Air conditioners
The air conditioner's dual drying operation adjusts compressor frequency and fan speed to dry the indoor heat exchanger safely, addressing discomfort and equipment protection issues.
Patent Information
- Application Number
- JP2021142610
- Authority / Receiving Office
- JP · JP
- Patent Type
- Patents
- Current Assignee / Owner
- Filing Date
- 2021-09-01
- Publication Date
- 2024-10-15
- Estimated Expiration
- 2041-09-01
AI Technical Summary
Drying operations in air conditioners can cause discomfort due to warm air flow into the indoor space and may adversely affect the refrigeration cycle equipment by abnormal pressure increases, especially during high outside temperatures.
The air conditioner employs a dual drying operation strategy with a first and second drying mode, adjusting compressor frequency and fan speed based on temperature and time thresholds to effectively dry the indoor heat exchanger without causing discomfort or equipment damage.
The dual drying operation effectively dries the indoor heat exchanger while preventing user discomfort and protecting the refrigeration cycle equipment, ensuring efficient and safe operation.
Smart Images

Figure 0007566704000001 
Figure 0007566704000002 
Figure 0007566704000003
Abstract
Description
[Technical field]
[0001] An embodiment of the present invention relates to an air conditioner having a drying operation function for an indoor heat exchanger. [Background technology]
[0002] An air conditioner has a refrigeration cycle consisting of a compressor, a four-way valve, an outdoor heat exchanger, a pressure reducer, an indoor heat exchanger, etc., which are connected in sequence through piping, and during cooling operation, the outdoor heat exchanger functions as a condenser and the indoor heat exchanger functions as an evaporator. During heating operation, the indoor heat exchanger functions as a condenser and the outdoor heat exchanger functions as an evaporator.
[0003] In this air conditioner, dust and dirt adhere to the indoor heat exchanger as the operation progresses, and if left as is, the heat exchange efficiency of the indoor heat exchanger will decrease. As a countermeasure, there are examples of performing a cleaning operation in which the indoor heat exchanger is condensed by the same refrigerant flow as in the cooling operation (and dehumidification operation), and the condensation is used to wash away and remove the dust and dirt from the indoor heat exchanger, or a cleaning operation in which the condensation remaining on the indoor heat exchanger after the cooling operation or dehumidification operation is finished is used to wash away and remove the dust and dirt from the indoor heat exchanger.
[0004] These cleaning operations usually include a drying operation in which dust and dirt are removed by draining the condensed water as drain water, and then drying the indoor heat exchanger on which the condensed water remains. This drying operation removes moisture from inside the housing of the indoor unit and reduces the humidity inside the unit, thereby suppressing the growth of mold and bacteria inside the indoor unit. In the drying operation, for example, high-temperature refrigerant discharged from the compressor is supplied to the indoor heat exchanger, and the indoor heat exchanger is heated with the heat of the high-temperature refrigerant to evaporate the condensed water in the indoor heat exchanger, while indoor air is supplied to the indoor heat exchanger by operating the indoor fan, thereby reducing the humidity inside the indoor unit. [Prior art documents] [Patent documents]
[0005] [Patent Document 1] Japanese Patent Application Publication No. 11-63632 Summary of the Invention [Problem to be solved by the invention]
[0006] When the drying operation is performed, the heat from the heated indoor heat exchanger may flow into the indoor space as warm air, causing discomfort to the user (resident). In addition, when the drying operation is performed during the cooling operation period in midsummer, the high outdoor temperature may cause an abnormal increase in the pressure of the refrigeration cycle, which may adversely affect the life of the refrigeration cycle equipment.
[0007] An object of the embodiments is to provide an air conditioner that can eliminate the discomfort caused by the execution of a drying operation and the adverse effects on refrigeration cycle equipment. [Means for solving the problem]
[0008] An air conditioner according to an embodiment includes a refrigeration cycle in which a refrigerant discharged from a compressor is passed through an outdoor heat exchanger, a pressure reducer, and an indoor heat exchanger and returned to the compressor; an indoor fan that supplies indoor air to the indoor heat exchanger; a temperature detection means that detects a temperature of the indoor heat exchanger; and a control means. The control means starts a first drying operation in which the compressor is operated at a first operating frequency to heat the indoor heat exchanger with heat of the refrigerant discharged from the compressor while operating the indoor fan at a first rotation speed, and when a first set time has elapsed from the start of the first drying operation, if the temperature detected by the temperature detection means is equal to or higher than a threshold value, stops the first drying operation, and when the threshold value is not reached, transitions to a second drying operation in which the compressor is operated at a second operating frequency lower than the first operating frequency to heat the indoor heat exchanger with heat of the refrigerant discharged from the compressor while operating the indoor fan at a second rotation speed lower than the first rotation speed. [Brief description of the drawings]
[0009] [Figure 1] FIG. 1 is a diagram showing a configuration of an embodiment. [Diagram 2] FIG. 2 is a block diagram showing a configuration of a control circuit according to an embodiment. [Diagram 3] FIG. 3 is a flowchart showing the control of one embodiment. [Figure 4] FIG. 4 is a flowchart showing a modified example of the control according to the embodiment. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0010] Hereinafter, an embodiment of the present invention will be described with reference to the drawings. The air conditioner includes an outdoor unit A and an indoor unit B shown in Fig. 1. The outdoor unit A is installed outdoors, and houses therein a compressor 1, a four-way valve 2, an outdoor heat exchanger 3, a pressure reducer such as an electric expansion valve 4, an outdoor fan 5, an outdoor air temperature sensor 6, an outdoor control unit 10, etc. The indoor unit B includes an indoor housing that is attached indoors or above the ceiling, and housed therein an indoor heat exchanger 21, an indoor fan 22, a heat exchanger temperature sensor (temperature detection means) 23, an indoor temperature sensor 24, an indoor humidity sensor 25, an indoor control unit 20, etc.
[0011] Compressor 1 draws in, compresses, and discharges refrigerant. One end of outdoor heat exchanger 3 is connected to the discharge port of compressor 1 via four-way valve 2, one end of indoor heat exchanger 21 is connected to the other end of outdoor heat exchanger 3 via motorized expansion valve 4, and the suction port of compressor 1 is connected to the other end of indoor heat exchanger 21 via four-way valve 2. These piping connections constitute a heat pump type refrigeration cycle capable of cooling operation, dehumidification operation, and heating operation.
[0012] The motorized expansion valve 4 is a pulse motor valve (PMV) whose opening changes almost continuously according to the number of input drive pulses. The outdoor fan 5 draws in outdoor air and supplies it to the outdoor heat exchanger 3. The outdoor air temperature sensor 6 detects the temperature To of the outdoor air drawn in by the outdoor fan 5. The indoor fan 22 draws in indoor air and supplies it to the indoor heat exchanger 21. The air that has passed through the indoor heat exchanger 21 is blown out directly into the indoor space (the space to be air-conditioned). The heat exchanger temperature sensor 23 detects the temperature Tc of the indoor heat exchanger 21. The indoor temperature sensor 24 detects the temperature Ti of the indoor air drawn in by the indoor fan 22. The indoor humidity sensor 25 detects the humidity Th of the indoor air drawn in by the indoor fan 22.
[0013] During cooling operation and dehumidification operation, as shown by solid arrows in FIG. 1, high-temperature gaseous refrigerant (gas refrigerant) discharged from the compressor 1 flows into the outdoor heat exchanger 3 through the four-way valve 2. The gaseous refrigerant that flows into the outdoor heat exchanger 3 releases heat to the outdoor air supplied from the outdoor fan 5 and condenses. The liquid refrigerant (liquid refrigerant) that flows out of the outdoor heat exchanger 3 passes through the electric expansion valve 4, becomes low in temperature, and flows into the indoor heat exchanger 21. The liquid refrigerant that flows into the indoor heat exchanger 21 removes heat from the indoor air supplied from the indoor fan 22 and evaporates. The gaseous refrigerant that flows out of the indoor heat exchanger 21 passes through the four-way valve 2 and is sucked into the compressor 1. Due to this flow of refrigerant, the outdoor heat exchanger 3 functions as a condenser, and the indoor heat exchanger 21 functions as an evaporator.
[0014] During heating operation, the flow path of the four-way valve 2 is switched, so that high-temperature gas refrigerant discharged from the compressor 1 flows through the four-way valve 2 to the indoor heat exchanger 21, and liquid refrigerant flowing out from the indoor heat exchanger 21 flows through the motorized expansion valve 4 to the outdoor heat exchanger 3. The gas refrigerant flowing out from the outdoor heat exchanger 3 passes through the four-way valve 2 and is sucked into the compressor 1. Due to this flow of refrigerant, the indoor heat exchanger 21 functions as a condenser, and the outdoor heat exchanger 3 functions as an evaporator.
[0015] The outdoor control unit 10 and the indoor control unit 20 each consist of a microcomputer and its peripheral circuits, and are connected to each other via signal lines. A remote control type operating device (abbreviated as remote control) 30 is connected to the indoor control unit 20 via signal lines as an operating means for setting various conditions related to the operation of the air conditioner, and as a notification means for notifying the user of the operating status of the air conditioner. The configuration of the peripheral parts of the outdoor control unit 10 and the indoor control unit 20 is shown in Figure 2.
[0016] An inverter 11, drive circuits 12, 13, 14, and a transmission / reception unit 15 are connected to the outdoor control unit 10. The inverter 11 converts AC voltage to DC voltage, converts the DC voltage to AC voltage of a frequency (called an operating frequency) F according to a command from the outdoor control unit 10, and outputs the AC voltage as drive power to a motor (compressor motor) 1M of the compressor 1. The drive circuits 12, 13 drive the four-way valve 2 and the electric expansion valve 4 according to a command from the outdoor control unit 10. The drive circuit 14 drives a motor (fan motor) 5M of the outdoor fan 5 at a variable speed according to a command from the outdoor control unit 10. The transmission / reception unit 15 transmits and receives data to and from the indoor control unit 20. An inverter is generally used as the drive circuit 14 that drives the motor (fan motor) 5M of the outdoor fan 5 at a variable speed, but variable speed drive using winding switching by tap switching may also be used.
[0017] The indoor control unit 20 is connected to a heat exchanger temperature sensor (temperature detection means) 23, an indoor temperature sensor 24, an indoor humidity sensor 25, a drive circuit 26, and transmission / reception units 27 and 28. The drive circuit 26 drives the motor (fan motor) 22M of the indoor fan 22 at a rotation speed N according to a command from the indoor control unit 20. The transmission / reception unit 27 transmits and receives data to and from a remote control 30. The remote control 30 has a display unit 31 that displays various information, and an operation unit 32 that can be operated by a user (resident). The transmission / reception unit 28 transmits and receives data to and from the outdoor control unit 10.
[0018] In particular, the indoor control unit 20 executes a cleaning operation for the indoor heat exchanger 21 in cooperation with the outdoor control unit 10. For example, the compressor 1 is started at a regular, predetermined timing when the operation is stopped, thereby forming the same refrigerant flow (cooling cycle) as in the cooling operation (and dehumidification operation) to condense the indoor heat exchanger 21, and a cleaning operation is executed to remove dust and dirt from the indoor heat exchanger 21 by appropriate measures using the condensation. Alternatively, a cleaning operation is executed to remove dust and dirt from the indoor heat exchanger 21 by using the condensation remaining in the indoor heat exchanger 21 immediately after the cooling operation or dehumidification operation is completed. The indoor heat exchanger 21 is formed by a combination of aluminum fins and pipes through which the refrigerant flows. In this indoor heat exchanger 21, it is preferable that the surfaces of the fins and pipes are subjected to a surface treatment (painting) that makes it difficult for dust and dirt to adhere, so that dust and dirt attached to the surfaces can be easily washed away by condensation water.
[0019] These cleaning operations include a drying operation for drying the indoor heat exchanger 21 that is wet due to condensation after the process of washing away and removing dirt from the indoor heat exchanger 21 is completed. As this drying operation, a first drying operation with a higher capacity and a second drying operation with a lower capacity than the first drying operation are prepared.
[0020] Hereinafter, the control of the drying operation executed by the indoor control unit 20 in cooperation with the outdoor control unit 10 will be described with reference to the flowchart in Fig. 3. Steps S1, S2, ... in the flowchart will be abbreviated simply as S1, S2, .... In Fig. 3, the cooling operation and dehumidification operation before the drying operation are omitted, and only the operation of the drying operation portion is shown.
[0021] In the cleaning operation for the indoor heat exchanger 21, after the process of removing dirt from the indoor heat exchanger 21 is completed, when it becomes time to perform a drying operation for drying the indoor heat exchanger 21 that is wet due to condensation (YES in S1), the indoor control unit 20 determines whether the detected temperature Ti of the indoor temperature sensor 24 is within a first temperature range of equal to or higher than a set value (first set value) Ti1 and lower than a set value (second set value) Ti2 (S2). This first temperature range is an operational allowance condition under which even if a first drying operation with a higher capacity is performed, it does not adversely affect the comfort of the indoor space.
[0022] If the temperature Ti detected by the indoor temperature sensor 23 falls within this first temperature range (YES in S2), the indoor control unit 20 judges whether the temperature To detected by the outdoor air temperature sensor 6 falls within a second temperature range of equal to or greater than a predetermined value (first predetermined value) To1 and less than a predetermined value (second predetermined value) To2 (S3). This second temperature range is an allowable operating condition under which even if a first drying operation with a higher capacity is performed, it does not cause an abnormal increase in the high-pressure side pressure and does not adversely affect the life of the refrigeration cycle equipment.
[0023] When the temperature T detected by the outdoor air temperature sensor 6 falls within this second temperature range (YES in S3), the indoor control unit 20 starts the first drying operation (S4). That is, the indoor control unit 20 operates the compressor 1 at a higher operating frequency (first operating frequency) F1, forms a heating cycle in which the high-temperature refrigerant (gas refrigerant) discharged from the compressor 1 flows directly to the indoor heat exchanger 21 through the four-way valve 2, and operates the indoor fan 22 at a higher rotation speed (first rotation speed) N1 while heating the indoor heat exchanger 21 with the heat of the high-temperature refrigerant. For example, the operating frequency F1 is 60 Hz, and the rotation speed N1 is 1000 rpm.
[0024] In this first drying operation, the high-temperature refrigerant supplied to the indoor heat exchanger 21 heats the indoor heat exchanger 21, which has been wetted by the process up to that point in the cleaning operation. The indoor air supplied to the indoor heat exchanger 21 by the operation of the indoor fan 21 promotes condensation of the high-temperature refrigerant in the indoor heat exchanger 21, and promotes evaporation of water remaining on the indoor heat exchanger 21.
[0025] With the start of this first drying operation, the indoor control unit 20 starts counting time t1 (S5) and compares the time count t1 with a set time (first set time) t1s, which is the rated time for the first drying operation (S6). The set time t1s is, for example, 10 minutes. If the time count t1 is less than the set time t1s (NO in S6), the indoor control unit 20 continues the first drying operation in S4 and the time count t1 in S5.
[0026] When the time count t1 reaches the set time t1s (YES in S6), the indoor control unit 20 compares the detected temperature Tc of the heat exchanger temperature sensor 23 with the threshold value Tcs, which is the rated temperature for the drying operation (S7). The threshold value Tcs is, for example, 45°C. When the detected temperature Tc of the heat exchanger temperature sensor 23 reaches the threshold value Tcs (YES in S7), the indoor control unit 20 judges that the drying of the indoor heat exchanger 21 is almost completed and that continuing the first drying operation in this state would adversely affect the life of the refrigeration cycle equipment, so stops (ends) the drying operation (S8) and returns to the processing of S1 above.
[0027] On the other hand, if the detected temperature Tc of the heat exchanger temperature sensor 23 does not meet the threshold value Tcs (NO in S7), the indoor control unit 20 judges that the drying of the indoor heat exchanger 21 is insufficient and starts a second drying operation with a lower capacity than the first drying operation (S9). That is, the indoor control unit 20 operates the compressor 1 at an operating frequency (second operating frequency) F2 lower than the operating frequency F1 of the first drying operation, and maintains the formation of a heating cycle in which the high-temperature refrigerant discharged from the compressor 1 flows directly to the indoor heat exchanger 21 through the four-way valve 2, and operates the indoor fan 22 at a rotation speed (second rotation speed) N2 lower than the rotation speed N1 of the first drying operation while heating the indoor heat exchanger 21 with the heat of the high-temperature refrigerant. For example, the operating frequency F2 is 30 Hz and the rotation speed N2 is 700 rpm.
[0028] In this second drying operation, the high-temperature refrigerant supplied to the indoor heat exchanger 21 has a lower temperature than the high-temperature refrigerant in the first drying operation, but is able to dry the indoor heat exchanger 21. The indoor air supplied to the indoor heat exchanger 21 by the operation of the indoor fan 21 promotes condensation of the high-temperature refrigerant in the indoor heat exchanger 21 and promotes evaporation of the condensation water remaining on the indoor heat exchanger 21.
[0029] With the start of this second drying operation, the indoor control unit 20 starts counting time t2 (S10) and compares the time count t2 with a set time (second set time) t2s, which is the rated time for the second drying operation (S11). The set time t2 is, for example, 5 minutes. If the time count t2 is less than the set time t2s (NO in S11), the indoor control unit 20 continues the second drying operation in S9 above and the time count t2 in S10 above.
[0030] When the time count t2 reaches the set time t2s (YES in S11) and when the detected temperature Tc of the heat exchanger temperature sensor 23 reaches the threshold value Tcs (YES in S12), the indoor control unit 20 stops the second drying operation (S8) and returns to the processing of S1 above. This stopping of the second drying operation marks the end of the series of cleaning operations.
[0031] If the temperature Ti detected by the indoor temperature sensor 23 is not within the first temperature range, which is the operation allowable condition for the first drying operation, in the judgment of S2 (NO in S2), the indoor control unit 20 judges that the first drying operation with higher capacity may adversely affect the comfort of the indoor space, and proceeds to S9 to select and execute the second drying operation with a lower heating capacity for the indoor heat exchanger 21 than the first drying operation (S9). Also, if the temperature To detected by the outdoor air temperature sensor 6 is not within the second temperature range, which is another operation allowable condition for the first drying operation, in the judgment of S3 (NO in S3), the indoor control unit 20 judges that the first drying operation with higher heating capacity may cause an abnormal increase in the high-pressure side pressure, which may adversely affect the life of the refrigeration cycle equipment, and proceeds to S9 as in the case of NO in S2 to start the second drying operation with lower capacity (S9).
[0032] As described above, by selectively executing the first drying operation with a higher capacity and the second drying operation with a lower capacity than the first drying operation according to the indoor air temperature Ti, the outdoor air temperature To, and the heat exchanger temperature Tc of the indoor heat exchanger 21, it is possible to dry the indoor heat exchanger 21 without causing discomfort to users of the indoor space and without adversely affecting the life of the refrigeration cycle equipment. This allows a series of cleaning operations for the indoor heat exchanger 21 to be properly completed to the end.
[0033] In the above embodiment, the cleaning operation for the indoor heat exchanger 21 is described as being performed at a regular, predetermined timing while the operation is stopped, or as being performed immediately after the cooling operation or dehumidification operation is completed. However, the first drying operation and the second drying operation may be performed in a first cleaning operation (manually started cleaning operation) that is started in response to a user's operation of the remote control 30, and in a second cleaning operation (automatically started cleaning operation) that is automatically started after the cooling operation or dehumidification operation is completed.
[0034] In this configuration, the first cleaning operation may be configured to execute the first drying operation or the second drying operation, and the second cleaning operation may be configured to execute the second drying operation without executing the first drying operation. The control of the indoor control unit 20 in this case is shown in the flowchart of FIG. That is, if the manually started first cleaning operation is being performed (YES in Sa), the indoor control unit 20 selectively performs the first drying operation and the second drying operation through the processes in S1 to S12 above. If the automatically started second cleaning operation is being performed (NO in Sa), the indoor control unit 20 proceeds to S9 above and performs the second drying operation without performing the first drying operation, provided that the necessity of the drying operation has been specified in advance by a user operation of the remote control 30 (YES in Sb). If the necessity of the drying operation has not been specified in advance (NO in Sb), the indoor control unit 20 does not perform either the first drying operation or the second drying operation.
[0035] In addition, the above-mentioned embodiments and modifications are presented as examples and are not intended to limit the scope of the invention. The novel embodiments and modifications can be implemented in various other forms, and various omissions, rewritings, and modifications can be made without departing from the scope of the invention. These embodiments and modifications are included in the scope of the invention and the scope of equivalents thereof as described in the claims. [Explanation of symbols]
[0036] A... outdoor unit, B... indoor unit, 1... compressor, 2... four-way valve, 3... outdoor heat exchanger, 4... electric expansion valve (pressure reducer), 6... outdoor temperature sensor, 10... outdoor control unit, 20... indoor control unit, 21... indoor heat exchanger, 22... indoor fan, 23... heat exchanger temperature sensor (temperature detection means), 30... remote control (operation means)
Claims
1. a refrigeration cycle in which the refrigerant discharged from the compressor is passed through an outdoor heat exchanger, a pressure reducer, and an indoor heat exchanger, and then returned to the compressor; an indoor fan for supplying indoor air to the indoor heat exchanger; A temperature detection means for detecting a temperature of the indoor heat exchanger; a control means for starting a first drying operation in which the compressor is operated at a first operating frequency and the indoor fan is operated at a first rotation speed while heating the indoor heat exchanger with heat of the refrigerant discharged from the compressor, and for stopping the first drying operation if the temperature detected by the temperature detection means is equal to or higher than a threshold value after a first set time has elapsed from the start of the first drying operation, and for transitioning to a second drying operation in which the compressor is operated at a second operating frequency lower than the first operating frequency and the indoor fan is operated at a second rotation speed lower than the first rotation speed while heating the indoor heat exchanger with heat of the refrigerant discharged from the compressor, if the temperature detected by the temperature detection means is lower than the threshold value; An air conditioner equipped with:
2. the control means terminates the second drying operation when a second set time has elapsed after the transition to the second drying operation and when the temperature detected by the temperature detection means is equal to or higher than the threshold value. The air conditioner according to claim 1.
3. The control means starts the first drying operation on condition that the temperature of the indoor air is within a first temperature range of equal to or higher than a first set value and lower than a second set value and the temperature of the outdoor air is within a second temperature range of equal to or higher than a first predetermined value and lower than a second predetermined value at the start of the drying operation, and if the condition is not satisfied, executes the second drying operation without executing the first drying operation. The air conditioner according to claim 1 or 2.
4. The control means executes the first drying operation or the second drying operation in a first cleaning operation that is started in response to a user's operation, and executes the second drying operation without executing the first drying operation in a second cleaning operation that is started after the cooling operation and the dehumidification operation are completed. The air conditioner according to any one of claims 1 to 3.
Citation Information
Patent Citations
Air conditioner operation control method
CN106225176A
Air conditioner self-cleaning control method
CN110470070A
Cleaning control method for air conditioner
CN113266934A
Air conditioner
JP1999063632A
Air conditioning system
JP2004138377A
