Information processing device, information processing method, and information processing program
The information processing device addresses the lack of objective credibility in service confirmations by comparing and verifying work content information, enhancing trust and reducing redundant work in service estimates.
Patent Information
- Application Number
- JP2024020088
- Authority / Receiving Office
- JP · JP
- Patent Type
- Patents
- Current Assignee / Owner
- Filing Date
- 2024-02-14
- Publication Date
- 2024-10-17
- Estimated Expiration
- 2044-02-14
AI Technical Summary
Existing systems lack objective credibility in confirming service information, leading to trust issues and increased workload due to potential misinterpretations or misunderstandings in service estimates, especially for specialized services.
An information processing device and method that includes a storage unit and processor to acquire, compare, and verify user and vehicle information, creating and comparing work content information to ensure objective credibility and reduce redundant work.
Enables objective confirmation of service information, ensuring credibility and reducing workload by preventing redundant work through accurate comparison and verification processes.
Smart Images

Figure 0007569465000001_ABST
Abstract
Description
[Technical field]
[0001] The present invention relates to an information processing device, an information processing method, and an information processing program. [Background technology]
[0002] When purchasing goods or receiving services, the parties involved confirm the contents of the purchase or service, as well as the associated costs, etc., in advance. This confirmation prevents misunderstandings between the parties and enables smooth transactions. Methods for confirmation at this time include, for example, creating and sharing an estimate, or explaining the contents verbally and sharing them.
[0003] For example, Patent Document 1 describes a computational model for estimating vehicle damage repair as shown in paragraph
[0018] . Also, paragraph
[0019] of the same document describes that the computational model identifies one or more damaged parts from an image, identifies whether the damaged parts are repairable or suitable for replacement, and calculates a repair cost estimate for the vehicle damage.
[0004] As a result, Patent Document 1 discloses that insurance claims for vehicle damage can be processed quickly. [Prior art documents] [Patent documents]
[0005] [Patent Document 1] Patent No. 2022-91875 Summary of the Invention [Problem to be solved by the invention]
[0006] These confirmations are generally carried out by the purchaser of the product or the recipient of the service accepting an estimate etc. provided by the seller (service provider). In particular, when receiving the provision of a service, the service provider may prepare an estimate etc. after confirming certain items, and the recipient of the service may accept it.
[0007] In other words, the recipient of the service often trusts and accepts the information confirmed by the service provider. Of course, it is desirable for the recipient to check the authenticity of the confirmation items from the service provider, but in cases where highly specialized services are being received, it is difficult to check the details of the estimate and request minor corrections or changes.
[0008] In Patent Document 1 as well, a process for identifying the damaged portion is performed, and then a process for identifying whether the damaged portion can be repaired or whether replacement is appropriate is performed, and then an estimate is calculated. In other words, the "process for identifying the damaged portion is performed, and then a process for identifying whether the damaged portion can be repaired or whether replacement is appropriate" shown in Patent Document 1 is a matter to be confirmed by the service provider, and therefore the recipient of the service must trust this and decide whether or not to receive the service.
[0009] In this way, it is common for the recipient of the service to trust the confirmation items made by the service provider and to accept the contents of the estimate prepared based on them.
[0010] SUMMARY OF THE PRESENT EMBODIMENTS Accordingly, an object of the present invention is to provide an information processing device, an information processing method, and an information processing program that enable information relating to a service to be provided to be objectively confirmed. Another object of the present invention is to provide an information processing device, an information processing method, and an information processing program that are capable of guaranteeing the objective credibility of work content information. Another object of the present invention is to provide an information processing device, an information processing method, and an information processing program that can reduce the workload by preventing the need to redo work, etc., so as to ensure the objective credibility of work content information. [Means for solving the problem]
[0011] An information processing device according to one aspect of the present invention includes a second storage unit that stores information, and a second processor that can communicate with the second storage unit, and the second processor executes a user information acquisition process that acquires user information related to a user of a vehicle, a second vehicle information acquisition process that acquires vehicle information related to the vehicle in response to an instruction from the user, a work type designation process that designates a work type for the vehicle, a category standard work output process that outputs standard work for the work type designated in the work type designation process, and a second creation process that creates second work content information using the work identified from the standard work for the work type output in the category standard work output process and the vehicle information acquired in the second vehicle information acquisition process, and the second storage unit stores the second work content information created in the second creation process. The system is capable of communicating with another computer having a first processor that executes a first creation process to create first work content information for the work using vehicle information regarding the vehicle obtained in response to an instruction from another worker different from the user and work information for the work to be performed on the vehicle of the identified vehicle information, and a first memory unit that stores the first work content information created in the first creation process, and the second processor executes a comparison result output process to output a comparison result of comparing the first work content information with the second work content information, an information selection process to select the first work content information or the second work content information depending on the comparison result by the comparison result output process, and a notification process to notify the other computer of the first work content information or the second work content information selected by the information selection process.
[0012] According to another aspect of the present invention, there is provided an information processing method, wherein a computer having a second storage unit for storing information executes a user information acquisition process for acquiring user information related to a user of a vehicle, a second vehicle information acquisition process for acquiring vehicle information related to the vehicle in response to an instruction from the user, a work type designation process for designating a work type for the vehicle, a category standard work output process for outputting standard work for which work for the work type designated in the work type designation process has been identified, and a second creation process for creating second work content information using the work identified from the standard work for the work type output in the category standard work output process and the vehicle information acquired in the second vehicle information acquisition process, wherein the second storage unit stores the second work content information created in the second creation process, The computer is capable of communicating with another computer having a first memory unit that stores the first work content information created in the first creation process, and the computer executes a comparison result output process that outputs a comparison result between the first work content information and the second work content information, an information selection process that selects the first work content information or the second work content information depending on the comparison result by the comparison result output process, and a notification process that notifies the other computer of the first work content information or the second work content information selected by the information selection process.
[0013] According to another aspect of the present invention, an information processing program causes a computer having a second storage unit for storing information to execute a user information acquisition process for acquiring user information related to a user of a vehicle, a second vehicle information acquisition process for acquiring vehicle information related to the vehicle in response to an instruction from the user, a work type designation process for designating a work type for the vehicle, a category standard work output process for outputting standard work for which work for the work type designated in the work type designation process has been identified, and a second creation process for creating second work content information using the work identified from the standard work for the work type output in the category standard work output process and the vehicle information acquired in the second vehicle information acquisition process, wherein the second storage unit stores the second work content information created in the second creation process, The computer is capable of communicating with another computer having a first memory unit that stores the first work content information created by the first creation process, and is caused to execute a first creation process that creates first work content information for the work using vehicle information regarding the vehicle obtained in response to instructions from another worker different from the user and work information for the work to be performed on the vehicle of the identified vehicle information, and is caused to execute a comparison result output process that outputs a comparison result of comparing the first work content information with the second work content information, an information selection process that selects the first work content information or the second work content information depending on the comparison result by the comparison result output process, and a notification process that notifies the other computer of the first work content information or the second work content information selected by the information selection process.
[0014] According to another aspect of the present invention, there is provided an information processing device comprising: a first storage unit that stores information; and a first processor that is capable of communicating with the first storage unit, wherein the first processor executes a first vehicle information acquisition process for acquiring vehicle information relating to the vehicle in response to an instruction from another worker different from a user of the vehicle; a work identification process for identifying work to be performed on the vehicle of the vehicle information based on the vehicle information acquired in the vehicle information acquisition process; and a first creation process for creating first work content information relating to the work using the work information for the work identified by the work identification process, wherein the first storage unit stores the first work content information created in the first creation process, and wherein the first processor executes a first vehicle information acquisition process for acquiring vehicle information relating to the vehicle in response to an instruction from a worker different from a user of the vehicle, and a work identification process for identifying a work to be performed on the vehicle of the vehicle information based on the vehicle information acquired in the vehicle information acquisition process. The first processor is capable of communicating with an instruction device having a second processor that executes a second creation process to create second work content information using vehicle information regarding the vehicle acquired as a trigger and work specified for a work type of work for the specified vehicle, and a second memory unit that stores the second work content information created by the second creation process, and the first processor executes a comparison result output process to output a comparison result of comparing the first work content information with the second work content information, and an information output process to output the first work content information or information regarding work based on the second work content information to a work providing device that provides the work, depending on the comparison result by the comparison result output process.
[0015] An information processing device according to one aspect of the present invention includes a second storage unit that stores information, and a second processor that can communicate with the second storage unit, and the second processor executes a user information acquisition process that acquires user information related to a user of a vehicle, a second vehicle information acquisition process that acquires vehicle information related to the vehicle in response to an instruction from the user, a work type designation process that designates a work type of work for the vehicle, a category standard work output process that outputs standard work for the work type designated in the work type designation process, and a second creation process that creates second work content information using the work identified from the standard work for the work type output in the category standard work output process and the vehicle information acquired in the second vehicle information acquisition process, and the second storage unit stores the second work content information created in the second creation process. The system is capable of communicating with a control device having a first processor that executes a first creation process to create first work content information for the work using vehicle information regarding the vehicle, which is acquired in response to an instruction from another worker different from the user, and work information for the work to be performed on the vehicle of the identified vehicle information, and a first memory unit that stores the first work content information created in the first creation process, and the second processor executes a comparison result output process to output a comparison result obtained by comparing the first work content information with the second work content information, an information selection process to select the first work content information or the second work content information depending on the comparison result by the comparison result output process, and a notification process to notify the control device of the first work content information or the second work content information selected by the information selection process.
[0016] An information processing device according to one embodiment of the present invention includes a memory unit that stores information and a processor that can communicate with the memory unit, and the processor executes a comparison process that compares first work content information related to the work created using vehicle information related to the vehicle obtained in response to instructions from another worker other than a user and work information for the work to be performed on the vehicle of the identified vehicle information, and second work content information created using vehicle information related to the vehicle obtained in response to instructions from the user and work identified for a specified work type of the work on the vehicle, a difference extraction process that extracts differences from the comparison results output by the comparison process, an authentication information setting process that sets authentication information including a hash value based on any information to any information, and an information storage process that stores the information to which the authentication information is set, and the authentication information setting process sets authentication information including a hash value based on the information to at least one of the differences extracted by the difference extraction process, the first work content information, and the second work content information used to extract the differences.
[0017] An information processing device according to one aspect of the present invention includes a control device including a first processor that executes a first creation process to create first work content information for a task using vehicle information on the vehicle acquired in response to an instruction from a worker different from a user and work information for the task to be performed on the vehicle of the identified vehicle information, and a first storage unit that stores the first work content information created in the first creation process, and a control device that creates second work content information using the vehicle information on the vehicle acquired in response to an instruction from the user and the task identified for a specified task type for the task on the vehicle. The computer-readable medium includes a second processor that executes a second creation process, a communication unit capable of communicating with an instruction device having a second memory unit that stores second work content information created in the second creation process, a third memory unit that stores information, and a third processor that can communicate with the third memory unit, and the third processor performs a comparison process that compares the first work content information with the second work content information, a difference extraction process that extracts differences from a comparison result output by the comparison process, an authentication information setting process that sets authentication information including a hash value based on any information to any information, and saves the information in which the authentication information is set.
[0018] According to one aspect of the present invention, there is provided an information processing device including a control device having a first processor that executes a first vehicle information acquisition process for acquiring vehicle information related to a vehicle, a work identification process for identifying work to be performed on the vehicle of the vehicle information based on the vehicle information acquired by the first vehicle information acquisition process, and a first creation process for creating first work content information related to the work using the work information for the work identified by the work identification process, a first storage unit that stores first work content information in association with the vehicle, work content and work result information of the work performed on the vehicle, and stores work record information including the work content and work result information of the work performed on the vehicle, and a user information acquisition process for acquiring user information related to a user, a second vehicle information acquisition process for acquiring vehicle information related to the vehicle in response to an instruction from the user, and a second process for specifying a work type of the work on the vehicle. The device is capable of communicating with an instruction device having a second processor that executes a work type designation process and a second creation process that creates second work content information using the work identified for the work type designated in the work type designation process and the vehicle information acquired in the second vehicle information acquisition process, and a second memory unit that stores the second work content information, wherein the first memory unit stores first work content information or second work content information that is the basis of the work content of the work performed on the vehicle in association with the work record information, and is equipped with a third processor that executes a verification process that verifies whether the work record information related to the work performed on the vehicle is based on the first work content information or second work content information stored in association with the work record information, and a verification result output process that outputs verification result information verified in the verification process, and a third memory unit that stores the verification result information. Effect of the Invention
[0019] According to the present invention, it is possible to objectively confirm information related to a service to be provided. Another effect is that the objective credibility of the work content information can be guaranteed. As another effect, the workload can be reduced by preventing the need to redo work so that the objective credibility of the work content information can be guaranteed. [Brief description of the drawings]
[0020] [Figure 1] 1 is a system configuration diagram of an information processing system according to an embodiment of the present invention. [Diagram 2] 2 is a block diagram showing detailed configurations of a control device, an instruction device, and a management device that constitute the information processing system according to the embodiment of the present invention. [Diagram 3] 2 shows an example of a hardware configuration in the case where a control device, an instruction device, and a management device constituting the information processing system according to the embodiment of the present invention are each realized by a computer. [Figure 4] FIG. 2 is a sequence diagram showing a process transition performed in the information processing system according to the embodiment of the present invention. [Diagram 5] FIG. 2 is a sequence diagram showing a process transition performed in the information processing system according to the embodiment of the present invention. [Figure 6] FIG. 2 is a sequence diagram showing a process transition performed in the information processing system according to the embodiment of the present invention. [Figure 7] FIG. 2 is a sequence diagram showing a process transition performed in the information processing system according to the embodiment of the present invention. [Figure 8] FIG. 2 is a sequence diagram showing a process transition performed in the information processing system according to the embodiment of the present invention. [Figure 9] 5A and 5B are diagrams showing examples of screens displayed on an instruction device constituting the information processing system according to the embodiment of the present invention. [Figure 10] 5A and 5B are diagrams showing examples of screens displayed on an instruction device constituting the information processing system according to the embodiment of the present invention. [Figure 11] 5A and 5B are diagrams showing examples of screens displayed on an instruction device constituting the information processing system according to the embodiment of the present invention. [Figure 12] 5A and 5B are diagrams showing examples of screens displayed on an instruction device constituting the information processing system according to the embodiment of the present invention. [Figure 13] 5A and 5B are diagrams showing examples of screens displayed on an instruction device constituting the information processing system according to the embodiment of the present invention. [Figure 14] 5A and 5B are diagrams showing an example of a diagnostic machine and a diagnosis result displayed on a display unit of the diagnostic machine; [Figure 15] 3A and 3B are diagrams showing examples of a user information table and a vehicle information table used in the information processing system according to the embodiment of the present invention. [Figure 16] 3A to 3C are diagrams showing examples of a vehicle image information table, a work history information table, and a work site list information table used in the information processing system according to the embodiment of the present invention. [Figure 17] 4A and 4B are diagrams showing examples of an estimate information table and a unit price information table used in the information processing system according to the embodiment of the present invention. [Figure 18] 4 is a flowchart showing a flow of processing performed in the information processing system according to the embodiment of the present invention. [Figure 19] 4 is a flowchart showing a flow of processing performed in the information processing system according to the embodiment of the present invention. [Figure 20] 4 is a flowchart showing a flow of processing performed in the information processing system according to the embodiment of the present invention. [Figure 21] 4 is a flowchart showing a flow of processing performed in the information processing system according to the embodiment of the present invention. [Figure 22] 4 is a flowchart showing a flow of processing performed in the information processing system according to the embodiment of the present invention. [Figure 23] 4 is a flowchart showing a flow of processing performed in the information processing system according to the embodiment of the present invention. [Figure 24] 4 is a flowchart showing a flow of processing performed in the information processing system according to the embodiment of the present invention. [Diagram 25] 4 is a flowchart showing a flow of processing performed in the information processing system according to the embodiment of the present invention. [Figure 26] 4 is a flowchart showing a flow of processing performed in the information processing system according to the embodiment of the present invention. [Figure 27] 4 is a flowchart showing a flow of processing performed in the information processing system according to the embodiment of the present invention. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0021] An embodiment of the present invention will be described with reference to the drawings. The following embodiments, including modified examples, can apply the techniques of each other. The following embodiments do not limit the contents of the present invention, and modifications can be made without departing from the scope of the claims.
[0022] FIG. 1 is a system configuration diagram of an information processing system according to an embodiment of the present invention.
[0023] The information processing system 1 shown in Fig. 1 is configured to include a control device 100, an instruction device 200, a management device 300, and an external device 400. Although only one of each of these devices is shown in Fig. 1, this is merely for convenience of explanation, and it is naturally possible to configure the system with a plurality of each device. Note that this information processing system may not only exist independently, but also be a part of another system. In other words, it may be realized as a part of the function of another system.
[0024] FIG. 2 is a block diagram showing detailed configurations of the control device 100, instruction device 200, and management device 300 that constitute the information processing system 1 in the embodiment of the present invention. The control device 100 is configured with a transmission / reception unit 101, an information processing unit 102, an acquisition unit 103, a memory unit 104, a diagnosis unit 105, a work information identification unit 106, an estimate creation unit 107, an estimate comparison unit 108, a work site judgment unit 109, an authentication information judgment unit 110, a work instruction information creation unit 111, and an output processing unit 112. The instruction device 200 is composed of a transmission / reception unit 201, an information processing unit 202, a setting registration unit 203, an acquisition unit 204, a memory unit 205, an operation unit 206, a display unit 207, a type designation unit 208, a work output unit 209, an information update unit 210, an estimate creation unit 211, a diagnosis unit 212, a work judgment unit 213, an estimate comparison unit 214, a work site extraction unit 215, and a work site setting unit 216. The management device 300 comprises a transmitting / receiving unit 301 , a verifying unit 302 , an output unit 303 , a comparison processing unit 304 , an output processing unit 305 , a storage unit 306 , an authentication information setting unit 307 , and an information registration unit 308 .
[0025] The following description will be given with reference to FIG. 1 and FIG.
[0026] <Control device 100> The control device 100 is configured by a computer (also referred to as a "first computer") having a configuration as shown in FIG. 3, and is a device installed at a provider that provides a specific service, and is also referred to as a "provider device." This control device 100 is a device associated with a workshop where work related to the specific service is performed, and is often installed at the workshop, and is also referred to as a "workshop device." In other words, the method of expression differs depending on the type of service provided. This control device 100 also transmits and receives various types of information, processes information, and stores it, and is therefore also referred to as an "information processing device" or an "information processing terminal."
[0027] There are no limitations on the type of specified services, but they can include maintenance services and diagnostic services such as inspection and repair of vehicles, small aircraft, and other mobile objects, insurance services such as vehicle insurance and personal insurance, facility services that utilize specific facilities or residences, nursing care services, communications services, data storage services, legal information services, food and beverage services, logistics services, and goods storage services, as long as a relationship between the service provider and the service recipient (recipient) is established directly or indirectly. The control device 100 can provide a predetermined service itself, and can also provide a predetermined service according to information received from the service providing device 120 through communication with the connected service providing device 120.
[0028] In the following, a predetermined service will be described by taking a maintenance service for a mobile object as an example. The mobile object in this case refers to an object for which the service is provided and is also referred to as a "service provision object." An example of the mobile object will be described below by taking a vehicle as an example.
[0029] When a user (also referred to as a user, owner or possessor) of a vehicle, which is an example of a service recipient, brings the vehicle to a service provider, such as a maintenance workshop, to receive maintenance service, the control device 100 performs reception processing to receive the maintenance service, and the service providing device 120 performs diagnosis processing of the vehicle (diagnosis unit 105). This service providing device 120 is a device that provides various prescribed services, and is also referred to as a "work providing device" or a "work management device" because it provides and manages work related to these prescribed services.
[0030] In the reception process, triggered by instructions from the service provider (operator), an acquisition process (first user information acquisition process) is performed to identify the user, and an acquisition process (first vehicle information acquisition process) is performed to acquire vehicle information of the vehicle to which the service is to be provided from the memory unit 104 or the management device 300 (acquisition unit 103).
[0031] The user information is information about a user, and is composed of information configured in a table as shown in FIG. 15(a). For example, it is user identification information (user ID) for identifying a user, a user name, an address, etc. The vehicle information is information about a vehicle, and is composed of information configured in a table as shown in FIG. 15(b). This vehicle information is composed of (includes) vehicle identification information for uniquely identifying a vehicle and vehicle status information for indicating the status of the vehicle. The former vehicle identification information includes vehicle identification information for identifying a vehicle (vehicle ID, chassis ID, chassis number), model, vehicle specifications, equipment, etc. The latter vehicle status information includes model year, mileage, registration year, user ID, vehicle image, maintenance history, whether or not the vehicle has been inspected, information obtained from various sensors (for example, information obtained from an atmospheric pressure sensor, an intake pressure sensor, a throttle opening sensor, an oxygen sensor, an air-fuel ratio sensor, etc.).
[0032] This user information and vehicle information can be obtained from the management device 300, or can be obtained based on information indicated by the user.
[0033] This diagnostic process is also called "first diagnostic process" or "service provider side diagnostic process", and includes a process of acquiring vehicle information about the vehicle from the vehicle, and checking whether or not the item value is normal for each designated diagnostic item among the items of the vehicle information, and a process of checking the condition by an operator performing work related to the diagnosis. In addition to acquiring vehicle information about the vehicle from the vehicle, the diagnostic process can also acquire vehicle information registered in advance in DB320 (described later) by requesting the management device 300, and is performed using at least vehicle information acquired by any of the vehicle information acquisition processes (diagnosis unit 105).
[0034] The control device 100, which receives the diagnosis result (diagnosis result information) of the diagnosis process from the service providing device 120, performs a work identification process to identify work to be performed on the vehicle based on the diagnosis result and the vehicle information (work information identification unit 106). The work identified by this work identification process includes preventive and preliminary work to be performed based on the diagnosis result and the vehicle information. The work in this case refers to the service content of the maintenance service performed on a vehicle, which is an example of a service provision target, and is to maintain, improve, and normalize the condition of the vehicle, so that the benefit (service) provided by the vehicle can be received as usual. In the case of a vehicle, an example of this benefit is moving to a different location.
[0035] When a task is identified by this task identification process, the control device 100 selects task information for that task. This task information is information on parts, tools, equipment, task difficulty, task time, etc. required to perform the task, and is used to create information (task content information) indicating the task content required to perform the above task, which is presented to the user.
[0036] In this way, the control device 100 performs diagnostic processing, and when the work and work information for that work are specified and selected, it then creates work content information to be presented to the user for performing maintenance service on the vehicle (estimate creation unit 107). This work content information includes work items indicating the specific work to be performed on the vehicle, the labor hours required for the work, the necessary parts and quantities, and the labor cost (work cost) for the work per unit time. In particular, the control device 100 acquires unit price information such as a basic work fee and basic work man-hours for the work information from the management device 300 and includes them in the work content information. This basic work fee is determined in advance and is a basic fee (labor rate) for the corresponding work, and the basic work man-hours is determined in advance and is the standard work man-hours for performing the corresponding work.
[0037] This work content information is generally referred to as estimate information (also simply called "estimate"), pre-work confirmation, or work agreement, and is information that allows the user to confirm the content and cost of the maintenance service to be performed on the vehicle, and also includes user information and vehicle information. By presenting this estimate to the user before the maintenance service is provided, it is possible to prevent misunderstandings between the maintenance service provider and the user.
[0038] The work content information created using the control device 100 is also referred to as "first work content information", and will be simply referred to as "work content information A" or "estimate A" below.
[0039] This estimate A is created by the control device 100 that provides the maintenance service, and the user will trust and approve this estimate A to a certain extent. More specifically, the control device 100 simply creates estimate A using the work information for the work specified by the work site, so estimate A is created depending on the specified work and its work information.
[0040] Then, the control device 100 stores this estimate A in a storage device (not shown) in association with the creation date, user information, and vehicle information. In addition, the control device 100 stores the estimate A associated with the creation date, user information, and vehicle information in the storage unit 104, and transmits it to the management device 300 together with control device identification information that identifies the control device 100 that created it. The management device 300 then saves and stores it in the DB320 as estimate information. This estimate A may be transmitted to the instruction device 200 used by the requested user.
[0041] In this way, the control device 100 creates an estimate A and accepts a work request based on this estimate A. Then, the control device 100 uses the service providing device 120 and the like to perform vehicle diagnosis processing and processing to check the vehicle condition.
[0042] In addition, when the control device 100 creates an estimate A and stores it in association with user information, and then receives second work content information (estimate B, estimate C) created in the instruction device 200 from the instruction device 200 of the user of that user information, as described below, the control device 100 performs an estimate comparison process (also referred to as a ``verification process'' or ``estimate verification process'') that compares estimate A with estimate B or estimate C (estimate comparison unit 108).
[0043] Then, a comparison result output process is performed to output the comparison result information (output processing unit 112). In this output process, the comparison result information can be output to a display device (display unit) of the control device 100, and can also be output (transmitted) to an external device including the management device 300. Note that the details of this comparison process and specific examples thereof are similar to the process performed in the instruction device 200 described later.
[0044] The control device 100 selects and determines the estimate information for the work to be performed according to the comparison result information in this comparison process. A process is performed to output information on the work content, work procedure, and work by the worker based on this selected estimate information to a service providing device 120 (also referred to as the "work providing device") that provides the work. Then, this service providing device 120 performs a vehicle diagnosis process, a process to check the vehicle condition, and the like as a service (work).
[0045] In this selection process, either estimate A (first work content information) created by the control device 100 or estimate B or estimate C (second work content information) created by the instruction device 200 is selected. As the comparison result information, when the validity of estimate A (first work content information) is objectively recognized, such as when the content of estimate A (first work content information) is included in or is identical to estimate B or estimate C (second work content information), the control device 100 selects either the first work content information or the second work content information. This is because, since the validity is objectively recognized, an appropriate service (work) can be provided to the user regardless of whether the first work content information or the second work content information is selected.
[0046] On the other hand, if the comparison result information shows that the validity of estimate A (first work content information) cannot be objectively recognized, such as when the contents of estimate A (first work content information) are not included in estimate B or estimate C (second work content information) or when they are clearly different beyond the same range, the control device 100 selects the second work content information. This means that the second work content information is selected because the validity of the first work content information has not been objectively recognized, and an appropriate service (work) is provided to the user. In addition, when this second work content information is selected, the control device 100 may perform an implementation confirmation process described later, and provide the service only if the implementation is confirmed by this implementation confirmation process. If the implementation cannot be confirmed, the first work content information or the second work content information is recreated to make it objectively recognized as legitimate.
[0047] The control device 100 can also receive a request for maintenance service related to a vehicle for which estimate A has not been created from the instruction device 200. Of course, it is also possible to receive a request for service related to a vehicle for which estimate A has been created by the control device 100 from the instruction device 200. In this case, first, a workshop determination process is performed to determine whether the destination (request destination) set in the second work content information (estimate B or estimate C) (details will be described later) received as the service request is the own workshop. In addition to this work site judgment process, it is also possible to perform an authentication confirmation process to confirm whether the second work content information has been authenticated, specifically, whether authentication information has been assigned (set) to the second work content information.
[0048] In this work site determination process, if the destination is not the control device 100's own work site, an error is sent to the sender, but if the destination is the control device's own work site, an implementation confirmation process is performed to confirm whether the work content of the received second work content information (Estimate B or Estimate C) can be implemented (information processing unit 102). In addition, an authentication confirmation process may be performed to check whether the second work content information is authenticated, and if it is not authenticated, an error may be sent to the sender, and if it is authenticated, the above-mentioned implementation confirmation process may be performed. This implementation confirmation process verifies that the situation is not one in which it is impossible to respond due to a temporary equipment failure, a shortage of workers, or the like.
[0049] Based on the results of this implementation confirmation process, if implementation can be confirmed, the control device 100 performs a work instruction information creation process (work instruction information creation unit 111) to create work instruction information related to the work based on the second work content information (estimate B or estimate C) in order to perform the work content of the second work content information. This work instruction information is a document (document data) that is given to workers who are different for each work site and who will perform the work. For example, it is a document (document data) that gives instructions regarding information related to the work, such as the worker, the work equipment, the work date and time, and the work order. The workshop information extracted by such a workshop extraction process and the workshop information with the priority set are stored in the storage unit.
[0050] In the above authentication confirmation process, the control device 100 requests the management device 300 whether the authentication information is correct, and the management device 300 performs a process to confirm the authentication information. Details of this confirmation process are shown in S2314 to S2316 of Fig. 23 (authentication information determination unit 110). In this authentication confirmation process, it is confirmed whether the second work content information has been created illegally or has been tampered with, and if the authentication information can be confirmed, it is proven that the second work content information is legitimate and created in the instruction device described below. Of course, if the authentication information cannot be confirmed, it means that the second work content information was not created in the instruction device 200, or that the second work content information is illegal and may have been tampered with.
[0051] In addition, the management device 300 may inquire of the external device 400, which is an authentication authority, as to whether the authentication information is correct, and if the external device 400 responds to this inquiry by replying that the authentication information is correct, the management device 300 may authenticate and confirm the second work content information to which the authentication information has been assigned (set) (information processing unit 102). In addition to the above, the control device 100 may check whether authentication information is set in the first work content information created in the workshop where the control device 100 is installed, and may receive a request for maintenance service for the first work content information for which authentication information is set (authentication information determination unit 110).
[0052] That is, when the control device 100 transmits first work content information to the instruction device 200, it judges whether the request is based on the first work content information by using the authentication information. In this case, the control device 100 requests the management device 300 to confirm whether the authentication information set in the first work content information is correct, and makes a judgment based on the response. If the response is that the authentication information is correct, the control device 100 accepts a request for maintenance service, and performs a work instruction information creation process to create work instruction information based on the first work content information in which the authentication information is set.
[0053] When work is performed based on the work instruction created by the work instruction information creation process described above, the control device 100 stores history information of the performed work in the storage unit 104 and also in the management device 300. An example of this work history information is shown in the work history information table of FIG. 16(d).
[0054] Furthermore, when the work is completed, the control device 100 creates work record information as one piece of work history information and stores it in association with the estimate (the estimate on which the work content of the work performed on the vehicle was based (the first work content information or the second work content information)). This work record information is also called a "work record book" and records the work that was actually performed, such as whether the work specified in the estimate (maintenance such as inspection or repair) was actually performed, what kind of work was performed, who performed it, and when it was performed. This work record book is included in the work history information, and in a broad sense, although the format may differ, the contents are included. This work record book is provided to the user of the vehicle when the work is completed, or is output (transmitted) to the instruction device 200 used by the user (output processing unit 112).
[0055] This allows each user and each work site to have their own work log, and the specific work that was done can be tracked using this document.
[0056] Furthermore, upon completion of the work, the control device 100 transmits a work record book to the management device 300 and stores it in DB 320 of the management device 300 in association with user information, vehicle information, and estimate information for the work performed. Furthermore, in response to a request from the instruction device 200 or management device 300, the control device 100 outputs (transmits) the work record book (output processing unit 112). Of course, the control device 100 may output (transmit) the work record book to the instruction device 200 or management device 300 at any timing.
[0057] <Instruction device 200> The instruction device 200 is configured by a computer (also referred to as a "second computer") having a configuration as shown in FIG. 3, and is a device operated by a user (vehicle user) who uses a vehicle maintenance service, also referred to as a user terminal, and is an electronic device owned by the user. This instruction device 200 can also be realized as one function of an electronic device owned by the user, in which case it is realized as an application or software installed on the electronic device. In addition, this instruction device 200 transmits and receives various types of information, processes information, and stores it, and therefore is also referred to as an "information processing device" and an "information processing terminal", respectively.
[0058] The instruction device 200 is a device that issues instructions, contacts, and communications to receive a predetermined service provided by the control device 100, and is capable of switching between and using not only a single service provided by the control device 100 but also any predetermined service provided by the control device 100. For example, it is possible to switch between and use a maintenance service and an insurance service.
[0059] An imaging device 220 and a diagnostic device 230 can be connected to the instruction device 200. The imaging device 220 is a device that can capture an image of a service provision target as an imaging target and record the captured image, and the diagnostic device 230 is a device that can perform diagnostic processing on the service provision target as a diagnostic target and record the diagnostic result as diagnostic result information. An example is shown in Fig. 14. Of course, the instruction device 200 may be equipped with the functions of the imaging device 220 and the diagnostic device 230.
[0060] When the instruction device 200 receives an instruction operation by a user using the operation unit 206, this triggers a user information acquisition process (second user information acquisition process) to acquire user information about the user from the management device 300, and a vehicle information acquisition process (second vehicle information acquisition process) to acquire vehicle information about the vehicle for which maintenance service is to be received (acquisition unit 204).
[0061] In addition, as a method of acquiring the vehicle information, a vehicle information reader may be connected to the vehicle and the vehicle information may be acquired from the vehicle information reader. The vehicle information reader is a device that is connected to an information transmission / reception connector provided in the vehicle or is connected to the vehicle wirelessly to read the vehicle information. A diagnostic device 230, which will be described later, may also be used as the vehicle information reader.
[0062] Next, the instruction device 200 performs a process for designating the service type to be provided in the maintenance service, which is a predetermined service. This service type is also called a "work type." That is, a process for designating the work type to be performed on the vehicle receiving the maintenance service is performed. This process is a process for designating based on the type selected by the user, and it is also possible to designate a recommended work type by learning information on the user's past usage status (usage history) of the same service (maintenance service) as learning source information (type designation unit 208).
[0063] This work type is type information that identifies the specific service to be performed in the maintenance service, and specifically indicates the specific items of maintenance such as (1) inspection maintenance, (2) repair maintenance, and (3) specific item inspection (also referred to as "specific maintenance").
[0064] In addition, there are (1) types of inspection and maintenance that provide more detail, such as "6-month inspection, 12-month inspection, statutory vehicle inspection (also simply called "vehicle inspection"), pre-drive inspection, pre-long-distance drive inspection, post-drive inspection, and post-long-distance drive inspection," (2) types of repair and maintenance that provide more detail, such as "body metal repair, paint repair," and (3) types of disassembly and maintenance that provide more detail on checking specific items, such as "electronic control unit maintenance."
[0065] As an example, when specifying a work type, if the vehicle usage status (usage history) indicates that approximately 12 months have passed since the last inspection date, the instruction device 200 can specify "12-month inspection" as the learning result.In addition, when the instruction device 200 receives an image of the vehicle and analyzes the image to detect damage, it can also specify "body metal repair" as the learning result.
[0066] Next, the instruction device 200 extracts standard work that is specified as work for the specified work type (maintenance in the above example).The instruction device 200 then performs output processing of this standard work (work output unit 209).This extracted standard work is standard work (standard work) that is specified in advance as work to be performed in the specified work type, and can also be called "standard work specified based on the specified work type."
[0067] In other words, when a work type is specified, the standard work to be performed for that work type is identified, and any work that differs from this standard work indicates that it is work that has no direct relationship to the work in the work type (work that is different from the standard work).
[0068] For example, when a "12-month inspection" is specified as a work type, various tasks such as steering check and battery check are extracted as standard (pre-specified) standard tasks to be performed in the maintenance that corresponds to the work type "12-month inspection." Information on these standard tasks can be stored in advance in the instruction device 200 in association with the work type, or information previously stored in the management device 300 in association with the work type can be acquired and stored.
[0069] Moreover, the output process of the standard work includes communication output to an external device, display output on the display unit 207 of the instruction device 200, and the like.
[0070] When the information on the standard work is output in this manner, the instruction device 200 creates work content information for performing a maintenance service on the vehicle based on (using) the work specified by the standard work for this output work type and the acquired vehicle information (estimate creation unit 211). That is, a work content information creation process is performed to create work content information for performing the work specified by the standard work on the vehicle indicated in the vehicle information.
[0071] As described above, this vehicle information includes vehicle status information indicating the status of the vehicle.
[0072] In the work content information creation process, the work related to the maintenance service performed using the vehicle condition information of another vehicle may be identified based on the vehicle condition information (vehicle information) to create the work content information. In other words, the vehicle condition information of another vehicle may be learned as learning source information to create the work content of the maintenance service to be performed on the vehicle to which the service is to be provided.
[0073] Furthermore, in this work content information creation process, one or more diagnostic results stored in storage unit 205, which will be described later, are learned as learning source information, and work content information appropriate for the vehicle in the vehicle information and the user in the user information is created (estimate creation unit 211). This makes it possible to create optimal work content information according to the work performed on the related vehicle and the work performed by that user in the past.
[0074] In addition, this work content information creation process involves a process of identifying vehicle information of the vehicle that performed the work specified by the standard work for the work type, and then it is possible to create work content information using vehicle work history information of the vehicle that was performed on the vehicle with the identified vehicle information.
[0075] The work history information at this time is managed in DB 320 connected to management device 300 in association with the vehicle, and instruction device 200 obtains the work history information from management device 300 and creates the work history information.
[0076] This work content information includes work items indicating the specific work to be performed on the vehicle, the labor hours required for the work, the necessary parts and quantities, and the labor cost (work cost) for the work per unit time.
[0077] In particular, the instruction device 200 acquires unit price information such as a basic work fee and basic work man-hours for the work information from the management device 300 and includes them in the work content information. This basic work fee is determined in advance and is a basic fee (labor rate) for the corresponding work, and the basic work man-hours is determined in advance and is a standard work time for performing the corresponding work.
[0078] This work content information is generally referred to as estimate information (or simply as "estimate") or pre-work confirmation, and is information that allows the user to confirm the content and cost of the maintenance service to be performed on the vehicle, and also includes user information and vehicle information. The work content information created using this instruction device 200 is also referred to as "second work content information", and hereinafter will be referred to simply as "work content information B" or "estimate B".
[0079] This estimate B is generated by the indicating device 200 based on the standard work specified based on the specified work type and the vehicle information.
[0080] This estimate B is based on at least the standard work specified based on the specified work type and vehicle information, and is therefore based on objective information (information that is factual). It is also possible to create estimate B by learning from work history information based on vehicle status information (vehicle information) of other vehicles that have performed the specified standard work as learning source information.
[0081] Estimate B created using this historical information is an estimate that is objectively more reliable (trustworthy). In addition, when creating estimate B, the vehicle image is analyzed to detect the presence or absence of damage and the state (level) of the damage, and based on the detected contents, the work details to repair the damage can be included, resulting in an even more reliable (trustworthy) estimate.
[0082] Then, the instruction device 200 stores this estimate B in the storage unit 205 in association with the creation date, user information, and vehicle information. In addition, the instruction device 200 outputs (transmits) (transmitting / receiving unit 201) the estimate B associated with the creation date, user information, and vehicle information to the management device 300 together with instruction device identification information that identifies the instruction device 200 that created the estimate, and the management device 300 saves and stores it in the DB320 as estimate information.
[0083] Furthermore, the instruction device 200 stores the estimate A received from the control device 100 in the storage device. Of course, it is also possible to store the estimate A in association with estimates B and C created under the same or similar conditions.
[0084] When a standard task is extracted, this indication device 200 can not only create work content information based on the standard task itself, but can also create work content information by adding a specified additional task to the standard task or by replacing it with another task.
[0085] Based on this standard work, it is possible to add or replace work desired by the user, and it is possible to create work content information related to the maintenance service desired by the user. A specific example of this is the selection of any plan (also called a "group") shown in Figure 10(a), Figure 10(c), etc.
[0086] This plan is a list of tasks to be performed for each specified type, allowing the user to specify the desired tasks all at once rather than specifying them one by one. This plan is recommended using the service content provided to the user in the past and the history information of the service content provided to the same or similar vehicle as the vehicle to be provided with the service. Of course, it is possible to select plans other than the recommended plan.
[0087] Furthermore, the instruction device 200 performs an estimate comparison process (also referred to as a "verification process" or "estimate verification process") to compare the estimate B with the estimate A created in the control device 100 (estimate comparison unit 214). Then, a comparison result output process is performed to output the comparison result information. In this output process, the comparison result information can be output to the display device (display unit) of the instruction device 200, and can also be output (transmitted) to external devices including the control device 100 and management device 300.
[0088] This comparison process is a process for verifying whether or not the first work content information (estimate A) is based on the second work content information (estimate B or estimate C) corresponding to each item of the estimate by comparing it with items associated with each item in advance. Alternatively, it can be expressed as a verification process for verifying whether or not the first work content information is included in the second work content information, and further, it can be expressed as a verification process for verifying whether or not the first work content information is appropriate based on the second work content information.
[0089] More specifically, by comparing the values of items and setting values, if the value of an item (work result information) included in estimate A corresponds to the value of an item (quantity, etc.) included in estimate B or estimate C (is the same or within a certain margin of error), the verification result is that estimate A is based on estimate B or estimate C stored in association with estimate A. On the other hand, if the value of an item included in estimate A does not correspond to the value of an item (quantity, etc.) included in estimate B or estimate C (is the same or within a certain margin of error), the verification result is that estimate A is not based on estimate B or estimate C stored in association with estimate A.
[0090] More specifically, the instruction device 200 acquires suitability judgment information from the management device 300, which is used to judge whether the work was performed appropriately (suitability judgment) by comparing the items, and verifies whether the comparison result between the items matches the suitability judgment information. That is, a process is performed to verify whether estimate A and estimate B or estimate C stored in association with estimate A match the suitability judgment information.
[0091] If the comparison result matches the appropriateness judgment information, the verification result is that estimate A is an appropriate estimate. On the other hand, if the comparison result does not match the appropriateness judgment information, the verification result is that estimate A is not an appropriate estimate and is likely to have problems with unnecessary items, quantities, amounts, etc., and is therefore not an appropriate estimate.
[0092] The instruction device 200 performs an information selection process to select and determine the estimate information for performing the work (either the first work content information or the second work content information) according to the comparison result information in the comparison process. A notification process is performed to notify the control device 100 of the selected estimate information.
[0093] As a result, the control device 100 that has received the notification performs processing to output information related to the work content, work procedure, and work by the worker, etc., based on the received estimate information, to a service providing device 120 (also referred to as a "work providing device") that provides the work. Then, this service providing device 120 performs vehicle diagnosis processing, processing to check the vehicle condition, etc., as a service (work).
[0094] In the above information selection process, either estimate A (first work content information) created by the control device 100 or estimate B or estimate C (second work content information) created by the instruction device 200 is selected. As the comparison result information, when the validity of estimate A (first work content information) is objectively recognized, such as when the content of estimate A (first work content information) is included in or is identical to estimate B or estimate C (second work content information), the instruction device 200 selects either the first work content information or the second work content information. This is because, since the validity is objectively recognized, an appropriate service (work) can be provided to the user regardless of whether the first work content information or the second work content information is selected. At this time, the control device 100 performs a process of outputting information on the work content, work procedure, and work by the worker based on the selected estimate information to a service providing device 120 (also referred to as a "work providing device") that provides the work. Then, this service providing device 120 performs a vehicle diagnosis process, a process to check the vehicle condition, and the like as a service (work).
[0095] On the other hand, when the comparison result information shows that the validity of estimate A (first work content information) cannot be objectively recognized, such as when the content of estimate A (first work content information) is not included in estimate B or estimate C (second work content information) or when they are clearly different beyond the same range, the instruction device 200 selects the second work content information. This means that the second work content information is selected because the validity of the first work content information is not objectively recognized, and an appropriate service (work) is provided to the user. In addition, when this second work content information is selected, the control device 100 may perform an implementation confirmation process described later, and provide the service only if the implementation is confirmed by this implementation confirmation process. If the implementation cannot be confirmed, the first work content information or the second work content information is recreated to make it objectively recognized as legitimate.
[0096] In the above example, when the validity of estimate A is not objectively recognized as the comparison result information, the second work content information is selected, but the present invention is not limited to this, and an instruction to recreate the first work content information may be issued. At this time, the differences from the second work content information may be transmitted to the control device 100 to instruct the first work content information to be recreated. This makes it possible for the control device 100 to recreate the first work content information taking into account the differences.
[0097] 14 can be connected to the instruction device 200, and the diagnostic device 230 reads vehicle information by connecting to the vehicle and performs diagnostic processing of the vehicle condition information contained in the vehicle information (diagnosis unit 212). This diagnostic processing is also called "second diagnostic processing," "service recipient diagnostic processing," or "service demander diagnostic processing," and is a processing for determining whether the vehicle condition information described above is a diagnostic item, whether this diagnostic item satisfies a predetermined threshold value, whether a predetermined operation is performed, and whether any break has occurred in an electric circuit or the like.
[0098] In this diagnostic process, it is also possible to diagnose other diagnostic items such as catalyst deterioration, engine misfire, exhaust gas recirculation system malfunction, and evaporative system malfunction by making the above three judgments.
[0099] Then, the diagnostic device 230 outputs the diagnostic results of this diagnostic process to the instruction device 200. The diagnostic results include, for each diagnostic item, whether it is normal or it cannot be determined that no malfunction has occurred.
[0100] Then, the instruction device 200 performs an information update process for updating the contents of the estimate B based on the diagnosis result from the diagnostic device 230 (information update unit 210). In this information update process, the diagnostic result is referenced, and a process is performed to identify the work content to be performed on the vehicle state information including a diagnosis item for which it cannot be determined that no malfunction has occurred (work determination unit 213). Then, in the information update process, it is determined whether the work content identified by this identification process is included in estimate B, and if not, that work content is used to update estimate B. More specifically, an information update is performed to add that work content to estimate B, and new, different work content information (hereinafter referred to as "estimate C") is created.
[0101] Furthermore, if the work content identified by the identification process is included in estimate B, a new estimate C having the same content as estimate B is created. That is, when the diagnostic process is performed, the instructing device 200 creates estimate C as new work content information reflecting the diagnostic results, based on estimate B. As a result, it can be said that the work content information before reflecting the content of the diagnostic process is estimate B, and the work content information after reflecting the content of the diagnostic process is estimate C. It is also possible for the instructing device 200 to perform a diagnostic process similar to the diagnostic process performed in the diagnostic machine 230. That is, the instructing device 200 performs the diagnostic process (diagnosis unit 212).
[0102] Then, the indicating device 200 updates the estimate B using the diagnosis result to create a new estimate C. In this case, the information update is to update the estimate B using work related to the vehicle state information that cannot be determined as being free of defects in the diagnosis result of the diagnosis process.
[0103] Then, the instruction device 200 associates the diagnosis result with the estimate B before the information update and the estimate C after the information update, and stores the diagnosis result in the storage unit 205, and also stores it in the management device 300. Of course, the estimate B before the information update may be overwritten with the estimate C after the information update and stored.
[0104] Next, the instruction device 200 performs a work site extraction process (work site extraction unit 215) to extract one or more pieces of work site information related to the work site that will perform the work content of the estimate B or the estimate C, based on the instruction from the user, in order to receive the provision of a maintenance service based on the work content information of the estimate B or the estimate C. The work site list information related to the work sites performed by this work site extraction process can be stored in advance in the storage unit 205, for example, or can be obtained from the management device 300.
[0105] Then, from this work site list information, information on one or more work sites that will perform the work content included in estimate B or estimate C is extracted. This work site list information is information that allows a work site to be selected based on the work content, user information, and vehicle information, and an example is shown in Figure 16(e).
[0106] This process of extracting work site information is a process in which the second work content information, which is estimate B or estimate C, includes not only the work content but also user information and vehicle information, and one or more pieces of work site information are extracted based on at least one of the work content, user information, and vehicle information.
[0107] The user information includes information on the address (area) as shown in the user information table in Figure 15(a), and the vehicle information includes vehicle identification information that uniquely identifies the vehicle, such as the vehicle ID and model, and vehicle condition information that indicates the condition of the vehicle, such as the year and mileage, as well as the history of work that has been performed on the vehicle, as shown in the vehicle information table in Figure 15(b).Therefore, the workshop extraction process learns this information as learning source information, and performs a process to extract one or more optimal workshop information.
[0108] More specifically, in the work site extraction process, for extraction conditions such as work content included in the work content information, a work site is extracted based on information on work equipment used for the work content and the number of workers performing the work, and for extraction conditions such as the address (area) of the user information, a work site near the address (area) is extracted, and further, for extraction conditions such as the model and vehicle model ID of the vehicle information, a work site is extracted based on information on work equipment and workers capable of performing work on the vehicle. In the work site extraction process, one or more pieces of work site information are extracted based on at least one of these extraction conditions.
[0109] When a work site is extracted by this work site extraction process, the instruction device 200 performs a priority setting process to set a priority for the extracted work site based on the past work history of the user who uses the maintenance service (the user who requests the work).
[0110] This priority setting process is a process for setting priorities for work sites according to extraction conditions or combinations of extraction conditions. For example, if the extraction conditions are work content included in the work content information, the higher the priority is set in order of the highest possible rate of work content that can be performed. Also, if the extraction conditions are the address (area) of the user information, the higher the priority is set in order of proximity to the address (area). Furthermore, if the extraction conditions are the model or model ID of a vehicle, the higher the priority is set in order of the highest possible rate of work that can be performed on vehicles of that model or model ID.
[0111] Furthermore, when these extraction conditions are combined, an AND operation is performed to set the priority.
[0112] The instruction device 200 designates a workshop that is permitted to perform work on a vehicle in a maintenance service based on the work list information in which priority is set. For example, the instruction device 200 designates a workshop that is set with the highest priority, or designates a workshop by accepting an operation by a user.
[0113] Then, the process of setting the work site identification information that can identify the designated work site to the estimate (second work content information) for requesting the work to the work site is performed (setting and registration unit 203). That is, the estimate (second work content information) and the designated work site are associated with each other, and this second work content information is stored. Of course, it is possible to set multiple pieces of work site identification information. This work site identification information is information specified in a work site location information table as shown in Fig. 16(c), and is information that can uniquely identify a work site.
[0114] The workshop information extracted by such workshop extraction processing and the workshop information with the priority set are stored in the storage unit 205. Furthermore, the instruction device 200 stores the estimate B or the updated estimate C stored in the storage unit 205 or the management device 300 in association with the creation date, user information, and vehicle information, in association with the work type and standard work used in creating the estimate, as well as the workshop information. That is, it is possible to identify the vehicle that performed work related to the standard work, and to identify and learn the work history information (work history information) of the vehicle.
[0115] Then, the instruction device 200 transmits the second work content information (Estimate B or Estimate C) to the management device 300 at a predetermined timing to request authentication. In response to this authentication request, the instruction device 200 receives (sets) authentication information from the management device 300, and stores the information in the storage unit 205.
[0116] Next, when the instruction device 200 receives a user's operation to specify a work site via the operation unit 206 or the like, or when a single work site is extracted, it transmits second work site information (Estimate B or Estimate C) as a request for maintenance service to the control device 100 for that work site (information processing unit 202). In response to this, the control device 100 performs the above-mentioned work site determination process and the process of creating work instruction information based on the work content, and the work related to the maintenance service is performed.
[0117] This allows the instruction device 200 to specify the most suitable workshop based on the created work content information, without having to specify in advance a workshop (such as a maintenance factory) for receiving the maintenance service. Note that in the above example, workshops are extracted by the workshop extraction process, and the maintenance service can be received at any of these workshops, but the present invention is not limited to this. The created work content information may be made public outside (on a public website), and one or more workshops wishing to provide maintenance services for the published work content information may make a request to provide the maintenance service, allowing the workshop to be specified by lottery or auction.
[0118] The detailed flow of this process is shown in the flowchart of FIG.
[0119] Furthermore, when the instruction device 200 receives or inputs work record information regarding work performed through the user's operation, the instruction device 200 breaks down the work record information into items and analyzes the values set for each item (information processing unit 202). Moreover, the instruction device 200 acquires the estimate (first work content information, second work content information) stored in association with the work logbook and stored in the control device 100 (acquisition unit 204).
[0120] The instruction device 200 verifies whether the work record book is based on an estimate (first work content information, second work content information) stored in association with the work record book by comparing each item of the estimate with the items of work record information that are previously associated with the work record book (estimate comparison unit 214).
[0121] More specifically, by comparing the values of items and setting values, if the value of an item in the work record book (work result information) corresponds to the value of an item in the estimate (quantity, etc.), it is verified that the work record book is based on the estimate (first work content information, second work content information) stored in association with the work record book.On the other hand, if the value of an item in the work record book does not correspond to the value of an item in the estimate (quantity, etc.), it is verified that the work record book is not based on the estimate (first work content information, second work content information) stored in association with the work record book.
[0122] Specifically, the instruction device 200 acquires suitability judgment information from the management device 300, which is used to judge whether the work was performed appropriately (suitability judgment) by comparing the items, and verifies whether the comparison result between the items matches the suitability judgment information. That is, a process is performed to verify whether the work record book and the estimate (first work content information or second work content information) stored in association with the work record book match the suitability judgment information.
[0123] The former case indicates that work was done based on estimates, and it was confirmed after the fact that it was done appropriately, whereas the latter case indicates that work was likely not done based on estimates, and it was confirmed after the fact that unintended or fraudulent work was done.
[0124] Then, the instruction device 200 performs an output process of the verification result. This output process includes displaying the result on the instruction device 200 and transmitting the result to the management device 300. In this output process, when the result of comparing the items matches the appropriateness judgment information, information is output indicating that the work based on the estimate has been performed, and when the result of comparing the items does not match the appropriateness judgment information, information is output indicating that the work based on the estimate has not been performed.
[0125] From the above, the second work content information (Estimate B or Estimate C) created in the instruction device 200 is not only information used to determine whether the first work content information created in the control device 100 is valid or invalid (including invalid), but is also used as information indicating the work content to be requested from a workshop to receive maintenance service.
[0126] <Management device 300> The management device 300 is configured by a computer (also shown as a "third computer") having a configuration as shown in FIG. 3, and is connectable to a control device 100 provided at a provider that provides a predetermined service, and an instruction device 200 that issues instructions, makes contact, and communicates to receive the predetermined service, and is a device that manages information required by the control device 100 and the instruction device 200 and provides the information. As an example, the management device 300 is realized by a server or a cloud device. This management device 300 transmits and receives various types of information, processes the information, and stores it, and therefore is also called an "information processing device" or an "information processing terminal."
[0127] A DB320 that stores and manages various information is connected to this management device 300. This DB320 stores user information, vehicle information, work history information of work related to various services, estimate item information indicating items constituting work content information, unit price information including basic work fee, basic work man-hours, and appropriateness judgment information, workshop information indicating a provider of maintenance services, work content information (estimate information) created by the control device 100 or the instruction device 200, format information of work instruction information created at each workshop based on the work content information, created work instruction information, work record information (work maintenance book) indicating a record of work performed at the workshop based on the work instruction information, verification result information indicating a result of verifying whether work based on the work content information was performed based on the work content information and the work record information, standard work information specifying a standard work specified for a work type, appropriateness judgment information determining that the work is appropriate for each work, and the like.
[0128] The management device 300 receives work content information (first work content information) from the control device 100. The management device 300 also receives work content information (second work content information) from the instruction device 200. This work content information includes user information and vehicle information in addition to the work content, and the work content information to be compared is identified based on this user information and vehicle information.
[0129] For example, if the user ID of the user information and the vehicle ID of the vehicle information included in the first work content information are equal to the user ID of the user information and the vehicle ID of the vehicle information included in the second work content information, and the creation dates of the first work content information and the second work content information are within a certain period of time, they are identified as objects of comparison.
[0130] Alternatively, the control device 100 may be configured to receive first work content information and second work content information from the instruction device 200. That is, the control device 100 transmits the first work content information created in the control device 100 to the instruction device 200, and the instruction device 200, upon receiving the information, transmits the first work content information and the second work content information created by the instruction device 200 to the management device 300.
[0131] Next, the management device 300 performs a comparison process to compare the first work content information with the second work content information. As a comparison result in this comparison process, it is verified whether the first work content information is included in the second work content information, and if it is included, the verification result is that the first work content information (estimate A) is a proper estimate, whereas if it is not included, the verification result is that the first work content information (estimate A) is not a proper estimate and there is a high possibility that there are problems with unnecessary items, quantities, amounts, etc.
[0132] Furthermore, in this verification process, a process is also performed to verify whether or not the work record book (work record information) that records the work content of the work performed at the work site corresponds to the appropriateness judgment information (whether or not it is included in the appropriateness judgment information). The detailed process will be described later.
[0133] Then, an output process of the verification result (comparison result) of this comparison process is performed. This management device 300 outputs (transmits) information indicating the comparison result (comparison result information) to the control device 100 and the instruction device 200, and also outputs (transmits) it only to the instruction device 200 that received the first work content information and the second work content information.
[0134] In this comparison process, the items of work content constituting the first work content information and the second work content information, and the unit price information for each work content item (basic work fee, basic work man-hours, etc.) are extracted, and these items, unit price information, total amounts for each item, and total amounts of work content information are compared. Details of this comparison process are shown in Fig. 24 and will be described later.
[0135] This comparison process performs a judgment process to judge whether the first work content information is included in the second work content information, and if it is judged that it is included, a comparison result that the first work content information is valid is output. If it is judged that it is not included, a comparison result that the first work content information is invalid or not valid is output. In other words, the first work content information is verified, authenticated, and evaluated based on the second work content information. In this judgment process, it is further judged whether the items constituting the first work content information are within a certain range based on the values of each item constituting the second work content information, or whether they are within the range of acceptable values.
[0136] Then, the management device 300 performs a process of recording the first work content information and the second work content information in association with each other. The comparison result may also be stored in association with these.
[0137] Furthermore, for the first work content information for which a comparison result deemed valid has been output, the management device 300 creates a hash value of the first work content information and sets the hash value as authentication information. In addition, it is also possible to obtain time information at the time of creating the hash value, create a timestamp including the hash value and the time information, and set this as authentication information. Note that the hash value is a fixed value determined according to the second work content information, and when the second work content information is changed, the fixed value is also changed.
[0138] In this way, by comparing the first work content information created by the control device 100 with the second work content information created by the instruction device 200 based on different information, it becomes possible to confirm the validity and reliability of the information on the first work content. In other words, it becomes possible to objectively evaluate the estimate A created using the work information for the work specified by the work site, and it becomes possible to support the user in deciding whether or not to accept it.
[0139] Furthermore, when the management device 300 receives an authentication request including second work content information (Estimate B or Estimate C) from the instruction device 200, it creates a hash value of the received second work content information and sets this hash value and the requesting instruction device 200 as authentication information that specifies the information. This sets authentication information indicating that the information was created by the instruction device 200 that made the request. In addition, it is also possible to obtain time information when the hash value was created, and create a timestamp including the hash value and the time information, and set this as authentication information. Alternatively, the management device 300 may make an authentication request to the external device 400, which is an authentication authority, and the external device 400 may perform the above-mentioned authentication information setting process and return the information in response.
[0140] Then, the management device 300 transmits the second work content information in which the authentication information has been set to the instruction device 200 that has requested the authentication. Also, the management device 300 stores the second work content information in which the authentication information has been set in a storage device in association with the instruction device 200 that has requested the authentication.
[0141] In the example shown above, the control device 100 receives instructions from a worker other than the user, acquires vehicle information about the vehicle, and performs a process to identify work information for work to be performed on the vehicle in the vehicle information, thereby creating the first work content information. However, without being limited to this, these processes (the same processes as those performed by the control device 100) may be performed in the management device 300.
[0142] Specifically, when a worker inputs vehicle identification information (vehicle ID, chassis number, etc.) and work information using the control device 100 or an information input terminal and this information is acquired by the management device 300, the management device 300 acquires vehicle information stored in the storage unit (DB320) for this vehicle identification information. The management device 300 then identifies the input work information and performs a process of using this work information to create first work content information for the work. The management device 300 then stores this first work content information in the storage unit in association with user information or vehicle information.
[0143] In addition, in the example shown above, the instruction device 200 receives instructions from a vehicle user, acquires vehicle information about the vehicle, and performs a process of specifying work that is identified for the work type of work on the vehicle, thereby creating second work content information, but this is not limited to this, and these processes (the same processes as those performed by the instruction device 200) may be performed in the management device 300. Specifically, when a vehicle user inputs user information about the user, vehicle identification information (same as above), and a task type of the task to be performed on the vehicle using the instruction device 200 or an information input terminal, a process is performed to create second task content information using the task specified by the task type and the vehicle information. Then, this second task content information is stored in the storage unit in association with the user information or vehicle information.
[0144] As described above, when the first work content information and the second work content information are stored in the storage unit in association with the user information or the vehicle information, the management device 300 performs the comparison process as described above. That is, in the comparison process, a process is performed to compare first work content information related to the work created using vehicle information related to the vehicle acquired in response to an instruction from a worker other than the user and work information for the specified work to be performed on the vehicle of the vehicle information, with second work content information created using vehicle information related to the vehicle acquired in response to an instruction from the user and work specified for the work type of the specified work on the vehicle.
[0145] When the comparison process is performed in this manner, the management device 300 performs the processes after the comparison process as described above (see Figs. 23, 24, 25, 26, and 27). At this time, the management device 300 performs a difference extraction process, and when authentication information including a hash value based on the estimate information is set in the difference information and the estimate information of the first work content information and the second work content information, the management device 300 transmits the difference information to the control device 100, the instruction device 200, and also to the information input terminal. This difference extraction process extracts items and values that differ between the first work content information and the second work content information as differences (difference information), and also extracts them as difference information if the value for that item does not fall within a pre-specified tolerance range, and does not extract them as difference information if the value falls within the tolerance range (within the tolerance range).
[0146] This allows the control device 100, the instruction device 200, and other information input terminals to check the difference information, and when the difference information is approved, acknowledged, or agreed to, the intention is expressed by operating an agreement button displayed on the screen displaying the difference information. When an operator, user, or the like operating the control device 100, the instruction device 200, or other information input terminal operates the agreement button, an agreement notification is sent to the management device 300.
[0147] Then, when the management device 300 receives a notification from the control device 100, the instruction device 200, and / or the information input terminal that the worker and the user have each expressed their intention to agree to the differences, the management device 300 performs a work instruction process to instruct the control device 100 to perform work based on the first work content information containing the difference information. This is to instruct the user who requests the work and the worker in charge of the work to agree on the differences in the estimate information, and then to perform the work based on the first work content information contained in the agreed upon items.
[0148] This enables the control device 100 to perform work based on the first work content information created at the work site. When work based on the first work content information is performed, the control device 100 records work history information for that work and transmits the work history information to the management device 300. This causes the management device 300 to perform a work history recording process in which the received work history information is recorded in association with the first work content information.
[0149] In the above example, the difference information is confirmed on the control device 100, the instruction device 200, and an information input terminal, and the work is performed by receiving a notification that the worker and the user have each expressed their intention to agree to the differences, but this is not limited to this, and the following processing may also be used.
[0150] As another process, when difference information is extracted by the difference extraction process, the difference information is first sent to the control device 100 or the information input terminal, and the control device 100 or the information input terminal that receives this accepts input of the reason for the difference in the difference information by the worker, and sends this entered reason for the difference to the management device 300. Then, when the management device 300 receives the reason for the difference, it transmits the reason information together with the difference information to the corresponding user (the instruction device 200). The instruction device 200 or the information input terminal that receives this accepts the user's expression of intent such as confirmation, approval, acknowledgement, or agreement of the difference information and the reason for the difference by, for example, operating a button on a screen that displays the difference information and the reason for the difference.
[0151] The management device 300 may obtain standard information for each item of the estimate information in the difference information, and transmit this standard information to the instruction device 200 or the information input terminal. This standard information is a value or amount that is a predetermined standard for each item of the estimate information, and is stored in advance in the DB 320 or obtained from an external device. For example, when an oil change item is extracted as the difference information, the management device 300 performs a process to determine whether or not the amount of oil to be changed exceeds the allowable range based on the vehicle information. At this time, the management device 300 determines that there is a difference if the oil amount specified exceeds the allowable range, and does not determine that there is a difference if it is within the allowable range. As a result, when difference information is extracted, the management device 300 obtains standard information on the oil amount that serves as a reference for the vehicle information together with the difference information, and transmits it to the user (instruction device 200).
[0152] When the instruction device 200 or the information input terminal receives the difference information and the reason for the difference from the user by operating a button on the screen, the instruction device 200 or the information input terminal notifies the management device 300 that an indication of intent to confirm, approve, acknowledge, or agree has been received from the user. At this time, the management device 300 confirms that the worker and the user have agreed on the differences in the estimate information, and instructs the control device 100 to perform work based on the first work content information containing the difference information. Such processing may be performed.
[0153] Once the worker and the user have reached an agreement on the difference information through the above processing, a hash value is calculated for at least one of the following information: (1) the information sent by the management device 300 to the control device 100, (2) the information received by the management device 300 from the control device 100, (3) the information sent by the management device 300 to the instruction device 200, (4) the information received by the management device 300 from the instruction device 200, and (5) time series information indicating the order in which this information was provided (transmitted and received). That is, at least one hash value is calculated for the information transmitted and received between the worker (control device 100) and the user (instruction device 200) via the management device 300. Of course, it is desirable to calculate hash values for all of this information in order to ensure credibility, but it is preferable to calculate a hash value for at least "(5) time-series information." Note that information transmitted from the user to the worker is referred to as "first provided information," and information transmitted from the worker to the user is referred to as "second provided information."
[0154] Then, the management device 300 performs an authentication information setting process to set authentication information (timestamp) including the hash value to each piece of information. As a result, the agreement between the worker and the user regarding the difference information is stored as agreement history information in association with the first work content information and the second work content information from which the difference information was extracted. As a result, even if any differences arise between the worker and the user regarding the difference information at a later date, both parties can confirm the agreement process using the agreement history information, which can prove that the information has not been tampered with based on the time information in the authentication information.
[0155] 3 illustrates an example of a hardware configuration in which the above-mentioned control device 100, instruction device 200, and management device 300 are each realized by a computer. Of course, the functions of each device can also be realized by multiple devices. That is, the control device 100 is referred to as the first computer 100, the instruction device 200 is referred to as the second computer 200, and the management device 300 is referred to as the third computer 300.
[0156] In addition, the control device 100, the instruction device 200, and the management device 300 each transmit and receive various information, process information, and store information, and therefore each can also be expressed as an "information processing device" or an "information processing terminal." Similarly, the first computer 100, the second computer 200, and the third computer 300 each can also be expressed as an "information processing device" or an "information processing terminal."
[0157] As shown in FIG. 3, the first computer 100, the second computer 200, and the third computer 300 each include a processor 901, a storage device 902, an I / F 903, and a display device 904.
[0158] The processor 901 controls processing in the computers (first computer 100, second computer 200, third computer 300) by executing programs stored in the storage device 902. For example, the respective functional units and processing units of the control device 100, instruction device 200, and management device 300 are realized by the processor 901 executing the programs stored in the storage device 902. The programs are executed by the computers (first computer 100, second computer 200, third computer 300). In particular, the processor 901 provided in the first computer 100 may be referred to as the "first processor," the processor 901 provided in the second computer 200 may be referred to as the "second processor," and the processor 901 provided in the third computer 300 may be referred to as the "third processor."
[0159] The storage device 902 temporarily stores the source code of the program executed by the processor 901 and data required when executing the program, and is a volatile or non-volatile storage medium such as a RAM, a ROM, a hard disk drive (HDD), or a flash memory. This storage device 902 also functions as a database for storing various programs, setting information, tables, and the like for implementing the operating system (OS) and the above-mentioned configurations.
[0160] The processor 901 realizes various functions by reading and executing these programs, setting information, table information, etc. In particular, the storage device 902 provided in the first computer 100 may be referred to as a "first storage device (storage unit)", the storage device 902 provided in the second computer 200 may be referred to as a "second storage device (storage unit)", and the storage device 902 provided in the third computer 300 may be referred to as a "third storage device (storage unit)".
[0161] I / F903 is an input / output interface (also called a "communication unit") for accepting input from users such as a keyboard, mouse, touch panel, various sensors, and wearable devices, and is an interface for inputting and outputting data from external devices of the computer, and is a communications interface for communicating data between computers or with external devices of the computer via a communications network, either wired or wirelessly.
[0162] The display device 904 is a device that displays various information. Specific examples include a liquid crystal display, an organic EL (Electro-LuminCe) display, and the like, and may be a wearable device. It may also be a touch panel or a touch operation input device that combines an input / output interface and the display device 904.
[0163] Figures 4, 5, 6, 7 and 8 are sequence diagrams showing process transitions performed in the information processing system in the embodiment of the present invention, and show process sequences performed by the control device 100, instruction device 200 and management device 300 constituting the information processing system. Also, Figures 9, 10, 11, 12 and 13 are diagrams showing examples of screens displayed on the instruction device constituting the information processing system in the embodiment of the present invention. The following description will be given with reference to FIGS.
[0164] The sequence diagram shown in Figure 4 is a processing transition in which a user specifies a work site where a specified service will be used, and includes processing performed in the control device 100 corresponding to that work site, and processing in which the result of the processing performed in the control device 100 is confirmed in the instruction device 200 used by the user, and work is performed at the work site where the control device 100 is installed based on the processing performed in the control device 100.
[0165] A login process is performed by a user operation in the control device 100 associated with the work site where the work is to be performed (S401). When this login process is performed, the management device 300 identifies and transmits user information and vehicle information (S403, S404) in conjunction with the login process in the management device 300 (S402) through communication with the management device 300, and the control device 100 receives and identifies this (S405). In the control device 100, a vehicle diagnosis process and a process to check the vehicle condition are performed using the service providing device 120, etc. (S406).
[0166] At this time, the control device 100 identifies the necessary work based on the vehicle condition information, which is the result of the vehicle diagnosis process and the vehicle condition confirmation process, and the service content desired by the user (specifically, the inspection content and repair content for the maintenance service), and creates and saves first work content information (estimate A) related to the identified work (S407). Note that the creation process of this estimate A is performed by the control device 100 and the management device 300 working together, with the management device 300 providing information required for creating the estimate A (list information of work for the vehicle condition information, unit price information for the work, etc.), and a storage process is performed to save the estimate A in the control device 100 and the management device 300. At this point, the created estimate A is provided to the user from the workshop. The method of providing the estimate may be through various social network services, electronic communication media such as email, or through a storage medium, and the method is not important.
[0167] The instruction device 200 operated by the user also performs a login process (S408), receives and identifies user information and vehicle information from the management device 300 (S409), and specifies the type of service content desired by the user in the service (S410). The instruction device 200 also selects a service plan for the type of service content desired by the user (S411). Specifically, when a user ID and password are entered on the login screen shown in Fig. 9(a), the user ID and password are transmitted from the instruction device 200 to the management device 300 to authenticate the user. Then, when the "Make Estimate" button is operated on the process selection screen shown in Fig. 9(b), the instruction screen shown in Fig. 9(c) is displayed.
[0168] The instruction screen shown in Fig. 9(c) displays the user information of the authenticated user and the vehicle information associated with the user information, and allows the selection of the work type. When "repair" is selected as the work type and the "OK" button is pressed, a repair content selection screen as shown in Fig. 9(d) is displayed, and when "inspection" is selected as the work type and the "OK" button is pressed, an inspection type content selection screen as shown in Fig. 9(e) is displayed.
[0169] In the repair content selection screen shown in Fig. 9(d), the type of repair can be specified as the type of repair, and an example is shown in which the repair type "sheet metal" has been selected. When the "Next" button is pressed on the screen shown in Fig. 9(d), a screen for selecting a plan for the sheet metal repair type is displayed, as shown in Fig. 10(a).
[0170] In addition, in the inspection type selection screen shown in Fig. 9(e), the type of inspection can be specified as the content of the inspection, and an example is shown in which "vehicle inspection" and "3 years" are selected. When the "Next" button is operated on the screen shown in Fig. 9(e), a screen appears asking you to select a plan for the inspection repair type, as shown in Fig. 10(c).
[0171] Then, the instruction device 200 uses the user information, vehicle information, and also type and plan information to create work content information (estimate B) for work related to the service the user desires for the vehicle (S412). Note that in the process of creating this estimate B, the instruction device 200 and the management device 300 work together, with the management device 300 providing information required for creating estimate B (list information of work for vehicle status information, unit price information for work, etc.), and a storage process is performed in which the instruction device 200 and the management device 300 store estimate B.
[0172] More specifically, when the details of the repair are specified, and one of the multiple plans displayed on the plan selection screen shown in Figure 10(a) is selected, the selected details are displayed as shown in Figure 10(b), and on the confirmation screen shown in Figure 10(b), it is also possible to register (input) an image of the vehicle for which repair work is to be requested.
[0173] Furthermore, on the confirmation screen shown in FIG. 10(b), it is also possible to perform a damage diagnosis process in which the vehicle is diagnosed from the registered image, damage areas on the vehicle are identified, and the degree of damage is measured by comparing the identified areas with an image of a normal state.
[0174] Then, when the “Create” button shown in FIG. 10(b) is operated, a creation process is performed to create second work content information (estimate B) based on user information, vehicle information, work type, work plan for the work type, vehicle images, and simple diagnosis results.
[0175] In addition, when the contents of the inspection are specified, and one of the plans is selected from the multiple plans displayed on the plan selection screen shown in Figure 10(c), the selected contents are displayed as shown in Figure 10(d), and on the confirmation screen shown in Figure 10(d), it is also possible to register (input) an image of the vehicle for which repair work is to be requested.
[0176] Furthermore, on the confirmation screen shown in FIG. 10(d), it is also possible to perform a damage diagnosis process in which the vehicle is diagnosed from the registered image, damage areas on the vehicle are identified, and the degree of damage is measured by comparing the identified areas with an image of a normal state.
[0177] Then, when the “Create” button shown in FIG. 10(d) is operated, a creation process is performed to create second work content information (estimate B) based on user information, vehicle information, work type, work plan for the work type, vehicle images, and simple diagnosis results.
[0178] When the second work content information (Estimate B) is created by the above operations, an estimate result screen as shown in Fig. 11(a) is displayed. This Fig. 11(a) is a screen that is displayed when the "Create" button is operated on the inspection work confirmation screen shown in Fig. 10(d). Note that a screen similar to Fig. 11(a) is also displayed on the sheet metal work confirmation screen as shown in Fig. 10(b), and a description thereof will be omitted.
[0179] The quotation result screen shown in Fig. 11(a) displays the quotation details in addition to the user information, vehicle information, selected vehicle type, and selected plan. Note that the screen shown in Fig. 11(a) also displays a two-dimensional code including these details.
[0180] When the "save estimate" button is pressed on the screen shown in FIG. 11(a), the second work content information (estimate B) including the above information is saved.
[0181] Next, in the instruction device 200, when a diagnostic process is performed in the instruction device 200 and a diagnostic result is obtained, or a diagnostic result of a diagnostic process performed by an external diagnostic device is obtained (S413), a process is performed to identify a task based on the diagnostic result by linking the instruction device 200 with the control device 100, and a process is performed to update the estimate B based on the work content of the task and create an estimate C as new work content information. Also, a process is performed to store the estimate C in the instruction device 200 and the management device 300 (S414).
[0182] When estimate C is created, estimate B is updated, so estimate B is overwritten and saved with estimate C. Note that the above diagnostic process is optional, and if diagnostic process is not performed, estimate B is saved, and if diagnostic process is performed, estimate C is saved in place of estimate B.
[0183] As a result, the control device 100 stores estimate A created by the control device 100, the instruction device 200 stores estimate B or estimate C created by the instruction device 200, and the management device 300 stores estimate A and estimate B or estimate C created by the control device 100 and instruction device 200.
[0184] More specifically, when the "Perform diagnostic processing" button is operated on the estimate display screen shown in Fig. 11(a), the results of the diagnostic processing performed by the diagnostic machine are obtained if a diagnostic machine is connected to the indicating device 200. Also, if a diagnostic machine is not connected to the indicating device 200, the results of the diagnostic processing performed by the indicating device 200 are obtained.
[0185] The results of the diagnostic process are displayed on the diagnostic result display screen of FIG. 11(b).
[0186] The diagnosis result display screen shown in FIG. 11(b) displays, as an example of the results of the vehicle diagnosis process, a malfunction of "poor purging" in the "evaporative system diagnosis" and a malfunction of "NG" in the "vehicle speed sensor" diagnosis.
[0187] When the "Reflect" button is operated on the diagnosis result display screen shown in Fig. 11(b), the instruction device 200 performs a process to determine whether or not the second work content information (estimate B) created by the above process includes performing work based on these diagnosis results, and if the result of this determination process shows that this work is not included in estimate B, it performs an information update process to include this work in estimate B, and creates and saves a new estimate C for estimate B. Also, if the result of this determination process shows that this work is included in estimate B, it creates and saves a new estimate C with the same content as estimate B.
[0188] Regardless of the result of the determination, when the diagnostic process is performed, a new estimate C will be created in place of estimate B.
[0189] The estimate display screen shown in Fig. 11(c) is a screen showing the contents of estimate C in the former case (when the work is not included in estimate B). That is, in addition to the contents of estimate B, estimate C reflecting the work of the diagnosis result by the diagnosis process is displayed.
[0190] When the "Save" button on the estimate display screen shown in FIG. 11(c) is operated, the instruction device 200 associates and saves the user information, vehicle information, work type, work plan, and estimate details.
[0191] In this manner, when estimate A created by the control device 100 and estimate B or estimate C created by the instruction device 200 are each saved, and an instruction to confirm the estimate is given using the instruction device 200, the instruction device 200 reads estimate A from the control device 100 or the management device 300 (S415).
[0192] When the "Confirm Estimate" button is operated on the processing selection screen as shown in Fig. 9(b), a screen as shown in Fig. 12(a) is displayed. The screen shown in Fig. 12(a) displays the estimate B or estimate C that was just created by the instruction device 200, and allows the user to specify the estimate A to be compared.
[0193] The method of designation includes reading a two-dimensional code including the contents of Estimate A attached to Estimate A, and uploading the data of Estimate A.
[0194] When estimates A and C (here, estimate C is used as an example) to be compared are designated in the instruction device 200, a comparison process between estimates A and C is performed (S416). Then, the instruction device 200 outputs the comparison result (S417) and stores it (S418).
[0195] Specifically, when the "Compare" button is operated on the screen shown in FIG. 12(a), a comparison process is performed and a screen showing the comparison results as shown in FIG. 12(b) is displayed.
[0196] Figure 12(b) shows information identifying each of the compared estimates, and the results of the comparison, including the matching percentage for each item that makes up the estimate, the matching percentage for the quantities set for each item, the matching percentage for the unit prices set for each item, and the matching percentage for the amounts of each item.The overall result taking all of these into consideration is also displayed as a rank, and a comment indicating the comparison result is also displayed.
[0197] Based on this, the user can confirm whether estimate A prepared by the workshop is credible and valid, taking into account objective estimate C, which is based on vehicle information and historical information derived from this vehicle information.
[0198] In other words, even if a user has little or no specialized knowledge of a particular service, they can objectively evaluate the estimate A prepared by the workshop and can request the work after they are satisfied. Conversely, even for specialized work, the workshop can prove that the estimate is objectively guaranteed.
[0199] When the estimate comparison process is performed in this manner, the instruction device 200 accepts an operation by the user (S419) and issues a request (instruction) to the control device 100 via the management device 300 to carry out work based on estimate A. At this time, the management device 300 stores the request source, the request destination, and the content of the requested estimate A in association with each other (S420).
[0200] Specifically, when a user operates the "Work Request" button on the processing selection screen shown in FIG. 9(b), a destination selection screen as shown in FIG. 13(a) is displayed. This destination selection screen shows the contents of the estimate A to be requested, and also displays only the workshop for which estimate A was created as the destination.
[0201] The control device 100 checks whether the requested estimate A was created by the control device 100 itself (S421), and if it was created by the control device 100 itself, creates work instruction information to be used for work at the work site based on the requested estimate A (S422), and performs the work based on the work instruction information (S423). In addition, when the work is completed, the control device 100 creates and saves a work record book that records the details of the work.
[0202] The sequence diagram shown in Figure 5 is a processing transition in which a user specifies a work site where a specified service will be used, and includes processing performed in the control device 100 corresponding to that work site, and processing in which the management device 300 confirms the results of the processing performed in the control device 100 based on instructions from the instruction device 200 used by the user, and work is performed at the work site where the control device 100 is installed based on the results of the processing performed in the control device 100.
[0203] The processes shown in S401 to S414 in FIG. 5 are the same as those shown in FIG. 4, and therefore the description thereof will be omitted.
[0204] That is, through these processes, the management device 300 is in a state where estimate A and either estimate B or estimate C are stored.
[0205] In this state, when the user uses the instruction device 200 to specify estimate A and the corresponding estimate B or estimate C, the management device 300 performs a comparison process between estimate A and estimate C (here, estimate C is used as an example) (S502).Then, the management device 300 outputs the comparison result of the comparison process to the instruction device 200 (S502) and stores it (S503).
[0206] At this time, the instruction device 200 performs a process of outputting the comparison result received from the management device 300 (S504). For example, the comparison result is displayed on a display device (display unit) of the instruction device 200.
[0207] In the management device 300, if the comparison result of the comparison process shows that the first work content information (estimate A) is included in the second work content information (estimate B or estimate C), that is, if the verification result shows that estimate A is an appropriate estimate, the management device 300 sets the created authentication information to estimate A (S505), and associates the estimate A with this authentication information with estimate B or estimate C and saves them (S506).
[0208] Furthermore, the management device 300 transmits the estimate A in which the authentication information is set to the instruction device 200, and the instruction device 200 stores the estimate A in association with the estimate B or C (S507).
[0209] The process of setting authentication information shown in S505 is optional and does not necessarily have to be performed, in which case the management device 300 only needs to transmit the comparison result to the instruction device 200. As a result, the instruction device 200 that receives the comparison result stores the result for the requested estimate C.
[0210] Next, when the instruction device 200 accepts a request operation by the user (when it accepts the operation of the ``Work request'' button on the processing selection screen shown in Figure 9 (b)), it sends an estimate A with authentication information set to the control device 100 corresponding to the work site to be requested to perform the work via the management device 300, and makes a work request (S508).
[0211] At this time, the management device 300 stores, as information related to the request, the request source, the request destination, the request date, and the quotation A for which the authentication information has been set, in association with each other.
[0212] Furthermore, the control device 100 checks whether the requested estimate A was created by the control device 100 itself (S509), and if it was created by the control device 100 itself, creates work instruction information to be used for work at the work site based on the requested estimate A (S510), and performs the work based on the work instruction information (S511). Furthermore, when the work is completed, the control device 100 creates and saves a work record book that records the details of the work.
[0213] The sequence diagram shown in Figure 6 is a processing transition in which a user specifies a work site where a specified service will be used, and includes processing performed in the control device 100 corresponding to that work site, and processing in which the management device 300 confirms the results of the processing performed in the control device 100 based on instructions from the instruction device 200 used by the user, and work is performed at the work site where the control device 100 is installed based on the results of the processing performed in the instruction device 200.
[0214] The processes shown in S401 to S414 in Fig. 6 are the same as S401 to S414 in Fig. 4, and therefore will be described below, and the processes shown in S501 to S504 are the same as S501 to S504 in Fig. 5, and therefore will not be described below. That is, through these processes, in the management device 300, estimate A and estimate B or estimate C are stored, and a comparison process between estimate A and estimate C is performed and stored.
[0215] In this state, if estimate A is included in estimate C, the management device 300 sets the created authentication information in estimate C (S601), and stores the estimate C with the authentication information set in association with estimate A (S603). Then, the management device 300 transmits this estimate C to the instruction device 200.
[0216] As a result, the instruction device 200 stores the estimate C in which the authentication information is set (S602).
[0217] Next, when the instruction device 200 accepts a request operation by the user (when it accepts the operation of the ``Work request'' button on the processing selection screen shown in Figure 9 (b)), it sends the estimate C with the authentication information set to the control device 100 corresponding to the work site to be requested to perform the work via the management device 300, and makes a work request (S604).
[0218] At this time, the management device 300 converts the estimate C, in which the authentication information is set, into the format specified by the control device 100 to which the work is to be requested (S605), and transmits the estimate C to the control device 100 corresponding to the requested work site.
[0219] The control device 100 receives a work request and determines the type of estimate for the work request. If it determines that the estimate type is not based on estimate A created in the control device itself but is based on estimate C, it checks whether authentication information is set for estimate C.
[0220] If authentication information is set in estimate C, the control device 100 inquires of the management device 300 as to whether the authentication information is correct, and makes a judgment (S606) based on the result of the judgment process (S607) performed in the management device 300.
[0221] If it is determined that the authentication information is correct, the control device 100 creates work instruction information to be used for work at the work site based on the requested estimate C (S608), and performs the work based on the work instruction information (S609). In addition, when the work is completed, the control device 100 creates and saves a work record book that records the details of the work.
[0222] The sequence diagram shown in Figure 7 shows a process transition to verify whether the work record book (work record information) that records the work content of work performed at a work site is based on the work content information (estimate) regarding the work performed when recording the work record book.
[0223] The processes of S402 to S414 (excluding S405, S406, and S407) shown in Fig. 7 are the same as those of S402 to S414 (excluding S405, S406, and S407) shown in Fig. 4, and therefore will not be described. That is, by these processes, estimate B or estimate C is stored in management device 300.
[0224] In this state, when the user operates the "Work Request" button shown on the processing selection screen shown in Fig. 9(b), the instruction device 200 acquires candidate information of the workshop to which the request is to be made from the management device 300 (S701). From the candidate information, the information of the workshop to which the work based on the estimate B or estimate C for the vehicle is to be requested is searched for and displayed based on the user information and the vehicle information (S702).
[0225] Furthermore, the instruction device 200 transmits the estimate C and the information of the requested workshop to the management device 300 when making a request to the control device 100 corresponding to the workshop that accepts the user's operation and makes the work request (S703). The instruction device 200 also stores the estimate C associated with the information of the requested workshop (S704).
[0226] In the above-mentioned process of searching for information on a work site to be requested to perform work (S702), the work history information stored in the management device 300 is learned as learning source information, and information on a work site that can perform the work included in the estimate is extracted.
[0227] The instruction device 200 displays the candidate destinations to which the received work request is to be made on a screen (FIG. 13(b)), and makes a work request to the requested destination designated by an operation by the user.
[0228] At this time, the management device 300 stores the requester, the requested party, and the content of the requested estimate C in association with each other, and identifies the workshop that is the requested party and the content of the estimate C (S705). Then, the management device 300 converts the estimate C into a format that corresponds to the identified workshop that is the requested party (S706).
[0229] Specifically, when a user operates the “Work Request” button on the processing selection screen shown in FIG. 9(b), a destination selection screen as shown in FIG. 13(b) is displayed. On this destination selection screen, the details of the requested estimate C are shown, and three candidate workshops as destinations are also displayed.
[0230] The management device 300 performs a request confirmation process with the control device 100 corresponding to the requested work site (S707).
[0231] This request confirmation process involves sending estimate C, converted into the format of the work request destination, to the control device 100, confirming whether the work based on estimate C is possible at the work site corresponding to that control device 100, and responding with the result to the management device 300.
[0232] At this time, if the work is possible, the control device 100 creates work instruction information to be used for the work at the work site based on the requested estimate C (S708), and performs the work based on the work instruction information (S709). Furthermore, when the work is completed, the control device 100 creates and saves a work record book that records the details of the work.
[0233] On the other hand, if the work is not possible, the control device 100 responds to that effect to the management device 300, and the management device 300 responds to that effect to the instruction device 200. At this time, the instruction device 200 selects another request destination and makes a work request again.
[0234] Instead of the above steps S701 and S702, an auction for quotations may be held, and the request may be made to the successful bidder in the auction. A detailed flow of this case is shown in the flowchart of FIG. 26, and will be described later.
[0235] The sequence diagram shown in FIG. 8 shows a process transition that is performed after the work-related processes (S423, S511, S609, S709) that are performed in the control device 100 in each of the sequence diagrams shown in FIGS.
[0236] When processing related to work is performed in the control device 100, the control device 100 creates work record information related to the work and stores this work record information in association with the estimate (first work content information or second work content information) that was the basis for the work (S801).
[0237] As a result, the control device 100 associates work record information, which records the content of the work actually performed at the corresponding work site, with the estimate that became the work. In other words, the estimate is instruction information that indicates what work needs to be performed, and the work record information is record information that records what work was actually performed.
[0238] Next, the control device 100 transmits the work record information and the estimate to the management device 300, and the management device 300 performs a verification process to verify whether the work record information for the vehicle on which the work was performed is based on the estimate (S803).
[0239] Then, the verification result of the verification process is output to at least one of the control device 100 and the instruction device 200 (S804). In response to this, the control device 100 and the instruction device 200 output the verification result (S805, S806).
[0240] The detailed processing of the verification process (S803) and the output process (S804) performed in the management device 300 will be described below.
[0241] When the work record information and the estimate are stored in association with each other, the management device 300 verifies whether the work record information matches the appropriateness judgment information based on the work content information. This appropriateness judgment information is information set for each vehicle model, and a value or range that is judged to be appropriate is set for each item of the work record information.
[0242] If the appropriateness judgment information applies, an output is made indicating that work has been performed based on an estimate (first work content information or second work content information), and conversely, if the appropriateness judgment information does not apply, an output is made indicating that work has not been performed based on an estimate (first work content information or second work content information).
[0243] For example, this is a process to verify whether a value within an appropriate range of error (for example, 100 ml plus or minus) from a value specified in an item of work content information (for example, 5,000 ml of oil) from this item (oil amount) is recorded as work record information. In this case, if the amount of oil changed as work is in the range of 4,900 ml to 5,100 ml, it is judged to be appropriate (outputting that the work was performed based on an estimate), and if it is outside this range, it is not judged to be appropriate (outputting that the work was not performed based on an estimate (first work content information or second work content information)).
[0244] FIG. 15 is a diagram showing an example of a user information table and a vehicle information table used in the information processing system in the embodiment of the present invention.
[0245] Figure 15(a) shows a user information table, which is composed of the items of user ID, user name, address (area), family information, and user rank, and shows that these items are stored in correspondence with each other.
[0246] The user ID is information that identifies the user, and the user rank is ranking information that is set according to the number of times the user has used the service, etc. Generally, the more the user uses the service, the higher the rank is set. This ranking information is used to calculate the order of work at the work site and the cost of estimates, and the higher the rank, the more priority the work order will be set and the greater the discount you can receive.
[0247] Figure 15(b) shows a vehicle information table, which is composed of the following items: vehicle ID, model, vehicle type ID, year, mileage, manufacturer, registration year, vehicle image ID, user ID, and work history ID, and shows that these items are stored in correspondence with each other.
[0248] The vehicle image ID is information that identifies an image file related to the vehicle identified by the vehicle ID, the user ID is information that identifies the user (owner) of the vehicle identified by the vehicle ID, and the work history ID indicates history information of work performed on the vehicle identified by the vehicle ID.
[0249] FIG. 16 is a diagram showing an example of a vehicle image information table, a work history information table, and a work site list information table used in the information processing system in the embodiment of the present invention.
[0250] Figure 16(c) shows a vehicle image information table. This user information table is composed of the following items: vehicle image ID, name, shooting date and time, photographer, shooting location, and storage location, and shows that these items are stored in correspondence with each other.
[0251] The vehicle image ID is information for identifying the image of the file of the vehicle, and the corresponding file name is indicated in the name. The storage location indicates the access information (URL) by which the image can be accessed.
[0252] Figure 16(d) shows a work history information table, which is composed of the following items: work history ID, work content, worker, work date, estimate ID, vehicle ID, work status, next recommended work date, and next recommended work content, and shows that these items are stored in correspondence with each other.
[0253] The work history ID is information for identifying the work history, and corresponds to the worker who performed the work identified by this work ID and the work date, and the estimate ID indicates the identification information of the estimate on which the work was performed. The vehicle ID indicates the identification information of the vehicle on which the work is to be performed, and the work status indicates the work status. The next recommended work date is the next date on which the work is recommended to be performed, calculated based on the work date information, and the next recommended work content indicates the content of the work recommended to be performed on the next recommended date.
[0254] Figure 16(e) shows a work site list information table, which is composed of the following items: work site ID, name, address (area), worker information, work equipment information, and reservation information ID, and shows that these items are stored in correspondence with each other.
[0255] The work site ID is information for identifying a work site, and the location of the work site is indicated in the address (area). In addition, the worker who will be working at the work site is indicated in the worker information, and the work equipment (lift-up device, tire changing device, etc.) installed at the work site is indicated in the work equipment information.
[0256] In addition, the workshop ID is associated with the reservation information ID of the workshop, and this reservation information ID is identification information that links reservation information with other reservation systems.
[0257] FIG. 17 shows an example of an estimate information table and a unit price information table used in the information processing system in the embodiment of the present invention.
[0258] FIG. 17(f) shows an estimate information table. This estimate information table is composed of the following items: estimate ID, creator, creation date, vehicle ID, estimate content, and user desired conditions and specified items, and shows that these items are stored in correspondence with each other.
[0259] The estimate ID is information that identifies the estimate, and indicates the vehicle for which the estimate is made in the vehicle ID, and the specific details of the estimate in the estimate details. In addition, the desired conditions specified by the user when creating the estimate are indicated in the user desired conditions / specified items.
[0260] Figure 17(g) shows a unit price information table, which is composed of the following items: vehicle type ID, work content ID, work content, basic work fee, special work fee, basic work man-hours, related work, and appropriateness judgment information, and shows that these items are stored in correspondence with each other.
[0261] Each vehicle model ID is associated with a work content ID, work content, basic work fee, special work fee, basic work hours, related work, and appropriateness judgment information, and the appropriateness judgment information is used to verify whether the work record book is based on an estimate, based on the unit price information of the basic work fee, special work fee, and basic work hours.
[0262] 18 to 26 are flowcharts showing the flow of processing performed in the information processing system 1 in the embodiment of the present invention.
[0263] Figure 18 shows the estimate creation process performed in the control device 100, in which user information and vehicle information for which an estimate is to be created are input, and after a login process to the control device 100 (S1801), user information and vehicle information for the user ID and vehicle ID (including model and chassis number) are obtained (S1802).
[0264] This identifies the vehicle to which the specified service is to be provided and the user of that vehicle.
[0265] Next, the control device 100 acquires vehicle state information as a diagnosis result of the process of diagnosing the vehicle state of the vehicle (S1803). This vehicle state information includes information acquired from a diagnosing device (diagnostic machine) that diagnoses the vehicle in a workshop corresponding to the control device 100, as well as measurement values measured by a worker performing the work.
[0266] The control device 100 identifies the work required for the vehicle based on at least one of the vehicle condition information, the work history for the vehicle, the user's request (request items), etc. (S1804), and creates a first work content information (estimate A) for the work using the work information indicating the work content for the identified work (S1805).
[0267] At this time, as the work history information for the vehicle, in addition to using the work history information for that vehicle stored in the management device 300, it is also possible to use previously recorded work record information (work record book).
[0268] Then, the control device 100 associates the first work content information with the vehicle information and the user information, and stores the information in the control device 100 and the management device 300 (S1806).
[0269] 19 shows the process of work based on estimates by the control device 100, which starts by receiving a work request for work based on estimates and other information (verification result information, etc.). It is checked whether the estimate included in the work request is an estimate prepared at another work site (other work site) different from the work site (own work site) corresponding to the control device 100 (S1901).
[0270] The following shows the process when a work request is made based on an estimate created at another work site.
[0271] If the work request is based on an estimate made at another workshop (YES in S1901), the control device 100 then judges whether the workshop information set in the estimate that will perform the work is the own workshop (S1902). That is, this is the process when the work request is based on estimate B or estimate C. In the following, a work request based on estimate C (an estimate that reflects the diagnosis result of the diagnosis process) will be described as an example.
[0272] If the workshop information for the work site where the work will be performed is not the user's own workshop (NO in S1902), the destination is assumed to be incorrect, so an error notification is sent to the sender, and the process proceeds to verification of the estimate based on the work record information in S1915.
[0273] If the information of the workshop performing the work is the own workshop (YES in S1902), the control device 100 then judges whether the estimate for the requested work is an authenticated estimate in which authentication information has been set (S1903). If it is an authenticated estimate (YES in S1903), the control device 100 performs a confirmation process to confirm whether the authentication information is correct by mutual communication with the management device 300 (S1904).
[0274] If the authentication information cannot be confirmed to be correct in this confirmation process, an error is returned to the sender to inform the sender that the requested work cannot be carried out, and the process is terminated.
[0275] If the verification process confirms that the authentication information is correct, or if the estimate is not an authenticated estimate, the control device 100 then checks the work content included in the estimate and determines whether or not to accept (undertake) the work based on the work content (S1905).
[0276] If it is determined that the work will not be accepted (NO in S1905), the control device 100 proceeds to a process of verifying the estimate based on the work record information in S1915. If it is determined that the work will be accepted (YES in S1905), the control device 100 creates (S1906) and saves (S1907) work instruction information based on the estimate C for the work request.
[0277] Next, the control device 100 performs work management of the work based on the created work instruction information (S1908). This work management is a work management method that differs for each work environment of the work site corresponding to the control device 100, and sets the work environment and procedures required for the work, such as the work process, worker, work location, and tools required for the work.
[0278] Then, when the work is performed based on this estimate C, the control device 100 stores the work record information of this work in association with the estimate C (S1909).
[0279] Next, the process when a work request is made based on an estimate prepared in the own workshop is shown below.
[0280] In the process of determining whether the work request is based on an estimate prepared by the own workshop (S1910), if it is not determined that the estimate was prepared by the own workshop (NO at S1910), this is because the workshop that prepared the estimate is unknown, and the control device 100 notifies the sender of an error and proceeds to the process of verifying the estimate based on the work record information at S1915.
[0281] When it is determined that the estimate was prepared by its own workshop (YES in S1910), the control device 100 prepares work instruction information based on the estimate C for the requested work (S1911) and stores it (S1912).
[0282] Next, the control device 100 performs work management of the work based on the created work instruction information (S1913). Then, when the work is performed based on this estimate C, the control device 100 stores the work record information of this work in association with the estimate C (S1914).
[0283] If the estimate is created in one's own workshop, it is not necessarily required to perform the processes of determining whether or not to authenticate as shown in S1903 and whether or not to accept the job as shown in S1905, and of course these processes may be performed.
[0284] Next, the control device 100 judges whether or not it has received information on the result of the verification of the estimate based on the work record information from the management device 300 (S1915). The information on the result of the verification of the estimate based on the work record information is information received by the management device 300 through the process shown in FIG.
[0285] If the control device 100 receives the verification result of the estimate based on the work record information from the management device 300 (YES in S1915), the control device 100 stores and outputs (displays) the verification result information (S1916), and if the control device 100 has not received the verification result of the estimate based on the work record information from the management device 300 (NO in S1916), it terminates the processing.
[0286] Figure 20 shows the estimate creation process performed by the instruction device 200, in which user information and vehicle information for which an estimate is to be created are input, and after a login process to the instruction device 200 (S2001), user information and vehicle information for the user ID and vehicle ID (including model and chassis number) are obtained (S2002).
[0287] This identifies the vehicle to which the specified service is to be provided and the user of that vehicle.
[0288] Next, the instruction device 200 accepts the task type (S2003), and specifies standard tasks for the task type (S2004). The instruction device 200 also displays task plans that the user can select based on the standard tasks for each task type (S2005).
[0289] Then, the instruction device 200 creates an estimate B using the work in the selected work plan and the vehicle information (S2006), and stores the estimate B in association with the user information and the vehicle information (S2007).
[0290] FIG. 21 shows a diagnostic process performed in the indicating device 200. There are a method for acquiring a diagnostic result by the diagnostic process performed in the indicating device 200, and a method for the indicating device 200 to receive a diagnostic process performed by a diagnostic machine.
[0291] The instruction device 200 determines whether a diagnosis request (diagnosis operation) has been accepted (S2101).
[0292] The instruction device 200 waits until a diagnosis request is made (NO in S2101), and upon receiving the diagnosis request (YES in S2101), the instruction device 200 subsequently determines whether the diagnosis request is a request from a diagnostic device (S2102).
[0293] If the diagnosis request is from a diagnostic machine (YES in S2102), the instruction device 200 checks the connection with the diagnostic machine (S2103) and issues a diagnosis instruction to the diagnostic machine (S2104). As a result, the instruction device 200 determines whether or not a diagnosis result has been received from the diagnostic machine (S2105), and waits until the diagnosis result is received (NO in S2105).
[0294] Furthermore, when a diagnostic result is received from the diagnostic device (YES in S2105), the instruction device 200 stores the received information on the diagnostic result (diagnosis result information) in association with the user information and the vehicle information (S2108).
[0295] If the diagnosis request is not from the diagnostic device (NO in S2102), it is assumed that the diagnosis request is from the indicating device 200, and the indicating device 200 is connected to the vehicle to check communication (S2106), and a diagnosis process is performed (S2107).
[0296] Then, the result of the diagnostic process (diagnosis result information) is stored in association with the user information and the vehicle information (S2108). Of course, the result may be stored in the management device 300 as diagnosis result information for the vehicle.
[0297] As described above, this diagnostic process is a process of obtaining measured values and suitability as diagnostic results for diagnostic items specified in advance, as well as a process of obtaining measured values and suitability for diagnostic items specified by the operator.
[0298] FIG. 22 shows the estimate creation, estimate comparison, and work request processing carried out by the instruction device 200.
[0299] The processes shown in S2201 to S2208 are estimate creation processes, the processes shown in S2209 to S2211 are estimate comparison processes, and the processes shown in S2212 to S2216 are work request processes.
[0300] In the instruction device 200, when an instruction operation for creating an estimate is performed after an estimate B has been created in the flowchart shown in Fig. 20, processing is started. First, a diagnosis process as shown in Fig. 21 is performed, and it is determined whether or not diagnosis result information for the vehicle to be worked on is stored in the instruction device 200 or the management device 300 (S2201).
[0301] If it is determined that the diagnostic result information has been saved (YES in S2202), the instruction device 200 extracts "vehicle configuration information for which it cannot be determined that no malfunction has occurred" from the diagnostic result information (S2202). This process determines whether the vehicle configuration information has been extracted (S2203), and if it has not been extracted (NO in S2203), the instruction device 200 creates and saves an estimate C with the same contents as estimate B, since there is no need to reflect the diagnostic process results in estimate B (S2204). Furthermore, if the vehicle configuration information can be extracted (YES in S2203), the indicating device 200 stores the vehicle information and diagnosis result information including this "vehicle configuration information for which it cannot be determined that no malfunction has occurred" (S2205).
[0302] Next, the instruction device 200 judges whether the work required for this vehicle configuration information (the work to be performed) is included in the estimate B (S2206). If it is included (YES in S2206), there is no need to perform an estimate procedure for the additional work required for the vehicle configuration information, so an estimate C with the same contents as the estimate B is created and saved (S2204).
[0303] In addition, if the work required (work to be done) for the vehicle configuration information is not included in estimate B (NO in S2206), the instruction device 200 identifies the work required (work to be done) for this vehicle configuration information, and creates and saves a new estimate C based on estimate B by adding the work content for that work (S2207).
[0304] In this way, when estimate C, which is second work content information based on the contents of the diagnosis result information, is created based on the diagnosis result information, the identification information of estimate B and the created estimate C are transmitted to management device 300 (S2208). As a result, management device 300 identifies the managed estimate B based on the identification information of estimate B, and updates estimate B with the received estimate C and stores it.
[0305] Next, the instruction device 200 judges whether or not a request for confirmation of the estimate A, which is the first work content information created by the control device 100, has been received (S2209). Upon receiving the request for confirmation, the instruction device 200 performs a comparison process (verification process) between the estimate A requested for confirmation and the estimate B or estimate C created and stored by the instruction device 200 (S2210). At this time, estimate B or estimate C is the most recent estimate that has been saved in the instruction device 200. In other words, even if the creation conditions of estimate A and estimate B or estimate C are different or the same, they can be compared.
[0306] Of course, estimates may be compared by using identification information to specify estimate B or estimate C to be compared with estimate A, or estimates may be searched for estimate B or estimate C to be compared with estimate A based on the estimate creation conditions, and then the estimate may be compared with the searched estimate B or estimate C.
[0307] Then, the instruction device 200 outputs and stores the result of this comparison process (S2211).
[0308] Next, the instruction device 200 judges whether or not a request to specify a work site has been made by an operation by the user (S2212). For example, the operation at this time is an operation to specify a work site on a screen displayed on the instruction device 200 as shown in FIG. 13(b).
[0309] When a workshop is designated (YES in S2212), the instruction device 200 extracts candidate workshops to be requested to perform work based on the estimate C from the workshop list based on at least one of the user information and vehicle information (S2213). The instruction device 200 also sets priorities for the extracted candidate workshops based on the past work history included in the user information (S2214), and outputs the candidate workshops to which the priorities have been set (S2215). Furthermore, the instruction device 200 requests the workshop designated by the user to confirm the work, and requests the work based on the estimate C when the confirmation response from the workshop indicates that the work has been accepted (S2216).
[0310] 23 shows the management process performed by the management device 300. When a login request is made from the control device 100 or the instruction device 200 (S2301), authentication process is performed based on the login ID and password received as the login request, and information based on the login ID is transmitted (S2302). When authentication process is performed from the control device 100, information associated with that control device 100 is transmitted, and when authentication process is performed from the instruction device 200, user information and vehicle information are transmitted.
[0311] After the authentication process has been completed, a determination process (S2303) is performed to determine whether a request for creating an estimate (quote request) has been received from the instruction device 200 or control device 100. If this request is received (YES in S2303), the information and setting information required to create an estimate according to the request source are transmitted to the request source (S2304). If the request is from the control device 100, the management device 300 transmits vehicle information for the vehicle for which an estimate is being made, user information for the user of the vehicle, estimate item information, unit price information, etc. Also, if the request is from the instruction device 200, the management device 300 transmits information similar to that of the control device 100, as well as information such as standard work information for the work type.
[0312] Next, the management device 300 determines whether or not an estimate comparison request has been received (S2305), and if it is not an estimate comparison request (NO in S2305), the process proceeds to S2315. If an estimate comparison request is received from the instruction device 200 (YES in S2305), the management device 300 performs an estimate comparison process (S2306). The detailed flow of this comparison process is shown in FIG. 24 and will be described later. Based on the results of this comparison process, each of the compared estimates and the comparison result information are stored (S2307).
[0313] Next, from the comparison result information, it is determined whether or not estimate A is set as valid, which indicates that the content of estimate A is included in estimate C and is a proper estimate A (S2308). If it is not set as valid (NO in S2308), the authentication information setting process described below is not performed, and therefore authentication information is not set in estimate A. Of course, information indicating that authentication information is not set may be set in estimate A.
[0314] If estimate A is valid (YES in S2308), the management device 300 calculates a hash value of estimate A (S2309), acquires current time information (S2310), and sets (adds) a timestamp including the hash value and the current time information as authentication information to estimate A (S2311). Then, estimate A with this authentication information set is saved (S2312). This authentication information may also include an authentication expiration date, etc.
[0315] Next, the management device 300 judges whether or not an authentication request for the estimate A has been received from the instruction device 200 (S2313). If an authentication request has not been received (NO in S2313), the process ends.
[0316] If an authentication request is accepted (YES at S2313), the management device 300 calculates a hash value of the estimate A for which authentication is requested (S2314), compares the hash value with the hash value included in the authentication information set in the estimate A (S2315), and stores the authentication success or failure result based on the comparison and the hash value itself in association with the estimate A (S2316).
[0317] 24 and 25 show the comparison process (verification process) of estimates performed in the instruction device 200 or the management device 300. FIG.
[0318] This comparison process (verification process) shows a process that is performed by both the instruction device 200 and the management device 300, but the following description will be given taking the management device 300 as an example.
[0319] This comparison process (verification process) is a process that determines whether the first work content information (estimate A) created in the control device 100 is appropriate by comparing it with (verifying it based on) the second work content information (estimate B or estimate C) created in the instruction device 200, and if it is not appropriate, identifies the information that is deemed to be inappropriate.
[0320] In the management device 300, when it receives the first work content information (estimate A) from the control device 100 and the second work content information (estimate B or estimate C (hereinafter, estimate C)) from the instruction device 200 and stores each estimate, it first extracts the estimate items (hereinafter, referred to as "items") that make up each estimate (estimate A and estimate C) (S2401).
[0321] Then, the management device 300 performs a process of associating the extracted items of estimate A with the items of estimate C for each item (S2402), and stores items that can be associated and items that cannot be associated separately (S2403). This process of associating items for each item is an example of a difference extraction process that extracts differences between the first work content information and the second work content information. In other words, items that cannot be associated are extracted as differences.
[0322] This item matching process matches items with the same or similar names, as well as matching items designated in advance.
[0323] Then, the management device 300 performs an analysis process for the items that cannot be associated (S2404). A detailed flow of this analysis process (first analysis process) is shown in the flowchart of FIG. 26 and will be described below. That is, the analysis process in S2404 becomes a verification result of the estimate A based on the items that could not be associated. This analysis process is an example of a difference extraction process that extracts differences between the first work content information and the second work content information. That is, the information on this item is an example of difference information in the comparison result information of the comparison process.
[0324] On the other hand, the following processing shown in S2405 to S2418 is an analysis processing (second analysis processing) of the associated items, and this analysis processing becomes a verification result of the estimate A based on the associated items.
[0325] First, for each associated item, the management device 300 extracts the basic labor charge, which is the unit price information for that item (S2405), and extracts the labor hours, which is the number of hours required to perform the work for that item (S2406). Next, the management device 300 calculates the total amount for each item using the basic labor charge and labor hours for each item (S2407), and reads from the storage device the tolerance information for the extracted items (basic labor charge and labor hours) and the calculated value (total amount) (S2408).
[0326] The management device 300 then compares the extracted items (basic labor charge and labor hours) and the calculated values (total amount) with the corresponding allowable range information (S2409), and judges whether the value of each item exceeds the value (threshold) of the allowable range information (S2410). This allowable range information is made up of information or thresholds indicating a certain range that is judged to be appropriate, and items (basic labor charge, labor hours, total amount) that are included in this allowable range information can be judged to be appropriate, and items (basic labor charge, labor hours, total amount) that are not included in this allowable range information are not judged to be appropriate.
[0327] If the value of each item does not exceed the value (threshold) of the tolerance information (NO at S2410), the management device 300 sets the estimate A to be verified as being included in the tolerance information of estimate C (S2411), and stores the estimate A, estimate C, and the comparison result in correspondence with each other (S2412).
[0328] Furthermore, if the value of each item exceeds the value (threshold) of the tolerance information (YES in S2410), the management device 300 compares the total amounts obtained by adding up the total amounts of all items (S2413) and determines whether or not the total amount exceeds the value (threshold) of the tolerance information (S2414). If the total amount does not exceed the value (threshold) of the tolerance information (NO in S2414), the management device 300 sets estimate A to be verified as being included in the tolerance information of estimate C (S2411), and stores estimate A, estimate C, and the comparison result in association with each other (S2412).
[0329] On the other hand, if the total amount exceeds the value (threshold) of the tolerance information (YES in S2414), the management device 300 sets estimate A to be outside the range included in the tolerance information of estimate C (S2415), and identifies the items that exceed the tolerance value of the tolerance information and the excess amount for those items that exceeds the tolerance value (S2416).
[0330] The above-mentioned processes in S2405 to S2416 are an example of a difference extraction process for extracting differences between the first work content information and the second work content information. In other words, the information on this item and the excess amount is an example of difference information in the comparison result information of the comparison process. In other words, this difference information is not simply information that indicates the difference between the first work content information (estimate A) and the second work content information (estimate B or estimate C (hereinafter, estimate C)), but can also be extracted as a difference when the tolerance for each item is exceeded (outside the tolerance), and not as a difference when it is within the tolerance.
[0331] Furthermore, the management device 300 stores the estimate A, the estimate C, the comparison result information, the item that exceeded the allowable range value, and the amount that exceeded in association with each other (S2417).
[0332] Then, in the management device 300, since the amount of the associated item exceeds the tolerance information and this needs to be raised as an issue to the user, the management device 300 sets "requires confirmation" to indicate that estimate A is not valid, and sets the confirmation level (in the example shown in FIG. 24, the confirmation level is set to "level 5", which is higher than S2502 in FIG. 26 described later and lower than S2506 in the same figure) (S2418).
[0333] Through the above process, the management device 300 determines whether the estimate is valid or invalid (invalid) for each of the items that can be matched and those that cannot be matched in the estimate items that make up the estimate in the process of comparing estimates (verification process), and then sets whether the estimate is valid or invalid as a comparison result based on these. Note that the estimate is deemed invalid by setting it as "needs confirmation."
[0334] More specifically, the judgment is made as follows. 1. If the analysis process for items that cannot be matched (first analysis process) determines that estimate A is valid, and the analysis process for items that can be matched (second analysis process) determines that the item information does not exceed the tolerance information and the total amount does not exceed the tolerance range, then estimate A will be determined to be valid as is. 2. If the analysis process for items that cannot be matched (first analysis process) determines that estimate A is valid, and at least one of the following is determined in the analysis process for items that can be matched (second analysis process): the item information exceeds the allowable range information or the total amount exceeds the allowable value range, then the item will be set to “needs confirmation” and estimate A will be determined to be invalid. 3. If estimate A is not determined to be valid in the analysis process of the item that cannot be matched (first analysis process), then regardless of the results of the first analysis process and the second analysis process, it will be set to "needs confirmation" and estimate A will be determined to be invalid.
[0335] Then, the management device 300 outputs the result of the determination to at least one of the control device 100 and the instruction device 200 (S2419).
[0336] 25, the management device 300 performs a process of identifying at least one of the difference information extracted by the difference extraction process and the first work content information and the second work content information used to extract the difference information as information to be saved (S2420). In addition, when the management device 300 transmits difference information to the control device 100 or the instruction device 200 and receives, as a response to this transmission, information on the reason for the difference in the difference information received from the control device 100 or the instruction device 200, the existence of differences in the control device 100 or the instruction device 200, and confirmation by the worker or user of the contents of the difference information, it is also possible for the management device 300 to identify such information as information to be saved.
[0337] Then, the management device 300 calculates a hash value based on each piece of specified information (S2421). This hash value calculation process is a value calculated by using a hash function on the specified information, and is also called a message digest. Once the hash value is calculated based on the specified information in this way, authentication information including the hash value is created (S2422). This authentication information is time information including the hash value, and the time information is time information of the timing at which the authentication information is created. This authentication information is also called a time stamp.
[0338] The management device 300 then sets the created authentication information to the identified information (S2423), and saves the information in which the authentication information has been set (S2424). It is proven that the information in which this authentication information is set existed before the time of the authentication information and has not been tampered with since that time. Therefore, even if work was performed at a work site based on the first work content information or the second work content information that has difference information, it can be proven that the work was performed with the difference information in place. In addition, if the management device 300 receives information such as the reason for the difference in the difference information received from the control device 100 or the instruction device 200, the fact that differences exist in the control device 100 or the instruction device 200, and that the content of the difference information has been confirmed by the worker or user, and creates authentication information based on this information, it can prove that the work was performed after acknowledging the difference information.
[0339] FIG. 26 shows details of the analysis process shown in FIG. This is a process to be performed when there is an item that cannot be associated with the estimate items in the first work content information and the second work content information through the process of associating the estimate items with each other.
[0340] The management device 300 determines whether the item that cannot be associated is an item that is specified based on a standard work and is included in estimate C but not in estimate A (S2501). This determination process is an example of a difference extraction process that extracts differences between the first work content information and the second work content information.
[0341] If the item is included in estimate C but not in estimate A (YES in S2501), the management device 300 can determine that since it is an item in a standard operation, the item setting is simply omitted or the item was deliberately deleted, and the inability to match is treated as a minor issue, so the management device 300 sets the setting to "needs confirmation" to indicate that estimate A is not valid, and sets the confirmation level to "Level 2," which is lower than the confirmation level in S2506 described below (S2502). This item is an example of difference information extracted as a difference in the difference extraction process.
[0342] On the other hand, if the item is included in estimate C but not included in estimate A (NO in S2501), the management device 300 then determines whether or not estimate A includes other items that are included in estimate C but are different from the items specified based on the standard work (S2503). If estimate A does not include other items (NO in S2503), the management device 300 verifies estimate A based on estimate C and determines that it is not an estimate that will cause any particular problems, and sets estimate A as valid (S2505).
[0343] On the other hand, if "other items" are included in estimate A (YES in S2503), the management device 300 can determine that estimate A includes items other than those specified based on the standard work, and therefore that unnecessary items have been added or that items desired by the user have been added. In this case, the management device 300 then judges whether the "other items" are items designated as additional work by the user (S2504). In this judgment, a display may be displayed to the user to confirm whether the items are designated as additional work, or a type "user-added items" may be set in the process of creating estimate A, and the management device 300 may judge whether this type is set. If it is determined that the "other items" are items designated by the user as additional work (YES in S2504), the management device 300 sets estimate A as valid since the items relate to work that is in line with the user's intentions (S2505).
[0344] On the other hand, if the "other items" are not determined to be items specified by the user as additional work (NO in S2504), the management device 300 determines that estimate A is an estimate that has a problem for some reason as a result of verifying it based on estimate C, since the "other items" are different items from those specified based on the standard work and are not work items that align with the user's intentions, and determines (verifies) that the inability to match the items is due to the occurrence of some problem. This item is an example of difference information extracted as a difference in the difference extraction process. Since this is an issue that needs to be raised with the user, the estimate A is set to “requires confirmation”, indicating that it is not valid, and the confirmation level is set to “level 10”, which is a higher confirmation level than S2502 described below (S2506).
[0345] By the above-described analysis process, the instruction device 200 or the management device 300 can set the result of analyzing the estimate A (first work content information) based on the estimate C (second work content information).
[0346] FIG. 27 shows the auction process performed in the management device 300.
[0347] In this auction process, bids are accepted from those who have applied to undertake work based on estimates, and the bidder who has specified the most advantageous bidding conditions is selected from among the work acceptors who have submitted bids. The management device 300 opens an online auction venue and accepts registrations of estimate registrants who register estimates and work acceptors who accept work based on those estimates (S2601). One or more auction venues can be set up, and each is identified by a venue ID.
[0348] While accepting registration of an estimate registrant and a work acceptor, management device 300 determines whether or not the estimate registrant has registered an estimate (S2602), and if the estimate registration process has been performed (YES at S2602), it checks the format of the registered estimate and confirms the conditions (work conditions) specified for performing the work based on that estimate (S2603).
[0349] That is, the person who registered the estimate can set the work conditions when requesting work based on the estimate. The work conditions at this time consist of general conditions and special conditions, the special conditions are conditions for instantly and uniformly determining the work request destination, and the general conditions are conditions other than the special conditions.
[0350] If the estimate format and work conditions are confirmed and the correct information is set, the estimate with the work conditions set is disclosed at the auction site (S2604). At this time, it is possible to disclose not only the entire estimate but also part of the estimate. An example of information that is not disclosed is the personal information of the estimate registrant.
[0351] With the estimate disclosed at the auction venue in this manner, it is determined whether or not a bid that satisfies the special conditions has been made within the period during which bidding is possible (S2605). If a bid has been made (YES in S2605), the work acceptor who processed the bid under those special conditions is confirmed as the work recipient (S2612), and the work site information of that work recipient is associated with the estimate and saved (S2613).
[0352] Furthermore, until a bid that satisfies the special conditions is received within the period during which bidding is possible (NO in S2605), it is then determined whether the bidding period has expired (S2606), and bids remain accepted until the bidding period has expired (NO in S2606). When the bidding period has expired (YES in S2606), the management device 300 determines whether bidding processing is being performed (S2607). If there are no bids at this point (NO in S2607), the management device 300 saves the bidding history and ends the process. In other words, this indicates that no one was willing to take on the work based on the estimate in the auction process. In this case, it is possible to hold the auction again at a different auction venue.
[0353] On the other hand, when the bidding period has expired (YES in S2606), if the bidding process is in progress in the management device 300 (YES in S2607), the management device 300 then determines whether there are multiple bidding processes (S2609). If there are multiple bids (YES in S2609), the management device 300 sets a priority for each bid based on the bidding conditions (S2610). The priority setting process at this time sets the priority in consideration of multiple conditions such as the shortest delivery date specified as the bidding conditions, the lowest estimated amount, and the fastest bid. Note that when setting the priority at this time, the priority may be set based on the conditions (general conditions) set by the person who registered the estimate.
[0354] The priority is then notified to the work acceptor (bidder) who has processed the bidding (S2611). Of course, it is also possible to notify in descending order of priority. If there are not multiple bids (NO in S2609) and there is a single bid, the priority (first place) is notified to that bidder (S2611). The work recipient is determined when the bidder accepts (allows) the notification (S2612). In this way, once the work recipient has been determined, the management device 300 stores the work recipient's information (requested workshop information) in association with the estimate (S2613).
[0355] The above-mentioned learning is, for example, a method in which data patterns are input into a computer based on what is called teacher data, which is a set of information and correct judgments, and the computer finds new characteristics and associations based on these patterns, or a method in which the computer finds commonalities and characteristic data in the input data.
[0356] Another example of learning is a method known as deep learning, in which a computer constructs a neural network to analyze, extract, and output local or characteristic data.
[0357] Of course, this learning also includes preprocessing, which consists of processes such as supplementing missing data, eliminating unnecessary data, and standardizing data formats, as well as postprocessing, which stores the learning results so that they can be used for other learning.
[0358] The terms "part," "means," "device," and "system" used in the above-described embodiments and claims do not simply mean physical means, but also include cases in which the functions they possess are realized by software or software services.
[0359] Furthermore, the functions of a single "part," "means," "device," or "system" may not only be constituted by a single physical means, software, software module, or device, but may also be realized by multiple physical means, software, software modules, devices, or a combination of these.
[0360] The terms used in the above embodiments and claims should be interpreted as open-ended terms. For example, the term "including" should be interpreted as "not limited to what is described as including". The term "containing" should be interpreted as "not limited to what is described as containing". The term "comprises" should be interpreted as "not limited to what is described as comprising". The term "having" should be interpreted as "not limited to what is described as having". The term "comprising" should be interpreted as "not limited to what is described as comprising". [Explanation of symbols]
[0361] 100 Control device 120 Service provision equipment 200 Indicating device 220 Imaging device 230 Diagnostic Machine 300 Management device 320 DB 400 External device
Claims
1. a second storage unit that stores information; a second processor capable of communicating with the second storage unit; Equipped with The second processor comprises: a second vehicle information acquisition process for acquiring vehicle information related to the vehicle in response to an instruction from a user; A work type designation process for designating a work type for a vehicle; a second creation process for creating second work content information using a work identified from a standard work for the work type specified in the work type designation process and the vehicle information acquired in the second vehicle information acquisition process; Run the second storage unit stores second work content information created in the second creation process; a first creation process for creating first work content information for a work by using vehicle information regarding the vehicle acquired in response to an instruction from a worker different from the user and work information for the work to be performed on the vehicle of the vehicle information; a first processor executing a first storage unit that stores the first work content information created in the first creation process; and capable of communicating with another computer having The second processor comprises: a comparison result output process for outputting a comparison result obtained by comparing the first work content information with the second work content information; a notification process of notifying the other computer of the first work content information when the first work content information is found to be valid in a comparison result by the comparison result output process; An information processing device that executes the above.
2. a second storage unit that stores information; a second processor capable of communicating with the second storage unit; Equipped with The second processor comprises: a second vehicle information acquisition process for acquiring vehicle information related to the vehicle in response to an instruction from a user; A work type designation process for designating a work type for a vehicle; a second creation process for creating second work content information using a work identified from a standard work for the work type specified in the work type designation process and the vehicle information acquired in the second vehicle information acquisition process; Run the second storage unit stores second work content information created in the second creation process; a first creation process for creating first work content information for a work by using vehicle information regarding the vehicle acquired in response to an instruction from a worker different from the user and work information for the work to be performed on the vehicle of the vehicle information; a first processor executing a first storage unit that stores the first work content information created in the first creation process; and capable of communicating with another computer having The second processor comprises: a comparison result output process for outputting a comparison result obtained by comparing the first work content information with the second work content information; a notification process of notifying the other computer of the second work content information when the first work content information is found to be valid in a comparison result by the comparison result output process; An information processing device that executes the above.
3. a second storage unit that stores information; a second processor capable of communicating with the second storage unit; Equipped with The second processor comprises: a second vehicle information acquisition process for acquiring vehicle information related to the vehicle in response to an instruction from a user; A work type designation process for designating a work type for a vehicle; a second creation process for creating second work content information using a work identified from a standard work for the work type specified in the work type designation process and the vehicle information acquired in the second vehicle information acquisition process; Run the second storage unit stores second work content information created in the second creation process; a first creation process for creating first work content information for a work by using vehicle information regarding the vehicle acquired in response to an instruction from a worker different from the user and work information for the work to be performed on the vehicle of the vehicle information; a first processor executing a first storage unit that stores the first work content information created in the first creation process; and capable of communicating with another computer having The second processor comprises: a comparison result output process for outputting a comparison result obtained by comparing the first work content information with the second work content information; an information selection process for selecting the second work content information when the first work content information is not recognized as valid in a comparison result by the comparison result output process; a notification process for notifying the other computer of the second work content information selected by the information selection process; An information processing device that executes the above.
4. The first processor, a first vehicle information acquisition process for acquiring vehicle information related to the vehicle in response to an instruction from a worker different from a user of the vehicle; a task identification process for identifying a task to be performed on the vehicle of the vehicle information acquired in the first vehicle information acquisition process based on the vehicle information; Run The first creation process includes:
4. The information processing apparatus according to claim 1, further comprising: generating first work content information relating to the work identified by the work identification process using work information for the work.
5. A computer including a second storage unit for storing information, a second vehicle information acquisition process for acquiring vehicle information related to the vehicle in response to an instruction from a user; A work type designation process for designating a work type for a vehicle; a second creation process for creating second work content information using a work identified from a standard work for the work type specified in the work type designation process and the vehicle information acquired in the second vehicle information acquisition process; Run the second storage unit includes storing second work content information created in the second creation process; a first creation process for creating first work content information for a work by using vehicle information regarding the vehicle acquired in response to an instruction from a worker different from the user and work information for the work to be performed on the vehicle of the vehicle information; Run a first storage unit that stores the first work content information created in the first creation process; and capable of communicating with another computer having The computer, a comparison result output process for outputting a comparison result obtained by comparing the first work content information with the second work content information; a notification process of notifying the other computer of the first work content information when the first work content information is found to be valid in a comparison result by the comparison result output process; An information processing method for performing the above.
6. A computer including a second storage unit for storing information, a second vehicle information acquisition process for acquiring vehicle information related to the vehicle in response to an instruction from a user; A work type designation process for designating a work type for a vehicle; a second creation process for creating second work content information using a work identified from a standard work for the work type specified in the work type designation process and the vehicle information acquired in the second vehicle information acquisition process; Run the second storage unit includes storing second work content information created in the second creation process; a first creation process for creating first work content information for a work by using vehicle information regarding the vehicle acquired in response to an instruction from a worker different from the user and work information for the work to be performed on the vehicle of the vehicle information; Run a first storage unit that stores the first work content information created in the first creation process; and capable of communicating with another computer having The computer, a comparison result output process for outputting a comparison result obtained by comparing the first work content information with the second work content information; a notification process of notifying the other computer of the second work content information when the first work content information is found to be valid in a comparison result by the comparison result output process; An information processing method for performing the above.
7. A computer including a second storage unit for storing information, a second vehicle information acquisition process for acquiring vehicle information related to the vehicle in response to an instruction from a user; A work type designation process for designating a work type for a vehicle; a second creation process for creating second work content information using a work identified from a standard work for the work type specified in the work type designation process and the vehicle information acquired in the second vehicle information acquisition process; Run the second storage unit includes storing second work content information created in the second creation process; a first creation process for creating first work content information for a work by using vehicle information regarding the vehicle acquired in response to an instruction from a worker different from the user and work information for the work to be performed on the vehicle of the vehicle information; Run a first storage unit that stores the first work content information created in the first creation process; and capable of communicating with another computer having The computer, a comparison result output process for outputting a comparison result obtained by comparing the first work content information with the second work content information; an information selection process for selecting the second work content information when the first work content information is not recognized as valid in a comparison result by the comparison result output process; a notification process for notifying the other computer of the second work content information selected by the information selection process; An information processing method for performing the above.
8. A computer including a second storage unit for storing information, a second vehicle information acquisition process for acquiring vehicle information related to the vehicle in response to an instruction from a user; A work type designation process for designating a work type for a vehicle; a second creation process for creating second work content information using a work identified from a standard work for the work type specified in the work type designation process and the vehicle information acquired in the second vehicle information acquisition process; Run the command, the second storage unit includes storing second work content information created in the second creation process; a first creation process for creating first work content information for a work by using vehicle information regarding the vehicle acquired in response to an instruction from a worker different from the user and work information for the work to be performed on the vehicle of the vehicle information; Run the command, a first storage unit that stores the first work content information created in the first creation process; and capable of communicating with another computer having The computer includes: a comparison result output process for outputting a comparison result obtained by comparing the first work content information with the second work content information; a notification process of notifying the other computer of the first work content information when the first work content information is found to be valid in a comparison result by the comparison result output process; An information processing program that executes the above.
9. A computer including a second storage unit for storing information, a second vehicle information acquisition process for acquiring vehicle information related to the vehicle in response to an instruction from a user; A work type designation process for designating a work type for a vehicle; a second creation process for creating second work content information using a work identified from a standard work for the work type specified in the work type designation process and the vehicle information acquired in the second vehicle information acquisition process; Run the command, the second storage unit includes storing second work content information created in the second creation process; a first creation process for creating first work content information for a work by using vehicle information regarding the vehicle acquired in response to an instruction from a worker different from the user and work information for the work to be performed on the vehicle of the vehicle information; Run the command, a first storage unit that stores the first work content information created in the first creation process; and capable of communicating with another computer having The computer includes: a comparison result output process for outputting a comparison result obtained by comparing the first work content information with the second work content information; a notification process of notifying the other computer of the second work content information when the first work content information is found to be valid in a comparison result by the comparison result output process; An information processing program that executes the above.
10. A computer including a second storage unit for storing information, a second vehicle information acquisition process for acquiring vehicle information related to the vehicle in response to an instruction from a user; A work type designation process for designating a work type for a vehicle; a second creation process for creating second work content information using a work identified from a standard work for the work type specified in the work type designation process and the vehicle information acquired in the second vehicle information acquisition process; Run the command, the second storage unit includes storing second work content information created in the second creation process; a first creation process for creating first work content information for a work by using vehicle information regarding the vehicle acquired in response to an instruction from a worker different from the user and work information for the work to be performed on the vehicle of the vehicle information; Run the command, a first storage unit that stores the first work content information created in the first creation process; and capable of communicating with another computer having The computer includes: a comparison result output process for outputting a comparison result obtained by comparing the first work content information with the second work content information; an information selection process for selecting the second work content information when the first work content information is not recognized as valid in a comparison result by the comparison result output process; a notification process for notifying the other computer of the second work content information selected by the information selection process; An information processing program that executes the above.
Citation Information
Patent Citations
Insurance benefit agreement processing system and computer-readable medium storing program
JP2000113060A
Processing policy determination support system
JP2003122869A
Maintenance support method
JP2003323508A
Semi-automatic labeling of datasets
JP2022091875A
How to determine damage to vehicle parts
JP2023524608A
