INFRASTRUCTURE EQUIPMENT, COMMUNICATIONS DEVICES AND METHODS

JP7586169B2Active Publication Date: 2024-11-19SONY GROUP CORP
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
JP2022507780
Authority / Receiving Office
JP · JP
Patent Type
Patents
Current Assignee / Owner
Priority Date
2019-08-15
Filing Date
2020-07-27
Publication Date
2024-11-19
Estimated Expiration
2040-07-27

Smart Images

  • Figure 0007586169000001
    Figure 0007586169000001
  • Figure 0007586169000002
    Figure 0007586169000002
  • Figure 0007586169000003
    Figure 0007586169000003
Patent Text Reader

Abstract

Provided is infrastructure equipment configured to transmit and receive data and forming part of a wireless communication network, the infrastructure equipment comprising: a transceiver circuit configured to transmit and receive signals over a radio access interface provided by the wireless communication network; and a controller circuit, the controller circuit configured in combination with the transceiver circuit to: send to a communication device a first control signal providing an indication of a set of downlink communication resources of the radio access interface on which the infrastructure equipment intends to transmit a plurality of transport blocks to the communication device; and to send to the communication device during a scheduling gap a second control signal providing an indication of at least one change associated with a second plurality of transport blocks, the plurality of transport blocks including a first plurality of transport blocks transmitted on the first set of downlink communication resources and the second plurality of transport blocks transmitted on the second set of downlink communication resources, the first set of downlink communication resources and the second set of downlink communication resources being separated in time by the scheduling gap formed by a third set of downlink communication resources of the radio access interface.
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present disclosure relates to communication devices, infrastructure equipment, and methods for transmitting data by communication devices in a wireless communication network. This application claims the Paris Convention priority of European Patent Application No. 19191977.6, the contents of which are incorporated herein by reference. [Background technology]

[0002] The "Background" discussion provided herein is intended to generally provide a context for the present disclosure. The work of the presently named inventors is not admitted expressly or impliedly as prior art to the present invention, as are aspects of the specification that do not qualify as prior art at the time of filing, to the extent that they are described in this Background section.

[0003] Third and fourth generation mobile communication systems, such as those based on the 3GPP® defined UMTS and LTE (Long Term Evolution) architectures, are capable of supporting more advanced services than the simple voice and messaging services offered by previous generations of mobile communication systems. For example, with the improved air interface and enhanced data rates offered by LTE systems, users can enjoy high data rate applications such as mobile video streaming and mobile video conferencing that were previously available only over fixed-line data connections. Thus, the demand for deploying such networks is strong, and the coverage areas of these networks, i.e., the geographic locations where the networks are accessible, are expected to expand at an ever-increasing rate.

[0004] Future wireless communication networks are expected to routinely and efficiently support communications with a wider range of devices associated with a wider range of data traffic profiles and types than current systems are optimized to support. For example, future wireless communication networks are expected to efficiently support communications with devices including reduced complexity devices, machine type communication (MTC) devices, high definition video displays, virtual reality headsets, and the like. Some of these different types of devices may be deployed in very large numbers, e.g., low complexity devices to support the "Internet of Things," and may be typically associated with the transmission of relatively small amounts of data with relatively high latency tolerance. Another type of device, for example supporting high definition video streaming, may be associated with the transmission of relatively large amounts of data with relatively low latency tolerance. Other types of devices, for example used for autonomous vehicle communications or other critical applications, are characterized by data that must be transmitted over low latency, highly reliable networks. A single device type may also be associated with different traffic profiles / characteristics depending on the application it is running. For example, different considerations may apply to efficiently support data exchange with a smartphone running a video streaming application (high downlink data) versus an Internet browsing application (sporadic uplink and downlink data), or used for voice communications by emergency responders in emergency scenarios (data subject to stringent reliability and latency requirements).

[0005] In this regard, it is expected that future wireless communication networks, such as, for example, what may be referred to as 5G or New Radio (NR) systems / New Radio Access Technology (RAT) systems, and future versions / releases of existing systems, will be desired to efficiently support connectivity for a wide range of devices associated with different applications and different characteristic data traffic profiles.

[0006] One example of a field currently receiving attention in this regard is the so-called "Internet of Things", or IoT for short. Proposed in Release 13 of the 3GPP specifications, 3GPP has developed techniques to support Narrowband (NB)-IoT and the so-called enhanced MTC (eMTC) operation using LTE / 4G radio access interfaces and radio infrastructure. Recently, there have been proposals to build on these ideas in Release 14 of the 3GPP specifications with the so-called enhanced NB-IoT (eNB-IoT) and further enhanced MTC (feMTC) and in Release 15 of the 3GPP specifications with the so-called further enhanced NB-IoT (feNB-IoT) and further enhanced MTC (efeMTC) (see, for example, non-patent documents 1-4). IoT is further enhanced in 3GPP with the introduction of two additional Release 16 work items, namely A-MTC (Additional Machine Type Communication Enhancements) (Non-Patent Document 5) and A-NB-IoT (Additional Enhancements for Narrowband Internet of Things) (Non-Patent Document 6).

[0007] The increasing use of different types of network infrastructure equipment and terminal devices associated with different traffic profiles creates new challenges for efficiently handling communications in wireless communication systems that need to be addressed. [Prior art documents] [Non-patent literature]

[0008] [Non-Patent Document 1] RP- 161464, "Revised WID for Further Enhanced MTC for LTE," Ericsson, 3GPP TSG RAN Meeting #73, New Orleans, USA, September 19 - 22, 2016. [Non-Patent Document 2] RP-161901, "Revised work item proposal: Enhancements of NB-IoT", Huawei, HiSilicon, 3GPP TSG RAN Meeting #73, New Orleans, USA, September 19 - 22, 2016. [Non-Patent Document 3] RP-170732, "New WID on Even further enhanced MTC for LTE," Ericsson, Qualcomm, 3GPP TSG RAN Meeting #75, Dubrovnik, Croatia, March 6 - 9, 2017. [Non-Patent Document 4] RP-170852, "New WID on Further NB-IoT enhancements," Huawei, HiSilicon, Neul, 3GPP TSG RAN Meeting #75, Dubrovnik, Croatia, March 6 - 9, 2017. [Non-Patent Document 5] RP-191356, "Additional MTC enhancements for LTE," Ericsson, 3GPP TSG RAN Meeting #84, Newport Beach, USA, June 3 - 6, 2019. [Non-Patent Document 6] RP-191576, "Additional enhancements for NB-IoT," Huawei, 3GPP TSG RAN Meeting #84, Newport Beach, USA, June 3 - 6, 2019. [Non-Patent Document 7] Holma H. ​​and Toskala A, "LTE for UMTS OFDMA and SC-FDMA based radio access", John Wiley and Sons, 2009. Summary of the Invention

[0009] The present disclosure may help address or alleviate at least some of the problems discussed above.

[0010] In a first embodiment of the present technology, there is provided infrastructure equipment forming part of a wireless communication network. The infrastructure equipment is configured to transmit and receive data; a transceiver circuit configured to transmit and receive signals over a radio access interface provided by the wireless communication network; Controller circuit and Equipped with The controller circuit is transmitting a first control signal to the communications device providing an indication of a set of downlink communications resources of the radio access interface on which the infrastructure equipment intends to transmit a plurality of transport blocks to the communications device; transmitting a second control signal to the communications device during a scheduling gap, the second control signal providing an indication of at least one change related to a second plurality of transport blocks; Combining the above-mentioned transmitter / receiver circuit, the plurality of transport blocks includes a first plurality of transport blocks transmitted on a first set of downlink communications resources and the second plurality of transport blocks transmitted on a second set of downlink communications resources; The first and second series of downlink communications resources are separated in time by the scheduling gap formed by a third series of downlink communications resources of the radio access interface.

[0011] In some configurations of the first embodiment of the present technology, the at least one modification related to the second plurality of transport blocks is that the scheduling gap is extended in time. In other configurations of the first embodiment of the present technology, the at least one modification related to the second plurality of transport blocks is that the infrastructure equipment does not transmit one or more of the second plurality of transport blocks indicated by the first control signal. In another configuration of the first embodiment of the present technology, the at least one modification associated with the second plurality of transport blocks is a modification of at least one communication parameter of a second set of downlink communication resources indicated by the first control signal.

[0012] A second embodiment of the present technology may provide infrastructure equipment forming part of a wireless communication network. The infrastructure equipment includes a transceiver circuit configured to transmit and receive data and configured to transmit and receive signals over a radio access interface provided by the wireless communication network; Controller circuit and Equipped with The controller circuit is transmitting a first control signal to the communications device providing an indication of a set of uplink communications resources of the radio access interface over which the communications device transmits a plurality of transport blocks to the infrastructure equipment; transmitting a second control signal to the communications device during a scheduling gap, the second control signal providing an indication of at least one change related to a second plurality of transport blocks; Combining the above-mentioned transmitter / receiver circuit, the plurality of transport blocks includes a first plurality of transport blocks transmitted on a first set of uplink communications resources and the second plurality of transport blocks transmitted on a second set of uplink communications resources; The first set of uplink communications resources and the second set of uplink communications resources are separated in time by the scheduling gap formed by a third set of uplink communications resources of the radio access interface.

[0013] In some configurations of the second embodiment of the present technology, the at least one modification related to the second plurality of transport blocks is that the scheduling gap is extended in time. In other configurations of the second embodiment of the present technology, the at least one modification related to the second plurality of transport blocks is that the communication device should not transmit one or more of the second plurality of transport blocks indicated by the first control signal. In another configuration of the second embodiment of the present technology, the at least one modification associated with the second plurality of transport blocks is a modification of at least one communication parameter of a second set of uplink communication resources indicated by the first control signal.

[0014] Embodiments of the present technology relate to communication devices, infrastructure equipment and methods of operating communication devices, and circuitry for infrastructure equipment and communication devices, which can enable enhanced scheduling of multi-TB transmissions while mitigating at least some of the problems associated with multi-TB transmissions.

[0015] Each aspect and feature of the present disclosure is defined in the accompanying claims.

[0016] It is to be understood that both the foregoing general description and the following detailed description are exemplary of the present technology but are not restrictive of the present technology, the described embodiments together with further advantages will be best understood by reference to the following detailed description taken in conjunction with the accompanying drawings, in which: [Brief description of the drawings]

[0017] The present disclosure and many of the attendant advantages will be better understood by reference to the following detailed description when taken in conjunction with the accompanying drawings, in which like reference numerals indicate the same or corresponding parts throughout the several views, and in which: [Figure 1] 1 illustrates generally some aspects of an LTE-type wireless telecommunications system configured to operate in accordance with certain embodiments of the present disclosure; [Diagram 2] 1 illustrates generally several example aspects of a new Radio Access Technology (RAT) wireless telecommunications system configured to operate in accordance with certain embodiments of the present disclosure; [Diagram 3] FIG. 2 is a schematic block diagram of an example of infrastructure equipment and communication devices configured to operate in accordance with certain embodiments of the present disclosure. [Figure 4] 1 illustrates an example of how a single MTC Physical Downlink Control Channel (MPDCCH) schedules a single Physical Downlink Shared Channel (PDSCH), such as in legacy enhanced machine type communications (eMTC). [Diagram 5] 1 shows an example of how a single MPDCCH can schedule multiple PDSCHs, such as Additional MTC (A-MTC). [Figure 6] 1 shows an example of a multi-transport block (TB) transmission with scheduling gaps between the multi-TB transmissions. [Figure 7] An example of how channel conditions vary within a multi-TB transmission is shown. [Figure 8A]1 shows a first partial schematic diagram, some message flow diagram representations, of a wireless communication network comprising communication devices and infrastructure equipment according to an embodiment of the present technology; [Figure 8B] 2 shows a second partial schematic diagram, some message flow diagram representations, of a wireless communication network including communication devices and infrastructure equipment according to an embodiment of the present technology; [Figure 9] 1 illustrates an example of a method for extending a scheduling gap through skipping one or more TBs according to an embodiment of the present technology. [Figure 10] 1 illustrates an example of how a scheduling gap can be expanded through the postponement of one or more TBs according to an embodiment of the present technology. [Figure 11] 1 shows an example of how a scheduling gap can be extended by postponing one or more TBs that are in the extended scheduling gap until the end of a multi-TB transmission, according to an embodiment of the present technology. [Figure 12] 1 illustrates an example of how the scheduling gap can be extended when there is a delay at the UE in decoding the MPDCCH according to an embodiment of the present technology. [Figure 13] 1 illustrates an example of how a downlink grant received by a UE during a scheduling gap schedules a new PDSCH and preempts a multi-TB transmission according to an embodiment of the present technology. [Figure 14] 1 illustrates an example of how Hybrid Automatic Repeat Request Acknowledgement (HARQACK / NACK) signaling during a scheduling gap can result in early termination of a multi-TB transmission in accordance with an embodiment of the present technology. [Figure 15] 1 illustrates an example of how an early termination signal may cause a UE to send HARQACK / NACK feedback in accordance with an embodiment of the present technology. [Figure 16] 1 illustrates an example of how a UE implicitly derives resources used for a Physical Uplink Control Channel (PUCCH) transmission in which a multi-TB transmission ends during a scheduling gap, according to an embodiment of the present technology. [Figure 17] 1 illustrates an example of how a UE may transmit a channel state information (CSI) report during a scheduling gap in accordance with an embodiment of the present technology. [Figure 18] 1 illustrates an example of how a UE may perform measurements during scheduling gaps and transmit CSI reports based on these measurements in accordance with an embodiment of the present technology. [Figure 19] 1 illustrates an example of a method for a UE to transmit a Sounding Reference Signal (SRS) upon receiving a NACK at an eNB related to a Physical Uplink Shared Channel (PUSCH) transmission by the UE. [Figure 20A] FIG. 1 shows a first flow diagram illustrating a process of communication in a communication system according to an embodiment of the present technology. [Figure 20B] FIG. 2 shows a second flow diagram illustrating a process of communication in a communication system according to an embodiment of the present technology. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0018] (Long Term Evolution Advanced Radio Access Technology (4G)) FIG. 1 provides a schematic diagram illustrating some basic functionality of a mobile telecommunications network / system 100 that generally operates according to LTE principles, but may also support other radio access technologies, and that can be adapted to implement embodiments of the present disclosure as described herein. Specific aspects of the various elements of FIG. 1 and their respective modes of operation are well known and defined in the relevant standards administered by the 3GPP (RTM) organization and are also described in many books on the subject, for example Holma H. ​​and Toskala A, “3GPP 3GPP Standards for Multimedia Applications,” IEEE Trans. It will be understood that operational aspects of a telecommunications (or simply, communication) network not specifically described herein (e.g., with respect to particular communication protocols and physical channels for communicating between different elements) may be implemented in accordance with any known techniques, for example in accordance with the relevant standards and known proposed amendments and additions to those standards.

[0019] The network 100 includes a number of base stations 101 connected to a core network portion 102. Each base station provides a coverage area 103 (i.e., a cell) over which data can be communicated to and from terminal devices 104. Data is transmitted from the base stations 101 to the terminal devices 104 within their respective coverage areas 103 via a wireless downlink (DL). Data is transmitted from the terminal device 104 to the base station 101 via a wireless uplink (UL). The core network unit 102 transmits and receives data to and from the terminal device 104 via each base station 101, and provides functions such as authentication, mobility management, and billing. The terminal device may also be called a mobile station, user equipment (UE), user terminal, mobile radio, or communication device. A base station, which is an example of network infrastructure equipment / network access node, may also be referred to as a transceiver station / Node B / eNode B, eNB, gNode B, gNB, etc. In this regard, different terminology is often associated with different generations of wireless telecommunications systems for elements that provide broadly equivalent functionality. However, certain embodiments of the present disclosure may be equally implemented in different generations of wireless telecommunications systems, and for brevity, a particular terminology may be used regardless of the underlying network architecture, i.e., the use of a particular term in connection with a particular example embodiment is not intended to indicate that those examples are limited to the particular generation of networks to which that particular terminology may be most relevant.

[0020] (New Wireless Access Technology (5G)) FIG. 2 is a schematic diagram illustrating a network architecture for a New RAT wireless communication network / system 200 based on a previously proposed approach that may also be adapted to provide functionality according to embodiments of the present disclosure described herein. The New RAT network 200 shown in Fig. 2 includes a first communication cell 201 and a second communication cell 202. Each communication cell 201, 202 includes a control node (centralization unit) 221, 222 that communicates with a core network configuration requirement 210 via a respective wired or wireless link 251, 252. Each control node 221, 222 is also in communication with a number of distributed units (radio access nodes / remote transmission / reception points (TRPs)) 211, 212 in its respective cell. Again, these communications may be via respective wired or wireless links. The distributed units (DUs) 211, 212 are responsible for providing a wireless access interface to communication devices connected to the network. Each distributed unit 211, 212 has a coverage area (radio access footprint) 241, 242, and the sum of the coverage areas 241, 242 of the distributed units 211, 212 under the control of the control nodes 221, 222 together define the coverage of the respective communication cell 201, 202. Each distributed unit 211, 212 includes a transmitter circuit (receiver circuit) for transmitting and receiving radio signals, and a processor circuit (controller circuit) configured to control the respective distributed unit 211, 212.

[0021] From the perspective of broad top-level functionality, the core network portion 210 of the New RAT communications network depicted in Figure 2 may be broadly considered to correspond to the core network 12 depicted in Figure 1. Each control node 221, 222 and their associated distributed units / TRPs 211, 212 may be broadly considered to provide functionality corresponding to the base station 11 of Figure 1. The term network infrastructure equipment / access node may be used to encompass these components as well as more traditional base station type components of wireless communication systems. Depending on the application at hand, the responsibility for scheduling transmissions scheduled over the air interface between each distributed unit and the communication devices may rest with the control node / centralized unit and / or with the distributed units / TRPs.

[0022] 2 shows a communication device or UE 260 located within the coverage area of ​​a first communication cell 201. This communication device 260 is therefore able to exchange signals with a first control node 221 in the first communication cell 201 via one of the distributed units 211 associated with the first communication cell 201. It will be appreciated that in some cases, communications for a given communication device are routed through only one of the distributed units, while in some other implementations, communications associated with a given communication device may be routed through two or more distributed units, for example in soft handover scenarios and other cases.

[0023] For simplicity, in the example of FIG. 2, two communication cells 201, 202 and one communication device 260 are shown, but it will be appreciated that in practice the system may comprise a larger number of communication cells (supported by respective control nodes and multiple distribution units) serving a larger number of communication devices.

[0024] It will be further appreciated that FIG. 2 represents merely one example of a proposed architecture for a New RAT communication system in which an approach in accordance with the principles described herein may be employed, and that the functionality disclosed herein may also be applied in relation to wireless communication systems having different architectures.

[0025] Thus, the exemplary embodiments of the present disclosure described herein may be implemented in wireless telecommunications systems / networks according to a variety of different architectures, such as the exemplary architectures shown in Figures 1 and 2. It will thus be understood that the particular wireless communication architecture in any given implementation is not of primary importance to the principles described herein. In this regard, the exemplary embodiments of the present disclosure may be generally described in the context of communications between network infrastructure equipment / access nodes and communications devices, with the particular nature of the network infrastructure equipment / access nodes and communications devices depending on the network infrastructure for the implementation at hand. For example, in some cases the network infrastructure equipment / access nodes may comprise base stations such as an LTE type base station 11 as shown in FIG. 1 adapted to provide functionality in accordance with the principles described herein, and in other examples the network infrastructure equipment / access nodes may comprise controllers / control nodes 221, 222 and / or TRPs 211, 212 of the type shown in FIG. 2 adapted to provide functionality in accordance with the principles described herein.

[0026] A more detailed illustration of a UE 270 and exemplary network infrastructure equipment 272, which may be a combination of an eNB 101 or a control node 221 and a TRP 211, is shown in FIG. As shown in FIG. 3, a UE 270 is shown transmitting uplink data to infrastructure equipment 272 via resources of a radio access interface, as generally indicated by arrow 274 . The UE 270 may similarly be configured to receive downlink data transmitted by infrastructure equipment 272 via resources of a radio access interface (not shown). Similar to Figures 1 and 2, the infrastructure equipment 272 is connected to a core network 276 via an interface 278 to a controller 280 of the infrastructure equipment 272. The infrastructure equipment 272 includes a receiver 282 coupled to an antenna 284 and a transmitter 286 coupled to the antenna 284. Correspondingly, the UE 270 includes a controller 290 coupled to a receiver 292 that receives signals from an antenna 294 and a transmitter 296 that is also coupled to the antenna 294.

[0027] The controller 280 is configured to control the infrastructure equipment 272 and may include a processor circuit (controller circuit) that in turn has various sub-units / sub-circuits to provide desired functionality, as further described herein. These sub-units may be implemented as separate hardware elements or as suitably configured functions in a processor circuit. Thus, controller 280 may consist of circuitry suitably configured / programmed to provide the desired functionality described herein, using conventional programming / configuration techniques for equipment in wireless telecommunications systems. The transmitter 286 and receiver 282 may include signal processing, radio frequency filters, amplifiers, and circuitry in accordance with conventional configurations. The transmitter 286, receiver 282, and controller 280 are shown generally in FIG. 3 as separate elements for ease of presentation. However, it will be appreciated that the functionality of these circuit elements may be provided in a variety of different ways, for example using one or more suitably programmable computers or one or more suitably configured application specific integrated circuits / circuits / chips / chipsets. It is understood that infrastructure equipment 272 may generally comprise a variety of other elements associated with its operational functions.

[0028] Correspondingly, the controller 290 of the UE 270 may include a processor circuit (controller circuit) configured to control the transmitter 296 and the receiver 292 and which in turn comprises various sub-units / sub-circuits for providing the functionality as further described herein. These sub-units may be implemented as separate hardware elements or as suitably configured functions in the processor circuit. Thus, controller 290 may comprise circuitry suitably configured / programmed to provide the desired functionality using conventional programming / configuration techniques for equipment in wireless telecommunications systems. Similarly, the transmitter 296 and receiver 292 may include signal processing, radio frequency filters, amplifiers, and circuitry in accordance with conventional configurations. The transmitter 296, receiver 292 and controller 290 are shown generally in FIG. 3 as separate elements for ease of presentation. However, it will be appreciated that the functionality of these circuit elements may be provided in a variety of different ways, for example using one or more suitably programmable computers, or one or more suitably configured application specific integrated circuits / circuits / chip(s) / chipset(s). As will be appreciated, communications device 270 will typically include various other elements associated with its operational functions, such as a power source, a user interface, etc., which are not shown in FIG. 3 for the sake of simplicity.

[0029] The controllers 280, 290 may be configured to execute instructions stored in a computer-readable medium, such as a non-volatile memory. The process steps described herein may be performed, for example, by a microprocessor in conjunction with a random access memory, which may operate according to instructions stored in a computer-readable medium.

[0030] (Transport Block Enhanced Scheduling) One of the objectives of Rel-16 A-MTC (Non-Patent Document 6) is to enhance DL / UL Transport Block (TB) scheduling. ·Specify scheduling of multiple DL / UL transport blocks with or without DCI for SC-PTM and unicast [RAN1, RAN2]. An extension of SPS is described (Non-Patent Document 6). In legacy enhanced machine type communications (eMTC) systems, a single Link Control Information (DCI) carrying a UL or DL ​​grant schedules a single Physical Uplink Shared Channel (PUSCH) TB or a single Physical Downlink Shared Channel (PDSCH) TB, respectively. The maximum transport block size (TBS) of the PDSCH is 1000 bits. If an eNB has 8000 data bits to send to a UE, it needs to send 8 MTC-Physical Downlink Control Channels (MPDCCHs) for 8 DL grants and schedule 8 PDSCHs, each with a TBS of 1000 bits. This is shown in the example of Figure 4, where the eNB sends 8 MPDCCHs labeled {M1, M2, M3, M4, M5, M6, M7, M8} to the 8 corresponding PDSCHs labeled {1, 2, 3, 4, 5, 6, 7, 8} that it schedules.

[0031] Legacy eMTC systems that use a single MPDCCH to schedule a single TB (PUSCH or PDSCH) are inefficient. Therefore, Rel-16 A-MTC (Non-Patent Document 6) introduces "multiple TBs per DCI" scheduling, where a single DCI can schedule multiple TBs. An example with 8000 data bits that the eNB transmits to the UE is shown in Figure 5. Here, we transmit a single DCI carried by MPDCCH M1, carrying 8 PDSCH TBs of a single DL grant scheduling, where each PDSCH transmits a 1000-bit transport block. The maximum number of TBs that can be scheduled in one DCI is 8 TB and 4 TB for CE mode A and CE mode B, respectively.

[0032] When multiple transport blocks are scheduled over a single DCI, communication resources are allocated to the UE (either in DL or UL) for a long period of time (i.e. the period required to schedule multiple transport blocks). At the time of scheduling, the eNodeB does not know if it needs to schedule another UE during that long period and therefore there is a risk that the eNodeB will schedule multiple transport blocks (there is a risk that the eNodeB may want to use the scheduled communication resources for some other reason in the future). Therefore, 3GPP introduces the concept of "scheduling gap" during multi-TB transmission, as shown in Fig. 6. Fig. 6 shows the operation in the following cases. · t0: The MPDCCH (labeled M1) schedules the multi-TB PDSCH starting at t1. · From t1 to t2: The first four transport blocks of a multi-TB transmission are transmitted to the UE on the PDSCH. · t2 to t3: A scheduling gap during which no PDSCH is transmitted to the UE and the UE does not attempt to decode the PDSCH (the scheduling gap is shown as one subframe in Figure 6 but can be longer than this). ·t3 to t4: Transmission of the final four transport blocks of the TB transmission in the same figure.

[0033] The use of scheduling gaps varies depending on the system implementation. Some potential uses are: · Transmitting MPDCCH to allocate resources to another eMTC UE. Transmission of an MPDCCH to allocate resources in the other link direction for the same UE (e.g., referring to FIG. 6, a scheduling gap may be used to schedule a PUSCH transmission from the UE), or Transmission of PDSCH resources for another LTE UE, e.g. a smartphone can be scheduled using PDSCH resources during a scheduling gap.

[0034] There are several issues with multi-TB transmission to and from the UE: A fixed duration of the scheduling gap means that other traffic scheduled during the scheduling gap is constrained to only use resources available during the scheduling gap. There is no mechanism for the UE to receive or send any acknowledgements during the scheduling gap. For short transmissions (e.g. with legacy operation), the eNodeB may select favorable communication resources for those transmissions. For example, the eNodeB may perform frequency selective scheduling to select non-fading communication resources for transmission. Multi-TB transmissions may extend beyond the coherence time of the channel and therefore some of the later transmitted transport blocks may experience poor channel conditions. This problem is illustrated in Figure 7. The eNodeB scheduler has channel knowledge (e.g., via Channel Quality Indicator (CQI) reports) to schedule a multi-TB transmission to the UE using NB1, where the channel conditions are good in narrowband 1 at time t0, and therefore the multi-TB transmission is extended between times t1 and t4. During the multi-TB transmission, the channel quality of NB1 deteriorates, and by the time of the scheduling gap, the channel conditions of NB1 deteriorate and NB2, which has different channel conditions from NB1, has better channel conditions. However, the eNodeB and the UE are still committed to using NB1 for PDSCH transmission because of the scheduling decision made at time t0. In this case, transport blocks 5, 6, 7 and 8 in Figure 7 may be received in error at the UE.

[0035] SUMMARY OF THE PRESENT TECHNOLOGY EMBODIMENTS Embodiments of the present technology seek to enhance scheduling of multi-TB transmissions while mitigating at least some of the problems associated with multi-TB transmissions as discussed above.

[0036] (Use of multiple transport block scheduling gaps) 8A and 8B show a schematic diagram and partial message flow diagram representations, respectively, of a wireless communication network including a communication device 801 and infrastructure equipment 802, in accordance with at least some embodiments of the present technology. In each of the examples of Figures 8A and 8B, a communication device 801 is configured to transmit and receive data to and from an infrastructure equipment 802 via a wireless access interface provided by a wireless communication network. The communication device 801 and the infrastructure equipment 802 each include a transceiver (or transceiver circuit) 801.1, 802.1 and a controller (or controller circuit) 801.2, 802.2, respectively. Each of the controllers 801.2, 802.2 may be, for example, a microprocessor, a CPU, or a dedicated chipset, etc.

[0037] As shown in the example of FIG. 8A , the transceiver circuit 802.1 and the controller circuit 802.2 of the infrastructure equipment 802 are configured in combination to transmit a first control signal 811 to the communication device 801, the first control signal providing an indication of a set of downlink communication resources of a radio access interface on which the infrastructure equipment 802 intends to transmit a plurality of transport blocks to the communication device 801, where the plurality of transport blocks includes a first plurality of transport blocks transmitted on the set of first downlink communication resources and a second plurality of transport blocks transmitted on the set of second downlink communication resources, where the set of first downlink communication resources and the set of second downlink communication resources are separated in time by a scheduling gap formed by a set of third downlink communication resources of the radio access interface, and transmit a second control signal 812 to the communication device 801 during the scheduling gap, where the second control signal provides an indication of at least one change regarding the second plurality of transport blocks.

[0038] As shown in the example of FIG. 8B, the transceiver circuit 802.1 and the controller circuit 802.2 of the infrastructure equipment 802 are combined and configured to transmit a first control signal 821 to the communication device 801, the first control signal 821 configured to transmit a plurality of transport blocks to the infrastructure equipment 802, the plurality of transport blocks including a first plurality of transport blocks transmitted on a first series of uplink communications resources and a second plurality of transport blocks transmitted on a second series of uplink communications resources, the first series of uplink communications resources and the second series of uplink communications resources being separated in time by a scheduling gap formed by a third series of uplink communications resources of the radio access interface, and to transmit a second control signal 822 to the communication device 801 during the scheduling gap, the second control signal providing an indication of at least one change related to the second plurality of transport blocks.

[0039] Here, the scheduling gap may be indicated in a first control signal by infrastructure equipment to the communication device or may be determined by the communication device in another manner, for example, the communication device may receive a radio resource control (RRC) signal that instructs the communication device how often to insert a scheduling gap (e.g., every 4 TB). The communications device may determine when to insert a scheduling gap based on other criteria or based on a specification definition.

[0040] An embodiment of the present technology essentially proposes to indicate a change in the characteristics of a multi-TB transmission during a scheduling gap of the multi-TB transmission (i.e., a combination of a first plurality of transport blocks and a second plurality of transport blocks). This indication can be transmitted using the MPDCCH. The following configurations of an embodiment of the present technology explain the above change in the characteristics of the multi-TB transmission.

[0041] (Extending the duration of the scheduling gap) In a configuration of an embodiment of the present technology, when another user is scheduled in the scheduling gap, the eNB transmits an MPDCCH to the UE that extends the scheduling gap. In other words, the at least one modification related to the second plurality of transport blocks is that the scheduling gap is extended in time. The scheduling gap may be extended in time by an amount indicated by a second control signal, or this amount may be RRC signaled to the UE. The eNB may then schedule another UE in the uplink or downlink during the scheduling gap, such that the UE does not receive a PDSCH or transmit a PUSCH during the enhanced multi-TB scheduling gap.

[0042] An extended scheduling gap can be created by pausing a multi-TB transmission or by skipping parts of a multi-TB transmission. In the case of a paused transmission, the total remaining duration of the multi-TB transmission is not changed (the start time of the remaining multi-TB transmission is only delayed in time). In a skipped transmission, subframes of the multi-TB transmission that fall within the time window of the extended scheduling gap time are not transmitted or received. In this case, the end time of the skipped multi-TB transmission does not change despite the extended scheduling gap.

[0043] Figure 9 illustrates the extended scheduling gap created by the "skip" process. The top part of Figure 9 illustrates operation without an extended scheduling gap, and the bottom part illustrates operation with an extended scheduling gap. In the lower part of Figure 9, during the scheduling gap, the MPDCCH labeled M2 extends the scheduling gap in "skip" mode. M2 is transmitted between times t2 and t3, and the scheduling gap is extended so that it is between times t2 and t4 (while the original scheduling gap occupied the time between t2 and t3). Transport block "5" from the multi-TB transmission is skipped between times t3 and t4 to allow scheduling of another UE. In this example, transport block "5" is not transmitted by the eNB and may be retransmitted in the future (this is not shown in Figure 9). In other words, in the example of Figure 9, the scheduling gap is to be extended by the infrastructure equipment not transmitting at least one of the second plurality of transport blocks, and the first control signal indicated that the infrastructure equipment is to transmit at least one of the second plurality of transport blocks before others of the second plurality of transport blocks. The procedure for skipping transport blocks when the scheduling gap is extended may be indicated by RRC signaling from the network to the UE or may be known a priori by the UE and defined in the specification. Additionally, a second control signal may explicitly indicate to the UE that the scheduling gap is extended in this way. It should be understood by those skilled in the art that if transport block "5" is transmitted using multiple repetitions (e.g., for coverage extension purposes) and some of those repetitions are not received by the UE, the UE may be able to decode the transport block even if the number of repetitions is reduced.

[0044] FIG. 10 shows the extended scheduling gap created by the "postponement" process. The example of Figure 10 shows that during the scheduling gap between t2 and t3, the MPDCCH, M2 extends the scheduling gap via the "postponement" method. The scheduling gap is thus extended to end at time t4. The multi-TB transport block is now postponed to occupy the period between t4 and t6 instead of the period between t3 and t5. In other words, the second control signal indicates that the scheduling gap is extended by shifting in time the second set of downlink communication resources. The second set of downlink communications resources may be shifted by the amount indicated by the second control signal, or the communications device may determine the shift amount by looking up an “extension duration” previously signaled by the network, e.g., via RRC, after the second control signal signals that the second set of downlink communications resources is to be shifted in time.

[0045] Those skilled in the art will understand that the order of the transport blocks may be rearranged in the process of extending the scheduling gap. For example, when the scheduling gap is extended through postponement, as shown in Figure 11, a transport block that fell within the extended scheduling gap will be extended by the infrastructure equipment transmitting at least one of the second plurality of transport blocks after others of the second plurality of transport blocks, and the first control signal indicated that the infrastructure equipment intends to transmit at least one of the second plurality of transport blocks before others of the second plurality of transport blocks. The procedure for postponing transport blocks when the scheduling gap is extended may be indicated by RRC signaling from the network to the UE or may be known in advance by the UE and defined in the specification. Additionally, a second control signal may explicitly indicate to the UE that the scheduling gap is extended in this way. The example of Figure 11 is similar to Figure 10, but: - The timing of transport blocks 6, 7, and 8 remains unchanged. Transport block 5 is transmitted following transport blocks 6, 7 and 8 as it falls within the extended scheduling gap.

[0046] In another embodiment of this configuration of an embodiment of the present technology, the MPDCCH that extends the scheduling gap is a group MPDCCH. The group MPDCCH indicates that the scheduling gap is being extended, and UEs that are currently decoding the group MPDCCH during the duration of the scheduling gap are subject to having their scheduling gap increased. In other words, the second control signal is a group control signal common between the communication device and the one or more other communication devices, and the infrastructure equipment is configured to transmit the second control signal to each of the communication device and the one or more other communication devices.

[0047] The previous paragraphs of this section and referenced Figures 9 to 11 explain how to extend the scheduling gap. For simplicity, Figures 9 to 11 show an "instantaneous" response to an MPDCCH (M2) extending the scheduling gap (i.e., the UE may extend the scheduling gap in the subframe immediately following M2). It will be appreciated that there may be some delay in decoding such an MPDCCH, and the dimensions of the scheduling gap and the position of M2 within the scheduling gap need to take such processing delay into account. An example of this is shown in Figure 12. This is equivalent to Figure 9, but is based on the assumption that there is a one subframe delay in decoding the MPDCCH. To accommodate this decoding delay, the minimum duration of the scheduling gap is two subframes, and the gap extension MPDCCH M2 is constrained to occupy the first subframe of the scheduling gap. In this example shown in Figure 12, MPDCCH M2 is received between t2 and t3, MPDCCH M2 is decoded between t3 and t4, i.e. there is one subframe decoding delay. At t4, the UE realizes that the scheduling gap has been extended and therefore skips decoding of transport block 5, as discussed above with reference to FIG.

[0048] (Stopping multi-TB messages during scheduling gaps) In a configuration of an embodiment of the present technology, in response to the signaling carried by the MPDCCH, multi-TB transmissions to the UE (via PDSCH in DL) or from the UE (via PUSCH in UL) are stopped during the scheduling gap. In other words, the at least one change related to the second plurality of transport blocks is that the infrastructure equipment is not attempting to transmit one or more of the second plurality of transport blocks indicated by the first control signal. It should be understood by those skilled in the art that in some implementations, another MPDCCH may be transmitted by the eNodeB indicating that the stopped multi-TB transmission will be resumed at a later time.

[0049] There are various methods known in the prior art for stopping transmission, such as using early termination signaling, where an explicit "STOP" signal is sent to the UE using the MPDCCH or other signals (e.g., early termination signal available in an uplink compensation gap). In the following embodiments of this embodiment of the present technology, several novel methods of signaling early termination of multi-TB transmission during a scheduling gap are described.

[0050] The eNB may schedule DL grants to the UE related to the PDSCH that the eNB transmits to the UE during a previously scheduled multi-TB transmission. This mode of operation may be used to preempt an ongoing DL transmission to the UE when higher priority data needs to be transmitted to the UE. This is illustrated in Figure 13. In the upper part of Figure 13, the operation is shown when there is no DL grant in the multi-TB scheduling gap, and in the lower part of Figure 13, the operation is shown when there is a DL grant. Figure 13 shows that the UE receives MPDCCH 'M2' during the scheduling gap between times t2 and t3 which schedules PDSCH '9' within the multi-TB transmission following the scheduling gap (PDSCH '9' is scheduled between times t3 and t4). The consequence of PDSCH '9' being scheduled by the MPDCCH to the UE during the scheduling gap is that the remainder of the multi-TB transmission is cancelled, i.e. PDSCHs 5, 6, 7, 8 from the multi-TB transmission are cancelled and PDSCH 9 is received by the UE instead. In this way, PDSCHs 5, 6, 7, 8 are preempted by PDSCH 9. In other words, the second control signal provides an indication that the infrastructure equipment intends to transmit a downlink signal to the communication device in at least a portion of the second set of downlink communication resources. Here, the downlink signal may be associated with a higher priority than the second plurality of transport blocks. It should be noted that if PDSCH 9 has a higher priority than PDSCHs 5, 6, 7, 8, PDSCH 9 may be scheduled to have a more robust transport format than that applied to PDSCHs 5, 6, 7, 8.

[0051] The eNB may schedule an UL grant to the UE related to a PUSCH that the UE transmits during a previously scheduled multi-TB transmission from the UE. Again, this mode of operation may be used to preempt an ongoing UL transmission from the UE when the eNB determines that higher priority data should be transmitted by the UE. In other words, the second control signal indicates that the communication device is to transmit an uplink signal to the infrastructure equipment on a set of uplink communication resources of the radio access interface, the set of uplink communication resources overlapping in time with at least a portion of the second set of downlink communication resources. Here, the uplink signal may be associated with a higher priority than the second plurality of transport blocks. This implementation is the UL counterpart of the implementation described in the paragraph above with reference to Figure 13, and therefore the skilled person will have no problem understanding it from the description provided for the DL counterpart of Figure 13.

[0052] The eNB may inform the UE of a HARQ ACK / NACK message associated with an ongoing UL multi-TB message. Early reception of this HARQ ACK / NACK feedback at the UE implicitly indicates that the multi-TB UL transmission is terminated by the UE. It should be understood by those skilled in the art that the HARQ ACK / NACK for a multi-TB transmission typically occurs after the multi-TB transmission, not during an intermediate scheduling gap of the multi-TB transmission. This implementation is shown in the top part of Figure 14, which shows a UE being assigned a multi-TB PUSCH transmission with a scheduling gap between times t2 and t3. The bottom part of Figure 14 shows an MPDCCH, M2, carrying HARQ ACK / NACK signaling to the UE that is being received during the scheduling gap. The HARQ ACK / NACK signaling relates to one or more of PUSCH1, 2, 3, 4 (i.e., the PUSCH for the multi-TB assignment that precedes the scheduling gap). Upon receiving MPDCCH M2 with HARQ ACK / NACK signaling, the UE cancels the transmission of PUSCHs 5, 6, 7, 8. That is, the reception of MPDCCH carrying HARQ ACK / NACK signaling during the multi-TB scheduling gap results in early termination of the multi-TB PUSCH transmission. In other words, the second control signal further includes feedback indicating whether each of the first plurality of transport blocks was successfully received by the infrastructure equipment from the communication device. The second control signal may further indicate that, if the feedback signal indicates that at least one of the first plurality of transport blocks was not successfully received by the infrastructure equipment, the communication device retransmits at least one of the first plurality of transport blocks that was not successfully received by the infrastructure equipment in at least a portion of the second series of uplink communication resources.

[0053] Once the eNB has terminated the transmission of the DL multi-TB transmission (either using an explicit early termination signal or the implicit method described above), in this implementation of the present technology, the UE responds with HARQ ACK / NACK feedback (which can be carried on either the Physical Uplink Control Channel (PUCCH) or PUSCH) indicating which of the received PDSCHs were successfully decoded. Note that any remaining PDSCHs after termination are either indicated as NACK or are not represented at all in this HARQ ACK / NACK feedback. The resources used to transmit this HARQ ACK / NACK feedback are determined by the UE in various ways as described below with reference to Figures 15 and 16.

[0054] FIG. 15 shows an example implementation in which the UE sends HARQ ACK / NACK feedback signaling to the eNB in ​​response to receiving early termination signaling during the scheduling gap. The original scheduling of the multi-TB PDSCH with a scheduling gap is shown in the top part of Figure 15. The bottom part of Figure 15 shows the UE receiving an early termination signal during the scheduling gap over the MPDCCH, M2. This MPDCCH M2 may trigger early termination via one of the implementations described earlier in this section or via one of the methods of signaling early termination known from legacy systems. In response to the early termination signal, the UE cancels reception of PDSCHs 5, 6, 7, 8 (i.e., the PDSCHs after the scheduling gap). The UE also transmits a PUCCH including HARQ ACK / NACK signaling for PDSCH transmissions 1, 2, 3, 4 within the PUCCH between times t3 and t4. The physical resources used for the PUCCH may be signaled within the MPDCCH M2 (e.g., the MPDCCH M2 may indicate the physical resource blocks and subcarriers used for the PUCCH transmissions). That is, the second control signal indicates that the communications device terminates reception of at least one of the second plurality of transport blocks and, in response, transmits a feedback signal to the infrastructure equipment within a set of uplink communications resources of the radio access interface indicating whether each of the first plurality of transport blocks was successfully received by the communications device from the infrastructure equipment. Alternatively, the second control signal indicates the communications device to transmit a feedback signal to the infrastructure equipment on a set of uplink communications resources of the radio access interface (subsequently terminating reception by the at least one communications device of the second plurality of transport blocks), the feedback signal indicating, for each of the first plurality of transport blocks, whether each of the first plurality of transport blocks was successfully received by the communications device from the infrastructure equipment. The set of uplink communications resources may overlap in time with at least a portion of the second set of downlink communications resources or may be completely separated in time.

[0055] In a variation of the above implementation described with reference to Figure 15, the PUCCH resources are determined implicitly. The original multi-TB transmission has an associated PUCCH transmission, which follows the last transport block of the multi-TB transmission. In this implementation, the timing of the PUCCH is advanced by the amount of resources not used for the canceled transmission. An example is shown in Figure 16. The top part of Figure 16 shows the first scheduled multi-TB transmission, whose HARQ ACK / NACK is scheduled to be transmitted on PUCCH in the two subframes following the last subframe used for multi-TB transmission, i.e., PUCCH is scheduled to be transmitted at time t6. The bottom part of Figure 16 shows the case where during a scheduling gap M2, MPDCCH finishes the multi-TB transmission during the scheduling gap. Since the multi-TB transmission ended four subframes early, the PUCCH (carrying the HARQ ACK / NACK for the first four transport blocks) is transmitted four subframes first at time t4, i.e. the second control signal indicates to transmit, for each of the first plurality of transport blocks, a feedback signal to the infrastructure equipment indicating whether each of the first plurality of transport blocks was successfully received by the communication device from the infrastructure equipment, the feedback signal being transmitted on a set of uplink communication resources of the radio access interface associated with the second set of downlink resources (subsequently terminating reception by the at least one communication device of the second plurality of transport blocks). Here, the set of uplink communication resources may be shifted forward in time in response to a second control signal indicating that the communication device transmits a feedback signal. Alternatively, the second control signal indicates that the communication device has finished receiving at least one of the second plurality of transport blocks and, in response, that the communication device transmits a feedback signal to the infrastructure equipment on a set of uplink communication resources of the radio access interface associated with the second set of downlink resources. Again, the set of uplink communication resources may be shifted forward in time in response to a second control signal indicating that the communication device transmits a feedback signal.

[0056] It should be understood by those skilled in the art that in any of the embodiments of the current configuration of this embodiment of the present technology described in this section with reference to Figures 13 to 16, the early termination signal may not necessarily terminate all transmission / reception after the scheduling gap, but may simply terminate some of the transmission / reception. For example, with reference to Figure 14, the early termination signal may terminate the transmission of PUSCH 5, but still allow the transmission of PUSCHs 6, 7, and 8.

[0057] It should be further understood by those skilled in the art that the above Figures 13-16 show example timings between physical channels, e.g., between PDSCH and PUCCH. The timings actually employed in certain embodiments may differ from those shown in such figures, as would be apparent to a skilled person. For example, Figure 16 shows a time gap between PDSCH and PUCCH of one time slot, whereas a typical timing between PDSCH and PUCCH (ignoring timing advance) is three time slots. The particular timing between physical channels is not relevant to the inventive contribution of the embodiments of the present technology, as would be readily understood by those skilled in the art.

[0058] (Changes in physical resources) As mentioned above, referring to Fig. 7, channel conditions may change during an ongoing multi-TB transmission. Therefore, in the configuration of an embodiment of the present technology, it is desirable to adapt the multi-TB transmission (using scheduling gaps) during the ongoing multi-TB transmission. In other words, the at least one change related to the second plurality of transport blocks is a change in at least one communication parameter of the second set of downlink communication resources indicated by the first control signal.

[0059] During the scheduling gap, the eNB can send an MPDCCH to the UE that changes the physical resources used by the multi-TB transmission. In other words, the at least one communication parameter is a physical resource of the radio access interface that constitutes a second set of downlink communication resources. For example, if the UE transmits a multi-TB PUSCH to the eNB, upon receiving the PUSCH in poor channel conditions, the eNB can transmit an MPDCCH with new physical resources used for the PUSCH after the scheduling gap. The eNB can select the physical resources to be used in several different ways: · When the PUSCH is frequency hopped, if the PUSCH is hopped and indicates poor channel conditions and the other frequency is one of the frequencies that indicates good channel conditions, the eNB will transmit MPDCCH to stop transmission on the frequency with poor channel conditions and continue transmission only on the other (good) frequency. If the UE transmits SRS (Sounding Reference Signal) in addition to the PUSCH, the eNB performs measurements on the SRS and selects some physical resources for the PUSCH following the scheduling gap based on these measurements; and / or If the channel conditions are poor on the frequency at which the PUSCH is received, the eNB makes a blind decision on a new frequency to transmit the PUSCH on. This decision can be made based on the principle that no other frequency can be worse than the bad frequency currently used by the PUSCH.

[0060] If the UE observes poor channel conditions on the monitored narrowbands (e.g., narrowbands on which the PDSCH is received), it transmits a PUCCH to the eNB indicating those narrowbands with poor channel conditions. In other words, the infrastructure equipment is configured to receive measurement information from the communication device indicating that a quality of a signal received by the communication device within at least a portion of the first set of downlink communication resources and / or at least a portion of the second set of downlink communication resources is below a threshold quality, and to transmit a second control signal based on the received measurement information. The report on the PUCCH may take the form of a CSI report (Channel State Information report).

[0061] Figure 17 shows an example of this functionality. As shown in Figure 17, a UE monitors two narrowbands (narrowband 1 and narrowband 2) that it is receiving, for example, due to frequency hopping of PDSCH. During the scheduling gap, the UE observes that the channel conditions on narrowband 1 are significantly worse than the channel conditions on narrowband 2. This triggers the UE to send a CSI report on PUCCH during the scheduling gap indicating that the channel conditions on narrowband 2 are significantly better than on narrowband 1. In response to this CSI report, the eNB sends a second MPDCCH, M2, that changes the physical resources (e.g., frequency) or transport format (e.g., MCS) for the portion of the multi-TB transmission that follows the scheduling gap. Note that a longer scheduling gap is shown in this figure to allow the UE to transmit a PUCCH and receive a subsequent MPDCCH.

[0062] In an implementation related to that described in the above paragraph, if the UE observes poor channel conditions on a monitored narrowband, during the scheduling gap, the UE performs measurements on other narrowbands and then transmits a CSI report (e.g., via a PUCCH) to the eNB. The eNB can then send a second MPDCCH to the UE updating the physical resources used for multi-TB transmission following the scheduling gap. In other words, the measurement information further comprises an indication of a quality of a signal received by the communications device in downlink resources of the radio access interface other than the first set of downlink communications resources and the second set of downlink communications resources, and the infrastructure equipment is configured to indicate with a second control signal that it intends to transmit a second plurality of transport blocks on the set of downlink communications resources of the radio access interface based on the quality indicated in the measurement information but not on the second set of downlink communications resources. This mode of operation is illustrated in Figure 18, which shows a multi-TB PDSCH scheduled to the UE at time t0. During reception of the multi-TB PDSCH, the UE observes that the channel conditions on narrowband 1 ("NB1") where the PDSCH is being received are poor. Thus, during a scheduling gap, at time t2, the UE performs measurements on narrowband 2 ("NB2"). Since the channel conditions on NB2 are better than those on NB1, the UE transmits a CSI report on the PUCCH at time t3. In response, at time t4, the eNB modifies the physical resources used by the multi-TB PDSCH, such that following the scheduling gap, the UE uses narrowband 2 for the multi-TB PDSCH following the scheduling gap.

[0063] It should be appreciated that in at least some implementations, the scheduling gap is designed to allow the UE to perform channel measurements and potentially transmit a PUCCH during the scheduling gap. Thus, referring to Figure 18, a potential PUCCH within the scheduling gap is timed to occur at a time that allows the UE to perform measurements between t2 and t3 and prepare the PUCCH for transmission.

[0064] In an implementation related to that described in the paragraphs above with reference to Figures 17 and 18, the UE indicates a CSI report in response to a PDSCH preceding one of the scheduling gaps failing a cyclic redundancy check (CRC). That is, the PDSCH is NACKed. In other words, the measurement information is received by the infrastructure equipment in response to the communication device not successfully receiving at least one of the first plurality of transport blocks. The CSI report may relate to a narrowband that the UE is monitoring, or the NACK status may trigger the UE to perform measurements on the narrowband.

[0065] In another implementation, if the PUSCH is received as a NACK by the eNB, the eNB sends an MPDCCH to the UE instructing the UE to send an SRS report. The UE sends the SRS report, allowing the eNB to determine a better narrowband for the UE to transmit the PUSCH. The eNB then sends another MPDCCH to the UE with new physical resources (e.g., using the better narrowband) for the UE to use following the scheduling gap. FIG. 19 shows an example of operation according to this implementation. The UE is initially scheduled to transmit a PUSCH on narrowband 1. One of the PUSCHs before the scheduling gap is erroneously received by the eNB (the PUSCH is NACKed). In response to the NACK, the eNB transmits MPDCCH, M2 at time t2 and instructs the UE to transmit an SRS at time t3. In other words, the infrastructure equipment is configured to transmit a second control signal in response to determining that at least one of the first plurality of transport blocks was not successfully received from the communication device, the second control signal further indicating that the communication device should transmit a sounding reference signal to the infrastructure equipment. The SRS transmission occupies multiple narrowbands, allowing the eNB to determine that narrowband 2 is the preferred narrowband for the continuation of the PUSCH transmission. Thus, at time t4, the eNB transmits an MPDCCH, M3, to the UE, instructing the UE to use narrowband 2 for the portion of the multi-TB transmission following the scheduling gap. In other words, the infrastructure equipment is configured to receive a sounding reference signal from the communication device, perform measurements on the received sounding reference signal, and transmit a third control signal to the communication device, the third control signal indicating to transmit a second plurality of transport blocks within the set of uplink communication resources of the radio access interface rather than within the second set of uplink communication resources based on the measurements performed on the sounding reference signal. It should be understood that Figure 19 is an example for illustrating the implementation, and in a typical MTC operation, the UE can only transmit SRS in one narrowband at a time. In the case of Figure 19, the UE can transmit SRS for NB1 and NB2 in different subframes.

[0066] The above embodiments of the present configurations of the present technology contemplate modifying the narrowband (or other physical resource) in response to observing poor channel conditions. In another implementation, in response to a deterioration or improvement in DL channel conditions, the UE may send a CSI report to the eNB indicating such change. The eNB then modifies the MCS or number of repetitions used for the remainder of the multi-TB PDSCH following the scheduling gap. In other words, the at least one communication parameter is a transport format (e.g., MCS) in which the second plurality of transport blocks are transmitted by the infrastructure equipment on the second set of downlink communication resources or, alternatively or additionally, the at least one communication parameter is a number of repetitions in which the second plurality of transport blocks are transmitted by the infrastructure equipment on the second set of downlink communication resources.

[0067] In an equivalent implementation in the UL, the eNB transmits an MPDCCH to the UE indicating a change in the MCS or number of repetitions to be applied for the multi-TB PUSCH transmission if the eNB observes a change in the UL channel conditions during the scheduling gap. In other words, the at least one communication parameter is a transport format in which the communication device transmits the second plurality of transport blocks on the second set of downlink communication resources or, alternatively or additionally, the at least one communication parameter is a number of repetitions in which the communication device transmits the second plurality of transport blocks on the second set of downlink communication resources.

[0068] Previous configurations of embodiments of the present technology describe the use of a single second control signal to indicate a variation of multi-TB transmission. It is understood that in general, there may be further control signals present during the scheduling gap. For example, the second control signal indicates an extension of the scheduling gap, and during that extended scheduling gap, there may be reasons to further extend the scheduling gap (e.g., if more data needs to be scheduled to another UE) through the use of a third control signal. In other words, the infrastructure equipment is configured to transmit, during a scheduling gap after the second control signal, a third control signal to the communication device providing an indication of at least one further modification regarding the second plurality of transport blocks. Indeed, in some configurations of embodiments of the present technology, receipt of the second control signal can trigger the UE to monitor the third control signal if the format of the third control signal may be different from the format of the second control signal, or if the communication resources used by the third control signal may be different from the communication resources used by the second control signal, or if the periodicity of the monitoring for the third control signal may be different from the periodicity of the second control signal.

[0069] (Flowchart representation) FIG. 20A shows a flow diagram illustrating an example of a first process for communication in a communication system according to an embodiment of the present technology. The process illustrated by FIG. 20A is a method of operating infrastructure equipment forming part of a wireless communications network and configured to transmit and / or receive data to and from communication devices.

[0070] The method starts at step S2011. The method includes, in step S2012, transmitting to the communication device a first control signal providing an indication of a set of downlink communication resources of a radio access interface on which infrastructure equipment intends to transmit a plurality of transport blocks to the communication device, the plurality of transport blocks including a first plurality of transport blocks transmitted on the first set of downlink communication resources and a second plurality of transport blocks transmitted on a second set of downlink communication resources, the first set of downlink communication resources and the second set of downlink communication resources being separated in time by a scheduling gap formed by a third set of downlink communication resources of the radio access interface. In step S2013, the process includes transmitting a second control signal to the communication device during the scheduling gap, the second control signal providing an indication of at least one change regarding the second plurality of transport blocks. The method ends in step S2014.

[0071] 20B shows a flow diagram illustrating an example of a second process for communication in a communication system according to an embodiment of the present technology. The process illustrated by FIG. 20B is a method of operating infrastructure equipment forming part of a wireless communication network and configured to transmit and / or receive data to and from communication devices.

[0072] The method starts at step S2021. The method includes, in step S2022, transmitting to the communication device a first control signal providing an indication of a set of uplink communication resources of a radio access interface for the communication device to transmit a plurality of transport blocks to infrastructure equipment, the plurality of transport blocks including a first plurality of transport blocks transmitted on the first set of uplink communication resources and a second plurality of transport blocks transmitted on a second set of uplink communication resources, the first set of uplink communication resources and the second set of uplink communication resources being separated in time by a scheduling gap formed by a third set of uplink communication resources of the radio access interface. In step S2023, the process includes transmitting a second control signal to the communication device during the scheduling gap, the second control signal providing an indication of at least one change regarding the second plurality of transport blocks. The method ends in step S2024.

[0073] Those skilled in the art will appreciate that the methods illustrated by Figures 20A and 20B may be adapted in accordance with embodiments of the present technology, for example, other intermediate steps may be included in these methods, and the steps may be performed in any logical order.

[0074] Although embodiments of the present technology have been largely described in terms of the example communication system shown in Figures 8A and 8B, it will be apparent to one skilled in the art that the embodiments are equally applicable to the other systems described herein, according to the examples of Figures 9 to 19.

[0075] It should be understood by those skilled in the art that although the examples in Figures 9 to 19 show multi-TB transmission in either the downlink or the uplink, these examples are equally applicable to multi-TB transmission in the other of the downlink or the uplink, and thus the scope of the present application is not limited to the examples as shown in Figures 9 to 19.

[0076] Those skilled in the art will further appreciate that the infrastructure equipment and / or communication devices defined herein may be further defined according to the various configurations and embodiments discussed in the previous paragraph. Those skilled in the art will further appreciate that the infrastructure equipment and communication devices defined and described herein may form part of communication systems other than those defined by this specification.

[0077] The following numbered paragraphs provide further exemplary aspects and features of the present technology. Paragraph 1. Infrastructure equipment configured to transmit and receive data and forming part of a wireless communication network, comprising: a transceiver circuit configured to transmit and receive signals over a radio access interface provided by the wireless communication network; Controller circuit and Equipped with The controller circuit includes: transmitting a first control signal to the communications device providing an indication of a set of downlink communications resources of the radio access interface on which the infrastructure equipment intends to transmit a plurality of transport blocks to the communications device; transmitting a second control signal to the communications device during a scheduling gap, the second control signal providing an indication of at least one change related to a second plurality of transport blocks. In combination with the transceiver circuit, the plurality of transport blocks includes a first plurality of transport blocks transmitted on a first set of downlink communications resources and a second plurality of transport blocks transmitted on a second set of downlink communications resources; The first set of downlink communications resources and the second set of downlink communications resources are separated in time by the scheduling gap formed by a third set of downlink communications resources of the radio access interface. Infrastructure equipment. Paragraph 2. An infrastructure device as described in paragraph 1, comprising: The at least one modification associated with the second plurality of transport blocks is that the scheduling gap is extended in time. Infrastructure equipment. Paragraph 3. An infrastructure device as described in paragraph 2, comprising: The scheduling gap is extended in time by an amount indicated by the second control signal. Infrastructure equipment. Paragraph 4. An infrastructure device as described in paragraph 2 or paragraph 3, The scheduling gap is extended in time by an amount indicated in a Radio Resource Control, RRC, signaling message sent by the infrastructure equipment to the communication device. Infrastructure equipment. Paragraph 5. An infrastructure device according to any one of paragraphs 2 to 4, the scheduling gap is extended by the infrastructure equipment not transmitting at least one of the second plurality of transport blocks; The first control signal indicated that the infrastructure equipment intended to transmit at least one of the second plurality of transport blocks prior to other ones of the second plurality of transport blocks. Infrastructure equipment. Paragraph 6. An infrastructure device according to any one of paragraphs 2 to 5, The second control signal indicates extending the scheduling gap by shifting in time the second set of downlink communications resources. Infrastructure equipment. Paragraph 7. An infrastructure device according to any one of paragraphs 2 to 6, the second control signal indicates that the infrastructure equipment intends to transmit at least one of the second plurality of transport blocks after another of the second plurality of transport blocks, thereby extending the scheduling gap; the first control signal indicating that the infrastructure equipment intends to transmit at least one of the second plurality of transport blocks before another of the second plurality of transport blocks. Infrastructure equipment. Paragraph 8. An infrastructure device according to any one of paragraphs 2 to 7, the second control signal is a common group control signal between the communication device and one or more other communication devices; The infrastructure equipment is configured to transmit the second control signal to the communication device and to each of the one or more other communication devices. Infrastructure equipment. Paragraph 9. An infrastructure device according to any one of paragraphs 1 to 8, The at least one modification regarding the second plurality of transport blocks is the infrastructure equipment not transmitting one or more of the second plurality of transport blocks indicated by the first control signal. Infrastructure equipment. Paragraph 10. An infrastructure device as described in Paragraph 9, comprising: The second control signal provides an indication that the infrastructure equipment intends to transmit a downlink signal to the communications device on at least a portion of the second set of downlink communications resources. Infrastructure equipment. Paragraph 11. An infrastructure device as described in Paragraph 10, comprising: The downlink signal is associated with a higher priority than the second plurality of transport blocks. Infrastructure equipment. Paragraph 12. An infrastructure device according to any one of paragraphs 9 to 11, The second control signal provides an indication that the communications device is to transmit an uplink signal to the infrastructure equipment on a set of uplink communications resources of the radio access interface. Infrastructure equipment. Paragraph 13. An infrastructure device as described in Paragraph 12, comprising: The uplink signal is associated with a higher priority than the second plurality of transport blocks. Infrastructure equipment. Paragraph 14. An infrastructure device according to any one of paragraphs 9 to 13, the second control signal indicates, for each of the first plurality of transport blocks, transmitting a feedback signal to the infrastructure equipment within a set of uplink communication resources of the radio access interface; The feedback signal indicates whether each of the first plurality of transport blocks was successfully received by the communication device from the infrastructure equipment. Infrastructure equipment. Paragraph 15. An infrastructure device according to any one of paragraphs 9 to 14, comprising: the second control signal indicating that the communications device has finished receiving at least one of the second plurality of transport blocks; In response, the infrastructure equipment is configured to receive, for each of the first plurality of transport blocks, a feedback signal from the communications device within a set of uplink communications resources of the radio access interface; The feedback signal indicates whether each of the first plurality of transport blocks was successfully received by the communication device from the infrastructure equipment. Infrastructure equipment. Paragraph 16. An infrastructure device according to any one of paragraphs 9 to 15, the second control signal indicates, for each of the first plurality of transport blocks, that the communications device transmit a feedback signal to the infrastructure equipment; the feedback signal indicating whether each of the first plurality of transport blocks was successfully received by the communications device from the infrastructure equipment; The feedback signal is transmitted on a set of uplink communications resources of the radio access interface associated with the second set of downlink communications resources. Infrastructure equipment. Paragraph 17. An infrastructure device according to any one of paragraphs 9 to 16, the second control signal indicating that the communications device has finished receiving at least one of the second plurality of transport blocks; In response, the infrastructure equipment is configured to receive, for each of the first plurality of transport blocks, a feedback signal from the communication device; the feedback signal indicating whether each of the first plurality of transport blocks was successfully received by the communications device from the infrastructure equipment; The feedback signal is transmitted on a set of uplink communications resources of the radio access interface associated with the second set of downlink communications resources. Infrastructure equipment. Paragraph 18. An infrastructure device according to paragraph 16 or 17, The infrastructure equipment is configured to determine, in response to the second control signal indicating that the communications device is to transmit the feedback signal, that the set of uplink communications resources is to be shifted forward in time. Infrastructure equipment. Paragraph 19. An infrastructure device according to any one of paragraphs 1 to 18, comprising: The at least one change associated with the second plurality of transport blocks is a change in at least one communication parameter of the second set of downlink communication resources indicated by the first control signal. Infrastructure equipment. Paragraph 20. An infrastructure device as described in Paragraph 19, comprising: The at least one communication parameter is a physical resource of the radio access interface forming the second set of downlink communication resources. Infrastructure equipment. Paragraph 21. An infrastructure device as described in Paragraph 20, comprising: the infrastructure equipment receives measurement information from the communications device indicating that a quality of a signal received by the communications device within at least a portion of the first set of downlink communications resources and / or at least a portion of the second set of downlink communications resources is below a threshold quality; and and configured to transmit the second control signal based on the received measurement information. Infrastructure equipment. Paragraph 22. An infrastructure device as described in Paragraph 21, comprising: the measurement information further comprises an indication of a quality of a signal received by the communications device in downlink resources of the radio access interface other than the first set of downlink communications resources and the second set of downlink communications resources; The infrastructure equipment is configured to indicate in the second control signal that the infrastructure equipment intends to transmit the second plurality of transport blocks on a set of downlink communications resources of the radio access interface based on a quality indicated in the measurement information rather than on the second set of downlink communications resources. Infrastructure equipment. Paragraph 23. An infrastructure device according to Paragraph 21 or Paragraph 22, The measurement information is received by the infrastructure equipment in response to the communications device failing to successfully receive at least one of the first plurality of transport blocks. Infrastructure equipment. Paragraph 24. An infrastructure device according to any one of paragraphs 19 to 23, comprising: The at least one communication parameter is a transport format in which the second plurality of transport blocks are transmitted by the infrastructure equipment within the second set of downlink communication resources. Infrastructure equipment. Paragraph 25. An infrastructure device according to any one of Paragraphs 19 to 24, comprising: The at least one communication parameter is a number of repetitions that the second plurality of transport blocks are transmitted by the infrastructure equipment within the second set of downlink communication resources. Infrastructure equipment. Paragraph 26. An infrastructure device according to any one of paragraphs 1 to 25, The infrastructure equipment is configured to transmit, during the scheduling gap after the second control signal, a third control signal to the communication device providing an indication of at least one further change related to the second plurality of transport blocks. Infrastructure equipment. Paragraph 27. A method of operating infrastructure equipment forming part of a wireless communications network, the method being arranged to transmit and receive data, the method comprising the steps of: transmitting a first control signal to the communications device providing an indication of a set of downlink communications resources of the radio access interface on which the infrastructure equipment intends to transmit a plurality of transport blocks to the communications device; transmitting a second control signal to the communications device during a scheduling gap, the second control signal providing an indication of at least one change related to a second plurality of transport blocks; Including, the plurality of transport blocks includes a first plurality of transport blocks transmitted on a first set of downlink communications resources and a second plurality of transport blocks transmitted on a second set of downlink communications resources; The first set of downlink communications resources and the second set of downlink communications resources are separated in time by the scheduling gap formed by a third set of downlink communications resources of the radio access interface. method. Paragraph 28. A circuit for infrastructure equipment forming part of a wireless communication network, configured to transmit and receive data, comprising: a transceiver circuit configured to transmit and receive signals over a radio access interface provided by the wireless communication network; Controller circuit and Equipped with The controller circuit includes: transmitting a first control signal to the communications device providing an indication of a set of downlink communications resources of the radio access interface on which the infrastructure equipment intends to transmit a plurality of transport blocks to the communications device; transmitting a second control signal to the communications device during a scheduling gap, the second control signal providing an indication of at least one change related to a second plurality of transport blocks. In combination with the transceiver circuit, the plurality of transport blocks includes a first plurality of transport blocks transmitted on a first set of downlink communications resources and a second plurality of transport blocks transmitted on a second set of downlink communications resources; The first set of downlink communications resources and the second set of downlink communications resources are separated in time by the scheduling gap formed by a third set of downlink communications resources of the radio access interface. Infrastructure equipment circuits. Paragraph 29. A communications device configured to transmit and receive data, comprising: a transceiver circuit configured to transmit and receive signals over the wireless access interface; Controller circuit and Equipped with The controller circuit includes: receiving a first control signal providing an indication of a set of downlink communication resources of the radio access interface over which the communications device is to receive a plurality of transport blocks; receiving, during the scheduling gap, a second control signal indicating at least one change related to a second plurality of transport blocks; In combination with the transceiver circuit, the plurality of transport blocks includes a first plurality of transport blocks received on a first set of downlink communications resources and a second plurality of transport blocks received on a second set of downlink communications resources; The first set of downlink communications resources and the second set of downlink communications resources are separated in time by the scheduling gap formed by a third set of downlink communications resources of the radio access interface. Communication devices. Paragraph 30. A method of operating a communications device configured to transmit and receive data to and from infrastructure equipment of a wireless communications network, comprising: receiving a first control signal providing an indication of a set of downlink communication resources of the radio access interface over which the communications device is to receive a plurality of transport blocks; receiving, during the scheduling gap, a second control signal indicating at least one change associated with a second plurality of transport blocks; Including, the plurality of transport blocks includes a first plurality of transport blocks received on a first set of downlink communications resources and a second plurality of transport blocks received on a second set of downlink communications resources; The first set of downlink communications resources and the second set of downlink communications resources are separated in time by the scheduling gap formed by a third set of downlink communications resources of the radio access interface. method. Paragraph 31. A circuit for a communications device configured to transmit and receive data, comprising: a transceiver circuit configured to transmit and receive signals over the wireless access interface; Controller circuit and Equipped with The controller circuit includes: receiving a first control signal providing an indication of a set of downlink communication resources of the radio access interface over which the communications device is to receive a plurality of transport blocks; receiving, during the scheduling gap, a second control signal indicating at least one change related to a second plurality of transport blocks; In combination with the transceiver circuit, the plurality of transport blocks includes a first plurality of transport blocks received on a first set of downlink communications resources and a second plurality of transport blocks received on a second set of downlink communications resources; The first set of downlink communications resources and the second set of downlink communications resources are separated in time by the scheduling gap formed by a third set of downlink communications resources of the radio access interface. Circuits for communication devices. Paragraph 32. Infrastructure equipment configured to transmit and receive data and forming part of a wireless communication network, comprising: a transceiver circuit configured to transmit and receive signals over a radio access interface provided by the wireless communication network; Controller circuit and Equipped with The controller circuit includes: transmitting a first control signal to the communications device providing an indication of a set of uplink communications resources of the radio access interface over which the communications device transmits a plurality of transport blocks to the infrastructure equipment; transmitting a second control signal to the communications device during a scheduling gap, the second control signal providing an indication of at least one change related to a second plurality of transport blocks. In combination with the transceiver circuit, the plurality of transport blocks includes a first plurality of transport blocks transmitted on a first set of uplink communications resources and a second plurality of transport blocks transmitted on a second set of uplink communications resources; The first set of uplink communications resources and the second set of uplink communications resources are separated in time by the scheduling gap formed by a third set of uplink communications resources of the radio access interface. Infrastructure equipment. Paragraph 33. An infrastructure device as described in Paragraph 32, comprising: The at least one modification associated with the second plurality of transport blocks is that the scheduling gap is extended in time. Infrastructure equipment. Paragraph 34. An infrastructure device as described in Paragraph 33, comprising: The scheduling gap is extended in time by an amount indicated by the second control signal. Infrastructure equipment. Paragraph 35. An infrastructure device as described in Paragraph 33 or Paragraph 34, comprising: The scheduling gap is extended in time by an amount indicated in a Radio Resource Control, RRC, signaling message sent by the infrastructure equipment to the communication device. Infrastructure equipment. Paragraph 36. An infrastructure device according to any one of paragraphs 33 to 35, comprising: the second control signal indicates that the scheduling gap is to be extended by indicating that the communications device will not transmit at least one of the second plurality of transport blocks; The first control signal indicated that the communications device intended to transmit at least one of the second plurality of transport blocks prior to other ones of the second plurality of transport blocks. Infrastructure equipment. Paragraph 37. An infrastructure device according to any one of Paragraphs 33 to 36, comprising: The second control signal indicates extending the scheduling gap by shifting in time the second set of uplink communications resources. Infrastructure equipment. Paragraph 38. An infrastructure device according to any one of Paragraphs 33 to 37, comprising: the second control signal indicates that the communications device intends to transmit at least one of the second plurality of transport blocks after another of the second plurality of transport blocks, thereby extending the scheduling gap; The first control signal indicates that the communications device intended to transmit at least one of the second plurality of transport blocks before another of the second plurality of transport blocks. Infrastructure equipment. Paragraph 39. An infrastructure device according to any one of Paragraphs 33 to 38, comprising: The second control signal is a common group control signal between the communication device and one or more other communication devices. Infrastructure equipment. Paragraph 40. An infrastructure device according to any one of paragraphs 32 to 39, The at least one modification regarding the second plurality of transport blocks is that the communication device does not transmit one or more of the second plurality of transport blocks indicated by the first control signal. Infrastructure equipment. Paragraph 41. An infrastructure device as described in Paragraph 40, comprising: The second control signal further includes feedback indicating whether each of the first plurality of transport blocks was successfully received by the infrastructure equipment from the communication device. Infrastructure equipment. Paragraph 42. An infrastructure device as described in Paragraph 41, comprising: if the feedback signal indicates that at least one of the first plurality of transport blocks was not successfully received by the infrastructure equipment; The second control signal further indicates that the communications device is to retransmit, on at least a portion of the second set of uplink communications resources, at least one of the first plurality of transport blocks that was not successfully received by the infrastructure equipment. Infrastructure equipment. Paragraph 43. An infrastructure device according to any one of paragraphs 40 to 42, comprising: The second control signal provides an indication that the infrastructure equipment intends to transmit a downlink signal to the communications device on a set of downlink communications resources of the radio access interface. Infrastructure equipment. Paragraph 44. An infrastructure device as described in Paragraph 43, comprising: The downlink signal is associated with a higher priority than the second plurality of transport blocks. Infrastructure equipment. Paragraph 45. An infrastructure device according to any one of paragraphs 40 to 44, comprising: The second control signal provides instructions to the communications device to transmit an uplink signal to the infrastructure equipment on at least a portion of the second set of uplink communications resources. Infrastructure equipment. Paragraph 46. An infrastructure device as described in Paragraph 45, comprising: The uplink signal is associated with a higher priority than the second plurality of transport blocks. Infrastructure equipment. Paragraph 47. An infrastructure device according to any one of Paragraphs 32 to 46, comprising: The at least one change associated with the second plurality of transport blocks is a change in at least one communication parameter of the second set of uplink communication resources indicated by the first control signal. Infrastructure equipment. Paragraph 48. An infrastructure device as described in Paragraph 47, comprising: The at least one communication parameter is a physical resource of the radio access interface forming a second set of uplink communication resources. Infrastructure equipment. Paragraph 49. An infrastructure device as described in Paragraph 48, comprising: the infrastructure equipment is configured to transmit the second control signal in response to determining that at least one of the first plurality of transport blocks was not successfully received from the communication device; The second control signal further indicates that the communications device should transmit a sounding reference signal to the infrastructure equipment. Infrastructure equipment. Paragraph 50. An infrastructure device as described in Paragraph 49, comprising: The infrastructure equipment includes: receiving the sounding reference signal from the communication device; performing measurements on said sounding reference signal; Transmitting a third control signal to the communication device. It is configured as follows: The communications device indicates, based on measurements performed on the sounding reference signal, to transmit the second plurality of transport blocks on a set of uplink communications resources of the radio access interface rather than the second set of uplink communications resources. Infrastructure equipment. Paragraph 51. An infrastructure device according to any one of Paragraphs 47 to 50, comprising: The at least one communication parameter is a transport format in which the communication device transmits the second plurality of transport blocks on the second set of downlink communication resources. Infrastructure equipment. Paragraph 52. An infrastructure device according to any one of Paragraphs 47 to 51, comprising: The at least one communication parameter is a number of repetitions during which the communication device will transmit the second plurality of transport blocks on the second set of downlink communication resources. Infrastructure equipment. Paragraph 53. An infrastructure device according to any one of Paragraphs 32 to 52, The infrastructure equipment is configured to transmit, during the scheduling gap after the second control signal, a third control signal to the communication device providing an indication of at least one further change related to the second plurality of transport blocks. Infrastructure equipment. Paragraph 54. A method of operating infrastructure equipment forming part of a wireless communications network, the method being arranged to transmit and receive data, comprising the steps of: transmitting a first control signal to a communications device providing an indication of a set of uplink communications resources of the radio access interface over which the communications device transmits a plurality of transport blocks to the infrastructure equipment; transmitting a second control signal to the communications device during a scheduling gap, the second control signal providing an indication of at least one change related to a second plurality of transport blocks; Including, the plurality of transport blocks includes a first plurality of transport blocks transmitted on a first set of uplink communications resources and a second plurality of transport blocks transmitted on a second set of uplink communications resources; The first set of uplink communications resources and the second set of uplink communications resources are separated in time by the scheduling gap formed by a third set of uplink communications resources of the radio access interface. method. Paragraph 55. A circuit for infrastructure equipment forming part of a wireless communications network, configured to transmit and receive data, comprising: a transceiver circuit configured to transmit and receive signals over a radio access interface provided by the wireless communication network; Controller circuit and Equipped with The controller circuit includes: transmitting a first control signal to the communications device providing an indication of a set of uplink communications resources of the radio access interface over which the communications device transmits a plurality of transport blocks to the infrastructure equipment; transmitting a second control signal to the communications device during a scheduling gap, the second control signal providing an indication of at least one change related to a second plurality of transport blocks. In combination with the transceiver circuit, the plurality of transport blocks includes a first plurality of transport blocks transmitted on a first set of uplink communications resources and a second plurality of transport blocks transmitted on a second set of uplink communications resources; The first set of uplink communications resources and the second set of uplink communications resources are separated in time by the scheduling gap formed by a third set of uplink communications resources of the radio access interface. Infrastructure equipment circuits. Paragraph 56. A communications device configured to transmit and receive data, comprising: a transceiver circuit configured to transmit and receive signals over the wireless access interface; Controller circuit and Equipped with The controller circuit includes: receiving a first control signal providing an indication of a set of uplink communication resources of the radio access interface over which the communications device is to transmit a plurality of transport blocks; receiving, during the scheduling gap, a second control signal providing an indication of at least one change related to a second plurality of transport blocks; In combination with the transceiver circuit, the plurality of transport blocks includes a first plurality of transport blocks transmitted on a first set of uplink communications resources and a second plurality of transport blocks transmitted on a second set of uplink communications resources; The first set of uplink communications resources and the second set of uplink communications resources are separated in time by the scheduling gap formed by a third set of uplink communications resources of the radio access interface. Communication devices. Paragraph 57. A method of operating a communications device configured to transmit and receive data to and from infrastructure equipment of a wireless communications network, comprising: receiving a first control signal providing an indication of a set of uplink communication resources of the radio access interface over which the communications device is to transmit a plurality of transport blocks; receiving, during a scheduling gap, a second control signal providing an indication of at least one change related to a second plurality of transport blocks; Including, the plurality of transport blocks includes a first plurality of transport blocks transmitted on a first set of uplink communications resources and a second plurality of transport blocks transmitted on a second set of uplink communications resources; The first set of uplink communications resources and the second set of uplink communications resources are separated in time by the scheduling gap formed by a third set of uplink communications resources of the radio access interface. method. Paragraph 58. A communications device configured to transmit and receive data, comprising: a transceiver circuit configured to transmit and receive signals over the wireless access interface; Controller circuit and Equipped with The controller circuit includes: receiving a first control signal providing an indication of a set of uplink communication resources of the radio access interface over which the communications device is to transmit a plurality of transport blocks; receiving, during the scheduling gap, a second control signal providing an indication of at least one change related to a second plurality of transport blocks; In combination with the transceiver circuit, the plurality of transport blocks includes a first plurality of transport blocks transmitted on a first set of uplink communications resources and a second plurality of transport blocks transmitted on a second set of uplink communications resources; The first set of uplink communications resources and the second set of uplink communications resources are separated in time by the scheduling gap formed by a third set of uplink communications resources of the radio access interface. Communication devices.

[0078] It will be appreciated that for clarity of the invention, the above description has described embodiments with reference to different functional units, circuits and / or processors. However, it will be apparent that any suitable distribution of functionality between different functional units, circuits and / or processors may be used without detracting from embodiments of the invention.

[0079] The embodiments described herein may be implemented in any suitable form including hardware, software, firmware or any combination of these. The embodiments described herein may optionally be implemented at least partly as computer software running on one or more data processors and / or digital signal processors. The components and elements of any embodiment may be physically, functionally and logically implemented in any suitable way. Indeed functionality may be implemented in a single unit, in multiple units or as part of other functional units. Thus, embodiments of the present disclosure may be implemented in a single unit or may be physically and functionally distributed between different units, circuits, and / or processors.

[0080] Although the present disclosure has been described in connection with some embodiments, it is not intended to be limited to the specific form set forth herein. Moreover, while features of the present disclosure appear to be described in connection with particular embodiments, those skilled in the art will recognize that the various features of the described embodiments may be combined in any manner suitable for implementing the present techniques.

Claims

1. 1. An infrastructure device configured to transmit and receive data and forming part of a wireless communication network, comprising: a transceiver circuit configured to transmit and receive signals over a radio access interface provided by the wireless communication network; Controller circuit and Equipped with The controller circuit includes: transmitting a first control signal to the communications device providing an indication of a set of downlink communications resources of the radio access interface on which the infrastructure equipment intends to transmit a plurality of transport blocks to the communications device; transmitting a second control signal to the communications device during a scheduling gap, the second control signal providing an indication of at least one change related to a second plurality of transport blocks. In combination with the transceiver circuit, the plurality of transport blocks includes a first plurality of transport blocks transmitted on a first set of downlink communications resources and a second plurality of transport blocks transmitted on a second set of downlink communications resources; The first set of downlink communications resources and the second set of downlink communications resources are separated in time by the scheduling gap formed by a third set of downlink communications resources of the radio access interface. Infrastructure equipment.

2. 2. The infrastructure equipment of claim 1, The at least one modification associated with the second plurality of transport blocks is that the scheduling gap is extended in time. Infrastructure equipment.

3. 3. An infrastructure device according to claim 2, comprising: The scheduling gap is extended in time by an amount indicated by the second control signal. Infrastructure equipment.

4. 3. An infrastructure device according to claim 2, comprising: The scheduling gap is extended in time by an amount indicated in a Radio Resource Control, RRC, signaling message sent by the infrastructure equipment to the communication device. Infrastructure equipment.

5. 3. An infrastructure device according to claim 2, comprising: the scheduling gap is extended by the infrastructure equipment not transmitting at least one of the second plurality of transport blocks; The first control signal indicated that the infrastructure equipment intended to transmit at least one of the second plurality of transport blocks prior to other ones of the second plurality of transport blocks. Infrastructure equipment.

6. 3. An infrastructure device according to claim 2, comprising: The second control signal indicates extending the scheduling gap by shifting in time the second set of downlink communications resources. Infrastructure equipment.

7. 3. An infrastructure device according to claim 2, comprising: the second control signal indicates that the infrastructure equipment intends to transmit at least one of the second plurality of transport blocks after another of the second plurality of transport blocks, thereby extending the scheduling gap; the first control signal indicating that the infrastructure equipment intends to transmit at least one of the second plurality of transport blocks before another of the second plurality of transport blocks. Infrastructure equipment.

8. 3. An infrastructure device according to claim 2, comprising: the second control signal is a common group control signal between the communication device and one or more other communication devices; The infrastructure equipment is configured to transmit the second control signal to the communication device and to each of the one or more other communication devices. Infrastructure equipment.

9. 2. The infrastructure equipment of claim 1, The at least one modification regarding the second plurality of transport blocks is the infrastructure equipment not transmitting one or more of the second plurality of transport blocks indicated by the first control signal. Infrastructure equipment.

10. 10. An infrastructure device according to claim 9, comprising: The second control signal provides an indication that the infrastructure equipment intends to transmit a downlink signal to the communications device on at least a portion of the second set of downlink communications resources. Infrastructure equipment.

11. 11. The infrastructure equipment of claim 10, The downlink signal is associated with a higher priority than the second plurality of transport blocks. Infrastructure equipment.

12. 10. An infrastructure device according to claim 9, comprising: The second control signal provides an indication that the communications device is to transmit an uplink signal to the infrastructure equipment on a set of uplink communications resources of the radio access interface. Infrastructure equipment.

13. 13. An infrastructure device according to claim 12, comprising: The uplink signal is associated with a higher priority than the second plurality of transport blocks. Infrastructure equipment.

14. 10. An infrastructure device according to claim 9, comprising: the second control signal indicates, for each of the first plurality of transport blocks, transmitting a feedback signal to the infrastructure equipment within a set of uplink communication resources of the radio access interface; The feedback signal indicates whether each of the first plurality of transport blocks was successfully received by the communication device from the infrastructure equipment. Infrastructure equipment.

15. 10. An infrastructure device according to claim 9, comprising: the second control signal indicating that the communications device has finished receiving at least one of the second plurality of transport blocks; In response, the infrastructure equipment is configured to receive, for each of the first plurality of transport blocks, a feedback signal from the communications device within a set of uplink communications resources of the radio access interface; The feedback signal indicates whether each of the first plurality of transport blocks was successfully received by the communication device from the infrastructure equipment. Infrastructure equipment.

16. 10. An infrastructure device according to claim 9, comprising: the second control signal indicates, for each of the first plurality of transport blocks, that the communications device transmit a feedback signal to the infrastructure equipment; the feedback signal indicating whether each of the first plurality of transport blocks was successfully received by the communications device from the infrastructure equipment; The feedback signal is transmitted on a set of uplink communications resources of the radio access interface associated with the second set of downlink communications resources. Infrastructure equipment.

17. 10. An infrastructure device according to claim 9, comprising: the second control signal indicating that the communications device has finished receiving at least one of the second plurality of transport blocks; In response, the infrastructure equipment is configured to receive, for each of the first plurality of transport blocks, a feedback signal from the communication device; the feedback signal indicating whether each of the first plurality of transport blocks was successfully received by the communications device from the infrastructure equipment; The feedback signal is transmitted on a set of uplink communications resources of the radio access interface associated with the second set of downlink communications resources. Infrastructure equipment.

18. 18. An infrastructure device according to claim 16 or 17, comprising: The infrastructure equipment is configured to determine, in response to the second control signal indicating that the communications device is to transmit the feedback signal, that the set of uplink communications resources is to be shifted forward in time. Infrastructure equipment.

19. 2. The infrastructure equipment of claim 1, The at least one change associated with the second plurality of transport blocks is a change in at least one communication parameter of the second set of downlink communication resources indicated by the first control signal. Infrastructure equipment.

20. 20. The infrastructure equipment of claim 19, The at least one communication parameter is a physical resource of the radio access interface forming the second set of downlink communication resources. Infrastructure equipment.

21. 21. The infrastructure equipment of claim 20, the infrastructure equipment receives measurement information from the communications device indicating that a quality of a signal received by the communications device within at least a portion of the first set of downlink communications resources and / or at least a portion of the second set of downlink communications resources is below a threshold quality; and and configured to transmit the second control signal based on the received measurement information. Infrastructure equipment.

22. 22. The infrastructure equipment of claim 21, the measurement information further comprises an indication of a quality of a signal received by the communications device in downlink resources of the radio access interface other than the first set of downlink communications resources and the second set of downlink communications resources; The infrastructure equipment is configured to indicate in the second control signal that the infrastructure equipment intends to transmit the second plurality of transport blocks on a set of downlink communications resources of the radio access interface based on a quality indicated in the measurement information rather than on the second set of downlink communications resources. Infrastructure equipment.

23. 22. The infrastructure equipment of claim 21, The measurement information is received by the infrastructure equipment in response to the communications device failing to successfully receive at least one of the first plurality of transport blocks. Infrastructure equipment.

24. 20. The infrastructure equipment of claim 19, The at least one communication parameter is a transport format in which the second plurality of transport blocks are transmitted by the infrastructure equipment within the second set of downlink communication resources. Infrastructure equipment.

25. 20. The infrastructure equipment of claim 19, The at least one communication parameter is a number of repetitions that the second plurality of transport blocks are transmitted by the infrastructure equipment within the second set of downlink communication resources. Infrastructure equipment.

26. 2. The infrastructure equipment of claim 1, The infrastructure equipment is configured to transmit, during the scheduling gap after the second control signal, a third control signal to the communication device providing an indication of at least one further change related to the second plurality of transport blocks. Infrastructure equipment.

27. 1. A method of operating infrastructure equipment forming part of a wireless communications network, the infrastructure equipment being configured to transmit and receive data, the method comprising the steps of: transmitting a first control signal to the communications device providing an indication of a set of downlink communications resources of the radio access interface on which the infrastructure equipment intends to transmit a plurality of transport blocks to the communications device; transmitting a second control signal to the communications device during a scheduling gap, the second control signal providing an indication of at least one change related to a second plurality of transport blocks; Including, the plurality of transport blocks includes a first plurality of transport blocks transmitted on a first set of downlink communications resources and a second plurality of transport blocks transmitted on a second set of downlink communications resources; The first set of downlink communications resources and the second set of downlink communications resources are separated in time by the scheduling gap formed by a third set of downlink communications resources of the radio access interface. method.

28. 1. A circuit for infrastructure equipment forming part of a wireless communication network, configured to transmit and receive data, comprising: a transceiver circuit configured to transmit and receive signals over a radio access interface provided by the wireless communication network; Controller circuit and Equipped with The controller circuit includes: transmitting a first control signal to the communications device providing an indication of a set of downlink communications resources of the radio access interface on which the infrastructure equipment intends to transmit a plurality of transport blocks to the communications device; transmitting a second control signal to the communications device during a scheduling gap, the second control signal providing an indication of at least one change related to a second plurality of transport blocks. In combination with the transceiver circuit, the plurality of transport blocks includes a first plurality of transport blocks transmitted on a first set of downlink communications resources and a second plurality of transport blocks transmitted on a second set of downlink communications resources; The first set of downlink communications resources and the second set of downlink communications resources are separated in time by the scheduling gap formed by a third set of downlink communications resources of the radio access interface. Infrastructure equipment circuits.

29. 1. A communications device configured to transmit and receive data, comprising: a transceiver circuit configured to transmit and receive signals over the wireless access interface; Controller circuit and Equipped with The controller circuit includes: receiving a first control signal providing an indication of a set of downlink communication resources of the radio access interface over which the communications device is to receive a plurality of transport blocks; receiving, during the scheduling gap, a second control signal indicating at least one change related to a second plurality of transport blocks; In combination with the transceiver circuit, the plurality of transport blocks includes a first plurality of transport blocks received on a first set of downlink communications resources and a second plurality of transport blocks received on a second set of downlink communications resources; The first set of downlink communications resources and the second set of downlink communications resources are separated in time by the scheduling gap formed by a third set of downlink communications resources of the radio access interface. Communication devices.

30. 1. A method of operating a communications device configured to transmit and receive data to and from infrastructure equipment of a wireless communications network, comprising: receiving a first control signal providing an indication of a set of downlink communication resources of a radio access interface over which the communications device is to receive a plurality of transport blocks; receiving, during the scheduling gap, a second control signal indicating at least one change associated with a second plurality of transport blocks; Including, the plurality of transport blocks includes a first plurality of transport blocks received on a first set of downlink communications resources and a second plurality of transport blocks received on a second set of downlink communications resources; The first set of downlink communications resources and the second set of downlink communications resources are separated in time by the scheduling gap formed by a third set of downlink communications resources of the radio access interface. method.

31. 1. A circuit for a communications device configured to transmit and receive data, comprising: a transceiver circuit configured to transmit and receive signals over the wireless access interface; Controller circuit and Equipped with The controller circuit includes: receiving a first control signal providing an indication of a set of downlink communication resources of the radio access interface over which the communications device is to receive a plurality of transport blocks; receiving, during the scheduling gap, a second control signal indicating at least one change related to a second plurality of transport blocks; In combination with the transceiver circuit, the plurality of transport blocks includes a first plurality of transport blocks received on a first set of downlink communications resources and a second plurality of transport blocks received on a second set of downlink communications resources; The first set of downlink communications resources and the second set of downlink communications resources are separated in time by the scheduling gap formed by a third set of downlink communications resources of the radio access interface. Circuits for communication devices.

32. 1. An infrastructure device configured to transmit and receive data and forming part of a wireless communication network, comprising: a transceiver circuit configured to transmit and receive signals over a radio access interface provided by the wireless communication network; Controller circuit and Equipped with The controller circuit includes: transmitting a first control signal to the communications device providing an indication of a set of uplink communications resources of the radio access interface over which the communications device transmits a plurality of transport blocks to the infrastructure equipment; transmitting a second control signal to the communications device during a scheduling gap, the second control signal providing an indication of at least one change related to a second plurality of transport blocks. In combination with the transceiver circuit, the plurality of transport blocks includes a first plurality of transport blocks transmitted on a first set of uplink communications resources and a second plurality of transport blocks transmitted on a second set of uplink communications resources; the first set of uplink communications resources and the second set of uplink communications resources are separated in time by the scheduling gap formed by a third set of uplink communications resources of the radio access interface; the at least one modification associated with the second plurality of transport blocks is that the scheduling gap is extended in time; The scheduling gap is extended in time by an amount indicated by the second control signal. Infrastructure equipment.

33. An infrastructure device configured to transmit and receive data and forming part of a wireless communications network, comprising: a transceiver circuit configured to transmit and receive signals over a radio access interface provided by the wireless communication network; Controller circuit and Equipped with The controller circuit includes: transmitting a first control signal to the communications device providing an indication of a set of uplink communications resources of the radio access interface over which the communications device transmits a plurality of transport blocks to the infrastructure equipment; transmitting a second control signal to the communications device during a scheduling gap, the second control signal providing an indication of at least one change related to a second plurality of transport blocks. In combination with the transceiver circuit, the plurality of transport blocks includes a first plurality of transport blocks transmitted on a first set of uplink communications resources and a second plurality of transport blocks transmitted on a second set of uplink communications resources; the first set of uplink communications resources and the second set of uplink communications resources are separated in time by the scheduling gap formed by a third set of uplink communications resources of the radio access interface; the at least one modification associated with the second plurality of transport blocks is that the scheduling gap is extended in time; The scheduling gap is extended in time by an amount indicated in a Radio Resource Control, RRC, signaling message sent by the infrastructure equipment to the communication device. Infrastructure equipment.

34. The infrastructure device of claim 32, comprising: The second control signal indicates extending the scheduling gap by shifting in time the second set of uplink communications resources. Infrastructure equipment.

35. The infrastructure device of claim 32, comprising: the second control signal indicates that the communications device intends to transmit at least one of the second plurality of transport blocks after another of the second plurality of transport blocks, thereby extending the scheduling gap; The first control signal indicates that the communications device intended to transmit at least one of the second plurality of transport blocks before another of the second plurality of transport blocks. Infrastructure equipment.

36. The infrastructure device of claim 32, The second control signal is a common group control signal between the communication device and one or more other communication devices. Infrastructure equipment.

37. The infrastructure device of claim 32, comprising: the at least one modification regarding the second plurality of transport blocks is the communication device not transmitting one or more of the second plurality of transport blocks indicated by the first control signal; The second control signal provides an indication that the infrastructure equipment intends to transmit a downlink signal to the communications device on a set of downlink communications resources of the radio access interface. Infrastructure equipment.

38. The infrastructure device of claim 37, comprising: The downlink signal is associated with a higher priority than the second plurality of transport blocks. Infrastructure equipment.

39. The infrastructure device of claim 32, The second control signal provides instructions to the communications device to transmit an uplink signal to the infrastructure equipment on at least a portion of the second set of uplink communications resources. Infrastructure equipment.

40. The infrastructure device of claim 39, comprising: The uplink signal is associated with a higher priority than the second plurality of transport blocks. Infrastructure equipment.

41. 33. The infrastructure equipment of claim 32, The at least one change associated with the second plurality of transport blocks is a change in at least one communication parameter of the second set of uplink communication resources indicated by the first control signal. Infrastructure equipment.

42. The infrastructure device of claim 41, The at least one communication parameter is a physical resource of the radio access interface forming a second set of uplink communication resources. Infrastructure equipment.

43. The infrastructure device of claim 42, comprising: the infrastructure equipment is configured to transmit the second control signal in response to determining that at least one of the first plurality of transport blocks was not successfully received from the communication device; The second control signal further indicates that the communications device should transmit a sounding reference signal to the infrastructure equipment. Infrastructure equipment.

44. The infrastructure device of claim 43, comprising: The infrastructure equipment includes: receiving the sounding reference signal from the communication device; performing measurements on said sounding reference signal; Transmitting a third control signal to the communication device. It is configured as follows: The communications device indicates, based on measurements performed on the sounding reference signal, to transmit the second plurality of transport blocks on a set of uplink communications resources of the radio access interface rather than the second set of uplink communications resources. Infrastructure equipment.

45. The infrastructure device of claim 41, The at least one communication parameter is a transport format in which the communication device transmits the second plurality of transport blocks on the second set of downlink communication resources. Infrastructure equipment.

46. ​​The infrastructure device of claim 41, The at least one communication parameter is a number of repetitions during which the communication device will transmit the second plurality of transport blocks on the second set of downlink communication resources. Infrastructure equipment.

47. 33. The infrastructure equipment of claim 32, The infrastructure equipment is configured to transmit, during the scheduling gap after the second control signal, a third control signal to the communication device providing an indication of at least one further change related to the second plurality of transport blocks. Infrastructure equipment.

Citation Information

Patent Citations

  • Data Block Repetition with Transmission Gaps

    JP2019503145A