ENERGY MANAGEMENT DEVICE, ENERGY MANAGEMENT SYSTEM, ENERGY MANAGEMENT METHOD, AND COMPUTER PROGRAM
By determining control times and energy exchange amounts based on object states and plans, the energy management device reduces its load and ensures optimal operation at the individual object level.
Patent Information
- Application Number
- JP2022014807
- Authority / Receiving Office
- JP · JP
- Patent Type
- Patents
- Current Assignee / Owner
- Filing Date
- 2022-02-02
- Publication Date
- 2024-10-29
- Estimated Expiration
- 2042-02-02
AI Technical Summary
As the number of managed objects increases, energy management devices face a significant load in outputting suitable driving patterns, leading to suboptimal operation at the individual object level.
The energy management device determines control times and energy exchange amounts based on the operating state and plan of each managed object, allowing objects to set their own optimal operation patterns within specified constraints.
This approach reduces the management device's load and enables optimal operation at the individual object level by allowing each object to determine its operation pattern within the specified control time and energy flexibility.
Smart Images

Figure 0007574814000011 
Figure 0007574814000012 
Figure 0007574814000013
Abstract
Description
[Technical field]
[0001] The present invention relates to an energy management device, an energy management system, an energy management method, and a computer program. [Background technology]
[0002] Conventionally, there has been known an energy management device that manages the energy of multiple managed objects. In general, the energy management device creates an operation pattern for each managed object according to an energy interchange plan for each managed object, and outputs a command to each managed object to manage the exchange of energy between the managed objects (e.g., Patent Documents 1 and 2). [Prior art documents] [Patent documents]
[0003] [Patent Document 1] JP 2015-35941 A [Patent Document 2] JP 2016-42478 A Summary of the Invention [Problem to be solved by the invention]
[0004] However, as the number of managed objects increases, the management load of the energy management device increases, making it difficult for the energy management device to output information on appropriate operation patterns for each of the multiple managed objects, which may result in the device being unable to perform optimal operation at the individual managed object level.
[0005] The present invention has been made to solve the above-mentioned problems, and aims to provide a technology in an energy management device that realizes optimal operation at the level of individual managed objects while reducing the load on the energy management device. [Means for solving the problem]
[0006] The present invention has been made to solve at least part of the above-mentioned problems, and can be realized in the following forms.
[0007] (1) According to one aspect of the present invention, there is provided an energy management device that manages the energy of managed objects. The energy management device manages the energy of managed objects of one or more devices, or one or more units consisting of a plurality of devices and another energy management device that manages the energy of the plurality of devices, and issues a command to the managed objects with a control time of the managed objects and an amount of energy to be accommodated during the control time.
[0008] According to this configuration, the energy management device issues commands to the managed object in terms of the control time and the amount of energy interchange at the control time. Here, the amount of energy interchange refers to the amount of change in energy in the managed object, such as storage, conversion, consumption, and movement of energy. The managed object determines an operation pattern so as to match the control time and the amount of energy interchange at the control time instructed by the energy management device. This makes it possible to reduce the load on the energy management device compared to a case in which the energy management device also determines the operation pattern of the managed object. Furthermore, the managed object can determine its own optimal operation pattern within a range that satisfies the control time and the amount of energy interchange at the control time instructed by the energy management device. This makes it possible to realize optimal operation at the level of individual managed objects.
[0009] (2) The energy management device of the above embodiment may include an information acquisition unit that acquires information about an operating state of the managed object, a planning unit that acquires an operation plan of the managed object, and a command unit that determines a control time of the managed object and an amount of energy to be exchanged at the control time using the information acquired by the information acquisition unit and the operation plan acquired by the planning unit. According to this configuration, the energy management device determines the control time and the amount of energy to be exchanged using information about the operating state of the managed object and the operation plan of the managed object. As a result, the energy management device can create an energy exchange plan in consideration of the operating state of the managed object and determine the control time and the amount of energy to be exchanged.
[0010] (3) In the energy management device of the above embodiment, the managed objects are an energy conversion device, an upstream energy storage device connected to the upstream side of the energy conversion device in the energy movement direction, and a downstream energy storage device connected to the downstream side of the energy conversion device in the energy movement direction, and the information acquisition unit acquires information on the difference between the current energy storage amount and the upper and lower limit values of the energy storage amount in the upstream energy storage device and the difference between the current energy storage amount and the upper and lower limit values of the energy storage amount in the downstream energy storage device, and the command unit may determine the control time of the energy conversion device and the energy interchange amount in the energy conversion device using the information on the difference acquired by the information acquisition unit. According to this configuration, the command unit determines the control time of the energy conversion device and the energy interchange amount using information on the energy amounts of the upstream energy storage device and the downstream energy storage device connected to the energy conversion device as the managed object. This allows energy to be interchanged according to the actual state of the energy storage device, thereby preventing the energy storage device from being over or short of energy.
[0011] (4) In the energy management device of the above aspect, the command unit uses the formula (1) to calculate the control time t h may be determined.
number
[0012] (5) In the energy management device of the above embodiment, the managed object is a plurality of energy storage devices, the information acquisition unit acquires information on the difference between the current energy storage amount and the upper and lower limit values of the energy storage amount in a specific energy storage device among the plurality of energy storage devices, and the difference between the current energy storage amount and the upper and lower limit values of the energy storage amount in an energy storage device connected to the specific energy storage device, and the command unit may determine the control time of the specific energy storage device and the energy interchange amount in the specific energy storage device based on the information on the difference acquired by the information acquisition unit. According to this configuration, the command unit determines the control time and the energy interchange amount of a specific energy storage device among the plurality of energy storage devices as the managed object, using information on the energy amount of an energy storage device connected to the specific energy storage device. Here, the "specific energy storage device" is a device having an energy storage function, and for example, a storage battery corresponds to this, but a gas tank does not correspond to this. As a result, energy is interchanged according to the actual state of the energy storage device, so that it is possible to suppress the occurrence of an excess or shortage of energy in the energy storage device.
[0013] (6) In the energy management device of the above aspect, the command unit uses the formula (2) to calculate the control time t h may be determined.
number
[0014] (7) In the energy management device of the above aspect, the command unit may determine an amount E of energy interchange in the managed object by using equation (3).
number
[0015] (8) In the energy management device of the above embodiment, the energy management device may stop issuing a command to the managed object regarding the control time and the amount of energy interchange when the control time is equal to or less than a predetermined value. According to this configuration, when the determined control time becomes too short, the energy management device stops outputting the control time and the amount of energy interchange to the managed object. This makes it possible for the energy management device to suppress instability in the operation of the managed object, for example, by outputting a predetermined amount of energy interchange to the managed object per unit time.
[0016] (9) According to another aspect of the present invention, an energy management system is provided. The energy management system includes an appliance energy management device that issues commands to one or more appliances based on the control time of the appliance and the amount of energy interchange at the control time, and a unit energy management device that manages the energy of a unit consisting of the one or more appliances and the appliance energy management device, and issues commands to the appliance energy management device based on the control time of the unit and the amount of energy interchange at the control time. According to this configuration, the unit energy management device manages the energy of a unit including one or more appliances and the appliance energy management device that manages the energy of the appliances. The appliance energy management device included in the unit manages the energy of the appliances included in the unit. In this way, by hierarchically arranging the unit energy management device and the appliance energy management device for the appliances, the load for managing the energy of a relatively large number of appliances can be shared between the unit energy management device and the appliance energy management device. This makes it possible to realize optimal operation at the level of individual managed objects.
[0017] (10) According to yet another aspect of the present invention, there is provided an energy management method for managing the energy of a managed object by an energy management device. This energy management method includes a step of issuing a command to the managed object with a control time of the managed object and an energy interchange amount at the control time, and the managed object is one or more devices, or one or more units consisting of a plurality of devices and another energy management device that manages the energy of the plurality of devices. According to this configuration, the method includes a step of issuing a command to the managed object with a control time of the managed object and an energy interchange amount at the control time. The managed object can determine an operation pattern to match the commanded control time and the energy interchange amount at the control time, so that the load of the energy management device can be reduced compared to a case where the energy management device determines the operation pattern of the managed object. Furthermore, the managed object can determine its own optimal operation pattern within a range that satisfies the commanded control time and the energy interchange amount at the control time. This makes it possible to realize optimal operation at the level of an individual managed object.
[0018] (11) According to yet another aspect of the present invention, there is provided a computer program for making a computer execute energy management of a managed object. This computer program makes the computer execute a function of issuing a command to the managed object with a control time of the managed object and an energy interchange amount at the control time, and the managed object is one or more devices, or one or more units consisting of a plurality of devices and another energy management device that manages the energy of the plurality of devices. According to this configuration, the computer program makes the computer execute a function of issuing a command to the managed object with a control time of the managed object and an energy interchange amount at the control time. This makes it possible to reduce the load on the energy management device compared to a case in which the energy management device determines the operation pattern of the managed object. Furthermore, the managed object can determine its own optimal operation pattern within a range that satisfies the commanded control time and the energy interchange amount at the control time. This makes it possible to realize optimal operation at the level of an individual managed object.
[0019] The present invention can be realized in various forms, for example, in the form of a control method for managed objects including an energy management system, a server device for distributing a computer program for managing the energy within the managed objects, a non-transitory storage medium on which the computer program is stored, etc. [Brief description of the drawings]
[0020] [Figure 1] 1 is a schematic diagram of a factory managed by an energy management system according to a first embodiment. [Diagram 2] FIG. 1 is a first schematic diagram illustrating a configuration of an energy management system according to a first embodiment. [Diagram 3] FIG. 2 is a second schematic diagram illustrating the configuration of the energy management system of the first embodiment. [Figure 4] FIG. 11 is an explanatory diagram of a managed object of an energy management system according to a second embodiment. [Diagram 5] FIG. 4 is a schematic diagram illustrating the configuration of an energy management system according to a second embodiment. [Figure 6] FIG. 4 is a diagram illustrating a change over time in an operation plan output value of a water electrolysis apparatus. [Figure 7] FIG. 13 is a schematic diagram illustrating the configuration of an energy management system according to a third embodiment. [Figure 8] FIG. 13 is an explanatory diagram of a managed object of an energy management system according to a fourth embodiment. [Figure 9] FIG. 13 is a schematic diagram illustrating the configuration of an energy management system according to a fourth embodiment. [Figure 10] FIG. 13 is an explanatory diagram of a managed object of an energy management system according to a fifth embodiment. [Figure 11] FIG. 13 is a schematic diagram illustrating the configuration of an energy management system according to a fifth embodiment. [Figure 12] FIG. 4 is a schematic diagram illustrating a modified example of the energy management system of the first embodiment. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0021] First Embodiment FIG. 1 is a schematic diagram of a factory managed by the energy management system of the first embodiment. The energy management system 1A of the present embodiment can be applied to a factory 10 equipped with a plurality of devices 21, 22, 23, 31, 32, 33, 41, 42, 43 as shown in FIG. 1. The plurality of devices 21, 22, 23, 31, 32, 33, 41, 42, 43 are connected by energy lines L1, L2, L3, L12, L23, respectively, and energy can be exchanged between the devices. Here, "energy" in the present embodiment is not limited to electricity, heat, etc., but also includes hydrogen gas, methane gas, etc. that can generate energy by chemical reaction.
[0022] Fig. 2 is a first schematic diagram for explaining the configuration of the energy management system of this embodiment. Fig. 3 is a second schematic diagram for explaining the configuration of the energy management system of this embodiment. The energy management system 1A includes a unit energy management device 5 and a plurality of equipment energy management devices 20, 30, 40. The energy management system 1A grasps the energy supply and demand status of each of the plurality of equipment 21, 22, 23, 31, 32, 33, 41, 42, 43 included in the factory 10, and manages the amount of energy interchange between the plurality of equipment 21, 22, 23, 31, 32, 33, 41, 42, 43.
[0023] In this embodiment, each of the multiple equipment energy management devices 20, 30, 40 and the multiple equipment 21, 22, 23, 31, 32, 33, 41, 42, 43 belongs to one of three units 10A, 10B, 10C in the factory 10. The unit 10A includes the equipment 21, 22, 23 and an equipment energy management device 20 that manages the energy of the equipment 21, 22, 23. The unit 10B includes the equipment 31, 32, 33 and an equipment energy management device 30 that manages the energy of the equipment 31, 32, 33. The unit 10C includes the equipment 41, 42, 43 and an equipment energy management device 40 that manages the energy of the equipment 41, 42, 43.
[0024] The unit energy management device 5 collects information on energy such as the supply and demand and storage amounts of energy for each of the units 10A, 10B, and 10C. The unit energy management device 5 outputs commands for each of the units 10A, 10B, and 10C to the equipment energy management devices 20, 30, and 40 based on the energy interchange plans for each of the units 10A, 10B, and 10C that are formulated to satisfy the operation plan of the entire factory 10. The unit energy management device 5 includes a factory information acquisition unit 5A, a factory planning unit 5B, and a factory command unit 5C.
[0025] The factory information acquisition unit 5A is electrically connected to each of the multiple equipment energy management devices 20, 30, and 40. The factory information acquisition unit 5A acquires information relating to the energy of each of the units 10A, 10B, and 10C.
[0026] Based on the information obtained by the factory information acquisition unit 5A, the factory planning unit 5B formulates an energy interchange plan for each of the units 10A, 10B, and 10C so as to satisfy the operation plan for the entire factory 10. In this way, the factory planning unit 5B can acquire the energy interchange plan for each of the units 10A, 10B, and 10C.
[0027] The factory command unit 5C determines command contents to the units 10A, 10B, and 10C using information on the energy of each of the units 10A, 10B, and 10C acquired by the factory information acquisition unit 5A and the energy interchange plan between the units acquired by the factory planning unit 5B. In this embodiment, the determined command contents include information on the control time of each of the units 10A, 10B, and 10C and the interchange amount of energy interchanged between the units. Here, the interchange amount of energy refers to the amount of change in energy such as storage, conversion, consumption, and movement of energy in the managed object. The command contents determined by the factory command unit 5C are output from the factory command unit 5C to each of the multiple equipment energy management devices 20, 30, and 40. Note that in this embodiment, the control time and the interchange amount of energy are instructed to each of all the units 10A, 10B, and 10C, but it is not necessary to instruct all the units. For example, the control time and the amount of energy transfer may be instructed to the units 10A and 10B, and the amount of energy transfer per unit time may be instructed only to the unit 10C.
[0028] Each of the multiple equipment energy management devices 20, 30, 40 is electrically connected to the unit energy management device 5. The equipment energy management device 20 is electrically connected to the equipment 21, 22, 23. The equipment energy management device 30 is electrically connected to the equipment 31, 32, 33. The equipment energy management device 40 is electrically connected to the equipment 41, 42, 43. Each of the equipment energy management devices 20, 30, 40 includes a unit information acquisition unit, a unit planning unit, and a unit command unit. Here, the functions of the unit information acquisition unit 20A, the unit planning unit 20B, and the unit command unit 20C included in the equipment energy management device 20 will be described with reference to FIG. 3, but the equipment energy management devices 30, 40 also have the same configuration and function.
[0029] The unit information acquisition unit 20A is electrically connected to each of the devices 21, 22, and 23. The unit information acquisition unit 20A acquires information on the operation state and energy state of each of the devices 21, 22, and 23.
[0030] The unit planning section 20B is electrically connected to the unit energy management device 5. The unit planning section 20B receives inputs from the unit energy management device 5 of the control time of the unit 10A and the interchange amount of energy during the control time.
[0031] The unit command unit 20C is electrically connected to the unit information acquisition unit 20A and the unit planning unit 20B. The unit command unit 20C uses information on the operation state and energy state of each of the multiple devices 21, 22, 23 acquired by the unit information acquisition unit 20A and command contents input from the unit energy management device 5 via the unit planning unit 20B to determine the control time of each of the multiple devices 21, 22, 23 and the interchange amount of energy to be allocated to each of the multiple devices 21, 22, 23. The unit command unit 20C issues commands to the multiple devices 21, 22, 23 regarding the control time and the interchange amount of energy for each of the multiple devices 21, 22, 23.
[0032] Each of the multiple devices 21, 22, 23, 31, 32, 33, 41, 42, and 43 includes a device control unit and a device function unit. Here, the functions of the device control units 21A, 22A, and 23A and the device function units 21B, 22B, and 23B included in each of the devices 21, 22, and 23 included in the unit 10A will be described with reference to Fig. 3, but each of the multiple devices 31, 32, 33, 41, 42, and 43 has a similar configuration.
[0033] The equipment control units 21A, 22A, and 23A each include an equipment planning unit 21C, 22C, and 23C, and an equipment command unit 21D, 22D, and 23D. The equipment planning unit 21C determines an optimal operation pattern (output plan) for the equipment 21 within a range that satisfies the control time and the energy interchange amount of the equipment 21 output by the unit command unit 20C. Here, the optimal operation pattern may be, for example, an operation pattern that takes into consideration the efficiency of operation and the durability of the equipment 21. The equipment command unit 21D controls the equipment function unit 21B with the operation pattern determined by the equipment planning unit 21C. The equipment planning unit 22C determines an optimal operation pattern (output plan) for the equipment 22 within a range that satisfies the control time and the energy interchange amount of the equipment 22 output by the unit command unit 20C. Here, the optimal operation pattern may be, for example, an operation pattern that takes into consideration the efficiency of operation and the durability of the equipment 22, as in the case of the equipment 21. The equipment command unit 22D controls the equipment function unit 22B according to the operation pattern determined by the equipment planning unit 22C. The equipment planning unit 23C determines an optimum operation pattern (output plan) for the equipment 23 within a range that satisfies the control time of the equipment 23 and the amount of energy interchange output by the unit command unit 20C. Here, the optimum operation pattern may be an operation pattern that takes into consideration the efficiency of operation and the durability of the equipment 23, as in the case of the equipment 21. The equipment command unit 23D controls the equipment function unit 23B according to the operation pattern determined by the equipment planning unit 23C.
[0034] Each of the device function units 21B, 22B, and 23B exerts a function specific to each of the devices 21, 22, and 23. For example, if the device is a storage battery, the device function unit is a power storage unit having a battery, and if the device is a generator, the device function unit is a power generation unit. Each of the device function units 21B, 22B, and 23B is electrically connected to each of the device command units 21D, 22D, and 23D, and exerts a function according to the operation pattern output by each of the device command units 21D, 22D, and 23D.
[0035] According to the energy management system 1A of the present embodiment described above, the unit energy management device 5 issues commands to each of the multiple units 10A, 10B, and 10C, with respect to the control time of each of the units 10A, 10B, and 10C, and the amount of energy interchange between the units 10A, 10B, and 10C at the control time. Each of the multiple units 10A, 10B, and 10C determines an operation pattern so as to match the control time and the amount of energy interchange at the control time instructed by the unit energy management device 5. This can reduce the load on the unit energy management device 5 compared to the case where the unit energy management device 5 determines the operation patterns of each of the units 10A, 10B, and 10C. Furthermore, the units 10A, 10B, and 10C can determine their own optimal operation pattern within a range that satisfies the control time and the amount of energy interchange at the control time instructed by the unit energy management device 5, so that optimal operation can be realized at the level of each of the units 10A, 10B, and 10C.
[0036] According to the energy management system 1A of the present embodiment, the unit energy management device 5 includes a factory information acquisition unit 5A that acquires information about the energy of each of the equipment energy management devices 20, 30, and 40. As a result, the unit energy management device 5 determines the control time and the amount of energy interchange using information about the operation state of each of the multiple units 10A, 10B, and 10C and the operation plan of the managed units. As a result, the unit energy management device 5 can create an energy interchange plan taking into account the operation state of each of the units 10A, 10B, and 10C, and issue commands about the control time and the amount of energy interchange to each of the units 10A, 10B, and 10C.
[0037] According to the energy management system 1A of the present embodiment, in the unit 10A, the equipment energy management device 20 issues commands to each of the multiple equipment 21, 22, 23, including the control time of each of the equipment 21, 22, 23 and the energy exchange amount of the equipment 21, 22, 23 at the control time. Each of the multiple equipment 21, 22, 23 determines an operation pattern according to the control time and the energy exchange amount at the control time instructed by the equipment energy management device 20. This is similar to the unit 10B and the unit 10C. As a result, in the unit 10A, the load of the equipment energy management device 20 can be reduced compared to the case where the equipment energy management device 20 determines the operation patterns of each of the equipment 21, 22, 23. Furthermore, the equipment 21, 22, 23 can determine their own optimal operation pattern within a range that satisfies the control time and the energy exchange amount at the control time instructed by the equipment energy management device 20, so that optimal operation can be realized at the level of each of the equipment 21, 22, 23. Such an effect is similarly achieved in the device energy management device 30 provided in the unit 10B and the device energy management device 40 provided in the unit 10C.
[0038] According to the energy management system 1A of the present embodiment, the unit energy management device 5 that manages the energy of each of the units 10A, 10B, and 10C, and the equipment energy management devices 20, 30, and 40 that manage the energy of multiple equipment included in the units are arranged in a hierarchical manner. This makes it possible to share the load of managing the energy of a relatively large number of equipment between the unit energy management device 5 and the multiple equipment energy management devices 20, 30, and 40, and to realize optimal operation at the individual equipment level.
[0039] Moreover, the energy management method of the present embodiment includes a step of issuing commands to the multiple units 10A, 10B, 10C with the control time of each of the multiple units 10A, 10B, 10C and the amount of energy interchange at the control time. Since each of the multiple units 10A, 10B, 10C can determine an operation pattern that matches the commanded control time and the amount of energy interchange at the control time, the load on the unit energy management device 5 can be reduced compared to when the unit energy management device 5 determines the operation pattern of each of the multiple units 10A, 10B, 10C. Furthermore, each of the multiple units 10A, 10B, 10C can determine its own optimal operation pattern within a range that satisfies the commanded control time and the amount of energy interchange at the control time. This allows optimal operation at the level of the individual units 10A, 10B, 10C.
[0040] <Second embodiment> Fig. 4 is a schematic diagram illustrating a managed object of an energy management system according to a second embodiment. Fig. 5 is a schematic diagram illustrating a configuration of an energy management system according to a second embodiment. An energy management system 1B according to the second embodiment is applied to a factory 10 equipped with a unit 10D including a water electrolysis device 52, a hydrogen tank 53, a storage battery 54, and the like.
[0041] The energy management system 1B includes a unit energy management device 5 and an equipment energy management device 50 that manages the unit 10D (see FIG. 5). The equipment energy management device 50 has the same configuration and function as the equipment energy management device 20 of the first embodiment. As a result, the energy management system 1B reduces the load on the unit energy management device 5 while fulfilling the operation plan of the entire factory 10, and mainly realizes optimal operation of the water electrolysis device 52. The unit 10D can be said to be a modified example of the unit 10A of the first embodiment.
[0042] In this embodiment, the unit 10D includes a solar power generation device 511, a grid power relay device 512, a water electrolysis device 52, a hydrogen tank 53, a hydrogen consumer 551, a storage battery 54, and a power consumer 552. In the unit 10D, the solar power generation device 511 functions as an energy supply source. The power supplied from the solar power generation device 511 is used for the electrolysis of water by the water electrolysis device 52. The hydrogen produced by the electrolysis of water is stored in the hydrogen tank 53. The hydrogen stored in the hydrogen tank 53 is consumed by the hydrogen consumer 551. The power supplied from the solar power generation device 511 is stored in the storage battery 54 and is used for the electrolysis of water in the water electrolysis device 52 via the storage battery 54, or is consumed by the power consumer 552. Furthermore, when the energy in the unit 10D is insufficient, the grid power relay device 512 supplies power from another unit to the unit 10D. Of the devices included in the unit 10D, the devices that can be managed by the device energy management device 50 are the water electrolysis device 52 and the storage battery 54. In this embodiment, the device energy management device 50 controls only the water electrolysis device 52 and does not issue commands to the storage battery 54. The storage battery 54 operates independently of the device energy management device 50 so as to maintain the system frequency (system voltage in the case of a DC grid).
[0043] The equipment energy management device 50 of this embodiment includes a unit information acquisition unit 50A, a unit planning unit 50B, and a unit command unit 50C. As shown in Fig. 5, the unit information acquisition unit 50A is electrically connected to the water electrolysis device 52, the storage battery 54, and the hydrogen tank 53. The unit information acquisition unit 50A acquires information relating to the operating states and energy states of the water electrolysis device 52, the storage battery 54, and the hydrogen tank 53.
[0044] The unit planning unit 50B is electrically connected to the unit energy management device 5. The unit planning unit 50B receives inputs of the control time of the unit 10D and the amount of energy interchange at that control time from the unit energy management device 5. The unit planning unit 50B creates an operation plan for the water electrolysis device 52 using information on the operation state and energy state of each of the water electrolysis control unit 52A and the power storage control unit 54A acquired by the unit information acquisition unit 50A, the control time of the unit 10D, and the amount of energy interchange at that control time. In this embodiment, a plan for the output of the water electrolysis device 52 (storage battery charge / discharge output and water electrolysis output) and the amount of energy stored in the storage battery 54 is derived by optimization calculation, for example, in 0.5 hour units up to 24 hours later. As a method of optimization calculation, for example, time is treated as a discrete point, and a solution that minimizes the amount of grid power introduced by the grid power relay device 512 is derived by mixed integer programming. Note that the presence or absence of optimization in the planning of the operation plan, the method thereof, the unit time in the plan, and the like are not limited to those mentioned above.
[0045] The unit command unit 50C calculates a control period for the water electrolysis apparatus 52 based on the operation plan drawn up by the unit planning unit 50B, and outputs the control period to the water electrolysis apparatus 52. In this embodiment, the unit command unit 50C calculates the control time t h Calculate.
number
[0046] In this embodiment, the "upstream energy storage device" in formula (1) refers to the storage battery 54 connected upstream of the water electrolysis device 52 in the energy transfer direction, and the "downstream energy storage device" refers to the hydrogen tank 53 connected downstream of the water electrolysis device 52 in the energy transfer direction. In this embodiment, one energy storage device is connected to each of the upstream and downstream sides of the water electrolysis device 52, and therefore both i and j are 1.
[0047] Here, the control time t h A specific example of the calculation of is described below. As an example of calculation using formula (1), the upper limit of the energy storage amount of the storage battery 54 is set to 50 (MWh) and the lower limit is set to 0 (MWh). The upper limit of the energy storage amount of the hydrogen tank 53 is set to 100 (MWh) and the lower limit is set to 0 (MWh). The current energy storage amount of the storage battery 54 is set to 10 (MWh), and the current energy storage amount of the hydrogen tank 53 is set to 60 (MWh). The estimated difference between actual and forecasted input / output of the storage battery 54 and the hydrogen tank 53 are set to 15 (MWh) and 10 (MWh). This estimated difference between actual and forecasted input / output may be determined from experience or may be determined based on some kind of prediction model. Substituting these values into formula (1), the control time t h is calculated as follows: t h=Min(Min((50-10) / 15,(10-0) / 15),Min((100-60) / 10,(60-0) / 10)) =Min(Min(2.67,0.67),Min(4,6)) =0.67[hour]
[0048] The unit command unit 50C calculates the amount of energy interchange E of the water electrolysis apparatus 52 based on the operation plan formulated by the unit plan unit 50B. The unit command unit 50C calculates the amount of energy interchange E by using the following formula (3).
number
[0049] Fig. 6 is a diagram illustrating the change over time in the operation plan output value of the water electrolysis device. In Fig. 6, as an example, the operation plan output of the water electrolysis device 52 based on the energy supply and demand forecast in the factory 10 is shown by a solid line (solid line G1 in Fig. 6). Specifically, at the current time t now = 0, the operation plan output value P op_ ε changes in units of 0.5 hours as shown in FIG 6. As shown in formula (3), now From time (t now +t h ) is the amount of energy interchange E, so the area of the shaded area S1 shown in Fig. 6 corresponds to the amount of energy interchange E in the water electrolysis apparatus 52. That is, in the example shown in Fig. 6, the amount of energy interchange E is calculated as follows using Fig. 6. E = 10 x 0.5 + 20 x 0.17 = 8.4 (MWh)
[0050] In this manner, the unit command section 50C determines the control time t hThe unit command unit 50C calculates the amount of energy interchange E in the water electrolysis device 52. h and outputs information including the amount of energy interchange E in the water electrolysis device 52 to the water electrolysis control unit 52A.
[0051] The water electrolysis device 52 includes a water electrolysis control unit 52A and a water electrolysis unit 52B. The water electrolysis control unit 52A controls the water electrolysis unit 52B, which performs water electrolysis, in response to a command from the unit command unit 50C. The storage battery 54 includes an electricity storage control unit 54A and an electricity storage unit 54B. As described above, the electricity storage control unit 54A controls the electricity storage unit 54B, which charges and discharges power, independently of the appliance energy management device 50.
[0052] In this embodiment, the water electrolysis control unit 52A controls the control time t h Based on information including the amount of energy interchange E in the water electrolysis device 52, for example, a control time t h In this embodiment, the water electrolysis control unit 52A determines an operation pattern so that hydrogen equivalent to the amount of energy interchange E=8.4 (MWh) can be produced within a control time t h Within the range of the energy interchange amount E, the optimal operation pattern is determined taking into consideration various constraints such as the capacity and durability of the water electrolysis device 52, and the operation efficiency. h By making the value of x as large as possible, the degree of control freedom of the water electrolysis control unit 52A can be increased.
[0053] Calculated control time t h When the control time t becomes shorter, it becomes difficult for the water electrolysis control unit 52A to update the command in a short period of time. h When the control time t hThe output of the command related to the amount of energy interchange E is interrupted, and a command is directly output to the water electrolysis device 52. The predetermined value at this time may be, for example, the time until the response of the water electrolysis control unit 52A becomes too late, or it may be set to any time longer than that.
[0054] According to the energy management system 1B of the present embodiment described above, the equipment energy management device 50 issues a command to the water electrolysis device 52 regarding the control time of the water electrolysis device 52 and the amount of energy interchange between the water electrolysis device 52, the storage battery 54, and the hydrogen tank 53 at the control time. The water electrolysis device 52 determines an operation pattern that matches the control time and the amount of energy interchange at the control time instructed by the equipment energy management device 50. This reduces the load on the equipment energy management device 50 compared to a case in which the equipment energy management device 50 also determines the operation pattern of the water electrolysis device 52. Furthermore, the water electrolysis device 52 can determine its own optimal operation pattern within a range that satisfies the control time and the amount of energy interchange at the control time instructed by the equipment energy management device 50, thereby achieving optimal operation at the level of the water electrolysis device 52.
[0055] Furthermore, in the energy management system 1B of the present embodiment, the unit command section 50C determines the control time for the water electrolysis device 52 and the amount of energy to be exchanged, using information about the amounts of energy in the storage battery 54 connected upstream of the water electrolysis device 52 and the hydrogen tank 53 connected downstream of the water electrolysis device 52 as the managed object. This makes it possible to exchange energy according to the actual states of the storage battery 54 and the hydrogen tank 53, thereby making it possible to prevent the occurrence of an energy surplus or deficiency in the storage battery 54 and the hydrogen tank 53.
[0056] Furthermore, in energy management system 1B of the present embodiment, as shown in formula (1), unit command section 50C determines the control time for water electrolysis device 52 using the difference between the upper and lower limits of the current energy storage amount in storage battery 54 and hydrogen tank 53, as well as the estimated difference between the actual and estimated input / output amounts of storage battery 54 and hydrogen tank 53. This makes it possible to set appropriate control times for each device while taking into account the estimated difference between the actual and estimated input / output amounts, thereby further preventing energy surpluses and deficiencies in water electrolysis device 52.
[0057] According to the energy management system 1B of the present embodiment, the equipment energy management device 50 calculates the control time t h When the control time t h and stops outputting the interchangeable amount of energy E. This enables the water electrolysis control unit 52A to, for example, output a predetermined interchangeable amount of energy per unit time, thereby preventing the operation of the water electrolysis device 52 from becoming unstable.
[0058] <Third embodiment> Fig. 7 is a schematic diagram illustrating the configuration of an energy management system according to a third embodiment. The energy management system 1C according to the third embodiment is different from the energy management system according to the second embodiment (Fig. 5) in that a unit command section 50C of an equipment energy management device 50 and a storage battery 54 are electrically connected to each other.
[0059] In the energy management system 1C of the third embodiment, when managing the energy of the unit 10D, first, the unit command unit 50C sends a control time t h When information including the amount of energy interchange E is input (reference symbol Op1 in FIG. 7), the water electrolysis control unit 52A controls the control time t hThe water electrolysis control unit 52A determines an operation pattern for the period. After determining the operation pattern, the water electrolysis control unit 52A transmits the determined operation pattern to the equipment energy management device 50 (Op2 in FIG. 7). Using the operation pattern transmitted from the water electrolysis control unit 52A, the equipment energy management device 50 calculates the output (W) of the storage battery 54, for example, so as to maintain the power balance in the unit 10D, and issues a command on a second-by-second basis to the power storage control unit 54A (Op3 in FIG. 7).
[0060] The water electrolysis control section 52A controls the control time t h When the operation pattern is changed within this time period, the water electrolysis control unit 52A sends information about the change in the operation pattern to the equipment energy management device 50 every time the operation pattern is changed. Upon receiving the information sent from the water electrolysis control unit 52A, the equipment energy management device 50 recalculates the output to the storage battery 54 and issues a command on a second-by-second basis to the power storage control unit 54A.
[0061] According to the energy management system 1C of the present embodiment described above, when the water electrolysis control unit 52A that controls the water electrolysis device 52 changes the operation pattern within the control time, the water electrolysis control unit 52A sends information related to the change in the operation pattern to the equipment energy management device 50. In the unit 10D, the change in the operation pattern of the water electrolysis device 52 will also change the future change in the amount of energy stored in the storage battery 54 over time, so the equipment energy management device 50 changes the content of control of the storage battery 54 in accordance with the change in the operation pattern of the water electrolysis device 52. This makes it possible to maintain energy balance in the unit 10D and the factory 10 including the unit 10D.
[0062] <Fourth embodiment> Fig. 8 is a schematic diagram for explaining a managed object of an energy management system of a fourth embodiment. Fig. 9 is a schematic diagram for explaining a configuration of the energy management system of this embodiment. An energy management system 1D of the fourth embodiment is applied to a factory 10 including a unit 10E including a water electrolysis device 62, a hydrogen tank 63, a fuel cell 64, a storage battery 65, a methanation device 66, a methane gas tank 67, a generator 68, etc.
[0063] The energy management system 1D includes an equipment energy management device 60 that manages the unit 10E. The equipment energy management device 60 has the same functions as the equipment energy management device 20 of the first embodiment, and includes a unit information acquisition unit 60A, a unit planning unit 60B, and a unit command unit 60C. As a result, the energy management system 1D reduces the load on the unit energy management device 5 while fulfilling the operation plan of the entire factory 10, and realizes optimal operation of each of the water electrolysis device 52, the fuel cell 64, the methanation device 66, and the generator 68. The unit 10E can be said to be a modified example of the unit 10A of the first embodiment.
[0064] In this embodiment, the unit 10E includes a solar power generation device 611, a grid power relay device 612, a water electrolysis device 62, a hydrogen tank 63, a fuel cell 64, a storage battery 65, a power consumption unit 691, a methanation device 66, a methane gas tank 67, a methane consumption unit 692, and a generator 68. In the unit 10E, the solar power generation device 611, which functions as an energy supply source, supplies generated power to the water electrolysis device 62, the storage battery 65, and the power consumption unit 691. The water electrolysis device 62 electrolyzes water using power supplied from the solar power generation device 611 and the storage battery 65 to generate hydrogen. The hydrogen tank 63 stores the hydrogen generated by the water electrolysis device 62. The fuel cell 64 generates power using the hydrogen stored in the hydrogen tank 63. The storage battery 65 stores the power generated by the fuel cell 64 and also stores a portion of the power generated by the solar power generation device 611.
[0065] The methanation device 66 generates methane using hydrogen stored in the hydrogen tank 63 and carbon dioxide supplied from outside the unit 10E (4H2+CO2→CH4+2H2O). Carbon dioxide can be obtained, for example, by recovering it from exhaust gas discharged from a combustor installed outside the unit 10E. The methane gas tank 67 stores the methane gas generated by the methanation device 66. The methane consumption unit 692 utilizes the methane gas stored in the methane gas tank 67.
[0066] The generator 68 generates power by utilizing the methane gas stored in the methane gas tank 67. The power generated by the generator 68 is utilized by the water electrolysis device 62, or is stored in the storage battery 65. In addition, in the unit 10E, when there is a shortage of energy in the unit 10E, the system power relay device 612 supplies power from another unit to the unit 10E.
[0067] Among the devices included in the unit 10E, the devices that can be managed by the equipment energy management device 60 are the storage battery 65, the water electrolysis device 62, the fuel cell 64, the methanation device 66, and the generator 68. In this embodiment, the equipment energy management device 60 controls the water electrolysis device 62, the fuel cell 64, the methanation device 66, and the generator 68. In this embodiment, the equipment energy management device 60 does not issue a command to the storage battery 65, and as with the storage battery 54 in the second embodiment, for example, the power storage control unit 65A controls the power storage unit 65B that charges and discharges power independently of the equipment energy management device 60 as described above.
[0068] The equipment energy management device 60 of this embodiment includes a unit information acquisition unit 60A, a unit planning unit 60B, and a unit command unit 60C. As shown in Fig. 9, the unit information acquisition unit 60A is electrically connected to the storage battery 65, the water electrolysis device 62, the fuel cell 64, the methanation device 66, and the generator 68, and acquires information on the operating state and energy state of each of the storage battery 65, the water electrolysis device 62, the fuel cell 64, the methanation device 66, and the generator 68.
[0069] The unit planning unit 60B is electrically connected to the unit energy management device 5, and receives as input the control time of the unit 10E and the amount of energy interchange at that control time from the unit energy management device 5. The unit planning unit 60B creates operation plans for each of the water electrolysis device 62, the fuel cell 64, the methanation device 66, and the generator 68, using information on the operating state and energy state of each of the storage battery 65, the water electrolysis device 62, the fuel cell 64, the methanation device 66, and the generator 68 acquired by the unit information acquisition unit 60A, and the control time of the unit 10E and the amount of energy interchange at that control time.
[0070] The unit command unit 60C calculates the control period and the amount of energy interchange for each of the water electrolysis device 62, the fuel cell 64, the methanation device 66, and the generator 68 based on the operation plan drawn up by the unit schedule unit 60B, and outputs the results to each device. In this embodiment, the unit command unit 60C calculates the control period t h The unit command unit 60C calculates the amount of energy interchange E based on the calculated control time t h and the amount of energy interchange E are output to the water electrolysis device 62, the fuel cell 64, the methanation device 66, and the generator 68, respectively.
[0071] The water electrolysis device 62 is connected to the storage battery 65 on the upstream side in the energy transfer direction, and to the hydrogen tank 63 on the downstream side (see FIG. 8). Therefore, for the water electrolysis device 62, the control time t h The calculation of is performed using the current energy storage amounts of the storage battery 65 and the hydrogen tank 63, the upper and lower limits of the energy storage amounts, and the estimated difference between the actual and forecast amounts of input and output. hand the amount of energy interchange E, the unit 10E determines an optimal operation pattern and outputs it to the water electrolysis unit 62B that performs water electrolysis. As a result, the water electrolysis unit 62B operates according to the optimal operation pattern while fulfilling the operation plan of the unit 10E.
[0072] The fuel cell 64 is connected to the hydrogen tank 63 on the upstream side and the storage battery 65 on the downstream side in the energy transfer direction (see FIG. 8). Therefore, for the fuel cell 64, the control time t h The calculation of is performed using the current energy storage amount of each of the hydrogen tank 63 and the storage battery 65, the upper and lower limits of the energy storage amount, and the estimated difference between the actual and forecast amounts of input and output. h Based on information including the amount of energy interchange E, the system determines an optimal operation pattern and outputs it to the fuel cell section 64B, which generates electricity by a reaction between water and oxygen. As a result, the fuel cell section 64B operates according to the optimal operation pattern while fulfilling the operation plan of the unit 10E.
[0073] In the methanation device 66, the hydrogen tank 63 is located on the upstream side in the energy transfer direction, and the methane gas tank 67 is located on the downstream side. Therefore, for the methanation device 66, the control time t h The calculation uses the current energy storage amount, upper and lower limits of the energy storage amount, and the estimated difference between the actual and forecast amounts of input and output in the hydrogen tank 63 and the methane gas tank 67. The reaction control unit 66A of the methanation device 66 calculates the control time t h The unit 10E determines an optimal operation pattern based on information including the amount of energy interchange E and the amount of energy interchange E, and outputs the determined optimal operation pattern to the methanation reaction section 66B that produces methane by a reaction between hydrogen and carbon dioxide. As a result, the methanation reaction section 66B operates according to the optimal operation pattern while satisfying the operation plan of the unit 10E.
[0074] In the generator 68, the methane gas tank 67 is located upstream and the storage battery 65 is located downstream in the energy transfer direction. Therefore, for the generator 68, the control time t h The calculation uses the current energy storage amount of the methane gas tank 67 and the storage battery 65, the upper and lower limits of the energy storage amount, and the expected difference between the actual and forecast outputs. h Based on information including the amount of energy interchange E, the power generation unit 68B determines an optimal operation pattern and outputs the optimal operation pattern to the power generation unit 68B that generates power by burning methane gas. As a result, the power generation unit 68B operates according to the optimal operation pattern while fulfilling the operation plan of the unit 10E.
[0075] According to the energy management system 1D of the present embodiment described above, the equipment energy management device 60 issues commands to each of the water electrolysis device 62, the fuel cell 64, the methanation device 66, and the generator 68 in terms of the control time and the amount of energy interchange at the control time. Each of the water electrolysis device 62, the fuel cell 64, the methanation device 66, and the generator 68 determines an operation pattern so as to match the control time and the amount of energy interchange at the control time instructed by the equipment energy management device 60. This can reduce the load on the equipment energy management device 60 compared to a case in which the equipment energy management device 60 determines each of the operation patterns of the water electrolysis device 62, the fuel cell 64, the methanation device 66, and the generator 68. Furthermore, each of the water electrolysis device 62, the fuel cell 64, the methanation device 66, and the generator 68 can determine its own optimal operation pattern within a range that satisfies the control time and the amount of energy interchange at the control time instructed by the equipment energy management device 60, so that optimal operation can be realized at each level of the water electrolysis device 62, the fuel cell 64, the methanation device 66, and the generator 68.
[0076] <Fifth embodiment> Fig. 10 is a schematic diagram for explaining a management target of an energy management system of the fifth embodiment. Fig. 11 is a schematic diagram for explaining a configuration of the energy management system of the present embodiment. An energy management system 1E of the fifth embodiment is applied to a factory 10 including a unit 10F including two storage batteries 72, 73 (see Fig. 10).
[0077] The energy management system 1E includes an equipment energy management device 70 that manages the unit 10F. The equipment energy management device 70 has the same functions as the equipment energy management device 20 of the first embodiment, and thus the energy management system 1F of the fifth embodiment reduces the load on the unit energy management device 5 while fulfilling the system operation plan for the entire factory 10, and realizes optimal operation with either one of the two storage batteries 72, 73. The unit 10F can be said to be a modified example of the unit 10A of the first embodiment.
[0078] In this embodiment, the unit 10F includes a solar power generation device 711, a grid power relay device 712, two storage batteries 72 and 73, and a power consumption unit 74. In the unit 10F, the solar power generation device 711 functions as an energy supply source. Power supplied from the solar power generation device 711 is stored in the two storage batteries 72 and 73. The power stored in the solar power generation device 711 is consumed by the power consumption unit 74. In addition, in the unit 10F, when the energy in the unit 10F is insufficient, the grid power relay device 712 supplies power from another unit to the unit 10F. Of the devices included in the unit 10F, the storage batteries 72 and 73 can be targets of management by the equipment energy management device 70. In this embodiment, the equipment energy management device 70 does not issue commands to the storage battery 73. For example, like the storage battery 54 in the second embodiment, the storage control unit 73A controls the storage unit 73B, which charges and discharges power, independently of the equipment energy management device 70, as described above.
[0079] The equipment energy management device 70 of this embodiment includes an equipment information acquisition unit 70A, a unit planning unit 70B, and a unit command unit 70C. As shown in Fig. 11, the equipment information acquisition unit 70A is electrically connected to each of the two storage batteries 72, 73. The equipment information acquisition unit 70A acquires information on the operating state and energy state of each of the storage batteries 72, 73.
[0080] The unit planning unit 70B is electrically connected to the unit energy management device 5. The control time of the unit 10F and the amount of energy interchange at that control time are input to the unit planning unit 70B from the unit energy management device 5. The unit planning unit 70B creates a power storage plan for the storage battery 72 using information on the operating state and energy state of each of the two storage batteries 72, 73 acquired by the device information acquisition unit 70A, the control time of the unit 10F, and the amount of energy interchange at that control time.
[0081] The unit command unit 70C calculates the control period of the storage battery 72 based on the operation plan drawn up by the unit schedule unit 70B, and outputs the control period to the storage battery 72. In this embodiment, the unit command unit 70C calculates the control time t h Calculate.
number
[0082] In this embodiment, the “specific energy storage device” in formula (2) is the storage battery 72, and the “connected energy storage device” is the storage battery 73. In this embodiment, the only energy storage device connected to the storage battery 72 is the storage battery 73, so i is 1.
[0083] The unit command unit 70C calculates the energy interchange amount E of the storage battery 72 based on the operation plan drawn up by the unit plan unit 70B. The unit command unit 70C calculates the energy interchange amount E by using the formula (3) in the same manner as in the second embodiment.
number
[0084] The unit command unit 70C controls the storage battery 72 at a control time t h The unit command unit 70C calculates the amount of energy interchange E. h and the amount of energy interchange E, to the power storage control unit 72A of the storage battery 72. The power storage control unit 72A controls the power storage unit 72B that stores power, in response to a command from the unit command unit 70C.
[0085] According to the energy management system 1E of the present embodiment described above, the appliance energy management device 70 issues a command to the storage battery 72 based on the control time of the storage battery 72 and the amount of energy interchange between the storage battery 72 and the storage battery 73 at the control time. The storage battery 72 determines an operation pattern that matches the control time and the amount of energy interchange at the control time commanded by the appliance energy management device 70. This can reduce the load on the appliance energy management device 70 compared to a case in which the appliance energy management device 70 also determines the operation pattern of the storage battery 72. Furthermore, the storage battery 72 can determine its own optimal operation pattern within a range that satisfies the control time and the amount of energy interchange at the control time commanded by the appliance energy management device 70, thereby achieving optimal operation at the level of the storage battery 72.
[0086] Furthermore, according to the energy management system 1E of the present embodiment, the unit command unit 70C determines the control time and the amount of energy to be exchanged for the storage battery 72 as the managed storage battery, using information on the amount of energy of the storage battery 73 connected to the storage battery 72. As a result, energy is exchanged according to the actual state of the storage battery 73, and thus it is possible to prevent the occurrence of an energy surplus or deficiency in the storage battery 73.
[0087] Furthermore, according to the energy management system 1E of this embodiment, the unit command unit 70C determines the control time of the storage battery 72 using the difference between the current energy storage amount of the storage battery 73 and the upper and lower limits of the energy storage amount as well as the estimated difference between the actual and estimated values of the input and output of the energy storage device. This makes it possible to set a control time appropriate for each device while assuming the estimated difference between the actual and estimated values of the input and output, thereby further suppressing the occurrence of energy surplus or deficiency in the storage battery 73.
[0088] <Modifications of this embodiment> The present invention is not limited to the above-described embodiment, and can be embodied in various forms without departing from the spirit and scope of the invention. For example, the following modifications are also possible.
[0089] [Variation 1] In the above embodiment, the energy management system manages the energy of the multiple units 10A, 10B, and 10C using the unit energy management device 5, and manages multiple devices belonging to each of the units 10A, 10B, and 10C using the device energy management devices 20, 30, and 40. However, the configuration of the energy management system is not limited to this. Multiple devices may be directly managed by one energy management device.
[0090] Fig. 12 is a schematic diagram for explaining a modified example of the energy management system of the first embodiment. The factory 10 shown in Fig. 12 includes a factory energy management device 6 and a plurality of devices 21, 22, 23, 31, 32, and 33. The factory energy management device 6 is electrically connected to each of the plurality of devices 21, 22, 23, 31, 32, and 33, and collects information on energy such as the supply and demand amount and storage amount of energy of each of the plurality of devices 21, 22, 23, 31, 32, and 33. The factory energy management device 6 has a configuration similar to that of the unit energy management device 5 of the first embodiment, and includes a factory information acquisition unit 6A, a factory planning unit 6B, and a factory command unit 6C. The factory energy management device 6 outputs commands for control time and energy interchange amount to each of the plurality of devices 21, 22, 23, 31, 32, 33 based on the energy interchange plan of each of the plurality of devices 21, 22, 23, 31, 32, 33, which is designed to satisfy the operation plan of the entire factory 10. Each of the plurality of devices 21, 22, 23, 31, 32, 33 determines its own optimal operation pattern within a range that satisfies the control time and the energy interchange amount output by the factory energy management device 6. This makes it possible to reduce the load on the factory energy management device 6 and to realize optimal operation at each level of the plurality of devices while satisfying the operation plan of the entire factory 10.
[0091] [Variation 2] In the above embodiment, the unit energy management device 5 includes the factory information acquisition unit 5A that acquires information about the energy of the devices belonging to the equipment energy management device. However, the unit energy management device 5 does not necessarily have to include the factory information acquisition unit 5A. In this case, the factory planning unit 5B may create an energy interchange plan for each of the units 10A, 10B, and 10C so as to satisfy the operation plan of the entire factory 10.
[0092] [Variation 3] In the first to fifth embodiments, the energy management system includes a unit energy management device 5 that manages the energy of each of the units 10A, 10B, and 10C, and an equipment energy management device that manages the energy of a plurality of equipment included in the unit, which are arranged in a hierarchical manner. Three or more management devices may be arranged in a hierarchical manner.
[0093] [Variation 4] In the above embodiment, the energy management system manages energy in the factory 10 that includes multiple devices 21, 22, 23, 31, 32, 33, 41, 42, and 43. However, the objects managed by the energy management system are not limited to factories. Any object that includes multiple elements and exchanges energy between the elements can be the object of management by the energy management system.
[0094] Although the present aspect has been described above based on the embodiment and modified examples, the above-mentioned embodiment of the aspect is intended to facilitate understanding of the present aspect and does not limit the present aspect. The present aspect may be modified or improved without departing from the spirit and scope of the claims, and equivalents are included in the present aspect. Furthermore, if a technical feature is not described as essential in this specification, it may be deleted as appropriate. [Explanation of symbols]
[0095] 1A, 1B, 1C, 1D, 1E, 1F...Energy management systems 5...Unit energy management device 6...Factory energy management equipment 10A, 10B, 10C, 10D, 10E, 10F...Unit 20, 30, 40, 50, 60, 70...Equipment energy management device 21,22,23,31,32,33,41,42,43…Equipment 52,62…Water electrolysis device 53,65,72,73…Batteries 54,63…Hydrogen tank 64...fuel cell 66…Methanation device 67…Methane gas tank 68…Generator t h …Control time E: Energy exchange amount
Claims
1. An energy management device for managing energy to be managed, the managed object is one or more units each including a plurality of devices and another energy management device that manages the energy of the plurality of devices, The energy management device issues a command to the managed object based on a control time of the managed object and an amount of energy to be accommodated during the control time.
2. An energy management device comprising:
2. The energy management device according to claim 1 further comprises: an information acquisition unit that acquires information regarding an operating state of the managed object; A planning unit that acquires an operation plan of the management target; A command unit that determines a control time of the managed object and an amount of energy to be exchanged during the control time by using the information acquired by the information acquisition unit and the operation plan acquired by the planning unit.
2. An energy management device comprising:
3. 3. The energy management device according to claim 2, the managed object is a unit including an energy conversion device, an upstream energy storage device connected to an upstream side of the energy conversion device in a direction of energy movement, and a downstream energy storage device connected to a downstream side of the energy conversion device in the direction of energy movement, the information acquisition unit acquires information regarding a difference between a current energy storage amount and an upper and lower limit values of the energy storage amount in the upstream energy storage device, and information regarding a difference between a current energy storage amount and an upper and lower limit values of the energy storage amount in the downstream energy storage device, The command unit determines the control time of the energy conversion device and an amount of energy to be exchanged in the energy conversion device by using information on the difference acquired by the information acquisition unit.
2. An energy management device comprising:
4. 4. The energy management device according to claim 3, The command unit calculates the control time t h Determine, 2. An energy management device comprising: [0010] (In formula (1), t h :Control time of energy conversion device (s) E max- α _i : upper limit energy storage amount (Wh) of the i-th upstream energy storage device E min- α _i :Lower limit energy storage amount (Wh) of the i-th upstream energy storage device E now- α _i : current energy storage amount (Wh) of the i-th upstream energy storage device P er- α _i : Estimated difference between actual and forecasted input / output to the i-th upstream energy storage device (W) E max- β _j : Upper limit energy storage amount (Wh) of the jth downstream energy storage device E min- β _j :Lower limit energy storage amount of the jth downstream energy storage device (Wh) E now- β _j : Current energy storage amount (Wh) of the jth downstream energy storage device P er- β _j : Estimated difference between actual and forecasted input / output to the jth downstream energy storage device (W) i and j are integers of 1 or more, and n i is the number of upstream energy storage devices, and n j is the number of downstream energy storage devices.)
5. 3. The energy management device according to claim 2, the managed object is a unit including a plurality of energy storage devices, the information acquisition unit acquires information regarding a difference between a current energy storage amount and an upper and lower limit values of the energy storage amount in a specific energy storage device among the plurality of energy storage devices, and information regarding a difference between a current energy storage amount and an upper and lower limit values of the energy storage amount in an energy storage device connected to the specific energy storage device, The command unit determines the control time of the specific energy storage device and the amount of energy to be exchanged in the specific energy storage device based on information regarding the difference acquired by the information acquisition unit.
2. An energy management device comprising:
6. 6. The energy management device according to claim 5, The command unit uses the formula (2) to calculate the control time t h Determine, 2. An energy management device comprising: [0025] (In formula (2), t h :Control time of a specific energy storage device (s) E max- γ: upper limit energy storage capacity (Wh) of a particular energy storage device E min- γ: Lower limit energy storage capacity (Wh) of a particular energy storage device E now- γ: current energy storage amount (Wh) of a particular energy storage device P er- γ: Estimated difference between the input and output of a specific energy storage device (W) E max- δ _i : The upper limit energy storage amount (Wh) of the i-th energy storage device connected to a specific energy storage device E min- δ _i :Lower limit energy storage amount (Wh) of the i-th energy storage device connected to a specific energy storage device E now- δ _i : the current energy storage amount (Wh) of the i-th energy storage device connected to a specific energy storage device P er- δ _i : Estimated difference between the input and output of the i-th energy storage device connected to a specific energy storage device (W) i is an integer of 1 or more, i is the number of energy storage devices connected to a particular energy storage device.)
7. The energy management device according to any one of claims 2 to 6, The command unit determines the amount of energy interchange E in the managed object by using equation (3).
2. An energy management device comprising: [0030] (In formula (3), t now : Current time (s) t h : Control time of the object to be managed (s) P op_ ε: operation plan output value (W) of the managed object It is.)
8. The energy management device according to any one of claims 1 to 7, When the control time is equal to or less than a predetermined value, the energy management device stops issuing commands for the control time and the energy interchange amount to the managed object.
2. An energy management device comprising:
9. 1. An energy management system, comprising: an appliance energy management device that issues commands to one or more appliances based on a control time of the appliance and an amount of energy to be exchanged during the control time; a unit energy management device that manages the energy of a unit consisting of the one or more devices and the device energy management device, and that issues a command to the device energy management device regarding a control time of the unit and an amount of energy to be exchanged during the control time; 1. An energy management system comprising:
10. An energy management method for managing energy to be managed by an energy management device, comprising: a step of issuing a command to the managed object based on a control time of the managed object and an amount of energy to be exchanged during the control time, The managed object is one or more units including a plurality of devices and another energy management device that manages the energy of the plurality of devices.
23. An energy management method comprising:
11. A computer program for causing a computer to execute energy management of a managed object, the managed object is one or more units each including a plurality of devices and another energy management device that manages the energy of the plurality of devices, causing the computer to execute a function of issuing a command to the managed object based on a control time of the managed object and an amount of energy to be exchanged during the control time; Computer program.
Citation Information
Patent Citations
Power management system
JP2012175825A
Energy control system, energy control method, and computer program
JP2015035941A
LED bulb
JP2016042478A
Micro grid operation scheduling system and method
JP2018036926A
Operation planning system, operation planning device and operation planning method
JP2019032659A
