Bath hot water system
The bath water supply system integrates an automatic drain valve to streamline test runs by starting the bath test run during water heater air bleeding, reducing time and operator burden.
Patent Information
- Application Number
- JP2021073109
- Authority / Receiving Office
- JP · JP
- Patent Type
- Patents
- Current Assignee / Owner
- Filing Date
- 2021-04-23
- Publication Date
- 2024-10-30
- Estimated Expiration
- 2041-04-23
AI Technical Summary
Existing bath water supply systems require lengthy test runs for water heaters and bathtubs, with workers needing to manually manage drain plugs and monitor water levels, leading to increased time and burden.
A bath water supply system that integrates an automatic drain valve with the bathtub, allowing simultaneous air bleeding and bath test run initiation during the water heater test run, reducing the need for manual intervention and optimizing water usage.
This system significantly shortens test run times by integrating automatic drain valve operations with air bleeding, reducing operator burden and optimizing water usage.
Smart Images

Figure 0007575690000001 
Figure 0007575690000002 
Figure 0007575690000003
Abstract
Description
[Technical field]
[0001] The present invention relates to a bath hot water supply system configured to link a hot water supply device that supplies hot water to a bathtub with an automatic drain valve of the bathtub. [Background technology]
[0002] Conventionally, heat pump heat source machines and water heaters with hot water tanks have been widely used as heat source machines with excellent energy efficiency. Since it is difficult for such heat source machines to instantly heat the hot water required for hot water supply, preheated hot water is stored in the hot water tank and the hot water from the hot water tank is used when supplying hot water. The capacity of the hot water tank of a domestic hot water heater is generally several tens to about 300 L, and hot water shortages, which are caused by a lack of hot water at a temperature that can be used for hot water supply, are prevented.
[0003] When installing a hot water supply system, a test run is conducted to confirm that there are no defects in the hot water supply system or its installation. The test run includes a test run of the hot water supply system alone, a bath test run including the bathtub that receives hot water from the hot water supply system, and if the hot water supply system is connected to a hot water heating system, a heating test run is also included.
[0004] In the test run of the water heater, after filling the water heater with water, the pump, valves, etc. are driven to move the water while air removal is performed to expel any air remaining in the water heater (residual air) along with the water. At this time, the large hot water tank is also filled with water, so the test run of the water heater takes time. After this test run of the water heater, a bath test run is performed in which water is filled from the water heater into the bathtub and the correlation between the amount of hot water supplied by the water heater and the water level in the bathtub is established.
[0005] Thus, when installing a hot water supply system, it takes time to perform a test run of the hot water supply system and the subsequent test run of the bath, which places a heavy burden on the worker. For this reason, a technology is known that automatically performs a test run of the bath in succession after the test run of the hot water supply system, as in Patent Document 1, for example. However, the worker must check and open and close the bathtub drain plug, and there is room for reducing the burden on the worker.
[0006] Meanwhile, there is known a technology for automatically closing the bathtub drain plug and filling the bathtub with water when there is no hot or cold water in the bathtub, as in Patent Document 2. When a bathtub is equipped with such an automatic drain plug, the drain plug is automatically closed at the start of the test run as in Patent Document 1 and opened at the end, reducing the burden on the worker. [Prior art documents] [Patent documents]
[0007] [Patent Document 1] JP 2011-12817 A [Patent Document 2] Patent Publication No. 2021-42867 Summary of the Invention [Problem to be solved by the invention]
[0008] However, if a bath test run is started after the water heater test run is completed, as in Patent Document 1, it takes a long time from the start of the water heater test run to the end of the bath test run. Also, in Patent Document 1, during the water heater test run, water is drained together with air into the bathtub with the drain plug closed and into the water heater's drain passage, so water accumulates in the bathtub, but the amount cannot be detected and is unknown.
[0009] Therefore, in the bath trial run after the trial run of the hot water supply system, the supply of a certain amount of water to the bathtub and the operation of the bath water circulation pump are alternately repeated until the bath water can be circulated, and the water level at which the bath water can be circulated is set as the reference water level. Then, by supplying more water from this point, the correlation between the amount of hot water supplied and the water level in the bathtub is set. Therefore, it takes time for the reference water level to be determined, which lengthens the bath trial run time. For this reason, there was a need to further reduce the burden on workers by shortening the trial run time, including the hot water supply system trial run and the bath trial run.
[0010] An object of the present invention is to provide a bath hot water supply system that can reduce the burden on workers by shortening the test run time. [Means for solving the problem]
[0011] The bath hot water supply system of claim 1 is a bath hot water supply system that links a water supply device having a hot water storage tank and hot water heating means with an automatic drain valve of a bathtub that receives hot water supply from the water supply device, and the test run of the bath hot water supply system is configured to fill the water supply device with water by a test run of the water supply device, and then to perform a bath test run in which water is filled into the bathtub, and the test run of the water supply device includes an air bleed to expel residual air after the water supply device is filled with water, and The automatic drain valve is closed, The bath test run is started simultaneously with the start of the air bleeding.
[0012] According to the above configuration, in the test run of the bath hot water supply system, water is filled in the water supply device by the test run of the water supply device, and after the water is filled, air is removed by moving the water to expel the remaining air. In addition, in the test run of the bath hot water supply system, the bathtub is filled with water by the test run of the bath, and a correlation between the amount of hot water supply and the water level of the bathtub is set. In the test run of the water supply device, water is filled in the water tank, which takes time, and water is filled while draining into the bathtub until the completion of water filling can be confirmed, so the automatic drain valve of the bathtub is opened to drain water from the bathtub. On the other hand, in the test run of the bath, the automatic drain valve of the bathtub is closed to fill the bathtub with water. In the air removal, the remaining air in the water supply device is discharged into the bathtub together with the water, but since the amount of drainage can be detected after the water is filled, the bath test run is started together with the start of air removal. Therefore, air removal is started and the bath test run is started before the completion of the test run of the water supply device, so the time for the test run of the bath hot water supply system is shortened and the burden on the operator can be reduced.
[0013] The bath hot water supply system of the invention of claim 2 is characterized in that, in the invention of claim 1, the automatic drain valve is opened when the trial run of the water heating device begins, and the automatic drain valve is closed before the trial run of the bath begins. According to the above configuration, the worker does not need to check the state of the bathtub's automatic drain plug and operate the automatic drain plug to open or close, thereby reducing the burden on the worker.
[0014] The bath hot water supply system of the invention of claim 3 is characterized in that, in the invention of claim 1 or 2, it is configured to perform the bath trial run by utilizing the drainage water discharged when bleeding air during the trial run of the water heating device. According to the above configuration, the bath test run is performed using the drainage water from the air bleeder, thereby reducing the amount of water used.
[0015] The bath hot water supply system of the invention of claim 4 is characterized in that, in the invention of any one of claims 1 to 3, it is configured to select whether or not to drain the bathtub after the bath trial run is completed at the start of the trial run of the water heating device. With the above configuration, whether or not to drain the water in the bathtub can be selected at the start of the test run of the hot water supply device depending on the work to be done after the test run of the bath. Therefore, if the water is to be drained, the worker does not need to wait for the completion of the test run of the bathtub to open the automatic drain valve, which reduces the burden on the worker, and if the water is not to be drained, the water in the bathtub can be used effectively. Effect of the Invention
[0016] According to the bath hot water supply system of the present invention, the burden on workers can be reduced by shortening the test run time. [Brief description of the drawings]
[0017] [Figure 1] 1 is an explanatory diagram of a bath hot water supply device according to an embodiment of the present invention. [Diagram 2] 13 is a flowchart of a test run start operation according to an embodiment. [Diagram 3] 1 is a flowchart of a test run according to an embodiment. [Figure 4] FIG. 13 is a diagram showing the reduction in test run time. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0018] Hereinafter, the mode for carrying out the present invention will be described based on examples. EXAMPLES
[0019] As shown in Figure 1, bath hot water supply system 1 is configured to supply hot water from water heater 2 to bathtub 3. Bathtub 3 receives a supply of hot water from water heater 2 via a circulation adapter 3a, and is connected so that the hot water in bathtub 3 can be reheated by water heater 2. This bathtub 3 is equipped with an electric automatic drain plug 3b that opens and closes in conjunction with water heater 2. Automatic drain plug 3b can also be opened and closed by operating a drain switch (not shown) provided on the edge of bathtub 3, for example.
[0020] The hot water supply device 2 has a heat pump heat source unit 10 (hot water heating means), a hot water storage tank 11 covered with a heat insulating material (not shown), a gas combustion type auxiliary heat source unit 12, a bath heat exchanger 13, a heating heat exchanger 14, and a control unit 15 that controls the automatic drain valve 3b and the hot water supply device 2. An operation remote control 16 for operating the hot water supply device 2 is connected to this control unit 15. The hot water supply device 2 also has a water supply system A, a heating circulation system B, a hot water supply system C, a bathtub hot water pouring system D, and a heat utilization system E that supplies hot water to the bath heat exchanger 13 and the heating heat exchanger 14 as a flow path system composed of piping and equipment.
[0021] The hot water supply device 2 stores hot water heated by a heat pump heat source unit 10 in a hot water storage tank 11, and supplies the hot water from this hot water storage tank 11 to the faucet 4 and the bathtub 3. Furthermore, when there is no hot water at a temperature that can be used for hot water supply in the hot water storage tank 11, the hot water or clean water in the hot water storage tank 11 is heated by an auxiliary heat source unit 12 and supplied. The hot water supply device 2 heats and circulates hot water between the auxiliary heat source unit 12, a bath heat exchanger 13, and a heating heat exchanger 14, enabling bath reheating and hot water heating. The hot water storage tank 11 is provided with a number of hot water temperature sensors 11a-11f that detect the water temperature of the temperature stratification formed in the vertical direction.
[0022] The water supply system A has a water supply passage 18 connected to a water supply system via a water supply main valve 17 to supply clean water to the bottom of the hot water tank 11, and a pressure reducing valve 19 installed in this water supply passage 18. A drainage passage 21 equipped with a drainage valve 20 for draining the hot water tank 11 is connected to the water supply passage 18.
[0023] In order to heat the hot water in the hot water tank 11 by the heat pump heat source unit 10 and store the hot water in the hot water tank 11, the heating circulation system B has a supply passage 22 connected from the bottom of the hot water tank 11 to the heat pump heat source unit 10, a return passage 23 connected from the heat pump heat source unit 10 to the top of the hot water tank 11, and a hot water storage pump 24 interposed in the supply passage 22. A hot water storage switching valve 25 is disposed in the return passage 23, and a bypass passage 25a branched off from the return passage 23 by the hot water storage switching valve 25 is connected to the supply passage 22 downstream of the hot water storage pump 24. When the hot water cannot be heated sufficiently after the start of the heat pump heat source unit 10, the hot water storage switching valve 25 is switched to the bypass passage 25a side to prevent the hot water from returning to the hot water tank 11.
[0024] The hot water supply system C has a hot water tank outlet passage 27 extending from the top of the hot water tank 11 and connected to the mixing valve 26, a water supply bypass passage 28 branching off from the water supply passage 18 and connected to the mixing valve 26, and a hot water supply passage 29 that supplies the hot water mixed by the mixing valve 26 to the faucet 4. The hot water supply passage 29 has a hot water supply flow rate sensor 30 that detects the hot water supply flow rate, and a hot water supply flow rate adjustment valve 31 that adjusts the hot water supply flow rate. The water supply bypass passage 28 has a bypass passage 33 equipped with a high-temperature hot water outlet avoidance solenoid valve 32 to supply clean water to the hot water supply passage 29 in an emergency to avoid supplying high-temperature hot water.
[0025] The bathtub pouring system D has a pouring passage 34 branching off from the hot water supply passage 29 at the hot water supply flow rate adjustment valve 31, and a reheating passage 35 for heating and circulating the hot water in the bathtub 3, and the pouring passage 34 is connected to the reheating passage 35. A pouring flow rate sensor 36 for detecting the pouring flow rate when pouring hot water (supplying hot water) into the bathtub 3, and a pouring solenoid valve 37 that is opened when pouring hot water are installed in the pouring passage 34.
[0026] In the reheating passage 35, there are disposed a bath pump 38 for circulating the hot and cold water in the bathtub 3, a water flow switch 39 for detecting the flow of the hot and cold water downstream of the bath pump 38, and a bath heat exchanger 13. The hot and cold water supplied from the water heater 2 through the hot water supply passage 34 is supplied to the bathtub 3 via the reheating passage 35. In the reheating passage 35, there are disposed upstream of the bath pump 38, a bath water level sensor 40 for detecting the water level in the bathtub 3, and a bath temperature sensor 41 for detecting the temperature of the hot and cold water in the bathtub 3.
[0027] Heat utilization system E has a circulation passage 42 connecting the outlet and inlet of auxiliary heat source unit 12, a circulation pump 43 installed in circulation passage 42 on the inlet side of auxiliary heat source unit 12 to supply hot water to auxiliary heat source unit 12, and a bath heat exchanger 13 and a heating heat exchanger 14 installed in parallel in circulation passage 42 for heat exchange with the hot water heated by auxiliary heat source unit 12. To control the supply of hot water to bath heat exchanger 13 and heating heat exchanger 14, corresponding bath heat exchange outlet solenoid valve 13a and heating heat exchange outlet solenoid valve 14a are provided on the outlet side of each heat exchanger.
[0028] A circulation flow rate sensor 44 is disposed between the circulation pump 43 and the inlet of the auxiliary heat source unit 12. A three-way valve 45 for switching flow paths is disposed upstream of the circulation pump 43, and a reheating passage 46 branched off from the hot water tank outlet passage 27 is connected to the circulation passage 42 via the three-way valve 45. In order to supply hot water heated by the auxiliary heat source unit 12 to the mixing valve 26, an auxiliary heated hot water outlet passage 48 equipped with a flow rate adjustment valve 47 branches off from the circulation passage 42 on the outlet side of the auxiliary heat source unit 12, and is connected to the hot water tank outlet passage 27 downstream of the branching point of the reheating passage 46.
[0029] The auxiliary heat source unit 12 is a combustion type heat source unit having a fuel gas supply unit 12a, a burner 12b that burns a mixture of fuel gas and air, and a heat exchanger 12c that heats hot water using the sensible heat and latent heat of the combustion gas generated by the burner 12b. This auxiliary heat source unit 12 has a neutralization device 12d to neutralize and discharge acidic condensed water formed by condensing moisture in the combustion gas in the heat exchanger 12c.
[0030] To reheat the hot water in the bathtub 3, the control unit 15 opens the bath heat exchange outlet solenoid valve 13a, drives the circulation pump 43, and operates the auxiliary heat source unit 12 to circulate the hot water between the auxiliary heat source unit 12 and the bath heat exchanger 13. At the same time, the bath pump 38 is driven to circulate the hot water in the bathtub 3 through the reheating passage 35, and the hot water heated by the auxiliary heat source unit 12 and the hot water in the bathtub 3 are heat exchanged in the bath heat exchanger 13 to heat the hot water in the bathtub 3 and return it to the bathtub 3.
[0031] Similarly, in the heating heat exchanger 14, for hot water heating, the control unit 15 opens the heating heat exchange outlet solenoid valve 14a, drives the circulation pump 43, and operates the auxiliary heat source unit 12 to heat and circulate hot water between the auxiliary heat source unit 12 and the heating heat exchanger 14. Then, the heating pump 49 is driven to circulate the heat medium flowing through the heating passage 50 between the heating heat exchanger 14 and a heating terminal (not shown) (e.g., a bathroom heating device, a floor heating device), and the heat medium is heated by heat exchange in the heating heat exchanger 14.
[0032] Next, the start operation of the bath hot water supply system trial run (hereinafter sometimes abbreviated to "trial run") performed on the bath hot water supply system 1 when the hot water supply device 2 is installed will be described with reference to the start operation flowchart in Fig. 2. In the figure, Si (i = 1, 2, ...) represents a step. A trial run is started after an operator performs setting operations on an operation terminal (maintenance terminal or operation remote control 16, not shown) connected to control unit 15. First, in S1, trial run is selected from a menu displayed on the operation terminal, and the process proceeds to S2, where the contents of the trial run are set and the process proceeds to S3. Here, settings are made to perform a water heater trial run and a bath trial run.
[0033] In S3, the drain setting for the bathtub 3 after the trial run is performed, and then the process proceeds to S4. When setting up a bath trial run, the bathtub 3 is filled with water, so this is the step where you set whether or not to leave water in the bathtub 3 depending on the work to be done after the trial run. After setting the trial run details and completing the subsequent drain setting, you perform the trial run start operation in S4, and the bath hot water system trial run begins, which involves a hot water supply device trial run and a bath trial run. The operator opens the water supply main valve 17 immediately before or after starting the trial run of the bath hot water supply system 1.
[0034] Next, the control of the test operation by control unit 15 of water heating apparatus 2 will be described with reference to the flowchart of FIG. When the test run of the bath hot water supply system is started, the state of the automatic drain valve 3b is checked in S11 to determine whether it is open or not. If the determination in S11 is No (closed), the process proceeds to S12, where the automatic drain valve 3b is opened and the process proceeds to S13. If the determination in S11 is Yes (open), the process proceeds to S13.
[0035] In S13, a trial run of the water heater is started, and the process proceeds to S14. In S14, hot water supply solenoid valve 37 is opened to start filling water in water heater 2, and the process proceeds to S15. Since water heater 2 has multiple flow paths from water supply system A to heat utilization system E and hot water tank 11, it takes some time to fill water. The clean water supplied at this time causes air in the part of water heater 2 through which hot water passes to be discharged to bathtub 3 via hot water supply passage 29, hot water supply passage 34, and reheating passage 35. Hot water supply flow rate sensor 30 and hot water supply flow rate sensor 36 may detect the flow rate based on the flowing air even when water is not actually flowing. Even when water actually starts to flow, air is mixed in, so the flow rates detected by hot water supply flow rate sensor 30 and hot water supply flow rate sensor 36 will not be stable for a while.
[0036] In S15, it is determined whether the flow rates detected by the hot water supply flow rate sensor 30 and the hot water pouring flow rate sensor 36 are stable. When there is little air mixed in the flowing water, the flow rates detected by the hot water supply flow rate sensor 30 and the hot water pouring flow rate sensor 36 will stabilize, and it can be determined that water filling is complete. If the determination in S15 is No, the determination in S15 is repeated until the flow rate stabilizes. If the determination in S15 is Yes, the process proceeds to S16, where the hot water pouring solenoid valve 37 is closed to end water filling, and the process proceeds to S17.
[0037] In S17, the state of the automatic drain valve 3b is checked to determine whether it is closed or not. If the determination in S17 is No (closed), the process proceeds to S18, where the automatic drain valve 3b is opened to drain all of the water accumulated during water filling, and the process proceeds to S19. The automatic drain valve 3b is opened before water filling begins, but since the automatic drain valve 3b may be closed by operating a drain switch (not shown) during water filling, the accumulated water is drained and then the valve is closed. If the determination in S17 is Yes (open), the process proceeds to S19. If the determination in S17 is No, the occurrence of an error is notified to the operator, the test run is temporarily stopped, and the operator can be prompted to take action.
[0038] In S19, the automatic drain valve 3b is closed, and the process proceeds to S20. In S20, air removal is started, in which the water is made to flow to discharge the residual air in the water-filled water heater 2 together with the water into the bathtub 3. At the same time, a bath test run is started to set the correlation between the amount of hot and cold water supplied to the bathtub 3 and the water level in the bathtub 3, and the process proceeds to S21.
[0039] In S21, a small amount of clean water (e.g., 10 L) is supplied to the bathtub 3 as a predetermined amount at the beginning of the bath test run, and the process proceeds to S22. This first supply amount is supplied by utilizing the drainage water used when removing air. Since the water has already been filled, the hot water supply flow rate sensor 30 and the hot water supply flow rate sensor 36 can each detect the flow rate even if some residual air is mixed in, and the supply amount can be detected based on the flow rate and time.
[0040] When the first supply amount is supplied, the hot water supply solenoid valve 37 is opened again, and while the circulation pump 43 and the hot water storage pump 24 are driven, the three-way valve 45, the hot water storage switching valve 25, the mixing valve 26, the bath heat exchange outlet solenoid valve 13a, etc. are driven to switch the water flow path and perform air bleeding. This allows residual air that could not be discharged when the bathtub was filled to be discharged together with the water into the bathtub 3. When the hot water supply flow rate sensor 30 and the hot water supply flow rate sensor 36 detect that the first supply amount of water has been supplied to the bathtub 3, the hot water supply solenoid valve 37 is closed. Then, for example, with water circulating through the circulation passage 42 of the heat utilization system E, it is confirmed that the flow rate detected by the circulation flow rate sensor 44 is stable, and air bleeding is terminated (completion of the test run of the hot water supply device).
[0041] In S22, it is determined whether there is an abnormality in the hot water supply amount detection. For example, by driving the bath pump 38, it is determined whether the water in the bathtub 3 can circulate through the reheating passage 35 based on the detection state of the water flow switch 39. Because the amount of water in the bathtub 3 is too small when the first supply amount is supplied, the water in the bathtub 3 cannot be circulated through the reheating passage 35. Using this, if the water flow switch 39 detects a water flow, it is determined that there is an abnormality in the hot water supply flow sensor 30 or the hot water supply flow sensor 36. If the determination in S22 is No (abnormal), proceed to S23, where a flow rate error is notified and proceed to S29. If the determination in S22 is Yes (no abnormality), proceed to S24.
[0042] In S24, a predetermined second supply amount (e.g., 70 L) of water is supplied to the bathtub 3, and then the bath pump 38 is driven to circulate the water in the bathtub 3 through the reheating passage 35, and it is confirmed that reheating is possible by the water flow switch 39. The water level in the bathtub 3 detected by the bath water level sensor 40 at this time is set as the reference water level, and the process proceeds to S25.
[0043] In S25, a predetermined third supply amount (e.g., 40 L) is additionally supplied to bathtub 3, and a correlation between the supply amount and the water level is set based on the difference between the water level of bathtub 3 detected by bath water level sensor 40 and the reference water level at this time, and the additionally supplied third supply amount, and then the process proceeds to S26. Then, in S26, the amount of water that can be brought to the preset water level from the current water level based on the correlation between the set supply amount and the water level is calculated, and the calculated amount of water is additionally supplied, and then the process proceeds to S27.
[0044] In S27, it is determined whether the difference between the water level in the bathtub 3 detected by the bath water level sensor 40 and the set water level is within the allowable range, i.e., whether the correlation between the supply amount and the water level is set correctly. If the determination in S27 is No, the process proceeds to S28, where a setting error is notified and the process proceeds to S29. If the determination in S27 is Yes, the process proceeds to S29.
[0045] In S29, the bath trial run ends and the process proceeds to S30. In S30, a decision is made as to whether or not to drain the water based on the drain setting set in S3 of FIG. 2. If the decision in S30 is Yes (to drain the water), the process proceeds to S31, where the automatic drain valve 3b is opened and the trial run of the bath hot water supply system 1 ends. If the decision in S30 is No (to not drain the water), the trial run of the bath hot water supply system 1 ends. If the decision in S27 is Yes, it is also possible to check the reheating operation before ending the bath trial run. If the decision in S27 is No, the trial run may be stopped by reporting the occurrence of a setting error in S28.
[0046] In the above-mentioned trial run of the bath hot water system, as shown in Fig. 4, the trial run of the water heater starts at time t0, and when water filling is completed at time t1, air bleeding starts and the bath trial run begins. Air bleeding then ends at time t2, and the bath trial run ends at time t3. Therefore, the trial run time can be shortened compared to the comparative example, in which the bath trial run starts at time t2, when the trial run of the water heater including air bleeding is completed, and ends at time t3'.
[0047] There is only a small amount of residual air in the drainage water when the air is removed, and after filling the bath with water, the hot water supply flow rate sensor 30 and the hot water supply flow rate sensor 36 can correctly detect the flow rate. Therefore, the first supply amount can be correctly detected by the hot water supply flow rate sensor 30 and the hot water supply flow rate sensor 36, and the water discharged when the air is removed can be effectively used to perform a bath test run. In addition, because the amount of water supplied to the bathtub 3 during the bath test run can be detected from the time the air is removed, the time required for filling the bath with water until the reference water level is set can be shortened, and the time required for the bath test run can also be shortened.
[0048] The operation and effects of the bath hot water supply system 1 will now be described. The bath hot water supply system 1 fills the water supply device 2 with water by performing a test run of the water supply device, and after the water is filled, the water flows to perform an air bleed to expel the remaining air. The bath hot water supply system 1 also fills the bathtub 3 with water by performing a test run of the bath, and sets the correlation between the amount of hot water supplied by the water supply device 2 and the water level of the bathtub 3. In the test run of the water supply device, water is stored in the hot water storage tank 11 during the water filling process, which takes time, and water is filled while draining into the bathtub 3 until the completion of the water filling can be confirmed, so the automatic drain valve 3b of the bathtub 3 is opened to drain water from the bathtub 3. On the other hand, in the bath test run, the automatic drain valve 3b of the bathtub 3 is closed to fill the bathtub 3 with water. In the air bleed, the remaining air in the water supply device 2 is discharged into the bathtub 3 together with the water, but since the amount of drainage can be detected after the water is filled, the bath test run starts when the air bleed starts. Therefore, the bath test run starts when the air bleed starts before the completion of the test run of the water supply device, which shortens the test run time of the bath hot water supply system and reduces the burden on the operator.
[0049] In addition, the bath hot water supply system 1 opens the automatic drain valve 3b when the test run of the hot water supply device starts, and closes the automatic drain valve 3b before the test run of the bath starts. Therefore, the worker does not need to check the state of the automatic drain valve 3b of the bathtub 3 and open and close this automatic drain valve 3b, which reduces the burden on the worker.
[0050] The bath hot water supply system 1 performs a bath test run using the drainage water discharged when air is removed during the test run of the water heater, thereby reducing the amount of water used during the test run of the bath hot water supply system 1.
[0051] In the bath hot water supply system 1, when the test run of the water supply device starts, it is possible to select whether or not to drain the water in the bathtub 3 depending on the work to be done after the test run. Therefore, when draining the water, the worker does not need to wait for the completion of the test run of the bath to open the automatic drain valve 3b, which reduces the burden on the worker. Also, when not draining the water, the water in the bathtub 3 can be used effectively as it is.
[0052] In the bath hot water supply system 1, it is possible to start not only a bath test run but also a heating test run at the same time as the start of air bleeding. In addition, a person skilled in the art can implement the above embodiment in various modified forms without departing from the spirit of the present invention, and the present invention includes such modified forms. [Explanation of symbols]
[0053] 1: Bath hot water system 2: Hot water supply equipment 3: Bathtub 3b: Automatic drain plug 4: Karan 10: Heat pump heat source (hot water heating means) 11: Hot water tank 12:Auxiliary heat source machine 13: Bath heat exchanger 13a: Bath heat exchange outlet solenoid valve 14: Heating heat exchanger 14a: Heating heat exchange outlet solenoid valve 15: Control unit 16: Operation remote control 17: Water supply valve 18:Water supply passage 19: Pressure reducing valve 20: Drain valve 21: Drain passage 22: Outbound Passage 23: Return passage 24: Hot water pump 25: Hot water storage switching valve 26: Mixing valve 27: Hot water tank outlet passage 28: Water supply bypass passage 29: Hot water passage 30: Hot water flow sensor 31: Hot water flow control valve 32: High temperature water discharge prevention solenoid valve 33: Bypass passage 34: Pouring passage 35: Reheating passage 36: Pouring flow rate sensor 37: Pouring solenoid valve 38: Bath pump 39: Water flow switch 40: Bath water level sensor 41: Bath temperature sensor 42: Circulation passage 43: Circulation pump 44: Circulation flow sensor 45: Three-way valve 46: Reheating passage 47: Flow control valve 48: Auxiliary heating outlet passage 49: Heating pump 50: Heated corridor A: Water supply system B: Heating circulation system C: Hot water supply system D: Bathtub pouring system E: Heat utilization system
Claims
1. A hot water supply system for a bath, which links the opening and closing of a hot water supply device having a hot water storage tank and a hot water heating means with the opening and closing of an automatic drain valve of a bathtub that receives hot water supply from the hot water supply device, The test run of the bath hot water supply system is configured so that after the test run of the hot water supply device fills the hot water supply device with water, a bath test run is performed to fill the bathtub with water, The test run of the water heater includes air bleeding to remove residual air after filling the water heater with water, A bath hot water supply system characterized in that the automatic drain valve is closed after the water supply device is filled with water, and the bath trial run is started when the air bleeding begins.
2. The bath hot water supply system according to claim 1, characterized in that the automatic drain valve is opened when the test run of the hot water supply device starts, and the automatic drain valve is closed before the test run of the bath starts.
3. The bath hot water supply system according to claim 1 or 2, characterized in that the bath test run is performed by utilizing drainage water discharged during air removal during the test run of the water heater.
4. A bath hot water supply system as described in any one of claims 1 to 3, characterized in that, at the start of the trial run of the hot water supply device, a choice is made as to whether or not to drain the bathtub after the trial run of the bath is completed.
Citation Information
Patent Citations
Water level setting method for automatic hot water pouring trial operation
JP2002168518A
Heat pump type water heater
JP2011012817A
Storage type water heater
JP2011094863A
Hot water system
JP2020012622A
Water filling system
JP2021042867A