Command creation device and command creation method
The command creation device addresses the challenge of creating accurate food plating work plans by integrating dish, worker, and robot information to generate efficient plating operations, enhancing user experience and precision.
Patent Information
- Application Number
- JP2024520185
- Authority / Receiving Office
- JP · JP
- Patent Type
- Patents
- Current Assignee / Owner
- Filing Date
- 2022-05-12
- Publication Date
- 2024-10-11
- Estimated Expiration
- 2042-05-12
AI Technical Summary
Existing systems fail to create accurate work plans for food plating work that consider the nature of the dish, the worker, and the robot, making it difficult for inexperienced users to create effective plans.
A command creation device that acquires and processes information about dish properties, worker capabilities, and robot configurations to generate a work plan for multiple lines, ensuring efficient plating operations.
Enables inexperienced users to easily create accurate work plans for food plating, improving efficiency and precision by considering dish characteristics and worker/robot capabilities.
Smart Images

Figure 0007566210000001 
Figure 0007566210000002 
Figure 0007566210000003
Abstract
Description
[Technical field]
[0001] The present disclosure relates to a command creating device and a command creating method. [Background technology]
[0002] In recent years, devices have been proposed that present cooking tasks based on information about workers, environments, robots, or delivery dates (for example, Patent Documents 1 and 2). [Prior art documents] [Patent documents]
[0003] [Patent Document 1] International Publication No. 2020 / 075368 [Patent Document 2] Patent Publication No. 2021-131605 Summary of the Invention [Problem to be solved by the invention]
[0004] Since the tendency of food to crumble varies depending on the nature of the food, it is preferable that the work speed of the food plating work varies depending on the nature of the food. In addition, it is preferable that the work speed of the food plating work varies depending on the worker and the robot. However, in the conventional technology, the work plan for the food plating work is not created taking such points into consideration, and therefore there is a problem that the accuracy of the work plan is low. In addition, there is a problem that creating a work plan taking such points into consideration is difficult for people who are not accustomed to creating work plans.
[0005] Therefore, the present disclosure has been made in consideration of the above-mentioned problems, and aims to provide a technology that enables even people who are not accustomed to creating work plans to easily create work plans. [Means for solving the problem]
[0006] A command creation device according to the present disclosure includes: 1. A command creation device that creates a work plan for a plurality of lines to perform plating work for a plurality of dishes and issues commands to the plurality of lines, To container The above Multiple cuisines The above Plan information including a planned time for the serving operation and a time when the serving operation is possible The above an acquisition unit that acquires line configuration information including configurations of a plurality of lines, menu information including properties of the plurality of dishes, and operation performance information including operation speeds of the plurality of lines for each of the properties of the plurality of dishes; memorandum and a control unit that creates a work plan and generates commands for the multiple lines based on the work plan. Effect of the Invention
[0007] According to the present disclosure, a work plan for multiple lines to plate multiple dishes is created based on plan information, line configuration information, menu information, and work performance information, and commands to the multiple lines are created based on the work plan. With this configuration, even people who are not familiar with creating work plans can easily create a work plan.
[0008] The objects, features, aspects and advantages of the present disclosure will become more apparent from the following detailed description and the accompanying drawings. [Brief description of the drawings]
[0009] [Figure 1] 1 is a block diagram showing a configuration of a command creating device according to a first embodiment. [Diagram 2] FIG. 4 is a diagram showing serving operation information according to the first embodiment. [Diagram 3] FIG. 4 is a diagram showing plan information according to the first embodiment. [Figure 4] FIG. 4 is a diagram showing line configuration information according to the first embodiment. [Diagram 5] FIG. 2 is a diagram showing menu information according to the first embodiment. [Figure 6] FIG. 4 is a diagram showing operation performance information according to the first embodiment. [Figure 7] FIG. 4 is a diagram showing operation performance information according to the first embodiment. [Figure 8] FIG. 2 is a diagram showing a work plan according to the first embodiment. [Figure 9] 4 is a flowchart showing an operation of the command creating device according to the first embodiment. [Figure 10] 4 is a flowchart showing an operation of the command creating device according to the first embodiment. [Figure 11] FIG. 11 is a block diagram showing a configuration of a command creating device according to a second embodiment. [Figure 12] FIG. 11 is a diagram showing menu information according to the second embodiment. [Figure 13] 10 is a flowchart showing the operation of the command creating device according to the second embodiment. [Figure 14] FIG. 11 is a block diagram showing a configuration of a command creating device according to a third embodiment. [Figure 15] FIG. 13 is a diagram showing serving operation information according to the third embodiment. [Figure 16] FIG. 11 is a diagram showing menu information according to embodiment 3. [Figure 17] 11 is a flowchart showing the operation of the command creating device according to the third embodiment. [Figure 18] FIG. 11 is a block diagram showing a configuration of a command creating device according to a fourth embodiment. [Figure 19] 13 is a flowchart showing the operation of the command creating device according to the fourth embodiment. [Figure 20] FIG. 13 is a block diagram showing a configuration of a command creating device according to a fifth embodiment. [Figure 21] FIG. 13 is a diagram showing monitoring information according to the fifth embodiment. [Figure 22] 13 is a flowchart showing the operation of the command creating device according to the fifth embodiment. [Figure 23] FIG. 13 is a block diagram showing a hardware configuration of a command creating device according to another modified example. [Figure 24] FIG. 13 is a block diagram showing a hardware configuration of a command creating device according to another modified example. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0010] <Embodiment 1> Fig. 1 is a block diagram showing the configuration of a command creation device according to the present embodiment 1. The command creation device in Fig. 1 includes a plating work input unit 1, a plan input unit 2, a line configuration input unit 3, a menu storage unit 4, a menu input unit 5, a task performance storage unit 6, a task performance input unit 7, a process plan unit 8, a control command creation unit 9, and a notification device 10.
[0011] For example, input devices, various interfaces, communication devices, etc. are used for the plating work input unit 1, plan input unit 2, line configuration input unit 3, menu input unit 5, and work performance input unit 7. The plating work input unit 1, plan input unit 2, line configuration input unit 3, menu input unit 5, and work performance input unit 7 are included in the concept of an acquisition unit that acquires various information from a storage device, a server, a cloud, etc.
[0012] The process planning unit 8 uses, for example, a processing circuit, which will be described later, and the control command creation unit 9 uses, for example, various interfaces and a communication device. The process planning unit 8 and the control command creation unit 9 are included in the concept of a control unit that performs information processing and control processing based on the various information acquired by the acquisition unit.
[0013] For example, a storage device is used for the menu storage unit 4 and the task performance storage unit 6. For example, at least one of a display device and an audio output device is used for the notification device 10.
[0014] Next, each component of the command generating device in FIG. 1 will be described in detail.
[0015] The plating work input unit 1 acquires plating work information including the plating work of multiple dishes in a container from outside the command creation device. The dishes are processed foods, such as hamburger steaks and sauces. The processing includes cutting, heating, seasoning, and combinations of these. The plating work information is input by a menu creator, such as a line supervisor or a nutritionist.
[0016] FIG. 2 is a diagram showing plating information according to the first embodiment. The plating information in FIG. 2 includes a product name, a menu name, a plating amount, a plating location, and considerations when plating. The menu name is information for identifying the food that constitutes the product name, that is, the food to be plated in the container. In the following description, either the name or the ID is used for each of the various contents as information for identifying the various contents, and either may be used. The plating amount is the amount of food to be plated in the container. The plating location is the location in the container where the food is plated. The considerations when plating are the considerations when plating the food in the container. Note that the plating information does not have to include the plating location and the considerations when plating.
[0017] The plan input unit 2 in FIG. 1 acquires plan information including a planned time for the task of plating a plurality of dishes into containers from outside the command creation device.
[0018] FIG. 3 is a diagram showing plan information according to the first embodiment. The plan information in FIG. 3 includes a plan ID, a planned work start date and time, a planned work end date and time, a production item name, a planned production quantity, and a lot number. The plan ID is information for identifying a planned plan. The time from the planned work start date and time to the planned work end date and time corresponds to the planned time. The production item name corresponds to the product name in FIG. 2. The planned production quantity is the number of products that are planned to be produced within the planned time. The lot number is a number for identifying a combination of a shipping destination, a planned shipping date and time, and a planned shipping quantity. Note that the plan information does not have to include a lot number.
[0019] The line configuration input unit 3 in Fig. 1 acquires line configuration information including the configuration of multiple lines capable of plating work from outside the command creation device. The line includes at least one of workers, robots, and production equipment. Since the production equipment can be handled in the same way as the robot, in the following description, the production equipment and the robot will be referred to as the robot without distinction.
[0020] FIG. 4 is a diagram showing line configuration information according to the first embodiment. The line configuration information in FIG. 4 includes a line ID, a scheduled operation start date and time, a scheduled operation end date and time, and each component. The line ID is information that identifies a line. The scheduled operation start date and time is the date and time when the line operation is scheduled to start, and the scheduled operation end date and time is the date and time when the line operation is scheduled to end. The components make up a line. For example, the line with line ID "1" in FIG. 4 is made up of workers A1, A2, and A3, and robots B1 and B2.
[0021] The line configuration information may include the capabilities of the robots and workers (e.g., the content that can be processed, skill rank, years of experience, etc.), limitations on the robots and workers (e.g., maximum speed, work restrictions, etc.), schedules for robot operation and worker attendance, and information regarding the conditions on work days (e.g., daily inspection results, pre-operation inspection results, worker physical condition results, etc.).
[0022] The menu storage unit 4 in FIG. 1 stores menu information including the characteristics of a plurality of dishes, and the menu input unit 5 acquires the menu information from the menu storage unit 4.
[0023] FIG. 5 is a diagram showing menu information according to the first embodiment. The menu information in FIG. 5 includes a menu name, a property, allergen information, and a manufacturer. The menu name corresponds to the menu name in FIG. 2. The property is the property of the dish indicated by the menu name. The property includes, for example, solid, semi-solid, pouched, and indefinite. The allergen information indicates whether the dish indicated by the menu name contains various allergens (for example, egg, milk, wheat, etc.). The manufacturer is the manufacturer of the dish indicated by the menu name. Note that the menu information does not have to include the allergen information and the manufacturer. The property may include the degree of crumbling, and may include the shape of the dish indicated by the menu name (for example, rectangular prism, flat plate, spherical, etc.). For example, although not shown, a rectangular prism and semi-solid may be set as the property of hamburger A, and a cylindrical shape and solid may be set as the property of hamburger B.
[0024] 1 stores work performance information including the work speeds of a plurality of lines for a plurality of food characteristics, and the work performance input unit 7 acquires the work performance information from the work performance storage unit 6. The work performance information may be created based on the measurement results of various sensors, etc., or may be created based on the specifications of the robot.
[0025] FIG. 6 is a diagram showing the working performance information according to the first embodiment. The working performance information in FIG. 6 includes a line ID and a working speed. The line ID corresponds to the line ID in FIG. 4. The working speed is the working speed of the line set for each of the properties of a plurality of dishes. In the example of FIG. 6, the working speed is expressed as the working time, which is the reciprocal of the working speed, but of course it may be expressed as the working speed itself. In the example of FIG. 6, the working speed of each component is used as the working speed of the line, but this is not limited to this. In the example of FIG. 6, the working speed of the line is set for each of the properties of the dishes, solid and amorphous, but this is not limited to this. For example, when the property of the dish is expressed as a combination of the degree of crumbling and the shape of the dish, the working speed of the line may be set for each of the combinations.
[0026] The work performance information is not limited to the information in FIG. 6, so long as the information in FIG. 6 can be obtained. For example, as shown in FIG. 7, the work performance information may include components, introduction date, work speed, work parts, and next maintenance inspection date instead of the information in FIG. 6. The components correspond to the components in FIG. 4. The introduction date is set when the component is a robot, and is the introduction date of the robot. The work speed is the work speed of the components set for each of a plurality of cooking properties.
[0027] The working parts include parts such as robot hands that can be selectively attached to the robot during work. When the component is a robot, the working speed may be set for each working part that can be attached to the robot and for each type of food. The next maintenance inspection date is a date that is set when the component is a robot, and is the date when the robot will be next inspected for maintenance. The information in FIG. 6 can be obtained by extracting the components of each line and the working speeds of the components for each line from the information in FIG. 7.
[0028] The work performance information does not have to include the installation date, the parts for work, and the next maintenance inspection date. The work performance information may also include an estimate of the setting change time, which is the time when the settings used in the work of the robot are changed. If the line configuration information includes the capabilities of the robot and the workers, restrictions, the operation of the robot and the attendance schedule of the workers, and information on the conditions on the work day, the work speeds in Figures 6 and 7 may be appropriately changed based on this information.
[0029] The process planning unit 8 creates a work plan for multiple lines to perform plating work for multiple dishes based on the plan information, line configuration information, menu information, and work performance information. The process planning unit 8 also determines plating work in the work plan based on the plating work information. The operation of the process planning unit 8 will be described in detail later.
[0030] FIG. 8 is a diagram showing a work plan created by the process planning unit 8 according to the first embodiment. The work plan in FIG. 8 includes a line ID, a process ID, a scheduled work start date and time, a component, a responsible menu, and a serving position. The line ID corresponds to the line ID in FIG. 4. The process ID is information for identifying the work plan. The scheduled work start date and time is the date and time when the serving work of the work plan is scheduled to start. The components correspond to the components in FIG. 4 and are the components that perform the serving work of the work plan. The responsible menu and the serving position are the food and the position that the component should serve. The work plan does not have to include the scheduled work start date and time. The work plan may also include a scheduled work end date and time when the work of the work plan is scheduled to be completed, matters to be considered when serving, and the selection result of the work parts such as a robot hand.
[0031] The control command creation unit 9 in FIG. 1 creates commands for multiple lines based on the work plan created by the process planning unit 8. For example, the control command creation unit 9 creates a control signal as a command for multiple lines. This enables the robot to perform an operation specified in the work plan based on the control signal, and the notification device 10 to notify the menu creator and workers of the contents of the work plan by display or voice, etc.
[0032] <Operation> FIG. 9 is a flowchart showing the overall operation of the command generating device according to the first embodiment.
[0033] First, in step S1, the plating work input unit 1 acquires plating work information. In step S2, the plan input unit 2 acquires plan information. In step S3, the line configuration input unit 3 acquires line configuration information. In step S4, the menu input unit 5 acquires menu information from the menu memory unit 4. In step S5, the task performance input unit 7 acquires task performance information from the task performance memory unit 6. Note that the order of steps S1 to S5 is not limited to that of FIG. 9 and may be changed as appropriate.
[0034] In step S6, the process planning unit 8 creates a work plan for multiple lines to perform plating work for multiple dishes based on the plating work information, plan information, line configuration information, menu information, and work performance information. In step S7, the control command creation unit 9 creates commands for the multiple lines based on the work plan created by the process planning unit 8. Thereafter, the operation in FIG. 9 ends.
[0035] FIG. 10 is a flowchart showing the operation of step S6 of the process planning unit 8 according to the first embodiment.
[0036] First, in step S11, the process planning unit 8 extracts information about the plating work included in the plating work information from the plan information and the menu information. For example, if the plating work indicates a hamburger steak lunch in which lettuce, hamburger steak, and demi-glace sauce are plated as shown in Fig. 2, the process planning unit 8 extracts information about the hamburger steak lunch from the plan information in Fig. 3 and information about lettuce, hamburger steak, and demi-glace sauce from the menu information in Fig. 5.
[0037] Based on the information extracted in this way, the process planning unit 8 creates the following work plan. Therefore, the menu creator can create a work plan for plating the dishes desired by the menu creator by inputting plating work information, etc., to have the plating work input unit 1 acquire the plating work information. Note that, for the sake of convenience, the information extracted from the plan information and menu information will be described below simply as plan information and menu information.
[0038] In step S12, the process planning unit 8 creates a tentative work plan in which a line out of a plurality of lines is assigned to a plurality of dishes based on the plan information and the line configuration information. For example, the process planning unit 8 creates a tentative work plan by assigning a line in which the time from the scheduled operation start date and time to the scheduled operation end date and time in Fig. 4 is included in the time from the scheduled operation start date and time to the scheduled operation end date and time in Fig. 3 and the scheduled production quantity in Fig. 3 to the date and time of the tentative work plan.
[0039] In step S13, the process planning unit 8 calculates a tentative operation time for the line to plate multiple dishes in accordance with the tentative operation plan based on the tentative operation plan, the menu information, and the operation performance information. For example, for the line assigned to the tentative operation plan, the process planning unit 8 reads the operation speed corresponding to the nature of the dishes in the menu information in Fig. 5 from the operation performance information in Fig. 6. The process planning unit 8 calculates the tentative operation time based on the planned production quantity assigned to the tentative operation plan and the read operation speed.
[0040] As an example, a case will be described in which a line with a line ID of 1 in FIG. 4 is assigned to a hamburger lunch box including lettuce (solid), hamburger (solid), and demi-glace sauce (irregular shape) in the provisional work plan. In this case, the process planning unit 8 reads the top two fastest work speeds of solid items from the work speeds of solid items set in the work performance information in FIG. 6, and the top fastest work speed from the work speeds of irregular items. Then, the process planning unit 8 calculates the time required for the plating work of the two solid items from the planned production quantity assigned to the provisional work plan and the work speeds of the top two solid items. The process planning unit 8 also calculates the time required for the plating work of one irregular item from the planned production quantity assigned to the provisional work plan and the work speed of the top irregular item. Then, the process planning unit 8 calculates a provisional work time based on the time required for the plating work of the two solid items and the time required for the plating work of one irregular item. For example, when two solid plating operations and one irregular plating operation are performed in parallel, the process planning unit 8 calculates the longer of the time required for the two solid plating operations and the time required for the one irregular plating operation as the provisional operation time. For example, when two solid plating operations and one irregular plating operation are performed in series, the process planning unit 8 calculates the sum of the time required for the two solid plating operations and the time required for the one irregular plating operation as the provisional operation time.
[0041] In step S14, the process planning unit 8 judges whether the provisional work time satisfies the scheduled time of the plan information. For example, if the provisional work time is equal to or less than the time from the scheduled work start date and time to the scheduled work end date and time in FIG. 3 (i.e., the scheduled time), the process planning unit 8 judges that the provisional work time satisfies the scheduled time of the plan information. On the other hand, if the provisional work time is greater than the time from the scheduled work start date and time to the scheduled work end date and time in FIG. 3 (i.e., the scheduled time), the process planning unit 8 judges that the provisional work time does not satisfy the scheduled time of the plan information. If it is judged that the provisional work time does not satisfy the scheduled time of the plan information, the process proceeds to step S16, and if it is judged that the provisional work time does not satisfy the scheduled time of the plan information, the process proceeds to step S15.
[0042] In step S15, the process planning unit 8 creates a tentative work plan in which a line other than the above line is assigned to each of the multiple dishes based on the planning information and the line configuration information. Then, the process returns to step S13. By repeating the loop from step S13 to step S15, when the process proceeds to step S16, a tentative work time that meets the scheduled time in the planning information is created as the work plan. If there is no other line, the process planning unit 8 may notify the menu creator, etc., via the notification device 10 that a work plan that meets the scheduled time in the planning information cannot be created.
[0043] In step S16, the process planning unit 8 saves the work plan. Note that, as in other embodiments described later, the order of the plating work of the multiple dishes in the work plan may be determined before step S16. Then, the operation in FIG. 10 ends.
[0044] <Summary of the first embodiment> According to the command creation device of the first embodiment described above, the process planning unit 8 creates a work plan for multiple lines to perform plating work for multiple dishes based on the plan information, line configuration information, menu information, and work performance information. Then, the control command creation unit 9 creates commands for the multiple lines based on the work plan. With this configuration, even people who are not familiar with creating work plans can easily create a work plan. In addition, the accuracy of the work plan can be improved because the work speeds of the multiple lines for each of the characteristics of the multiple dishes are taken into consideration.
[0045] In the first embodiment, the process planning unit 8 determines the plating work in the work plan based on the plating work information. With this configuration, a work plan can be created for the plating work of the dishes desired by the menu creator. Note that, in cases where the plating work of the dishes is fixed, the plating work information does not need to be used by the process planning unit 8.
[0046] In the first embodiment, the process planning unit 8 creates a tentative work plan, calculates a tentative work time from the tentative work plan, and creates a work plan by changing the line of the tentative work plan to another line if the tentative work time does not meet the scheduled time in the plan information. With this configuration, the work speeds of multiple lines for each of multiple cuisine characteristics are taken into account, so that the accuracy of the work plan can be improved. However, the creation of the work plan is not limited to this. For example, the process planning unit 8 may create a visual plan by performing reinforcement learning using AI (artificial intelligence) based on the plan information, line configuration information, menu information, and work performance information.
[0047] <Modification> The plating operation input unit 1, the plan input unit 2 and the line configuration input unit 3 may be provided in a remote location away from the location where the plating operation of the multiple dishes is carried out.
[0048] In the first embodiment, the command creating device includes the menu storage unit 4 and the task performance storage unit 6, but the menu storage unit 4 and the task performance storage unit 6 may be provided outside the command creating device. The menu input unit 5 may obtain menu information from outside the command creating device, and the task performance input unit 7 may obtain task performance information from outside the command creating device.
[0049] In the first embodiment, the command creating device includes the notification device 10, but the notification device 10 may be provided outside the command creating device.
[0050] Furthermore, even if the robot is the same, if the robot hand, which is a work part attached to the robot, is different, the working speed of the robot will also be different. Therefore, the working speed of the multiple lines may include the working speed of the robot for each of the multiple robot hands. Then, the process planning unit 8 may create a work plan taking into account the working speed of the robot hand, as with the working speed of the line, so that the plan of the robot hand to be attached to the robot among the multiple robot hands may be included in the work plan. Furthermore, if the command creation device can obtain data on the picking success rate of the robot for each of the multiple robot hands, the working speed of the robot hand may be calculated based on the picking success rate.
[0051] This modified example is also applicable to the second and subsequent embodiments described below.
[0052] <Embodiment 2> Fig. 11 is a block diagram showing the configuration of a command creation device according to the present embodiment 2. The command creation device in Fig. 11 has a configuration similar to that of the command creation device in Fig. 1, in which a menu plan change unit 11 included in the concept of a control unit is added. Hereinafter, among the components according to the present embodiment 2, the components that are the same as or similar to the components described above are given the same or similar reference symbols, and different components will be mainly described.
[0053] FIG. 12 is a diagram showing menu information according to the second embodiment. The menu information in FIG. 12 includes not only the information in FIG. 5 but also the costs of multiple dishes. When the process planning unit 8 cannot create an operation plan that satisfies the planning information for multiple dishes including a first dish, the menu plan change unit 11 selects multiple dishes including a second dish whose difference from the cost of the first dish is within a predetermined range based on the menu information. The predetermined range is set, for example, to a range in which the cost of the first dish and the cost of the second dish are equal. For example, in the case of FIG. 12, when the process planning unit 8 cannot create an operation plan that satisfies the planning information for multiple dishes including ketchup A, the menu plan change unit 11 replaces ketchup A of the multiple dishes with ketchup B and selects multiple dishes including ketchup B.
[0054] The process planning unit 8 creates a work plan for a plurality of dishes including the second dish selected by the menu plan changing unit 11. The operation of the process planning unit 8 will be described in detail later.
[0055] <Operation> The overall operation of the command creating device according to the second embodiment is similar to the overall operation of the command creating device according to the first embodiment (see FIG. 9). FIG. 13 is a flowchart showing the operation of step S6 in FIG. 9 of the process planning unit 8 according to the second embodiment. The flowchart in FIG. 13 is similar to the flowchart in FIG. 10 with steps S21 and S22 added, so steps S21 and S22 will be mainly described below.
[0056] After it is determined in step S14 that the tentative work time does not satisfy the scheduled time in the plan information, the process planning unit 8 determines in step S21 whether or not a tentative work plan has been created for each of all the lines. If it is determined that a tentative work plan has been created for each of all the lines, the process proceeds to step S22, and if it is not determined that a tentative work plan has been created for each of all the lines, the process proceeds to step S15.
[0057] In step S22, the menu plan change unit 11 replaces the first dish included in the multiple dishes used to calculate the provisional work time with a second dish having the same cost as the first dish based on the menu information, and selects multiple dishes including the second dish. Then, the process proceeds to step S12. As a result, the process planning unit 8 creates a work plan for the multiple dishes including the second dish selected by the menu plan change unit 11.
[0058] <Summary of the second embodiment> According to the command creation device of the second embodiment described above, when the process planning unit 8 cannot create a work plan that satisfies the planning information for multiple dishes including the first dish, it creates a work plan for multiple dishes including the second dish whose difference from the cost of the first dish is within a predetermined range. This configuration can increase the possibility of creating a work plan that satisfies the planning information.
[0059] <Modification> In the second embodiment, when creating a work plan for multiple dishes including the second dish, the process planning unit 8 may control the notification device 10 to notify the cost of multiple dishes including the first dish and the cost of multiple dishes including the second dish. With this configuration, the menu creator can easily know how the cost will change when changing from the first dish to the second dish.
[0060] <Embodiment 3> Fig. 14 is a block diagram showing the configuration of a command creation device according to the present embodiment 3. The command creation device in Fig. 14 has a configuration similar to that of the command creation device in Fig. 1, with a nutrient amount evaluation unit 14 included in the concept of a control unit being added. Hereinafter, among the components according to the present embodiment 3, components that are the same as or similar to the components described above are given the same or similar reference symbols, and different components will be mainly described.
[0061] Fig. 15 is a diagram showing plating work information according to the third embodiment. The plating work information in Fig. 15 not only includes the information in Fig. 2, but also includes the order of plating work of multiple dishes into a container. The example in Fig. 15 shows that the lettuce, hamburger steak, and demi-glace sauce are plated into a container in this order. Note that in the third embodiment, plating work input unit 1 acquires plating work information including the order of plating work, but an input unit different from plating work input unit 1 may acquire the plating order.
[0062] The process planning unit 8 determines the order of plating work for a plurality of dishes in the work plan based on the plating work order included in the plating work information. The operation of the process planning unit 8 will be described in detail later.
[0063] FIG. 16 is a diagram showing menu information according to the third embodiment. The menu information in FIG. 16 includes not only the information in FIG. 5 but also the nutrient amounts of multiple dishes. The nutrient amounts in FIG. 16 include the nutrient amounts in red for protein, the nutrient amounts in green for vegetables, the nutrient amounts in yellow for carbohydrates, and the nutrient amounts of energy. When the process planning unit 8 cannot create an operation plan that satisfies the plan information for multiple dishes including the first dish, the nutrient amount evaluation unit 14 selects multiple dishes including a second dish whose difference from the nutrient amount of the first dish is within a predetermined range based on the menu information. The predetermined range is set, for example, to a range in which the nutrient amount of the first dish is equal to the nutrient amount of the second dish.
[0064] The process planning unit 8 creates a work plan for a plurality of dishes including the second dish selected by the menu plan changing unit 11. The operation of the process planning unit 8 will be described in detail later.
[0065] <Operation> The overall operation of the command creating device according to the third embodiment is similar to the overall operation of the command creating device according to the first embodiment (see FIG. 9). FIG. 17 is a flowchart showing the operation of step S6 in FIG. 9 of the process planning unit 8 according to the third embodiment. The flowchart in FIG. 17 is similar to the flowchart in FIG. 10 with steps S31 to S33 added, and therefore steps S31 to S33 will be mainly described below.
[0066] After it is determined in step S14 that the tentative work time does not satisfy the scheduled time in the plan information, the process planning unit 8 determines in step S31 whether or not a tentative work plan has been created for each of all the lines. If it is determined that a tentative work plan has been created for each of all the lines, the process proceeds to step S32, and if it is not determined that a tentative work plan has been created for each of all the lines, the process proceeds to step S15.
[0067] In step S32, the menu plan change unit 11 replaces the first dish included in the multiple dishes used to calculate the provisional operation time with a second dish having the same nutrient amount as the first dish based on the menu information, and selects multiple dishes including the second dish. Then, the process proceeds to step S12. As a result, the process planning unit 8 creates an operation plan for the multiple dishes including the second dish selected by the menu plan change unit 11.
[0068] After it is determined in step S14 that the provisional work time meets the scheduled time in the plan information, in step S33, the process planning unit 8 determines the order of plating work for the multiple dishes in the work plan based on the order of plating work included in the plating work information. As a result, the order of the components of the line in the work plan is determined. For example, assume that the order of plating work as shown in FIG. 15 has been acquired. In this case, the process planning unit 8 changes the order of work for the components of the line in the work plan so that the components assigned to lettuce, the components assigned to hamburger steak, and the components assigned to demi-glace sauce work in this order. Then, the process proceeds to step S16.
[0069] <Summary of the Third Embodiment> According to the command creation device of the third embodiment as described above, the process planning unit 8 determines the order of plating work for a plurality of dishes in the work plan based on the order of plating work. With this configuration, the order of plating work in the work plan can be set to the order of plating work desired by the menu creator. Note that, in cases where the order of plating work for dishes is fixed, the order of plating work does not need to be used by the process planning unit 8.
[0070] In the third embodiment, when the process planning unit 8 cannot create a work plan that satisfies the planning information for multiple dishes including the first dish, the process planning unit 8 creates a work plan for multiple dishes including the second dish whose difference in nutrient amount from the first dish is within a predetermined range. With this configuration, it is possible to increase the possibility of creating a work plan that satisfies the planning information.
[0071] <Modification> When creating a work plan for multiple dishes including the second dish, the process planning unit 8 may control the notification device 10 to notify the nutrient amounts of multiple dishes including the first dish and the nutrient amounts of multiple dishes including the second dish. With this configuration, the menu creator can easily know how the nutrient amounts change when changing from the first dish to the second dish.
[0072] Moreover, the third embodiment and its modified examples may be applied to the second embodiment and its modified examples. In other words, when creating a work plan for a plurality of dishes including the second dish, the process planning unit 8 may control the notification device 10 to notify the cost and nutrient amounts of the plurality of dishes including the first dish and the cost and nutrient amounts of the plurality of dishes including the second dish.
[0073] <Fourth embodiment> Fig. 18 is a block diagram showing the configuration of a command creation device according to the present embodiment 4. The command creation device in Fig. 18 has a configuration similar to that of the command creation device in Fig. 1, with a line configuration proposing unit 17 included in the concept of a control unit being added. Hereinafter, among the components according to the present embodiment 4, components that are the same as or similar to the components described above will be given the same or similar reference symbols, and different components will be mainly described.
[0074] For example, if the container in which the food is to be served cannot be automatically transported from the first robot to the second robot, it is preferable for a worker to perform a plating operation between the plating operation of the first robot and the plating operation of the second robot. On the other hand, if a no-entry range for workers is set for the first robot as the movable range of the first robot, it is preferable for the plating operation of the second robot to be performed after the plating operation of the first robot without a plating operation by a worker.
[0075] Therefore, the line configuration proposing unit 17 determines the order of the plating work of the multiple dishes in the work plan based on the line configuration information. The line configuration information includes, for example, information on whether the first robot can be automatically transported between the first robot and the second robot, and information on whether a restricted access area is set for the first robot. If the line configuration information indicates that the first robot cannot be automatically transported between the first robot and the second robot, the line configuration proposing unit 17 assigns a plating work of a worker between the plating work of the first robot and the plating work of the second robot. If the line configuration information indicates that a restricted access area is set for the first robot, the line configuration proposing unit 17 assigns a plating work of the second robot, rather than a plating work of a worker, after the plating work of the first robot.
[0076] <Operation> The overall operation of the command creating device according to the fourth embodiment is similar to the overall operation of the command creating device according to the first embodiment (see FIG. 9). FIG. 19 is a flowchart showing the operation of step S6 in FIG. 9 of the process planning unit 8 according to the fourth embodiment. Since the flowchart in FIG. 19 is similar to the flowchart in FIG. 10 with step S41 added, step S41 will be mainly described below.
[0077] After it is determined in step S14 that the provisional operation time meets the scheduled time in the plan information, in step S41, the process planning unit 8 determines the order of the plating operation of the multiple dishes in the operation plan based on the line configuration information. As a result, the order of the components of the line in the operation plan is determined. Then, the process proceeds to step S16.
[0078] <Summary of the fourth embodiment> According to the command creation device of the fourth embodiment as described above, the line configuration proposing unit 17 determines the order of plating work of multiple dishes in the work plan based on the line configuration information. With this configuration, the order of plating work in the work plan can be set to an order suitable for the line configuration.
[0079] <Modification> In the above description, the line configuration information includes information on whether the first robot can be automatically transported between the second robot and the first robot, and information on whether a no-entry area is set for the first robot, but is not limited to this. For example, the line configuration information may include information on whether the work flow line of the first line and the work flow line of the second line partially overlap. Hereinafter, the overlapping portion of the work flow line of the first line and the work flow line of the second line will be referred to as an overlapping portion.
[0080] In this case, when the line configuration information indicates the presence of an overlapping portion, the line configuration proposal unit 17 may calculate the operation time for each component of the first and second lines based on the operation plans of the first and second lines and the operation speed of each component. Then, the line configuration proposal unit 17 may determine the order of plating operations for multiple dishes in the first and second lines so that the time when the first line uses the overlapping portion does not overlap with the time when the second line uses the overlapping portion.
[0081] <Fifth Preferred Embodiment> Fig. 20 is a block diagram showing the configuration of a command creation device according to the fifth embodiment. The command creation device in Fig. 20 has a configuration similar to that of the command creation device in Fig. 1, with a monitoring content storage unit 20, a monitoring content input unit 21, a monitoring content planning unit 22, and a monitoring execution unit 23 added. The monitoring content input unit 21 is included in the concept of an acquisition unit, and the monitoring content planning unit 22 and the monitoring execution unit 23 are included in the concept of a control unit. Hereinafter, among the components according to the fifth embodiment, components that are the same as or similar to the components described above are given the same or similar reference symbols, and different components will be mainly described.
[0082] The monitoring content storage unit 20 stores monitoring information in which at least one of a plurality of dishes is associated with a monitoring content in advance, and the monitoring content input unit 21 acquires the monitoring information from the monitoring content storage unit 20.
[0083] FIG. 21 is a diagram showing monitoring information according to the fifth embodiment. The correspondence information in FIG. 21 includes a product name, a monitoring target, and monitoring contents. The product name corresponds to the product name in FIG. 2. The monitoring target corresponds to the menu name, i.e., the dish, in FIG. 2. The monitoring target is associated with monitoring contents including a monitoring item, a lower limit value, and an upper limit value. The monitoring contents are set in advance based on various laws and regulations and various guidelines, such as HACCP (Hazard Analysis and Critical Control Point). The correspondence information may include a monitoring importance level and information regarding the contents not to be monitored.
[0084] The monitoring content planning unit 22 determines the monitoring content of at least one of the multiple dishes in the work plan based on the monitoring information acquired by the monitoring content input unit 21. For example, when monitoring information such as that shown in Fig. 21 is acquired and the work of plating hamburgers is assigned in the work plan, the monitoring content planning unit 22 determines the monitoring content to monitor that the temperature of the hamburgers is 80°C and adds it to the work plan.
[0085] The monitoring execution unit 23 in Fig. 20 performs monitoring based on the monitoring content added to the work plan. When the inspection result does not satisfy the monitoring content, the monitoring execution unit 23 may perform control to notify the notification device 10 of that fact. In addition, the monitoring execution unit 23 may store the monitoring result in the monitoring content storage unit 20.
[0086] <Operation> Fig. 22 is a flowchart showing the overall operation of the command creating device according to embodiment 5. The flowchart in Fig. 22 is similar to the flowchart in Fig. 9 in which step S51 is added and step S7 is changed to steps S52 and S53, so steps S51 to S53 will be mainly described below.
[0087] After step S5, in step S51, the monitoring content input unit 21 acquires monitoring information from the monitoring content storage unit 20. The order of steps S1 to S5 and step S51 is not limited to the order in Fig. 22 and may be changed as appropriate. After that, the process proceeds to step S6, where the process planning unit 8 creates a work plan.
[0088] After step S6, in step S52, the monitoring content planning unit 22 determines the monitoring content of at least one of the multiple dishes in the work plan based on the monitoring information acquired by the monitoring content input unit 21.
[0089] In step S53, the control command creation unit 9 creates commands for multiple lines based on the work plan created by the process planning unit 8. The monitoring execution unit 23 performs monitoring based on the monitoring content added to the work plan created by the process planning unit 8. Thereafter, the operation of FIG. 22 ends.
[0090] <Summary of the fifth embodiment> According to the command creation device of the fifth embodiment as described above, the monitoring content planning unit 22 determines the monitoring content of at least one of the multiple dishes in the work plan based on the monitoring information. With this configuration, it is possible to appropriately monitor at least one of the multiple dishes in the work plan.
[0091] <Modification> The monitoring information may be automatically generated based on a hygiene management plan supervised by a public health center or the like and prepared in consultation with the public health center or the like. An example of this will be described below.
[0092] The command creation device sets important monitoring contents for each dish based on past hygiene management plans, and sets a hygiene risk index based on the number of times the important monitoring contents have been set. For example, the command creation device sets the hygiene risk index so that the hygiene risk index increases the more times the important monitoring contents have been set. The command creation device then generates monitoring information by setting the important monitoring contents with the highest hygiene risk index or those with hygiene risk indexes equal to or greater than a threshold as the monitoring contents of the monitoring information. This configuration can reduce the effort and time required for people to create monitoring information.
[0093] The preparation command device may change the hygiene risk index based on the components of the line where the plating work is performed. For example, hygiene risk may be reduced by changing the handling of ingredients from a worker to a robot. Therefore, the command preparation device may change the hygiene risk index to be smaller when the robot is set to be in charge of the ingredients.
[0094] <Other Modifications> The above-mentioned acquisition unit and control unit are hereinafter referred to as "acquisition unit, etc." The acquisition unit, etc. are realized by a processing circuit 81 of FIG. 23. That is, the processing circuit 81 includes an acquisition unit that acquires plan information including a scheduled time for plating multiple dishes in a container, line configuration information including a configuration of multiple lines capable of plating, menu information including the properties of the multiple dishes, and operation performance information including the operation speed of the multiple lines for each of the properties of the multiple dishes, and a control unit that creates an operation plan for multiple lines to perform plating work for multiple dishes based on the plan information, line configuration information, menu information, and operation performance information, and creates commands to the multiple lines based on the operation plan. The processing circuit 81 may be implemented with dedicated hardware, or may be implemented with a processor that executes a program stored in a memory. The processor may be, for example, a central processing unit, a processing unit, an arithmetic unit, a microprocessor, a microcomputer, a DSP (Digital Signal Processor), etc.
[0095] When the processing circuit 81 is a dedicated hardware, the processing circuit 81 corresponds to, for example, a single circuit, a composite circuit, a programmed processor, a parallel programmed processor, an ASIC (Application Specific Integrated Circuit), an FPGA (Field Programmable Gate Array), or a combination of these. Each function of the acquisition unit and the like may be realized by a circuit in which the processing circuit is distributed, or the functions of each unit may be realized by a single processing circuit.
[0096] When the processing circuit 81 is a processor, the functions of the acquisition unit and the like are realized by a combination with software and the like. The software and the like corresponds to, for example, software, firmware, or software and firmware. The software and the like are written as a program and stored in a memory. As shown in FIG. 24, the processor 82 applied to the processing circuit 81 realizes the functions of each unit by reading and executing a program stored in the memory 83. That is, the command creation device includes a memory 83 for storing a program that, when executed by the processing circuit 81, results in the execution of the steps of acquiring plan information including a scheduled time for plating a plurality of dishes in a container, line configuration information including a configuration of a plurality of lines capable of plating, menu information including the properties of the plurality of dishes, and operation performance information including the operation speed of each of the plurality of lines for the properties of the plurality of dishes, and creating an operation plan for a plurality of lines to perform plating operations for a plurality of dishes based on the plan information, line configuration information, menu information, and operation performance information, and creating commands for the plurality of lines based on the operation plan. In other words, this program can be said to cause a computer to execute the procedures and methods of the acquisition unit and the like. Here, the memory 83 may be, for example, a non-volatile or volatile semiconductor memory such as a Random Access Memory (RAM), a Read Only Memory (ROM), a flash memory, an Erasable Programmable Read Only Memory (EPROM), an Electrically Erasable Programmable Read Only Memory (EEPROM), an HDD (Hard Disk Drive), a magnetic disk, a flexible disk, an optical disk, a compact disk, a mini disk, a DVD (Digital Versatile Disc), a drive device for any of these, or any storage medium to be used in the future.
[0097] The above describes a configuration in which each function of the acquisition unit, etc. is realized either by hardware or software, etc. However, the present invention is not limited to this, and a configuration in which a part of the acquisition unit, etc. is realized by dedicated hardware and another part is realized by software, etc. For example, the acquisition unit can realize its functions by a processing circuit 81 as dedicated hardware, an acquisition circuitry such as an interface, etc., and the remaining functions can be realized by the processing circuit 81 as a processor 82 reading and executing a program stored in a memory 83.
[0098] As described above, the processing circuitry 81 can realize each of the above-mentioned functions by hardware, software, or a combination of these.
[0099] The command creation device described above can also be applied to a command creation system constructed as a system by appropriately combining an information processing device, a communication terminal including a mobile terminal such as a mobile phone, a smartphone, and a tablet, the functions of an application installed in at least one of the information processing device and the communication terminal, and a server. In this case, each function or each component of the command creation device described above may be distributed among the devices that construct the system, or may be concentrated in one of the devices.
[0100] It should be noted that the embodiments and modifications may be freely combined, and the embodiments and modifications may be modified or omitted as appropriate.
[0101] The above description is illustrative in all respects and is not restrictive. It is understood that countless variations not illustrated can be envisioned. [Explanation of symbols]
[0102] 1 plating work input section, 2 planning input section, 3 line configuration input section, 5 menu input section, 7 work performance input section, 8 process planning section, 9 control command creation section, 10 notification device, 11 menu plan change section, 14 nutrient amount evaluation section, 17 line configuration proposal section, 21 monitoring content input section, 22 monitoring content planning section, 23 monitoring execution section.
Claims
1. A command creation device that creates a work plan for multiple lines to perform plating work for multiple dishes and issues commands to the multiple lines, an acquisition unit that acquires plan information including a scheduled time for the plating operation of the plurality of dishes into containers, line configuration information including a configuration of the plurality of lines capable of the plating operation, menu information including the characteristics of the plurality of dishes, and operation performance information including the operation speeds of the plurality of lines for each of the characteristics of the plurality of dishes; a control unit that creates the work plan based on the plan information, the line configuration information, the menu information, and the work performance information, and creates commands to the plurality of lines based on the work plan; A command creation device comprising:
2. The command creation device according to claim 1, The acquisition unit further acquires serving operation information including a serving operation of a plurality of dishes onto a container; The control unit is a command creation device that determines the plating work for the plurality of dishes in the work plan based on the plating work information.
3. The command creating device according to claim 1 or 2, The control unit is creating a tentative work plan in which the plurality of dishes are assigned to any one of the plurality of lines based on the plan information and the line configuration information; calculating a provisional operation time required for the production line to perform the plating operation of the plurality of dishes in accordance with the provisional operation plan based on the provisional operation plan, the menu information, and the operation performance information; a command creation device that creates the work plan by changing the line of the tentative work plan to another line when the tentative work time does not satisfy the scheduled time of the plan information.
4. The command creating device according to claim 1 or 2, the line includes a robot capable of selectively mounting a plurality of work parts; the work speeds of the plurality of lines include a work speed of the robot for each of the plurality of work parts; The work plan includes a plan for a work part to be mounted by the robot among the plurality of work parts.
5. The command creating device according to claim 1 or 2, The menu information further includes the cost price of the plurality of dishes, The control unit is An instruction creation device that, when it is not possible to create an operation plan that satisfies the planning information for the plurality of dishes including a first dish, creates the operation plan for the plurality of dishes including a second dish whose difference from the cost of the first dish is within a predetermined range.
6. The command creating device according to claim 5, The control unit is An instruction creation device that controls a notification device to notify the cost of the multiple dishes including the first dish and the cost of the multiple dishes including the second dish when creating the work plan for the multiple dishes including the second dish.
7. The command creating device according to claim 1 or 2, The acquisition unit further acquires an order of serving the plurality of dishes into the containers, The control unit is a command creation device that determines an order of the plating work of the plurality of dishes in the work plan based on the order of the plating work.
8. The command creating device according to claim 1 or 2, The menu information further includes nutrient amounts of the plurality of dishes, The control unit is An instruction creation device that, when it is not possible to create an operation plan that satisfies the planning information for the plurality of dishes including a first dish, creates the operation plan for the plurality of dishes including a second dish whose difference from the nutrient amount of the first dish is within a predetermined range.
9. The command creating device according to claim 8, The control unit is An instruction creation device that controls a notification device to notify the nutrient amounts of the multiple dishes including the first dish and the nutrient amounts of the multiple dishes including the second dish when creating the work plan for the multiple dishes including the second dish.
10. The command creating device according to claim 1 or 2, The control unit is A command creation device that determines an order of the plating work of the plurality of dishes in the work plan based on the line configuration information.
11. The command creating device according to claim 1 or 2, The acquisition unit further acquires monitoring information in which at least one of the plurality of dishes is previously associated with a monitoring content, The control unit is A command creation device that determines the monitoring content for at least one of the plurality of dishes in the work plan based on the monitoring information.
12. A command creation method performed by a command creation device that creates a work plan for multiple lines to perform plating work for multiple dishes and issues commands to the multiple lines, comprising: the command creation device acquires plan information including a scheduled time for the plating operation of the plurality of dishes onto containers, line configuration information including a configuration of the plurality of lines capable of the plating operation, menu information including properties of the plurality of dishes, and operation performance information including a work speed of the plurality of lines for each of the properties of the plurality of dishes; The command creation method, wherein the command creation device creates the work plan based on the plan information, the line configuration information, the menu information, and the work performance information, and creates commands for the multiple lines based on the work plan.
13. An acquisition unit that acquires planning information including a scheduled time for plating a plurality of dishes onto a container, line configuration information including a configuration of a plurality of lines capable of said plating operation, menu information including the properties of said plurality of dishes, and work performance information including the work speeds of said plurality of lines for each of said properties of said plurality of dishes; a control unit that creates a work plan for the plurality of lines to perform the plating work for the plurality of dishes based on the plan information, the line configuration information, the menu information, and the work performance information, and creates commands to the plurality of lines based on the work plan; Equipped with The control unit is creating a tentative work plan in which the plurality of dishes are assigned to any one of the plurality of lines based on the plan information and the line configuration information; calculating a provisional operation time required for the production line to perform the plating operation of the plurality of dishes in accordance with the provisional operation plan based on the provisional operation plan, the menu information, and the operation performance information; a command creation device that creates the work plan by changing the line of the tentative work plan to another line when the tentative work time does not satisfy the scheduled time of the plan information.
Citation Information
Patent Citations
Conveyor device for dishing up packed lunch
JP2011246206A
Work management support method and work management support service providing method
JP2021131605A
Information processing apparatus, information processing method and program
WO2020075368A1
