Information processing device, information processing method, and program
The information processing device uses machine learning to predict hydrogen demand based on customer behavior patterns, enhancing accuracy and operational efficiency by optimizing supply and notification.
Patent Information
- Application Number
- JP2021097938
- Authority / Receiving Office
- JP · JP
- Patent Type
- Patents
- Current Assignee / Owner
- Filing Date
- 2021-06-11
- Publication Date
- 2024-10-16
- Estimated Expiration
- 2041-06-11
AI Technical Summary
Existing methods for predicting hydrogen demand at hydrogen stations lack accuracy, especially when users do not make reservations, leading to potential supply shortages and inefficiencies.
An information processing device utilizing machine learning to predict hydrogen demand based on customer behavior patterns, including vehicle usage data and regional information, to forecast demand without reservations.
Accurately predicts hydrogen demand, stabilizes station profits, reduces supply shortages, and improves operational efficiency by optimizing supply and notification of available stations.
Smart Images

Figure 0007567673000001 
Figure 0007567673000002 
Figure 0007567673000003
Abstract
Description
[Technical field]
[0001] The present invention relates to an information processing device, an information processing method, and a program, and more particularly to an information processing device, an information processing method, and a program for predicting demand for hydrogen at a hydrogen station. [Background technology]
[0002] Patent Document 1 discloses a control method for a hydrogen station reservation system that aims to smoothly fill hydrogen fuel. The method in Patent Document 1 allows a user to input reservation information for reserving the date and time for filling hydrogen fuel at a hydrogen station, and creates a hydrogen filling reservation table in which the input reservation information can be registered. The method in Patent Document 1 also calculates the required amount of hydrogen fuel on a target date that is a preset number of days after the date of reading the reservation information from the user, using the hydrogen filling reservation table in which the reservation information from the user is registered. [Prior art documents] [Patent documents]
[0003] [Patent Document 1] JP 2016-183768 A Summary of the Invention [Problem to be solved by the invention]
[0004] The technology disclosed in Patent Document 1 does not know whether a user will visit a hydrogen station unless the user makes a reservation. Therefore, even if an attempt is made to predict hydrogen demand at a hydrogen station using the technology disclosed in Patent Document 1, the prediction accuracy may be insufficient.
[0005] The present invention provides an information processing device, an information processing method, and a program that are capable of accurately predicting the demand for hydrogen at a hydrogen station. [Means for solving the problem]
[0006] The information processing device of the present invention has an acquisition unit that acquires customer behavior patterns regarding hydrogen-fueled vehicles, and a prediction unit that predicts the demand for hydrogen at at least one hydrogen station using a demand prediction model that is a learned model generated in advance by machine learning, which inputs at least the behavior patterns and outputs predicted demand for hydrogen.
[0007] In addition, the information processing method of the present invention acquires customer behavior patterns regarding hydrogen-fueled vehicles, and predicts the demand for hydrogen at at least one hydrogen station using a demand prediction model, which is a trained model generated in advance by machine learning, and which takes at least the behavior patterns as input and outputs predicted demand for hydrogen.
[0008] In addition, the program of the present invention causes a computer to execute the steps of acquiring customer behavior patterns regarding hydrogen-fueled vehicles, and predicting the demand for hydrogen at at least one hydrogen station using a demand prediction model, which is a trained model generated in advance by machine learning, and which takes at least the behavior patterns as input and outputs predicted demand for hydrogen.
[0009] Since the present invention is configured to predict the demand for hydrogen using the behavioral patterns of customers, it is possible to predict the demand for hydrogen even if the customers do not make reservations. Therefore, the present invention makes it possible to accurately predict the demand for hydrogen.
[0010] Preferably, the prediction unit determines the amount of hydrogen that can be supplied according to the timing based on the predicted demand. By being configured in this manner, the present invention makes it possible to stabilize the profits of a hydrogen station.
[0011] Also, preferably, the prediction unit determines the timing for preparing high-pressure hydrogen gas based on the predicted demand. By being configured in this manner, the present invention makes it possible to reduce opportunity losses such as when a customer visits a hydrogen station and is unable to have hydrogen supplied to his or her vehicle.
[0012] Also, preferably, the prediction unit predicts demand for hydrogen based on the timing at which the customer fills up his / her vehicle with hydrogen, as indicated by the behavior pattern. By being configured in this manner, the present invention can improve the accuracy of predicting hydrogen demand.
[0013] Also, preferably, the prediction unit predicts demand for hydrogen based on reservation information from the customer, as indicated by the behavior pattern. By being configured in this manner, the present invention can improve the accuracy of predicting hydrogen demand.
[0014] In a preferred embodiment, the system further includes a learning unit that performs machine learning on the demand forecasting model, and the learning unit continuously learns the demand forecasting model in accordance with the difference between the demand predicted by the prediction unit and the actual demand. By being configured in this way, the present invention can further improve the accuracy of demand forecasting.
[0015] Preferably, the system further comprises a notification unit that notifies the customer of when and from which hydrogen station hydrogen can be supplied in accordance with the predicted demand. By being configured in this manner, the present invention makes it possible to more reliably adjust the supply and demand of hydrogen.
[0016] In addition, preferably, a hydrogen station group is formed from a plurality of the hydrogen stations, and when the amount of hydrogen that a certain hydrogen station can actually supply falls short of the predicted demand at that hydrogen station, the notification unit notifies the customer that hydrogen can be supplied from another hydrogen station in the hydrogen station group to which the hydrogen station belongs that can supply hydrogen. By being configured in this manner, the present invention makes it possible to balance the supply of hydrogen among a group of hydrogen stations. Effect of the Invention
[0017] According to the present invention, it is possible to provide an information processing device, an information processing method, and a program capable of accurately predicting the demand for hydrogen at a hydrogen station. [Brief description of the drawings]
[0018] [Figure 1] FIG. 1 illustrates an information processing system according to a first embodiment. [Diagram 2] FIG. 2 is a diagram illustrating a hardware configuration of the information processing device according to the first embodiment. [Diagram 3] 1 is a block diagram showing a configuration of an information processing device according to a first embodiment; [Figure 4] FIG. 2 is a diagram illustrating an example of input data input to the demand forecasting model according to the first embodiment. [Diagram 5] FIG. 4 is a diagram illustrating an example of feature amounts in input data according to the first embodiment. [Figure 6] FIG. 2 is a diagram illustrating a customer behavior pattern according to the first embodiment. [Figure 7] FIG. 2 is a diagram illustrating a customer behavior pattern according to the first embodiment. [Figure 8] FIG. 2 is a diagram illustrating a customer behavior pattern according to the first embodiment. [Figure 9] FIG. 2 is a diagram illustrating a customer behavior pattern according to the first embodiment. [Figure 10] FIG. 4 is a diagram illustrating an example of output data output from the demand forecasting model according to the first embodiment. [Figure 11] 4 is a diagram illustrating a demand forecast obtained by a demand forecasting unit according to the first embodiment. FIG. [Figure 12] 4 is a flowchart showing an information processing method executed by the information processing device according to the first embodiment. [Figure 13]4 is a flowchart showing an information processing method executed by the information processing device according to the first embodiment. [Figure 14] FIG. 11 is a diagram illustrating a group of hydrogen stations according to a second embodiment. [Figure 15] FIG. 11 is a block diagram showing a configuration of an information processing device according to a second embodiment. [Figure 16] 11 is a flowchart showing an information processing method executed by an information processing device according to a second embodiment. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0019] (Embodiment 1) Hereinafter, an embodiment of the present invention will be described with reference to the drawings. For clarity of explanation, the following description and drawings are omitted and simplified as appropriate. In addition, in each drawing, the same elements are given the same reference numerals, and duplicate explanations are omitted as necessary.
[0020] FIG. 1 is a diagram showing an information processing system 1 according to a first embodiment. The information processing system 1 includes a plurality of vehicles 2 and an information processing device 10. The vehicles 2 are vehicles (e.g., fuel cell vehicles) that use hydrogen as fuel. The information processing device 10 is, for example, a computer such as a server. The information processing device 10 and the vehicles 2 can be communicatively connected via a network 1a, such as wirelessly. The vehicle 2 may have a hardware configuration of the information processing device 10, which will be described later with reference to FIG. 2.
[0021] The information processing device 10 predicts the demand for hydrogen at a hydrogen station that supplies hydrogen to the vehicle 2. Specifically, the information processing device 10 predicts the demand for hydrogen by a machine learning algorithm such as deep learning, a neural network, or a recurrent neural network. The information processing device 10 may be realized by one or more computers. The information processing device 10 may also be realized by a cloud system. Therefore, the information processing device 10 is not limited to being realized by one physical device.
[0022] 2 is a diagram showing a hardware configuration of the information processing device 10 according to the first embodiment. The information processing device 10 has, as its main hardware components, a CPU 12 (Central Processing Unit), a ROM 14 (Read Only Memory), a RAM 16 (Random Access Memory), and an interface unit 18 (IF; Interface). The CPU 12, the ROM 14, the RAM 16, and the interface unit 18 are connected to each other via a data bus or the like.
[0023] The CPU 12 has a function as a calculation device (processing device or processor) that performs control processing and calculation processing. The calculation device may be realized by a dedicated device for machine learning, such as an NPU (Neural network Processing Unit) or a GPU (Graphics Processing Unit). The ROM 14 has a function as a storage that stores a control program and a calculation program executed by the CPU 12 (calculation device). The RAM 16 has a function as a memory that temporarily stores processing data and the like. The interface unit 18 has a function as a communication device that inputs and outputs signals to and from the outside via wired or wireless communication. The interface unit 18 also has a function as a user interface that accepts a data input operation by a user and performs processing to display information to the user. The interface unit 18 may display the results of the demand forecast.
[0024] 3 is a block diagram showing a configuration of the information processing device 10 according to the first embodiment. The information processing device 10 according to the first embodiment includes a learning unit 100, a trained model storage unit 122, an input data acquisition unit 124 (acquisition unit), a prediction unit 140, a notification unit 150, and a learning continuation processing unit 160. The learning unit 100 includes a teacher data acquisition unit 102 and a demand prediction model learning unit 104. The prediction unit 140 includes a demand prediction unit 142 and a supplyable amount determination unit 144.
[0025] These components can be realized, for example, by the CPU 12 (arithmetic unit) executing a program stored in the ROM 14 (storage unit). Each component may be realized by recording a necessary program in an arbitrary non-volatile recording medium and installing it as necessary. Each component is not limited to being realized by software as described above, but may be realized by hardware such as some kind of circuit element. One or more of the above components may be realized by physically separate hardware. For example, the learning unit 100 may be realized by hardware separate from the other components.
[0026] The learning unit 100 learns a demand prediction model for predicting hydrogen demand at hydrogen stations using the above-mentioned machine learning algorithm. In other words, the learning unit 100 performs machine learning on the demand prediction model. The learning unit 100 performs machine learning to predict hydrogen demand using at least customer behavior patterns. Therefore, the demand prediction model receives input data including at least customer behavior pattern information indicating customer behavior patterns, and outputs demand (predicted demand amount of hydrogen (demand forecast amount)) for each hydrogen station. The demand forecast amount indicates the demand amount of hydrogen after a predetermined period of time (e.g., one day later, two days later, one week later, one month later, etc.).
[0027] The teacher data acquisition unit 102 acquires teacher data, which is a set of input data and correct answer data. The input data includes customer behavior pattern information and area information. Here, the input data is time-series data whose feature values change over time.
[0028] The customer behavior pattern information indicates the behavior pattern of each of a plurality of customers. Therefore, the customer behavior pattern information can be generated for each of a plurality of customers. The customer behavior pattern information can be acquired, for example, from the vehicle 2 owned by the customer via the network 1a. The customer behavior pattern information indicates, for example, the timing (frequency of filling) when the customer fills the vehicle 2 with hydrogen, the hydrogen stations visited by the customer, and the amount of hydrogen filled when filling. Details will be described later.
[0029] The area information is different from the behavioral patterns of the customers and indicates various information in the area. For example, the area information indicates the weather, information about hydrogen stations in the corresponding area, information about events in the corresponding area, etc. Details will be described later.
[0030] The correct answer data corresponds to the output data in the operation phase (inference phase, prediction phase). As described above, the output data indicates the demand for hydrogen for each hydrogen station after a predetermined period of time. Therefore, the correct answer data corresponds to the actual demand for hydrogen for each hydrogen station at a certain time.
[0031] The demand forecast model learning unit 104 performs learning processing of the demand forecast model using the acquired teacher data. The demand forecast model can be realized by a machine learning algorithm such as deep learning, neural network, or recurrent neural network. The demand forecast model learning unit 104 takes the input data as an input and learns the demand forecast model so that the difference between the predicted value and the correct answer data becomes small. The demand forecast model learning unit 104 adjusts parameters that become weights so that the difference between the predicted value and the correct answer data becomes small. The demand forecast model learning unit 104 may generate a demand forecast model using teacher data in a certain period (e.g., several months) as learning data. Then, the demand forecast model learning unit 104 may adjust parameters (weights, etc.) of the demand forecast model using teacher data in a predetermined period (e.g., several weeks) after the period as evaluation data. The demand forecast model learning unit 104 may also extract important features from the input data by an autoencoder.
[0032] FIG. 4 is a diagram illustrating input data input to the demand forecasting model according to the first embodiment. As illustrated in FIG. 4, the input data is time-series data of a plurality of feature quantities. In the example of FIG. 4, the input data is shown with the horizontal axis representing the time axis and the vertical axis representing the time-series feature quantities. That is, each of the feature quantities x1, x2, x3, . . . , x N is time series data. N is the number of features. The features may be sampled, for example, every predetermined period Δt. In this case, t1, t2, t3, . . . , t k The time interval between the sampling periods is Δt. Δt may be, for example, 30 minutes, 1 hour, 6 hours, or 1 day (24 hours). This sampling period Δt may be set appropriately depending on the time-series granularity of the desired demand forecast. For example, the sampling period Δt when it is desired to obtain a demand forecast every few hours may be shorter than the sampling period Δt when it is desired to obtain a demand forecast every few days.
[0033] In addition, input data can be generated for each customer and region. For example, input data (customer behavior pattern information) U1, U2, and U3 for customer #1, customer #2, and customer #3 are generated, respectively. In addition, input data (region information) U1, U2, and U3 for region #1, region #2, and region #3 are generated, respectively. m+1 ,U m+2 ,U m+3 These input data U1 to U M The set of is input as input data to the demand forecasting model.
[0034] FIG. 5 is a diagram illustrating an example of feature quantities in input data according to the first embodiment. Note that the feature quantities illustrated in FIG. 5 are merely examples, and various other feature quantities are possible. Here, in FIG. 5, components x1 to x n indicates the feature value in the customer behavior pattern information. Also, the component x n+1 ~x N indicates the feature value in the regional information. In addition, in the customer behavior pattern information, x n+1 ~x N The value of may be 0. Similarly, in the area information, x1 to x n The value of may be 0.
[0035] 5, a component x1 indicates the position (vehicle position) of the vehicle 2 of the corresponding customer at the corresponding time (sampling time) for the feature amount included in the customer behavior pattern information. Also, a component x2 indicates the remaining amount of hydrogen in the vehicle 2 of the corresponding customer at the corresponding time (sampling time). The remaining amount of hydrogen may be the filling rate (State Of Charge: SOC).
[0036] Furthermore, component x3 indicates the hydrogen station that the corresponding customer visited to fill the vehicle 2 with hydrogen at the corresponding time (sampling time). The component value of x3 is determined in advance for each hydrogen station, for example, "hydrogen station A: x3=1", "hydrogen station B: x3=2", etc. If the customer has not visited the hydrogen station at the corresponding time (sampling time), the component value of x3 may be 0.
[0037] Furthermore, component x4 indicates the amount of hydrogen filled into the vehicle 2 of the corresponding customer. The filled amount may be the increased filling rate when hydrogen is filled. If the customer has not filled hydrogen into the vehicle 2 at the corresponding time (sampling time), the component value of x4 may be 0. Furthermore, component x5 indicates reservation information regarding the corresponding customer. The reservation information indicates whether or not the customer has made a reservation in advance to visit the hydrogen station and fill up with hydrogen for the corresponding time (sampling time). The component value of x5 is predetermined depending on whether or not there is a reservation, for example, "with reservation: x5=1" and "without reservation: x5=0".
[0038] Furthermore, component x6 indicates the frequency of visits by the corresponding customer to each hydrogen station. Furthermore, component x7 indicates the frequency with which the corresponding customer fills up the vehicle 2 with hydrogen. Furthermore, component x8 indicates seasonal fluctuations in the behavioral pattern of the corresponding customer. Note that, as will be described later, x6 to x8 do not have to be time-series data, and can be derived from customer behavioral pattern information. Therefore, x6 to x8 do not have to be included as feature quantities.
[0039] Regarding the feature quantity included in the regional information, in the example shown in Fig. 5, the component x n+1 indicates the weather in the corresponding area at the corresponding time (sampling time). n+1 The component value of is, for example, "Clear: x n+1 =1", "Rainy weather: x n+1 = 2" are predefined for each weather (sunny, rainy, etc.). n+2 indicates the temperature of the corresponding area at the corresponding time (sampling time). Also, the component x n+3 indicates the operation status of a hydrogen station installed in a corresponding area at a corresponding time (sampling time). The operation status indicates, for example, whether a corresponding hydrogen station is in operation for each day of the week and each time period. In addition, the component x n+4indicates event information for the corresponding area. The event information may indicate the type of event to be held at the corresponding time (sampling time) and the scale of the event (such as the number of people that can be accommodated).
[0040] 6 to 9 are diagrams illustrating customer behavior patterns according to the first embodiment. The customer behavior patterns illustrated in FIGS. 6 to 9 are shown as graphs with the horizontal axis representing time and the vertical axis representing the hydrogen filling rate (remaining hydrogen amount) of the corresponding customer's vehicle 2. Therefore, the customer behavior patterns are time-series data. Note that FIGS. 6 to 9 show the hydrogen filling rate over time. Therefore, the filling rate over time in FIGS. 6 to 9 corresponds to the feature "remaining hydrogen amount" illustrated in FIG. 5. Note that the customer behavior patterns may also show the location of the corresponding vehicle 2 over time. In this case, the location of the vehicle 2 over time corresponds to the feature "vehicle location" illustrated in FIG. 5.
[0041] FIG. 6 illustrates an example of a customer behavior pattern of customer #1. In the customer behavior pattern illustrated in FIG. 6, the hydrogen filling rate of customer #1's vehicle 2 drops to 20% about two weeks after the hydrogen filling rate is 90%. Then, the first time the filling rate drops to 20% (time t11), customer #1 visits hydrogen station A and fills up the vehicle from 20% to 90%, i.e., with hydrogen for a filling rate of 70%. At this time, customer #1 makes a reservation to visit hydrogen station A and fill up with hydrogen.
[0042] Furthermore, when the filling rate drops to 20% for the second time (time t12), customer #1 visits hydrogen station B and fills up from 20% to 90%, i.e., a filling rate of 70%. At this time, customer #1 does not make a reservation to visit hydrogen station B to fill up with hydrogen. When the filling rate drops to 20% for the third time (time t13), customer #1 visits hydrogen station A to fill up with hydrogen from 20% to 90%, i.e., a filling rate of 70%. At this time, customer #1 does not make a reservation to visit hydrogen station A to fill up with hydrogen.
[0043] In the customer behavior pattern illustrated in Fig. 6, visiting hydrogen stations A, B, and A at times t11, t12, and t13, respectively, corresponds to the feature "visited hydrogen stations" illustrated in Fig. 5. Also, filling with hydrogen to a filling rate of 70% at times t11, t12, and t13, respectively, corresponds to the feature "amount filled per trip" illustrated in Fig. 5. Also, "reservation: yes," "reservation: no," and "reservation: no" at times t11, t12, and t13, respectively, correspond to the feature "reservation information" illustrated in Fig. 5.
[0044] Furthermore, the fact that customer #1 visited hydrogen station A at time t11 and time t13, and visited hydrogen station B at time t12 corresponds to the feature "visit frequency per hydrogen station" illustrated in Fig. 5. Furthermore, the fact that hydrogen was filled up every two weeks corresponds to the feature "filling frequency" illustrated in Fig. 5.
[0045] FIG. 7 illustrates a customer behavior pattern of customer #1 in a season different from that in FIG. 6. FIG. 6 corresponds to a customer behavior pattern in summer, and FIG. 7 corresponds to a customer behavior pattern in winter. In summer, customer #1 fills hydrogen into vehicle 2 when the filling rate drops to 20%, but in winter, customer #1 fills hydrogen into vehicle 2 when the filling rate drops to 40%. That is, customer #1 fills hydrogen into vehicle 2 before the filling rate drops more in winter than in summer. On the other hand, customer #1 fills hydrogen into vehicle 2 every two weeks in summer, but in winter, customer #1 fills hydrogen into vehicle 2 every three weeks. That is, customer #1 fills hydrogen less frequently in winter than in summer. In this way, the behavior pattern differs depending on the season, which corresponds to the "seasonal variation" of the feature illustrated in FIG. 5.
[0046] FIG. 8 illustrates the customer behavior pattern of customer #2. FIG. 9 illustrates the customer behavior pattern of customer #3. Note that the time axis is the same in FIG. 8 and FIG. 9. As illustrated in FIG. 8, customer #2 fills hydrogen into vehicle 2 once a month. Also, customer #2 fills hydrogen into vehicle 2 when the filling rate drops to 20%. On the other hand, as illustrated in FIG. 9, customer #3 fills hydrogen into vehicle 2 once every two weeks, but may not fill hydrogen into vehicle 2 for two months. Also, customer #3 fills hydrogen into vehicle 2 when the filling rate drops to 40%. In other words, customer #3 normally fills hydrogen more frequently than customer #2. Also, customer #3 fills hydrogen into vehicle 2 before the filling rate drops more than customer #2. Also, customer #2 fills hydrogen into vehicle 2 at roughly the same intervals, whereas customer #3 has periods of low hydrogen consumption, so the intervals at which hydrogen is filled into vehicle 2 are not constant. In this way, behavioral patterns may vary depending on the customer.
[0047] Fig. 10 is a diagram illustrating an example of output data output from the demand forecasting model according to the first embodiment. As illustrated in Fig. 10, the demand forecasting model outputs the predicted hydrogen demand at each hydrogen station after a predetermined period of time. In the example of Fig. 10, for hydrogen station A, the demand forecasting model outputs the hydrogen demand after period T1, the hydrogen demand after period T2, the hydrogen demand after period T3, and the hydrogen demand after period T4. The same is true for hydrogen station B and hydrogen station C.
[0048] Here, in the teacher data used in the learning stage, the correct answer data may correspond to the output data exemplified in FIG. 10. Therefore, the correct answer data may be, for example, the last point in time on the time series of the customer behavior pattern information input for hydrogen station A (t in FIG. 4). k (corresponding to the above) to after a period T1, a period T2, a period T3, and a period T4.
[0049] In the learning stage, information prior to the predicted timing of hydrogen demand (a point in time after a specified period, such as after period T1) may be used as input data for customer behavior pattern information. In the operation stage, past information in a time series may be used as input data for customer behavior pattern information. This is because it is practically difficult to obtain future customer behavior pattern information in the operation stage. In the case of reservation information in customer behavior pattern information, if there is a reservation at the predicted timing, information up to the predicted timing (future information) may be used as input data.
[0050] On the other hand, for regional information, information up to the prediction target time may also be used as input data. In other words, in the operation stage, for regional information, future information may also be used as input data. Here, in the example of FIG. 5, "weather" and "temperature" can be obtained from a weather forecast. Furthermore, "hydrogen station operation status" can be obtained from the operation schedule of the hydrogen station. Furthermore, "event information" can be obtained from the event schedule.
[0051] When learning a demand forecast for a period T1 after time T0, the demand forecast model learning unit 104 may input data for a period ΔT going back from T0, and may learn a demand forecast model using the actual hydrogen demand from time T0 to the period T1 as correct answer data. Note that ΔT is the time from t1 to t on the time axis in FIG. 4. k where ΔT>Δt. For example, when the sampling period is Δt=30 minutes, ΔT=6 hours may be set and input data for the past six hours from T0 may be input to the demand forecasting model. When the sampling period is Δt=24 hours, ΔT=1 month may be set and input data for the past one month from T0 may be input to the demand forecasting model. When the sampling period is Δt=24 hours, ΔT=1 year may be set and input data for the past one year from T0 may be input to the demand forecasting model.
[0052] When the demand prediction model learning unit 104 finishes learning the demand prediction model, it outputs the learned demand prediction model to the learned model storage unit 122. As a result, the learned model storage unit 122 stores the demand prediction model, which is a learned model generated in advance by machine learning. The demand prediction model, which is a learned model, receives input data, which is time-series data including features as exemplified in Fig. 4 and Fig. 5, and outputs the predicted demand for hydrogen for each hydrogen station as exemplified in Fig. 10.
[0053] Furthermore, the learning unit 100 may continue to perform learning on the demand prediction model according to the difference between the demand predicted by the prediction unit 140 (to be described later) and the actual demand. This will be described in detail later.
[0054] The input data acquisition unit 124 acquires the above-mentioned input data in the operation stage. Here, the input data acquisition unit 124 acquires at least a customer behavior pattern (customer behavior pattern information) as input data. The input data acquisition unit 124 acquires the customer behavior pattern information, which is input data, from each vehicle 2 via the network 1a using the interface unit 18. The input data acquisition unit 124 also acquires regional information as input data. The input data acquisition unit 124 also acquires customer behavior pattern information, which is time-series data, for example, from the present time point to a time point going back a predetermined period of time. The input data acquisition unit 124 also acquires regional information, which is time-series data, for example, from a time point going back a predetermined period of time from the present time to a time point that can be acquired in the future.
[0055] The prediction unit 140 predicts the demand for hydrogen at at least one hydrogen station using the demand prediction model stored in the learned model storage unit 122. In other words, the prediction unit 140 predicts the demand for hydrogen at at least one hydrogen station using a demand prediction model that receives as input at least customer behavior pattern information and outputs a predicted demand for hydrogen.
[0056] The demand prediction unit 142 inputs the input data acquired by the input data acquisition unit 124 into the demand prediction model stored in the learned model storage unit 122. As a result, the demand prediction model outputs a predicted demand for hydrogen for each hydrogen station, as shown in Fig. 10. As a result, the demand prediction unit 142 predicts the demand for hydrogen for each hydrogen station.
[0057] In this way, the demand prediction unit 142 (prediction unit 140) is configured to predict the demand for hydrogen at at least one hydrogen station using a demand prediction model that inputs at least customer behavior pattern information and outputs predicted hydrogen demand. This allows the information processing device 10 according to the first embodiment to accurately predict the demand for hydrogen at a hydrogen station. In other words, since it is configured to predict the demand for hydrogen using customer behavior patterns, it is possible to predict the demand for hydrogen even if a customer does not visit a hydrogen station and make a reservation to fill up with hydrogen. Therefore, the information processing device 10 according to the first embodiment is able to accurately predict the demand for hydrogen.
[0058] In addition, from the feature quantities "remaining hydrogen amount," "visited hydrogen stations," and "amount filled per time" illustrated in FIG. 5, it can be said that the customer behavior pattern information, which is time-series data, indicates the timing when the customer fills the vehicle with hydrogen. In other words, the timing when the component value of the feature quantity "remaining hydrogen amount" increases and the component values of the feature quantities "visited hydrogen stations" and "amount filled per time" change corresponds to the timing when the customer fills the vehicle with hydrogen. Therefore, the demand prediction unit 142 predicts the demand for hydrogen using the timing when the customer fills the vehicle with hydrogen, which is indicated in the customer behavior pattern information. Since the demand prediction unit 142 (prediction unit 140) predicts the demand for hydrogen as described above, it is possible to improve the prediction accuracy of the demand for hydrogen. In other words, the timing when the customer fills the vehicle with hydrogen often occurs at roughly the same cycle. Therefore, the demand prediction model is adjusted so as to predict that the demand will be high at the timing corresponding to that cycle, thereby making it possible to improve the prediction accuracy.
[0059] As illustrated in FIG. 5, the customer behavior pattern information includes the vehicle location. Therefore, the demand prediction unit 142 predicts the demand for hydrogen using the customer's vehicle location indicated by the customer behavior pattern information. As illustrated in FIG. 5, the customer behavior pattern information includes the remaining amount of hydrogen. Therefore, the demand prediction unit 142 predicts the demand for hydrogen using the remaining amount of hydrogen in the customer's vehicle 2 indicated by the customer behavior pattern information. The demand prediction unit 142 (prediction unit 140) predicts the demand for hydrogen as described above, so that the prediction accuracy of the demand for hydrogen can be improved. That is, for example, when the remaining amount of hydrogen in the customer's vehicle 2 becomes low enough to require refueling (a filling rate of 20% in the examples of FIGS. 6 and 8, and a filling rate of 40% in the examples of FIGS. 7 and 9), the customer is likely to visit a hydrogen station. Furthermore, the customer is likely to visit a hydrogen station close to the vehicle location at that time. Therefore, the prediction accuracy can be improved by adjusting the demand prediction model so as to predict that the demand for hydrogen stations close to the vehicle location at that time will be high at that time.
[0060] As shown in FIG. 5, the customer behavior pattern information includes reservation information. Therefore, the demand prediction unit 142 predicts the demand for hydrogen using the reservation information from customers, which is indicated in the customer behavior pattern information. Since the demand prediction unit 142 (prediction unit 140) predicts the demand for hydrogen as described above, it is possible to improve the prediction accuracy of the demand for hydrogen. In other words, there is a very high possibility that a customer will visit a hydrogen station at a time corresponding to the reservation information. Therefore, by adjusting the demand prediction model so as to predict that demand will be high at that time, it is possible to improve the prediction accuracy.
[0061] FIG. 11 is a diagram illustrating a demand forecast obtained by the demand forecasting unit 142 according to the first embodiment. FIG. 11 illustrates a demand forecast for hydrogen station A. FIG. 11 also illustrates a graph in which the horizontal axis represents time and the vertical axis represents predicted demand. Here, the demand forecast model outputs predicted demand at multiple timings (after T1, after T2, after T3, after T4, ...) as illustrated in FIG. 10. Therefore, the graph illustrated in FIG. 11 can be generated by plotting the predicted demand at these multiple timings.
[0062] In the demand forecast illustrated in FIG. 11, the demand increases at a timing corresponding to Ta. The demand decreases at a timing corresponding to Tb. The demand increases at a timing corresponding to Tc. Note that Ta, Tb, and Tc may indicate a time, a time period, or a date. Whether each timing indicates a time, a time period, or a date may depend on which timing of the demand forecast is performed. For example, if the demand forecasting model is configured to perform a demand forecast for each time period in a day, the above timing may indicate a time period. Also, if the demand forecasting model is configured to perform a demand forecast for each date in a week or a month, the above timing may indicate a date.
[0063] The supplyable amount determination unit 144 determines the amount of hydrogen that can be supplied (supplyable amount) according to the timing based on the predicted demand. Specifically, the supplyable amount determination unit 144 determines the supplyable amount so that the supplyable amount is increased at a timing when the demand is predicted to be high. On the other hand, the supplyable amount determination unit 144 determines the supplyable amount so that the supplyable amount is decreased at a timing when the demand is predicted to be low. In the example of FIG. 11, the supplyable amount determination unit 144 determines the supplyable amount at each timing for hydrogen station A such that the supplyable amount at time Ta is greater than the supplyable amount at time Tb. Similarly, the supplyable amount determination unit 144 determines the supplyable amount at each timing for hydrogen station A such that the supplyable amount at time Tc is greater than the supplyable amount at time Tb.
[0064] In this way, the supplyable amount determination unit 144 (prediction unit 140) determines the amount of hydrogen that can be supplied (supplyable amount) according to the timing based on the predicted demand, which makes it possible to stabilize the profits of the hydrogen station. In other words, by increasing the supplyable amount at times when demand is predicted to be high, it is possible to reduce opportunity losses such as the hydrogen station being unable to supply hydrogen when a customer visits the hydrogen station to fill up the vehicle 2 with hydrogen. In addition, by reducing the supplyable amount at times when demand is predicted to be low, it is possible to reduce losses due to over-preparation. This makes it possible to stabilize the profits of the hydrogen station.
[0065] Furthermore, the available supply amount determination unit 144 may determine the amount of hydrogen preparation in accordance with the timing of ordering hydrogen based on the predicted demand for hydrogen. Specifically, the available supply amount determination unit 144 determines the amount of hydrogen preparation corresponding to the demand for a period corresponding to the frequency of ordering for each hydrogen station. For example, when hydrogen is ordered once a week for hydrogen station A, the available supply amount determination unit 144 determines the amount of hydrogen preparation corresponding to the predicted demand for hydrogen for one week for hydrogen station A. For example, the amount of hydrogen preparation may be determined by adding up the predicted demand amounts at each timing at which the demand is predicted within one week. In this way, the available supply amount determination unit 144 (prediction unit 140) determines the amount of hydrogen preparation in accordance with the timing of ordering hydrogen based on the predicted demand for hydrogen, thereby further suppressing the opportunity loss or overpreparation described above.
[0066] Furthermore, the supplyable amount determination unit 144 may determine the timing for preparing high-pressure hydrogen gas based on the predicted demand. Specifically, when hydrogen demand is predicted for each time period of a day, the supplyable amount determination unit 144 determines the timing for preparing high-pressure gas so that high-pressure gas (high-pressure hydrogen) is prepared a predetermined time (e.g., one hour) before the time period when demand is high. The "predetermined time" may be set appropriately according to the time required to pressurize hydrogen. Even if hydrogen is prepared at a hydrogen station, hydrogen cannot be supplied to the vehicle 2 unless the hydrogen is pressurized. Therefore, by determining the timing for preparing high-pressure hydrogen gas based on the predicted demand, it is possible to suppress opportunity losses such as not being able to supply hydrogen to the vehicle 2 when a customer visits the hydrogen station.
[0067] The notification unit 150 notifies the customer of when and from which hydrogen station hydrogen can be supplied according to the predicted demand. Using the interface unit 18, the notification unit 150 transmits a notification (supply availability notification) to the customer's device via the network 1a indicating the hydrogen stations that can supply hydrogen and the timing (time period) when hydrogen can be supplied from the hydrogen stations.
[0068] Specifically, the notification unit 150 determines the timing when it is predicted that there will be a demand for hydrogen for each hydrogen station. For example, the notification unit 150 determines the timing when it is predicted that the demand for hydrogen will be equal to or greater than a predetermined value for each hydrogen station. Then, the notification unit 150 sets the timing when it is predicted that there will be a demand for hydrogen for each hydrogen station as the timing when hydrogen can be supplied. Then, the notification unit 150 generates a supply availability notification according to this hydrogen station and timing. The notification unit 150 transmits the generated supply availability notification.
[0069] For example, the notification unit 150 may transmit a supply availability notification to the customer's vehicle 2. This causes the supply availability notification to be displayed on the vehicle 2. In this case, the notification unit 150 may display the supply availability notification using a navigation system mounted on the vehicle 2. For example, when a hydrogen station capable of supplying hydrogen is displayed on the screen of the navigation system, the notification unit 150 may display the timing when hydrogen can be supplied at that hydrogen station.
[0070] Also, for example, the notification unit 150 may transmit a supply availability notification to a terminal (such as a smartphone) owned by the customer. In this case, the notification unit 150 may perform the same process for the navigation system of the vehicle 2 as described above for the navigation system that can be realized on the customer's terminal. Alternatively, the notification unit 150 may cause the terminal to display a list that associates hydrogen stations with the timing when hydrogen can be supplied.
[0071] Alternatively, the notification unit 150 may display a supply availability notification on the website of the hydrogen station. In this case, the notification unit 150 may display a map on the website and display the times when hydrogen can be supplied at the hydrogen stations displayed on the map. Alternatively, the notification unit 150 may display on the website a list that associates hydrogen stations with the times when hydrogen can be supplied.
[0072] The notification unit 150 notifies the customer of when and at which hydrogen station hydrogen can be supplied according to the predicted demand, thereby improving convenience for the customer. Furthermore, the hydrogen station also increases the possibility of being able to supply the prepared hydrogen. Therefore, by notifying the customer as described above, it becomes possible to more reliably adjust the demand and supply of hydrogen.
[0073] Furthermore, the notification unit 150 may also notify the price of hydrogen when notifying the hydrogen stations that can supply hydrogen and the timing when hydrogen can be supplied. This allows the customer to simultaneously know the price of hydrogen and the timing when hydrogen can be filled into the vehicle 2, improving convenience for the customer.
[0074] The continuing learning processing unit 160 performs a process for continuing the learning of the demand prediction model. Specifically, the continuing learning processing unit 160 acquires an actual value (actual demand amount) corresponding to the predicted value of the demand. Then, the continuing learning processing unit 160 performs a continuing process of the learning by the learning unit 100 (continuing learning process) according to the difference between the predicted value and the actual value of the demand. More specifically, the continuing learning processing unit 160 performs the continuing learning process when the difference between the predicted value and the actual value of the demand is equal to or greater than a predetermined threshold. That is, when the difference between the predicted value and the actual value of the demand becomes large, it is a case where the accuracy of the demand forecast by the demand prediction model may have decreased. Therefore, in this case, it is preferable to re-learn the demand prediction model. The above threshold can be appropriately determined according to the accuracy of the demand required.
[0075] The continuous learning process may be performed, for example, as follows. The continuous learning processing unit 160 acquires, as input data, customer behavior pattern information (and area information) up to the time when the difference between the predicted value and the actual value of the demand becomes equal to or greater than a predetermined threshold. The continuous learning processing unit 160 also acquires, as supervised data, the actual value of the demand obtained up to that time. Here, since more time has passed at this time than in the learning stage of the demand forecasting model, the amount of input data acquired at this time is greater than the amount of input data used in the learning stage of the demand forecasting model. The continuous learning processing unit 160 then performs processing to re-learn the demand forecasting model using the acquired set of input data and supervised data as teacher data. In this way, the learning unit 100 re-learns the demand forecasting model.
[0076] The learning continuation process does not have to be executed immediately when the difference between the demand forecast value and the actual value becomes equal to or greater than the threshold value. For example, the learning continuation process may be executed when the difference between the demand forecast value and the actual value becomes equal to or greater than the threshold value a predetermined number of times or more.
[0077] In this way, the information processing device 10 may continue to perform learning for the machine learning algorithm according to the difference between the demand predicted by the prediction unit 140 and the actual demand. With such a configuration, the demand prediction model is adjusted according to the actual operation, so that it is possible to further improve the prediction accuracy of the demand.
[0078] 12 and 13 are flowcharts showing an information processing method executed by the information processing device 10 according to the first embodiment. The flowcharts shown in Fig. 12 and 13 correspond to a demand prediction method for predicting demand for hydrogen.
[0079] 12 shows the process in the learning stage of the demand forecasting model. As described above, the teacher data acquisition unit 102 acquires teacher data, which is a set of input data and correct answer data (step S102). As described above, the demand forecasting model learning unit 104 performs a learning process of the demand forecasting model using the acquired teacher data (step S104).
[0080] 13 shows the process in the operation stage of the demand forecasting model. As described above, the input data acquisition unit 124 acquires input data (step S112). As described above, the input data includes at least a customer behavior pattern (customer behavior pattern information).
[0081] As described above, the demand prediction unit 142 inputs input data into the demand prediction model, which is a trained model, and obtains the predicted hydrogen demand for each hydrogen station (step S114). As described above, the supplyable amount determination unit 144 determines the supplyable amount based on the predicted demand (step S116). As described above, the notification unit 150 notifies the customer of the hydrogen stations that can supply hydrogen and the time periods (timing) (step S118).
[0082] The continuing learning processing unit 160 judges whether the difference between the predicted value and the actual value of the demand is equal to or greater than a predetermined threshold value (step S120). If it is judged that the difference between the predicted value and the actual value of the demand is equal to or greater than the threshold value (YES in S120), the continuing learning processing unit 160 performs the continuing learning process as described above (step S122). On the other hand, if it is not judged that the difference between the predicted value and the actual value of the demand is equal to or greater than the threshold value (NO in S120), the process of S122 is not performed. Then, the processes of S112 to S122 may be repeated.
[0083] (Embodiment 2) Next, a second embodiment will be described. The second embodiment differs from the first embodiment in that a group of hydrogen stations (hydrogen station group) made up of a plurality of hydrogen stations is taken into consideration. Note that the configuration of the information processing system 1 according to the second embodiment is substantially similar to the configuration of the information processing system 1 according to the first embodiment shown in FIG. 1, and therefore a description thereof will be omitted. Also, the hardware configuration of the information processing device 10 according to the second embodiment is substantially similar to the hardware configuration of the information processing device 10 according to the first embodiment shown in FIG. 2, and therefore a description thereof will be omitted.
[0084] FIG. 14 is a diagram illustrating a hydrogen station group according to the second embodiment. As illustrated in FIG. 14, a hydrogen station group is made up of a plurality of hydrogen stations. For example, hydrogen station group X is made up of hydrogen station A and hydrogen station B. In other words, hydrogen station A and hydrogen station B belong to hydrogen station group X. Furthermore, hydrogen station group Y is made up of hydrogen station C and hydrogen station D. In other words, hydrogen station C and hydrogen station D belong to hydrogen station group Y. Note that one hydrogen station may belong to a plurality of hydrogen station groups.
[0085] A hydrogen station group may be made up of, for example, multiple hydrogen stations that have the same hydrogen supplier (such as a hydrogen manufacturer). Also, a hydrogen station group may be made up of, for example, multiple hydrogen stations located in the same area. Note that the number of hydrogen stations that make up a hydrogen station group may be any number equal to or greater than two. Also, the number of hydrogen stations that make up each hydrogen station group may be different.
[0086] Fig. 15 is a block diagram showing a configuration of the information processing device 10 according to the second embodiment. The information processing device 10 according to the second embodiment has substantially the same components as those of the information processing device 10 according to the first embodiment shown in Fig. 3. Furthermore, the information processing device 10 according to the second embodiment has a supply determination unit 210. In the information processing device 10 according to the second embodiment, the functions of the components of the information processing device 10 shown in Fig. 3 are substantially similar to those of the first embodiment unless otherwise specified, and therefore description thereof will be omitted.
[0087] The supply determination unit 210 determines whether each hydrogen station can actually supply hydrogen corresponding to the predicted demand. Specifically, the supply determination unit 210 acquires the actual supplyable amount at the time when the demand is predicted for each hydrogen station. Note that the actual supplyable amount may differ from the supplyable amount determined by the supplyable amount determination unit 144. That is, in some cases, hydrogen may not be prepared to meet the predicted demand. In that case, the actual supplyable amount will be less than the supplyable amount determined by the supplyable amount determination unit 144 (i.e., the predicted demand).
[0088] The supply determination unit 210 compares the predicted demand for each hydrogen station with the actual supply available at the predicted timing, and if the actual supply available falls short of the predicted demand, the supply determination unit 210 determines that the hydrogen station may not be able to supply sufficient hydrogen to customers at that timing.
[0089] In this case, the supply determination unit 210 decides to notify (suggest) to the customer other hydrogen stations in the group to which the hydrogen station belongs that can supply hydrogen. The supply determination unit 210 also determines whether the actual supplyable amount of the other hydrogen stations at that time is equal to or greater than the predicted demand.
[0090] Therefore, in this case, the notification unit 150 notifies the customer that hydrogen can be supplied from another hydrogen station in the hydrogen station group to which the hydrogen station belongs that can supply hydrogen. For example, suppose that at a certain time, the actual supplyable amount for hydrogen station A is lower than the predicted demand, but the actual supplyable amount for hydrogen station B is equal to or greater than the predicted demand. In this case, the notification unit 150 notifies the customer that hydrogen can be supplied from hydrogen station B in hydrogen station group X to which hydrogen station A belongs. In other words, the notification unit 150 does not need to notify that hydrogen station A can supply hydrogen at that time.
[0091] The information processing device 10 according to the second embodiment is configured to notify customers of other hydrogen stations that can supply hydrogen at a certain timing when a certain hydrogen station cannot supply enough hydrogen to meet the predicted demand at that timing. This makes it possible to prevent an imbalance in hydrogen supply in the same hydrogen station group, where one hydrogen station may not be able to supply hydrogen while another hydrogen station may be able to supply hydrogen. In other words, it becomes possible to balance the hydrogen supply in the hydrogen station group.
[0092] FIG. 16 is a flowchart showing an information processing method executed by the information processing device 10 according to the second embodiment. FIG. 16 corresponds to a demand prediction method in the operation stage of the demand prediction model. As in S112 of FIG. 13, the input data acquisition unit 124 acquires input data (including at least customer behavior pattern information) (step S212). As in S114 of FIG. 13, the demand prediction unit 142 inputs the input data into the demand prediction model, which is a trained model, and acquires a predicted hydrogen demand amount for each hydrogen station (step S214). As in S114 of FIG. 13, the supplyable amount determination unit 144 determines a supplyable amount based on the predicted demand (step S216).
[0093] As described above, the supply determination unit 210 obtains the actual supplyable amount at the predicted timing for a certain hydrogen station (step S218). The supply determination unit 210 determines whether the actual supplyable amount is lower than the predicted demand amount (step S220). If it is determined that the actual supplyable amount is lower than the predicted demand amount (YES in S220), the notification unit 150 notifies the customer of other hydrogen stations in the same hydrogen station group as the hydrogen station, as described above (step S222). On the other hand, if it is not determined that the actual supplyable amount is lower than the predicted demand amount (NO in S220), the notification unit 150 does not perform the process of S222. In this case, the notification unit 150 may perform the process of S118.
[0094] (Modification) The present invention is not limited to the above embodiment, and can be modified as appropriate without departing from the spirit of the present invention. For example, the order of the steps in the above-mentioned flowchart can be changed as appropriate. Also, one or more steps in the above-mentioned flowchart can be omitted as appropriate.
[0095] The program includes a set of instructions (or software code) that, when loaded into a computer, causes the computer to perform one or more functions described in the embodiments. The program may be stored in a non-transitory computer-readable medium or a tangible storage medium. By way of example and not limitation, the computer-readable medium or tangible storage medium includes random-access memory (RAM), read-only memory (ROM), flash memory, solid-state drive (SSD) or other memory technology, CD-ROM, digital versatile disk (DVD), Blu-ray® disk or other optical disk storage, magnetic cassette, magnetic tape, magnetic disk storage or other magnetic storage device. The program may be transmitted on a transitory computer-readable medium or communication medium. By way of example and not limitation, the transitory computer-readable medium or communication medium includes electrical, optical, acoustic, or other forms of propagated signals. [Explanation of symbols]
[0096] 1. Information Processing Systems 2 Vehicles 10. Information processing device 100 Learning Department 102 Teacher Data Acquisition Department 104 Demand forecast model learning section 122 Trained model storage 124 Input data acquisition unit 140 Prediction Department 142 Demand Forecasting Department 144 Available supply amount determination section 150 Notification Department 160 Learning Continuation Processing Unit 210 Supply judgment section
Claims
1. An acquisition unit that acquires customer behavior patterns related to hydrogen-fueled vehicles; a prediction unit that predicts the demand for hydrogen at at least one hydrogen station using a demand prediction model that is a trained model generated in advance by machine learning and that inputs at least the behavioral patterns and outputs a predicted demand for hydrogen; a notification unit that notifies customers of when and at which hydrogen station hydrogen can be supplied according to the predicted demand; having when the amount of hydrogen that can actually be supplied at a certain hydrogen station falls short of the predicted demand at that hydrogen station, the notification unit notifies the customer that hydrogen can be supplied from another hydrogen station that is capable of supplying hydrogen and is part of a hydrogen station group to which the certain hydrogen station belongs, the hydrogen station being made up of a plurality of the hydrogen stations; Information processing device.
2. The prediction unit determines a timing for preparing high-pressure hydrogen gas based on the predicted demand. The information processing device according to claim 1 .
3. the prediction unit predicts demand for hydrogen based on the timing at which the customer fills up their vehicle with hydrogen, as indicated by the behavior pattern; The information processing device according to claim 1 .
4. The prediction unit predicts demand for hydrogen based on reservation information from the customer, which is indicated by the behavior pattern. The information processing device according to claim 1 .
5. A learning unit that performs machine learning on the demand forecasting model; and The learning unit continues to learn the demand forecasting model according to a difference between the demand predicted by the prediction unit and an actual demand. The information processing device according to claim 1 .
6. Obtaining customer behavior patterns regarding hydrogen-fueled vehicles; predicting the demand for hydrogen at at least one hydrogen station using a demand prediction model, which is a trained model generated in advance by machine learning, the demand prediction model inputting at least the behavioral patterns and outputting a predicted demand for hydrogen; When the amount of hydrogen that can actually be supplied at a certain hydrogen station falls short of the predicted demand at that hydrogen station, a customer is notified that hydrogen can be supplied from another hydrogen station that is capable of supplying hydrogen and is part of a hydrogen station group to which the certain hydrogen station belongs, the hydrogen station group being made up of a plurality of said hydrogen stations; A computer-implemented information processing method.
7. acquiring customer behavior patterns related to hydrogen-fueled vehicles; predicting the demand for hydrogen at at least one hydrogen station using a demand prediction model, which is a trained model generated in advance by machine learning, and which takes at least the behavioral patterns as input and outputs a predicted demand for hydrogen; When the amount of hydrogen that can actually be supplied at a certain hydrogen station falls short of the predicted demand at that hydrogen station, a customer is notified that hydrogen can be supplied from another hydrogen station that is capable of supplying hydrogen and is part of a hydrogen station group to which the certain hydrogen station belongs, the hydrogen station group being made up of a plurality of said hydrogen stations; A program that causes a computer to execute the following.
Citation Information
Patent Citations
Hydrogen station filling control device, on-vehicle terminal device, hydrogen station, hydrogen station filling control method, and program for on-vehicle terminal device
JP2003130295A
Method for controlling reservation system of hydrogen station, hydrogen fuel production method, and hydrogen station filling reservation device
JP2016183768A
Centralized management system of hydrogen station, and hydrogen manufacturing and shipping system
JP2017009069A
Hydrogen supply system, train and hydrogen supply method
JP2020035522A
Required hydrogen amount prediction system, required hydrogen amount prediction method, and required hydrogen amount prediction device
WO2017130280A1
