Control System
The control system optimizes air conditioning by determining the operation modes and capacities of multiple air conditioners based on environmental and occupancy factors, addressing the challenge of adapting to specific area conditions.
Patent Information
- Application Number
- JP2022174608
- Authority / Receiving Office
- JP · JP
- Patent Type
- Patents
- Current Assignee / Owner
- Filing Date
- 2022-10-31
- Publication Date
- 2024-10-29
- Estimated Expiration
- 2042-03-30
AI Technical Summary
Existing air conditioning systems struggle to perform appropriate control based on the specific situation of a target area, such as adjusting ventilation and temperature according to the number of people and environmental conditions.
A control system that includes an air conditioner with a ventilation device and primary and secondary air conditioners, controlled by a system that determines the operation modes and capacities of each based on the required capacities and abilities of the air conditioners, considering factors like solar radiation, temperature, humidity, and the number of people, to optimize air conditioning operations.
The system enables appropriate air conditioning control by anticipating changes in occupancy and environmental conditions, optimizing energy use and maintaining comfortable conditions in the target area.
Smart Images

Figure 0007574839000008 
Figure 0007574839000009 
Figure 0007574839000010
Abstract
Description
[Technical field]
[0001] The present disclosure relates to control systems. [Background technology]
[0002] Patent Document 1 describes an air conditioning system. The system described in Patent Document 1 includes a device for determining the number of people on each floor. Outside air is taken in according to the number of people determined by the device. [Prior art documents] [Patent documents]
[0003] [Patent Document 1] Japanese Patent Publication No. 9-269262 Summary of the Invention [Problem to be solved by the invention]
[0004] The system described in Patent Document 1 is capable of controlling ventilation according to the number of people. In such a system, it is further desired to perform appropriate air conditioning control according to the situation of the target area.
[0005] The present disclosure has been made to solve the above-mentioned problems. An object of the present disclosure is to provide a control system that can realize appropriate air conditioning control according to the situation of a target area. [Means for solving the problem]
[0006] The control system according to the present disclosure includes an air conditioner for sending conditioned air to a specific area, and a control device for controlling the air conditioner. The air conditioner includes a ventilation device for taking in outside air into the area, a primary air conditioner for processing the outside air taken in by the ventilation device, and a secondary air conditioner for processing the outside air processed by the primary air conditioner and the air in the area. The control device selects an operating mode for the primary air conditioner and an operating mode for the secondary air conditioner based on a first capacity required for the primary air conditioner and a second capacity required for the secondary air conditioner. each the mode determination unit determines the amount of humidification or dehumidification required for the area based on the first capacity and the second capacity; an allocation determination unit determines the portion of the combined capacity of the first capacity and the second capacity to be handled by the primary air conditioner and the portion to be handled by the secondary air conditioner based on the determination result by the mode determination unit, the determination result by the humidification / dehumidification determination unit, a first COP characteristic curve of the primary air conditioner, and a second COP characteristic curve of the secondary air conditioner; and an operation control unit controls the air conditioning device in accordance with the determination result by the allocation determination unit. The mode determination unit determines whether the operation mode is a cooling mode or a heating mode. Effect of the Invention
[0007] A control system according to the present disclosure can achieve appropriate air conditioning control according to the conditions of a target area. [Brief description of the drawings]
[0008] [Figure 1] FIG. 2 is a diagram illustrating an example of a control system according to the first embodiment. [Diagram 2] FIG. 2 is a diagram for explaining functions of a control system required to perform a first control. [Diagram 3] 4 is a flowchart showing an example of the operation of the control system. [Figure 4] FIG. 13 is a diagram for explaining the functions of a control system required for creating a database of time lags. [Diagram 5] 4 is a flowchart showing an example of the operation of the control system. [Figure 6] 4 is a flowchart showing an example of the operation of the control system. [Figure 7] FIG. 11 is a diagram for explaining functions of a control system required to perform a third control. [Figure 8] 4 is a flowchart showing an example of the operation of the control system. [Figure 9] 11 is a flowchart illustrating an example of specifying a first load. [Figure 10] 10 is a flowchart illustrating an example of specifying a second load. [Figure 11] 13 is a flowchart illustrating an example of specifying a third load. [Figure 12] FIG. 2 is a diagram for explaining functions of a control system required for creating a database of the amount of solar radiation. [Figure 13] FIG. 13 illustrates an example of a load identifying unit. [Figure 14] 13 is a flowchart illustrating an example of the operation of an estimation unit. [Figure 15] FIG. 13 illustrates an example of a load identifying unit. [Figure 16] FIG. 13 illustrates an example of a load identifying unit. [Figure 17] FIG. 13 is a diagram for explaining functions of a control system required to perform a fourth control. [Figure 18] FIG. 13 is a diagram for explaining a ventilation control function according to the number of people D after X minutes. [Figure 19] FIG. 13 is a diagram for explaining functions of a control system required to perform the fifth control. [Figure 20] 4 is a flowchart showing an example of the operation of the control system. [Figure 21] 4 is a diagram showing an example of a first COP characteristic curve and a second COP characteristic curve extracted by an allocation determination unit. FIG. [Figure 22] FIG. 2 is a diagram illustrating an example of hardware resources of a control device. [Diagram 23] FIG. 11 is a diagram illustrating another example of hardware resources of a control device. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0009] Hereinafter, a detailed description will be given with reference to the drawings. Duplicate descriptions will be appropriately simplified or omitted. In each drawing, the same reference numerals indicate the same or corresponding parts.
[0010] Embodiment 1 Fig. 1 is a diagram showing an example of a control system in embodiment 1. The control system shown in Fig. 1 includes a management facility 1, an air conditioning facility 2, an elevator facility 3, an environment measuring facility 4, and a power measuring facility 5. The control system may further include other facilities such as lighting facilities.
[0011] The management facility 1 performs integrated management of the facilities included in the system. The management facility 1 includes a display device 11 and a control device 12. In the example shown in this embodiment, the object controlled by the control device 12 is an air conditioning facility 2. The elevator facility 3, the environmental measuring facility 4, and the power measuring facility 5 function as sensors for providing information to the control device 12. The control device 12 may further include a function for displaying necessary information on the display device 11.
[0012] The air conditioning facility 2 includes an air conditioner 21 and a ventilation device 22. The air conditioner 21 and the ventilation device 22 are controlled by the control device 12.
[0013] The air conditioner 21 is a device for sending conditioned air to a specific area. Conditioned air is air whose temperature or humidity has been regulated at least. The area is located on a specific floor of a building. In the following, the area is referred to as area A. The floor on which area A is located is referred to as floor B. The building containing area A is referred to as building C. The number of people in area A is referred to as number D. Area A may be a part of floor B or the entire area. In the following explanation, the entire floor B is considered to be area A.
[0014] The ventilation device 22 is a device for supplying air outside the building C to the area A and discharging the air in the area A to the outside of the area A, preferably to the outside of the building C. The ventilation device 22 takes in air outside the building C, i.e., outside air. As an example, the outside air taken in by the ventilation device 22 is supplied to the area A as is. The ventilation device 22 may be a function of the air conditioning device 21. In such a case, the outside air taken in by the ventilation device 22 may be supplied to the area A after the temperature or humidity is adjusted by the air conditioning device 21. The outside air taken in by the ventilation device 22 may be supplied to the area A as is.
[0015] The elevator equipment 3 is equipment for transporting people to each floor of a building C. Therefore, the elevator equipment 3 can also transport people to floor B. Fig. 1 shows an example in which the elevator equipment 3 includes multiple elevator devices. In such a case, the elevator equipment 3 includes a communication device 31 and a group control panel 32 in addition to the multiple elevator devices.
[0016] The communication device 31 is a device that allows the elevator equipment 3 to communicate with other equipment including the management equipment 1. The group management panel 32 manages a plurality of elevator equipment. Each elevator equipment includes a control panel 33, a hoisting machine 34, and a car 35. The car 35 moves up and down in the hoistway. The hoisting machine 34 drives the car 35. The control panel 33 controls the hoisting machine 34.
[0017] The environmental measurement equipment 4 includes an input / output device 41 and various measuring instruments. The input / output device 41 performs input / output processing of information. Fig. 1 shows an example in which the environmental measurement equipment 4 includes, as measuring instruments for measuring environmental information, a solar pyranometer 42, an outdoor thermometer / hygrometer 43, an indoor thermometer / hygrometer 44, and a CO2 concentration meter 45. The environmental measurement equipment 4 may include other measuring instruments.
[0018] The pyranometer 42 measures the amount of solar radiation in area A. The "amount of solar radiation in area A" also includes the amount of solar radiation that does not actually enter area A. For example, the pyranometer 42 is provided on the roof of building C. The pyranometer 42 may also be provided within the premises of building C. The thermometer / hygrometer 43 measures the temperature and humidity outside building C. The thermometer / hygrometer 43 may be provided with a thermometer and a hygrometer as separate measuring instruments. The thermometer / hygrometer 44 measures the temperature and humidity in area A. The thermometer / hygrometer 44 may be provided with a thermometer and a hygrometer as separate measuring instruments. The CO2 concentration meter 45 measures the concentration of carbon dioxide in area A.
[0019] In this embodiment, the outside of building C is also written as "outdoors". Area A is also written as "indoors" in contrast to outdoors. Outdoor air is also written as "outdoor air". Moreover, indoors (area A) and outdoors are also written as "inside and outside".
[0020] The power measurement equipment 5 includes a measurement device 51, a lighting panel 52, a power panel 53, and a solar power generator 54. The measurement device 51 measures the power consumption of devices installed in area A based on information from the lighting panel 52, the power panel 53, and the solar power generator 54.
[0021] Next, characteristic controls performed by this control system will be described. This control system performs the following first to fifth controls. First control: Air conditioning startup control according to the number of people D Second control: Air conditioning change control according to the number of people D -Third control: Air conditioning change control according to load - 4th control: Ventilation control according to the number of people D - 5th control: Efficiency optimization control
[0022] [First control] 2 is a diagram for explaining the functions of the control system required to perform the first control. The control device 12 includes a memory unit 120, a weather estimation unit 121, a time determination unit 122, a number of people estimation unit 123, a determination unit 124, and an operation control unit 125.
[0023] Fig. 3 is a flowchart showing an example of the operation of the control system. Fig. 3 shows an example in which the control system performs the first control. As an example, the first control is started in the morning when the air conditioner 21 is stopped. In other words, when the first control is started, conditioned air is not being supplied from the air conditioner 21 to the area A.
[0024] The weather estimation unit 121 estimates the weather. First, the weather estimation unit 121 acquires the actual measured value of the current amount of solar radiation measured by the pyranometer 42 (S101). The weather estimation unit 121 acquires the actual measured value of the current temperature and the actual measured value of the humidity measured by the thermometer / hygrometer 43 (S102). The weather estimation unit 121 acquires information on the current time from the clock 150 provided in the control device 12 (S103). The weather estimation unit 121 may acquire information on the current time from other equipment.
[0025] The weather estimation unit 121 estimates the current weather based on the current amount of solar radiation measured by the pyranometer 42, the current temperature and humidity measured by the thermo-hygrometer 43, and the current time (S104). For example, a table T1 for estimating the weather is stored in the storage unit 120. Table 1 shows an example of table T1.
[0026] [Table 1]
[0027] Table 1 shows an example in which the weather can be determined according to the time, the amount of solar radiation, the outdoor temperature, and the outdoor humidity. Consider a case in which the weather estimation unit 121 estimates the weather based on table T1. In this case, if the amount of solar radiation at 7:30 is 0.55 [MJ / m 2 ], the temperature is 29°C, and the humidity is 75%, the weather estimation unit 121 determines that the current weather is sunny. If the measured values of the amount of solar radiation, temperature, and humidity do not meet either the sunny or rainy conditions, the weather estimation unit 121 determines that the current weather is cloudy.
[0028] The method by which the weather estimation unit 121 estimates the weather is not limited to the above example. For example, the weather estimation unit 121 may estimate the current weather based only on the current amount of solar radiation. The weather estimation unit 121 may estimate the current weather based only on the current amount of solar radiation and the current outdoor temperature. The weather estimation unit 121 may estimate the current weather based on the current amount of solar radiation and other environmental information.
[0029] The time specifying unit 122 specifies the time lag at the current time point (S105). The time lag in the first control indicates the time from when the air conditioner 21 is started until the temperature in the area A stabilizes at the target temperature.
[0030] The time determining unit 122 first obtains information on the weather estimated by the weather estimating unit 121. The time determining unit 122 also obtains information on the current time from the clock 150. The weather estimating unit 121 may obtain information on the current time from another facility.
[0031] The time determination unit 122 determines the time lag in S105 based on the current weather estimated by the weather estimation unit 121 and the current time. For example, a table T2 for determining the time lag is stored in the storage unit 120. Table 2 shows an example of the table T2.
[0032] [Table 2]
[0033] Table 2 shows an example in which the time lag can be determined according to the weather and the time. Consider a case in which the time determination unit 122 determines the time lag based on table T2. In this case, if the current time is 7:15 and the weather is sunny, the time determination unit 122 determines that the time lag at the current time is 30 minutes. If the current time is 8:10 and the weather is rainy, the time determination unit 122 determines that the time lag at the current time is 40 minutes.
[0034] The method by which the time determination unit 122 determines the time lag is not limited to the above example. For example, the time determination unit 122 may determine the time lag based only on the current weather. The time determination unit 122 may determine the time lag based on the current weather, the current time, and the current season.
[0035] The number of people estimation unit 123 estimates the number of people D at the time when the time lag specified by the time specification unit 122 has elapsed. That is, if the time lag is specified as 30 minutes in S105, the number of people estimation unit 123 estimates the number of people D at the time when 30 minutes have elapsed from the current time. In the following, an example in which the number of people estimation unit 123 acquires information required for estimating the number of people D from the elevator equipment 3 will be described.
[0036] 2, the elevator equipment 3 further includes a headcount management device 36. The headcount management device 36 includes a memory unit 360, a detection unit 361, a calculation unit 362, and a learning unit 363. The car 35 is further provided with a weighing device 37. The weighing device 37 measures the load of the car 35.
[0037] The detection unit 361 detects the amount of change in the load measured by the weighing device 37. The calculation unit 362 calculates the number of people who have entered the car 35 and the number of people who have exited the car 35 for each floor based on the amount of change in the load detected by the detection unit 361. The calculation unit 362 also calculates the number of people on each floor. The actual value of the number of people currently on floor B, i.e., the actual value of the number of people D at the current time, is calculated by the calculation unit 362.
[0038] As described above, the calculation unit 362 calculates the number of people on each floor in real time. The learning unit 363 classifies the number of people on each floor under arbitrary conditions based on the calculation result by the calculation unit 362, and stores the classified numbers in a database. Any method of learning may be used by the learning unit 363. The database generated by the learning unit 363 is stored in the storage unit 360. The generated database is updated periodically. For this reason, even if restrictions on coming to work are imposed due to an epidemic or the like, the effects of the restrictions will be reflected in the database after a certain period of time has passed.
[0039] As one example, the database is constructed so that, by specifying a time, it is possible to identify an estimated value of the number of people D at that time. As another example, the database is constructed so that, by specifying a day of the week and a time, it is possible to identify an estimated value of the number of people D at that day of the week and at that time.
[0040] The number of people estimation unit 123 first acquires an actual measurement value N1 of the number of people D at the current time from the calculation unit 362 (S106). The number of people estimation unit 123 acquires an estimated value N2 of the number of people D at the current time from the storage unit 360 (S107). The number of people estimation unit 123 acquires an estimated value N3 of the number of people D at the time when the time lag specified by the time specification unit 122 has elapsed from the current time from the storage unit 360 (S108).
[0041] The number of people estimation unit 123 estimates the number of people D at a point when the time lag specified by the time specifying unit 122 has elapsed from the current time based on the actual measurement value N1, the estimated value N2, and the estimated value N3 (S109). As an example, the number of people estimation unit 123 calculates a correction coefficient using the actual measurement value N1 and the estimated value N2. The correction coefficient may be calculated based on the difference between the actual measurement value N1 and the estimated value N2. The number of people estimation unit 123 estimates the number of people D in S109 by correcting the estimated value N3 using the calculated correction coefficient.
[0042] The method by which the number of people estimation unit 123 estimates the number of people D is not limited to the above example. For example, the number of people estimation unit 123 may estimate the number of people D based only on the estimated value N3.
[0043] The number of people estimation unit 123 may obtain information required to estimate the number of people D from equipment other than the elevator equipment 3. For example, if the building C is equipped with a passage management equipment, the number of people estimation unit 123 may obtain the required information from the passage management equipment. The passage management equipment includes a card reader or other authentication device. As another example, if the building C is equipped with multiple cameras, the number of people estimation unit 123 may obtain the required information from images captured by the cameras.
[0044] The determination unit 124 determines whether or not to start the air conditioner 21 based on the number of people D estimated by the number of people estimation unit 123. For example, the determination unit 124 determines whether or not the number of people D estimated by the number of people estimation unit 123 is greater than a reference value Dth1 (S110). The reference value Dth1 is set in advance. It is preferable that the reference value Dth1 is set according to the environment of the building C, etc. As an example, a number of people equivalent to 50% of the number of people who have their own seats in the area A is set as the reference value Dth1.
[0045] The operation control unit 125 starts the air conditioner 21 in accordance with the determination result by the determination unit 124. For example, if the number of people D estimated by the number of people estimation unit 123 is greater than the reference value Dth1, the determination unit 124 determines Yes in S110. If the determination in S110 is Yes, the operation control unit 125 starts the air conditioner 21 (S111). In S111, the operation control unit 125 may start both the air conditioner 21 and the ventilation device 22. When the operation control unit 125 starts the air conditioner 21 in S111, it starts control to bring the temperature of area A closer to the target temperature and then stabilize it at the target temperature.
[0046] On the other hand, if the number of people D estimated by the number of people estimation unit 123 is not greater than the reference value Dth1, the judgment unit 124 judges No in S110. If it is judged No in S110, the operation control unit 125 does not start the air conditioner 21. The operation control unit 125 keeps the air conditioner 21 stopped. Note that if it is judged No in S110, the process returns to S101. The series of processes shown from S101 to S110 are repeated until it is judged Yes in S110.
[0047] In the first control, if the number of people D estimated by the number of people estimation unit 123 is greater than the reference value Dth1, the judgment unit 124 judges that the air conditioner 21 should be started. The number of people D estimated by the number of people estimation unit 123 is the number of people at the time when the time lag specified by the time specification unit 122 has elapsed. Therefore, with this control system, it is possible to start the air conditioner 21 in advance according to the time lag, before many people gather in area A. In other words, with this control system, it is possible to realize appropriate air conditioning control according to the situation in area A.
[0048] Next, an example of pre-processing for creating a database of time lags will be described with reference to FIGS.
[0049] Fig. 4 is a diagram for explaining the functions of the control system required for creating a database of time lags. In the example shown in Fig. 4, the control device 12 includes a storage unit 120, a weather estimation unit 121, a determination unit 126, a detection unit 127, and a creation unit 128. Fig. 5 is a flowchart showing an example of the operation of the control system.
[0050] The control device 12 determines whether the air conditioner 21 has started (S201). When the air conditioner 21 starts, a start-up signal is sent from the air conditioner 21 to the control device 12. When the control device 12 receives the start-up signal from the air conditioner 21, the result of S201 is Yes.
[0051] The detection unit 127 detects the time from when the air conditioner 21 is started until the temperature in the area A stabilizes at the target temperature, that is, the time lag in the first control. If the determination in S201 is Yes, the detection unit 127 starts counting the time (S202).
[0052] When counting is started in S202, the determination unit 126 acquires information on the target temperature from the air conditioner 21 (S203). For example, the target temperature is set by the user. The determination unit 126 also acquires the actual value of the current temperature measured by the thermo-hygrometer 44 (S204). Note that, if the air conditioner 21 has a function for detecting the intake temperature, the determination unit 126 may acquire the actual value of the indoor temperature from the air conditioner 21. Similarly, in other controls, the control device 12 may acquire the actual value of the indoor (area A) temperature from the air conditioner 21.
[0053] The determination unit 126 determines whether the temperature of area A is stable at the target temperature based on the target temperature set in the air conditioner 21 and the indoor temperature measured by the thermometer / hygrometer 44 (S205). As an example, the determination unit 126 determines Yes in S205 when the difference between the target temperature and the indoor temperature is within 0.2°C and this state continues for 10 minutes. As another example, the determination in S205 may be made further using the target humidity set in the air conditioner 21 and the indoor humidity measured by the thermometer / hygrometer 44.
[0054] The determination unit 126 repeats the processes shown in S204 and S205 until it is determined as Yes in S205.
[0055] If the determination in S205 is Yes, the detection unit 127 ends the time count (S206). The detection unit 127 detects the time from when the counting is started in S202 to when the counting is ended in S206 as a time lag.
[0056] The weather estimation unit 121 estimates the current weather based on the current amount of solar radiation (S207). For example, similar to the examples shown in Fig. 2 and Fig. 3, the weather estimation unit 121 estimates the current weather based on the current amount of solar radiation measured by the pyranometer 42, the current temperature and humidity measured by the thermo-hygrometer 43, and the current time. In this case, the weather estimation unit 121 performs processes similar to those shown in S101 to S104 in Fig. 3.
[0057] The creation unit 128 creates a database of time lags (S208). For example, the creation unit 128 acquires information on the time lag and information on the start-up time of the air conditioner 21 from the detection unit 127. The creation unit 128 acquires information on the current weather from the weather estimation unit 121. The creation unit 128 determines the correlation between the time lag, the start-up time, and the weather, and constructs a database as shown in table T2. The database created by the creation unit 128 is stored in the memory unit 120. Instead of a database, the creation unit 128 may create a mathematical formula having a similar function.
[0058] [Second control] Next, the second control will be described with reference to Fig. 2 and Fig. 6. Fig. 6 is a flowchart showing an example of the operation of the control system. Fig. 6 shows an example in which the control system performs the second control. As an example, the second control is started before a lunch break when the number of people D changes significantly. When the second control is started, the air conditioner 21 is already operating.
[0059] The processes shown in S301 to S309 in Fig. 6 are similar to the processes shown in S101 to S109 in Fig. 3. For example, in S304, the weather estimation unit 121 estimates the current weather based on the current amount of solar radiation measured by the pyranometer 42, the current temperature and humidity measured by the thermo-hygrometer 43, and the current time. The weather estimation unit 121 may estimate the weather based on table T1.
[0060] In S305, the time determination unit 122 determines the time lag at the current time based on the current weather estimated by the weather estimation unit 121 and the current time. In the second control, a time lag different from the time lag used in the first control is used. The time lag in the second control indicates the time from when the setting contents of the parameters for controlling the air conditioner 21 are changed to when the temperature in the area A stabilizes at the target temperature.
[0061] Table 3 shows examples of parameter settings and time lags.
[0062] [Table 3]
[0063] In S309, the number of people estimation unit 123 estimates the number of people D at the time when the time lag specified by the time specifying unit 122 has elapsed from the current time. As an example, the number of people D is estimated based on the actual measurement value N1, the estimated value N2, and the estimated value N3.
[0064] Next, the determination unit 124 determines whether or not the setting contents of the parameters for controlling the air conditioner 21 should be changed based on the number of people D estimated by the number of people estimation unit 123 (S310). The conditions for changing the setting contents of the parameters (control parameters) are set in advance. Hereinafter, the conditions are also referred to as change conditions. That is, in S310, the determination unit 124 determines whether or not the change conditions are met.
[0065] As an example, in S310, the determination unit 124 determines whether the number of people D estimated by the number-of-people estimation unit 123 is smaller than a reference value Dth2. The reference value Dth2 is set in advance. It is preferable that the reference value Dth2 is set according to the environment of the building C, etc. As an example, a number of people equivalent to 10% of the number of people who have their own seats in the area A is set as the reference value Dth2.
[0066] The operation control unit 125 changes the settings of the control parameters of the air conditioner 21 in accordance with the determination result by the determination unit 124. For example, if the number of people D estimated by the number of people estimation unit 123 is less than the reference value Dth2, the change condition is met. As a result, S310 is determined as Yes. If S310 is determined as Yes, the operation control unit 125 changes the settings of the control parameters of the air conditioner 21 (S311). As a result, control is started on the assumption that the number of people in area A will decrease from now on.
[0067] Table 4 shows an example of the setting contents of the control parameters when the number of people D is less than the reference value Dth2 and therefore the result of the determination in S310 is Yes. In S311, the setting contents of the control parameters are changed from a specific first content to a second content shown in Table 4.
[0068] [Table 4]
[0069] If the number of people D estimated by the number of people estimation unit 123 is not less than the reference value Dth2, the change condition is not met. As a result, S310 is determined as No. If S310 is determined as No, the operation control unit 125 does not change the settings of the control parameters of the air conditioner 21. If S310 is determined as No, the process returns to S301. The series of processes shown from S301 to S310 are repeated until S310 is determined as Yes.
[0070] As another example, after the setting contents of the control parameters are changed from the first contents to the second contents, the change conditions may be changed and the process shown in Fig. 6 may be performed again. In this case, the same processes as those shown in S101 to S109 in Fig. 3 are performed in S301 to S309.
[0071] For example, in S310, the determination unit 124 determines whether the number of people D estimated by the number of people estimation unit 123 is greater than a reference value Dth3. The reference value Dth3 is set in advance. It is preferable that the reference value Dth3 is greater than the reference value Dth2. The reference value Dth3 may be the same as the reference value Dth1. It is preferable that the reference value Dth3 is set according to the environment of the building C, etc. As an example, a number of people equivalent to 50% of the number of people who have their own seats in the area A is set as the reference value Dth3.
[0072] If the number of people D estimated by the number of people estimation unit 123 is greater than the reference value Dth3, the change condition is met. As a result, S310 is determined as Yes. If S310 is determined as Yes after the setting content of the control parameter is changed to the second content, the operation control unit 125 changes the setting content of the control parameter of the air conditioner 21 (S311). As a result, control is started on the assumption that the number of people in area A will increase from now on.
[0073] Table 5 shows an example of the setting contents of the control parameters when the number of people D is greater than the reference value Dth3 and therefore the result of the determination in S310 is Yes. In S311, the setting contents of the control parameters are changed from the second content shown in Table 4 to the first content shown in Table 5.
[0074] [Table 5]
[0075] If the number of people D estimated by the number of people estimation unit 123 is not greater than the reference value Dth3, the change condition is not met. As a result, S310 is determined as No. If S310 is determined as No, the operation control unit 125 does not change the setting contents of the control parameters of the air conditioner 21. The operation control unit 125 controls the air conditioner 21 while maintaining the setting contents of the control parameters at the second contents.
[0076] In the second control, if the number of people D estimated by the number of people estimation unit 123 is smaller than the reference value Dth2, control is started on the premise that the number of people in area A will decrease in the future. Thereafter, if the number of people D estimated by the number of people estimation unit 123 becomes larger than the reference value Dth3, control is started on the premise that the number of people in area A will increase in the future. For this reason, with this control system, it is possible to change the control content of the air conditioner 21 in advance before many people leave area A and before many people return to area A. In other words, with this control system, it is possible to realize appropriate air conditioning control according to the situation in area A.
[0077] [Third control] Fig. 7 is a diagram for explaining the functions of the control system necessary for performing the third control. In the example shown in Fig. 7, the control device 12 includes a storage unit 120, a load identifying unit 129, a load identifying unit 130, a load identifying unit 131, a determination unit 124, and an operation control unit 125.
[0078] The load identifying unit 129 identifies a first load. The first load is an indoor intrusion load based on the amount of solar radiation on area A and the temperature difference between the inside and outside of area A. The load identifying unit 129 includes a weather estimating unit 121, a solar radiation estimating unit 132, a load calculating unit 133, a load calculating unit 134, and a load calculating unit 135.
[0079] The load identifying unit 130 identifies a second load. The second load is an outside air load based on the enthalpy difference between the inside and outside of the area A and the air volume of the ventilation device 22. The load identifying unit 130 includes an estimation unit 136 and a load calculation unit 137.
[0080] The load identifying unit 131 identifies a third load. The third load is an internal heat generation load based on the amount of heat generated by a person in area A and the amount of heat generated by a device in area A. The load identifying unit 131 includes a heat amount estimating unit 138, a heat amount estimating unit 139, and a load calculating unit 140.
[0081] Fig. 8 is a flowchart showing an example of the operation of the control system. Fig. 8 shows an example in which the control system performs the third control. As an example, the third control is started when a specific start condition is satisfied. The start condition is set in advance. The start condition will be described later.
[0082] First, the load identifying unit 129 identifies a first load (S401). Fig. 9 is a flowchart for explaining an example of identifying the first load. Fig. 9 shows an example of the operation performed by the load identifying unit 129 in S401.
[0083] The weather estimation unit 121 estimates the current weather. The processes shown in S501 to S504 of Fig. 9 are similar to the processes shown in S101 to S104 of Fig. 3. For example, in S504, the weather estimation unit 121 estimates the current weather based on the current amount of solar radiation measured by the pyranometer 42, the current temperature and humidity measured by the thermo-hygrometer 43, and the current time. The weather estimation unit 121 may estimate the weather based on table T1.
[0084] The solar radiation estimation unit 132 estimates the amount of solar radiation for each direction (S505). The solar radiation estimation unit 132 estimates the amount of solar radiation for each direction based on the current weather estimated by the weather estimation unit 121 and the current time. For example, a table T3 for estimating the amount of solar radiation for each direction is stored in the storage unit 120. Table 6 shows a part of table T3. Table 6 is a table for estimating the amount of solar radiation on an east-facing wall.
[0085] [Table 6]
[0086] Table 7 shows a part of table T3. Table 7 is a table for estimating the amount of solar radiation for a west-facing wall. Table T3 also includes a table for a north-facing wall and a table for a south-facing wall.
[0087] [Table 7]
[0088] Table 6 shows an example in which the amount of solar radiation on a wall facing east can be specified depending on the weather and the time of day. Consider a case in which the solar radiation estimation unit 132 estimates the amount of solar radiation for each direction based on table T3. In this case, the amount of solar radiation for the direction "east" is 0.3 [MJ / m] at 12:30 on a sunny day. 2 It is estimated that the amount of solar radiation for each direction is 1. The method by which the solar radiation estimation unit 132 estimates the amount of solar radiation for each direction is not limited to the above example. For example, a correction coefficient according to the season may be used when estimating the amount of solar radiation for each direction.
[0089] The load calculation unit 133 calculates the indoor intrusion load due to solar radiation (S506). For example, the load calculation unit 133 calculates the indoor intrusion load due to solar radiation for each direction based on the amount of solar radiation for each direction estimated by the solar radiation estimation unit 132, the solar radiation gain factor of the wall, and the solar radiation gain factor of the window. The load calculation unit 133 sums up the calculated loads for each direction and calculates the load for the entire area A in S506.
[0090] The load calculation unit 134 calculates the indoor intrusion load due to the temperature difference between inside and outside (S507). For example, the load calculation unit 134 calculates the temperature difference between inside and outside based on the current temperature measured by the thermometer / hygrometer 43 and the current temperature measured by the thermometer / hygrometer 44. The load calculation unit 134 calculates the indoor intrusion load due to the temperature difference based on the calculated temperature difference, the heat return rate of the wall, and the heat return rate of the window.
[0091] The load calculation unit 135 calculates the first load (S508). The load calculation unit 135 calculates the first load based on the load calculated by the load calculation unit 133 and the load calculated by the load calculation unit 134. For example, the first load is the sum of the indoor intrusion load due to solar radiation and the indoor intrusion load due to the temperature difference between inside and outside the room.
[0092] The load identifying unit 130 identifies the second load (S402). Fig. 10 is a flowchart for explaining an example of identifying the second load. Fig. 10 shows an example of the operation performed by the load identifying unit 130 in S402.
[0093] The estimation unit 136 estimates the inside / outside enthalpy difference. The estimation unit 136 first acquires the current actual temperature and humidity measured by the thermo-hygrometer 43 (S601). The estimation unit 136 acquires the current actual temperature and humidity measured by the thermo-hygrometer 44 (S602). The estimation unit 136 estimates the inside / outside enthalpy difference based on the current temperature and humidity measured by the thermo-hygrometer 43 and the current temperature and humidity measured by the thermo-hygrometer 44 (S603).
[0094] The load calculation unit 137 calculates the second load. The load calculation unit 137 acquires information on the current air volume from the ventilation device 22 (S604). The load calculation unit 137 calculates the second load based on the enthalpy difference estimated by the estimation unit 136 and the air volume of the ventilation device 22 (S605).
[0095] The load identifying unit 131 identifies a third load (S403). Fig. 11 is a flowchart for explaining an example of identifying the third load. Fig. 11 shows an example of the operation performed by the load identifying unit 131 in S403.
[0096] The heat quantity estimation unit 138 estimates the heat quantity Q1 emitted by people in the area A. First, the heat quantity estimation unit 138 acquires information on the number of people in the area A, that is, the number of people D (S701). For example, the heat quantity estimation unit 138 acquires the information from the elevator equipment 3. In S701, the heat quantity estimation unit 138 may acquire an actual measurement value N1 of the number of people D at the current time from the calculation unit 362. In S701, the heat quantity estimation unit 138 may acquire an estimated value N2 of the number of people D at the current time from the storage unit 360.
[0097] Next, the heat amount estimation unit 138 estimates the heat amount Q1 by multiplying the number of people D by the heat amount per person (S702). The heat amount per person is set in advance.
[0098] The heat quantity estimation unit 139 estimates the heat quantity Q2 emitted by the device in the area A. For example, the heat quantity estimation unit 139 acquires information on the power consumption in the area A from the measuring device 51 (S703). The heat quantity estimation unit 139 estimates the heat quantity Q2 based on the power consumption measured by the measuring device 51 (S704).
[0099] The load calculation unit 140 calculates the third load (S705). The load calculation unit 140 calculates the third load based on the heat amount Q1 estimated by the heat amount estimation unit 138 and the heat amount Q2 estimated by the heat amount estimation unit 139.
[0100] Next, the determination unit 124 performs a process for determining the setting contents of the control parameters of the air conditioner 21 (S404). Hereinafter, this process by the determination unit 124 is also referred to as a determination process. This determination process is performed based on the first load identified by the load identifying unit 129, the second load identified by the load identifying unit 130, and the third load identified by the load identifying unit 131. The operation control unit 125 changes the setting contents of the control parameters of the air conditioner 21 according to the determination result by the determination unit 124 (S405).
[0101] As described above, the third control shown in Fig. 8 is started when the start condition is satisfied. That is, when the start condition is satisfied, the judgment unit 124 performs a judgment process. For example, the judgment unit 124 calculates an amount of change ΔH1 in indoor enthalpy within a specific first time period. The judgment unit 124 judges whether the calculated amount of change ΔH1 is equal to or greater than a reference value ΔHth1. The reference value ΔHth1 is set in advance. It is preferable that the reference value ΔHth1 is set according to the environment of the building C, etc. As an example, the reference value ΔHth1 is 1.5%.
[0102] Furthermore, the determination unit 124 calculates the amount of change ΔH2 in the outdoor enthalpy within the first time period. The determination unit 124 determines whether the calculated amount of change ΔH2 is equal to or greater than a reference value ΔHth2. The reference value ΔHth2 is set in advance. It is preferable that the reference value ΔHth2 is set according to the environment of the building C, etc. As an example, the reference value ΔHth2 is 5%.
[0103] For example, the determination unit 124 determines that the start condition is satisfied if the calculated amount of change ΔH1 is equal to or greater than the reference value ΔHth1. The determination unit 124 determines that the start condition is satisfied if the calculated amount of change ΔH2 is equal to or greater than the reference value ΔHth2. That is, if the amount of change ΔH1 is equal to or greater than the reference value ΔHth1, the determination unit 124 starts the determination process even if the amount of change ΔH2 is not equal to or greater than the reference value ΔHth2. If the amount of change ΔH2 is equal to or greater than the reference value ΔHth2, the determination unit 124 starts the determination process even if the amount of change ΔH1 is not equal to or greater than the reference value ΔHth1.
[0104] In this determination process, the determination unit 124 calculates the required amount of cold energy from the differences between the first load, the second load, and the third load and the amount of cold energy currently being supplied. The determination unit 124 sets the target temperature, air volume, and air direction of the air conditioner 21 based on the calculated amount of cold energy. The operation control unit 125 changes the setting content of the control parameters from the first content shown in Table 5 to the second content shown in Table 4, for example, according to the determination result by the determination unit 124.
[0105] After the start condition is satisfied, the determination unit 124 determines whether or not a specific end condition is satisfied (S406). The end condition is a condition for terminating the determination process by the determination unit 124. The end process is set in advance. If the end condition is not satisfied, the processes shown in S401 to S405 are repeated.
[0106] For example, if the amount of change ΔH1 is smaller than the reference value ΔHth1 and the amount of change ΔH2 is smaller than the reference value ΔHth2, the determination unit 124 determines that the termination condition is met. As a result, S406 is determined as Yes. Note that even if the amount of change ΔH1 is smaller than the reference value ΔHth1, the termination condition is not met if the amount of change ΔH2 is equal to or larger than the reference value ΔHth2. Even if the amount of change ΔH2 is smaller than the reference value ΔHth2, the termination condition is not met if the amount of change ΔH1 is equal to or larger than the reference value ΔHth1.
[0107] If the determination in S406 is Yes, the determination process by the determination unit 124 ends. If the determination in S406 is Yes, the operation control unit 125 resets the setting contents of the control parameters to the original contents (S407). As a result, the setting contents are changed from the second contents shown in Table 4 to the first contents shown in Table 5.
[0108] In the third control, when the start condition is satisfied, the determination process by the determination unit 124 is started. The determination process is performed based on the first load, the second load, and the third load. Therefore, with this control system, the setting contents of the control parameters can be appropriately determined according to the first load, the second load, and the third load. In other words, with this control system, appropriate air conditioning control according to the situation in area A can be realized.
[0109] Next, an example of pre-processing for creating a database of the amount of solar radiation for each direction will be described with reference to FIG.
[0110] 12 is a diagram for explaining the functions of the control system required for creating a database of the amount of solar radiation. In the example shown in FIG.
[0111] The weather estimation unit 121 estimates the current weather based on the current amount of solar radiation. For example, similar to the examples shown in Fig. 2 and Fig. 3, the weather estimation unit 121 estimates the current weather based on the current amount of solar radiation measured by the pyranometer 42, the current temperature and humidity measured by the thermo-hygrometer 43, and the current time. In this case, the weather estimation unit 121 performs processes similar to those shown in S101 to S104 in Fig. 3.
[0112] The creation unit 128 creates a database of the amount of solar radiation for each direction. For example, the creation unit 128 acquires information on the current weather and information on the current time from the weather estimation unit 121. The creation unit 128 acquires an actual measurement value of the current amount of solar radiation measured by the pyranometer 42. Note that the amount of solar radiation measured by the pyranometer 42 is an actual measurement value on a horizontal plane. The creation unit 128 breaks down the amount of solar radiation measured by the pyranometer 42 for each direction, and obtains the amount of solar radiation for each direction. The creation unit 128 obtains the correlation between the time, the weather, and the amount of solar radiation, and builds a database as shown in table T3. The database created by the creation unit 128 is stored in the storage unit 120. Instead of a database, the creation unit 128 may create a formula having a similar function.
[0113] FIG. 7 shows a function for performing air conditioning change control according to the current load. An example of performing air conditioning change control according to the load after a certain time has elapsed from the current time will be described below. In the following, an example will be described in which the certain time is X minutes. The value of X is set arbitrarily. The time lag in the second control may be adopted as the value of X.
[0114] 7, in this example, the control device 12 includes a storage unit 120, a load identifying unit 129, a load identifying unit 130, a load identifying unit 131, a determination unit 124, and an operation control unit 125. However, in this example, the functions of the load identifying units 129 to 131 are different from those described above.
[0115] Fig. 13 is a diagram showing an example of the load identifying unit 129. The load identifying unit 129 identifies a first load at a time when X minutes have elapsed from the current time. In the example shown in Fig. 13, the load identifying unit 129 further includes an estimation unit 141 in addition to the weather estimation unit 121, the solar radiation estimation unit 132, the load calculation unit 133, the load calculation unit 134, and the load calculation unit 135.
[0116] In order for the load identifying unit 129 to identify the first load X minutes later, it is necessary to input the amount of solar radiation X minutes later, the outdoor temperature X minutes later, and the outdoor humidity X minutes later to the weather estimating unit 121. It is necessary to input the outdoor temperature X minutes later and the indoor temperature X minutes later to the load calculating unit 134. The weather estimating unit 121 and the solar radiation estimating unit 132 can identify the time X minutes later based on the current time from the clock 150.
[0117] 14 is a flowchart showing an example of the operation of the estimation unit 141. The estimation unit 141 estimates the amount of solar radiation after X minutes, the outdoor temperature after X minutes, and the outdoor humidity after X minutes. For example, the estimation unit 141 acquires an actual measurement value of the current amount of solar radiation measured by the pyranometer 42. The estimation unit 141 acquires an actual measurement value of the current outdoor temperature and the outdoor humidity measured by the thermo-hygrometer 43 (S801).
[0118] Next, the estimation unit 141 obtains an estimate of the current amount of solar radiation from the weather forecast device 6. Similarly, the estimation unit 141 obtains an estimate of the current outdoor temperature and an estimate of the outdoor humidity from the weather forecast device 6 (S802). Furthermore, the estimation unit 141 obtains an estimate of the amount of solar radiation X minutes from now from the weather forecast device 6. Similarly, the estimation unit 141 obtains an estimate of the outdoor temperature and an estimate of the outdoor humidity X minutes from now from the weather forecast device 6 (S803).
[0119] The estimation unit 141 estimates the amount of solar radiation after X minutes, the outdoor temperature after X minutes, and the outdoor humidity after X minutes based on the information acquired in S801 to S803 (S804). For example, the estimation unit 141 calculates a correction coefficient based on the actual measurement value and the estimated value of the current amount of solar radiation. The estimation unit 141 estimates the amount of solar radiation after X minutes in S804 by correcting the estimated value of the amount of solar radiation after X minutes using the calculated correction coefficient.
[0120] Similarly, the estimation unit 141 calculates a correction coefficient based on the actual measurement value and the estimated value of the current outdoor temperature. The estimation unit 141 estimates the outdoor temperature X minutes from now in S804 by correcting the estimated value of the outdoor temperature X minutes from now using the calculated correction coefficient. The estimation unit 141 calculates the correction coefficient based on the actual measurement value and the estimated value of the current outdoor humidity. The estimation unit 141 estimates the outdoor humidity X minutes from now in S804 by correcting the estimated value of the outdoor humidity X minutes from now using the calculated correction coefficient.
[0121] In the example shown in FIG. 13, the weather estimation unit 121 estimates the weather after X minutes based on the amount of solar radiation, the outdoor temperature, and the outdoor humidity after X minutes estimated by the estimation unit 141 in S804.
[0122] The load calculation unit 134 calculates the indoor intrusion load due to the inside / outside temperature difference based on the outdoor temperature X minutes from now estimated in S804 by the estimation unit 141. The estimation unit 141 may estimate the indoor temperature X minutes from now by a method similar to the method for estimating the outdoor temperature X minutes from now. If control is being performed to keep the temperature of area A constant, the actual measurement value of the current indoor temperature may be used as the indoor temperature X minutes from now.
[0123] Fig. 15 is a diagram showing an example of the load identifying unit 130. The load identifying unit 130 identifies a second load at a time when X minutes have elapsed from the current time. In the example shown in Fig. 15, the load identifying unit 130 further includes a number of people estimating unit 123 and an air volume estimating unit 142 in addition to an estimating unit 136 and a load calculating unit 137.
[0124] In order for the load identifying unit 130 to identify the second load after X minutes, it is necessary to input the outdoor temperature after X minutes, the outdoor humidity after X minutes, the indoor temperature after X minutes, and the indoor humidity after X minutes to the estimation unit 136. It is necessary to input the air volume after X minutes to the load calculation unit 137.
[0125] As described above, the outdoor temperature after X minutes and the outdoor humidity after X minutes are estimated by the estimation unit 141. The estimation unit 141 may estimate the indoor temperature after X minutes using a method similar to the method for estimating the outdoor temperature after X minutes. The estimation unit 141 may estimate the indoor humidity after X minutes using a method similar to the method for estimating the outdoor humidity after X minutes. If control is being performed to keep the temperature of the area A constant, the actual measurement value of the current indoor temperature may be used as the indoor humidity after X minutes. If control is being performed to keep the humidity of the area A constant, the actual measurement value of the current indoor humidity may be used as the indoor humidity after X minutes. The estimation unit 136 estimates the enthalpy difference between inside and outside after X minutes based on the outdoor temperature and humidity after X minutes and the indoor temperature and humidity after X minutes.
[0126] The air volume estimation unit 142 estimates the air volume of the ventilation device 22 after X minutes. If the air volume of the ventilation device 22 is controlled according to the number of people D, the air volume estimation unit 142 estimates the air volume of the ventilation device 22 based on the number of people D after X minutes.
[0127] For example, the number of people estimation unit 123 performs the same process as shown in S106 to S109 to estimate the number of people D X minutes later. That is, the number of people estimation unit 123 acquires the actual value N1 of the number of people D at the current time from the calculation unit 362. The number of people estimation unit 123 acquires the estimated value N2 of the number of people D at the current time from the storage unit 360. The number of people estimation unit 123 acquires the estimated value N3 of the number of people D at the point when X minutes have passed from the current time from the storage unit 360.
[0128] The number of people estimation unit 123 estimates the number of people D at the point in time X minutes have elapsed from the current time based on the actual measurement value N1, the estimated value N2, and the estimated value N3. As an example, the number of people estimation unit 123 calculates a correction coefficient using the actual measurement value N1 and the estimated value N2. The number of people estimation unit 123 estimates the number of people D X minutes later by correcting the estimated value N3 using the calculated correction coefficient. The airflow estimation unit 142 estimates the airflow of the ventilator 22 X minutes later based on the number of people D estimated by the number of people estimation unit 123 X minutes later.
[0129] The load calculation unit 137 calculates a second load based on the inside / outside enthalpy difference after X minutes estimated by the estimation unit 136 and the air volume of the ventilation device 22 after X minutes estimated by the air volume estimation unit 142.
[0130] Fig. 16 is a diagram illustrating an example of the load identifying unit 131. The load identifying unit 131 identifies a third load at a time when X minutes have elapsed from the current time. In the example illustrated in Fig. 16, the load identifying unit 131 further includes a number of people estimating unit 123 and a power estimating unit 143 in addition to a heat amount estimating unit 138, a heat amount estimating unit 139, and a load calculating unit 140.
[0131] In order for the load identifying unit 131 to identify the third load after X minutes, the number of people D after X minutes needs to be input to the heat quantity estimating unit 138. The power consumption after X minutes needs to be input to the heat quantity estimating unit 139.
[0132] The number of people estimation unit 123 performs the same process as shown in S106 to S109 to estimate the number of people D X minutes later. For example, like the above example, the number of people estimation unit 123 estimates the number of people D at the time when X minutes have passed from the current time based on the actual measurement value N1, the estimated value N2, and the estimated value N3. The estimated value N3 is an estimate of the number of people D at the time when X minutes have passed from the current time. The heat amount estimation unit 138 estimates the heat amount Q1 based on the number of people D estimated by the number of people estimation unit 123 X minutes later.
[0133] The power estimation unit 143 estimates the power consumption when X minutes have elapsed from the current time. For example, the power estimation unit 143 acquires information on the current power consumption in the area A from the measurement device 51. The power estimation unit 143 also acquires an actual measurement value N1 of the number of people D at the current time from the calculation unit 362. The power estimation unit 143 acquires an estimated value N4 of the number of people D at the time when X minutes have elapsed from the current time from the number of people estimation unit 123.
[0134] The power estimation unit 143 estimates the power consumption after X minutes based on the current power consumption, the actual measurement value N1, and the estimated value N4. As an example, the power estimation unit 143 calculates a correction coefficient using the actual measurement value N1 and the estimated value N4. The power estimation unit 143 estimates the power consumption after X minutes by correcting the current power consumption using the calculated correction coefficient. The heat quantity estimation unit 139 estimates the heat quantity Q2 based on the power consumption after X minutes estimated by the power estimation unit 143.
[0135] [Fourth control] 17 is a diagram for explaining the functions of the control system required to perform the fourth control. The control device 12 includes a ventilation amount specifying unit 144 and an operation control unit 125.
[0136] The ventilation amount specifying unit 144 specifies the ventilation amount required for the area A. First, the ventilation amount specifying unit 144 acquires information on the number of people currently in the area A, that is, the current number of people D. For example, the ventilation amount specifying unit 144 acquires information on the number of people D from the elevator equipment 3. The ventilation amount specifying unit 144 may acquire an actual measurement value N1 of the number of people D at the current time from the calculation unit 362. The ventilation amount specifying unit 144 may acquire an estimated value N2 of the number of people D at the current time from the storage unit 360.
[0137] Next, the ventilation amount specifying unit 144 calculates the ventilation amount required for the area A based on the current number of people D. For example, the ventilation amount specifying unit 144 performs this calculation by multiplying the number of people D by the ventilation amount required per person. The ventilation amount required per person is set in advance.
[0138] The operation control unit 125 controls the ventilation device 22. The ventilation device 22 is controlled in accordance with the ventilation volume specified by the ventilation volume specifying unit 144.
[0139] Fig. 17 shows a function for performing ventilation control according to the current number of people D. Fig. 18 is a diagram for explaining the ventilation control function according to the number of people D after X minutes. In the example shown in Fig. 18, the control device 12 further includes a number of people estimation unit 123 in addition to the ventilation amount specification unit 144 and the operation control unit 125.
[0140] The number of people estimation unit 123 performs the same process as that shown in S106 to S109 as in the above example, and estimates the number of people D when X minutes have passed from the current time. The ventilation volume specification unit 144 specifies the ventilation volume required for area A based on the number of people D estimated by the number of people estimation unit 123 after X minutes.
[0141] [5th control] Fig. 19 is a diagram for explaining the functions of the control system required to perform the fifth control. In the example shown in Fig. 19, the air conditioner 21 includes a ventilation device 22, a primary air conditioner 211, and a secondary air conditioner 212. The control device 12 includes a storage unit 120, load specifying units 129-131, a ventilation amount specifying unit 144, a capacity determining unit 145, a capacity determining unit 146, a mode determining unit 147, a humidification / dehumidification determining unit 148, an allocation determining unit 149, and an operation control unit 125.
[0142] As described above, the ventilation device 22 is a device for taking in outside air into the area A. The primary air conditioner 211 processes the outside air taken in by the ventilation device 22. The ventilation device 22 may be provided in the primary air conditioner 211 as one function of the primary air conditioner 211. The primary air conditioner 211 may process the outside air taken in by the ventilation device 22 as it is. The outside air from the ventilation device 22 may be taken into a space other than the area A, and the air in that space may be processed by the primary air conditioner 211. The primary air conditioner 211 may process only a portion of the outside air taken in by the ventilation device 22. In the primary air conditioner 211, water may be used as a medium for carrying heat, or a refrigerant such as an alternative fluorocarbon may be used.
[0143] The secondary air conditioner 212 processes the outside air processed by the primary air conditioner 211. The secondary air conditioner 212 also processes the air in area A. The secondary air conditioner 212 sends the conditioned air to area A. In the secondary air conditioner 212, water may be used as a medium for carrying heat, or a refrigerant such as an alternative fluorocarbon may be used.
[0144] In general, the characteristic curve of the coefficient of performance (COP) of an air conditioner depends on various factors, including the manufacturer, the model, the type of heat-transporting medium, and the flow rate of the medium. Furthermore, when water is used as the heat-transporting medium, the factors include the temperature difference between cold water and hot water, the outlet temperature difference, and the like.
[0145] A characteristic curve of the coefficient of performance for the primary air conditioner 211 is stored in the memory unit 120 of the control device 12. Hereinafter, this characteristic curve will also be referred to as a first COP characteristic curve. The first COP characteristic curve changes depending on the settings of the control parameters of the primary air conditioner 211. For this reason, it is preferable that the memory unit 120 stores a large number of first COP characteristic curves corresponding to various settings.
[0146] A characteristic curve of the coefficient of performance for the secondary air conditioner 212 is stored in the memory unit 120. Hereinafter, this characteristic curve will also be referred to as a second COP characteristic curve. The second COP characteristic curve changes depending on the settings of the control parameters of the secondary air conditioner 212. For this reason, it is preferable that the memory unit 120 stores a large number of second COP characteristic curves corresponding to various settings.
[0147] Fig. 20 is a flowchart showing an example of the operation of the control system, Fig. 20 shows an example in which the control system performs the fifth control.
[0148] Each of the load identifying units 129 to 131 has the functions described in the third control. That is, the load identifying unit 129 identifies a first load based on the amount of solar radiation on the area A and the temperature difference between the inside and outside of the area A (S901). The load identifying unit 130 identifies a second load based on the enthalpy difference between the inside and outside of the area A and the air volume of the ventilation device 22 (S902). The load identifying unit 131 identifies a third load based on the amount of heat generated by a person in the area A and the amount of heat generated by a device in the area A (S903).
[0149] The ventilation amount specifying unit 144 has the function described in the fourth control. That is, the ventilation amount specifying unit 144 specifies the ventilation amount required for the area A, that is, the ventilation amount according to the number of people in the area A (S904).
[0150] The capacity determination unit 145 determines the capacity required for the primary air conditioner 211 (S905). The capacity determination unit 145 performs the capacity determination in S905 based on the first load identified by the load identification unit 129, the second load identified by the load identification unit 130, and the ventilation volume identified by the ventilation volume identification unit 144.
[0151] The capacity determining unit 146 determines the capacity required for the secondary air conditioner 212 (S906). The capacity determining unit 146 performs the capacity determination in S906 based on the third load identified by the load identifying unit 131.
[0152] The mode determination unit 147 determines the operation mode (S907). For example, the mode determination unit 147 determines the cooling mode or the heating mode as the operation mode. The mode determination unit 147 determines the operation mode of the primary air conditioner 211 based on the capacity determined by the capacity determination unit 145 and the capacity determined by the capacity determination unit 146. The mode determination unit 147 determines the operation mode of the secondary air conditioner 212 based on the capacity determined by the capacity determination unit 145 and the capacity determined by the capacity determination unit 146.
[0153] The humidification / dehumidification determination unit 148 determines the amount of humidification or dehumidification required for area A (S908). For example, if humidification by the air conditioner 21 is required, the humidification / dehumidification determination unit 148 determines the amount of humidification required. If dehumidification by the air conditioner 21 is required, the humidification / dehumidification determination unit 148 determines the amount of dehumidification required. The determination in S908 is made based on the capacity determined by the capacity determination unit 145 and the capacity determined by the capacity determination unit 146.
[0154] The allocation determination unit 149 determines the allocation of the capacity handled by the primary air conditioner 211 and the capacity handled by the secondary air conditioner 212 (S909). The determination in S909 is made based on the determination result by the mode determination unit 147, the determination result by the humidification / dehumidification determination unit 148, the first COP characteristic curve, and the second COP characteristic curve.
[0155] In S909, the allocation determination unit 149 first adds up the capacity determined by the capacity determination unit 145 and the capacity determined by the capacity determination unit 146. The allocation determination unit 149 also determines whether the amount of humidification or dehumidification determined by the humidification / dehumidification determination unit 148 can be achieved by the performance of the secondary air conditioner 212 alone, based on the outdoor environmental condition measured by the thermometer / hygrometer 43 or the like.
[0156] For example, consider a case where the humidification performance of the secondary air conditioner 212 is low. In such a case, if the amount of humidification determined by the humidification / dehumidification determination unit 148 cannot be realized by the secondary air conditioner 212 alone, the allocation determination unit 149 determines that humidification is to be performed by both the primary air conditioner 211 and the secondary air conditioner 212. In addition, in dehumidification, it is necessary to process the latent heat portion of the total capacity (sensible heat and latent heat). For this reason, when performing dehumidification, the allocation determination unit 149 needs to consider the latent heat processing capacity of the primary air conditioner 211 and the latent heat processing capacity of the secondary air conditioner 212. Note that if the sensible heat ratio (SHF: Sensible Heat Factor) changes, the COP characteristic curve changes. For this reason, it is preferable that the storage unit 120 stores a plurality of first COP characteristic curves having different values of the sensible heat ratio. It is preferable that the storage unit 120 stores a plurality of second COP characteristic curves having different values of the sensible heat ratio.
[0157] Next, the allocation determination unit 149 extracts a first COP characteristic curve corresponding to various conditions for the primary air conditioner 211 from the storage unit 120. Similarly, the allocation determination unit 149 extracts a second COP characteristic curve corresponding to various conditions for the secondary air conditioner 212 from the storage unit 120. Then, based on the extracted first COP characteristic curve and second COP characteristic curve, the allocation determination unit 149 determines the portion of the combined capacity to be shared by the primary air conditioner 211 and the portion to be shared by the secondary air conditioner 212, so that the COP of the entire air conditioner 21 is maximized or maximized as much as possible.
[0158] Fig. 21 is a diagram showing examples of the first COP characteristic curve and the second COP characteristic curve extracted by the allocation determination unit 149. In the example shown in Fig. 21, the COP of the entire air conditioner 21 is maximum at P1. The allocation determination unit 149 determines the ratio between the capacity shared by the primary air conditioner 211 and the capacity shared by the secondary air conditioner 212 so that the primary air conditioner 211 and the secondary air conditioner 212 operate at capacities as close to P1 as possible.
[0159] As described above, the COP characteristic curve depends on various factors. For example, consider a case where the secondary air conditioner 212 is equipped with a refrigerant. In such a case, the second COP characteristic curve changes when the temperature of the refrigerant changes. The change in the temperature of the refrigerant contributes greatly to the change in the second COP characteristic curve. For this reason, it is preferable that the storage unit 120 stores a plurality of second COP characteristic curves having different refrigerant temperature values. For example, in an air conditioner, the condensation performance can be improved by lowering the temperature of the refrigerant. Even if the temperature of the refrigerant is lowered to perform dehumidification in the secondary air conditioner 212, the allocation determination unit 149 can extract the optimal second COP characteristic curve.
[0160] Similarly, when the primary air conditioner 211 includes a refrigerant as a medium for carrying heat, it is preferable that a plurality of first COP characteristic curves having different refrigerant temperature values are stored in the memory unit 120. When both the primary air conditioner 211 and the secondary air conditioner 212 include a refrigerant as a medium for carrying heat, it is preferable that a plurality of first COP characteristic curves and a plurality of second COP characteristic curves having different refrigerant temperature values are stored in the memory unit 120.
[0161] The operation control unit 125 controls the air conditioner 21 according to the determination result by the allocation determination unit 149 (S910). For example, the operation control unit 125 outputs target values of temperature, humidity, and air volume to each of the primary air conditioner 211 and the secondary air conditioner 212. If the primary air conditioner 211 is equipped with a refrigerant, the operation control unit 125 outputs a target value of the refrigerant temperature to the primary air conditioner 211. If the secondary air conditioner 212 is equipped with a refrigerant, the operation control unit 125 outputs a target value of the refrigerant temperature to the secondary air conditioner 212.
[0162] It is preferable that the target values of temperature and humidity for the secondary air conditioner 212 are determined by the user or by the third control. The target values of temperature and humidity for the primary air conditioner 211 can be changed as desired. It is preferable that the target value of the air volume for the ventilation device 22 is determined by a value corresponding to the number of people D estimated in the first control or a value determined in the fourth control. The target value of the refrigerant temperature is determined mainly according to the latent heat processing capacity described above.
[0163] Note that, when indoor humidity is higher than the target value, control may be performed to prioritize dehumidification. In such a case, for example, a command is output to lower the target temperature of one of the primary air conditioner 211 and the secondary air conditioner 212, which has a higher COP. A command to lower the temperature of the refrigerant of that one may be output. As another example, dehumidification in the primary air conditioner 211 may be prioritized, and when a sufficient amount of dehumidification cannot be obtained in the primary air conditioner 211, a command to lower the temperature of the refrigerant in the secondary air conditioner 212 may be output.
[0164] In the fifth control, the allocation determination unit 149 determines the allocation of the capacity handled by the primary air conditioner 211 and the capacity handled by the secondary air conditioner 212. This determination is made based on the determination result by the mode determination unit 147, the determination result by the humidification / dehumidification determination unit 148, the first COP characteristic curve, and the second COP characteristic curve, taking into consideration the COP of the entire air conditioner 21. For this reason, with this control system, it is possible to realize appropriate air conditioning control according to the situation of area A, taking into consideration the COP of the entire air conditioner 21.
[0165] 22 is a diagram showing an example of hardware resources of the control device 12. The control device 12 includes, as hardware resources, a processing circuit 60 including a processor 61 and a memory 62. The processing circuit 60 may include a plurality of processors 61. The processing circuit 60 may include a plurality of memories 62.
[0166] In this embodiment, each unit indicated by the reference numerals 120 to 149 indicates a function possessed by the control device 12. The function of the storage unit 120 is realized by the memory 62. The function of each unit indicated by the reference numerals 121 to 149 can be realized by software written as a program, firmware, or a combination of software and firmware. The program is stored in the memory 62. The control device 12 realizes the function of each unit indicated by the reference numerals 121 to 149 by executing the program stored in the memory 62 by the processor 61 (computer).
[0167] The processor 61 is also called a CPU (Central Processing Unit), central processing unit, processing unit, arithmetic unit, microprocessor, microcomputer, or DSP. The memory 62 may be a semiconductor memory, a magnetic disk, a flexible disk, an optical disk, a compact disk, a mini disk, or a DVD. Examples of semiconductor memories that can be used include RAM, ROM, flash memory, EPROM, and EEPROM.
[0168] Fig. 23 is a diagram showing another example of hardware resources of the control device 12. In the example shown in Fig. 23, the control device 12 includes a processing circuit 60 including a processor 61, a memory 62, and dedicated hardware 63. Fig. 23 shows an example in which some of the functions of the control device 12 are realized by the dedicated hardware 63. All of the functions of the control device 12 may be realized by the dedicated hardware 63. As the dedicated hardware 63, a single circuit, a composite circuit, a programmed processor, a parallel programmed processor, an ASIC, an FPGA, or a combination of these can be adopted.
[0169] The hardware resources of the number of people management device 36 are similar to the examples shown in FIG. 22 or FIG. 23. The number of people management device 36 has a processing circuit including a processor and memory as hardware resources. The number of people management device 36 realizes the functions of each part indicated by the reference numerals 361 to 363 by executing a program stored in the memory with the processor. The number of people management device 36 may have a processing circuit including a processor, memory, and dedicated hardware as hardware resources. Some or all of the functions of the number of people management device 36 may be realized by dedicated hardware. [Industrial Applicability]
[0170] The control system according to the present disclosure can be applied to a system equipped with an air conditioner. [Explanation of symbols]
[0171] 1 Management equipment, 2 Air conditioning equipment, 3 Elevator equipment, 4 Environmental measurement equipment, 5 Power measurement equipment, 6 Weather forecast equipment, 11 Display device, 12 Control device, 21 Air conditioning equipment, 211 Primary air conditioner, 212 Secondary air conditioner, 22 Ventilation equipment, 31 Communication equipment, 32 Group management panel, 33 Control panel, 34 Hoist, 35 Cage, 36 Number of passengers management device, 37 Weighing device, 41 Input / output device, 42 Pyranometer, 43~44 Thermo-hygrometer, 45 CO2 concentration meter, 51 Measurement device, 52 Light panel, 53 Power panel, 54 Solar power generator, 60 Processing circuit, 61 Processor, 62 Memory, 63 Dedicated hardware, 120 Memory unit, 121 Weather estimation unit, 122 time determination unit, 123 number of people estimation unit, 124 determination unit, 125 operation control unit, 126 determination unit, 127 detection unit, 128 creation unit, 129-131 load determination unit, 132 solar radiation estimation unit, 133-135 load calculation unit, 136 estimation unit, 137 load calculation unit, 138-139 heat quantity estimation unit, 140 load calculation unit, 141 estimation unit, 142 air volume estimation unit, 143 power estimation unit, 144 ventilation volume determination unit, 145-146 capacity determination unit, 147 mode determination unit, 148 humidification / dehumidification determination unit, 149 allocation determination unit, 150 clock, 360 memory unit, 361 detection unit, 362 Calculation section, 363 Learning section
Claims
1. an air conditioner for delivering conditioned air to a particular area; A control device for controlling the air conditioner; Equipped with The air conditioning device is a ventilation device for drawing fresh air into the area; A primary air conditioner that processes the outside air taken in by the ventilation device; a secondary air conditioner for treating the outside air treated by the primary air conditioner and the air in the area; Equipped with The control device includes: a mode determination unit that determines an operation mode of the primary air conditioner and an operation mode of the secondary air conditioner based on a first capacity required for the primary air conditioner and a second capacity required for the secondary air conditioner, respectively; a humidification / dehumidification determination unit that determines a humidification amount or a dehumidification amount required for the area based on the first capacity and the second capacity; an allocation determination unit that determines a portion of a combined capacity of the first capacity and the second capacity to be shared by the primary air conditioner and a portion to be shared by the secondary air conditioner, based on a result of the determination by the mode determination unit, a result of the determination by the humidification / dehumidification determination unit, a first COP characteristic curve of the primary air conditioner, and a second COP characteristic curve of the secondary air conditioner; an operation control unit that controls the air conditioner in accordance with a result of the determination by the allocation determination unit; Equipped with The mode determination unit is a control system that determines whether the operation mode is a cooling mode or a heating mode.
2. The control device includes: a first load specifying unit that specifies a first load based on an amount of solar radiation for the region and a temperature difference between inside and outside the region; A second load specifying unit that specifies a second load based on an enthalpy difference between the inside and outside of the area and an air volume of the ventilation device; a third load specifying unit that specifies a third load based on an amount of heat generated by a person in the area and an amount of heat generated by a device in the area; A ventilation amount specification unit that specifies a ventilation amount according to the number of people in the area; a first capacity determination unit that determines the first capacity based on a first load identified by the first load identification unit, a second load identified by the second load identification unit, and a ventilation volume identified by the ventilation volume identification unit; A second capacity determination unit that determines the second capacity based on the third load identified by the third load identification unit; The control system of claim 1 further comprising:
3. The control system according to claim 1 or claim 2, wherein the control device further includes a memory unit that stores a plurality of first COP characteristic curves having different sensible heat ratio values and a plurality of second COP characteristic curves having different sensible heat ratio values.
4. The primary air conditioner includes a refrigerant as a medium for carrying heat, The control system according to claim 1 or 2, wherein the control device further comprises a storage unit that stores a plurality of first COP characteristic curves each having a different temperature value of the refrigerant.
5. The secondary air conditioner includes a refrigerant as a medium for carrying heat, 3. The control system according to claim 1, wherein the control device further comprises a storage unit that stores a plurality of second COP characteristic curves each having a different temperature value of the refrigerant.
Citation Information
Patent Citations
Number of people confirmation device and air conditioner control device using it
JP1997269262A
Method and device for deciding the number of refrigerating machines to be operated
JP2012007824A
Air conditioning system and system control device
WO2021019761A1