Building construction method

The method of transferring loads from a building frame to stiffened columns during construction addresses delays in existing methods, enabling simultaneous wall placement and compliance with building codes, thus enhancing construction efficiency.

JP7572413B2Active Publication Date: 2024-10-23IAVILAER PTY LTD
View PDF 10 Cites 0 Cited by

Patent Information

Application Number
JP2022177861
Authority / Receiving Office
JP · JP
Patent Type
Patents
Current Assignee / Owner
Priority Date
2018-05-10
Filing Date
2022-11-07
Publication Date
2024-10-23
Estimated Expiration
2038-09-10

AI Technical Summary

Technical Problem

Existing construction methods for multi-storey buildings require load-bearing walls to be secured and cured before non-load-bearing walls can be placed, leading to delays and inefficiencies, especially in systems using precast concrete or masonry, and steel frames are weakened by fire, necessitating additional structural support.

Method used

A construction method involving a building frame with vertical aisles and channels filled with a hardenable substance, allowing load transfer from the frame to stiffened columns during construction, enabling simultaneous placement of non-load-bearing walls and eventual compliance with building codes.

Benefits of technology

Facilitates faster construction by allowing non-load-bearing walls to be erected during the curing process, reducing the need for temporary supports and ensuring compliance with fire resistance requirements.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 0007572413000001
    Figure 0007572413000001
  • Figure 0007572413000002
    Figure 0007572413000002
  • Figure 0007572413000003
    Figure 0007572413000003
Patent Text Reader

Abstract

It at least partially alleviates some of the limitations of conventional systems. The wall frame component includes a vertical stud 30 and horizontal rails 32, 34, 36. The wall frame 12 has a top rail 36 that is movable between a relatively raised position and a relatively lowered position. The wall frame 12 includes a removable fastener (retaining screw 50) that maintains the top rail 36 in its raised position, and removal of the fastener moves the top rail 36 to its lowered position.
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present invention relates to the construction of buildings. The present invention is made as a method for constructing a multi-storey building, with particular application to buildings with more than two floors.

[0002] 2. Background of the Invention Building regulations in some countries generally require that buildings with more than three stories must have load-bearing walls of concrete or masonry that support the load of the stories. These regulations are based on fire resistance requirements. Although it is possible to construct load-bearing buildings with steel or timber frames that are structurally sound, such frames are significantly weakened by fire.

[0003] Structures constructed using masonry are generally built up in stages, in layers, from the ground up. Beyond a certain height, it is necessary to allow the grout in the masonry to harden before further loads can be applied. In practice, this means that each story must be allowed to harden before construction of a higher story can begin.

[0004] Structures constructed using precast concrete can be constructed more quickly. However, precast concrete still requires that individual panels be bonded together, typically by grouting. In addition to the inherent costs and difficulties in using precast panels (significant shipping and movement costs associated with heavy panels), the use of such panels still has a significant "wait" time associated with grouting.

[0005] In recent years, buildings are increasingly being constructed using a "cast-in-place" system, in which building walls are laid out using lightweight, hollow wall panels, and then concrete is poured into the panels and allowed to harden to provide structural strength. While the costs of shipping and moving such panels are significantly lower than with precast concrete, the system requires that the concrete in the panels of each floor be fully hardened before subsequent floors are built.

[0006] All of the above mentioned systems have the further limitation that it is generally necessary to wait until the load-bearing walls and columns are secured and, if necessary, cured before fastening the interior walls within the structure. In fact, it is often necessary to complete the entire load-bearing structure of a building before the non-load-bearing walls can be placed.

[0007] US 2010 / 0058687 A1 describes a system of such a sacrificial formwork, which partially supports the load placed on it, and after hardening of the concrete column, the load is shared by the concrete and the sacrificial formwork.

[0008] The present invention proposes an alternative construction system that aims to at least partially alleviate some of these limitations.

[0009] For the avoidance of doubt, the term "column" as used herein broadly encompasses construction elements that support vertical loads, including conventional columns having a relatively uniform length-to-width ratio, blade columns and blade walls whose length may be much greater than their width. Summary of the Invention

[0010] According to one aspect of the present invention there is provided a method of constructing a structure, the method comprising: forming a building frame including a plurality of vertical passages, the frame having sufficient strength to support loads from at least one higher story and defining a load path for the loads of the at least one higher story; At least partially forming at least one higher level; filling the passageway with a hardenable substance; hardening the hardenable material within the passageway to form a column within the structure; creating a break in the load path of the frame, thereby transferring loads from at least one higher story from the building frame to the stiffened columns; It has.

[0011] It should be understood that once the load transfer from the building frame to the stiffened columns is complete, none of the final load is supported by the frame.

[0012] It should also be understood that the building frame may support a significant portion of the load of the higher stories, but not all of it. In some cases, the present invention contemplates sharing all of the load of the higher stories between the building frame and some of the temporary supports. It should also be understood that when used in connection with the present invention, the required number and load capacity of the temporary supports is substantially reduced.

[0013] Advantageously, this allows construction to continue whilst the load of the higher storeys is carried by the building frame whilst the columns are hardening. Once construction is complete, the hardened columns become the primary load-bearing members relative to the frame, thus meeting building regulation requirements.

[0014] Preferably, the building frame is made of structural steel. In a preferred embodiment, the building frame is made of cold rolled steel with a nominal thickness of the order of between 0.75 mm and 1.6 mm.

[0015] Preferably, the hardenable material is concrete.

[0016] Preferably, the method includes placing a deck form on top of the building frame and fluidly connecting the passageway to the deck form, followed by filling the passageway with a hardenable material simultaneously with pouring the hardenable material into the form to complete the floor on the structural frame.

[0017] Preferably, at least some of the interior wall framing is placed simultaneously with placing the exterior wall framing. For example, if an apartment building is being constructed, framing for parting walls may be included. While it is possible to complete the walls of an entire floor at the same time, this is not always desirable as it can make inspection difficult. The use of interior wall framing allows access for the interior fitting of lower floors while the higher floors are being constructed.

[0018] The building frame preferably includes vertical (length) studs and horizontal (width) rails. The building frame preferably includes a load transfer means created by fastening one rail, preferably the top rail, to the studs with at least one removable fastening member. Creating a break in the load path is accomplished by removing the fastening member.

[0019] Alternatively, the building frame may include a shear head arranged to shear at a load greater than that of a single higher story, but less than the load of the entire structure once complete. In this embodiment, a break in the load path can be affected by shearing the shear head following stiffening of the column, and vertical loads are carried by the column rather than the frame.

[0020] According to a second aspect of the invention there is provided a wall frame component including a vertical stud and a horizontal rail, the wall frame having a top rail movable between a relatively raised position and a relatively lowered position, the wall frame including a removable fixing member which maintains the top rail in its raised position, removal of the fixing member moving the top rail to its lowered position.

[0021] When the top rail is in a relatively raised position, the wall frame component preferably includes a load path that transfers load from the top rail through at least one removable fastener to the vertical studs, it being understood that removal of the fastener creates a break in the load path.

[0022] The top rail may include apertures that are positioned to align with corresponding apertures in the vertical studs when the top rail is in a relatively lowered position, so that the top rail can be secured in the relatively lowered position with fasteners, if desired.

[0023] It is convenient to further describe the invention with reference to preferred embodiments thereof. Other embodiments are possible, and therefore the details of the following discussion should not be understood as superseding the generality of the above description of the invention. [Brief description of the drawings]

[0024] [Figure 1] 1 is a series of schematic diagrams of a portion of a multi-layer building being constructed in accordance with the present invention; [Diagram 2] 1 is a series of schematic diagrams of a portion of a multi-layer building being constructed in accordance with the present invention; [Diagram 3] 1 is a series of schematic diagrams of a portion of a multi-layer building being constructed in accordance with the present invention; [Figure 4] 1 is a series of schematic diagrams of a portion of a multi-layer building being constructed in accordance with the present invention; [Diagram 5] 1 is a series of schematic diagrams of a portion of a multi-layer building being constructed in accordance with the present invention; [Figure 6] 1 is a series of schematic diagrams of a portion of a multi-layer building being constructed in accordance with the present invention; [Figure 7] FIG. 2 is a front view of a wall frame component according to the present invention; [Figure 8]FIG. 8 is a perspective view of the upper end of the wall frame component shown in FIG. [Figure 9] FIG. 8 is an end view of the upper end of the wall frame component shown in FIG.

[0025] Detailed Description of the Preferred Embodiments Referring to the drawings, Figure 1 shows a schematic diagram of one floor of a multi-story building. The floor includes a foundation slab 10. A wall frame 12 is placed on the foundation slab 10. The wall frame 12 in this embodiment is placed on the slab 10 to form an interior and exterior wall layout.

[0026] The wall frame 12 is formed from cold rolled section steel. Typical wall thickness is on the order of 90 mm. The steel is typically of a nominal thickness between 0.75 mm and 1.6 mm. The wall frame 12 is constructed to be capable of supporting relatively high vertical loads.

[0027] The wall frames 12 are positioned to allow for the placement of vertical passages 14 at desired intersections. These passages 14 are created through the use of pilasters 16 placed at the desired locations as shown in Figure 2. The vertical passages 14 are generally rectangular in cross section and are sized so that the concrete columns have a greater vertical load capacity than the wall frames 12 when filled with concrete to form the columns.

[0028] Once the wall frame 12 and pilaster boards 16 are in position, the framing deck 20 can be secured to the top of the wall frame 12, with the appropriate reinforcement in place. The framing deck 20 is positioned so that a cavity in the deck 20 is located over the opening to the vertical walkway 14. Reinforcing rods 22 are positioned in the vertical walkway 14 and extend beyond the deck 20. This can be seen in Figure 3. Additional temporary supports can be installed under the deck 20 if necessary.

[0029] Concrete can then be poured to simultaneously form the columns 24 in the vertical passages 14 and the floating slab 26. The wall frame 12 has sufficient strength to support the weight of the floating slab 26 by itself or in conjunction with temporary supports. This is shown in Figures 4 and 5.

[0030] As soon as the floating slab 26 is dry, the wall frame 12 can be placed on top of the floating slab 26 to form the next floor of the building. While this is happening, building service work, such as plumbing and electrical work, can begin on the wall frame 10 of the bottom floor. The concrete of the slab 26 and columns 24 will harden over time to reach its ultimate strength, during which time the load is carried by the wall frame 12. This can be seen in Figure 6.

[0031] The above process can be repeated for subsequent floors.

[0032] The wall frame 12 is formed from vertical studs 30 and three horizontal rails: a base rail 32, a mid rail 34 and a top rail 36. This can be seen in Figures 7-9.

[0033] Each vertical stud 30 has a lower end 40 and an upper end 42. The vertical studs are slightly crimped at the lower end 40 for placement within the base rail 32 so that the base rail 32 and the vertical studs 30 are approximately the same width. The lower ends 40 of the vertical studs 30 and the base rail 32 each include inwardly recessed screw-receiving openings 44. In this manner, the base rail 32 may be secured to the vertical studs 30 by screws 46. The screws 46 are advantageously countersunk to provide a correspondingly flat surface for the wall frame 12.

[0034] The intermediate rail 34 has an outer end that is crimped for placement within the vertical stud 30 such that the outer surface of the intermediate rail 34 is generally flush with the outer surface of the vertical stud 30.

[0035] The central region of each vertical stud 30, as well as the outer ends of the mid-rails 34, includes an inwardly recessed screw-receiving aperture 44. Like the base rails, the mid-rails 34 may be secured to the vertical studs 30 by screws 46. The screws are advantageously countersunk to provide a correspondingly flat surface on the wall frame 12.

[0036] The top rail 36 and its connection to the upper ends 42 of the vertical studs 30 are largely a mirror image of that of the base rail 32. The vertical studs are slightly crimped at their upper ends 42 for placement within the top rail 36 so that the top rail 36 and the vertical studs 30 are approximately the same width. The upper ends 42 of the vertical studs 30 and the top rail 36 each include inwardly recessed screw-receiving openings 44. In this manner, the top rail 36 can be secured to the vertical studs 30 with an effective countersunk screw.

[0037] The top rail 36 arrangement differs from the base rail 32 arrangement in that it includes a retaining screw 50 .

[0038] The alignment of the screw-receiving openings 44 in the upper ends 42 of the vertical studs 30 with the screw-receiving openings 44 in the top rail 36 indicates a relatively lowered position of the top rail 36. In use, the top rail 36 is secured to the vertical studs in a relatively elevated position by retaining screws 50 and is held in this relatively elevated position.

[0039] In practice, the wall frame 12 as described above is assembled with the top rail 36 held in its elevated position by the retaining screws 50. This means that the weight of the floating slab 26 passes from the top rail 36 through the retaining screws 50 to the vertical studs 30. In this manner the floating slab 26 is supported by the wall frame 12. The wall frame 12 therefore defines a load path through the top rail 36, the retaining screws 50 and the vertical studs 30 to the slab 10.

[0040] Once the columns 24 have hardened, the retaining screws 50 can be removed. Removal of the retaining screws 50 allows movement of the top rail 36, i.e., relative to the slab 26, between a raised and lowered position. With the retaining screws 50 removed, the vertical load of the slab 26 (and above stories) is taken by the columns 24, and the wall frame 12 no longer supports the load. Thus, removal of the retaining screws 50 creates a break in the load path identified above.

[0041] This essentially means that the wall framing 12 is load bearing during construction of the structure, allowing for a very fast pace of construction. After construction, the wall framing 12 is no longer load bearing and the load bearing elements are concreted as required by building regulations.

[0042] It should be appreciated that this represents a complete transfer of load from the wall frame 12 to the columns 24.

[0043] In an alternative embodiment, the retention screws 50 may be designed to shear under a particular load, for example the load of two higher stories. The shear of the retention screws 50 serves the same purpose of transferring the load from the wall frame 12.

[0044] It should be understood that the pier 16 does not have to support a load. Alternatively, the pier 16 may be formed in a similar manner to the wall frame 12 and may form part of the load-bearing capacity of the wall frame 12 prior to load transfer.

[0045] Modifications and variations obvious to one skilled in the art are deemed to be within the scope of the invention.

Claims

1. A wall frame component including a vertical stud and a horizontal rail, the wall frame component having a top rail movable between a relatively raised position and a relatively lowered position, the wall frame component including a removable fastening member that maintains the top rail in its raised position, removal of the fastening member moving the top rail to its lowered position.

2. 2. The wall frame component of claim 1, wherein the wall frame component includes a load path that transfers load from the top rail through at least one removable fastener to the vertical stud when the top rail is in a relatively raised position.

3. 3. A wall frame component as claimed in claim 1 or claim 2, wherein the top rail includes a plurality of apertures arranged to align with corresponding apertures in the vertical studs when the top rail is in a relatively lowered position.

Citation Information

Patent Citations

  • Method of executing wall for building construction

    JP1978070517A

  • Method and beam for supporting mold frame

    JP1984000465A

  • Erection of concrete mold

    JP1992062260A

  • Method for constructing reinforced concrete building and reinforced concrete building

    JP1992073338A

  • Structure of steel sheet fixing part of steel sheet concrete structure

    JP1993230914A