Operation plan generation device, learning device, operation plan generation method, learning method, and program
The operation plan generation device optimizes autonomous mobile device routes using learned models to predict and adjust for operational differences, enhancing accommodation density and simultaneous operations by dynamically adjusting section divisions to prevent collisions and improve efficiency.
Patent Information
- Application Number
- JP2020129887
- Authority / Receiving Office
- JP · JP
- Patent Type
- Patents
- Current Assignee / Owner
- Filing Date
- 2020-07-31
- Publication Date
- 2024-10-24
- Estimated Expiration
- 2040-07-31
AI Technical Summary
Existing technologies struggle to automatically create operation plans for autonomous mobile devices that enhance accommodation density and number of simultaneous operations, as they often require manual intervention and fail to account for dynamic disturbances and collisions, leading to reduced space and time utilization efficiency.
An operation plan generation device and method that generates scheduled operation routes for autonomous mobile devices, incorporating dynamic section divisions based on predicted differences between planned and actual operations, using learned models to optimize routes and avoid collisions, thereby improving spatial and temporal efficiency.
The solution enables automatic creation of operation plans that enhance accommodation density and number of simultaneous operations for autonomous mobile devices, preventing collisions and improving space and time utilization efficiency without human intervention.
Smart Images

Figure 0007572663000001 
Figure 0007572663000002 
Figure 0007572663000003
Abstract
Description
[Technical field]
[0001] The present disclosure relates to an operation plan generation device, a learning device, an operation plan generation method, a learning method, and a program. [Background technology]
[0002] In recent years, autonomously moving devices such as drones, self-driving cars, and self-driving ships (hereafter referred to as autonomous moving devices) have been actively researched and some of them are actually being used. An autonomous moving device is a device that autonomously controls its path to move along a given route, and is generally configured to autonomously correct its trajectory to move along the route even if there is a disturbance during movement.
[0003] A typical example of an autonomous mobile device is a drone that flies autonomously outside of visual line of sight. An autonomously flying drone does not receive sequential instructions from an operator, but moves while making its own decisions to follow a given route. If the autonomous mobile device is, for example, a device that operates in the air, such as a drone, or a device such as a ship that moves on the ocean, a typical example of a disturbance that may cause it to deviate from its operating route is wind. Even if such a disturbance occurs, the autonomous mobile device can autonomously control the aircraft to move as much as possible along the operating route.
[0004] Although autonomous mobile devices have a certain degree of autonomous navigation function, they are usually operated while being remotely monitored by a traffic management system in order to respond to unforeseen circumstances and ensure safe operation. Such monitoring of the operation route can be said to be one of the functions of the traffic management system. Some autonomous mobile devices are equipped with a function to avoid collisions with each other using sensors, etc., but since they may be used in cities, it is necessary to avoid collisions between autonomous mobile devices in the unlikely event that they occur. Therefore, even if multiple autonomous mobile devices are operated at the same time, it is necessary to create an operation plan by adjusting the route and time in advance so that the autonomous mobile devices do not collide with each other. Here, the operation plan indicates the operation route and passing time for which an adjustment plan has been made.
[0005] The function of formulating (creating) an operation plan is one of the functions of the operation management system. As an example of using the operation plan creation function, Non-Patent Document 1 describes a successful interconnection test of a drone traffic management system in which general drone operators also participated.
[0006] As an example of an operation planning system (in the case of drones), Non-Patent Document 2 describes the current flow from application to operation in a drone information infrastructure system. In the flow described in Non-Patent Document 2, procedures are carried out manually via email.
[0007] Non-Patent Document 3 describes that in research on flight management of the traffic control integration function, route design and collision judgment are handled with a uniform, fixed-width route. In Non-Patent Document 3, this route with width is called a protected airspace.
[0008] Patent Document 1 also describes a traffic control support system that includes a memory unit, an instruction responsiveness estimation unit, a geographic E-map generation unit, and a movement prediction unit, with the aim of improving the accuracy of ship route control while suppressing the amount of calculation. The memory unit has behavior data related to the behavior of a moving object, geographic data in which each section obtained by dividing a map into meshes is given geographic attribute information that is information related to the movement standard of the moving object, and responsiveness data related to the responsiveness of the moving object to an instruction. The instruction responsiveness estimation unit estimates an ideal behavior of the moving object based on the responsiveness data, calculates a difference between the estimated behavior and the behavior of the behavior data, and updates the responsiveness data based on the calculation result. The geographic E-map generation unit estimates the likelihood that the moving object exists at a certain coordinate at each time based on the behavior data, geographic data, and responsiveness data, and generates a geographic E-map. The movement prediction unit predicts the future coordinates of the moving object based on the geographic E-map. [Prior art documents] [Patent documents]
[0009] [Patent Document 1] JP 2018-036958 A [Non-patent literature]
[0010] [Non-Patent Document 1] New Energy and Industrial Technology Development Organization, NEC Corporation, and 8 other organizations, "Successful interconnection test of drone traffic management system with participation from general drone operators - 29 operators conduct flight tests -", [online], October 30, 2019, New Energy and Industrial Technology Development Organization, [June 1, 2020], Internet<URL:https: / / www.nedo.go.jp / news / press / AA5_101228.html> [Non-Patent Document 2] Ministry of Land, Infrastructure, Transport and Tourism, "Drone / UAS Information Platform System "Drone Information Platform System Operation Manual (Operation Manual Applicant Edition 3.0)" [online], March 26, 2020, Ministry of Land, Infrastructure, Transport and Tourism, [June 1, 2020], Internet<URL:https: / / www.dips.mlit.go.jp / portal / file_download> [Non-Patent Document 3] NEC Corporation and four other corporations, "Japan Drone 2018 DRESS Project Forum Project name: Research and development of a drone operation management system to realize safe, secure and efficient logistics services," pp. 10-13, [online], September 2018, New Energy and Industrial Technology Development Organization, National Research and Development Agency, [June 1, 2020], Internet<URL:https: / / nedo-dress.jp / wp-content / uploads / 2018 / 09 / kenkyuu_006.pdf> Summary of the Invention [Problem to be solved by the invention]
[0011] However, in the flow described in Non-Patent Document 2, the procedures are merely performed manually via email. Note that the test described in Non-Patent Document 1 is merely an interconnection test of the drone traffic management system, and does not take into consideration the procedures related to creating an operation plan. Therefore, a method is desired that automatically performs a series of procedures, such as designing a route and generating an operation plan that is adjusted with the routes of other autonomous mobile devices, simply by setting the start and end points.
[0012] As described above, even if an autonomous mobile device determines a route for operation, it may deviate from the planned route temporarily due to disturbances, and the route is usually designed to have a large margin so as not to collide with other autonomous mobile devices. For example, in the case of an autonomous mobile device flying in the air, such as a drone, a distance margin is provided so that the device will not protrude into other operation sections even if it is blown away under the maximum wind speed at which operation is permitted. This large margin must also be secured in terms of time. For example, in the case of an autonomous mobile device flying in the air, such as a drone, if multiple drones enter the same spatial section at the same time, collisions will occur, so the time period during which a drone can occupy a certain space must be long, taking delays into consideration. This large margin reduces the efficiency of space utilization, and the number of autonomous mobile devices that can operate simultaneously in the same time period within a certain space is kept low.
[0013] However, the technology described in Non-Patent Document 3 handles route design and collision detection for routes with a uniform, fixed width, but does not sufficiently increase the accommodation density of autonomous mobile devices such as drones in space or the number of simultaneous operations. Therefore, it is desirable to propose a method for planning (designing) a route that improves the efficiency of space utilization (spatial efficiency, time efficiency) and enables multiple autonomous mobile devices to operate efficiently.
[0014] Furthermore, the technology described in Patent Document 1 is designed with humans on board, and is based on the idea of allowing multiple ships to enter one section of a large mesh. This is because, since humans are on board, even if a collision is about to occur within the section, it can be avoided by human judgment. As can be seen from the fact that the technology described in Patent Document 1 is designed with ships in mind, it not only uses meshes that divide a two-dimensional plane, but also has a uniform size for these meshes. Furthermore, since the technology described in Patent Document 1 is a technology that focuses on collision avoidance and is used in an environment where human judgment is possible, the meshes are of a uniform size, and it is not a technology based on the perspective of improving the accommodation density of ships and the number of simultaneous operations.
[0015] As described above, the technology described in Patent Document 1 cannot automatically create an operation plan for an autonomous mobile device that does not have a human on board, and cannot improve the accommodation density and number of simultaneous operations of the autonomous mobile devices.
[0016] An object of the present disclosure is to provide an operation plan generation device, a learning device, an operation plan generation method, a learning method, and a program that are capable of automatically creating an operation plan for an autonomous mobile device, and improving the accommodation density and number of simultaneous operations of the autonomous mobile device. [Means for solving the problem]
[0017] An operation plan generation device according to a first aspect of the present disclosure includes a generation unit that generates an operation plan indicating a planned route for operation of an autonomous moving device based on operation conditions input for the operation of the autonomous moving device, and a prediction unit, wherein the route includes information expressed as a succession of sections that are areas for avoiding simultaneous or same-time co-existence with other autonomous moving devices, and the prediction unit predicts a difference between the operation plan and operation results, which are the results of actual operation based on the operation plan, for at least each section on the route included in the operation plan, and the generation unit generates an operation plan for the autonomous moving device based on the operation conditions using new sections updated according to the differences for each section predicted by the prediction unit.
[0018] A learning device according to a second aspect of the present disclosure includes an input unit that inputs an operation plan indicating a planned route for an autonomous mobile device and operation results that are the results of actual operation based on the operation plan, and a learning unit, wherein the route includes information expressed as a succession of sections that are areas for avoiding co-existence with other autonomous mobile devices at the same time or during the same time period, and the learning unit analyzes, for each section used to generate the operation plan, the differences between the operation plan and the operation results that are the results of actual operation based on the operation plan, and generates a learned model that predicts the differences that may occur in a new operation plan based on the analysis results.
[0019] An operation plan generation method according to a third aspect of the present disclosure includes a generation step of generating an operation plan indicating a planned route for operation of an autonomous moving device based on operation conditions input for the operation of the autonomous moving device, and a prediction step, wherein the route includes information expressed as a succession of sections which are areas for avoiding simultaneous or same-time co-existence with other autonomous moving devices, the prediction step predicts a difference between the operation plan and operation results, which are actual operation results based on the operation plan, for at least each section on the route included in the operation plan, and the generation step generates an operation plan for the autonomous moving device based on the operation conditions using new sections updated according to the difference for each section predicted in the prediction step.
[0020] A learning method according to a fourth aspect of the present disclosure includes an input step of inputting an operation plan indicating a planned route for an autonomous mobile device and operation results which are the results of actual operation based on the operation plan, and a learning step, wherein the route includes information expressed as a succession of sections which are areas for avoiding simultaneous or same-time co-existence with other autonomous mobile devices, and the learning step analyzes, for each section used to generate the operation plan, differences between the operation plan and operation results which are the results of actual operation based on the operation plan, and generates a learned model based on the analysis results which predicts the differences that may occur in a new operation plan.
[0021] A program according to a fifth aspect of the present disclosure causes a computer to execute a generation step of generating an operation plan indicating a planned route for operation of an autonomous moving device based on operation conditions input for the operation of the autonomous moving device, and a prediction step, wherein the route includes information expressed as a succession of sections which are areas for avoiding simultaneous or same-time co-existence with other autonomous moving devices, the prediction step predicts a difference between the operation plan and operation results, which are actual operation results based on the operation plan, for at least each section on the route included in the operation plan, and the generation step generates an operation plan for the autonomous moving device based on the operation conditions using new sections updated according to the difference for each section predicted in the prediction step.
[0022] A program according to a sixth aspect of the present disclosure causes a computer to execute an input step of inputting an operation plan indicating a planned route for an autonomous mobile device and operation results which are the results of actual operation based on the operation plan, and a learning step, wherein the route includes information expressed as a succession of sections which are areas for avoiding co-existence with other autonomous mobile devices at the same time or during the same time period, and the learning step analyzes, for each section used to generate the operation plan, the difference between the operation plan and the operation results which are the results of actual operation based on the operation plan, and generates a learned model based on the analysis results which predicts the difference that may occur in a new operation plan. Effect of the Invention
[0023] The present disclosure makes it possible to provide an operation plan generation device, a learning device, an operation plan generation method, a learning method, and a program that are capable of automatically creating operation plans for autonomous moving devices, as well as improving the accommodation density and number of simultaneous operations of autonomous moving devices. [Brief description of the drawings]
[0024] [Figure 1] 1 is a block diagram showing a configuration example of an operation plan generating device according to a first embodiment. [Diagram 2]FIG. 1 is a block diagram showing an example configuration of a learning device that generates a trained model that can be used in the operation plan generation device according to embodiment 1. [Diagram 3] 3 is a flow diagram for explaining an example of processing in the learning device of FIG. 2. [Figure 4] 2 is a flow diagram illustrating an example of processing in the operation plan generating device of FIG. 1. [Diagram 5] FIG. 11 is a block diagram showing a configuration example of a traffic management device according to a second embodiment. [Figure 6] 6 is a schematic diagram showing an example of an operation plan held in the operation management device of FIG. 5. [Figure 7] 10 is a schematic diagram showing an example of an operation plan generated based only on static operation sections, which is stored in a traffic management device according to a comparative example. FIG. [Figure 8] 6 is a schematic diagram showing an example of an operation plan generated by the operation management device of FIG. 5. [Figure 9] FIG. 9 is a schematic diagram showing an example of operation results based on the operation plan of FIG. 8. [Figure 10] 6 is a schematic diagram showing an example of a driving record held in the driving management device of FIG. 5. [Figure 11] 6 is a schematic diagram showing an example of a static traffic section held in the traffic management device of FIG. 5. [Figure 12] FIG. 12 is a schematic diagram for explaining the information contained in the static operation section of FIG. [Figure 13] 6 is a block diagram showing an example of the configuration of a learning unit in the traffic management device of FIG. 5. [Figure 14] 14 is a schematic diagram showing an example of position difference information extracted by the learning unit in FIG. 13. [Figure 15] 14 is a schematic diagram showing an example of time difference information extracted by the learning section of FIG. 13. [Figure 16] 14 is a schematic diagram for explaining an example of pre-learning processing executed by the learning unit in FIG. 13. FIG. [Figure 17] 14 is a schematic diagram showing an example of a result of execution of pre-learning processing held in the learning unit of FIG. 13. [Figure 18]14 is a schematic diagram for explaining an example of a multiple regression analysis process executed in the learning section of FIG. 13. FIG. [Figure 19] 14 is a schematic diagram showing an example of a result of execution of a multiple regression analysis process, which is held in a learning unit in FIG. 13. [Figure 20] 14 is a schematic diagram showing another example of the execution result of the multiple regression analysis process held in the learning unit of FIG. 13. [Figure 21] FIG. 21 is a schematic diagram for explaining the execution results of FIGS. 19 and 20. [Figure 22] 6 is a block diagram showing an example of the configuration of a prediction unit in the traffic management device of FIG. 5. [Figure 23] 23 is a schematic diagram showing an example of a predicted value for each operation section predicted by the prediction unit in FIG. 22. [Figure 24] 23 is a schematic diagram showing an example of a dynamic operation section generated by the prediction unit in FIG. 22 and held in the dynamic operation section holding unit. FIG. [Diagram 25] FIG. 25 is a schematic diagram for explaining the dynamic operation section of FIG. 24. [Figure 26] FIG. 25 is a schematic diagram for explaining the dynamic operation section of FIG. 24. [Figure 27] FIG. 25 is a schematic diagram for explaining the dynamic operation section of FIG. 24. [Figure 28] FIG. 25 is a schematic diagram for explaining the dynamic operation section of FIG. 24. [Figure 29] 6 is a schematic diagram showing an example of an operation plan generated by the operation management device of FIG. 5. [Diagram 30] 6 is a schematic diagram for explaining an example of a method for generating an operation plan in the operation management device of FIG. 5. FIG. [Diagram 31] 6 is a schematic diagram for explaining an example of a method for generating an operation plan in the operation management device of FIG. 5. FIG. [Diagram 32] FIG. 32 is a schematic diagram showing an example of an operation plan generated by the generation method of FIGS. 30 and 31. [Diagram 33] 6 is a flow diagram for explaining an example of a flow from an application for operation of an autonomous mobile device using the operation management device of FIG. 5 to arrival at a destination. [Diagram 34]6 is a flow diagram for explaining an example of a learning process in the traffic management device of FIG. 5. [Diagram 35] 6 is a flow diagram for explaining an example of a prediction process in the traffic management device of FIG. 5. [Diagram 36] 7 is a flow diagram illustrating an example of an operation plan generation process in the operation management device of FIG. 5. [Figure 37] 23 is a schematic diagram for explaining another example of the prediction process in the prediction unit in FIG. 22. FIG. [Figure 38] 23 is a schematic diagram for explaining another example of the prediction process in the prediction unit in FIG. 22. FIG. [Figure 39] 23 is a schematic diagram for explaining another example of the prediction process in the prediction unit in FIG. 22. FIG. [Diagram 40] FIG. 2 illustrates an example of a hardware configuration of the apparatus. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0025] Hereinafter, an embodiment will be described with reference to the drawings. In the embodiments, the same or equivalent elements may be denoted by the same reference numerals, and duplicated descriptions will be omitted as appropriate.
[0026] <Embodiment 1> An operation plan generating device according to the first embodiment will be described with reference to Fig. 1. Fig. 1 is a block diagram showing an example of the configuration of the operation plan generating device according to the first embodiment.
[0027] As shown in Fig. 1, the operation plan generation device 1 according to this embodiment is a device that generates an operation plan for an autonomous mobile device, and can include a generation unit 1a and a prediction unit 1b. The operation plan generation device 1 can also be called a route generation device, a route design device, or the like, since it can be said to generate (design) a route for the autonomous mobile device. Note that the operation plan generation device 1 can be constructed as a standalone device, but can also be constructed as a distributed system in which functions are distributed.
[0028] The autonomous mobile device for which the operation plan is generated will be described. The autonomous mobile device is a device that can move autonomously, and its movement according to the operation plan can be controlled based on the detection results of various sensors such as a position sensor and an attitude sensor.
[0029] The autonomous mobile device may be any type of autonomous mobile device, such as a drone (unmanned aerial vehicle), an autonomous vehicle (including a manually operable vehicle), an aircraft or ship equipped with an automatic navigation function, or a robotic electric wheelchair. Here, the drone may be operated in any environment, such as on the ground, in the air, on the water, underwater, or in space, and the robot may be moved by any method, such as running or walking. Furthermore, the autonomous mobile device may be used in any application, such as a forklift or an unmanned guided vehicle (automated guided vehicle) used in a factory or warehouse, a construction vehicle such as a construction machine or heavy machine, a railroad vehicle, a vehicle used in logistics such as a taxi or a truck, a police vehicle, or a fire engine. Here, the railroad vehicle may be moved by any method, such as a light rail, a steel wheel type, a new transportation system, a monorail, or a magnetic levitation type.
[0030] As exemplified by the manually operable automobile, the autonomous mobile device may be configured to allow a human to ride in it, and may also be configured to allow driving by a passenger or driving under external control. In this way, the autonomous mobile device only needs to be capable of moving autonomously, and may also have the function of moving according to the operation of a passenger or according to control from an external controller.
[0031] The operation plan generating device 1 according to the present embodiment can be used for services such as mediating, managing, and issuing operation routes to businesses that fly beyond visual line of sight for services such as transporting luggage, taking pictures, and monitoring. In Japan, such mediation services are provided by the Ministry of Land, Infrastructure, Transport and Tourism. Of course, services that can use the operation plan generating device 1 include not only drones, but also the operation management of various autonomous mobile devices as described above and services using these. Services using autonomous mobile devices are not limited to the transportation industry and manufacturing industry, but also include infrastructure inspection, maintenance, and management, construction and civil engineering, public (flood control, dam management, disaster prevention, disaster response, police, firefighting), and security services.
[0032] The generation unit 1a generates an operation plan indicating a route along which the autonomous mobile device is scheduled to operate, based on the operation conditions input for the operation of the autonomous mobile device. It is preferable to input the operation conditions through communication from an external device, from the viewpoint of user convenience and reduction of the processing burden on the administrator of the operation plan generation device 1.
[0033] Here, the operating conditions can include temporal conditions and spatial conditions. The temporal conditions can be conditions indicating a desired departure date and / or a desired arrival date and / or a desired time range (either of these times may be a time period with a certain degree of flexibility). The spatial conditions can include a desired departure point and a desired arrival point, and can also include conditions indicating a certain degree of desired route, such as a desired stopover point. If the autonomous mobile device is a flying device, the desired route can be a route including altitude, and can also include the flight altitude according to the regulations and / or performance of the autonomous mobile device.
[0034] The route referred to in this embodiment includes information (section route information) expressed as a series of sections, which are areas for avoiding simultaneous or simultaneous coexistence with other autonomous mobile devices (interference at the same time or time). These sections are set to exclude intrusion of other autonomous mobile devices at the same time or time, and can be set according to the margin of the operation route of the autonomous mobile device. These sections can be sections on a two-dimensional plane, but in cases where the autonomous mobile device is an autonomous flying device that flies, they are sections assuming a three-dimensional space. As will be described later, in this embodiment, these sections are variable. In this way, the planned operation route in this embodiment can be expressed by continuous planned operation sections.
[0035] The prediction unit 1b predicts the difference between the operation plan and the operation results (actual operation results) based on the operation plan for at least each section on the route included in the operation plan. The above difference can also be called a difference, a deviation, or the like. Of course, sections other than the route included in the operation plan can also be the subject of prediction. For example, the difference may be predicted for all sections between the desired departure point and the desired arrival point. In addition, when predicting the above difference for the first autonomous mobile device, the route may cross with a second autonomous mobile device that wishes to operate during the same time period, even if the second autonomous mobile device is avoided in terms of time. Note that the crossing of the routes means that the route of the second autonomous mobile device includes a section unrelated to the route of the first autonomous mobile device. In this way, the prediction unit 1b can make predictions taking into account other operation plans during the same period.
[0036] Furthermore, the generation unit 1a generates an operation plan for the autonomous mobile device based on the above operation conditions, using new sections updated according to the differences between each section predicted by the prediction unit 1b. This operation plan can be presented to a user such as a business operator (a requester who has requested the creation of an operation plan). Thus, in this embodiment, the sections are variable.
[0037] To supplement, the generation unit 1a can generate an operation plan for the autonomous mobile device using the set sections, update the sections as necessary through prediction by the prediction unit 1b, and update the operation plan for the autonomous mobile device using the updated sections. However, the generation unit 1a may be configured to generate an operation plan based on operation conditions using the sections predicted by the prediction unit 1b. Therefore, if such sections have already been set, the generation unit 1a may present the operation plan as it is to the user as the final version without performing prediction again.
[0038] In addition, the operation plan generating device 1 may include a control unit (not shown) that controls the entire device, and may be configured to execute the functions of the generating unit 1a and the predicting unit 1b. The control unit may be realized, for example, by a CPU (Central Processing Unit), a working memory, and a non-volatile storage device that stores a program. The program may be an operation plan generating program. The control unit may also be realized by including, for example, an integrated circuit.
[0039] In addition, it is preferable that the prediction unit 1b predicts the above-mentioned difference using a trained model. Note that the trained model here may be a trained model that has been determined to be used in the operation stage, and may be updated successively to further improve accuracy.
[0040] Next, such a trained model that can be used in the operation plan generation device 1 will be described with reference to Fig. 2. Fig. 2 is a block diagram showing an example of the configuration of a learning device that generates a trained model that can be used in the operation plan generation device 1.
[0041] 2, the learning device 2 can include a learning unit 2a and an input unit 2b. The learning device 2 can be constructed as a standalone device, or can be constructed as a distributed system in which functions are distributed. In addition, the learning device 2 will be described on the assumption that it is provided outside the operation plan generation device 1, but it can also be provided inside the operation plan generation device 1 as a learning unit.
[0042] The input unit 2b inputs an operation plan indicating a route along which the autonomous mobile device is scheduled to operate, and operation results which are results of actual operation based on the operation plan. The operation results can be input at any time from the autonomous mobile device, for example, at any time or at the end of operation. The route is as described above, and the operation plan includes information on sections. Note that the operation results may not include information on sections at the time of input, but may be added to the section information based on the operation plan after input.
[0043] The learning unit 2a analyzes the difference between the operation plan and the operation record of the actual operation based on the operation plan for each section used to generate the operation plan. The data set to be analyzed here is data showing operation plans generated for a plurality of autonomous mobile devices for various time periods and the corresponding operation records, preferably data including environmental information such as weather in the operation records, thereby improving the accuracy of the analysis.
[0044] Then, based on the analysis result, the learning unit 2a generates a trained model that predicts a difference that may occur in the new operation plan (at least for the sections included in the route of the new operation plan). The difference to be predicted is the difference between the operation plan and the operation results for each section, as described above. For convenience, the analysis and model generation are described in stages, but the learning unit 2a is not limited to applying such a staged process, and may generate a trained model as a result of the above-mentioned analysis.
[0045] The trained model generated by the learning unit 2a can be a model obtained by a statistical learning method or a model obtained by a machine learning method such as deep learning, regardless of its algorithm or method, or of course, it can be a model that falls into both categories.
[0046] For example, the trained model may be a model generated using multiple regression analysis as described later in the second embodiment. The algorithm of the untrained model that is the basis of the trained model generated by the learning device 2 may be, for example, a CNN (Convolutional Neural Network) having a convolutional layer, a pooling layer, and a fully connected layer. The algorithm may be suitable for prediction having a recursive structure such as an RNN (Recurrent Neural Network). The RNN may be a neural network extended to have a LSTM (Long short-term memory) block in order to alleviate the gradient vanishing problem. Of course, the untrained model and the trained model are not limited to those using DNNs such as these, even when a machine learning method is used.
[0047] The accuracy of the generated trained model may be checked, and if the accuracy is good, it may be implemented as is, and if the accuracy is poor, preprocessing such as convolution processing may be changed or tuning may be performed. After that, trained models may be generated and evaluated, and the trained model to be implemented may be determined. In addition, any hyperparameter may be tuned. Examples of hyperparameters include the number of layers of the NN, the number of units (number of nodes) in each layer, and the number of repeated learning times (number of epochs) using the same dataset.
[0048] As described above, the process of generating the trained model may be an update process. That is, the trained model can be updated at any time according to the operation method, such as when a certain amount of new training data has been accumulated.
[0049] The learning device 2 may include a storage unit (not shown) that stores the trained model generated by the learning unit 2a, and an untrained model may be stored in the storage unit and updated to become a trained model. The prediction unit 1b uses the trained model thus generated in the operation stage to perform difference prediction. For this reason, the learning device 2 may be connected in a state accessible from the operation plan generation device 1. The learning device 2 may also be configured to transmit the generated trained model to the operation plan generation device 1 via a network, or to a server device accessible from the operation plan generation device 1 via a network.
[0050] The learning device 2 may include a control unit (not shown) that controls the entire device, and may be configured to execute some of the functions of the learning unit 2a and the input unit 2b. The control unit may be realized, for example, by a CPU, a working memory, and a non-volatile storage device that stores a program. The program may be a learning program. The control unit may also be realized, for example, by including an integrated circuit.
[0051] In this way, the operation plan generation device 1 according to this embodiment can constitute an operation plan generation system together with the above-mentioned learning device 2, and this operation plan generation system can also be equipped with a server device as described above.
[0052] Next, an example of processing by the learning device 2 and the operation plan generating device 1 will be described with reference to Fig. 3 and Fig. 4. Fig. 3 is a flow diagram for describing an example of processing by the learning device 2, and Fig. 4 is a flow diagram for describing an example of processing by the operation plan generating device 1.
[0053] First, in the learning stage (model generation process), the learning device 2 inputs an operation plan indicating a route along which the autonomous mobile device is scheduled to operate, and operation results that are results of actual operations based on the operation plan (step S1). Next, the learning device 2 analyzes the difference between the operation plan and the corresponding operation results for each section used to generate the operation plan, and generates a trained model that predicts the above-mentioned difference that may occur in a new operation plan based on the analysis results (step S2). The data to be analyzed in step S2 can be the data input in step S1 itself, but it is preferable to perform preprocessing as necessary. The above steps S1 and S2 can be called an input step and a learning step, respectively.
[0054] In the operation stage (operation plan generation process), the operation plan generation device 1 generates an operation plan indicating a route along which the autonomous mobile device is scheduled to operate based on the operation conditions input for the operation of the autonomous mobile device (step S11). The operation plan generation device 1 predicts a difference between the operation plan and an operation result, which is an actual operation result based on the operation plan, for at least each section on the route included in the operation plan (step S12).
[0055] Here, step S11 uses new sections updated according to the differences between sections predicted in step S12 to generate an operation plan for the autonomous mobile device based on the operation conditions. That is, in the operation stage, an operation plan based on the operation conditions can be generated using sections based on the prediction. Note that steps S11 and S12 can be referred to as a generation step and a prediction step, respectively.
[0056] With the operation plan generation device 1 configured as described above, a series of procedures can be automatically performed, such as designing an operation route and generating an operation plan that is adjusted with the routes of other autonomous mobile devices, simply by setting, for example, a starting point (desired departure point), an end point (desired arrival point), and time conditions.
[0057] Furthermore, in the operation plan generation device 1, the sections that avoid the coexistence of other autonomous mobile devices at the same time or in the same time period are variable, and the sections used simultaneously can be made unequal in size (unevenly divided). Therefore, in the operation plan generation device 1, even if the size of the section is variable, collisions can be avoided and the accommodation efficiency (accommodation density) per space can be increased without compromising safety, and the number of vehicles that can operate simultaneously can be increased. For example, in the operation plan generation device 1, for a section (small place) where the difference between the planned and actual operation routes is small, the number of vehicles that can be accommodated simultaneously (the number of vehicles operating simultaneously) per space can be increased. Therefore, in the operation plan generation device 1, the utilization efficiency of the operation environment can be improved spatially and temporally, and multiple autonomous mobile devices can be operated efficiently. Furthermore, in the operation plan generation device 1, since the variable sections correspond to protected areas such as protected airspace, there is no need for a human being to board the autonomous mobile device and perform risk avoidance operations based on the judgment of the person on board.
[0058] In this way, according to the operation plan generation device 1 of this embodiment, not only can it automatically create (generate) an operation plan for an autonomous mobile device that avoids collisions between the autonomous mobile devices, but it can also improve the accommodation density and the number of simultaneous operations of the autonomous mobile devices. In other words, in this embodiment, it is possible to achieve both prevention of collisions and improvement of the utilization efficiency of space and time. In addition, according to the learning device 2 as described above, it is possible to generate a trained model that can be used in the operation plan generation device 1 so that the operation plan generation device 1 can be configured as a device that achieves such effects.
[0059] <Embodiment 2> The second embodiment will be described with reference to Figs. 5 to 39, focusing on the differences from the first embodiment, but various examples described in the first embodiment can be applied. For example, the second embodiment will be described mainly with an example applied to the operation plan of an autonomous mobile device such as a drone, but the second embodiment can also be applied to other examples. Also, for example, the present embodiment will be described with an example in which multiple regression analysis is used in the learning unit and the prediction unit, but other statistical methods such as other multivariate analysis may be adopted as the learning method, and machine learning such as deep learning may also be used.
[0060] <Configuration example> A configuration example of this embodiment will be described with reference to Fig. 5 to Fig. 32. First, a configuration example of the operation management device according to this embodiment will be described with reference to Fig. 5. Fig. 5 is a block diagram showing a configuration example of the operation management device according to this embodiment.
[0061] As shown in Figure 5, the operation management device 10 of this embodiment may include a learning unit 11, a learning model storage unit 12, a prediction unit 13, a dynamic operation section storage unit 14, an operation record storage unit 15, a static operation section storage unit 16, an operation plan storage unit 17, and an operation plan generation unit 18.
[0062] As will be apparent from the description below, the operation management device 10 is configured to have the functions of the operation plan generation device 1 in Fig. 1 and the functions of the learning device 2 in Fig. 2. Each of the storage units, the dynamic operation section storage unit 14, the operation record storage unit 15, the static operation section storage unit 16, and the operation plan storage unit 17, may have a common or separate storage device for storing information.
[0063] The operation management device 10 is configured to be able to receive input from a terminal device such as a PC (Personal Computer) used by the user 4, and therefore may be provided with a communication unit (not shown) for communicating with the terminal device. The user 4 is a person or business operator who wants to operate the autonomous mobile device 3. For example, in the case of a drone, the user 4 is a person who wants to fly beyond visual line of sight for business such as transporting luggage, taking pictures, and monitoring. The user 4 applies to the operation management device 10 for the desired departure and arrival points and operation times of the autonomous mobile device 3, and receives an operation plan. Of course, the user 4 is not limited to a person, and may be another system for operating the autonomous mobile device.
[0064] As described in the first embodiment, the autonomous mobile device 3 to be managed by the traffic management device 10 refers to, for example, drones, robots, self-driving cars, automated guided vehicles in factories, ships and aircraft equipped with an automatic navigation function, etc. The autonomous mobile device 3 is configured to be capable of moving to a destination by autonomous control so as to follow (adhere to) a given travel route and planned passing time as much as possible while compensating for disturbances such as wind using the equipped positioning function and sensors. Of course, the autonomous mobile device 3 may be partially controlled by human operation, and may be a device capable of at least autonomous movement control.
[0065] Furthermore, the autonomous mobile device 3 can measure its own position, can retain a history of its own operation record (coordinates passed and date and time), and can have a function of transmitting (reporting) them to the operation management device 10. For this reason, the autonomous mobile device 3 can have a communication unit (not shown) that communicates with the operation management device 10. This communication unit can be at least one of a wireless communication unit and a wired communication unit, depending on the type of the autonomous mobile device 3, the timing of sending and receiving data with the operation management device 10, etc. When this communication unit is a wired communication unit, communication is usually performed when movement based on the operation plan is completed.
[0066] The following describes each part of the operation management device 10. The operation management device 10 can be said to be a device that supports safe and reliable operation of the autonomous moving device 3, and its main functions are to remotely monitor the operation status (operation position, state, etc.) of the autonomous moving device 3 during operation, and to generate an operation plan for the autonomous moving device 3 (operation plan generation function).
[0067] When the traffic management device 10 performs remote monitoring, the target autonomous mobile device 3 is equipped with a communication unit that communicates with the traffic management device 10. Unless the autonomous mobile device 3 is a device that moves on an infrastructure that allows wired communication, such as a railway, this communication unit is limited to a wireless communication unit.
[0068] The operation plan generation function corresponds to the function of the operation plan generation device 1 in Fig. 1, and is a function for arbitrating and planning routes and times so that autonomous mobile devices do not collide with each other. In addition, the operation management device 10 can have a function for presenting (issuing) the generated operation plan to the target autonomous mobile device 3 and its user 4. Presentation to the autonomous mobile device 3 can be performed by communication, and presentation to the user 4 can be performed by communication with the terminal device of the user 4.
[0069] The operation plan generation unit 18 receives an operation application for the autonomous moving device 3 from the user 4 and generates an operation plan. The operation plan generation unit 18 normally receives multiple operation applications. The operation plan generation unit 18 generates an operation plan so that multiple autonomous moving devices (including the autonomous moving device 3) do not enter the same section at the same time or time period. In other words, even when there are multiple autonomous moving devices 3 that wish to move on a route where there is a possibility of collision, the operation plan generation unit 18 generates an operation plan for each of the multiple operation applications received so as to avoid collisions.
[0070] In this way, the operation plan generating unit 18 receives the starting point, end point, desired departure and arrival times, etc. of the operation from the user 4, and generates an operation plan that does not cause conflict with other autonomous mobile devices in the same section and meets the user's wishes as much as possible. Details of the operation plan generating unit 18 will be described later as a related element in the explanation of the prediction unit 13 with reference to FIG. 22.
[0071] The operation plan holding unit 17 holds the operation plan generated (planned) and output by the operation plan generating unit 18. The held operation plan can be referred to when generating a new operation plan in order to avoid conflicts between autonomous mobile devices in the same section at the same time or in the same time period, and duplication of operation plans.
[0072] Here, an example of an operation plan and an example of the format of information stored as the operation plan will be described with reference to Fig. 6 and Fig. 7. Fig. 6 is a schematic diagram showing an example of an operation plan stored in the operation plan storage unit 17 of the operation management device 10. Fig. 7 is a schematic diagram showing an example of an operation plan generated based only on static operation sections in which all sections have the same size, which is stored in a operation management device according to a comparative example.
[0073] An operation plan is generated for each application (one operation of the autonomous moving device 3) from the user 4. One operation plan can be a set of the following information arranged in the order that the autonomous moving device 3 should follow when operating, as exemplified in Fig. 6. The set can include a zone ID indicating a zone in which the autonomous moving device 3 may operate, a target arrival coordinate (e.g., the zone's center of gravity coordinate) to be set as a target when passing through the zone, and a target arrival time that is the target time for passing through the target arrival coordinate.
[0074] In the example of Fig. 6, the section is a dynamic section, and the section is indicated by a section ID and a division ID, but this will be described in detail later in the explanation of the prediction unit 13 with reference to Fig. 22 etc., and particularly in the explanation of the division mechanism with reference to Figs. 24 to 28. On the other hand, in the traffic management device according to the comparative example, an operation plan is generated based on a static operation section in which all sections are the same size, and as a result, as shown in Fig. 7, the following set of information can be arranged in the order to be followed when the autonomous mobile device operates. The set in Fig. 7 can include a section ID indicating a fixed section, a target arrival coordinate (e.g., the coordinates of the center of gravity of the section) to be targeted when passing through the section, and a target arrival time that is a target for the time at which the target arrival coordinate is passed.
[0075] 6 and 7, the destination coordinates are shown in three dimensions, but they may be two-dimensional when applied to management of an autonomous mobile device that travels on land or sea surface, etc. In addition, although a three-dimensional space is expressed using latitude, longitude, and altitude, any information that can uniquely indicate a point within the three-dimensional space is sufficient, and is not limited to the expression using latitude, longitude, and altitude.
[0076] In addition, in the example of FIG. 6, the coordinates of the center of gravity of a section are shown as an example of the target coordinates to be reached, but the coordinates do not necessarily have to be the center of gravity depending on the application. For example, if the section is treated in two dimensions, the coordinates of the center of gravity may be used. In addition, for example, in an autonomous mobile device that operates in the sky, such as a drone, if the policy is to be more cautious about sudden descent due to the influence of wind, etc. than about ascending for safety reasons, it is also possible to set the coordinates at a position vertically higher than the center of gravity. In this way, the coordinates to be reached can be determined depending on the application.
[0077] The operation record holding unit 15 holds the record of the operation status of the autonomous moving device 3. The operation status record, i.e., the operation record, can be a history of information transmitted one by one from the autonomous moving device 3 by remotely monitoring the operation status of the autonomous moving device 3. As described above, the operation record can also be collected by accumulating a status history while the autonomous moving device 3 is operating and registering it collectively in the operation record holding unit 15 after the operation is completed.
[0078] Here, examples of operation records and examples of the format of information stored as operation records will be described with reference to Fig. 8 to Fig. 10. Fig. 8 is a schematic diagram showing an example of an operation plan generated by the operation management device 10, and Fig. 9 is a schematic diagram showing an example of operation records operated based on the operation plan of Fig. 8. Fig. 10 is a schematic diagram showing an example of operation records stored in the operation management device 10.
[0079] An operation record indicates the actual operation record according to the operation plan, and one record is generated for each operation of the autonomous mobile device. One operation record can be an arrangement of the following sets of information, as illustrated in Fig. 9 for one operation plan illustrated in Fig. 8. The above set can include an actual arrival time, which is the time when the position of the autonomous mobile device 3 is recorded, and an actual arrival coordinate indicating the position where the autonomous mobile device 3 was at that time.
[0080] In Figures 8 and 9, the notation hh:mm indicates the target arrival time and the actual arrival time, respectively. Also, the black circles (●) in Figure 8 indicate the target arrival coordinates at the target arrival time, and the black circles (●) in Figure 9 indicate the actual arrival coordinates recorded at the target arrival time. Also, the white circles (◯) in Figure 9 indicate the actual arrival coordinates recorded at regular intervals or regular travel distances for the convenience of operation monitoring.
[0081] The timing for recording the position of the autonomous moving device 3 may be any timing required for operation management, and various methods can be adopted, such as, for example, recording at regular intervals or recording when there is a change in a certain position.
[0082] However, in the recording method of this embodiment, it is basically necessary to leave a record of where the autonomous mobile device 3 was at the target arrival time set in the operation plan. It is advisable to record this record together with the section ID so that it can be distinguished from records of other positions. Note that the section ID recorded together here is not the section ID of the location where the autonomous mobile device 3 was, but the planned section ID, which indicates in which section ID the autonomous mobile device 3 was planned to be located in the operation plan at the same planned arrival time as the actual arrival time.
[0083] The format of the information stored as the operation record can be, for example, a record that associates a section ID, actual arrival coordinates, and actual arrival time, as shown in Fig. 10. Fig. 10 shows an example in which the section ID column is missing, but it is also possible to record all section IDs without omissions, in which case it is advisable to add and record a column of flag information to distinguish that the record is of the actual arrival coordinates corresponding to the planned arrival time.
[0084] 10, the destination coordinates are shown in three dimensions, but may be two dimensions when applied to management of an autonomous mobile device that travels on land or sea surface, etc. Furthermore, although a three-dimensional space is expressed using latitude, longitude, and altitude, any information that can uniquely indicate a point within the three-dimensional space is sufficient, and is not limited to the expression using latitude, longitude, and altitude.
[0085] In addition, in the example of Fig. 10, the centroid coordinates of the section are shown as an example of the target coordinates to be targeted, but the centroid is not necessarily required depending on the application, and for example, if the section is treated in two dimensions, the central coordinates of the section may be used. It is preferable that the actual coordinates are the same type of coordinates as the target coordinates, since this makes it easier to calculate the difference, but even if they are different, it is possible to calculate the difference by conversion.
[0086] If there is information on the sections in the operation plan and the positions and time information in the operation records, it is possible to record them so that they are ultimately associated with each other. For example, even if only the white circles (○) in Fig. 9 are recorded, the positions of the black circles (●) in Fig. 9 can be approximately calculated by interpolation processing.
[0087] The static operation section storage unit 16 divides the space in which the autonomous mobile device 3 can move into box-shaped spaces of fixed, uniform size, and stores the information as coordinate information for each section. The sections here are called static operation sections. These static operation sections are of a predetermined size. The operation plan generated and output in this embodiment is not an operation route in which the static operation sections are lined up in a daisy chain, but an operation route in which dynamic operation sections (variable sections) are lined up in a daisy chain.
[0088] Here, an example of a static operation section in this embodiment will be described along with an example of the format of information stored as the static operation section, with reference to Figures 11 and 12. Figure 11 is a schematic diagram showing an example of a static operation section stored in the operation management device 10, and Figure 12 is a schematic diagram for explaining information included in the static operation section in Figure 11.
[0089] The information indicating the static operation section shown in Fig. 11 is associated with a section ID, a first vertex (vertex 1), a second vertex (vertex 2), and an altitude. One static operation section is a section uniformly divided into three-dimensional space as shown in the left diagram of Fig. 12, and can be represented by vertex 1, vertex 2, and the lower and upper limits of altitude as shown in the right diagram of Fig. 12.
[0090] 11 and 12, the destination coordinates are shown in three dimensions, but they may be two-dimensional when applied to management of an autonomous mobile device that travels on land or sea surface, and in that case, for example, upper and lower limits of altitude are not required. Also, although a three-dimensional space is expressed using latitude, longitude, and altitude, any information that can uniquely indicate a point within the three-dimensional space is sufficient, and is not limited to the expression using latitude, longitude, and altitude.
[0091] 11 and 12, the division is expressed by two vertices on a plane and the upper and lower limits of the altitude, but the present invention is not limited to this and any other method may be used as long as it can express a division in space. For example, it can be expressed by the coordinates of eight vertices, by specifying the length of the side of each division and the direction dividing the space and expressing it by the coordinates of one representative vertex, or by specifying the direction dividing the space and expressing it by the coordinates of three vertices.
[0092] The learning unit 11 analyzes the schedule and performance from the operation plan and operation performance for each static operation section, and generates a trained model. The learning model holding unit 12 holds the trained model that is the result of learning by the learning unit 11. Prediction is performed using the trained model held here, and the dynamic operation section is determined. Details of the learning unit 11 and the learning model holding unit 12 will be described later with reference to FIG. 13.
[0093] The prediction unit 13 predicts the difference between the operation plan and the actual operation performance during the period of operation conditions provided by the operation plan generation unit 18 based on the learned model, and calculates the dynamic operation section. The details of the prediction unit 13, the dynamic operation section storage unit 14, and the operation plan generation unit 18 will be described later with reference to FIG. 22.
[0094] The learning unit 11 will be described in detail together with related elements with reference to Fig. 13 to Fig. 21. Fig. 13 is a block diagram showing an example of the configuration of the learning unit 11 in the traffic management device 10.
[0095] 13, the learning unit 11 can include a planned performance difference storage unit 11a, a pre-learning processing unit 11b, a target variable explanatory variable storage unit 11c, a planned performance difference extraction unit 11d, and a main learning processing unit 11e. The learning unit 11 is connected to the operation plan storage unit 17, the operation performance storage unit 15, and the static operation section storage unit 16 at the planned performance difference extraction unit 11d, and is connected to the learning model storage unit 12 at the main learning processing unit 11e.
[0096] The plan-performance difference extraction unit 11d obtains the difference between the operation plan and the operation performance after processing, for example, adjusting the number of data as necessary, so that the operation plan stored in the operation plan storage unit 17 can be compared with the corresponding operation performance stored in the operation performance storage unit 15. The processing result in the plan-performance difference extraction unit 11d is stored in the plan-performance difference storage unit 11a.
[0097] The method of calculating the difference may be to align the times and calculate the position difference, or to align the positions and calculate the time difference, or both may be used. By calculating the position difference (vector difference) between the operation plan and the operation results, that is, by calculating the vector difference between the target arrival coordinate at the target arrival time and the actual arrival coordinate at the same time as the target arrival time, the position deviation distance and the position deviation direction can be obtained. At this time, since the section ID is always recorded in each row of the plan information at the target arrival time and the actual information at the same time as the target arrival time, information can be obtained as to which section the deviation occurred when the vehicle should be in. For the position deviation direction, for example, information expressed as a direction or a direction from a reference direction (such as magnetic north) in the case of two dimensions, or as a three-dimensional vector in the case of three dimensions, can be obtained.
[0098] In addition, by calculating the time difference (lead or lag) between the operation plan and the operation results, the target arrival time, the target arrival coordinates, and the delay or lead time relative to the target arrival time can be obtained.
[0099] Examples of information items obtained as a result of such processing will be described with reference to Figures 14 and 15. Figures 14 and 15 are schematic diagrams showing an example of position difference information and an example of time difference information extracted by the plan-performance difference extraction unit 11d of the learning unit 11 in Figure 13, respectively.
[0100] As shown in Fig. 14, as a result of obtaining the position difference (position deviation distance) between the operation plan and the operation results, it is possible to obtain information associating the position deviation distance, the position deviation direction, the target arrival coordinates (latitude, longitude, altitude), the target arrival time, and the section ID. Also, as shown in Fig. 15, as a result of obtaining the time difference (lag / lead time) between the operation plan and the operation results, it is possible to obtain information associating the lag / lead time, the target arrival coordinates (latitude, longitude, altitude), and the target arrival time.
[0101] The planned performance difference holding unit 11a holds the difference between the operation plan and the operation results obtained by the planned performance difference extraction unit 11d. For example, the planned performance difference holding unit 11a can hold the result of processing such as obtaining the position difference (vector difference) between the operation plan and the operation results by the planned performance difference extraction unit 11d. The results held here are the target arrival time, the section ID planned to be at the target arrival time, the target arrival coordinates, and the position deviation distance and position deviation direction relative to the target arrival coordinates. More specifically, the planned performance difference holding unit 11a can hold, for example, the information in FIG. 14 as the difference. The held position deviation direction can also be expressed as a direction from a reference direction (such as magnetic north) in the case of two dimensions, or as a three-dimensional vector in the case of three dimensions.
[0102] In the case of a result of determining a time difference (advance / delay time) between an operation plan and an operation result, the plan / actual result difference holding unit 11a can hold a target arrival time, a target arrival coordinate, and a delay or advance time relative to the target arrival time. More specifically, the plan / actual result difference holding unit 11a can hold, for example, information in FIG. 15 as the difference.
[0103] 14 and 15, the destination coordinates are shown in three dimensions, but they may be two-dimensional when applied to management of an autonomous mobile device that travels on land or sea surface, and in that case, for example, upper and lower limits of altitude are not required. Also, although a three-dimensional space is expressed using latitude, longitude, and altitude, any information that can uniquely indicate a point within the three-dimensional space is sufficient, and is not limited to the expression using latitude, longitude, and altitude.
[0104] 14 and 15 show examples in which information on positional deviation and information on lead / delay time are stored in table format. Such tables of positional deviation and lead / delay time can be stored in separate tables for each service (each operation), for each model or type of autonomous mobile device, or for each weather condition. As in this example, the operation of storing the difference between the operation plan and the operation results can have variations in the way data is grouped together, and it is particularly preferable to execute the operation so as to obtain optimal data depending on the processing method in the learning unit 11 in the subsequent process.
[0105] Thereby, for example, the prediction unit 13 using the learning result can execute the prediction of the above difference for at least one of the type of autonomous mobile device, the model of the autonomous mobile device, and the operating environment.
[0106] The learning pre-processing unit 11b processes and replaces data as pre-processing for information indicating the difference between the operation plan and the operation results stored in the plan-performance difference storage unit 11a so that the subsequent main learning processing unit 11e can perform machine learning. An example of the learning pre-processing will be described with reference to Fig. 16. Fig. 16 is a schematic diagram for explaining an example of the learning pre-processing executed by the learning pre-processing unit 11b of the learning unit 11.
[0107] The learning pre-processing unit 11b can store the objective variables and explanatory variables in the objective variable explanatory variable storage unit 11c. In the learning pre-processing illustrated in Fig. 16, the position difference (position deviation distance, position deviation direction) between the operation plan and the operation result is calculated, and the position deviation distance and the position deviation direction are extracted as objective variables and stored in the objective variable explanatory variable storage unit 11c.
[0108] In this pre-learning process, the date of the target arrival time corresponding to the objective variable is converted into a seasonal band number, and the hour and minute of the target arrival time are converted into a time period number, and are stored as explanatory variables in the objective variable explanatory variable storage unit 11c. For example, the following pre-processing is performed on the target arrival time, and the season number and time period number are separated into columns. For the season, 0 is assigned if 3≦M≦5, 1 if 6≦M≦8, 2 if 9≦M≦11, and 3 otherwise. For the time period, 0 is assigned if 0≦H≦12, 1 if 13≦H≦17, and 2 otherwise. As a result, in the example of FIG. 16, the season, which is a column of data, can be expressed as 0 for spring, 1 for summer, 2 for autumn, and 3 for winter, and the time period can be expressed as 0 am, 1 for afternoon, and 2 for evening. Note that the example shown in FIG. 16 does not intend to limit the number of classifications, such as four classifications of seasonal bands and two classifications of time periods, and more sparse or dense classifications may be used.
[0109] Among autonomous mobile devices, those that fly in the sky and those that navigate on the ocean tend to have differences in the time of arrival and coordinates of arrival due to the influence of wind, so other information that is expected to correlate with wind speed may be used as explanatory variables. For example, in addition to time periods and seasonal zones, numbers corresponding to the altitude zone of the ground surface can be assigned to the coordinates of arrival and the section to be used as explanatory variables. In addition, the type of the ground surface and the temperature zone of the temperature of each section can be used to convert them into explanatory variables or can be added as items of explanatory variables. The type of ground surface can be, for example, a number assigned to distinguish between land and sea, or a number assigned to distinguish between forest, desert, rocky area, city, etc.
[0110] In addition, if the time lag (advance, lag) is used as the objective variable instead of the positional shift distance and positional shift direction, the tendency of advance or lag can also be learned. Furthermore, by using the positional shift and time lag as the objective variables, both the tendency of positional shift and the tendency of advance or lag within the section can be learned.
[0111] The objective variable explanatory variable holding unit 11c holds objective variables and explanatory variables, which are the processing results of the learning pre-processing unit 11b. An example of the format of the information held here will be described with reference to Fig. 17. Fig. 17 is a schematic diagram showing an example of the execution result of the learning pre-processing held in the objective variable explanatory variable holding unit 11c of the learning unit 11.
[0112] In the example of pre-learning processing shown in Fig. 16, information is stored in a format as shown in Fig. 17. In the example of Fig. 17, information extracted as objective variables, namely, the positional deviation distance and the positional deviation direction, and information converted as explanatory variables, namely, the date of the target arrival time into a seasonal band number and the hour and minute of the target arrival time into a time zone number, are stored in association with each other.
[0113] 16, the example shown in Fig. 17 does not intend to limit the number of classifications, such as four classifications of seasonal zones and two classifications of time periods, and may have looser or denser classifications. In addition, application examples of explanatory variables are also given as examples corresponding to the information held in the objective variable explanatory variable holding unit 11c.
[0114] That is, among autonomous mobile devices, those that fly in the sky and those that sail on the ocean tend to have differences in the target arrival time and target arrival coordinates due to the influence of wind, so other information that is expected to correlate with wind speed may be used as explanatory variables. For example, in addition to time periods and seasonal zones, numbers corresponding to the altitude zone of the ground surface may be assigned to the target arrival coordinates and sections as explanatory variables, or the type of the ground surface, such as the temperature zone of the air temperature for each section, may be used or added as an item. The type of ground surface may be, for example, a number assigned to distinguish between land and sea, or a number assigned to distinguish between forests, deserts, rocky areas, and cities. In addition, if the time shift (advance, delay) is used as the objective variable instead of the position shift distance and the position shift direction, the tendency of advance and delay can also be learned. Furthermore, by using the position shift and the time shift as the objective variables, both the tendency of position shift and the tendency of advance and delay within the section can be learned.
[0115] The processing of the learning main processing unit 11e will be described based on an example in which the objective variable (positional deviation distance) and explanatory variables (time period number, season number) stored in the objective variable and explanatory variable storage unit 11c are input, but other examples are also applicable. The learning main processing unit 11e can perform multiple regression analysis for each section using the objective variable (positional deviation distance) and explanatory variables (time period number, season number) as input, and obtain a multiple regression equation for each section. The learning main processing unit 11e stores the generated multiple regression equation and the coefficients of the equation in the learning model storage unit 12 as a learned model.
[0116] The mechanism of multiple regression analysis processing applicable to this embodiment will be described with reference to Fig. 18. Fig. 18 is a schematic diagram for explaining an example of multiple regression analysis processing executed by the learning unit 11 of Fig. 13.
[0117] The main learning processing unit 11e can obtain data corresponding to the black circles (●) in the left graph of Fig. 18 for each section from the data on the positional deviation distance, seasonal zone, and time period in the table shown in Fig. 17 (the table in the right graph of Fig. 18), and obtains a multiple regression equation based on these data. The left graph of Fig. 18 is plotted with the positional deviation distance on the vertical axis, the seasonal zone on the first horizontal axis, and the time period on the second horizontal axis.
[0118] As a template for a multiple regression equation, for example, the following function can be given. y=w+ax 1 +bx 2 (Linear function) y=w+ax 1 2 +bx 1 +cx 2 2 +dx 2 (Quadratic function)
[0119] The main learning processing unit 11e prepares templates for multiple regression equations of several orders (for example, linear to sextic equations) and varies the coefficients (w, a, b, c, d in the above example) for each equation. The main learning processing unit 11e then finds an equation and coefficients that represent a plane (hyperplane) that passes close to the most black circles (●) and is as smooth as possible. This is performed for each piece of data with each partition ID. The main learning processing unit 11e then stores the obtained set of equations and coefficients for each partition in the learning model storage unit 12. Note that while the vertical axis is shown as the positional shift distance, the same concept applies when the vertical axis is the positional shift direction or time advance / delay.
[0120] The learning model holding unit 12 thus holds the multiple regression equation for each section generated by the main learning processing unit 11e and its coefficients (learned model). An example of the format of the information held here will be described with reference to Figs. 19 to 21. Fig. 19 is a schematic diagram showing an example of the execution result of the multiple regression analysis process held in the learning model holding unit 12, and Fig. 20 is a schematic diagram showing another example of the execution result of the multiple regression analysis process held in the learning model holding unit 12. Also, Fig. 21 is a schematic diagram for explaining the execution results of Figs. 19 and 20.
[0121] In the storage example shown in Fig. 19, a table is provided for each variation of the formula and coefficients are stored. In the storage example shown in Fig. 20, a table for formulas and a table for storing coefficients are stored separately. Although two examples of the format for storing information are given in Fig. 19 and Fig. 20, the storage method is not limited to these, and any storage method that can store the multiple regression formula and the coefficients of that formula in association with the block ID may be used.
[0122] In both the storage examples in Fig. 19 and Fig. 20, as shown in Fig. 21, a multiple regression equation including coefficients is stored so that it corresponds to each partition (the partition ID is shown inside each partition). In Fig. 21, the partitions are shown on a plane for convenience of explanation, but the partitions are not limited to a plane, and the same idea applies in three dimensions. Each partition has a function, and the function will have a different form, such as a linear expression or a quadratic expression. There are as many functions as there are fixed meshes, and in the example of Fig. 21, there are 16 functions. In Fig. 21, z is the objective variable (positional deviation), w is a constant, a, b, c, d are partial regression coefficients, and x, y are explanatory variables (seasonal zone number, time zone number).
[0123] As exemplified here, the trained model can be a model that inputs information including at least one of the operating time periods exemplified by the time period numbers, the operating seasons exemplified by the season numbers, and other operating environments, and outputs a predicted value of the above-mentioned difference.
[0124] Next, the details of the prediction unit 13 will be described together with related elements with reference to Fig. 22 to Fig. 32. Fig. 22 is a block diagram showing an example of a configuration of the prediction unit 13 in the traffic management device 10.
[0125] 22, the prediction unit 13 can include a planned performance difference prediction unit 13a and a dynamic operation section generation unit 13b. The prediction unit 13 is connected to the learning model storage unit 12 at the planned performance difference prediction unit 13a, and is connected to the static operation section storage unit 16 and the dynamic operation section storage unit 14 at the dynamic operation section generation unit 13b.
[0126] The planned performance difference prediction unit 13a obtains the position deviation predicted to occur for each section (the deviation of the actual arrival coordinate from the planned arrival coordinate that will occur in the future when passing through each section). The planned performance difference prediction unit 13a obtains the position deviation that will occur for each section by predicting it using the trained model (stored in the trained model storage unit 12) generated by the main learning processing unit 11e.
[0127] The planned performance difference prediction unit 13a obtains the multiple regression equation for each section stored in the learning model storage unit 12, and substitutes the values of the seasonal band (seasonal band number) and time period (time period number) to be predicted into the variables. This allows the planned performance difference prediction unit 13a to obtain a predicted value of the deviation of the actual arrival coordinate from the planned arrival coordinate that will occur in the specified seasonal band and time period in the corresponding operation section.
[0128] The position deviations for all time periods and seasons may be recalculated every time the learning dataset is updated (every time the operation record is changed). Also, if the required seasonal bands and time periods are fixed, such as for operating hours limited to daytime or for issuing operation plans up to two months in advance, the differences may be recalculated and updated within the required period.
[0129] In addition, after the operation plan generation unit 18 receives a request for plan generation from the user 4, the plan performance difference prediction unit 13a may narrow down the range, seasonal zone, and time period required for operation that meets the operation conditions included in the request, and execute calculation of the predicted values as described above.
[0130] The planned performance difference prediction unit 13a passes the predicted deviation value for each section (operation section) to the dynamic operation section generation unit 13b. An example of the data items of the processing result passed here will be described with reference to FIG. 23. FIG. 23 is a schematic diagram showing an example of a predicted value for each operation section predicted by the prediction unit 13 of FIG. 22. As illustrated in FIG. 23, the planned performance difference prediction unit 13a can pass, for example, data associating the obtained predicted value (position deviation distance), explanatory variables (time period number and season number), and section ID to the dynamic operation section generation unit 13b.
[0131] The dynamic operation section generation unit 13b determines the number of sections to be divided based on the predicted value of the positional deviation of the actual arrival coordinates from the planned arrival coordinates obtained by the planned performance difference prediction unit 13a, so that the section will not go beyond the section even if the deviation distance occurs, and the section will be as small as possible. The size that does not go beyond the section can also be a size that further includes a margin distance for safety. The dynamic operation section generation unit 13b then assigns a division ID to the divided section, calculates its coordinates, and stores them in the dynamic operation section storage unit 14.
[0132] The dynamic operation section generation unit 13b and the dynamic operation section retention unit 14 are examples of a section update unit that generates new sections based on the differences for each section predicted by the planned performance difference prediction unit 13a, and sets the new sections for generating an operation plan.
[0133] Here, the concept of this ID assignment and the data items output as a result of the process will be explained with reference to Figures 24 and 25. Figure 24 is a schematic diagram showing an example of a dynamic operation section generated by the prediction unit 13 in Figure 22 and stored in the dynamic operation section storage unit 14, and Figure 25 is a schematic diagram for explaining the dynamic operation section in Figure 24.
[0134] In the table illustrated in Fig. 24, dynamic partition IDs including partition IDs, the first row of partition IDs, and the second row of partition IDs are associated with vertex 1, vertex 2, altitude, and explanatory variables (time zone number and season number). For example, the partition indicated by the dynamic partition ID of the first record in Fig. 24 represents the partition indicated by partition ID 1, first row ID 3, and second row ID 4 illustrated in Fig. 25.
[0135] In addition, in Fig. 24 and Fig. 25, an example in which the division steps are up to two steps is given, but this is merely an example, and the number of steps can be increased or decreased depending on the difference in the autonomous driving device, the difference in the use, etc. In addition, in Fig. 24 and Fig. 25, an example in which the number of divisions in the horizontal direction and the vertical direction are the same is given, but this is merely an example. For example, depending on the difference in the autonomous driving device, the difference in the use, etc., various examples can be given, such as dividing only the horizontal direction, dividing only the vertical direction, dividing the horizontal and vertical division steps to have different numbers.
[0136] Here, the division mechanism will be described with reference to Figures 26 to 28. Figures 26 to 28 are schematic diagrams for explaining the dynamic operation sections in Figure 24. Note that the specific numerical values exemplified in Figures 26 to 28 are given for the convenience of explanation, and are not limited to these specific numerical values.
[0137] First, if the static operation section is considered as a cube with each side being 100m, the number of divisions is set so that the length of each side of the section is more than twice the expected position deviation distance and the size of each section is minimized. Also, to allow for a safety margin, the length of each side of the section can be set to twice the expected position deviation distance plus an additional margin distance.
[0138] As shown in FIG. 26, if the predicted position shift distance of section ID1 is 17 m and the predicted position shift distance of section ID8 is 11 m, the number of divisions for section ID1 and section ID8 can be determined as shown in FIGS. 27 and 28, respectively.
[0139] As shown in FIG. 27, in the case of section ID1, when a cube with a side of 100 m is divided into 8, 1 / 2 of the side (to take into account the distance from the center of the section to the edge of the adjacent section) is 25 m, which is larger than the expected position shift distance of 17 m, so dividing into 8 is not a problem. On the other hand, when divided into 64, 1 / 2 of the side is 12.5 m, which is smaller than the expected position shift distance of 17 m, so using a section divided to this extent may cause a collision with another autonomous mobile device, which is a problem. Therefore, section ID1 is divided into 8. As shown in FIG. 28, in the case of section ID8, when a cube with a side of 100 m is divided into 8 and 64, 1 / 2 of the side is 25 m and 12.5 m, respectively, which are both larger than the expected position shift distance of 11 m, so dividing into 8 and 64 is not a problem. On the other hand, if it is divided into 512, each side will be 6.25 m, which is smaller than the expected position shift distance of 11 m, so if a section divided to this extent is used, collisions with other autonomous mobile devices may occur, which is problematic. Therefore, section ID8 is divided into 64.
[0140] As described above, the dynamic operation section storage unit 14 stores the dynamic operation section that is the result of the dynamic operation section generation unit 13b. Here, information on sections that are divided finer than the static operation sections is stored. As the format of the dynamic operation section stored here, the examples shown in Figs. 24 and 25 can be adopted. By the operation plan generation unit 18 generating an operation plan using this dynamic operation section, it is possible to generate an operation plan that uses space more efficiently than when it is generated using a static operation section.
[0141] In this way, it is preferable that the section update unit exemplified by the dynamic operation section generation unit 13b and the dynamic operation section storage unit 14 set new sections so as to minimize at least one of the spatial and temporal aspects of the sections.
[0142] Furthermore, for example, when the difference between the operation plan and the operation results includes a spatial difference (spatial difference, distance difference) between the section included in the operation schedule and a section (section in the operation results) that was actually operated at the same time, the section update unit can set a new section as follows: That is, in this case, the section update unit can set a new section such that the section with a small spatial difference is smaller in at least one of space and time than the section with a large spatial difference among the sections included in the operation schedule.
[0143] Furthermore, for example, when the difference between the operation plan and the operation results includes a time difference, which is the difference between the planned time to pass through a section included in the operation schedule and the time when the section is actually passed through (the time indicated by the operation results), the section update unit can set a new section as follows: That is, in this case, the section update unit can set a new section such that a section with a small time difference among sections included in the operation schedule is smaller in at least one of space and time than a section with a large time difference.
[0144] As in these examples, in this embodiment, when designing a route, the margin range and exclusion time of the entire space (all sections) are not set to a fixed uniform size or length. As in these examples, in this embodiment, it is preferable to make the section smaller in places where there is little deviation from the planned route based on the operation record, and conversely, to make the section larger if the deviation is large. Also, in this embodiment, it is preferable to make the section exclusion time longer if the deviation between the planned arrival time and the actual arrival time is large, and to make it shorter if the deviation is small.
[0145] As described above, the operation plan generation unit 18 receives an operation application for the autonomous mobile device 3 from the user 4 and generates an operation plan. The operation plan generation unit 18 generates an operation plan so that multiple autonomous mobile devices do not enter the same section at the same time or time period. The operation plan generation unit 18 receives operation conditions such as the starting point, end point, and desired departure and arrival times of the operation from the user 4, and generates an operation plan so that there is no contention between autonomous mobile devices in the same section and so that the desired departure and arrival times are met as much as possible.
[0146] Here, the reason why the request is met as much as possible is that, for example, there may be an operation plan for another autonomous mobile device that has been issued in the past, and a situation may arise in which a route matching the operation conditions cannot be generated. To explain this in more detail, there may be a case where the same start point and end point at the same time have already been requested in an operation plan issued in the past, or a detour is required to detour a section used in an operation plan that has already been issued. In addition, instead of or in addition to such a detour, it may be necessary to shift the time of operation in that section. Therefore, even if operation conditions are input, there may be cases in which the request (request) for the departure and arrival times indicated by the operation conditions cannot be completely met, and therefore, a route matching the input operation conditions cannot be generated, and a route matching the request as much as possible may be generated.
[0147] The operation plan will be described with reference to Fig. 29. Fig. 29 is a schematic diagram showing an example of an operation plan generated by the operation management device 10. As illustrated in Fig. 29, the operation plan is expressed as information in which operation sections (dynamic operation sections) stored in the dynamic operation section storage unit 14 are linked from a start point to an end point based on the wishes (operation conditions) of the user 4. In Fig. 29, the route connected by black circles (●) is the operation plan for one operation, and the operation plan generation unit 18 can create an operation plan based on a route based on dynamic operation sections whose size varies depending on the location as shown in Fig. 29.
[0148] An example of a method for generating an operation plan so that other autonomous mobile devices do not enter the same section at the same time or in the same time period will be described with reference to Fig. 30 and Fig. 31. Also, an example of an operation plan generated as a result will be described with reference to Fig. 32. Figs. 30 and 31 are schematic diagrams for explaining an example of a method for generating an operation plan in the operation management device 10. Fig. 32 is a schematic diagram showing an example of an operation plan generated by the generation method of Figs. 30 and 31.
[0149] The operation plan holding unit 17 holds an operation plan that has already been assigned for another autonomous mobile device, as shown in the right diagram of Fig. 30. In this assigned operation plan, each section ID (section IDs 15, 11, and 7 in this example) is associated with a target arrival coordinate (latitude, longitude, and altitude) and a target arrival time.
[0150] In this state, an example will be given of a case where the user 4 inputs operation conditions including the coordinates (latitude, longitude, altitude) of the desired start point and end point of the operation of the autonomous mobile device 3 and the desired arrival time. In this case, the operation plan generation unit 18 searches for a section ID corresponding to the coordinates of the start point (section ID 2 in this example) and a section ID corresponding to the end point (section ID 12 in this example) from the dynamic operation section stored in the dynamic operation section storage unit 14 in accordance with the operation conditions. Then, as shown in the left diagram of Fig. 30, the operation plan generation unit 18 associates the section ID as the search result with those coordinates and the desired arrival time, and temporarily stores them in the operation plan storage unit 17 as information on the start point and end point of the operation plan.
[0151] The next step in generating an operation plan for the autonomous mobile device 3 will be described with reference to the example of Fig. 31. Fig. 31 shows meshes (rectangular shapes) that exist in the operation area (if the user 4 is a delivery company, the delivery area). In this example, for simplicity of explanation, it is assumed that there are 16 meshes in total. The numbers in the bottom right of the meshes in Fig. 31 are waypoint IDs.
[0152] The operation plan generating unit 18 searches for a route from the start point coordinates to the end point coordinates, as exemplified in the left diagram of Fig. 31. For example, if the route proceeds through waypoint IDs 2, 6, 10, 11, and 12, it will conflict with the issued operation plan held in the operation plan holding unit 17 in the 11th section (waypoint ID = 11). Note that the conflict refers to a state in which two or more autonomous mobile devices exist in the same section at the same time period.
[0153] Therefore, the operation plan generating unit 18 re-searches for a route that is the shortest other than this route. For example, as shown in the right diagram of FIG. 31, if the route proceeds from waypoint IDs 2, 3, 4, 8, and 12, this route is determined because there is no conflict with the issued operation plan (the routes do not overlap). In this way, when the route from the start point (section 2) to the end point (section 12) is determined (the conflict is resolved), the operation plan is completed. The operation plan generating unit 18 stores (updates) the completed operation plan for the autonomous mobile device 3 in the operation plan storage unit 17.
[0154] In addition, if the autonomous mobile device 3 is a device that can stop and wait, it can take into consideration the possibility of waiting outside the competing section and shifting the time period, and therefore not perform a re-search, or it can perform a re-search while taking into consideration such a shift in the time period.
[0155] The completed operation plan is stored in such a manner that the section IDs arranged in the order of the route are associated with the destination coordinates and the destination time, as shown in Fig. 32. For convenience, these section IDs are shown in a single column in Fig. 32, but they are dynamic section IDs, as shown in Fig. 24 and the like and in the balloon table in Fig. 32.
[0156] <Example of operation> Next, an overall flow of processing using the traffic management device 10 according to this embodiment will be described with reference to Fig. 33. Fig. 33 is a flow diagram for explaining an example of a flow from an operation application of an autonomous mobile device using the traffic management device 10 to arrival at a destination.
[0157] First, the user 4 registers application information for operating the autonomous mobile device 3 in the operation management device 10 (step S21). Details of the application information are as described above in relation to the operation plan generating unit 18.
[0158] Next, the operation management device 10 determines an operation plan (operation route and operation schedule) based on the registered application information, and issues the operation plan to the autonomous mobile device 3 (step S22). The operation schedule is information related to the date and time of operation. Alternatively, the operation route and operation schedule can be issued to the user 4, and the user 4 can input them to the autonomous mobile device 3. Details of the operation route and operation schedule are as described above in the explanation of the operation plan generation unit 18.
[0159] The autonomous mobile device 3 starts moving to the destination by autonomous control based on the route and schedule issued (or input by the user 4) (step S23). Details of the movement to the destination by autonomous control are as described above in the description of the autonomous mobile device 3.
[0160] The autonomous mobile device 3 notifies the operation management device 10 of operation record information (operation record) such as its own position information at a predetermined timing (step S24). Alternatively, the operation record information can be recorded in the autonomous mobile device 3 at a predetermined timing, and the operation record information can be collected after arrival at the destination or at the end of a day's operation, and submitted to the operation management device 10 and stored in the operation record storage unit 15. Details of the notification of operation record are as described above in the explanation of the operation record storage unit 15.
[0161] The autonomous mobile device 3 arrives at the destination by autonomous control based on the issued (or input by the user 4) operating route and operating schedule (step S25). The movement to the destination by autonomous control is as described above in the explanation of the autonomous mobile device 3, and the operating route and operating schedule are as described above in the explanation of the operation plan holding unit 17.
[0162] Next, the operation of the traffic management device 10 will be described. The procedures described here do not need to be performed in order, and each process may be performed when the input data is updated, or may be performed periodically or at a fixed time. Here, an overview of the three main processes will be described, but the details will be described later with reference to Figs. 34 to 36.
[0163] (First process) The learning unit 11 generates a trained model based on the information stored in the operation plan storage unit 17, the operation record storage unit 15, and the static operation section storage unit 16, and stores the model in the learning model storage unit 12.
[0164] (Second Processing) The prediction unit 13 predicts where and how much deviation will occur in the operation route of the autonomous mobile device operated in the future, using the trained model stored in the learning model storage unit 12. The prediction unit 13 then determines the size of the operation section in which no collision will occur even if the deviation occurs, and stores the result as a dynamic operation section in the dynamic operation section storage unit 14.
[0165] (Third Processing) The operation plan generation unit 18 selects and connects dynamic operation sections so as to satisfy the operation conditions given by the user 4 as much as possible and not overlap with operation plans already issued and stored in the operation plan storage unit 17, and generates a route along which the autonomous mobile device 3 should travel. Here, the dynamic operation sections are stored in the dynamic operation section storage unit 14. Then, the operation plan generation unit 18 provides the generated route to the autonomous mobile device 3 and the user 4 as an operation plan.
[0166] The first process, that is, the process in the learning unit 11, will be described with reference to Fig. 34. Fig. 34 is a flow diagram for explaining an example of the learning process in the operation management device 10. The process described here can be executed every time the operation record storage unit 15 is updated, or when a predetermined number of cases are accumulated in the operation record storage unit 15, or at regular or fixed time intervals, and the learned model is updated by this process.
[0167] First, the plan-performance difference extraction unit 11d compares the operation plan held in the operation plan holding unit 17 with the operation performance held in the operation performance holding unit 15 to calculate the deviation between the operation plan and the operation performance (step S31). Details of the process of calculating this deviation are as described above in relation to the plan-performance difference extraction unit 11d.
[0168] Furthermore, the plan-performance difference extraction unit 11d performs correspondence (step S32) to determine in which operation section stored in the static operation section storage unit 16 the deviation between the operation plan and the operation performance (in which operation section the deviation occurred). If the operation performance is based on an operation plan using a dynamic operation section, the static operation section storage unit 16 may be updated using the dynamic operation section, but the correspondence in step S32 may also be performed using static operation sections of a certain size.
[0169] Then, the planned performance difference extraction unit 11d stores the result in the planned performance difference storage unit 11a. Details of the association process for determining in which operation section stored in the static operation section storage unit 16 the deviation occurred (in which operation section the deviation occurred) are as described above in the explanation of the planned performance difference extraction unit 11d.
[0170] Next, the learning pre-processing unit 11b processes and replaces data as pre-processing so that the information on the difference between the operation plan and the operation results stored in the plan-results difference storage unit 11a can be subjected to machine learning in the subsequent learning main processing unit 11e (step S33). Details of the data processing and replacement as the learning pre-processing are as described above in the explanation of the learning pre-processing unit 11b.
[0171] Next, the main learning processing unit 11e performs multiple regression analysis for each section, obtains a multiple regression equation for each section, and stores the obtained multiple regression equation and coefficients of the equation in the learning model storage unit 12 (step S34). Details of the storage of the generated multiple regression equation and coefficients of the equation are as described above in the explanation of the main learning processing unit 11e and the learning model storage unit 12.
[0172] The second process, that is, the process in the prediction unit 13, will be described with reference to Fig. 35. Fig. 35 is a flow diagram for explaining an example of the prediction process in the traffic management device 10. This process is executed when the learning model is updated by the learning unit 11, but it does not need to be executed in conjunction with the learning model update process as a series of processes, and is executed at a timing when the dynamic traffic section may be updated. For example, it can be executed when formulating an operation plan such as night processing or regular execution.
[0173] In addition, if this process is executed in a state where an operation plan has already been issued but has not yet been operated, and then a new operation plan is generated, the underlying sections will change depending on the operation route. Therefore, when this process is executed at such a timing, the operation plan generation unit 18 needs to perform a determination process to respond to the change in the division of sections.
[0174] First, the planned performance difference prediction unit 13a predicts the amount of deviation of the route that occurs within the static operation section for each time period stored in the learning model storage unit 12 (step S41). A prediction is made for each time period. For details on the method for predicting the amount of deviation of the route, see the explanation of the planned performance difference prediction unit 13a. For details on the movement to the destination by autonomous control, see the explanation of the autonomous mobile device 3 above.
[0175] Next, the dynamic operation section generation unit 13b determines the number of divisions (including the number of connections, prohibited use, and no connections) for the static operation section based on the deviation amount of the route for each time period calculated in step S41, and stores it in the dynamic operation section storage unit 14 (step S42). The details of the method for determining the number of divisions for the static operation section are as described above in the explanation of the dynamic operation section generation unit 13b and the dynamic operation section storage unit 14.
[0176] The third process, that is, the process in the operation plan generating unit 18, will be described with reference to Fig. 36. Fig. 36 is a flow diagram for explaining an example of an operation plan generating process in the operation management device 10. This process is executed in response to an application by the user 4.
[0177] First, the operation plan generating unit 18 receives the starting point, the end point, and the desired departure and arrival times of the operation from the user 4, generates an operation plan so that there is no contention between autonomous mobile devices in the section and so as to meet the desired departure and arrival times as much as possible, and stores the operation plan in the operation plan storage unit 17 (step S51). Details of the method for generating the operation plan are as described above in the explanation of the operation plan generating unit 18.
[0178] Next, the operation plan generating unit 18 issues the generated operation plan to the user 4 and the autonomous mobile device 3 (step S52). Details of the issuance of the operation plan are as described above in the explanation of the operation plan generating unit 18.
[0179] <Other application examples> In this embodiment, an example of an operation plan in a three-dimensional space is mainly shown, but it can also be applied to an operation plan in a two-dimensional plane for an autonomous mobile device traveling on the ground. In that case, it is not necessary to use information on the upper limit altitude, the lower limit altitude, the altitude of the target arrival coordinates, and the actual arrival coordinates for the section. Even when applied to a traveling autonomous mobile device, if it is used in a situation with a hierarchical structure such as a multi-story parking lot, a large logistics center that vehicles can enter, or a factory, it may be expressed by floor height information in addition to expressing by altitude.
[0180] In addition, in this embodiment, an example was given in which the capacity per space was increased by using a dynamic operation section that divided a static operation section based on the learning result. However, this is not limited to this, and if the learning result shows that a position shift or time shift occurs beyond the static operation section, conversely, instead of dividing it, one section may be made larger by connecting it with adjacent operation sections. This can be done by adding a column that holds multiple adjacent section IDs to the information on the dynamic operation section, and when the predicted shift in the dynamic operation section generation unit 13b exceeds the size of the static operation section, registering the IDs of the adjacent sections in the dynamic operation section holding unit 14. This has the effect of avoiding collisions when a section that is likely to deviate from the operation route and go outside the section has already been assigned, without assigning the adjacent section to another drone.
[0181] In addition, in this embodiment, examples using time zone numbers and season zone numbers as explanatory variables are mainly given, but these items can be increased or replaced with other items. In other words, if the information is expected to correlate with the objective variable, not only can the data to be learned be obtained from the operation record alone, but also items from other information sources can be used. For example, when applied to an autonomous mobile device that operates on the ground, the ground surface condition type of each section may be added with a number (paved, unpaved, gravel, sand, etc.), and when applied to an autonomous mobile device that operates on the ocean, the wave height of each section may be added. Even in the case of an autonomous mobile device that operates in the air, weather information for each section may be added. It is also possible to increase the number of items of information obtained from the operation record. For example, a sensor or the like may be installed in the autonomous mobile device, and information such as vibration information, temperature information, fluctuations in the output of the motor or engine used for propulsion, inclination, and fuel consumption status may be added to the objective variable. Through such various applications, it is possible to improve prediction accuracy and build a trained model that is more in line with reality.
[0182] In addition, in the present embodiment, the example in which the objective variable is the positional shift distance has been mainly given, but the positional shift direction can also be used as the objective variable. By using the positional shift direction in addition to the positional shift distance, it is possible to divide or combine only in a specific direction when dividing a section, rather than dividing all of the sections equally, which has the effect of further increasing the efficiency of space utilization.
[0183] In this embodiment, the time margin can be shortened or lengthened depending on the operation record. Such an example will be described with reference to Fig. 37 to Fig. 39. Fig. 37 to Fig. 39 are schematic diagrams for explaining another example of the prediction process in the prediction unit of Fig. 22.
[0184] The left diagram in Fig. 37 shows data indicating an operation plan, and the right diagram in Fig. 37 shows data indicating operation results. Here, the data enclosed in a dashed line in the right diagram in Fig. 37 indicates data between coordinates that are not in the operation plan. When data with coordinates that are not in the operation plan exists like this, it is necessary to take into account its presence in terms of time delays and advances. This is because a correspondence cannot be made due to the difference in the amount of data.
[0185] Therefore, when performing the process of finding the difference between the operation plan and the operation results, first the number of data in the operation plan is increased by calculation to match the number of data in the operation results. For example, as shown in Fig. 38, the coordinates and time between two meshes (between mesh number 2 and mesh number 3 in this example) are calculated at equal intervals according to the increased number of data. This makes it possible to find the advance or lag in time between the operation plan and the operation results by increasing the amount of data as in the right diagram of Fig. 39 (a diagram showing the operation plan) as exemplified in the left diagram of Fig. 39 (a diagram showing the operation results).
[0186] By using this as the objective variable, it becomes possible to plan operations and set the time period during which one autonomous mobile device occupies one operation section to be shorter in accordance with past trends, thereby resulting in further improved efficiency in space utilization.
[0187] <Other embodiments> [a] In each embodiment, the functions of the operation plan generation device, the functions of the operation management device, the functions of the autonomous mobile device, and the functions of the learning device have been described, but each device is not limited to the exemplified configuration examples, and it is sufficient if each device can realize these functions.
[0188] [b] Each device according to each embodiment may have the following hardware configuration. Fig. 40 is a diagram showing an example of the hardware configuration of the device. The same applies to the other embodiment [a] described above.
[0189] The device 100 shown in FIG. 40 may have a processor 101, a memory 102, and an interface 103. The processor 101 may be, for example, a microprocessor, a microprocessor unit (MPU), or a CPU. The processor 101 may include a plurality of processors. The memory 102 is, for example, configured by a combination of a volatile memory and a non-volatile memory. The functions of each device described in each embodiment are realized by the processor 101 reading and executing a program stored in the memory 102. At this time, input and output of information can be performed via an interface 103 such as a communication interface that communicates with other internal parts or other external devices.
[0190] In the above example, the program can be stored and provided to the computer using various types of non-transitory computer readable media. The non-transitory computer readable media includes various types of tangible storage media. Examples of the non-transitory computer readable media include magnetic recording media (e.g., flexible disks, magnetic tapes, hard disk drives) and magneto-optical recording media (e.g., magneto-optical disks). Further, this example includes CD-ROM (Read Only Memory), CD-R, and CD-R / W. Further, this example includes semiconductor memory (e.g., mask ROM, PROM (Programmable ROM), EPROM (Erasable PROM), flash ROM, RAM (Random Access Memory)). The program may also be provided to the computer by various types of transitory computer readable media. Examples of the transitory computer readable media include electric signals, optical signals, and electromagnetic waves. The transitory computer readable media can provide the program to the computer via a wired communication path such as an electric wire and an optical fiber, or a wireless communication path.
[0191] [c] Furthermore, as the processing procedure in the operation plan generation device and the processing procedure in the learning device are exemplified in each of the above-mentioned embodiments, the present disclosure may also be embodied as an operation plan generation method in an operation plan generation device or a learning method in a learning device. This operation plan generation method may include a generation step and a prediction step as described in FIG. 4, and other examples are as described in each of the above-mentioned embodiments. Moreover, this learning method may include an input step and a learning step as described in FIG. 3, and other examples are as described in each of the above-mentioned embodiments.
[0192] Also, a program related to an operation plan generating device (operation plan generating program) can be said to be a program for causing a computer (control computer) mounted on the operation plan generating device or functioning as the operation plan generating device to execute a generation step and a prediction step. A program related to a learning device (learning program) can be said to be a program for causing a computer (control computer) mounted on the learning device or functioning as the learning device to execute an input step and a learning step to generate a trained model.
[0193] The present disclosure is not limited to the above-described embodiment, and may be modified as appropriate without departing from the spirit and scope of the present disclosure. In addition, the present disclosure may be implemented by appropriately combining the respective embodiments.
[0194] A part or all of the above-described embodiments can be described as, but is not limited to, the following supplementary notes. <Additional Notes> (Appendix 1) A generation unit that generates an operation plan indicating a route along which the autonomous mobile device is to be operated based on operation conditions input for the operation of the autonomous mobile device; A prediction unit; Equipped with The route includes information expressed as a succession of sections that are areas for avoiding simultaneous or simultaneous coexistence with other autonomous mobile devices, The prediction unit predicts a difference between the operation plan and an operation record, which is an actual operation record based on the operation plan, for at least each section on a route included in the operation plan; the generation unit generates an operation plan of the autonomous mobile device based on the operation conditions by using new sections updated according to the differences for each section predicted by the prediction unit. Operation plan generation device. (Appendix 2) A section update unit that generates a new section according to the difference for each section predicted by the prediction unit and sets the new section for use in generating an operation plan. 2. An operation plan generating device according to claim 1. (Appendix 3) The difference includes a spatial difference, which is a spatial difference between a section included in the operation schedule and a section that was actually operated at the same time, the section update unit sets the new section such that a section having a small spatial difference among sections included in the operation schedule is smaller in at least one of space and time than a section having a large spatial difference. 3. An operation plan generating device according to claim 2. (Appendix 4) The difference includes a time difference between a scheduled time to pass through a section included in the operation schedule and a time to actually pass through the section, the section update unit sets the new section such that a section having a small time difference among the sections included in the operation schedule is smaller in at least one of space and time than a section having a large time difference among the sections included in the operation schedule. 4. An operation plan generating device according to claim 2 or 3. (Appendix 5) the section update unit sets the new section so as to minimize at least one of spatial and temporal areas of a section for avoiding simultaneous or simultaneous coexistence with other autonomous mobile devices; An operation plan generating device according to any one of Supplementary notes 2 to 4. (Appendix 6) The difference is at least one of a spatial difference, which is a spatial difference between a section included in the operation schedule and a section that was actually operated at the same time, and a temporal difference, which is a difference between a scheduled time to pass through the section included in the operation schedule and a time to actually pass through the section. 3. An operation plan generating device according to claim 1 or 2. (Appendix 7) the prediction unit predicts the difference for at least one of a type of autonomous mobile device, a model of autonomous mobile device, and an operating environment; An operation plan generating device according to any one of appendix 1 to 6. (Appendix 8) The prediction unit performs prediction of the difference using a trained model. An operation plan generating device according to any one of appendix 1 to 7. (Appendix 9) A learning unit is provided that analyzes a difference between the operation plan and the operation record of the operation that is actually performed based on the operation plan for each section used for generating the operation plan, and generates a trained model that predicts the difference that may occur in a new operation plan based on the analysis result, The prediction unit performs prediction of the difference using the trained model generated by the learning unit. An operation plan generating device according to any one of appendix 1 to 7. (Appendix 10) The trained model is a model that inputs information including at least one of an operating time period, an operating season, and an operating environment, and outputs a predicted value of the difference. 10. The operation plan generating device according to claim 8 or 9. (Appendix 11) an input unit for inputting an operation plan indicating a route along which the autonomous mobile device is to be operated and an operation record indicating an actual operation performed based on the operation plan; The learning department and Equipped with The route includes information expressed as a succession of sections that are areas for avoiding simultaneous or simultaneous coexistence with other autonomous mobile devices, The learning unit analyzes a difference between the operation plan and an operation record, which is an actual operation record based on the operation plan, for each section used to generate the operation plan, and generates a trained model that predicts the difference that may occur in a new operation plan based on the analysis result. Learning device. (Appendix 12) A generation step of generating an operation plan indicating a planned route for operation of the autonomous mobile device based on operation conditions input for the autonomous mobile device; A prediction step; Equipped with The route includes information expressed as a succession of sections that are areas for avoiding simultaneous or simultaneous coexistence with other autonomous mobile devices, The prediction step predicts a difference between the operation plan and an operation result, which is an actual operation result based on the operation plan, for at least each section on a route included in the operation plan; the generation step uses new sections updated according to the differences for each section predicted in the prediction step to generate an operation plan for the autonomous mobile device based on the operation conditions. How to generate operation plans. (Appendix 13) an input step of inputting an operation plan indicating a route along which the autonomous mobile device is to be operated and an operation record indicating an actual operation performed based on the operation plan; The learning steps, Equipped with The route includes information expressed as a succession of sections that are areas for avoiding simultaneous or simultaneous coexistence with other autonomous mobile devices, The learning step includes analyzing a difference between the operation plan and an operation record, which is an actual operation record based on the operation plan, for each section used to generate the operation plan, and generating a trained model that predicts the difference that may occur in a new operation plan based on the analysis result. How to learn. (Appendix 14) A computer is caused to execute a generating step of generating an operation plan indicating a route along which the autonomous mobile device is to be operated based on operation conditions input for the operation of the autonomous mobile device, and a predicting step; The route includes information expressed as a succession of sections that are areas for avoiding simultaneous or simultaneous coexistence with other autonomous mobile devices, The prediction step predicts a difference between the operation plan and an operation result, which is an actual operation result based on the operation plan, for at least each section on a route included in the operation plan; the generation step uses new sections updated according to the differences for each section predicted in the prediction step to generate an operation plan for the autonomous mobile device based on the operation conditions. program. (Appendix 15) causing a computer to execute an input step of inputting an operation plan indicating a route along which the autonomous mobile device is to be operated and an operation record indicating an actual operation based on the operation plan, and a learning step; The route includes information expressed as a succession of sections that are areas for avoiding simultaneous or simultaneous coexistence with other autonomous mobile devices, The learning step includes analyzing a difference between the operation plan and an operation record, which is an actual operation record based on the operation plan, for each section used to generate the operation plan, and generating a trained model that predicts the difference that may occur in a new operation plan based on the analysis result. program. [Explanation of symbols]
[0195] 1. Operation plan generation device 1a Generator 1b, 13 Prediction section 2 Learning device 2a, 11 Learning Section 2b Input section 3. Autonomous Mobile Devices 4 User 12 Learning model storage unit 14 Dynamic operating section maintenance unit 15 Operation Records Department 16 Static operating section maintenance section 17 Operation Plan Storage Department 18 Operation plan generation unit 11a Plan and Actual Differences Holding Section 11b Pre-learning processing section 11c Objective variable explanatory variable storage section 11d Plan / Actual Difference Extraction Section 11e Learning book processing section 13a Plan-Actual Variance Forecasting Section 13b Dynamic operation section generation unit 100 devices 101 Processor 102 Memory 103 Interface
Claims
1. A generation unit that generates an operation plan indicating a route along which the autonomous mobile device is to be operated based on operation conditions input for the operation of the autonomous mobile device; A prediction unit; Equipped with the route includes information expressed as a succession of sections that are areas for avoiding simultaneous or simultaneous co-existence with other autonomous mobile devices; The prediction unit predicts a difference between the operation plan and an operation record, which is an actual operation record based on the operation plan, for at least each section on a route included in the operation plan; the generation unit generates an operation plan of the autonomous mobile device based on the operation conditions by using new sections updated according to the differences for each section predicted by the prediction unit. Operation plan generation device.
2. A section update unit that generates a new section according to the difference for each section predicted by the prediction unit and sets the new section for use in generating an operation plan. The operation plan generating device according to claim 1 .
3. an input unit for inputting an operation plan indicating a route along which the autonomous mobile device is to be operated and an operation record indicating an actual operation performed based on the operation plan; The learning department and Equipped with the route includes information expressed as a succession of sections that are areas for avoiding simultaneous or simultaneous co-existence with other autonomous mobile devices; The learning unit analyzes a difference between the operation plan and an operation record, which is an actual operation record based on the operation plan, for each section used to generate the operation plan, and generates a trained model that predicts the difference that may occur in a new operation plan based on the analysis result. Learning device.
4. A generation step of generating an operation plan indicating a planned route for operation of the autonomous mobile device based on operation conditions input for the autonomous mobile device; A prediction step; Equipped with the route includes information expressed as a succession of sections that are areas for avoiding simultaneous or simultaneous co-existence with other autonomous mobile devices; The prediction step predicts a difference between the operation plan and an operation result, which is an actual operation result based on the operation plan, for at least each section on a route included in the operation plan; the generation step uses new sections updated according to the differences for each section predicted in the prediction step to generate an operation plan for the autonomous mobile device based on the operation conditions. How to generate operation plans.
5. an input step of inputting an operation plan indicating a route along which the autonomous mobile device is to be operated and an operation record indicating an actual operation performed based on the operation plan; The learning steps, Equipped with the route includes information expressed as a succession of sections that are areas for avoiding simultaneous or simultaneous co-existence with other autonomous mobile devices; The learning step includes analyzing a difference between the operation plan and an operation record, which is an actual operation record based on the operation plan, for each section used to generate the operation plan, and generating a trained model that predicts the difference that may occur in a new operation plan based on the analysis result. How to learn.
6. A computer is caused to execute a generating step of generating an operation plan indicating a route along which the autonomous mobile device is to be operated based on operation conditions input for the operation of the autonomous mobile device, and a predicting step; the route includes information expressed as a succession of sections that are areas for avoiding simultaneous or simultaneous co-existence with other autonomous mobile devices; The prediction step predicts a difference between the operation plan and an operation result, which is an actual operation result based on the operation plan, for at least each section on a route included in the operation plan; the generation step uses new sections updated according to the differences for each section predicted in the prediction step to generate an operation plan for the autonomous mobile device based on the operation conditions. program.
7. causing a computer to execute an input step of inputting an operation plan indicating a route along which the autonomous mobile device is to be operated and an operation record indicating an actual operation based on the operation plan, and a learning step; the route includes information expressed as a succession of sections that are areas for avoiding simultaneous or simultaneous co-existence with other autonomous mobile devices; The learning step includes analyzing a difference between the operation plan and an operation record, which is an actual operation record based on the operation plan, for each section used to generate the operation plan, and generating a trained model that predicts the difference that may occur in a new operation plan based on the analysis result. program.
Citation Information
Patent Citations
Flight route plan, topography-avoidance and status recognition system, for general purpose aircraft
JP2001033271A
Traffic control support system
JP2018036958A
Unmanned aerial vehicle management device, unmanned aerial vehicle management method, and program
JP2018081675A
Drone dynamic management device, drone dynamic management method, and drone dynamic management program
JP2018165932A
Computer system and data structure
JP2020091201A
