP1996233255A
Hot water supply
JP1998160252A
Combustion device
JP2004044912A