Work efficiency calculation system, method, and program

The work efficiency calculation system improves productivity in distribution warehouses by analyzing worker tasks to differentiate between main and ancillary work, providing real-time efficiency metrics for process optimization.

JP7579423B2Active Publication Date: 2024-11-07LOGISTEED LTD
View PDF 3 Cites 0 Cited by

Patent Information

Application Number
JP2023506470
Authority / Receiving Office
JP · JP
Patent Type
Patents
Current Assignee / Owner
Filing Date
2021-03-17
Publication Date
2024-11-07
Estimated Expiration
2041-03-17

AI Technical Summary

Technical Problem

Existing systems struggle to accurately measure and improve the productivity of workers in distribution warehouses, as they require time-consuming task changes and lack indices for enhancing efficiency, particularly in distinguishing between main and ancillary work.

Method used

A work efficiency calculation system that utilizes image analysis to differentiate between main and ancillary work, calculating and outputting the time spent on each, enabling visualization and notification of efficiency levels.

Benefits of technology

Enables real-time assessment of worker productivity by distinguishing between main and ancillary work, allowing for timely process improvements and resource allocation adjustments.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 0007579423000001
    Figure 0007579423000001
  • Figure 0007579423000002
    Figure 0007579423000002
  • Figure 0007579423000003
    Figure 0007579423000003
Patent Text Reader

Abstract

[Problem] To analyze the work state of distribution processing for each worker, and to ascertain a main work time and an ancillary work time. [Solution] A work efficiency calculation system 1 includes: a camera 30 that images work performed by workers 5a-5d in a warehouse; a work efficiency output device 100 that calculates a work efficiency for distribution processing work by each worker; and a manager terminal 50 on which the calculated work efficiency is displayed. The work efficiency calculation system 1 acquires, from the camera 30, images showing packaging work by the workers 5a-5d. Next, the acquired images are analyzed to classify each image as an image showing main work in which processing proceeds towards shipment, or an image showing ancillary work which is not the main work. Next, a work time for the main work and a work time for the ancillary work are calculated for each worker from the imaged time of each classified image. Then, the calculated work time for the main work and the calculated work time for the ancillary work are output for each worker.
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present invention relates to a system, method, and program for calculating the efficiency of distribution processing operations carried out in a warehouse. [Background technology]

[0002] Generally, products produced in factories go through various processes before being distributed on the market. For example, there are processes to adjust the size and shape to suit logistics, to inspect the product to see if it meets certain standards, to inspect the product for any foreign objects (such as needles) left behind during the production process, to package the product, to attach retail store tags and price tags, and even to wrap the product for gifts. All distribution processing operations necessary to suit the characteristics of the product are carried out before it reaches the consumer.

[0003] When products arrive at a logistics warehouse after passing a certain level of inspection at the factory, the warehouse may take on the above-mentioned distribution processing tasks at the request of the shipper. Specifically, tasks include pricing, tagging, wrapping, needle inspection, etc. This type of distribution processing is a process that adds value to the product so that it can be sold at retail stores when it is shipped from the warehouse.

[0004] In a logistics warehouse, the number of incoming and outgoing packages and the number of different types of products are fluid, as they are determined by the products (= demand). Sometimes a large number of a few different types of products are handled, and other times a large number of different types are handled. Of course, the forms of products and goods are also diverse, making mechanization difficult, and the distribution processing work that adds value as mentioned above has to be done by people. Furthermore, because the number of incoming and outgoing packages to and from the warehouse is fluid, there is a lot of turnover of workers.

[0005] Given this background, it is difficult to grasp the productivity of individual workers in distribution processing operations at logistics warehouses, making it difficult to maintain a constant level of work.

[0006] As a method for managing workers who work in a logistics warehouse, for example, a system that uniformly manages the working hours of workers who perform distribution processing work at different logistics facilities is known (Patent Document 1). [Prior art documents] [Patent documents]

[0007] [Patent Document 1] JP 2016-224675 A Summary of the Invention [Problem to be solved by the invention]

[0008] However, in the system of Patent Document 1, when a worker starts each task such as receiving goods, warehousing inspection, distribution processing, inspection, etc., it takes time for the worker to input which task to start, and it also requires the worker to operate the tablet every time the task is changed. In addition, in Patent Document 1, the system simply measures the task time performed by the worker, and is not able to present an index for the worker to improve the productivity of these tasks.

[0009] The distribution processing work performed by workers can be divided into work that advances the process towards shipment (hereinafter referred to as "main work") and other ancillary work (preparatory work). The inventors realized that since not only the main work but also the preparatory work (ancillary work) can take a lot of time, in order to improve productivity, it is necessary to review both of these processes.

[0010] For example, if preparation work (ancillary work) takes a significant amount of time, the warehouse manager may consider reconsidering the process so that preparation can be carried out more quickly or reconsidering the allocation of work space.

[0011] In addition, when multiple workers are engaged in the same work and there are large individual differences, it is believed that productivity can be improved by reviewing the work manual and providing timely guidance to inexperienced workers.

[0012] In order to implement such improvement measures in a timely manner, it is desirable to be able to grasp, in real time and objectively to some extent, "how much time workers are spending on essential tasks" and "how much time they are spending on preparatory tasks."

[0013] Therefore, an object of the present invention is to provide a work efficiency calculation system that is capable of analyzing the work status of distribution processing work by worker and determining the main work time and ancillary work time.

[0014] In the narrow sense, distribution processing work refers to work that adds value in distribution. In the present invention, in addition to this narrow sense of work, it also includes all work that is unavoidable in distribution, such as packing, picking, etc.

[0015] In addition, in the present invention, the main work time refers to the time taken for the work to progress in the process towards shipment, and the ancillary work time refers to the time required for additional work necessary to complete the main work, including preparation time for the main work, and other times. [Means for solving the problem]

[0016] The present invention provides the following solutions.

[0017] The present invention is a method for storing and storing data by workers in a warehouse. Distribution processing A work efficiency calculation system for calculating the work efficiency of a logistics work, comprising: Condition of the machine, product and worker An acquisition unit that acquires an image showing the Condition of the goods and workers Analyze death , Distribution processing work The image shows the actual work in progress, or At least includes preparatory work Whether the image shows ancillary work that does not fall under the main work By workbench A classification unit that classifies the images, and a work time of the main work and the work time of the auxiliary work are calculated from the photographing time of each classified image. By workbench A calculation unit that calculates the Corresponding the work table to the worker;The present invention provides a work efficiency calculation system including an output unit that outputs the calculated work time of the main work and the calculated work time of the ancillary work for each worker.

[0018] In addition, the present invention may be such that the classification unit classifies an image into whether it is an image showing a main task in product packing work or an image showing an ancillary task that does not correspond to the main task, and the calculation unit calculates the work time of the main task of the classified product packing work and the work time of the ancillary task for each worker.

[0019] In addition, in the present invention, the calculation unit may calculate the work time for each of a plurality of main tasks and / or a plurality of ancillary tasks, and the output unit may accumulate and output the work time calculated for at least one of the plurality of main tasks and the plurality of ancillary tasks for each worker.

[0020] In the present invention, the output section may display at least one of the work time of the main work and the work time of the associated work for each worker in association with the work location of the worker.

[0021] In addition, in the present invention, the calculation unit may calculate the work efficiency of the worker based on the work time of the main task and the work time of the ancillary task, and notify the manager when the work efficiency of the worker is below a predetermined threshold.

[0022] In addition, in the present invention, the acquisition unit may acquire images of multiple workers working simultaneously and extract each worker from the images, and the classification unit may analyze each image extracted for each worker and classify the images of the multiple workers as either images depicting the main work or images depicting the ancillary work.

[0023] In addition, in the present invention, when the acquisition section detects a person within a predetermined range of an image showing the work of the worker, it may notify the worker that the person is providing guidance.

[0024] In addition, in the present invention, the calculation unit may calculate the work efficiency of the worker based on the work time of the main work and the work time of the ancillary work, and the output unit may display the work efficiency calculated by the calculation unit for each worker together with the time spent performing the main work and the ancillary work.

[0025] Although the present invention is in the category of a system, it may also be in the category of a method and a program. Effect of the Invention

[0026] According to the present invention, it is possible to analyze the work status of logistics work for each worker, grasp the main work time and the associated work time, and grasp the work efficiency of the worker. [Brief description of the drawings]

[0027] [Figure 1] 1 is a diagram illustrating an overview of a work efficiency calculation system according to an embodiment of the present invention. [Diagram 2] 1 is a diagram showing a functional configuration of a work efficiency calculation system according to an embodiment of the present invention. [Diagram 3] FIG. 2 is a diagram showing a flow of a work efficiency calculation process executed by the work efficiency calculation system according to the embodiment of the present invention. [Figure 4] FIG. 2 is a diagram showing a flow of a main task / accompanying task classification process executed by the task efficiency calculation system according to the embodiment of the present invention. [Diagram 5] FIG. 2 is a diagram showing a flow of a main task / accompanying task classification process executed by the task efficiency calculation system according to the embodiment of the present invention. [Figure 6] FIG. 13 is a diagram showing a display example on a manager terminal of the work efficiency calculation system according to the embodiment of the present invention. [Figure 7] FIG. 13 is a diagram showing an example of a display of a cumulative associated task time for each worker according to the embodiment of the present invention. [Figure 8] FIG. 2 is a diagram showing a time series of a task start time, a task end time, a main task time, an additional task time, and a task efficiency of a specific worker according to an embodiment of the present invention. [Figure 9]FIG. 1 is a diagram showing an example of a productivity graph according to an embodiment of the present invention. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0028] Hereinafter, a detailed description will be given of an embodiment of the present invention with reference to the accompanying drawings. In the following drawings, the same elements are designated by the same numbers or symbols throughout the description of the embodiment.

[0029] <Basic concept / basic configuration> 1 is a diagram illustrating an overview of a work efficiency calculation system according to an embodiment of the present invention. The work efficiency calculation system 1 includes a camera 30 that captures images of work (packing work in this case) performed by workers 5a to 5d in a warehouse, a work efficiency output device 100 that is connected to the camera 30 and calculates the work efficiency of the packing work for each of the workers 5a to 5d, and a manager terminal 50 that is connected to the work efficiency output device 100 via a network and displays the calculated work efficiency.

[0030] In the working efficiency calculation system 1, in this embodiment, the camera 30 captures the work of a plurality of workers 5a-5d. The workers 5a-5d are working at their respective workbenches 6a-6d, packing products 8a-8d in folding containers 7a-7d, and the packed products are placed on a conveyor 40 and transported.

[0031] In this embodiment, the manager terminal 50 is a smartphone, but may be a tablet or other network-connectable terminal. In this embodiment, the work efficiency output device 100 is a cloud server, and is managed by, for example, a warehouse manager (such as a logistics company).

[0032] In this embodiment, among the processing operations in distribution, the packing operation performed in a warehouse is taken as an example for explanation. The packing operation performed in a warehouse includes predetermined specific operations such as taking out the product to be packed from a storage box, putting the product in a container, and attaching a price tag, and these specific operations that advance the process toward shipping are referred to as "main operations". In addition, operations that do not advance the process but are necessary for the main operation, such as the operation of bringing a storage box closer to a work table, and other operations are referred to as "ancillary operations" in this specification. In addition, when a manager or other person gives guidance or confirmation work to a worker, this may be included in the ancillary operations as one of the operations that are not the main operation. In addition, when an image of a worker cannot be obtained, it may be recognized that the worker had to leave the work area for some reason, and the time may be included in the ancillary operations. Such ancillary operations tend to include processes that are not necessarily necessary (unnecessary work processes).

[0033] The work efficiency calculation system 1 acquires images of the workers 5a to 5d performing a predetermined task (packing work in this embodiment) from the camera 30. The images of the packing work may be moving images or still images.

[0034] Next, the work efficiency calculation system 1 analyzes the acquired image and classifies the image as to whether it is an image showing a main work in which the process is progressing towards shipment, or an image showing ancillary work such as preparatory work that does not fall under the main work.

[0035] Next, the work efficiency calculation system 1 calculates the work time of the main work and the work time of the auxiliary work for each worker 5a to 5d from the photographing time of each classified image. Then, the work efficiency calculation system 1 outputs the calculated work time of the main work and the work time of the auxiliary work for each worker. The output contents are displayed, for example, on the display unit of the manager terminal 50.

[0036] In this way, the work time during which the worker performs the main work and the work time during which the worker performs the ancillary work are calculated, and the work efficiency of the distribution processing work can be visualized for each of the workers 5a to 5d.

[0037] As a result, for example, if ancillary work prior to the main job takes up a lot of time, the worker's manager can determine that preparatory work is taking up too much time and reassess the process so that preparation can be completed more quickly or reassess the allocation of work space.

[0038] In addition, when multiple workers are engaged in the same work and there are large individual differences, productivity can be improved by reviewing the work manual and providing timely guidance to inexperienced workers.

[0039] <Functional configuration> 2 is a diagram showing a functional configuration of a work efficiency calculation system according to an embodiment of the present invention. The work efficiency calculation system 1 includes a camera 30, a work efficiency output device 100 connected to the camera 30, and an administrator terminal 50 connected to the work efficiency output device 100 via a network 3. In this embodiment, the work efficiency output device 100 and the administrator terminal 50 are described as separate devices, but the administrator terminal 50 may be omitted and the work efficiency output device 100 may have the functions of the administrator terminal 50 described later. Conversely, the work efficiency output device 100 may be omitted and the administrator terminal 50 may have the functions of the work efficiency output device 100 described later, in which case the camera 30 is connected to the administrator terminal 50.

[0040] (Functional configuration of the work efficiency output device) The task efficiency output device 100 includes an acquisition unit 101 , a classification unit 102 , and a calculation unit 103 .

[0041] The acquisition unit 101 acquires images of the workers 5a to 5d performing a predetermined task. In particular, the acquisition unit 101 acquires images of the workers 5a to 5d captured by the camera 30. The images may be moving images or still images. The acquisition unit 101 may be directly connected to the camera 30 or may be remotely connected.

[0042] The classification unit 102 analyzes the acquired images and classifies them as to whether they are images showing main work in which the process progresses towards shipment, or images showing auxiliary work such as preparatory work that does not fall under the main work. In detail, the main work and the auxiliary work are classified for each frame captured by the camera 30. For example, when the frame rate of the camera 30 is 60 fps, 60 images are captured per second. The classification unit 102 may analyze these 60 images and classify them into main work and auxiliary work. The classification unit 102 may also determine a part of the captured frames. For example, only the first and 31st images of the 60 images may be classified. In this way, the load of the classification process can be reduced.

[0043] The calculation unit 103 calculates the work time of the main work and the work time of the auxiliary work for each worker from the shooting time of each classified image. In detail, the shooting time for each frame is set in advance, and is multiplied by the number of frames classified into the main work and the auxiliary work to calculate the work time of the main work and the work time of the auxiliary work.

[0044] In this embodiment, the specified work is product packing work, and the classification unit 102 classifies the images into whether they are images showing the main work of product packing work or images showing ancillary work that does not correspond to the main work, and the calculation unit 103 calculates the work time for the main work of the classified product packing work (the work of putting products 8a to 8d into containers 7a to 7d) and the work time for the ancillary work for each worker.

[0045] In addition, in this embodiment, the specified work is composed of a plurality of main works (e.g., main work 1 to main work 3) and a plurality of ancillary works (e.g., ancillary work 1 to ancillary work 6), and the calculation unit 103 calculates the work time for each of the plurality of main works and the plurality of ancillary works.

[0046] Furthermore, in this embodiment, the work efficiency of the worker is calculated based on the work time of the main task and the work time of the ancillary task, and if the work efficiency of the worker is below a predetermined threshold (e.g., below 50%), the manager is notified.

[0047] Furthermore, in this embodiment, the acquisition unit 101 acquires images of multiple workers 5a to 5d working simultaneously and extracts each worker from the images, and the classification unit 102 analyzes each image extracted for each worker 5a to 5d and classifies the images of the multiple workers into images showing either a main work in which the process progresses towards shipment, or an image showing ancillary work that does not correspond to the main work.

[0048] In addition, in this embodiment, when a person is detected within a predetermined range of the image showing the work of the worker, the manager terminal may be notified that the person is giving guidance to the worker. In this case, the "guidance" may be classified as an ancillary work by the classification unit 102, and calculated as the work time of the ancillary work by the calculation unit 103.

[0049] (Functional configuration of administrator terminal) The manager terminal 50 is composed of, for example, a smartphone, tablet terminal, personal computer, etc., operated by each manager, and is connected to the work efficiency output device 100 via the network 3 so as to be able to send and receive information, and is equipped with a terminal control unit 51, an input / output unit 52, and a communication unit 53.

[0050] The terminal control unit 51 receives the work time of the main work and the work time of the associated work calculated by the calculation unit 103 of the work efficiency output device 100 via the communication unit 53. The input / output unit 52 is composed of, for example, a touch panel, and accepts operations by the manager, and displays (outputs), for example, the calculation results by the calculation unit 103 received from the work efficiency output device 100 via the network 3 under the control of the terminal control unit 51. Specifically, the work time of the main work and the work time of the associated work are output for each worker.

[0051] In addition, in this embodiment, the specified work is composed of a plurality of main works and a plurality of ancillary works, the calculation unit 103 calculates the work time for each of the plurality of main works and the plurality of ancillary works, and the input / output unit 52 accumulates and outputs the work time calculated for each of the plurality of ancillary works for each worker.

[0052] In this embodiment, the input / output unit 52 displays at least one of the work time of the main work and the work time of the associated work for each worker in association with the work location of the worker. Specifically, icons 6ax to 6dx of work tables and the workers are arranged on the screen so as to be the same as the actual work locations, and the work efficiency of the workers is displayed (see FIG. 6).

[0053] In this embodiment, the input / output unit 52 may compare the work efficiencies of multiple workers and display a ranking of the work efficiencies so that the workers can be seen, or may display a list of multiple workers and change the attention level of a worker whose work efficiency meets a predetermined condition (so that workers with poor work efficiency can be seen). Changing the attention level here means changing the lighting, blinking, font, color, etc. of the part displaying the worker. The manager can look back while looking at the image displayed on the input / output unit 52, and can extract and display unnecessary work.

[0054] In the work efficiency calculation system 1 of this embodiment, the calculation unit 103 of the work efficiency output device 100 calculates the work efficiency of the worker based on the work time of the main work and the work time of the associated work, and the input / output unit 52 of the manager terminal 50 may display the work efficiency calculated by the calculation unit 103 for each worker together with the time spent performing the main work and the associated work. Specifically, by calculating and displaying the work efficiency in chronological order, it is possible to know which time periods have high / low work efficiency.

[0055] The above-mentioned functional configuration of the present system is merely an example, and one functional block may be divided, or multiple functional blocks may be combined into one functional block. Each functional processing unit is realized by a computer program executed by a CPU (Central Processing Unit) built into the device or terminal, which reads out a computer program (e.g., a core software or an application that causes the CPU to execute the above-mentioned various processes) stored in a storage device (storage unit) such as a ROM (Read Only Memory), a flash memory, an SSD (Solid State Drive), or a hard disk. That is, each functional processing unit is realized by the computer program reading and writing necessary data such as a table from a database (DB; Data Base) stored in the storage device or a storage area on the memory, and, in some cases, controlling related hardware (e.g., an input / output device, a display device, a communication interface device).

[0056] <Processing flow> 3 is a diagram showing a flow of a work efficiency calculation process executed by the work efficiency calculation system according to the embodiment of the present invention. In this embodiment, the work efficiency calculation process is executed by the work efficiency output device 100 and the manager terminal 50.

[0057] In step S10, the acquisition unit 101 of the work efficiency output device 100 acquires images of the workers. Specifically, images (moving images or still images) of the workers 5a to 5d captured by the camera 30 are acquired.

[0058] In step S11, the acquisition unit 101 extracts each of the workers 5a to 5d from within the image.

[0059] In step S12, the classification unit 102 of the work efficiency output device 100 performs a classification process of main work and auxiliary work. In this embodiment, for each of the workers 5a to 5d extracted in step S11, each extracted image is analyzed, and the images of the multiple workers 5a to 5d are classified into whether they are images showing main work in the process of proceeding with the shipment, or images showing auxiliary work that does not correspond to the main work.

[0060] Here, the classification process of the main task and the auxiliary task will be described with reference to Fig. 4 and Fig. 5. Fig. 4 and Fig. 5 are diagrams showing the flow of the classification process of the main task and the auxiliary task executed by the task efficiency calculation system according to the embodiment of the present invention.

[0061] In step S30, the classification unit 102 of the work efficiency output device 100 of the work efficiency calculation system 1 determines whether or not one worker has been recognized in the image. If one worker has been recognized (YES in step S30 in FIG. 4), the process proceeds to step S31, where it is determined whether or not a product has been recognized on the workbench.

[0062] If a product is recognized on the work table (YES in step S31), proceed to step S32 in Fig. 5 to determine whether the area of ​​the product in the image has increased. If it is determined that the area of ​​the product in the image has increased (YES in step S32), it is classified as Main Task 1 (task of counting products, task of removing products from a box).

[0063] On the other hand, if the area of ​​the product in the image has not increased (NO in step S32), it is determined whether the area of ​​the product in the image has decreased (step S33). If it is determined that the area of ​​the product in the image has decreased (YES in step S33), it is classified as main task 2 (the task of putting the product into a container).

[0064] On the other hand, if the area of ​​the product in the image has not decreased (NO in step S33), it is determined whether the worker is facing the direction of the workbench (step S34). If the worker is facing the direction of the workbench (YES in step S34), it is determined whether the worker is working at the workbench (step S35).

[0065] If the worker is working at the workbench (YES in step S35), the worker is classified as main work 3 (price tagging work). On the other hand, if the worker is not working at the workbench (NO in step S35), the worker is classified as ancillary work 5 (guidance required).

[0066] Furthermore, in step S34, if the worker is not facing the direction of the workbench (NO in step S34), the task is classified as ancillary task 1 (preparatory task).

[0067] Returning to FIG. 4, if at least one worker is not recognized in the image in step S30 (NO in step S30), it is determined whether two or more workers have been recognized (step S36). If it is determined that two or more workers have been recognized (YES in step S36), the task is classified as ancillary task 4 (under instruction).

[0068] On the other hand, if it is determined that two or more people are not recognized (NO in step S36), the task is classified as ancillary task 6 (absent).

[0069] Next, in step S31, if it is determined that the product is not recognized on the work table (No in step S31), it is determined whether the immediately preceding task is the main task (step S37). If it is determined that the immediately preceding task is the main task (YES in step S37), it is classified as ancillary task 3 (task following the main task).

[0070] On the other hand, if it is determined that the immediately preceding task is not the main task (NO in step S37), it is classified as ancillary task 2 (preparatory task).

[0071] In this manner, classification is performed into a plurality of main tasks 1 to 3 and a plurality of auxiliary tasks 1 to 6.

[0072] 3, in step S13, the calculation unit 103 of the work efficiency output device 100 calculates the main work time and the auxiliary work time. Specifically, the calculation unit 103 calculates the work time for each of the main works and the auxiliary works.

[0073] In step S14, the calculation unit 103 calculates the work efficiency. Specifically, the calculation unit 103 calculates the work efficiency of the worker based on the work time of the main work and the work time of the ancillary work. The work efficiency is calculated by dividing the main work time by the sum of the main work time and the ancillary work time.

[0074] In step S15, the input / output unit 52 of the manager terminal 50 cumulatively displays the main task time, the auxiliary task time, and the task efficiency for each worker in association with the task location. Fig. 6 shows a display example on the manager terminal of the task efficiency calculation system according to the embodiment of the present invention.

[0075] In Fig. 6, the main task time, ancillary task time, and task efficiency are cumulatively displayed in association with the work location for each of multiple workers X, Y, Z, and W. Note that the icons of the work tables corresponding to the work tables 6a to 6d in Fig. 1 are shown as 6ax to 6dx, and the icon of the conveyor corresponding to the conveyor 40 in Fig. 1 is shown as 40x.

[0076] In Figure 6, the work efficiency of worker Z is ranked first, which is indicated by a crown icon, and the ratio of time spent on main work and ancillary work is shown in a bar graph and also numerically. For example, the work efficiency is 77%, the time spent on main work is 92.4 minutes, and the time spent on ancillary work is 27.6 minutes. Similarly, for the other workers X, Y, and W, a bar graph showing the ratio of time spent on main work and ancillary work, and numerical values ​​for work efficiency, main work time, and ancillary work time are shown.

[0077] Fig. 7 is a diagram showing an example of a display of the accumulated ancillary task time for each worker according to an embodiment of the present invention. As shown in Fig. 7, a bar graph is shown in which the times of a plurality of ancillary tasks W1 to W6 are piled up for each of workers X to W. In the bar graph of Fig. 7, the height of each graph indicates the total task time for a plurality of ancillary tasks W1 to W6, and the ancillary task time of worker X is the shortest, followed by worker Z, worker W, and worker Y in that order.

[0078] Returning to FIG. 3, in step S16, it is determined whether the work efficiency is equal to or lower than a predetermined value, and if the work efficiency is equal to or lower than the predetermined value (YES in step S16), the work efficiency output device 100 notifies the manager terminal 50 of the corresponding worker (step S17).

[0079] Next, in step S18, it is determined whether or not the auxiliary work is being supervised. If it is determined in step S16 that the work efficiency is not equal to or lower than the predetermined value, the process also proceeds to step S18.

[0080] When it is determined that the auxiliary work is being supervised (YES in step S18), the work efficiency output device 100 notifies the manager terminal 50 that supervision is being performed (step S19).

[0081] In step S20, the work efficiency is calculated and displayed for each worker by time period. If it is determined in step S18 that the auxiliary work is not being supervised (NO in step S18), the process also proceeds to step S20.

[0082] Specifically, the calculation unit 103 of the work efficiency output device 100 calculates the work efficiency of a worker based on the work time of the main task and the work time of the ancillary task, and the input / output unit 52 of the manager terminal 50 displays the work efficiency calculated by the calculation unit 103 for each worker, together with the time spent on the main task and the ancillary task.

[0083] FIG. 8 is a diagram showing the start and end times of work, the main work time, the auxiliary work time, and the work efficiency of a specific worker in a time series according to an embodiment of the present invention. FIG. 8 shows the start time, end time, main work time (minutes), auxiliary work time (minutes), and work efficiency (%) for work performed by worker X on October 10, 2020. By displaying the work efficiency by time period in this way, it can be seen that the work efficiency is high, for example, in the time period from 9:00 to 10:00 immediately after the start of work, and in the time periods from 13:00 to 14:00 and 14:00 to 15:00 after the lunch break.

[0084] FIG. 9 shows an example of a productivity graph according to an embodiment of the present invention. The productivity graph 110 shown in FIG. 9 graphically displays the work content of each worker or each work station number on an all-day or hourly basis. Here, the number of terms means one work, and for example, the work of taking out a product from a box is set as one term, and the number of terms is counted by image analysis. The graph for each work station is obtained by dividing each time by the number of terms. In addition, a button B is provided above the productivity graph 110 for selectively displaying the status of the work station for each time period. FIG. 9 shows the status of each work station when the "all-day" button is selected.

[0085] After the work efficiency for each worker is calculated and displayed for each time period in step S20 as described above, the work efficiency calculation process flow ends.

[0086] <Effects> According to such a work efficiency calculation system 1, it is possible to analyze the work status of logistics work for each worker, grasp the main work time and the associated work time, and quantitatively evaluate the work efficiency of the workers.

[0087] According to the work efficiency calculation system 1, a given work is composed of multiple main works and multiple auxiliary works, the calculation unit 103 calculates the work time for each of the multiple main works and multiple auxiliary works, and the input / output unit 52 accumulates and outputs the work time calculated for each of the multiple auxiliary works for each worker. This makes it possible to display the accumulated main work time and auxiliary work time for each worker.

[0088] Furthermore, according to the work efficiency calculation system 1, the input / output unit 52 displays at least one of the work time of the main work and the work time of the associated work for each worker in association with the work location of the worker. This makes it possible to display work efficiency in association with the work location.

[0089] Furthermore, the work efficiency calculation system 1 calculates the work efficiency of a worker based on the work time of the main work and the work time of the associated work, and notifies the manager when the work efficiency of the worker is below a predetermined threshold. This allows workers with low work efficiency to be individually addressed in terms of the work environment, health management, etc.

[0090] Moreover, according to the work efficiency calculation system 1, the acquisition unit 101 acquires images of multiple workers working simultaneously, extracts each worker from the images, and the classification unit 102 analyzes each image extracted for each worker and classifies the images of the multiple workers as to whether they are images of main work in which the process progresses toward shipment, or images of ancillary work that does not correspond to the main work. This makes it possible to calculate the work efficiency of multiple workers simultaneously with one camera 30.

[0091] Furthermore, according to the work efficiency calculation system 1, when a person is detected within a predetermined range of an image showing a worker's work, the worker is notified that the person is giving instructions. This makes it possible to encourage the worker to concentrate on the work.

[0092] Moreover, according to the work efficiency calculation system 1, the calculation unit 103 calculates the work efficiency of a worker based on the work time of the main work and the work time of the associated work, and the input / output unit 52 displays the work efficiency calculated by the calculation unit 103 for each worker together with the time spent on the main work and the associated work. This allows the work efficiency to be calculated in chronological order, making it possible to know which time periods have high / low work efficiency.

[0093] Although the present invention has been described above using the embodiments, it goes without saying that the technical scope of the present invention is not limited to the scope described in the above embodiments. It is clear to those skilled in the art that various modifications or improvements can be made to the above embodiments. In addition, it is clear from the claims that such modifications or improvements can also be included in the technical scope of the present invention. In the above embodiments, the present invention has been described as an invention of a product, that is, a work efficiency calculation system, but it can also be considered as an invention of a method executed by the work efficiency calculation system in the present invention, or a program that makes the work efficiency calculation system function as various means. In addition, the work to which the present invention can be applied includes distribution processing work that adds value in distribution, as well as unavoidable work in distribution, such as general logistics work such as receiving, warehousing, transporting, storing, inventory, picking, inspection, packaging, sorting, shipping, and loading.

[0094] Moreover, the working efficiency calculation system of the present invention can be configured as follows. (1) A work efficiency calculation system that calculates the work efficiency of logistics work performed by workers in a warehouse, comprising: an acquisition unit that acquires images showing specified work performed by the worker; a classification unit that analyzes the acquired images and classifies them as images showing main work in which a process is progressing towards shipment, or images showing ancillary work that does not correspond to the main work; a calculation unit that calculates the work time of the main work and the work time of the ancillary work for each worker from the shooting time of each classified image; and an output unit that outputs the calculated work time of the main work and the work time of the ancillary work for each worker.

[0095] (2) The specified work is product packing work, and the classification unit classifies the images as either images depicting a main task of product packing work or an ancillary task that does not correspond to the main task, and the calculation unit calculates the work time for the main task of product packing work and the work time for the ancillary task that are classified for each worker.

[0096] (3) The specified work is composed of a plurality of main tasks and a plurality of ancillary tasks, the calculation unit calculates the work time for each of the plurality of main tasks and / or the plurality of ancillary tasks, and the output unit accumulates and outputs the calculated work time for at least one of the plurality of main tasks and the plurality of ancillary tasks for each worker.

[0097] (4) The output unit is configured to display at least one of the work time of the main work and the work time of the ancillary work for each worker in association with the work location of the worker.

[0098] (5) The calculation unit is configured to calculate the work efficiency of the worker based on the work time of the main work and the work time of the ancillary work, and notify a manager when the work efficiency of the worker is equal to or lower than a predetermined threshold.

[0099] (6) The acquisition unit acquires images of multiple workers working simultaneously and extracts each worker from the images. The classification unit analyzes each image extracted for each worker and classifies the images of the multiple workers as either images showing the main work as the process progresses toward shipment or images showing the ancillary work.

[0100] (7) When the acquisition unit detects a person within a predetermined range of an image showing the worker working, the acquisition unit notifies the worker that the person is providing guidance.

[0101] (8) The calculation unit calculates the work efficiency of the worker based on the work time of the main work and the work time of the ancillary work, and the output unit displays the work efficiency calculated by the calculation unit for each worker together with the time spent performing the main work and the ancillary work. [Explanation of symbols]

[0102] 1. Work efficiency calculation system 3. Network 5a~5d worker 6a~6d Work bench 6ax~6dx Icon 7a~7d Oricon 8a~8d products 30 Camera 40 Conveyor 40x Icon 50 Administrator terminal 51 Terminal control unit 52 Input / output section 53 Communications Department 100 Work efficiency output device 101 Acquisition Department 102 Classification Department 103 Calculation section 110 Productivity Graph B Button

Claims

1. A work efficiency calculation system for calculating the work efficiency of logistics work for distribution processing performed by workers in a warehouse, An acquisition unit that acquires images showing the status of a predetermined work table, a product, and a worker; a classification unit that analyzes the state of the product and the worker in the acquired image and classifies the image by workbench as to whether the image is an image showing a main work in which the distribution processing work progresses or an image showing ancillary work not corresponding to the main work, including at least preparatory work; a calculation unit that calculates the work time of the main work and the work time of the ancillary work on a workbench basis from the photographing time of each of the classified images; an output unit that associates the workbench with the worker and outputs the calculated work time of the main work and the work time of the ancillary work for each worker.

2. The classification unit classifies the image into whether it is an image showing a main task in the packing work of the product or an image showing an ancillary task that does not correspond to the main task, 2. The work efficiency calculation system according to claim 1, wherein the calculation unit calculates the work time of a main work of packing the sorted products and the work time of ancillary work for each worker.

3. The calculation unit calculates the task time for each of a plurality of main tasks and / or a plurality of associated tasks, 3. The work efficiency calculation system according to claim 1, wherein the output unit accumulates and outputs the work time calculated for at least one of the plurality of main tasks and the plurality of auxiliary tasks for each worker.

4. The work efficiency calculation system according to any one of claims 1 to 3, wherein the output unit displays at least one of the work time of the main work and the work time of the ancillary work for each worker in association with the work location of the worker.

5. The work efficiency calculation system according to any one of claims 1 to 3, wherein the calculation unit calculates the work efficiency of the worker based on the work time of the main work and the work time of the ancillary work, and notifies an administrator when the work efficiency of the worker is equal to or lower than a predetermined threshold.

6. The acquisition unit acquires an image in which a plurality of workers are working simultaneously, and extracts each worker from the image; The work efficiency calculation system according to any one of claims 1 to 5, wherein the classification unit analyzes each image extracted for each worker and classifies the images of multiple workers into images showing the main work or images showing the ancillary work.

7. The work efficiency calculation system according to any one of claims 1 to 6, wherein the acquisition unit, when detecting a person within a predetermined range of an image showing the work of the worker, notifies the worker that the person is currently providing guidance.

8. The calculation unit calculates a work efficiency of the worker based on a work time of the main work and a work time of the associated work, 8. The work efficiency calculation system according to claim 1, wherein the output unit displays the work efficiency calculated by the calculation unit for each worker together with the time spent performing the main work and the associated work.

9. A method executed by a work efficiency calculation system for calculating work efficiency of logistics work of distribution processing performed by workers in a warehouse, comprising: Acquiring an image showing a state of a predetermined work table, a product, and a worker; A step of analyzing the acquired images and classifying the images by workbench as to whether they are images showing main work in which the distribution processing work progresses or images showing auxiliary work not corresponding to the main work, including at least preparatory work; calculating the work time of the main work and the work time of the ancillary work on a workbench basis from the photographing time of each of the classified images; and a step of associating the work bench with the worker and outputting the calculated work time of the main work and the work time of the ancillary work for each worker.

10. A work efficiency calculation system that calculates the work efficiency of distribution processing logistics work performed by workers in a warehouse, an acquisition unit that acquires images showing the status of a predetermined workbench, a product, and a worker; a classification unit that analyzes the acquired images and classifies the images by workbench as to whether the images are images of main work in which the distribution processing work progresses or images of ancillary work not corresponding to the main work, including at least preparatory work; a calculation unit that calculates the work time of the main work and the work time of the ancillary work on a workbench basis from the photographing time of each of the classified images; A program that functions as an output unit that associates the workbench with the worker and outputs the calculated work time of the main work and the work time of the ancillary work for each worker.

Citation Information

Patent Citations

  • Management system, managing device and management program

    JP2009076059A

  • Physical distribution history information management utilization system

    JP2016224675A

  • System for grasping in-physical-distribution-warehouse operation

    JP2019101693A