Payment calculation system

The payment calculation system addresses the challenge of calculating transportation expenses for employees using multiple commuting routes by incorporating route selection and payment amount determination, ensuring accurate and efficient expense verification.

JP7566264B2Active Publication Date: 2024-10-15BAIT AL HIKMA
View PDF 4 Cites 0 Cited by

Patent Information

Application Number
JP2023175852
Authority / Receiving Office
JP · JP
Patent Type
Patents
Current Assignee / Owner
Priority Date
2022-07-15
Filing Date
2023-10-11
Publication Date
2024-10-15
Estimated Expiration
2043-05-15

AI Technical Summary

Technical Problem

Existing payment systems fail to accurately calculate transportation expenses when employees use multiple commuting routes, such as outbound, return, or different routes for round trips, leading to inefficiencies in expense verification.

Method used

A payment calculation system that includes a route information storage, route selection means, and payment amount calculation means to determine transportation expenses based on selected routes and fare information, considering one-way or round trip usage.

Benefits of technology

The system effectively calculates transportation expenses for employees using multiple routes, reducing the effort required to verify the suitability of expense calculations and ensuring accurate payments.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 0007566264000001
    Figure 0007566264000001
  • Figure 0007566264000002
    Figure 0007566264000002
  • Figure 0007566264000003
    Figure 0007566264000003
Patent Text Reader

Abstract

To provide a payment calculation system suitable for calculating a transportation expense payment amount when one employee uses a plurality of commuting routes.SOLUTION: A commuting transportation expense calculation server 100 applies for a route to be used among a plurality of routes used by one employee for movement between a home and a work place, acquires fare information corresponding to the commuting route related to the application from an employee route information table 406, and acquires number-of-commuting-day information of a calculation target period from personal calendar information of a storage device 42. Based on the acquired fare information and the number-of-commuting-day information, a travel expense payment amount corresponding to the number of commuting days or a scheduled number of commuting days in the calculation target period is calculated.SELECTED DRAWING: Figure 11
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present invention relates to a payment calculation system that calculates the transportation expense payment amount of a payment recipient. [Background technology]

[0002] Conventionally, a technique for calculating commuting allowances in response to an application from a payee when there is a change due to a new occurrence of commuting expenses, a change in route, or termination, is known, for example, from the technique described in Patent Document 1.

[0003] The technology described in Patent Document 1 is a technology that works in conjunction with a payroll system to calculate the amount of commuting expenses paid into the salary when an application for a change to commuting expenses is made. It creates definitions regarding the company's commuting allowance payment standards and calculation methods, and when application data for commuting expenses is input, it converts the application data into commuting allowance data based on the commuting allowance definition, and performs an update process to recalculate the commuting allowance data when the amount of commuting expenses paid into the salary is to be settled. [Prior art documents] [Patent documents]

[0004] [Patent Document 1] JP 2016-192201 A Summary of the Invention [Problem to be solved by the invention]

[0005] However, the technology described in Patent Document 1 does not take into consideration the case where one employee uses multiple commuting routes when settling commuting expenses, and does not mention how to apply in such cases. Examples of cases where one employee uses multiple commuting routes include when the employee uses only the outbound journey, when the employee uses only the return journey, and when the employee uses different commuting routes for the round trip.

[0006] Therefore, the present invention has been made with a focus on the unresolved problems of such conventional technology, and aims to provide a payment calculation system that is suitable for calculating the amount of transportation expenses to be paid when one employee uses multiple commuting routes. [Means for solving the problem]

[0007] [Invention 1] In order to achieve the above object, the payment calculation system of Invention 1 comprises a route selection means which selects one of a plurality of routes based on route information stored in a route information storage means which stores route information relating to a plurality of routes used by a payment recipient to travel between his / her home and workplace, and a payment amount calculation means which calculates the payment amount of transportation expenses when the route selected by the route selection means is used, based on the route information stored in the route information storage means relating to the route selected by the route selection means and fare information stored in a fare information storage means which stores fare information relating to the fare for the route.

[0008] With this configuration, the route selection means selects one of a plurality of routes, and the payment amount calculation means calculates the payment amount of transportation expenses for using the selected route based on the route information and fare information relating to the selected route.

[0009] The fare here corresponds to, for example, the fare for public transportation or individual transportation, or an IC fare for using an IC card, etc.

[0010] The system may be realized as a single device, terminal, or other equipment, or as a network system in which multiple devices, terminals, or other equipment are communicatively connected. In the latter case, each component may belong to any one of the multiple devices, etc., as long as they are communicatively connected to each other.

[0011] [Invention 2] Furthermore, the payment calculation system of Invention 2, in the payment calculation system of Invention 1, is provided with a utilization direction type information acquisition means for acquiring information on the utilization direction type indicating whether the one or round trip of the route selected by the route selection means will be used by the one payment recipient, and the payment amount calculation means calculates the payment amount of transportation expenses for the outbound, return or round trip of the route selected by the route selection means, based on the information on the utilization direction type acquired by the utilization direction type information acquisition means, when the one payment recipient uses the route.

[0012] With this configuration, the utilization direction type information acquisition means acquires information on the utilization direction type indicating whether a one-way or round trip of the selected route will be used by a recipient of the grant, and the payment amount calculation means calculates the payment amount of transportation expenses when the one-way or round trip of the selected route is used by a recipient of the grant based on the acquired information on the utilization direction type.

[0013] [Invention 3] Furthermore, the payment calculation system of invention 3 is the payment calculation system of either invention 1 or 2, wherein the route selection means selects one of the plurality of routes approved by the approval process.

[0014] With this configuration, the route selection means selects one of the multiple routes approved in the approval process. Effect of the Invention

[0015] As described above, according to the payment calculation system of Invention 1, the payment amount for transportation expenses can be calculated regardless of which of multiple routes a payment recipient uses to travel between his or her home and workplace.

[0016] Furthermore, according to the payment calculation system of Invention 2, the payment amount for transportation expenses can be calculated in cases where a recipient uses only the outbound journey out of multiple routes, only the return journey, or different routes for the round trip.

[0017] Furthermore, according to the payment calculation system of Invention 3, a route is selected from multiple approved routes, which reduces the effort required to verify the appropriateness of the calculation results of travel expenses using multiple routes. [Brief description of the drawings]

[0018] [Figure 1] 1 is a block diagram showing a configuration of a network system according to an embodiment of the present invention; [Diagram 2] FIG. 2 is a diagram illustrating a hardware configuration of a commuter travel expense calculation server 100. [Diagram 3] 13A to 13E are diagrams showing the data structures of a company master table 400, a workplace master table 402, an employee information master table 404, an employee-specific route information table 406, and an employee-specific payment information table 408. [Figure 4] 4A and 4B are diagrams showing the data structures of an employee pro rata payment information table 410 and a department information table 412. FIG. [Diagram 5] 13 is a flowchart showing a new commute route information application process. [Figure 6] FIG. 6 shows an application information input screen 600. [Figure 7] 13 is a flowchart showing a payment information addition / modification process. [Figure 8] FIG. 5 shows an employee information list screen 500. [Figure 9] FIG. 8 shows a route list screen 800. [Figure 10] FIG. 8 is a diagram showing a first example of a payment information list screen 801. [Figure 11] 13 is a flowchart showing a payment information generating process according to the first embodiment. [Figure 12] FIG. 8 is a diagram showing a second example of the payment information list screen 801. [Figure 13] FIG. 9 shows a personal calendar information import screen 900 for importing a CSV file of an employee's personal calendar information. [Figure 14]13 is a flowchart showing exception processing after pro rata payment. [Figure 15] FIG. 9 shows a performance information import screen 901 for importing a CSV file of employee performance information. [Figure 16] 13 is a flowchart showing a payment information generating process according to the second embodiment. [Figure 17] 13 is a flowchart showing a payment information generating process according to the third embodiment. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0019] First Embodiment 〔composition〕 A first embodiment of the present invention will be described below. Figures 1 to 15 are diagrams showing the first embodiment.

[0020] First, the configuration of this embodiment will be described. FIG. 1 is a block diagram showing a configuration of a network system according to the present embodiment.

[0021] As shown in FIG. 1, the Internet 199 is connected to a commuter travel expense calculation server 100 that provides a service for calculating commuter travel expenses (hereinafter referred to as the "commuter travel expense calculation service"), and employee terminals 200 installed for each employee of the company who uses the commuter travel expense calculation service.

[0022] [Hardware configuration of commuter travel expense calculation server 100] Next, the configuration of the commute expense calculation server 100 will be described.

[0023] FIG. 2 is a diagram showing a hardware configuration of the commute expense calculation server 100. As shown in FIG. As shown in FIG. 2, the commuter travel expense calculation server 100 is composed of a CPU (Central Processing Unit) 30 which controls calculations and the entire system based on a control program, a ROM (Read Only Memory) 32 which has the control program etc. of the CPU 30 stored in advance in a specified area, a RAM (Random Access Memory) 34 for storing data read from the ROM 32 etc. and calculation results required in the calculation process of the CPU 30, and an I / F (InterFace) 38 which mediates the input and output of data to and from external devices, and these are connected to each other and capable of sending and receiving data by a bus 39, which is a signal line for transferring data.

[0024] The I / F 38 is connected to external devices such as an input device 40 consisting of a keyboard, mouse, etc. that can input data as a human interface, a storage device 42 that stores data, tables, etc. as files, a display device 44 that displays a screen based on an image signal, and a signal line for connecting to the Internet 199.

[0025] [Hardware configuration of employee terminal 200] The employee terminal 200 is composed of a terminal assumed to be a stationary type like the commuter travel expense calculation server 100, or a mobile terminal such as a smartphone or tablet. In the former case, the hardware configuration is the same as that of the commuter travel expense calculation server 100. On the other hand, in the latter case, the hardware configuration is composed of a CPU, a ROM that stores programs such as application software and data for executing the programs, a RAM for storing data read from the ROM and the calculation results required in the CPU's calculation process, and an I / F that mediates the input and output of data to various attached devices. These are connected to each other and capable of sending and receiving data by signal lines for transferring data.

[0026] To the I / F, various accessory devices are connected, such as a touch panel display input device that allows data input and can display a screen based on an image signal, a storage device, a wireless communication device, a video camera, and the like.

[0027] [About the various tables] Next, various tables stored in storage device 42 of commuter travel expense calculation server 100 will be described.

[0028] 3(a) to (e) are diagrams showing the data structures of a company master table 400, a workplace master table 402, an employee information master table 404, an employee-specific route information table 406, and an employee-specific payment information table 408.

[0029] As shown in Figures 3(a) to (e), the storage device 42 stores a company master table 400 for registering company information, a workplace master table 402 for registering information on the workplace of each company, an employee information master table 404 for registering employee information, an employee-specific route information table 406 for registering information on the commuting route for each employee, and an employee-specific payment information table 408 for registering commuting expense payment information for each employee.

[0030] As shown in Fig. 3(a), one record is registered for each combination of company ID and application start date in the company master table 400. Each record contains main information including company ID, company name, application control category, employee group category information, application start date, application end date, last update date, last updater, and other information.

[0031] Here, the company ID is information for identifying a company, and is composed of, for example, a unique number for each company (for example, numbers only or a combination of letters and numbers), etc. Also, the application control category is information that sets whether or not applications from employees belonging to a company can be accepted, and the employee group category information is information that indicates categories such as job type, office, and affiliation of the paid employee group and other employee groups.

[0032] 3(b), one record is registered for each combination of company ID, workplace ID, and application start date in the workplace master table 402. Each record contains main information including company ID, workplace ID, workplace name, commuter address, calendar ID, start time, end time, fuel unit price type ID, map information, application start date, application end date, last update date, last updater, and other information.

[0033] Here, the workplace ID is information for identifying the workplace, and is composed of, for example, a unique number for each workplace (for example, numbers only, a combination of letters and numbers). The calendar ID is information for identifying a calendar in which the business days and holidays of the workplace set for each company are written, and is composed of, for example, a unique number for each type of calendar (for example, numbers only, a combination of letters and numbers). The fuel unit price type ID is information for identifying a fuel unit price type set for each company, and is composed of, for example, a unique number for each unit price type (for example, numbers only, a combination of letters and numbers). The fuel unit price types include unit price types for each fuel, such as gasoline (regular), gasoline (high octane), and diesel (diesel), and unit price types for each type of eco-friendly vehicle, such as EV (electric vehicle), PHV (plug-in hybrid electric vehicle), and FCV (fuel cell vehicle). The map information is information on the nearest station to the workplace.

[0034] 3(c), one record is registered for each combination of company ID, employee ID, and application start date in employee information master table 404. Each record contains main information including company ID, employee ID, employee name, employee name (kana), employee postal code (home), employee address (home), phone number, email address, employer ID, employer name, department ID, department name, employee category, payment rule ID, calendar ID, password, authority level, map information, application start date, application end date, last update date, last updater, and other information.

[0035] Here, the department ID is information for identifying the department to which the employee belongs, and is composed of, for example, a unique number for each department (for example, only numbers, a combination of letters and numbers). The employee classification is information for classifying employees into full-time employees, part-time employees, etc., and the authority level is information indicating one of the personnel authority, superior authority, and employee authority. The personnel authority is the authority to use all functions related to the commuting expenses business of this system, the superior authority is the authority to only apply for commuting routes and approve the contents of the application, and the employee authority is the authority to only apply for commuting routes. The calendar ID is information for identifying the employee's personal calendar, and is composed of, for example, a unique number for each employee (for example, only numbers, a combination of letters and numbers). The map information is information on the nearest station to the employee's home.

[0036] 3(d), one record is registered for each combination of company ID, employee ID, and route ID in the employee-specific route information table 406. Each record contains main information including company ID, employee ID, vehicle ID, route direction type, nearest station to employee, route ID, route, route usage period, 1-month amount, 3-month amount, 6-month amount, 12-month amount, one-way amount, one-way distance, one-way time, number of transfers, route reference date, application start date, application end date, last update date, last updater, and other information.

[0037] Here, the route direction type is information indicating the direction of use of the commuting means, and is information on outward, return, or round trip. The route ID is information for identifying the commuting route, and is composed of, for example, a unique number for each commuting route (for example, only numbers, or a combination of letters and numbers). The route is the route from home to the workplace, and for example, if the commuting means is a train, it is "home → walk → nearest station (home) → intermediate station → nearest station (workplace) → walk → workplace", and for example, if the commuting means is a car, it is "home → car → workplace". The one-month amount, three-month amount, six-month amount, and 12-month amount are the amounts of the commuter discount fares for the 1st, 3rd, 6th, and 12th months of the set commuting means and route direction type, the one-way amount is the amount of the one-way regular fare (without discount) for the set commuting means, and the route reference date is the reference date on which the commuting route becomes valid. If the commuting means is a bus, the amount of the coupon ticket may be registered in addition to the amount of the commuter pass and the one-way amount.

[0038] 3(e), one record is registered for each combination of company ID, employee ID, route ID, and payment ID in the employee-specific payment information table 408. Each record contains main information including company ID, employee ID, route ID, payment ID, start date, end date, payment date, payment method, payment period, payment months, payment / deduction amount, self-payment amount, type, period, remarks, cancellation date, payment details, number of regular months, number of regular sheets, payment amount, total payment amount, total self-payment amount, and other information.

[0039] Here, the payment ID is information for uniquely identifying the payment information, and is composed of, for example, a unique number for each payment information (for example, numbers only, or a combination of letters and numbers). The payment method is information indicating the payment method for commuting expenses, such as incorporation into salary, transfer to a bank account, or payment in kind (cash), and the number of months for which payment is made and the number of regular months are either 1 month, 3 months, 6 months, or 12 months. The payment details are information indicating whether or not the payment is continuous, whether or not the payment cycle is fixed, and whether or not the fare revision process is applicable.

[0040] 4(a) and 4(b) are diagrams showing the data structures of the employee pro rata payment information table 410 and the department information table 412. As shown in FIG.

[0041] As shown in Figures 4(a) to (b), the storage device 42 stores an employee-specific daily payment information table 410 that registers daily commuting expense payment information for each employee, and a department information table 412 that registers information on approvers and proxy applicants for each department.

[0042] 4(a), one record is registered for each combination of company ID, employee ID, route ID, payment ID, and daily rate ID in employee-specific daily rate payment information table 410. Each record registers main information including employee ID, company ID, route ID, start date, end date, payment date, payment method, period subject to daily rate payment, number of days subject to payment, type of direction of use (one-way / round trip), number of days, payment amount, total payment amount, and other information.

[0043] Here, the per diem ID is information for uniquely identifying the per diem information, and is composed of, for example, a unique number for each per diem information (for example, numbers only, or a combination of letters and numbers). The per diem payment period is information indicating the period for which commuting expenses are calculated on a per diem basis, the number of payment days is information on the number of days during the payment period for which commuting expenses are paid on a per diem basis, and the direction type (one-way / round trip) is information indicating the type of route direction used during the payment period. The payment details are information indicating whether or not the fare is subject to fare revision processing.

[0044] 4(b), one record is registered for each department and each company in the department information table 412. Each record stores main information including the department ID, company ID, approver ID, proxy applicant ID, application start date, application end date, last update date, last updater, and other information.

[0045] Here, the approver ID is the employee ID of an employee with supervisor authority who is authorized to approve applications for commuting routes for employees who belong to the department corresponding to the department ID, and the proxy applicant ID is the employee ID of an employee with authority to submit commuting route applications on behalf of other employees who belong to the same department.

[0046] In addition to the above tables, the storage device 42 stores personal calendar information including information on scheduled work days for each month for each employee, in association with the company ID, employee ID, and calendar ID. In addition, work performance information regarding the work performance for each month for each employee is stored in association with the company ID and employee ID. Furthermore, fare type setting information, which defines a setting method for setting a fare type for calculating an appropriate transportation expense payment amount, is stored in association with the company ID.

[0047] Here, personal calendar information specifically includes information such as the planned commuting days, planned telecommuting days, total number of planned commuting days, and total number of planned telecommuting days for each employee each month, and is recorded by each employee themselves.

[0048] Furthermore, the work performance information is information including the days and working hours that each employee actually worked each month, and specifically includes information on the days and working hours on which commuting work was performed, information on the days and working hours on which telecommuting was performed, information on the total number of days on which commuting work was performed (hereinafter referred to as "actual number of commuting days"), and information on the total number of days on which telecommuting was performed. Note that this configuration is not limited to this, and other configurations are also possible, such as a configuration that does not include information on working hours, a configuration that does not include the number of days on which telecommuting was performed, or a configuration that does not include information on the total number of days.

[0049] [Operation] Next, the operation of this embodiment will be described. [New commute route information application process] Next, the operation of commute expense calculation server 100 when an employee newly applies for commute route information will be described.

[0050] FIG. 5 is a flowchart showing the process for applying for new commute route information. The CPU 30 starts a predetermined program stored in a predetermined area of ​​the ROM 32, and executes the new commute route information application process shown in the flowchart of FIG. 5 in accordance with the program.

[0051] When the new commute route information application process is executed by CPU 30, as shown in FIG. 5, first, the process proceeds to step S100.

[0052] In step S100, it is determined whether or not a new application request has been received from the employee terminal 200. If it is determined that a new application request has been received (YES), the process proceeds to step S102. If it is determined that a new application request has not been received (NO), the process repeats the determination process until a new application request is received.

[0053] Here, a new application for commuting route information is made, for example, when a new employee registers commuting route information for the first time, or when an employee moves and their commuting route changes.

[0054] If the process proceeds to step S102, an application information input process is executed, and the process proceeds to step S104.

[0055] FIG. 6 is a diagram showing an application information input screen 600. When the application information input process is executed, first, application information input screen information is sent to the employee terminal 200. As a result, the application information input screen 600 shown in Fig. 6 is displayed on the display device of the employee terminal 200. The employee inputs the commuting route information to be applied for into the application information input screen 600 shown in Fig. 6 via the employee terminal 200.

[0056] Specifically, this is a process for accepting input of information to be registered in the employee-specific route information table 406, employee-specific payment information table 408, and employee-specific daily prorated payment information table 410. Note that the screen shown in Fig. 6 is the first screen to be displayed, and the next input screen is displayed by selecting the Next button 61 displayed in the lower right of the application information input screen 600. In other words, the application information input process is performed across multiple screens.

[0057] Specifically, the application information input screen 600 allows the user to input commute route information such as the commuter means (vehicle ID), reason for application, home address, and route direction type. Specifically, the user can select one of three route direction types displayed in a drop-down list, "outbound," "return," and "round trip," and input the type in the input field 60. That is, if only the outbound journey is used, if only the return journey is used, or if the commute routes for the outbound and return journeys are different, the user can set commute route information separately for the outbound and return journeys.

[0058] Also, as shown in the check box 63 of "Register route only" in Fig. 6, it is possible to register only the commuting route. If the check box 63 is not checked, when the commuting route is registered, payment information corresponding to the registered commuting route is immediately and automatically generated, and the generated payment information is registered in the employee-specific payment information table 416. On the other hand, if the check box 63 is checked, even if the commuting route is registered, the automatic generation of payment information is not performed immediately, and the generation work is performed separately by a person in the human resources department or general affairs department.

[0059] The reason why "Register route only" can be selected here is to flexibly accommodate employees who, for example, start commuting using a new route midway through the month, or employees who have a mixed work schedule that includes telecommuting and commuting. When dealing with such employees, it is difficult to generate payment information in advance because it is not possible to simply use a commuter pass. Therefore, it is necessary to calculate the daily commuting allowance amount based on the actual number of commuting days or the planned number of commuting days for the month or each month. In particular, when paying commuting allowances in advance or in the current month, it is necessary to calculate the total daily payment amount (hereinafter referred to as "daily commuting allowance") based on the planned number of commuting days for the month or each month set for each employee.

[0060] In step S104, it is determined whether or not a registration application has been received from the employee terminal 200. If it is determined that a registration application has been received (YES), the process proceeds to step S106. If it is determined that a registration application has not been received (NO), the process proceeds to step S110.

[0061] If the process proceeds to step S106, information about the applicant's department (department ID) is obtained from the employee information master table 404, and approval recipient information (employee ID of an employee with approval authority) corresponding to the obtained department ID is obtained from the department information table 412, and the process proceeds to step S108.

[0062] In step S108, an approval route is constructed based on the obtained approval destination information, and then an approval request for the application information is sent to each approver at the route destination based on the constructed approval route, the series of processes is terminated, and the process returns to the original process.

[0063] As a result, approval is given and the application is permitted, and if "register only route" is not selected, the application information and payment information are registered in the employee-specific route information table 406, employee-specific payment information table 408, and employee-specific daily payment information table 410. On the other hand, if "register only route" is selected, the application information is only registered in the employee-specific route information table 406, and payment information is not generated.

[0064] On the other hand, if in step S104 no registration application is received and the process proceeds to step S110, it is determined whether or not a cancellation request has been received from employee terminal 200. If it is determined that a cancellation request has been received (YES), the process ends and the process returns to the original process; if it is determined that no registration request has been received (NO), the process proceeds to step S104.

[0065] [Payment information addition / modification processing] Next, the operation when a personnel officer adds payment information to the employee-specific payment information table 408 and the employee-specific daily prorated payment information table 410 and modifies registered payment information will be described.

[0066] Figure 7 is a flowchart showing the payment information addition / modification process, Figure 8 is a diagram showing employee information list screen 500, Figure 9 is a diagram showing route list screen 800, and Figure 10 is a diagram showing a first example of payment information list screen 801.

[0067] Here, when an employee with personnel authority logs in to the page providing the commuter travel expense calculation service with an account having personnel authority (hereinafter referred to as the "personnel employee"), the top page of the service is displayed on the display device of the employee terminal 200 of the employee with personnel authority (hereinafter referred to as the "personnel employee"). Although not shown in the figure, this top page displays main menu buttons such as "Application", "Employee Information", and "Business Master". Although not shown in the figure, these main menu buttons are always displayed at the top of the screen and can be selected from pages other than the top page. Then, when an employee with personnel authority selects the "Employee Information" menu button via the employee terminal 200 (by pressing the mouse or touching with a finger, etc.), the employee information list screen 500 shown in FIG. 8 is displayed on the display device. Here, the personnel employee has the authority to perform tasks related to the calculation of commuter travel expenses.

[0068] The payment information addition / modification process is a process executed on the route list screen 800 that is displayed after selecting an employee to be added or modified on the employee information list screen 500 and then selecting the route list button 51.

[0069] The CPU 30 starts a predetermined program stored in a predetermined area of ​​the ROM 32, and executes the payment information addition / modification process shown in the flow chart of FIG. 7 in accordance with the program.

[0070] When the payment information addition / modification process is executed by CPU 30, as shown in FIG. 7, first, the process proceeds to step S200.

[0071] In step S200, it is determined whether or not the route modification button 80 has been selected for a commuting route selected from the list of commuting routes for the selected employee displayed on the route list screen 800, based on information from the employee terminal 200. If it is determined that a route has been selected (YES), the screen information of the payment information list screen 801 is sent to the employee terminal 200 and the process proceeds to step S202; if it is determined that a route has not been selected (NO), the determination process is repeated until a route is selected.

[0072] That is, when the route modification button 80 is selected on the route list screen 800 shown in FIG. 9, a payment information list screen 801 shown in FIG.

[0073] In the example shown in FIG. 10, payment information has not been registered because "Register route only" was selected at the time of application.

[0074] Returning to Fig. 7, when the process proceeds to step S202, it is determined based on information from employee terminal 200 whether or not the Add button 82 has been selected on payment information list screen 801. If it is determined that the button has been selected (YES), screen information of a payment information setting screen (not shown) for setting payment information is sent to employee terminal 200 and the process proceeds to step S204, and if it is determined that the button has not been selected (NO), the process proceeds to step S206. As a result, the payment information setting screen is displayed on the display screen of employee terminal 200, although this is not shown in the figure.

[0075] When the process proceeds to step S204, a payment information addition process is executed, the series of processes is terminated, and the process returns to the original process.

[0076] The payment information addition process corresponds to, for example, when a new commuting route is used partway through a month, the process of adding pro rata payment information for the number of days the new commuting route is used in that month. Also, when a work style includes a mixture of telecommuting and commuting, the process of adding pro rata payment information according to the actual number of commuting days or the planned number of commuting days in each month corresponds to.

[0077] Specifically, the personnel staff inputs necessary information such as the period subject to pro rata payment, the number of days subject to payment, and the type of direction of use (one way / round trip) on the payment information setting screen via the employee terminal 200. The pro rata payment information is set, for example, when the joining date is an odd day and the employee starts work partway through the month using the requested commuting route, and commuting expenses are paid on a pro rata basis only for the days the employee works in that month. In addition, the information is set, for example, when telecommuting is necessary due to the spread of infectious diseases, and telecommuting and commuting are mixed, and commuting expenses are paid on a pro rata basis only for the days the employee works. Therefore, the period subject to pro rata payment is set as the period subject to pro rata payment.

[0078] If the applied commuting route is used partway through the month, the commuting period for that month will become the period for pro rata payments. For example, if the new commuting route is used to commute from June 15th, the period for pro rata payments will be set from June 15th to June 30th. On the other hand, for a work system that combines telecommuting and commuting (mixed work system), the period for each applicable month will become the period for pro rata payments. For example, if a mixed work system is implemented from June 1st, the period for pro rata payments will be set from June 1st to June 30th. If the mixed work system continues from the following month onwards, the period for each month from the following month onwards will also be set as the period for pro rata payments.

[0079] After inputting the necessary information, an OK button (not shown) displayed on the payment information setting screen is selected, and an instruction to generate payment information related to daily pro rata transportation expenses including the input information is sent to commuter transportation expense calculation server 100. As a result, commuter transportation expense calculation server 100 generates payment information related to daily pro rata transportation expenses.

[0080] On the other hand, if the Add button 81 is not selected in step S202 and the process proceeds to step S206, it is determined whether or not the Modify button 83 for the selected payment information is selected on the payment information list screen 801, based on information from the employee terminal 200. If it is determined that the button has been selected (YES), screen information of the payment information setting screen (not shown) is sent to the employee terminal 200 and the process proceeds to step S208, and if it is determined that the button has not been selected (NO), the process proceeds to step S210.

[0081] In other words, although not shown, when already registered pro rata payment information is selected on the payment information list screen 801 and the edit button 83 is selected, a payment information setting screen (not shown) with information already entered is displayed on the display screen of the employee terminal 200.

[0082] When the process proceeds to step S208, the payment information correction process is executed, the series of processes is terminated, and the process returns to the original process.

[0083] Here, the payment information correction process is a process for correcting information that has already been input on the payment information setting screen.

[0084] Furthermore, in step S206, if the Modify button 83 is not selected and the process proceeds to step S210, it is determined whether or not any other button other than the Add button 82 and the Modify button 83 has been selected. If it is determined that any other button has been selected (YES), screen information of the screen corresponding to the other button is transmitted to the employee terminal 200 and the process proceeds to step S212, and if it is determined that no other button has been selected (NO), the process proceeds to step S202.

[0085] When the flow advances to step S212, the process corresponding to the selected button is executed, the series of processes is terminated, and the process returns to the original process.

[0086] Other buttons include a cancel button, a delete button, a confirm button, and a cancel button, as shown in Fig. 10. When the cancel button is selected, the process of canceling the commuter pass is executed, when the delete button is selected, the process of deleting the selected payment information is executed, and when the cancel button is selected, the process of canceling the route modification and returning to the route list screen 800 is executed.

[0087] [Payment information generation process] Next, a description will be given of the operation of the commute travel expense calculation server 100 when executing the process of generating payment information related to the daily pro rata travel expenses. In the following, the calculation period for the daily pro rata travel expenses will be the calculation month.

[0088] Fig. 11 is a flowchart showing the payment information generation process according to this embodiment, and Fig. 12 is a diagram showing a second example of the payment information list screen 801. Fig. 13 is a diagram showing a personal calendar information import screen 900 for importing a CSV file of an employee's personal calendar information. Fig. 15 is a diagram showing a performance information import screen 901 for importing a CSV file of an employee's performance information.

[0089] When the payment information generating process is executed by the CPU 30, as shown in FIG. 11, the process first proceeds to step S250.

[0090] In step S250, it is determined whether or not a generation instruction for payment information has been issued. If it is determined that a generation instruction has been issued (YES), the process proceeds to step S252, and if it is determined that a generation instruction has not been issued (NO), the process repeats the determination process until a generation instruction is issued.

[0091] Here, the instruction to generate payment information corresponds to the instruction issued in the payment information addition process in step S204 of the payment information addition / modification process. In addition, it corresponds to the instruction issued when batch processing is performed to add payment information by the batch processing function implemented in the commuter travel expense calculation server 100.

[0092] In step S252, the actual work record information or personal calendar information for the employee in question corresponding to the calculation month is obtained, and the process proceeds to step S254.

[0093] Specifically, when the calculation period is the calculation month, if a daily transportation fee is to be paid in the month following the target month based on the work performance of the target month, work performance information is obtained, and, for example, if a daily transportation fee for the following month is to be paid in the previous month or the current month, personal calendar information is obtained.

[0094] Here, the commuting travel expense calculation server 100 acquires the work performance information or personal calendar information corresponding to the company ID, employee ID, and calculation target month of the relevant employee stored in the storage device 42. The work performance information and personal calendar information are stored in the storage device 42 as a file of a predetermined file format, such as a CSV file, and can be acquired by selecting and importing the CSV file of the relevant employee, as shown in the example of FIG. 13 or FIG. 15. This import can be performed for all employees to be processed when the batch processing function is applied, and when the files of all employees to be processed are imported, the subsequent processing can be performed for all employees at once. On the other hand, in the payment information addition / modification processing, the file of the selected employee is acquired, and the subsequent processing is performed only for the selected employee.

[0095] The decision as to whether the daily transportation expenses should be paid in advance, in the current month, or in the following month may be made automatically using the time information (year, month, day, hour, minute, and second) of the RTC (Real Time Clock) built into the commuter transportation expense calculation server 100, or may be made by a human resources employee selecting a check box or the like.

[0096] In step S254, the total number of days on which commuting work was performed is obtained from the actual work information for the processing month obtained in step S252, or the total number of days on which commuting was scheduled is obtained from the personal calendar information for the processing month obtained in step S252, and the process proceeds to step S256.

[0097] In step S256, the fare information corresponding to the commuting route of the corresponding employee is obtained, and the process proceeds to step S258. Here, the commuter travel expense calculation server 100 obtains, as fare information, information on the one-way amount for using a ticket (normal fare) and the amount of a one-month commuter pass (one-month amount) from the record of the corresponding employee in the employee-specific route information table 406.

[0098] In step S258, the actual expense payment amount is calculated based on the total number of days acquired in step S254 and the one-way amount (normal fare) acquired in step S256. After that, the process proceeds to step S260.

[0099] Specifically, if the same commute route is used for both the round trip and return journeys, the actual expense allowance is calculated as "actual expense allowance = total number of days x one-way amount x 2." On the other hand, if the commute route is used one way (only the "outbound" or "return" journey), the actual expense allowance is calculated as "actual expense allowance = total number of days x one-way amount." In other words, if the commute route is different for each way, the actual expense allowance is calculated for each commute route.

[0100] In step S260, it is determined whether the actual expense payment amount calculated in step S258 is larger than the monthly amount (hereinafter referred to as the "regular discount payment amount") obtained in step S254. Then, based on the result of this determination, it is determined whether the actual expense payment amount is lower than the regular discount payment amount, and if it is determined to be lower (YES), the process proceeds to step S262, and if it is determined not to be lower (NO), the process proceeds to step S264.

[0101] When the process proceeds to step S262, payment information for paying the actual cost calculated in step S258 is generated, and then the process proceeds to step S266.

[0102] On the other hand, if the process proceeds to step S264, payment information for paying a commuter pass discount payment amount consisting of the one-month commuter pass amount is generated, and then the process proceeds to step S266.

[0103] In step S266, the payment information generated in step S262 or S264 is registered in the record of the corresponding employee in the employee-specific payment information table 408 or the employee-specific daily prorated payment information table 410. Thereafter, the series of processes is terminated and the process returns to the original process.

[0104] Specifically, the commute travel expense calculation server 100 registers the generated payment information in the corresponding record in the employee-specific daily payment information table 410 for employees whose monthly travel expenses are paid at a daily rate, and registers it in the corresponding record in the employee-specific payment information table 408 for employees whose monthly travel expenses are normally paid at the rate of a commuter pass.

[0105] As a result, payment information relating to the registered daily transportation expenses is displayed on payment information list screen 801, as shown in FIG.

[0106] [Exception processing after pro rata payment] Next, an exceptional process after the payment of the daily transportation expenses will be described. Here, the exceptional process after the daily transportation expenses are paid is a process that is executed when the daily transportation expenses for commuting are paid in advance or in the same month.

[0107] Specifically, the exception processing after pro rata payment is a process that responds to a shortage or overpayment of the pro rata transportation expenses that may occur when the pro rata transportation expenses are paid in advance or in the same month. In the following, the calculation period will be explained as the calculation month.

[0108] Specifically, in the post-pro rata payment exception processing, if the pro rata transportation expenses have been overpaid, collection information is generated to collect the difference, and if the pro rata transportation expenses are insufficient, pro rata payment information is generated to pay the shortfall.

[0109] FIG. 14 is a flowchart showing the exception process after pro rata payment. The post-pro rata payment exception process is executed when a preset execution condition is met.

[0110] The CPU 30 starts a predetermined program stored in a predetermined area of ​​the ROM 32, and executes the post-pro rata payment exception process shown in the flowchart of FIG. 14 in accordance with the program.

[0111] When the post-pro rata payment exception process is executed by the CPU 30, as shown in FIG. 14, the process first proceeds to step S300.

[0112] In step S300, it is determined whether or not the execution condition is met. If it is determined that the execution condition is met (YES), the process proceeds to step S302. If it is determined that the execution condition is not met (NO), the determination process is repeated until the execution condition is met.

[0113] Here, the execution conditions are set so that they are met, for example, when there is a request from the employee to whom payment is made, when there is a request from the human resources staff, when a preset execution timing is reached, etc. For example, if the number of days planned to commute increases significantly after the daily travel expenses are paid at the actual cost payment amount, and a one-month commuter pass is purchased, the purchase cost may exceed the actual cost payment amount. In this case, a shortage of daily travel expenses has occurred. Also, for example, if the number of days planned to commute decreases significantly after the daily travel expenses are paid at the commuter discount payment amount, and a ticket is purchased to commute, the cost of commuting may fall below the commuter discount payment amount. In this case, an overpayment of daily travel expenses has occurred.

[0114] In this way, when a shortage or overpayment of daily transportation expenses occurs, the execution condition can be set to be satisfied upon a request from an employee via the employee terminal 200.

[0115] However, if the daily transportation expenses paid in advance exceed the actual cost of commuting, the employee is unlikely to proactively request a refund of the overpaid amount. Therefore, in consideration of such cases, it is possible to set the execution condition to be met periodically for all employees who receive daily transportation expenses on a regular basis (for example, on a fixed date each month).

[0116] In addition, the human resources staff can input an instruction to satisfy the execution condition, so that the execution condition can be satisfied at any timing of the human resources staff's choice.

[0117] If the process proceeds to step S302, the work performance information corresponding to the calculation month for the employee is obtained, and the process proceeds to step S304. Here, the commuter travel expense calculation server 100 obtains information on the total number of days of commuting work from the work performance information corresponding to the employee's company ID, employee ID, and target month stored in the storage device 42. For example, the work performance information can be stored as a CSV file in the storage device 42, and can be obtained by selecting and importing the CSV file for the employee, as shown in the example of FIG. 15. This import can be performed for multiple employees, and when CSV files for multiple employees are imported, the subsequent processing can be performed for multiple employees at once.

[0118] In step S304, the fare information corresponding to the commuting route of the corresponding employee is obtained, and the process proceeds to step S306. Here, the commuting expense calculation server 100 obtains information on the one-way amount (normal fare) and the amount of a one-month commuter pass (monthly amount) from the record of the corresponding employee in the employee-specific route information table 406.

[0119] In step S306, the payment information corresponding to the calculation month for the relevant employee (here, payment information for which pro rata transportation expenses have already been paid) is obtained, and the process proceeds to step S308. Here, the commute transportation expense calculation server 100 obtains the payment information corresponding to the calculation month from the record of the relevant employee in the employee-specific pro rata payment information table 410.

[0120] In step S308, the actual expense payment amount is calculated based on the total number of days acquired in step S302 and the one-way amount (normal fare) acquired in step S304, and the calculated actual expense payment amount is compared with the one-month amount acquired in step S304, and the lower amount is set as the actual payment amount. Then, the process proceeds to step S310.

[0121] In step S310, the amount of the payment information for the calculation month of the employee acquired in step S306 is compared with the actual payment amount set in step S308 to determine whether the amount of the payment information is equal to or less than the actual payment amount. If it is determined that it is equal to or less than the actual payment amount (YES), the process proceeds to step S312, and if it is determined that it is not equal to or less than the actual payment amount (NO), the process proceeds to step S316.

[0122] If the process proceeds to step S312, shortfall payment information for paying the shortfall is generated, and the process proceeds to step S314. That is, since the actual payment amount is higher, payment information for paying the difference with the payment amount is generated.

[0123] In step S314, the underpayment information generated in step S312 is registered in the record of the corresponding employee in the employee-specific daily pro rata payment information table 410. Thereafter, the series of processes ends and the process returns to the original process.

[0124] On the other hand, if it is determined in step S310 that the amount of the payment information is equal to or greater than the actual payment amount, and the process proceeds to step S316, collection information for collecting the overpayment is generated, and the process proceeds to step S318. In other words, since the actual payment amount is lower, the difference between the actual payment amount and the payment amount is collected.

[0125] If the amount in the payment information matches the actual payment amount, there is neither a shortage nor an overpayment, so the subsequent processing is not executed, the series of processing is terminated, and the process returns to the original processing.

[0126] In step S318, the collection information generated in step S316 is stored in the storage device 42 in association with the company ID, employee ID, and target month information of the corresponding employee. After that, the series of processes is terminated and the original process is returned to. Here, the collection information is viewable by the human resources staff, who performs processing based on this collection information, such as deducting the overpayment amount corresponding to the collection information from the salary payment amount.

[0127] 〔effect〕 Next, the effects of this embodiment will be described. In this embodiment, the commuter travel expense calculation server 100, in calculating the daily commuter travel expenses of the commuter route applied for by the employee to be paid, acquires information on the regular fare and the monthly amount (commuter discount payment amount) of the commuter route from the employee-specific route information table 406. In addition, the server acquires information on the actual number of commuting days or the planned number of commuting days for the calculation target period of the employee from the storage device 42, and calculates the actual expense payment amount based on the acquired regular fare and the actual number of commuting days or the planned number of commuting days. Then, the server judges whether the calculated actual expense payment amount is larger than the acquired monthly amount, which is the commuter discount payment amount, and judges which is the lower amount based on the judgment result. Furthermore, the server generates payment information related to the lower payment amount. Then, the server registers the generated payment information in the record of the employee in the employee-specific payment information table 408 or the employee-specific daily payment information table 410.

[0128] With this configuration, a daily commuting allowance amount appropriate for the employee to be paid can be selected, and payment information relating to the selected daily commuting allowance can be generated.

[0129] Furthermore, in this embodiment, when the daily commuting expenses are paid in advance or in the current month, the actual payment amount is calculated based on the actual commuting work (total number of commuting days) of the employee in the target month and the regular fare corresponding to the employee's commuting route depending on whether the execution condition is satisfied, and the actual payment amount is set to the lower of this actual payment amount and the monthly amount (regular discount payment amount). In addition, the daily commuting expenses (calculated based on the scheduled commuting days) corresponding to the daily payment information of the employee in the target month and the actual payment amount are compared in size, and if the actual payment amount is lower, collection information is generated to collect the overpayment amount, and if the actual payment amount is higher, daily payment information is generated to pay the shortfall.

[0130] With this configuration, if an exceptional situation occurs, for example, after a daily commuter allowance is paid at the actual cost, circumstances change and a one-month commuter pass is purchased, resulting in the purchase cost exceeding the actual cost, the shortfall can be paid to the employee. Also, if an exceptional situation occurs, for example, after a daily commuter allowance is paid at the commuter discount amount, circumstances change and a commuter ticket is purchased to commute, resulting in the cost of commuting falling below the commuter discount amount, the overpayment can be collected from the employee.

[0131] However, since both are determined based on actual work performance, for example, if the number of planned commuting days increases significantly after the payment of daily transportation expenses at the actual cost, and you purchase a one-month commuter pass, but are unable to commute for the latter half of the planned commuting days due to illness or injury, the determination will be made based on the number of days you actually performed commuting work. Depending on the actual number of commuting days, the amount may be less than the actual cost payment paid in advance, and you may be required to pay an overpayment.

[0132] [Correspondence] In this embodiment, steps S252 to S254 and S302 correspond to the planned commuting days information acquisition means of invention 1 or 3, or the actual commuting days information acquisition means of invention 2 or 3, step S256 corresponds to the fare information acquisition means of inventions 1 to 3, and step S258 corresponds to the first payment amount calculation means of invention 1 or 3.

[0133] In addition, in this embodiment, steps S262 to S264 correspond to the payment information generating means of invention 1 or 3, step S308 corresponds to the second payment amount calculation means of invention 2 or 3, step S312 corresponds to the underpayment information generating means of invention 2 or 3, and step S316 corresponds to the collection information generating means of invention 2 or 3.

[0134] In addition, in this embodiment, the memory device 42 corresponds to the fare information storage means of Invention 1 or 3, the planned number of commuting days information storage means of Invention 1 or 3, or the actual number of commuting days information storage means of Invention 2 or 3, the regular fare corresponds to the first fare of Invention 3, and the 1-month, 3-month, 6-month and 12-month amounts of the commuter pass correspond to the second fare of Invention 3.

[0135] Second Embodiment 〔composition〕 Next, a second embodiment of the present invention will be described. Fig. 16 is a diagram showing the second embodiment. Only the parts different from the first embodiment will be described below, and the explanation of the overlapping parts will be omitted.

[0136] This embodiment differs from the first embodiment in that, for a newly applied commute route, if the usage start date is a date in the middle of the usage start month, the fare type for calculating the daily transportation cost for the usage start month is determined by a determination method different from that of the first embodiment. The other configurations are the same as those of the first embodiment.

[0137] In this embodiment, if the usage start date of a newly applied commuter route in the usage start month falls within the first period of that month (e.g., the 1st to the 15th), the commuter pass discount fare is set as the fare type used to calculate the transportation expense payable amount for the usage start month. On the other hand, if the usage start date is a date included in the second period of the usage start month (e.g., the 16th to the 30th or 31st), the regular fare is set as the fare type used to calculate the transportation expense payable amount for the usage start month. Hereinafter, this setting method is referred to as the "first setting method." In other words, the first setting method is a setting method appropriate for calculating the transportation expense payable amount for a newly applied commuter route when the usage start date of this route falls on a date partway through the usage start month.

[0138] The first and second periods are set for each commute route applied for. Specifically, the optimal periods are set for each commute route, the month in which use begins, and the number of business days (number of days commuting) in that month. Specifically, the periods are set so that the transportation allowance amount is appropriate for the target employee.

[0139] For example, suppose that the railway company corresponding to the commuting route is railway company A, and the fare is set so that the one-month commuter pass is cheaper than the regular fare if the applied commuting route is used for 18 days or more. In this case, if weekdays are business days and the month of use start is, for example, June, the first period is set to the period from the 1st to the 7th of June, and the second period is set to the period from the 8th to the 30th. Also, for example, suppose that the railway company corresponding to the commuting route is railway company B, and the fare is set so that the one-month commuter pass is cheaper than the regular fare if the applied commuting route is used for 12 days or more. In this case, if weekdays are business days and the month of use start is, for example, June, the first period is set to the period from the 1st to the 15th of June, and the second period is set to the period from the 16th to the 30th. In other words, for railway company A, if the start date of use in June is within the period from the 1st to the 7th, the one-month commuter pass will be cheaper than the actual cost payment amount calculated at the regular fare, and if the start date of use is within the period from the 8th to the 30th, the actual cost payment amount will be cheaper than the one-month commuter pass. Similarly, for railway company B, if the start date in June is between the 1st and 15th, the monthly pass fare will be cheaper than the actual reimbursement amount, and if the start date is between the 16th and 30th, the actual reimbursement amount will be cheaper than the monthly pass fare.

[0140] As explained above, the first and second periods are set as optimal periods for each applied commuting route, and this information is associated with, for example, the commuting route, the means of transport corresponding to the commuting route (e.g., a railroad company, a bus company, etc.), the type of route used, the start month of use, and the number of business days in the start month of use (number of days of commuting work), and is stored in storage device 42. Hereinafter, various information for specifying the first and second periods, such as the commuting route, the means of transport corresponding to the commuting route, the type of route used, the start date of use (year, month, day), and the number of business days in the start month of use (number of days of commuting work), will be referred to as "commuting-related information."

[0141] [Operation] Next, the operation of this embodiment will be described. [Payment information generation process] Next, the operation of commute expense calculation server 100 when executing the process of generating payment information related to daily commute expenses when a commute route is newly applied for will be described.

[0142] FIG. 16 is a flowchart showing the payment information generating process according to this embodiment. When the payment information generating process is executed by the CPU 30, as shown in FIG. 16, the process first proceeds to step S400.

[0143] In step S400, it is determined whether or not a new application for a commute route has been made. If it is determined that a new application has been made (YES), the process proceeds to step S402. If it is determined that a new application has not been made (NO), the process repeats the determination process until a new application is made.

[0144] In step S402, the actual work record information or personal calendar information for the month in which the employee's commuting route was first used, which corresponds to the newly applied commuting route, is obtained, and the process proceeds to step S404.

[0145] Here, the work performance information and personal calendar information include information on the start date of use of the commuting route. As in the first embodiment, the work performance information and personal calendar information are stored in the storage device 42 as a file in a predetermined file format, such as a CSV file, and can be obtained by selecting and importing the CSV file of the relevant employee, for example, as shown in the examples of Figure 13 or Figure 15. This import can be performed for all employees to be processed when the batch processing function is applied, and when the files of all employees to be processed have been imported, the subsequent processing can be performed for all employees at once.

[0146] In step S404, the start date of use is obtained from the work performance information or personal calendar information of the start month of use obtained in step S402, and the process proceeds to step S405.

[0147] In step S405, it is determined whether the start date of use is a date in the middle of the start month of use, and if it is determined that it is a date in the middle of the month (YES), the process proceeds to step S406, and if it is determined that it is not a date in the middle of the month (NO), the process ends and returns to the original process.

[0148] Here, the process of determining whether or not the date is in the middle of the usage start month is basically a process of determining that the usage start date is in the middle if it is a date other than the first business day of the usage start month, and determining that it is not in the middle if it is the first business day. Note that, for example, if the first working day of the usage start month is working on a holiday, this date may be determined to be the business start date. Also, if the usage start date is the business start date, the payment amount is calculated separately based on the three-month amount of a commuter pass, etc.

[0149] In step S406, the first period corresponding to the commuting-related information of the employee is obtained from the storage device 42, and it is determined whether the usage start date obtained in step S404 is a date within the obtained first period. If it is determined that the date is within the first period (YES), the process proceeds to step S408, and if it is determined that the date is not within the first period (NO), the process proceeds to step S410.

[0150] If the process proceeds to step S408, the commuter pass discount fare (monthly amount) is set as the fare type for calculating the daily transportation fee for the usage start month, and the process proceeds to step S410.

[0151] In step S410, the monthly commuter pass amount corresponding to the employee's commuter route is obtained from the employee route information table 406, and payment information is generated to pay the commuter pass discount payment amount consisting of the obtained monthly amount. Then, the process proceeds to step S416.

[0152] On the other hand, if it is determined in step S406 that the start date of use is not a date within the first period (i.e., a date within the second period) and the process proceeds to step S412, the one-way amount (regular fare) is set as the fare type for calculating the daily transportation expenses for the start month of use, and the process proceeds to step S414.

[0153] In step S414, the total number of days on which commuting work was performed is obtained from the work performance information for the use start month obtained in step S402, or the total number of days on which commuting work was performed is obtained from the personal calendar information for the use start month obtained in step S402. In addition, a one-way fare corresponding to the commuting route of the employee is obtained from the employee route information table 406, and a pro rata payment amount is calculated based on the one-way fare amount and the total number of days. Furthermore, payment information for paying the calculated pro rata payment amount is generated, and the process proceeds to step S416.

[0154] In step S416, the payment information generated in step S410 or S414 is registered in the record of the corresponding employee in the employee-specific payment information table 408 or the employee-specific daily prorated payment information table 410. Thereafter, the series of processes ends and the process returns to the original process.

[0155] 〔effect〕 Next, the effects of this embodiment will be described. In this embodiment, when calculating the daily transportation expenses for the commuting route newly applied for by the employee to be paid for the commuting route in the usage start month, if the usage start date is a date in the middle of the usage start month, the commuting transportation expense calculation server 100 acquires the first period, which is the judgment period corresponding to the commuting-related information such as the commuting route information of the employee, from the storage device 42, and judges whether the usage start date is a date within the first period. In addition, based on the result of this judgment, if the date is within the first period, the fare type of the fare used to calculate the daily transportation expenses is set to the regular discount fare (one-month amount), and if the date is not within the first period, the fare type of the fare used to calculate the daily transportation expenses is set to the normal fare (one-way amount). Furthermore, the payment information regarding the daily transportation expenses calculated with the fare of the set fare type is generated. Then, the generated payment information is registered in the record of the employee in the employee-specific payment information table 408 or the employee-specific daily payment information table 410.

[0156] With this configuration, if the start date for the requested commute route falls on a date in the middle of the month, a simple determination process can be used to select a fare type that can calculate an appropriate amount of daily transportation expenses for the recipient, and payment information can be generated regarding the daily transportation expenses calculated using the fare of the selected fare type.

[0157] [Correspondence] In this embodiment, steps S402 to S404 correspond to the planned number of commuting days information acquisition means of invention 4, the actual number of commuting days information acquisition means of invention 8, or the use start date information acquisition means of invention 4, and steps S406 to S414 correspond to the payment information generation means of invention 4, 5, or 8.

[0158] In addition, in this embodiment, the memory device 42 corresponds to the fare information storage means of Invention 4, the usage date information storage means of Invention 4, the planned number of commuting days information storage means of Invention 4, or the actual number of commuting days information storage means of Invention 8, and the regular fare corresponds to the first fare of Invention 4, 5 or 8.

[0159] In this embodiment, the commuter pass discount fare (monthly amount) corresponds to the second fare of invention 4, 5 or 8.

[0160] Third embodiment Next, a third embodiment of the present invention will be described. Fig. 17 is a diagram showing the third embodiment. Only the parts different from the first embodiment will be described below, and the explanation of the overlapping parts will be omitted.

[0161] This embodiment differs from the first embodiment in that the daily transportation expenses for the calculation period are determined to be either the actual cost payment amount or the regular discount payment amount based on the actual number of commuting days or the planned number of commuting days for the calculation period according to the applied commuting route and the judgment reference number of days corresponding to the applied commuting route. The other configurations are the same as those of the first embodiment.

[0162] In this embodiment, if the actual number of commuting days or the planned number of commuting days in the calculation period is less than a preset judgment reference number of days, which is the border number of days at which the actual expense payment amount becomes higher than the commuter pass discount payment amount, the regular fare is set as the fare type used to calculate the commuter pass payment amount for the calculation period. On the other hand, if the actual number of commuting days or the planned number of commuting days in the calculation period is equal to or greater than the judgment reference number of days, the commuter pass discount fare is set as the fare type used to calculate the commuter pass payment amount for the calculation period. Hereinafter, this setting method will be referred to as the "second setting method."

[0163] The number of days that is the standard for determining whether or not an employee is eligible to use the service is set to an optimal number for each commute route that is applied for. Specifically, the number of days is set so that the amount of transportation expenses paid to the employee is appropriate.

[0164] Below, a specific example will be described assuming that the calculation period is the calculation month. For example, suppose that the railway company corresponding to the commuting route is railway company C, and the fare is set so that the one-month commuter pass is cheaper than the regular fare if the applied commuting route is used for 14 days or more round trip. In this case, the judgment reference number of days is set to 14 days. Also, suppose that the railway company corresponding to the commuting route is railway company D, and the fare is set so that the one-month commuter pass is cheaper than the regular fare if the applied commuting route is used for 16 days or more round trip. In this case, the judgment reference number of days is set to 16 days. In other words, for railway company C, if the actual number of commuting days or the planned number of commuting days in the calculation target month is less than the judgment reference number of days, 14 days, the actual expense payment amount is cheaper than the one-month commuter fare, and if it is 14 days or more, the one-month commuter fare is cheaper than the actual expense payment amount calculated at the regular fare. Similarly, for railway company D, if the actual number of commuting days or the planned number of commuting days in the calculation target month is less than the judgment reference number of days, 16 days, the actual expense payment amount is cheaper than the one-month commuter fare, and if it is 16 days or more, the one-month commuter fare is cheaper than the actual expense payment amount.

[0165] As explained above, the judgment reference number of days is set to an optimal number of days for each applied commuting route, and is stored in memory device 42, for example, in association with the commuting route, the transportation facility corresponding to the commuting route (e.g., a railway company, a bus company, etc.), and the type of route used.

[0166] [Operation] Next, the operation of this embodiment will be described. [Payment information generation process] Next, a description will be given of the operation of the commute travel expense calculation server 100 when executing the process of generating payment information related to daily commute expenses. In the following, the calculation target period will be the calculation target month.

[0167] FIG. 17 is a flowchart showing the payment information generating process according to this embodiment. When the payment information generating process is executed by the CPU 30, as shown in FIG. 17, the process first proceeds to step S500.

[0168] In step S500, it is determined whether or not an instruction to generate payment information has been given. If it is determined that an instruction to generate payment information has been given (YES), the process proceeds to step S502. If it is determined that an instruction to generate payment information has not been given (NO), the process repeats the determination process until an instruction to generate payment information is given.

[0169] In step S502, the work performance information or personal calendar information for the employee corresponding to the calculation month is obtained, and the process proceeds to step S504.

[0170] Here, the work performance information and personal calendar information are stored in the storage device 42 as files in a specified file format, such as a CSV file, in the same manner as in the first embodiment, and can be obtained by selecting and importing the CSV file for the relevant employee, for example, as shown in the examples of Figure 13 or Figure 15. This import can be performed for all employees to be processed when the batch processing function is applied, and when the files for all employees to be processed have been imported, the subsequent processing can be performed for all employees at once.

[0171] In step S504, the total number of days on which commuting work was performed (total commuting days) is obtained from the work performance information for the calculation month obtained in step S502, or the total number of days on which commuting was planned (total scheduled commuting days) is obtained from the personal calendar information for the calculation month obtained in step S502. Then, the process proceeds to step S506.

[0172] In step S506, the judgment reference number of days corresponding to the commuting route, etc. of the employee is obtained from the storage device 42, and it is determined whether the total number of days obtained in step S504 is less than the judgment reference number of days obtained. If it is determined that it is less than the judgment reference number of days (YES), the process proceeds to step S508, and if it is determined that it is not (NO), the process proceeds to step S512.

[0173] If the process proceeds to step S508, the one-way amount (regular fare) is set as the fare type for calculating the daily transportation fee, and the process proceeds to step S510.

[0174] In step S510, the one-way fare corresponding to the commuting route of the employee is obtained from the employee route information table 406, and the daily payment amount is calculated based on the obtained one-way fare amount and the total number of days obtained in step S504. In addition, payment information for paying the calculated daily payment amount is generated, and the process proceeds to step S516.

[0175] On the other hand, if it is determined in step S506 that the total number of days is not less than the judgment reference number of days and the process proceeds to step S512, the regular discount fare (monthly amount) is set as the fare type for calculating the daily transportation expenses for the calculation month, and the process proceeds to step S514.

[0176] In step S514, the monthly commuter pass amount corresponding to the employee's commuting route is obtained from the employee route information table 406, and payment information is generated to pay the commuter pass discount payment amount, which is the obtained monthly amount. Then, the process proceeds to step S516.

[0177] In step S516, the payment information generated in step S510 or S514 is registered in the record of the corresponding employee in the employee-specific payment information table 408 or the employee-specific daily prorated payment information table 410. Thereafter, the series of processes ends and the process returns to the original process.

[0178] 〔effect〕 Next, the effects of this embodiment will be described. In this embodiment, the commuter transportation cost calculation server 100, in calculating the daily transportation cost corresponding to the actual number of commuting days or the planned number of commuting days of the commuting route applied for by the employee to be paid, obtains the judgment reference number of days corresponding to the commuting route of the employee from the storage device 42, and judges whether the actual number of commuting days or the planned number of commuting days is less than the judgment reference number of days. In addition, based on this judgment result, if the actual number of commuting days or the planned number of commuting days is less than the judgment reference number of days, the fare type of the fare used to calculate the daily transportation cost is set to the normal fare (one-way amount), and payment information on the daily transportation cost calculated with the fare of this fare type is generated. On the other hand, if the judgment result is not less than the judgment reference number of days, the fare type of the fare used to calculate the daily transportation cost is set to the regular discount fare (one-month amount), and payment information on the daily transportation cost calculated with the fare of this fare type is generated. Then, the generated payment information is registered in the record of the employee in the employee-specific payment information table 408 or the employee-specific daily payment information table 410.

[0179] With this configuration, a simple judgment process can be used to select a fare type that can calculate an appropriate amount of daily transportation expenses for the employee to be paid, and payment information regarding the daily transportation expenses calculated using the fare of the selected fare type can be generated.

[0180] [Correspondence] In this embodiment, steps S502 to S504 correspond to the planned number of commuting days information acquisition means of invention 6 or the actual number of commuting days information acquisition means of invention 8, step S506 corresponds to the threshold acquisition means of invention 6, and steps S506 to S514 correspond to the payment information generation means of inventions 6 to 8.

[0181] In addition, in this embodiment, the memory device 42 corresponds to the fare information storage means of Invention 6, the planned commuting days information storage means of Invention 6, or the threshold value storage means of Invention 6, the judgment reference number of days corresponds to the first threshold value of Invention 7, and the regular fare corresponds to the first fare of Invention 6 or 8.

[0182] In this embodiment, the commuter pass discount fare (monthly amount) corresponds to the second fare of invention 6 or 8.

[0183] [Modifications] In the above embodiment, the actual payment amount for the calculation month is compared with the monthly amount of the commuter pass, and the lower amount is set as the daily transportation fee, but this is not limited to the above. For example, if the daily transportation fee is paid for several consecutive months, the daily transportation fee may be determined by comparing the actual payment amount for several months with the corresponding monthly amount of the commuter pass (for example, the amount for 3 months, 6 months, or 12 months).

[0184] In the above embodiment and its modified example, the configuration is such that it is determined whether the regular discount payment amount is lower (cheaper) than the actual payment amount, and if it is determined that it is lower (cheaper), the regular payment amount is paid, but this is not the only possible configuration. For example, it may be determined whether the regular discount payment amount is higher than the actual payment amount, and if it is determined that it is higher, the actual payment amount is paid. Alternatively, it may be determined whether the regular discount payment amount is higher than the actual payment amount depending on the payment conditions, and if it is determined that it is higher, the regular payment amount is paid, or it may be determined whether the regular discount payment amount is lower (cheaper) than the actual payment amount, and if it is determined that it is lower (cheaper), the actual payment amount is paid.

[0185] In the above embodiment and its modified example, if the use start date is a date within the first period, the fare type used to calculate the daily transportation expenses is set to the regular discount fare, and payment information regarding the regular discount payment amount (for example, one month amount) is generated, but this is not the only possible configuration. For example, it may be determined whether the use start date is a date within the second period, and if it is a date within the second period, the fare type used to calculate the daily transportation expenses is set to the regular fare, the actual payment amount is calculated, and payment information regarding the actual payment amount is generated. In addition, the judgment is not limited to the first or second period. For example, in the following cases: (a) an index that increases in accordance with the number of days from a base date earlier than the start date of use in the calculation period to the start date of use is below a predetermined value; (b) an index that increases in accordance with the number of days from a base date later than the start date of use in the calculation period to the start date of use is above a predetermined value; (c) an index that decreases in accordance with the number of days from a base date earlier than the start date of use in the calculation period to the start date of use is above a predetermined value; or (d) an index that decreases in accordance with the number of days from a base date later than the start date of use in the calculation period to the start date of use is below a predetermined value, the fare type used to calculate the daily transportation expenses may be set to the regular discount fare, and payment information may be generated to pay a regular discount payment amount (for example, a monthly amount). The indicator (a) above corresponds, for example, to the ratio (e.g., 8 / 30 or 31) of the number of days (e.g., 8 days) from the beginning of the month to the start of use date to the calculation target period (e.g., the number of days in the start of use month (e.g., 30 or 31 days)), the indicator (b) above corresponds, for example, to the ratio (e.g., 15 / 30 or 31) of the number of days (e.g., 15 days) from the end of the month to the start of use date to the calculation target period, the indicator (c) above corresponds, for example, to the ratio (e.g., 30 or 31 / 8) of the calculation target period to the number of days (e.g., 8 days) from the beginning of the month to the start of use date, and the indicator (d) above corresponds, for example, to the ratio (e.g., 30 or 31 / 15) of the calculation target period to the number of days (e.g., 15 days) from the end of the month to the start of use date. Note that the calculation target period is not limited to the total number of days in the period, and may be the number of business days.

[0186] In the above embodiment and its modified example, the information on the planned commuting date is obtained from the personal calendar information stored in the storage device 42, but the present invention is not limited to this configuration. For example, the information may be read from another storage medium, may be imported from manually entered information, or may be received and imported from information sent from a terminal used by an employee. The same applies to the case where the information on the start date of use is obtained.

[0187] In the above embodiment and its modified example, the fare type used to calculate the daily transportation cost is selected using the first setting method when the commuting route usage start date is midway through the month, but this is not the only possible configuration. For example, the first setting method may be applied to other similar cases, such as when a person is absent from work due to a long-term hospitalization, and the day of return to work is midway through the month.

[0188] In the above embodiment and its modified example, the actual number of commuting days or the planned number of commuting days is compared with the judgment reference number of days, and if the actual number of commuting days or the planned number of commuting days is equal to or greater than the judgment reference number of days, the fare type used to calculate the daily transportation expenses is set to the regular discount fare, and payment information regarding the regular discount payment amount (for example, one month amount) is generated, but this configuration is not limited to this. For example, information on the actual number of non-commuting days or the planned number of non-commuting days may be acquired or calculated based on the work performance information or personal calendar information, and if the actual number of non-commuting days or the planned number of non-commuting days is less than the judgment reference number of days, the fare type used to calculate the daily transportation expenses may be set to the regular discount fare. Note that when the calculation target period is the calculation target month, the actual number of non-commuting days or the planned number of non-commuting days is "the number of days in the month - the actual number of commuting days or the planned number of commuting days" or "the number of business days in the month - the actual number of commuting days or the planned number of commuting days".

[0189] Also, for example, information on the actual number of commuting days or the planned number of commuting days per week may be obtained from the work performance information or personal calendar information, and the actual number of commuting days or the planned number of commuting days per week may be compared with the second judgment reference number of days for the week (a number of days corresponding to the second threshold and set to be an appropriate payment amount like the judgment reference number of days for the month (first threshold)). If the actual number of commuting days or the planned number of commuting days per week is equal to or greater than the second judgment reference number of days (for example, 4 days), the fare type used to calculate the daily transportation expenses may be set to the regular discount fare. Here, the actual number of commuting days or the planned number of commuting days per week may be obtained, for example, by the average number of days per week (=actual number of commuting days or planned number of commuting days / 4) for the calculation month. Also, information on the actual number of non-commuting days or the planned number of non-commuting days per week may be obtained or calculated based on the work performance information or personal calendar information, and if the actual number of non-commuting days or the planned number of non-commuting days per week is less than the second judgment reference number of days, the fare type used to calculate the daily transportation expenses may be set to the regular discount fare.

[0190] Furthermore, from the same perspective as the judgment reference number of days (first threshold), instead of a threshold for the number of days, a threshold for a first indicator (for example, a percentage threshold (third threshold)) that increases according to the actual number of commuting days or the planned number of commuting days can be set, and, for example, the percentage of the actual number of commuting days or the planned number of commuting days for the calculation period (for example, the actual number of commuting days or the planned number of commuting days / 30 or 31 days or the number of business days) can be obtained or calculated from actual work performance information or personal calendar information, and if this percentage (first indicator) is equal to or greater than a third threshold (for example, the percentage at which a commuter pass is cheaper, "15 days / 30 or 31 days or the number of business days"), the fare type used to calculate the daily transportation expenses can be set to the commuter pass discount fare. In addition, for example, as a second indicator that increases according to the actual number of non-commuting days or the planned number of non-commuting days, the ratio of the actual number of non-commuting days or the planned number of non-commuting days to the calculation period (for example, the actual number of non-commuting days or the planned number of non-commuting days / 30 days or 31 days or the number of business days) may be obtained or calculated from actual work performance information or personal calendar information, and if this ratio (second indicator) is less than a third threshold, the fare type used to calculate the daily transportation expenses may be set to the regular discount fare.

[0191] Furthermore, from the same perspective as the second judgment reference number of days (second threshold), instead of a threshold for the number of days, a threshold for a third indicator (for example, a percentage threshold (fourth threshold)) that increases according to the actual number of commuting days or the planned number of commuting days per week can be set, and, for example, the percentage (third indicator) of the actual number of commuting days or the planned number of commuting days per week to the number of days in a week (7 days or the number of business days per week) can be obtained or calculated from actual work performance information or personal calendar information, and if this percentage is equal to or greater than the fourth threshold (for example, 4 days / 7 days, the border at which a monthly commuter pass becomes cheaper), the fare type used to calculate the daily transportation expenses can be set to the commuter pass discount fare. In addition, for example, as a fourth indicator that increases according to the actual number of non-commuting days or planned number of non-commuting days per week, the ratio of the actual number of non-commuting days or planned number of non-commuting days per week to the number of days in a week (7 days or number of business days per week) (fourth indicator) may be obtained or calculated from actual work performance information or personal calendar information, and if this ratio is less than a fourth threshold, the fare type used to calculate the daily transportation expenses may be set to the regular discount fare.

[0192] From the same viewpoint as the third threshold value described above, a fifth indicator threshold value (e.g., a percentage threshold (fifth threshold value)) that decreases according to the actual number of commuting days or the planned number of commuting days can be set, and, for example, the percentage of the calculation period to the actual number of commuting days or the planned number of commuting days (e.g., 30 or 31 days or number of business days / actual number of commuting days or planned number of commuting days) can be obtained or calculated from actual work performance information or personal calendar information, and if this percentage (fifth indicator) is less than the fifth threshold value (e.g., the percentage at which a commuter pass is cheaper, "30 or 31 days or number of business days / 15 days"), the fare type used to calculate the daily transportation expenses can be set to the commuter pass discount fare. In addition, for example, as a sixth indicator that decreases according to the actual number of non-commuting days or the planned number of non-commuting days, the ratio of the calculation period to the actual number of non-commuting days or the planned number of non-commuting days (for example, 30 days or 31 days, or number of business days / actual number of non-commuting days or planned number of non-commuting days) may be obtained or calculated from actual work performance information or personal calendar information, and if this ratio (sixth indicator) is equal to or greater than the fifth threshold, the fare type used to calculate the daily transportation expenses may be set to the regular discount fare.

[0193] From the same viewpoint as the fourth threshold, a seventh index threshold (for example, a ratio threshold (sixth threshold)) that decreases according to the actual number of commuting days or the planned number of commuting days per week may be set, and for example, the ratio (seventh index) of the number of days per week (7 days or the number of business days per week) to the actual number of commuting days or the planned number of commuting days per week may be obtained or calculated from the work performance information or personal calendar information, and if this ratio is less than the sixth threshold (for example, 7 days / 4 days, the border at which a one-month commuter pass becomes cheaper), the fare type used to calculate the daily commuting expenses may be set to the commuter pass discount fare. Also, for example, as an eighth index that decreases according to the actual number of non-commuting days per week or the planned number of non-commuting days per week, the ratio (eighth index) of the number of days per week (7 days or the number of business days per week) to the actual number of non-commuting days or the planned number of non-commuting days per week may be obtained or calculated from the work performance information or personal calendar information, and if this ratio is equal to or greater than the sixth threshold, the fare type used to calculate the daily commuting expenses may be set to the commuter pass discount fare.

[0194] In the above embodiment and its modified example, the system is configured to determine whether the amount of the payment information for which the daily transportation expenses have already been paid is less than the actual payment amount corresponding to the work performance, and to pay the shortfall or collect the overpayment based on the result of this determination, but this is not limited to the configuration. For example, when the daily transportation expenses are to be paid the following month, it may be configured to determine whether the amount is less than the actual payment amount corresponding to the work performance before the daily transportation expenses corresponding to the generated payment information are paid, and to correct the payment information based on the result of this determination before the daily transportation expenses are paid.

[0195] Furthermore, in the above embodiment and its modified examples, the system is realized as a network system, but the present invention is not limited to this and can also be realized as a single device or application.

[0196] In addition, in the above embodiment and its modified example, the case where the present invention is applied to a network system consisting of the Internet 199 has been described, but the present invention is not limited to this, and may be applied, for example, to a so-called intranet that performs communication in the same manner as the Internet 199. Of course, the present invention is not limited to a network that performs communication in the same manner as the Internet 199, and may be applied to a network of any communication method.

[0197] In addition, in the above embodiments and their variations, when executing the processes shown in the flowcharts of Figures 5, 7, 11, 14, 16 and 17, the case has been described where a program pre-stored in ROM is executed, but this is not limited to the above, and the program showing these procedures may be read into RAM from a storage medium on which the program is stored and executed. [Explanation of symbols]

[0198] 100...commuting travel expense calculation server, 200...employee terminal, 30...CPU, 32...ROM, 34...RAM, 38...I / F, 39...bus, 40...input device, 42...storage device, 44...display device, 199...Internet, 400...company master table, 402...workplace master table, 404...employee information master table, 406...employee route information table, 408...employee payment information table, 410...employee daily rate payment information table, 412...department information table, 500...employee information list screen, 600...application information input screen, 800...route list screen, 801...payment information list screen, 900...personal calendar information import screen, 901...actual information import screen

Claims

1. a route selection means for selecting different routes from among the multiple routes as a route to be used on the outbound journey and a route to be used on the return journey by a single recipient of payment, based on route information stored in a route information storage means that stores route information regarding multiple routes used by a single recipient of payment to travel between a home and a single workplace; A use direction type information acquisition means for acquiring information on a use direction type indicating which of the outward and return routes of the route selected by the route selection means is to be used by the one payee; a payment calculation means for calculating a payment amount for commuting expenses when the one recipient uses the route selected by the route selection means for the outbound or return journey of the route, based on route information in the route information storage means relating to the route selected by the route selection means, fare information in a fare information storage means which stores fare information relating to the fare for the route, and information on the direction of travel acquired by the direction of travel type information acquisition means.

2. In claim 1, The route selection means selects different routes from the plurality of routes for the one recipient to use on the same commuting day for the outbound journey and the return journey, respectively.

3. In any one of claims 1 and 2, The route selection means selects one of the plurality of routes approved by an approval process.

Citation Information

Patent Citations

  • Expense reimbursement system and expense reimbursement method

    JP2006202202A

  • Security control method

    JP2006309560A

  • Commutation traveling expenses change adjustment device, commutation traveling expenses change adjustment method, and commutation traveling expenses change adjustment program

    JP2016192201A

  • Terminal, management server, working management system, control method, and program

    JP2020024653A