Control device, control method and power supply system
By employing a control device that adjusts power distribution between a rotating electrical machine and a storage device based on average load power, the system effectively manages fluctuating loads, enabling the downsizing of the storage battery.
Patent Information
- Application Number
- JP2021087362
- Authority / Receiving Office
- JP · JP
- Patent Type
- Patents
- Current Assignee / Owner
- Filing Date
- 2021-05-25
- Publication Date
- 2024-12-20
- Estimated Expiration
- 2041-05-25
AI Technical Summary
The power system described in Patent Document 1 faces challenges in downsizing the storage battery to operate as the only power source due to difficulties in managing fluctuating load demands.
A control device and method that includes a power generation device using a rotating electrical machine, a power storage device, and a control mechanism that adjusts output power based on average load power, distributing power between the engine generator and the storage device to minimize the storage battery's output.
This configuration allows for the downsizing of the storage battery by ensuring the engine generator handles average power loads while the storage device manages fluctuations, thereby reducing its output requirements.
Smart Images

Figure 0007603527000010 
Figure 0007603527000011 
Figure 0007603527000012
Abstract
Description
[Technical field]
[0001] The present disclosure relates to a control device, a control method, and a power supply system. [Background technology]
[0002] Patent Document 1 discloses a ship equipped with a main generator and a power system that assists the main generator. The power system described in Patent Document 1 includes a first power storage device consisting of a storage battery and a second power storage device consisting of a capacitor. In the ship described in Patent Document 1, while anchored or traveling at low speed near a port, the power system operates as the only power source that supplies power to the ship, thereby achieving zero emissions at the port. [Prior art documents] [Patent documents]
[0003] [Patent Document 1] JP 2017-136894 A Summary of the Invention [Problem to be solved by the invention]
[0004] However, the power system described in Patent Document 1 has a problem in that it may be difficult to reduce the size of the storage battery in order to operate the power system as the sole power source.
[0005] The present disclosure has been made to solve the above-mentioned problems, and has an object to provide a control device, a control method, and a power supply system that can reduce the size of a storage battery. [Means for solving the problem]
[0006] In order to solve the above problems, the control device disclosed herein is a control device for a power supply system including a power generation device that generates electricity using a rotating electric machine, a power storage device that charges and discharges electricity, and an electrical load driven by the power generation device and the power storage device, and the control device controls the output power of the power generation device based on the average load power of the electrical load.
[0007] The control method disclosed herein is a control method for a power supply system including a power generation device that generates electricity using a rotating electric machine, a power storage device that charges and discharges electricity, and an electrical load driven by power supplied from the power generation device and the power storage device, wherein the control device controls the output power of the power generation device based on an average load power of the electrical load.
[0008] The power supply system according to the present disclosure includes a power generation device that generates electricity using a rotating electric machine, a power storage device that charges and discharges electricity, an electrical load driven by power supplied from the power generation device and the power storage device, and a control device that controls the output power of the power generation device based on the average power of the electrical load. Effect of the Invention
[0009] According to the control device, control method, and power supply system of the present disclosure, the storage battery can be made smaller. [Brief description of the drawings]
[0010] [Figure 1] 1 is a diagram illustrating a configuration example of a power supply system according to a first embodiment of the present disclosure. [Diagram 2] 2 is a schematic diagram showing an operation example of the power supply system according to the first embodiment of the present disclosure. FIG. [Diagram 3] 3 is a block diagram showing an example configuration of a power supply optimization unit according to the first embodiment of the present disclosure. FIG. [Figure 4] 4 is a schematic diagram for explaining an example of the operation of a power supply optimization unit according to the first embodiment of the present disclosure. FIG. [Diagram 5] 4 is a schematic diagram for explaining an example of the operation of a power supply optimization unit according to the first embodiment of the present disclosure. FIG. [Figure 6] 4 is a schematic diagram for explaining an example of the operation of a power supply optimization unit according to the first embodiment of the present disclosure. FIG. [Figure 7] 4 is a schematic diagram for explaining an example of the operation of a power supply optimization unit according to the first embodiment of the present disclosure. FIG. [Figure 8] 4 is a schematic diagram for explaining an example of the operation of a power supply optimization unit according to the first embodiment of the present disclosure. FIG. [Figure 9] 4 is a schematic diagram for explaining an example of the operation of a power supply optimization unit according to the first embodiment of the present disclosure. FIG. [Figure 10] 4 is a schematic diagram for explaining an example of the operation of a power supply optimization unit according to the first embodiment of the present disclosure. FIG. [Figure 11] 5 is a flowchart for explaining an example of the operation of a power supply optimization unit according to the first embodiment of the present disclosure. [Figure 12] 5 is a flowchart for explaining an example of the operation of a power supply optimization unit according to the first embodiment of the present disclosure. [Figure 13] FIG. 11 is a diagram illustrating an example of the configuration of a power supply system according to a second embodiment of the present disclosure. [Figure 14] FIG. 11 is a block diagram showing an example configuration of a power supply optimization unit according to a second embodiment of the present disclosure. [Figure 15] FIG. 11 is a block diagram showing an example configuration of a power supply optimization unit according to a second embodiment of the present disclosure. [Figure 16] 13 is a schematic diagram for explaining an example of the operation of a power supply optimization unit according to the second embodiment of the present disclosure. FIG. [Figure 17] 13 is a schematic diagram for explaining an example of the operation of a power supply optimization unit according to the second embodiment of the present disclosure. FIG. [Figure 18] 13 is a schematic diagram for explaining an example of the operation of a power supply optimization unit according to the second embodiment of the present disclosure. FIG. [Figure 19] 13 is a schematic diagram for explaining an example of the operation of a power supply optimization unit according to the second embodiment of the present disclosure. FIG. [Figure 20] 13 is a schematic diagram for explaining a configuration example of a power supply optimization unit according to a second embodiment of the present disclosure. FIG. [Figure 21]13 is a schematic diagram for explaining a configuration example of a power supply optimization unit according to a second embodiment of the present disclosure. FIG. [Figure 22] FIG. 11 is a schematic diagram for explaining a configuration example of a power supply system according to a second embodiment of the present disclosure. [Diagram 23] FIG. 11 is a schematic diagram for explaining a configuration example of a power supply system according to a second embodiment of the present disclosure. [Figure 24] FIG. 1 is a schematic block diagram illustrating a configuration of a computer according to at least one embodiment. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0011] First Embodiment (Power supply system configuration) Hereinafter, a control device, a control method, and a power supply system according to a first embodiment of the present disclosure will be described with reference to Figs. 1 to 12. Fig. 1 is a diagram showing a configuration example of the power supply system according to the first embodiment of the present disclosure. Fig. 2 is a schematic diagram showing an operation example of the power supply system according to the first embodiment of the present disclosure. Fig. 3 is a block diagram showing a configuration example of a power supply optimization unit according to the first embodiment of the present disclosure. Figs. 4 to 10 are schematic diagrams for explaining an operation example of the power supply optimization unit according to the first embodiment of the present disclosure. Figs. 11 and 12 are flowcharts for explaining an operation example of the power supply optimization unit according to the first embodiment of the present disclosure. Note that the same or corresponding configurations in each drawing are designated by the same reference numerals and their explanations are omitted as appropriate.
[0012] A power supply system 100 according to a first embodiment of the present disclosure shown in Fig. 1 is configured as an on-board power supply system mounted on a parallel hybrid system vehicle, as an example. The power supply system 100 shown in Fig. 1 includes a power supply optimization unit 1 as an example of a control device according to the present disclosure, an engine generator 2 as an example of a power generation device, an electricity storage device 3, a load 4 such as a large auxiliary machine as an example of a load device, a voltage sensor 61, and a current sensor 62.
[0013] The engine generator 2 includes an internal combustion engine 21, a motor / generator (hereinafter, motor generator) 22 as an example of a rotating electric machine, and an inverter 23. The engine 21 drives the motor generator 22 to generate electric power, and drives a running load 8 consisting of drive wheels and the like via a transmission 7. The motor generator 22 is an AC rotating electric machine, and is driven by the engine 21 to operate as a generator to generate electric power, or to operate as an electric motor by electric power supplied from the power storage device 3 to drive the running load 8. The inverter 23 converts AC power generated by the motor generator 22 into DC power and outputs it to the bus 5, or converts DC power supplied from the power storage device 3 via the bus 5 into AC power and supplies it to the motor generator 22, thereby driving the motor generator 22 to rotate. The inverter 23 also controls the output power of the motor generator 22 during power generation based on an engine generator output command value output by the power supply optimization unit 1.
[0014] The power storage device 3 includes a battery (storage battery) 31, a DC / DC converter (DC-DC conversion device) 32, and a state monitoring circuit 33. The battery 31 is a secondary battery that charges and discharges electric charge, such as a lithium ion battery. The DC / DC converter 32 converts DC power supplied from the engine generator 2 via the bus 5 to a predetermined voltage to charge the battery 31, and converts the discharged power of the battery 31 to a predetermined voltage to output to the bus 5. The DC / DC converter 32 also controls the DC current (=discharge current from the battery 31) to be output to the bus 5 and the DC current (=charge current to the battery 31) to be input from the bus 5, based on the DC / DC converter command current value output by the power supply optimization unit 1. The state monitoring circuit 33 monitors the charge / discharge current, charge / discharge voltage, temperature, etc. of the battery 31, calculates the SOC (State Of Charge; charging state or charging rate) of the battery 31, and outputs the obtained result to the power supply optimization unit 1 as a battery SOC (signal or information).
[0015] The load 4 is an electric load whose power consumption changes relatively sharply, such as a large auxiliary machine, a high-output actuator, or a mobile machine tool. The power consumption changes relatively sharply, for example, when the capacity of the battery 31 selected to correspond to the peak power consumption of the load 4 is larger than the capacity of the battery 31 selected to correspond to the average power consumption of the load 4. The load 4 may be one electric load or multiple electric loads.
[0016] The voltage sensor 61 measures the voltage of the bus 5 near the load 4 and outputs the measurement result to the power supply optimization unit 1. The current sensor 62 measures the current supplied from the bus 5 to the load 4 and outputs the measurement result to the power supply optimization unit 1.
[0017] A power supply system 100 according to a first embodiment of the present disclosure shown in Fig. 1 controls the output power of the engine generator 2 so that the output power of the engine generator 2 is equal to the average load power consumed by the load 4, as shown in Fig. 2, through control by a power supply optimization unit 1 described later. The power supply system 100 also controls the output power of the power storage device 3 so that the fluctuation from the average load power consumed by the load 4 is equal to the charge / discharge power from the power storage device 3. With this configuration, the engine generator 2 bears part of the power consumption of the load 4, so that the output power of the power storage device 3 can be suppressed and the battery 31 can be easily made smaller.
[0018] (Configuration of power supply optimization unit 1) As shown in Fig. 3, the power supply optimization unit 1 includes, as a functional configuration formed by a combination of hardware and software, a load power average P load calculation unit 11, a correction amount ΔPbatt calculation unit 12, an engine generator output command value Pinv* calculation unit 13, and a DC / DC converter command current value calculation unit 14. Here, "" corresponds to an overline. In addition, in the specification, for ease of reading, the subscripts of each variable are written as full-width characters without changing the character size.
[0019] In this embodiment, with a view to suppressing the output of the battery 31 and miniaturizing the power storage device 3 in mind, the following power flow is considered for load power with abrupt fluctuations. As shown in FIG. 2, the load power is considered to be the sum of a fluctuation component corresponding to a fluctuation faster than the response speed of the engine generator 2 and an average component corresponding to the average power, and a situation is considered in which the engine generator 2 outputs the average power. As an operation of the DC / DC converter 32 in this situation, if the output of the engine generator 2 is larger than the load power, power is supplied to the battery 31, and if it is smaller, power is supplied from the battery 31 to the load 4, so that the battery 31 bears just the fluctuation power. Therefore, if the DC / DC converter 32 operates as described above, the engine generator 2 supplies power, and therefore the output of the battery 31 is suppressed. To realize such a situation, a controller that determines the operation of the DC / DC converter 32 and the engine generator 2 is required. In this embodiment, this controller is the power supply optimization unit 1.
[0020] In the power supply system 100 in Fig. 1, the power supply optimization unit 1 calculates a command current value for the DC / DC converter and an output command value for the engine generator from the received bus voltage, load current, mode signal, and battery SOC, and transmits these values to the DC / DC converter 32 and inverter 23, respectively, to control these devices. To acquire the bus voltage, load current, and mode signal, a voltage sensor 61 is installed on the bus 5, a current sensor 62 is installed between the bus and the auxiliary load, and a control device (not shown) is installed on the load 4. In addition, the SOC signal of the battery 31 is received from a status monitoring circuit 33 accompanying the battery (which monitors the current, voltage, temperature, etc.).
[0021] Here, the mode signal is a signal that indicates the state of the load 4, and takes one of four types: (ST1) stopped, (ST2) waiting, (ST3) standby, or (ST4) operating (Figure 7 explains each state using an example waveform of the auxiliary load power). For example, as summarized in Figure 8, stopped is a state in which the auxiliary equipment is completely stopped and no load power is generated. Waiting is a state in which load power is generated by auxiliary equipment excluding the cooling system. Standby is a state in which load power is generated by auxiliary equipment including the cooling system. Operating is a state in which the main auxiliary equipment is operating and load power with sudden fluctuations may be generated.
[0022] When the mode signal is "(ST4) in operation", the load 4 generates load power with abrupt fluctuations. In this situation, the power supply optimization unit 1 calculates a power value equivalent to the average of the load power from the bus voltage and load current signals, and transmits it to the inverter 23 as an output command value of the engine generator 2 (a specific calculation method of the engine generator output command value will be described later). In addition, a command current value is transmitted to the DC / DC converter 32 so that the bus voltage is discharged when it is below a certain reference voltage value, and is charged when it is above a certain reference voltage value (for example, the characteristics of FIG. 4 can be used to generate such a command current). This means that when the engine generator 2 is larger than the load power, the bus voltage rises, so that the battery 31 is charged, and when it is smaller, the bus voltage drops, so that the battery 31 is discharged. Therefore, the DC / DC converter 32 appropriately controls the flow of power, so that the battery 31 bears the fluctuation of the load power and the engine generator 2 bears the average of the load power. In other words, the DC / DC converter 32 realizes the expected operation of the two power sources, the battery 31 and the engine generator 2.
[0023] Since the DC / DC converter 32 needs to be operated to follow abrupt load fluctuations, the DC / DC converter command current value calculation unit 14 in the power supply optimization unit 1 may be included in a (local) controller of the DC / DC converter 32. In that case, a voltage sensor for transmitting the bus voltage to the local controller is additionally provided.
[0024] In this embodiment, by adopting the configuration in which the power supply optimization unit 1 is introduced, the flow of power can be controlled by the operation of the DC / DC converter 32 for a load that fluctuates faster than the response speed of the engine generator 2, and the battery 31 and the engine generator 2 can perform the expected power supply operation. At the same time, since the engine generator 2 bears part of the load power, the battery output can be suppressed, leading to the miniaturization of the power storage device 3.
[0025] The DC / DC converter command current value calculation unit 14 calculates a DC / DC converter command current value, which is a command value for the output current when controlling the output power (charge / discharge power) of the DC / DC converter 32 based on the bus voltage, and outputs the calculated DC / DC converter command current value to the DC / DC converter 32. Fig. 4 shows an example of the correspondence between the bus voltage VBUS and the output current of the DC / DC converter 32. In the example shown in Fig. 4, discharging starts when the bus voltage is 620V or less, the discharge current increases as the voltage drops, and the limited current during discharging is constant when the bus voltage is 600V or less. Charging starts when the bus voltage is 670V or more, the charge current increases as the voltage rises, and the limited current during charging is constant when the bus voltage is 700V or more.
[0026] When the output power of the engine generator 2 is controlled to match the average power consumption of the load 4 as shown in Fig. 2, the bus voltage changes according to the fluctuation in the power consumption of the load 4, so that the output power of the power storage device 3 can be set to a value according to the fluctuation in the load power by having a DC / DC converter command current value calculation unit 14 control the DC / DC converter command current value based on the bus voltage as shown in Fig. 4, for example. Note that the output control of the DC / DC converter based on the bus voltage is described in Japanese Patent No. 3886940, for example.
[0027] The load power average component P load calculation unit 11 calculates the average component of the load power as follows: That is, with the load power average component being used as the engine generator output command value, the load power average component P load calculation unit 11 calculates the average component of the load power as the time average of the product of the bus voltage and the load current obtained by the sensor, as shown in formula (1).
[0028]
number
[0029] Here, P load is the average load power (moving average value), VBUS is the bus voltage measured by the voltage sensor 61, and Iload is the load current measured by the current sensor 62.
[0030] When calculating the time average, the time length T is set to be sufficiently long with respect to the period of the (anticipated) load fluctuation so that if equation (1) is used directly as the output command value of the engine generator, the fluctuation of the output command value will be slower than the response speed of the engine generator.
[0031] In addition, while equation (1) calculates the load power directly using the sensor value of the load current, as an alternative, the average of the supplied power may be calculated using the output current value (sensor value) of inverter 23 or DC / DC converter 32 to bus 5, and this may be used as the average of the load power.
[0032]
number
[0033]
number
[0034]
number
[0035] Here, Pinv is the output power of the inverter 23, and P DCDC is the average output power of the DC / DC converter 32. Iinv is the inverter current, and is a value measured by a current sensor (not shown) in the inverter 23. IDCDC is the DC / DC converter current, and is a value measured by a current sensor (not shown) in the DC / DC converter 32.
[0036] Furthermore, the outputs of the inverter 23 and the DC / DC converter 32 may be calculated by the following equations that utilize not only the sensor values but also command values and internal parameters of the controller.
[0037]
number
[0038]
number
[0039] ηmot is the motor efficiency (controller internal parameter), ηinv is the inverter efficiency (controller internal parameter), ω is the motor rotation speed (sensor value), and τ is the motor torque (command value). In addition, ηDCDC is the DC / DC converter efficiency, Vbatt is the battery voltage (sensor value), Kbatt is the conversion coefficient from SOC to power, and SOCbatt is the battery SOC (sensor value).
[0040] The sensor values, command values, and controller internal parameters used to calculate the various average outputs are summarized in Fig. 5.
[0041] The correction amount ΔPbatt calculation unit 12 calculates a correction amount ΔPbatt for the error occurring in the load power average component calculated by the load power average component P load calculation unit 11 in the following manner.
[0042] As described above, the load power average component P load calculation unit 11 estimates the load power average component using equation (1) (or equations (2) to (4)). However, due to the influence of sensor errors, time averaging delays, and the like, deviations from the actual values may occur. FIG. 6 shows, as an example, the behavior of the load power at the start of the load and the state in which deviations occur between the actual value and the estimated value due to the time averaging delays. In FIG. 6, the actual value of the load power is shown by a solid line, the estimated value (calculated average load power) is shown by a thin dashed line, and the average power calculated for each state is shown by a thick dashed line as the actual average load power. In such a situation, the SOC of the battery 31 may fluctuate and deviate from the specified value. Therefore, when calculating the output command value of the engine generator, the engine generator output command value Pinv* calculation unit 13, which will be described later, adds a correction amount to the load power average component as shown in equation (5).
[0043]
number
[0044] Here, Pinv* is the engine generator output command value, and ΔPbatt is the correction amount.
[0045] The correction amount ΔPbatt is set according to the following concept. Assume that the amount of battery SOC to be restored per unit time when the SOC of battery 31 is "low" or "high" is given as a requirement from the system design. In this case, the design value of the correction amount is determined using the relational expression between the change in SOC and the output (input) power of the battery, shown in Equation (6), (the voltage of battery 31 is assumed to be constant).
[0046]
number
[0047] Here, ΔSOC is the amount of change in SOC, Vbatt is the battery voltage, Abatt is the current capacity of the battery 31, and t is time.
[0048] For example, if the battery voltage is 300 [V] and the battery current capacity is 80 [Ah], and you want to increase or decrease the SOC by 0.025% per second, the correction amount is as follows:
[0049]
number
[0050] If the value of the correction amount calculated above is applied when the battery SOC is in a "low" or "high" state, and a double correction is applied when the battery SOC deviates from this range, then the correction amount can be taken as shown in Fig. 10. Fig. 10 shows a table 121 that defines the correspondence between the SOC of the battery 31 and the correction amount ΔPbatt. The correction amount ΔPbatt calculation unit 12 calculates the correction amount ΔPbatt using, for example, the table 121 shown in Fig. 10.
[0051] The engine generator output command value Pinv* calculation unit 13 calculates the engine generator output command value Pinv* using the above-mentioned equation (5) based on the load power average portion P ̄load calculated by the load power average portion P ̄load calculation unit 11 and the positive amount ΔPbatt calculated by the correction amount ΔPbatt calculation unit 12, and outputs the engine generator output command value Pinv* to the inverter 23.
[0052] However, if we try to deal with this using equation (5), there is a possibility that the power supply to the load will be insufficient momentarily in the following situation. Consider a situation in which a large load fluctuation occurs immediately after switching from a standby state to a large auxiliary operation state, as shown in Figure 6. At this time, since the average power calculated by time averaging is small, the output of the engine generator 2 also becomes small, and the power borne by the battery 31 exceeds the maximum allowable output, which may result in a power shortage to the load.
[0053] In order to avoid this situation, the engine generator output command value Pinv* calculation unit 13 secures the power supply to the load as follows. For example, immediately after the transition from the standby state to the large auxiliary device operation state, the output command value Pinv* of the engine generator 2 is given by a value (fixed value) Pinv_const that can sufficiently handle instantaneous high load power when added to the output of the battery 31 as shown in FIG. 9, instead of by Equation (5). At the same time, the load power average P load calculation unit 11 performs the calculation of Equation (1), and when the value becomes equal to or greater than Pinv_const, the command value of the engine generator is given by Equation (5). As described above, when the transition is made to the large auxiliary device operation state, the power supply to the load is secured by giving a fixed value without using Equation (5) from the beginning. Note that, for example, when the standby state is changed to the standby state, the engine generator output command value Pinv* may be the fixed value Pinv_const. By introducing this fixed value Pinv_const, it is possible to suppress large changes in the charge / discharge current, and thus to reduce the size of the battery.
[0054] In addition, when the battery SOC is high and the average load power is small, the engine generator output command value Pinv* calculation unit 13 may give a negative command power to the engine generator, causing the engine generator to power. To avoid this situation, a limit is set on the output command value of the engine generator so that the output of the engine generator is a value equal to or greater than 0.
[0055] FIG. 11 shows the flow of the above-mentioned determination of the output command value of the engine generator by the engine generator output command value Pinv* calculation unit 13.
[0056] FIG. 11 shows a flow of processing by the engine generator output command value Pinv* calculation unit 13. The processing shown in FIG. 11 is repeatedly executed at a predetermined cycle. In the processing shown in FIG. 11, first, when a predetermined condition is satisfied, for example, when the mode signal first indicates a change in state, the engine generator output command value Pinv* calculation unit 13 sets the engine generator output command value Pinv* to a predetermined fixed value Pinv_const (step S21). Next, the engine generator output command value Pinv* calculation unit 13 determines whether P ̄load+ΔPbatt is equal to or greater than the fixed value Pinv_const (or whether P ̄load+ΔPbatt is within a predetermined range from the fixed value Pinv_const) (step S22). If P ̄load+ΔPbatt is equal to or greater than the fixed value Pinv_const (or if P ̄load+ΔPbatt is a value within a predetermined range from the fixed value Pinv_const) (step S22: YES), the engine generator output command value Pinv* calculation unit 13 sets the engine generator output command value Pinv* to P ̄load+ΔPbatt (step S23). Next, the engine generator output command value Pinv* calculation unit 13 determines whether P ̄load+ΔPbatt is smaller than 0 (step S24). If P ̄load+ΔPbatt is smaller than 0 (step S24: YES), the engine generator output command value Pinv* calculation unit 13 sets the engine generator output command value Pinv* to 0 (step S25). If "No" is returned in step S22, if "No" is returned in step S24, or if step S25 has been executed, the engine generator output command value Pinv* calculation unit 13 ends the process shown in FIG. 11.
[0057] (Operation of power supply optimization unit 1) FIG. 12 shows an example of the operation of the power supply optimization unit 1. The process shown in FIG. 12 is repeatedly executed at a predetermined cycle. In the process shown in FIG. 12, first, the power supply optimization unit 1 acquires each piece of information such as the bus voltage, the load current, the mode signal, the battery SOC, etc. (step S1). Next, the power supply optimization unit 1 determines an output command value for the engine generator (step S2). The power supply optimization unit 1 determines a command current value for the DC / DC converter (step S3). Next, the power supply optimization unit 1 outputs each determined value (step S4) and ends the process shown in FIG. 12.
[0058] (Actions and Effects of the First Embodiment) According to this embodiment, the engine generator covers part of the load power that is accompanied by abrupt load fluctuations, thereby suppressing the output of the battery and leading to a reduction in the size of the battery.
[0059] <Second embodiment> (Power supply system configuration) Hereinafter, a control device, a control method, and a power supply system according to a second embodiment of the present disclosure will be described with reference to Figs. 13 to 23. Fig. 13 is a diagram showing a configuration example of a power supply system according to a second embodiment of the present disclosure. Fig. 14 is a block diagram showing a configuration example of a power supply optimization unit according to a second embodiment of the present disclosure. Fig. 15 is a block diagram showing a configuration example of a power supply optimization unit according to a second embodiment of the present disclosure. Figs. 16 to 23 are schematic diagrams for explaining an operation example of a power supply optimization unit according to a second embodiment of the present disclosure. Note that the same components as those in the first embodiment are denoted by the same reference numerals, and the description thereof will be omitted as appropriate.
[0060] As shown in Fig. 13, a power supply system 100a of the second embodiment is configured by replacing the power storage device 3 with a power storage device 3a in which a battery 31 and a capacitor 34 are connected in parallel in the power supply system 100 of the first embodiment shown in Fig. 1. Note that the power supply optimization unit 1a outputs a battery DC / DC converter command current value to the DC / DC converter 32 instead of the DC / DC converter command current value.
[0061] A power supply system 100a according to a second embodiment of the present disclosure shown in Fig. 13 is configured as an on-board power supply system mounted on a parallel hybrid system vehicle, similar to the first embodiment. The power supply system 100a shown in Fig. 13 includes a power supply optimization unit 1a as an example configuration of a control device according to the present disclosure, an engine generator 2, a power storage device 3a, a load 4, a voltage sensor 61, and a current sensor 62.
[0062] The power storage device 3a includes a battery 31, a DC / DC converter 32, a state monitoring circuit 33, a capacitor , a DC / DC converter 35, and a state monitoring circuit .
[0063] The capacitor 34 is a storage device such as an electric double layer capacitor. The DC / DC converter 35 converts the DC power supplied from the engine generator 2 via the bus 5 to a predetermined voltage to charge the capacitor 34, and converts the discharge power of the capacitor 34 to a predetermined voltage to output to the bus 5. The DC / DC converter 35 also controls the DC current (= discharge current from the capacitor 34) to be output to the bus 5 and the DC current (= charge current to the capacitor 34) to be input from the bus 5, based on the capacitor DC / DC converter command current value output by the power supply optimization unit 1a. The state monitoring circuit 36 monitors the charge / discharge current, charge / discharge voltage, temperature, etc. of the capacitor 34, calculates the SOC of the capacitor 34, and outputs the calculated result to the power supply optimization unit 1a as the capacitor SOC (signal or information).
[0064] (Configuration of power supply optimization unit 1a) As shown in FIG. 14, the power supply optimization unit 1a has, as its functional components, a load power average P load calculation unit 11, a correction amount ΔPbatt calculation unit 12a, an engine generator output command value Pinv* calculation unit 13, a battery DC / DC converter command current value calculation unit 15, a capacitor DC / DC converter command current value calculation unit 16, and a correction amount Δk calculation unit 17.
[0065] The power supply system 100a in Fig. 13 has three types of power supplies: the engine generator 2, the battery 31, and the capacitor 34, and the assumed operation of each power supply will be described. First, the engine generator 2 outputs power equivalent to the average load power, as in the first embodiment. Next, the battery 31 and the capacitor 34 are charged and discharged so that the sum of the outputs of the battery 31 and the capacitor 34 corresponds to the fluctuation in the load power, since the engine generator 2 outputs the average load power. In addition, in order to reduce the size of the power storage device 3a, the output ratio of the capacitor 34 to the fluctuation load power is increased (within the output possible range of the capacitor).
[0066] To realize the operation of each of the power sources described above, a controller called a power supply optimization unit 1a is introduced (see FIG. 13) in the same manner as in the first embodiment. A difference from the first embodiment is that a command current is added to be sent to a DC / DC converter for the capacitor in order to control the DC / DC converter for the capacitor. Also, a signal of the SOC of the capacitor used to calculate the output command value of the engine generator 2 is sent from a state monitoring circuit 36 (which monitors the current, voltage, temperature, etc.) associated with the capacitor.
[0067] Now, assume that a power value equivalent to the average load power is given as the output command value of the engine generator 2, and the engine generator 2 supplies power equivalent to the average load power. At this time, it is sufficient for the battery 31 and the capacitor 34 to operate to bear the fluctuating power, but unless the input / output power of both is appropriately controlled, the power borne by the battery 31 cannot be reduced, which does not lead to a reduction in size of the power storage device 3a. For this reason, the power supply optimization unit 1a has the control logic of FIG. 15 so as to adjust the output power ratio between the battery 31 and the capacitor 34 and reduce the power borne by the battery.
[0068] 15 shows an example of the configuration of battery DC / DC converter command current value calculation unit 15, capacitor DC / DC converter command current value calculation unit 16, and correction amount Δk calculation unit 17. Correction amount Δk calculation unit 17 receives the battery SOC, the capacitor SOC, the bus voltage, and the output power of the power storage device 3a as input, calculates the correction amount Δk using a map 171 of the correction amount Δk, and outputs the correction amount Δk.
[0069] The battery DC / DC converter command current value calculation unit 15 includes a command current generation map 151, a multiplier 152, a k1 characteristic map 153, an adder 154, and a multiplier 155. The command current generation map 151 is a map that converts the bus voltage into a battery DC / DC converter command current value (output current of the power storage device 3a) with, for example, the characteristic shown in FIG. 2. The multiplier 152 multiplies the output current of the power storage device 3a by the bus voltage to calculate the output power of the power storage device 3a. The k1 characteristic map 153 outputs a coefficient k1 based on the output power. The adder 154 adds the coefficient k1 and a correction amount Δk and outputs the result. The multiplier 155 multiplies the output current of the power storage device 3a by a value obtained by adding the coefficient k1 and the correction amount Δk, and calculates and outputs the battery DC / DC converter command current value.
[0070] On the other hand, the capacitor DC / DC converter command current value calculation unit 16 includes a command current generation map 161, a multiplier 162, a k2 characteristic map 163, an adder 164, and a multiplier 165. The command current generation map 161 is a map with the same characteristics as the command current generation map 151, and is a map that converts the bus voltage into a capacitor DC / DC converter command current value (output current of the power storage device 3a) with, for example, the characteristics shown in FIG. 2. The multiplier 162 multiplies the output current of the power storage device 3a by the bus voltage to calculate the output power of the power storage device 3a. The k2 characteristic map 163 outputs a coefficient k2 based on the output power. The adder 164 subtracts a correction amount Δk from the coefficient k2 and outputs the result. The multiplier 165 multiplies the output current of the power storage device 3a by a value obtained by subtracting the correction amount Δk from the coefficient k2 to calculate and output the capacitor DC / DC converter command current value.
[0071] The command current calculation units 15 and 16 of the DC / DC converters for the battery and the capacitor each have a common command current generation characteristic (command current generation maps 151 and 161) (for example, a map as shown in FIG. 2), and the command current, which is the output signal, is multiplied by coefficients k1 and k2 in the multipliers 155 and 165. Since the same bus voltage is referenced in generating the command current, these DC / DC converters charge and discharge so that the output power ratio becomes just k1:k2. k1 and k2 are functions of the sum of the output powers of the battery 31 and the capacitor 34 (hereinafter referred to as P_bc), and when P_bc is equal to or less than the maximum allowable output value of the capacitor 34, k2 is set to be sufficiently larger than k1 (for example, k1=0.1, k2=0.9) so that the capacitor 34 bears almost all the charge and discharge power.
[0072] Furthermore, when P_bc becomes equal to or exceeds the maximum allowable output of capacitor 34, k1 and k2 are set to gradually increase the burden on battery 31 so that the output of capacitor 34 becomes exactly the maximum allowable output value (this will be described later, but the rough shape of the graph will be as shown in Figure 16).
[0073] 15 is provided in the power supply optimization unit 1a, but for the purpose of increasing the response speed to follow abrupt load fluctuations, the command current calculation units for the DC / DC converters of the capacitor 34 and the battery 31 may be provided in the (local) controllers of the capacitor 34 and the battery 31. In that case, a voltage sensor for transmitting the bus voltage is additionally provided to each local controller.
[0074] Here, in the above setting of k1 and k2, the charging and discharging of the capacitor is prioritized, but in this situation, the SOC of the capacitor is sacrificed. For example, when the output command value of the engine generator becomes lower than the average of the actual load power due to the influence of the sensor error or the inherent nature of the calculation algorithm, the battery 31 and the capacitor 34 are charged and discharged, but the rate of discharge is large. In addition, since the output power ratio of the capacitor 34 to the battery 31 is large, the discharge amount of the capacitor 34 increases and the SOC decreases. In order to avoid such a situation in which the SOC of the capacitor 34 is sacrificed, the correction amount Δk calculated by the correction amount Δk calculation unit 17 according to the SOC of the battery 31 and the capacitor 34 is added to or subtracted from the values of k1 and k2 to change the output power ratio. The power supply system 100a of FIG. 13 basically operates to prioritize the charging and discharging of the capacitor 34, but in the following situations (1) and (2), it is desired to prioritize the charging and discharging of the battery 31.
[0075] (1) When charging (bus voltage is equal to or higher than the reference voltage value), the SOC of the capacitor 34 is high and the SOC of the battery 31 is low.
[0076] (2) When discharging (bus voltage is equal to or lower than the reference voltage value), the SOC of capacitor 34 is low and the SOC 31 of the battery is high.
[0077] Therefore, the bus voltage, battery SOC, and capacitor SOC are referenced, and if the situation corresponds to (1) or (2), the coefficients k1 and k2 are changed to k1+Δk and k2-Δk by adding or subtracting a correction amount Δk. Since charging and discharging of the battery 31 is given priority, the value of the correction amount Δk is set so that k1+Δk is sufficiently larger than k2-Δk (for example, k1+Δk=0.9, k2-Δk=0.1). To calculate this correction amount Δk, information on the SOC of the battery 31 and capacitor 34 is required, and these signals are sent from status monitoring circuits 33 and 36 (which monitor the current, voltage, temperature, etc.) associated with the battery 31 and capacitor 34, respectively.
[0078] The coefficients k1, k2 and the correction amount Δk can be specifically determined as follows, for example. Consider now that the load power is shared by various power sources (engine generator, battery, and capacitor) as shown in FIG. 16. FIG. 16 includes the output of the engine generator, and in order to focus on the sharing between the battery 31 and the capacitor 34, the power sharing obtained by subtracting the output of the engine generator from FIG. 16 is shown in FIG. 17. FIG. 17 means that when the load power is below a certain value, the load power is mostly shared by the capacitor 34, and when the load power exceeds that value, the battery 31 also supplies the load power. By sharing the load power in this way, the output of the battery 31 is reduced. The vertical axis of FIG. 17 is the total output of the battery 31 and the capacitor 34, and the output of each is expressed as a ratio to the total output as shown in FIG. 16. In other words, since it is desired to operate the battery 31 and the capacitor 35 so that their output powers are at this ratio, k1 and k2 can be given in the form of a graph in FIG. 18. The k1 characteristic map 153 and the k2 characteristic map 163 in FIG. 15 can be determined as shown in the characteristics of FIG. 18.
[0079] In FIG. 17, the battery output power is not set to 0 over the entire range of the total output power of the power storage device because keeping the DC / DC converter 32 in operation at all times when the power storage device 3a is in operation makes it easier to suppress abrupt changes in current from (to) the battery 31 when the DC / DC converter 32 is started up.
[0080] Next, a specific method for setting the correction amount Δk will be described. In the second embodiment, it is desired to give priority to charging and discharging the battery 31 in the following situations (1) and (2).
[0081] (1) When charging (bus voltage is above the reference voltage value), the capacitor SOC is high and the battery SOC is low.
[0082] (2) When discharging (bus voltage is below the reference voltage value), the capacitor SOC is low and the battery SOC is high.
[0083] The above is a qualitative expression, and the reference voltage value and the threshold value of the SOC of the battery capacitor in the situations (1) and (2) are summarized in FIG. 20. FIG. 20 shows an example of the configuration of map 171 of the correction amount Δk shown in FIG. 15. FIG. 20 shows an example of setting the correction amount Δk when the reference voltage value at which the battery charging / discharging operation is switched from FIG. 4 is set to 645 [V]. Map 171 of the correction amount Δk shown in FIG. 20 includes map 172 during charging and map 173 during discharging. The coefficients (k1, k2) indicate that no correction is made by the correction amount Δk when it is (0, 0), and that correction is made by the correction amount Δk when it is (Δk, -Δk).
[0084] In addition, the correction amount Δk is calculated as shown in FIG. 19 according to the load power when the battery 31 is to bear almost all the charge and discharge in a situation where a correction amount is added (FIG. 19 is an example where k1+Δ:k2-Δ=0.9:0.1).
[0085] The SOC of the battery 31 or the capacitor 34 is controlled so as not to deviate from the "low" or "high" range in FIG.
[0086] By using the correction amount Δk, it becomes possible to control the output power of the battery and the capacitor at an expected ratio, which makes the power storage device smaller than the case of a single battery.
[0087] In the second embodiment, the correction amount ΔPbatt calculation unit 12a calculates the correction amount ΔPbatt as follows: Hereinafter, a method of calculating the correction amount ΔPbatt in the case where the capacitor 34 is also used as the power storage device 3a will be described.
[0088] When the capacitor 34 is also used as in this embodiment, the correction amount ΔPbatt is determined by referring to the SOC of both the battery 31 and the capacitor 34. Specifically, it is set as shown in a map 121a shown in Fig. 21. The idea behind setting it as shown in Fig. 21 will be described below.
[0089] When considering the setting of the correction amount ΔPbatt, the following four situations are considered.
[0090] (1) When the battery SOC is high and the capacitor SOC is medium. (2) When the battery SOC is low and the capacitor SOC is medium. (3) When the capacitor SOC is high regardless of the battery SOC status. (4) When the capacitor SOC is low, regardless of the battery SOC status.
[0091] In the situation (1), a negative value is set as the correction amount ΔPbatt to reduce the output of the engine generator 2 in order to lower the SOC of the battery 31. At this time, the output of the engine generator 2 is smaller than the average load power, and the bus voltage is equal to or lower than the reference voltage. In this case, the coefficients k1 and k2 introduced in this embodiment are corrected (see FIG. 20), and charging and discharging of the battery 31 are prioritized. As a result, discharging of the battery 31 progresses, and the SOC of the battery 31 becomes medium. Therefore, the SOCs of both the battery 31 and the capacitor 34 are in a medium state (no correction is required). In the situation (2), if a positive value is set as the correction amount Δk based on the same concept, the output of the engine generator 2 increases, charging of the battery 31 progresses, and the SOC of the battery 31 becomes medium.
[0092] In the situation (3), a negative value is set as the correction amount ΔPbatt to reduce the output of the engine generator 2 in order to lower the SOC of the capacitor 34. At this time, the output of the engine generator 2 is smaller than the average load power, and the bus voltage is equal to or lower than the reference voltage. In this case, the coefficients k1 and k2 introduced in this embodiment are not corrected (see FIG. 20), and the charging and discharging of the capacitor are prioritized. Therefore, the discharging of the capacitor 34 progresses, and the SOC of the capacitor 34 becomes medium. In the situation (4), if a positive value is set as the correction amount Δk based on the same concept, the output of the engine generator 2 increases, so that the charging of the capacitor 34 progresses, and the SOC of the capacitor 34 becomes medium. Therefore, if the correction amount ΔPbatt is added as described above in the situations (3) and (4), the SOC of the capacitor 34 and the battery becomes medium. When transitioning to the situations (1) and (2), the SOC of both the battery and the capacitor becomes medium (no correction is required) by adding the correction amount ΔPbatt as described above.
[0093] From the above, if the correction amount ΔPbatt is added according to the SOC state of the battery and capacitor as shown in FIG. 21, the SOC of the battery and capacitor can be restored to a moderate level.
[0094] In addition, in the situations of (3) and (4), since the purpose is to increase or decrease the SOC of the capacitor, the specific value of the correction amount ΔPbatt may be calculated by replacing the battery voltage and current capacity in equation (6) with the capacitor voltage and current capacity.
[0095] (Actions and Effects of the Second Embodiment) With the above-mentioned configuration, the engine generator 2 outputs power to cover the average load power, while the battery 31 and capacitor 34 output power to cover the fluctuating power. In addition, the DC / DC converter operation of the battery 31 and capacitor 34 allows the output of the battery 31 to be suppressed, since the power shared by the capacitor 34 is increased while following steep load fluctuations.
[0096] In this embodiment, the power storage device is configured not only with a battery, but also with a high output density power storage device (for example, an EDLC (electric double layer capacitor)) in order to reduce the power burden on the battery. FIG. 22 is a diagram comparing the electrical characteristics of a battery and a capacitor. Compared to a battery, a capacitor has a lower energy density but a higher output density, so using a capacitor leads to smaller size. On the other hand, as shown in FIG. 23, a certain degree of continuity of power supply to the load is required, which cannot be achieved by a capacitor alone, and a certain capacity of a high energy density battery is required. In this embodiment, the capacity of the power storage device is reduced by using a battery and a capacitor in combination.
[0097] According to this embodiment, it is possible to control the output power of the battery and the capacitor at a desired ratio, and this also makes it possible to make the power storage device smaller than a single battery.
[0098] (Action and effect) According to the control device, control method, and power supply system of the present disclosure, the storage battery can be made smaller.
[0099] (Other embodiments) Although the embodiments of the present disclosure have been described in detail above with reference to the drawings, the specific configuration is not limited to this embodiment, and design changes and the like that do not depart from the gist of the present disclosure are also included.
[0100] Computer Configuration FIG. 24 is a schematic block diagram illustrating a configuration of a computer according to at least one embodiment. The computer 90 comprises a processor 91, a main memory 92, a storage 93, and an interface 94. The above-mentioned power supply optimization units 1 and 1a are implemented in a computer 90. The operations of the above-mentioned processing units are stored in the form of a program in a storage 93. The processor 91 reads the program from the storage 93, loads it in the main memory 92, and executes the above-mentioned processing in accordance with the program. The processor 91 also secures storage areas in the main memory 92 corresponding to the above-mentioned storage units in accordance with the program.
[0101] The program may be for realizing a part of the functions to be performed by the computer 90. For example, the program may be for realizing the functions by combining with other programs already stored in the storage or by combining with other programs implemented in other devices. In another embodiment, the computer may include a custom LSI (Large Scale Integrated Circuit) such as a PLD (Programmable Logic Device) in addition to or instead of the above configuration. Examples of PLDs include PAL (Programmable Array Logic), GAL (Generic Array Logic), CPLD (Complex Programmable Logic Device), and FPGA (Field Programmable Gate Array). In this case, some or all of the functions to be realized by the processor may be realized by the integrated circuit.
[0102] Examples of the storage 93 include a hard disk drive (HDD), a solid state drive (SSD), a magnetic disk, a magneto-optical disk, a compact disc read only memory (CD-ROM), a digital versatile disc read only memory (DVD-ROM), and a semiconductor memory. The storage 93 may be an internal medium directly connected to the bus of the computer 90, or an external medium connected to the computer 90 via an interface 94 or a communication line. In addition, when the program is distributed to the computer 90 via a communication line, the computer 90 that receives the program may load the program into the main memory 92 and execute the above-mentioned process. In at least one embodiment, the storage 93 is a non-transitory tangible storage medium.
[0103] <Additional Notes> The power supply optimization units 1 and 1a described in each embodiment can be understood, for example, as follows.
[0104] (1) The power supply optimization units 1 and 1a (control devices) according to the first aspect are control devices for power supply systems 100, 100a including a power generation device (engine generator 2) that generates electricity using a rotating electric machine, a power storage device 3, 3a that charges and discharges electricity, and an electric load 4 that is driven by the power supplied from the power generation device and the power storage device, and the control device controls the output power of the power generation device based on the average portion of the load power of the electric load. According to this aspect and each of the following aspects, the average portion can be covered by the output of the power generation device, and therefore the power storage device can be easily downsized.
[0105] (2) The power supply optimization units 1 and 1a (control devices) according to a second aspect are the power supply optimization units 1 and 1a (control devices) of (1), and the control devices correct the control of the output power of the power generation device according to the state of charge (SOC) of the power storage device. According to this aspect, it becomes easy to maintain the state of charge within a certain range.
[0106] (3) The power supply optimization units 1 and 1a (control devices) according to a third aspect are the power supply optimization units 1 and 1a (control devices) according to (1) or (2), in which the electrical load operates in at least two different predetermined states, and when the state changes, the control device controls the output power of the power generation device to a predetermined power, and then controls the output power of the power generation device based on the average. According to this aspect, it is possible to prevent abrupt changes in charging / discharging current when the operating state changes.
[0107] (4) A power supply optimization unit 1a (control device) according to a fourth aspect is the power supply optimization unit 1a (control device) of (1) or (2), wherein the power storage device 3a has a storage battery 31 and a capacitor 34, and the control device controls the ratio of the charge / discharge current of the storage battery and the charge / discharge current of the capacitor so that the charge / discharge current of the capacitor exceeds the charge / discharge current of the storage battery when the charge / discharge current of the capacitor has a margin relative to the allowable charge / discharge current.
[0108] (5) A power supply optimization unit 1a (control device) according to a fifth aspect is the power supply optimization unit 1a (control device) of (4), wherein the control device corrects the ratio according to the state of charge of the storage battery and the state of charge of the capacitor. [Explanation of symbols]
[0109] 100, 100a…Power supply system 1, 1a…Power supply optimization section 2...Engine generator (power generating device) 3, 3a...Power storage device 4...Load (electrical load) 31…Battery (storage battery) 34…Capacitor
Claims
1. A control device for a power supply system including a power generation device that generates electricity using a rotating electric machine, a power storage device that charges and discharges electricity, and an electric load that is driven by electric power supplied from the power generation device and the power storage device, the control device controls the output power of the power generation device based on an average portion of the load power of the electric load; the electrical load operates under at least two different predetermined conditions; When the state changes, the control device controls the output power of the power generation device so that the output power becomes a predetermined fixed value corresponding to the state, and then, from a point in time when the average portion of the load power becomes equal to or greater than the predetermined fixed value, controls the output power of the power generation device to the average portion of the load power. Control device.
2. The control device corrects control of the output power of the power generation device in accordance with a state of charge of the power storage device. The control device according to claim 1 .
3. the power storage device includes a storage battery and a capacitor, When the charge / discharge current of the capacitor has a margin relative to an allowable charge / discharge current, the control device controls a ratio of the charge / discharge current of the storage battery to the charge / discharge current of the capacitor so that the charge / discharge current of the capacitor exceeds the charge / discharge current of the storage battery. The control device according to claim 1 or 2.
4. The control device corrects the ratio according to a charging state of the storage battery and a charging state of the capacitor. The control device according to claim 3.
5. A control method for a power supply system including a power generation device that generates electricity using a rotating electric machine, a power storage device that charges and discharges electricity, and an electric load that is driven by electric power supplied from the power generation device and the power storage device, comprising: controlling the output power of the power generation device based on an average portion of the load power of the electrical load; the electrical load operates under at least two different predetermined conditions; In the step of controlling the output power of the power generation device, when the state changes, the output power of the power generation device is controlled so as to become a predetermined fixed value of power corresponding to the state, and then, from a point in time when the average portion of the load power becomes equal to or greater than the predetermined fixed value, the output power of the power generation device is controlled at the average portion of the load power. Control methods.
6. A power generation device that generates power using a rotating electric machine; A storage device that charges and discharges electricity; an electric load driven by electric power supplied from the power generation device and the power storage device; a control device that controls the output power of the power generation device based on an average portion of the load power of the electric load; Equipped with the electrical load operates under at least two different predetermined conditions; When the state changes, the control device controls the output power of the power generation device so that the output power becomes a predetermined fixed value corresponding to the state, and then, from a point in time when the average portion of the load power becomes equal to or greater than the predetermined fixed value, controls the output power of the power generation device to the average portion of the load power. Power supply system.
Citation Information
Patent Citations
Method and equipment for controlling series hybrid vehicle
JP1996205312A
Power generating system
JP2001112178A
Power generation control device for electric vehicle
JP2012066624A
Electric power system of ship
JP2017136894A
Hybrid automobile
JP2018039463A
