New planning and ordering device, new planning and ordering system, new planning and ordering method, and new planning and ordering program
Patent Information
- Application Number
- JP2024076445
- Authority / Receiving Office
- JP · JP
- Patent Type
- Patents
- Current Assignee / Owner
- Filing Date
- 2024-05-09
- Publication Date
- 2025-03-14
- Estimated Expiration
- 2044-05-09
AI Technical Summary
【0040】 本発明によれば、新規企画を提案する提案者の増加を図ることができると共に、新規企画の実現化を図ることができる。
Smart Images

Figure 0007645470000001_ABST
Abstract
Description
[Technical field]
[0001] The present invention relates to a new plan ordering device, a new plan ordering system, a new plan ordering method, and a new plan ordering program that match a proposer who proposes a new plan with a participant who wants to participate in the new plan, and place orders for the new plan when a match is made. [Background technology]
[0002] Japanese Patent Publication No. 2003-132237 (Patent Document 1) describes a new business planning contracting system that has a function of registering a list of new business plans, a function of registering in the list data on multiple practical teams (contractors) that can undertake the registered new business plans, a function of distributing participation information for the registered new business plans to multiple contractors, a function of accepting applications from contractors to participate in the new business plan and selecting at least one contractor, and a function of calculating profit allocation to the selected contractor.
[0003] The new business planning contracting system can match clients who want to realize new business plans with contractors who are able to undertake the new business plans, and can also pay the contractors a remuneration that corresponds to the profit sharing. [Prior art documents] [Patent documents]
[0004] [Patent Document 1] JP 2003-132237 A Summary of the Invention [Problem to be solved by the invention]
[0005] However, because a large amount of money may be required to realize a new business plan, even if one wishes to realize a new business plan, there are cases where one is forced to give up due to the cost. The new business plan contracting system described in the above-mentioned publication is a system that focuses on contractors who undertake new business plans, and although it is expected that a large number of contractors will participate, there is still room for improvement in terms of ensuring the number of new business plan registrations, which is the essential point.
[0006] The present invention has been made in consideration of the above, and one of its objects is to provide technology that contributes to both increasing the number of proposers of new projects and realizing those new projects. [Means for solving the problem]
[0007] The new project ordering device, the new project ordering system, the new project ordering method, and the new project ordering program of the present invention employ the following means to achieve the above-mentioned object.
[0008] According to a preferred embodiment of the new project ordering device of the present invention, a new project ordering device is configured to match a proposer who has proposed a new project with a participant who wants to participate in the new project, and to place an order for the new project for which a match has been made. The new project ordering device includes a project acceptance unit, a project publication unit, a project participation acceptance unit, a memory unit, a feasibility determination unit, a realization cost calculation unit, and an allotted cost calculation unit. The project acceptance unit accepts a new project and acquires proposer information related to the proposer. The project publication unit publishes new project information related to the accepted new project. The project participation acceptance unit accepts participation in the new project and acquires participant information related to the participants in the new project. The memory unit stores proposer information, participant information, and contractor information related to the contractor of the new project. The feasibility determination unit determines whether the new project can be realized based on the proposer information, participant information, and contractor information. The realization cost calculation unit calculates a plan realization cost, which is a cost required to realize the new plan, based on the contractor information when the feasibility determination unit determines that the new plan is feasible. . minutesThe cost calculation unit calculates the costs to be borne by the proposer and the participants for the project realization costs based on the project realization costs, the proposer information, and the participant information. The project participation reception unit acquires participant information and is capable of receiving unique requests from participants for a new project, the memory unit is capable of storing unique request information relating to the unique requests, and the shared cost calculation unit calculates the shared costs taking into account the unique request information. Here, the "proposer information" in the present invention includes identification information that can identify the proposer, the proposer's name, the proposer's contact information (address, telephone number, email address, etc.), new project information, the minimum number of participants required, etc. Furthermore, the "new project information" in the present invention typically corresponds to the content of a new project. The "participant information" in the present invention includes the number of participants, identification information that can identify the participants, the participant's name, the participant's contact information (address, telephone number, email address, etc.), information on whether or not the person has been introduced, and if the person has been introduced, the name and contact information of the introducer (address, telephone number, email address, etc.). Furthermore, the "contractor information" in the present invention includes the number of contractors, identification information that can identify the contractor, the contractor's name, the contractor's contact information (address, telephone number, email address, etc.), information on whether or not the person has been introduced, and if the person has been introduced, the name and contact information of the introducer, and the contract fee. Furthermore, the "unique request information" in this invention typically refers to information for changing and customizing the content of a new project to meet the requests of participants, such as information regarding optional functions and optional services.
[0009] According to the present invention, a proposer can register a new plan, and a participant can register to participate in a new plan registered by the proposer, so that a match can be made between a proposer who wants to realize a new plan and a participant who wants to participate in the new plan. This makes it possible to keep the burden of plan realization costs lower than when a new plan is realized alone, and reduces the occurrence of a situation in which the realization of a new plan has to be abandoned due to costs. As a result, it is possible to increase the number of proposers who propose new plans. In addition, since the feasibility of a new plan is determined based on the proposer information, the participant information, and the contractor information, if it is determined that the new plan is feasible, the new plan can be realized by the contractor. Furthermore, according to the present invention, if it is determined that the new plan is feasible, the costs to be shared by the proposer and the participants for the plan realization costs can be calculated. Furthermore, according to the present invention, even if the content of a new project is changed or customized to meet the requests of the participants, the shared costs can be calculated taking into account the change or customization.
[0010] According to a further embodiment of the new project ordering device of the present invention, the project disclosure unit can disclose project achievement information related to the realized project, which is a realized new project. The project participation acceptance unit can accept participation in the realized project and acquire additional participant information related to the additional participant who is a participant in the realized project. The storage unit stores the additional participant information. Then, the shared cost calculation unit recalculates the shared cost based on the project realization cost and the additional participant information, and calculates the return cost according to the recalculated shared cost. The "additional participant information" in the present invention includes the number of additional participants, identification information that can identify the additional participants, the additional participant name, the contact information of the additional participant (address, telephone number, email address, etc.), information on whether the additional participant was introduced, and if the additional participant was introduced, the name and contact information of the introducer (address, telephone number, email address, etc.). In addition, the "realized project information" in the present invention includes the content of the realized new project, the number of participants, the participant information, the shared cost at the current time, etc.
[0011] According to this embodiment, when an additional participant appears in the achievement project, the cost share to be borne by the additional participant can be recalculated, and the return cost corresponding to the cost share can be calculated.
[0014] According to a further embodiment of the new project ordering device of the present invention, the device further comprises an introduction determination unit that determines whether the participants and / or contractors are introduced by an introducer, and an introduction fee calculation unit that calculates an introduction fee to be paid to the introducer. The introduction fee calculation unit calculates the introduction fee when the feasibility determination unit determines that the new project is feasible and the participants and / or contractors are introduced by the introducer. Here, the "introducer information" in the present invention includes identification information that can identify the introducer, the introducer's name, the introducer's contact information (address, telephone number, email address, etc.), etc.
[0015] According to this embodiment, if a participant or contractor is introduced by an introducer, an introduction fee to be paid to the introducer can be calculated.
[0016] According to a further aspect of the new project ordering device of the present invention, the introduction determination unit determines whether the additional participant is introduced by the introducer. Then, the introduction fee calculation unit calculates an introduction fee when the feasibility determination unit determines that the new project is feasible and the additional participant is introduced by the introducer.
[0017] According to this embodiment, if the additional participant is introduced by an introducer, it is possible to calculate an introduction fee to be paid to the introducer.
[0018] According to a further embodiment of the new project ordering device of the present invention, the device is further provided with a notification unit which, when the feasibility determination unit determines that the new project is feasible, notifies the proposer and participants of the calculated shared costs, and, when the feasibility determination unit determines that the new project is not feasible, notifies the fact that the new project is not feasible.
[0019] According to this embodiment, if the new plan is feasible, the proposer and the participants can know the respective costs that they must bear, and if the new plan is not feasible, they can know that fact.
[0020] According to a further aspect of the new project ordering device of the present invention, the notification unit notifies the additional participant of the recalculated allotted expenses, and notifies the proposer and participants of the recirculated expenses.
[0021] According to this embodiment, the additional participants can know the shared costs that they will have to pay when participating in the success project, and the proposer of the success project and the participants who have been involved in the project from the beginning can know the costs that will be refunded with the participation of the additional participants.
[0022] According to a further aspect of the new project ordering device of the present invention, the notification unit notifies the introducer of the introduction fee.
[0023] According to this embodiment, the introducer of the participant, the introducer of the contractor, and the introducer of the additional participant can know the referral fee that they can receive.
[0024] According to a further aspect of the new project ordering device of the present invention, the new project ordering device further comprises an allotted expense publishing unit that publishes the allotted expense calculated by the allotted expense calculation unit.
[0025] According to this embodiment, the current shared costs for realizing a new project can be notified, which can encourage participation in the new project for those who want to participate in the new project but are hesitant to do so because the shared costs are an obstacle.
[0028] According to a further aspect of the new project ordering device of the present invention, the device further includes a contract receiving unit for receiving a contractor and acquiring contractor information. The feasibility determining unit determines that the new project cannot be realized if a predetermined number of participants do not appear within a predetermined period of time or if a contractor does not appear.
[0029] According to this embodiment, by setting the specified number to a value that ensures that the proposer's share of the costs is equal to or less than the desired amount, it is possible to effectively prevent the proposer from bearing costs greater than the desired amount.
[0030] According to a preferred embodiment of the new project ordering system of the present invention, a new project ordering system is configured that matches a proposer who proposes a new project with a participant who wants to participate in the new project, and that places an order for the new project for which a match has been made. The new project ordering system includes the new project ordering device of the present invention described above, a proposer terminal connected to the new project ordering device via a network and capable of sending proposer information and new project information to the new project ordering device, a participant terminal connected to the new project ordering device via a network and capable of sending participant information to the new project ordering device, and a contractor terminal connected to the new project ordering device via a network and capable of sending contractor information to the new project ordering device.
[0031] According to the present invention, since the new project ordering device of the present invention in any of the above-mentioned aspects is provided, it is possible to achieve the same effects as those achieved by the new project ordering device of the present invention described above, for example, the effect of being able to achieve both an increase in the number of proposers proposing new projects and the realization of those new projects.
[0032] According to a preferred embodiment of the new project ordering method of the present invention, a new project ordering method is configured to match a proposer who has proposed a new project with a participant who wants to participate in the new project, and to order or receive the new project for which a match has been made. The project reception department The project acceptance steps to be acquired, The project reception department New project information, which is information about new projects that have been accepted The Planning and Publication Department The project publication step to be published, and the participant information of the participants in the new project will be stored. The project participation reception department The method includes a plan participation acceptance step for acquiring information on the proposer, information on the participants, and information on the contractor of the new plan, a storage step, a feasibility determination step, a realization cost calculation step, and a shared cost calculation step. The memory section The feasibility determination step determines whether the new plan is feasible based on the proposer information, the participant information, and the contractor information. The feasibility determination section In the realization cost calculation step, when the feasibility determination step determines that the new plan is feasible, the realization cost, which is the cost required to realize the new plan, is calculated based on the contractor information. The Realization Cost Calculation Department Calculate . minutes The cost calculation step calculates the cost of the proposer and the participants based on the project realization cost, the proposer information, and the participant information. The cost sharing calculation department Calculate The plan participation acceptance step includes a step of acquiring participant information and accepting unique requests from the participants for the new plan by the plan participation acceptance unit, the storage step includes a step of the storage unit storing unique request information related to the unique requests, and the shared cost calculation step includes a step of the shared cost calculation unit calculating the shared costs by taking the unique request information into account.Here, the "proposer information" in the present invention includes identification information that can identify the proposer, the proposer's name, the proposer's contact information (address, telephone number, email address, etc.), the content of the new project, the minimum number of participants required, etc. Furthermore, the "participant information" in the present invention includes the number of participants, identification information that can identify the participants, the participant's name, the participant's contact information (address, telephone number, email address, etc.), information on whether or not the person has been introduced, and if the person has been introduced, the name and contact information of the introducer (address, telephone number, email address, etc.). Furthermore, the "contractor information" in the present invention includes the number of contractors, identification information that can identify the contractor, the contractor's name, the contractor's contact information (address, telephone number, email address, etc.), information on whether or not the person has been introduced, and if the person has been introduced, the name and contact information of the introducer, and the contract fee. Furthermore, the "unique request information" in this invention typically refers to information for changing and customizing the content of a new project to meet the requests of participants, such as information regarding optional functions and optional services.
[0033] According to the present invention, a proposer can register a new plan, and a participant can register to participate in a new plan registered by the proposer, so that a match can be made between a proposer who wants to realize a new plan and a participant who wants to participate in the new plan. This makes it possible to keep the burden of plan realization costs lower than when a new plan is realized alone, and reduces the occurrence of a situation in which the realization of a new plan has to be abandoned due to costs. As a result, it is possible to increase the number of proposers who propose new plans. In addition, since the feasibility of a new plan is determined based on the proposer information, the participant information, and the contractor information, if it is determined that the new plan is feasible, the new plan can be realized by the contractor. Furthermore, according to the present invention, if it is determined that the new plan is feasible, the costs to be shared by the proposer and the participants for the plan realization costs can be calculated. Furthermore, according to the present invention, even if the content of a new project is changed or customized to meet the requests of the participants, the shared costs can be calculated taking into account the change or customization.
[0034] According to a further embodiment of the new project ordering method of the present invention, the project publishing step includes: The Planning and Publication DepartmentThe project participation acceptance step includes a step of accepting participation in the project and publishing additional participant information regarding the additional participants who are participants in the project. The project participation reception department will accept your application. The step of storing the additional participant information is also included. The memory section The shared cost calculation step includes a step of recalculating the shared cost based on the project realization cost and the additional participant information, and calculating a return cost corresponding to the shared cost. The cost sharing calculation department The "additional participant information" in the present invention includes the number of additional participants, identification information for identifying the additional participants, the names of the additional participants, the contact information of the additional participants (address, telephone number, email address, etc.), information on whether or not the additional participants were introduced, and if introduced, the name and contact information of the introducer (address, telephone number, email address, etc.). Furthermore, the "accomplished project information" in the present invention includes the content of the new project that was achieved, the number of participants, participant information, the current shared costs, etc.
[0035] According to this embodiment, when an additional participant appears in the achievement project, the cost share to be borne by the additional participant can be recalculated, and the return cost corresponding to the cost share can be calculated.
[0036] According to a further embodiment of the new project ordering method of the present invention, the allocated cost is calculated by the allocated cost calculation step. The cost sharing disclosure department It further includes a shared cost disclosure step for disclosing the shared cost.
[0037] According to this embodiment, the current shared costs for realizing a new project can be notified, which can encourage participation in the new project for those who want to participate in the new project but are hesitant to do so because the shared costs are an obstacle.
[0038] According to a preferred embodiment of the program of the present invention, a new project ordering program is configured to match a proposer who has proposed a new project with a participant who wants to participate in the new project, and to place an order for the new project for which a match has been made. The new project ordering program causes a computer to execute each step of the new project ordering method of the present invention according to any of the above-mentioned aspects. The program may be recorded on a computer-readable recording medium, such as a hard disk, a ROM, an SSD, a flash memory (such as a USB memory or an SD card), a floppy disk, a CD, or a DVD, or may be distributed from one computer to another computer via a transmission medium, such as a communication network such as the Internet or a LAN, or may be transmitted and received in any other manner.
[0039] According to the present invention, it is possible to achieve the same effect as that achieved by the new project ordering and acceptance method of the present invention in any of the above-mentioned aspects, for example, the effect of being able to achieve both an increase in the number of proposers proposing new projects and the realization of those new projects. Effect of the Invention
[0040] According to the present invention, it is possible to increase the number of proposers who propose new plans and to realize the new plans. [Brief description of the drawings]
[0041] [Figure 1] 1 is a schematic diagram showing an outline of the configuration of a new project ordering system 1 according to an embodiment of the present invention. [Diagram 2] 2 is a functional block diagram showing a functional configuration of a server 2 functioning as a new project ordering device according to an embodiment of the present invention. FIG. [Diagram 3] FIG. 4 is an explanatory diagram showing an example of new system development information 48 that is made public when a new system development is registered. [Figure 4]This is an explanatory diagram showing an example of new system development information 48 that is made public after registration for participation in a new system development or after an order for a new system development has been registered, and after development costs Cd and shared costs Es have been calculated. [Diagram 5] 4 is an explanatory diagram showing an example of member company information 42. FIG. [Figure 6] FIG. 4 is an explanatory diagram showing an example of vendor information 44. [Figure 7] 13 is a flowchart showing an example of a new system development ordering processing routine. [Figure 8] 13 is a flowchart showing an example of a return cost calculation process routine. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0042] Next, the best mode for carrying out the present invention will be described with reference to examples. EXAMPLES
[0043] The new project ordering system 1 according to the embodiment of the present invention is configured as a system that provides a joint development platform that enables multiple member companies to jointly develop one system. As shown in FIG. 1, the system includes a server 2 as a new project ordering device according to the embodiment of the present invention, a platformer terminal 4 that can be connected to the server 2 via a network, multiple member company terminals 6A, 6B, 6C, and 6D that can be connected to the server 2 via a network, and a DX support company terminal 8 that can be connected to the server 2 via a network. In this embodiment, the platformer, which is the provider of the joint development platform, is configured to also serve as a vendor that undertakes new system development. If the platformer cannot undertake all of the new system development, the platformer outsources the parts of the new system development that it cannot undertake to other vendors. In other words, the contract fee Cm for new system development is calculated by the platformer in consideration of the contract fee Cmi (i=1, 2, . . . , g) of the outsourced vendor entrusted by the platformer (Cm=ΣCmi). Here, the "joint development platform" in this invention is defined as an online venue (e.g., a website) that enables multiple member companies to jointly develop a single system. Note that new system development is an example of an embodiment corresponding to a "new project" in this invention. Also, a vendor is an example of an embodiment corresponding to a "contractor" in this invention.
[0044] The server 2 is a device that provides a joint development platform (hereinafter, sometimes simply referred to as the "platform") and is a computer equipped with a CPU, memory, an input / output interface, and a communication unit. The new project ordering program according to the present invention is installed in the computer and stored in the memory. The server 2 generates a screen on which a member company can register a new system development, register participation in a registered new system development, and a platformer as a vendor can register an order for a registered new system development, and displays the screen on the member company terminals 6A, 6B, 6C, 6D and the platformer terminal 4. When a member company or a platformer inputs a request for execution of a joint development on the screen, the CPU reads the program in the memory and processes information according to the steps instructed by the program, so that the computer executes the new project ordering method according to the present invention and functions as a new project ordering device.
[0045] In addition, as shown in FIG. 2, the server 2 is configured as functional blocks including a plan reception unit 20, a plan disclosure unit 22, a plan participation reception unit 24, a contract reception unit 26, a feasibility determination unit 28, a realization cost calculation unit 30, a shared cost calculation unit 32, a referral determination unit 34, a referral fee calculation unit 36, a notification unit 38, a memory unit 40, etc., through collaboration between one or both of hardware resources (CPU, ROM, RAM, various interfaces, etc.) and software (an installed operating system and other application programs (such as a new plan order program according to an embodiment of the present invention)). In other words, each of these units (plan acceptance unit 20, plan disclosure unit 22, plan participation acceptance unit 24, contract acceptance unit 26, feasibility determination unit 28, realization cost calculation unit 30, shared cost calculation unit 32, introduction determination unit 34, introduction fee calculation unit 36, notification unit 38, memory unit 40) can be said to be a function realized by each component shown in Fig. 2 (CPU, ROM, RAM, etc.) operating alone or in cooperation with an instruction from a CPU that executes a program expanded on RAM. The plan acceptance unit 20, plan disclosure unit 22, plan participation acceptance unit 24, contract acceptance unit 26, feasibility determination unit 28, realization cost calculation unit 30, shared cost calculation unit 32, introduction determination unit 34, introduction fee calculation unit 36, notification unit 38, memory unit 40, etc. are electrically connected by a bus line 80 such as an address bus or a data bus. In addition, the functional units of the server 2 may be integrated into one functional unit, or one functional unit may be divided into multiple functional units for each function. The server 2 is an example of an embodiment corresponding to the "new project ordering device" of the present invention.
[0046] The plan receiving unit 20 receives registration of new system development from a member company that has registered as a member in the new plan ordering system 1. In this embodiment, the plan receiving unit 20 acquires proposing company information, which is information about a member company that has registered a new system development (hereinafter referred to as a "proposing company"), and the contents of the new system development entered by the proposing company, based on information entered by the member company using a new system development registration screen displayed by executing an application on the member company terminal 6A, 6B, 6C, 6D. In this embodiment, the plan receiving unit 20 is configured to acquire the proposing company information from the member company information 42 described later stored in the storage unit 40, and the acquired proposing company information and the contents of the new system development are linked to each other and stored in the storage unit 40 as new system development information 48 (see FIG. 3). The proposing company corresponds to the "proposer" in the present invention, and the proposing company information is an example of an embodiment corresponding to the "proposer information" in the present invention. In addition, the new system development information 48 is an example of an embodiment corresponding to the "new plan information" in the present invention.
[0047] The plan disclosure unit 22 discloses to the member companies the new system development information 48 accepted by the plan acceptance unit 20 and the closed system development information 49, which is information on the system development for which the recruitment has already ended (hereinafter referred to as "closed system development"). In this embodiment, the plan disclosure unit 22 reads the new system development information 48 and the closed system development information 49 from the storage unit 40, and displays the read new system development information 48 and the closed system development information 49 so that they can be viewed on a predetermined screen that is displayed by the member company or the platformer executing an application on the member company terminal 6A, 6B, 6C, 6D or the platformer terminal 4. Here, the new system development information 48 that is disclosed at the stage when the new system development is registered includes, for example, the case identification ID, the proposing company information, and the contents of the new system development including the participation recruitment period Pp of the new system development and the number of participating companies Npc* required for the new system development, as shown in FIG. 3. In addition, the new system development information 48 that is made public after the project participation reception unit 24 accepts the registration for participation in the new system development or after the contract reception unit 26 accepts the registration for receiving an order for the new system development includes, in addition to the above-mentioned information, information (hereinafter referred to as "participating company information") on the member companies (hereinafter referred to as "participating companies") that have registered their participation in the new system development, and receiving vendor information that is information on the vendor (in this embodiment, the platform provider, but may also be referred to as the "receiving vendor") that has registered the order for the new system development. Furthermore, the new system development information 48 that is made public after the realization cost calculation unit 30 calculates the development cost Cd or after the shared cost calculation unit 32 calculates the shared cost Es includes, in addition to the new system development information 48 shown in FIG. 4(a), the development cost Cd calculated by the realization cost calculation unit 30 and the shared cost calculated by the shared cost calculation unit 32.The closed system development information 49 is basically the same as the new system development information 48 shown in FIG. 4(b), but the closed system development information 49 that is made public after the planning participation reception unit 24 accepts the registration for participation in the closed system development includes information (hereinafter referred to as "additional participating companies") that has registered for participation in the closed system. It goes without saying that, among the proposing company information, participating company information, and receiving vendor information, passwords set by the proposing company, participating company, and platformer, and information on customization requested by the participating company for the new system development described later, are not made public. Here, the planning disclosure unit 22 corresponds to the "plan disclosure unit" and the "shared cost disclosure unit" in the present invention, the participating companies correspond to the "participants" in the present invention, and the participating company information is an example of an embodiment corresponding to the "participant information". Also, the receiving vendor information is an example of an embodiment corresponding to the "contractor information" in the present invention. Furthermore, the closed system development corresponds to the "accomplished project" in the present invention, and the closed system development information 49 is an example of an embodiment corresponding to the "accomplished project information" in the present invention. Furthermore, the additional participating company corresponds to the "additional participant" in the present invention, and the additional participating company information is an example of an embodiment corresponding to the "additional participant information" in the present invention.
[0048] The project participation acceptance unit 24 accepts participation from member companies in new system development and participation from member companies in closed system development. In this embodiment, the project participation acceptance unit 24 acquires participating company information and additional participating company information, which are information about member companies (participating companies and additional participating companies) who have registered for participation in new system development and closed system development, based on information entered into a new system development participation registration screen and a closed system development participation registration screen displayed by the member companies executing an application on the member company terminals 6A, 6B, 6C, and 6D. Note that, in this embodiment, the project participation acceptance unit 24 is configured to acquire participating company information and additional participating company information from member company information 42 described later stored in the storage unit 40. In addition, the project participation acceptance unit 24 reads new system development information 48 and closed system development information 49 from the storage unit 40, adds participating company information to the new system development information 48 and closed system development information 49, and transmits the new system development information 48 and closed system development information 49 to the storage unit 40 (see FIG. 4). In other words, when a participating company appears to participate in the new system development, or when a participating company appears to participate in the closed system development, the project participation reception unit 24 uses the participating company information and the additional participating company information to update the new system development information 48 and the closed system development information 49. The participating company information and the additional participating company information include information regarding customization requested by the participating companies for the new system development (hereinafter referred to as "customization information"). Here, the participating companies' requests for the new system development correspond to the "unique requests" in the present invention, and the customization information is an example of an embodiment corresponding to the "unique request information" in the present invention.
[0049] The contract acceptance unit 26 accepts vendors who can undertake the new system development. In this embodiment, the contract acceptance unit 26 acquires the order-receiving vendor information based on the information inputted into a new system development order registration screen displayed by the platformer executing an application on the platformer terminal 4. In this embodiment, the contract acceptance unit 26 is configured to acquire the order-receiving vendor information from the vendor information 44 described later stored in the storage unit 40. In addition, the contract acceptance unit 26 reads the new system development information 48 from the storage unit 40, adds the order-receiving vendor information to the new system development information 48, and transmits the new system development information 48 to the storage unit 40 (see FIG. 4). In other words, when a vendor who can undertake the new system development appears, the contract acceptance unit 26 updates the new system development information 48 using the order-receiving vendor information.
[0050] The feasibility determination unit 28 determines whether the new system development accepted by the plan acceptance unit 20 is feasible. In this embodiment, the feasibility determination unit 28 determines whether the new system development is feasible based on the new system development information 48 stored in the storage unit 40. Specifically, the feasibility determination unit 28 determines whether the new system development is feasible based on the "participation solicitation period Pp" and the "required number of participating companies Npc*" of the "contents of new system development" in the new system development information 48, and the presence or absence of order receiving vendor information. More specifically, the feasibility determination unit 28 determines that the new system development is feasible when there is participation registration of the required number of participating companies Npc* within the participation solicitation period Pp and there is an order registration for the new system development, and determines that the new system development is not feasible when there is no participation registration of the required number of participating companies Npc* within the participation solicitation period Pp or there is no order registration for the new system development. In addition, when the feasibility determination unit 28 determines that the new system development is feasible, it transmits information to the notification unit 38 that the new system development is feasible, closes the recruitment for the new system development, and transmits the new system development information 48 as recruitment-ended system development information 49 to the storage unit 40. In other words, it can be said that the feasibility determination unit 28 replaces (restores) the new system development information 48 stored in the storage unit 40 with recruitment-ended system development information 49. Here, "closing the recruitment for the new system development" corresponds to replacing (restores) the new system development information 48 with recruitment-ended system development information 49. As a result, the public information is updated from the new system development information 48 to the recruitment-ended system development information 49, so that the member companies and the platform operator can know that the recruitment for the new system development has been closed. The participation recruitment period Pp corresponds to the "predetermined period" in the present invention, and the required number of participating companies Npc* is an example of an embodiment corresponding to the "predetermined number" in the present invention.
[0051] The realization cost calculation unit 30 calculates the development cost Cd. In this embodiment, the realization cost calculation unit 30 calculates the development cost Cd based on the order receiving vendor information (contract cost Cm) in the new system development information 48 stored in the storage unit 40. The realization cost calculation unit 30 also reads the new system development information 48 stored in the storage unit 40, adds the development cost Cd to the new system development information 48, and transmits the new system development information 48 to the storage unit 40. In other words, when the feasibility determination unit 28 determines that the system development is feasible, the realization cost calculation unit 30 uses the development cost Cd to update the new system development information 48. The development cost Cd is an example of an embodiment corresponding to the "plan realization cost" in the present invention.
[0052] The shared cost calculation unit 32 calculates, when developing a new system, shared costs Es, which are costs shared by participating companies participating in the new system development including the proposing company, shared costs Es, which are costs shared by participating companies participating in the closed system development, and return costs Er, which are costs returned to participating companies participating in the new system development including the proposing company. Specifically, the shared costs Es and return costs Er are calculated based on new system development information 48 and closed system development information 49 stored in the storage unit 40.
[0053] Furthermore, the shared expense calculation unit 32 reads the new system development information 48 and the closed-recruitment system development information 49 stored in the storage unit 40, adds the shared expense Es and the return expense Er to the participating company information in the new system development information 48 and the participating company information in the closed-recruitment system development information 49, and transmits the new system development information 48 and the closed-recruitment system development information 49 to the storage unit 40. In other words, it can be said that the shared expense calculation unit 32 updates the new system development information 48 using the shared expense Es when a participating company appears in the new system development, and updates the closed-recruitment system development information 49 using the shared expense Es and the return expense Er when a participating company appears in a system for which recruitment has already ended.
[0054] The introduction determination unit 34 determines whether a participating company or vendor has been introduced by a DX support company. Specifically, the introduction determination unit 34 determines whether a participating company or vendor has been introduced by a DX support company based on information entered by the participating company or vendor when registering as a member in this system (member company information 42 and vendor information 44 described below). More specifically, if information about the introducer is described in the member company information 42 or vendor information 44, it is determined that the participating company or vendor has been introduced by a DX support company.
[0055] The introduction fee calculation unit 36 calculates the introduction fee Fr to be paid to the DX support company when the introduction determination unit determines that the participating company or vendor is introduced by the DX support company. The introduction fee Fr can be determined in advance between the platform provider and the DX support company for each new system development.
[0056] The notification unit 38 notifies the member companies and the platform provider via the member company terminals 6A, 6B, 6C, 6D and the platform provider terminal 4 that the new system development has been successful or has not been successful, notifies the proposing company and participating companies of the shared costs Es and the return costs Er via the member company terminals 6A, 6B, 6C, 6D, and notifies the DX support company of the introduction fee Fr via the DX support company terminal 8.
[0057] The storage unit 40 is secured in at least one of a RAM and a hard disk (HDD), and stores member company information 42, vendor information 44, DX support company information 46, new system development information 48, closed system development information 49, and the like. As shown in FIG. 5, the member company information 42 includes a company identification ID given to each member company, company name, address, telephone number, email address, website URL, date of establishment, capital, number of employees, business content, whether there is an introducer, introducer information, password, and the like. As shown in FIG. 6, the platform information (hereinafter referred to as "vendor information 44") 44 includes a company name, address, telephone number, email address, website URL, date of establishment, capital, number of employees, business content, password, and the like. In addition, the DX support company information 46 includes almost the same content as the member company information 42, except for "whether there is an introducer" and "introducer information". At the stage when a new system development is registered, new system development information 48 includes an identification ID assigned to each new system development, proposing company information which is information on the member company that registered the new system development, and the contents of the new system development, as shown in Fig. 3, and at the stage when participation in a new system development is registered or an order for the new system development is registered, in addition to the above information, as shown in Fig. 4(a), it includes participating company information which is information on the member company that registered participation in the new system development, and order receiving vendor information (in this embodiment, platform provider information) which is information on the vendor that registered the order for the new system development (in this embodiment, platform provider information). After an order for the new system development is registered, new system development information 48 includes development cost Cd and shared cost Es, as shown in Fig. 4(b).
[0058] The closed system development information 49 basically contains the same information as the new system development information 48 shown in Figure 4, except that additional participating company information is added after participation in the closed system development is registered.
[0059] The platformer terminal 4 is a terminal used by the platformer when using the services of the joint development platform provided by the server 2, and is a computer, smartphone, tablet, etc. equipped with a CPU, memory, input / output interface, and communication unit. The CPU reads out the program in the memory and processes information according to the steps instructed by the program, thereby realizing various functions of the platformer terminal 4. The program includes, for example, an application for the platformer to use the new planning and ordering system 1 according to the present invention.
[0060] The platformer can use various screens displayed by executing the platformer application on the platformer terminal 4 to, for example, input platformer information (vendor information 44) and register an order for new system development (input of order-receiving vendor information (platformer information)). Here, the order-receiving vendor information (platformer information) includes the new system development contract fee Cm and option fees for realizing customization requests from participating companies. The present invention can also be applied when the platformer application is not installed on the platformer terminal 4. In this case, for example, the new planning and ordering system 1 can be used while exchanging data between the platformer terminal 4 and the relay system using various screens displayed on the platformer terminal 4 by connecting the platformer terminal 4 to a designated site of the relay system. The platformer terminal is an example of an embodiment corresponding to the "contractor terminal" in the present invention.
[0061] The member company terminals 6A, 6B, 6C, 6D are terminals used by member companies when using the services of the joint development platform provided by the server 2, and are computers, smartphones, tablets, etc. equipped with a CPU, memory, input / output interface, and communication unit. The CPU executes programs stored in the memory, for example, applications such as a web browser for viewing various information provided by the server 2 via the network, thereby realizing various functions of the member company terminals 6A, 6B, 6C, 6D. The programs include, for example, member company applications for using the new planning and ordering system 1 according to the present invention.
[0062] Member companies can register as members in this system by accessing server 2 via the network using member company terminals 6A, 6B, 6C, 6D. Member companies input member company information 42 into a specified input screen displayed on member company terminals 6A, 6B, 6C, 6D. When a member company inputs member company information 42 and sends it to server 2, a user ID (e.g., a company identification ID) is sent from server 2 to member company terminals 6A, 6B, 6C, 6D. Member companies can access server 2 by using member company terminals 6A, 6B, 6C, 6D to input the sent user ID (e.g., a company identification ID) and a password they have set themselves into a specified input screen.
[0063] Using various screens displayed by executing applications on the member company terminals 6A, 6B, 6C, and 6D, the member companies can, for example, register new system development (input of proposing company information), view new system development information 48, register for participation in new system development (input of participating company information), view closed system development information 49, and register for participation in closed system development (input of additional participating company information). When registering for participation in new system development or closed system development, the member companies can include information on customization requested by each member company for the new system development (hereinafter, "customization information"). In this case, the participating company information and additional participating company information include the customization information. The terminal of the proposing company among the member company terminals 6A, 6B, 6C, and 6D of the member companies corresponds to the "proposer terminal" in the present invention, and the terminal of the participating company or additional participating company among the member company terminals 6A, 6B, 6C, and 6D of the member companies corresponds to the "participant terminal" in the present invention.
[0064] In addition, without installing applications on the member company terminals 6A, 6B, 6C, 6D, for example, the member company terminals 6A, 6B, 6C, 6D may be configured to connect to a specified site of the relay system, and various functions of the member company terminals 6A, 6B, 6C, 6D may be realized while exchanging data between the member company terminals 6A, 6B, 6C, 6D and the relay system using various screens displayed on the member company terminals 6A, 6B, 6C, 6D.
[0065] The DX support company terminal 8 is a terminal used by the DX support company when using the services of the joint development platform, and is a computer, smartphone, tablet, etc. equipped with a CPU, memory, input / output interface, and communication unit. The CPU executes programs stored in the memory, for example, applications such as a web browser for browsing various information provided by the server 2 via a network, thereby realizing various functions of the DX support company terminal 8. The programs include, for example, a DX support company application for using the new planning and ordering system 1 according to the present invention.
[0066] A DX support company can register with this system by accessing the server 2 via the network using a DX support company terminal 8. The DX support company inputs DX support company information 46 into a predetermined input screen displayed on the DX support company terminal 8. When the DX support company inputs the DX support company information 46 and sends it to the server 2, a user ID (e.g., a company identification ID) is sent from the server 2 to the DX support company terminal 8. The DX support company can access the server 2 by using the DX support company terminal 8 to input the sent user ID (e.g., a company identification ID) and a password set by the company itself into a predetermined input screen. The DX support company is an example of an implementation configuration corresponding to an "introducing company" in this invention.
[0067] The DX support company can view, for example, new system development information 48 and closed system development information 49 using various screens displayed by executing an application on the DX support company terminal 8. Note that, without installing an application on the DX support company terminal 8, for example, the DX support company terminal 8 may be connected to a designated site of the relay system, and various functions of the DX support company terminal 8 may be realized while exchanging data between the DX support company terminal 8 and the relay system using various screens displayed on the DX support company terminal 8.
[0068] Next, the operation of the new project ordering system 1 thus configured will be described, in particular the operation when placing an order for new system development, and the operation when a registration for participation in closed system development is made. First, the operation when placing an order for new system development will be described, and then the operation when a registration for participation in closed system development is made. FIG. 7 is a flowchart showing an example of a new system development ordering processing routine executed by the server 2, and FIG. 8 is a flowchart showing an example of a return cost calculation processing routine executed by the server 2.
[0069] <New system development order processing> When the new system development order receiving and placing processing routine is executed, the server 2, as shown in FIG. 7, first executes a process to determine whether or not a new system development has been registered (step S100). Specifically, the server 2 determines whether or not new system development information 48 is stored in the storage unit 40. If a new system development has been registered, the server 2 executes a process to read the new system development information 48 (see FIG. 3) (step S102) and executes a process to publish the read new system development information 48 to the member companies (step S104). This allows the member companies and the platformer to view the new system development information 48 by executing an application on the member company terminals 6A, 6B, 6C, 6D or the platformer terminal 4 to display a predetermined screen, and to register participation in the published new system development or register an order. At this time, the member company that registers participation in the new system development can include customization information in the participating company information. In addition, the platformer that registers an order for the new system development includes the contracted fee Cm and the option fee in the order receiving vendor information (platformer information).
[0070] Next, the server 2 executes a process to determine whether or not there has been registration for participation in the published new system development (step S106), and if there has been registration for participation, it updates the new system development information 48 (see FIG. 4(a)), executes a process to publish the updated new system development information 48 (step S108), and executes a process to determine whether or not an order has been registered for the new system development (step S110). Here, the update of the new system development information 48 is performed as a process to add participating company information to the new system development information 48 (see FIG. 3) in which the proposing company information and the contents of the new system development are linked to each other (see FIG. 4(a)).
[0071] When an order for new system development is registered, the server 2 reads the contract fee Cm and option fee (step S112) and executes a process of calculating the development cost Cd based on the read contract fee Cm (step S114). Here, the contract fee Cm and option fee are calculated by the platformer after viewing the new system development information 48 using the platformer terminal 4, based on the "contents of the new system" and "participating company information (including customization information, the presence or absence of an introducer, and introducer information)" contained in the new system development information 48, and are input as one of the order receiving vendor information (platformer information) using the platformer terminal 4 when registering an order for new system development, and are obtained from the order receiving vendor information (platformer information) when the realization cost calculation unit 30 calculates the development cost Cd.
[0072] In this embodiment, the development cost Cd is the total of the contract cost Cm and the platform revenue Rp (Cd=Cm+Rp), and the platform revenue Rp is the total of the platform usage fee Fps, which is the revenue of the platform provider, and the total referral fee Frt to all DX support companies (Rp=Fps+Frt). The contract cost Cm and the platform revenue Rp are set to a predetermined ratio in advance, and the platform usage fee Fps and the total referral fee Frt are set to a predetermined ratio in advance. That is, for example, when the ratio of the contract cost Cm to the platform revenue Rp is "g:(1-g)" and the ratio of the platform usage fee Fps to the total referral fee Frt is "h:(1-h)", the platform revenue Rp is "(1-g) / g×Cm" and the development cost Cd is "1 / g×Cm". In addition, the platform usage fee Fps is "1 / h x (1-g) / g x Cm", and the total referral fee Frt is "1 / (1-h) x (1-g) / g x Cm", where 0≦g≦1, 0≦h≦1.
[0073] After calculating the development cost Cd, the server 2 executes a process to calculate the shared cost Es of each participating company participating in the new system development, including the proposing company, with respect to the development cost Cd (step S116). In this embodiment, the shared cost Es is calculated by dividing the development cost Cd by the number of participating companies, including the proposing company (hereinafter referred to as the "number of participating companies" or the "number of existing participating companies") Npc. In other words, the server 2 calculates the shared cost Es as "1 / g x Cm x 1 / Npc".
[0074] Then, the server 2 executes a process of notifying the participating companies of the calculated shared cost Es (step S118), and executes a process of updating the new system development information 48 using the calculated development cost Cd and shared cost Es (a process of adding the calculated development cost Cd and shared cost Es to the new system development information 48 and storing them) (see FIG. 4), and executes a process of publishing the updated new system development information 48 (a process of updating the published information) (step S120). By publishing the updated new system development information 48 (updating the published information), the member companies can view the updated new system development information, particularly the development cost Cd and shared cost Es, by executing an application on the member company terminals 6A, 6B, 6C, and 6D to display a predetermined screen. As a result, it is possible to promote the registration for participation in the new system development for member companies that want to register for participation in the new system development but are hesitant to register for participation in the new system development because the shared cost Es is an obstacle.
[0075] Next, server 2 executes a process to determine whether the number of registered participants in the new system development, i.e., the number of participating companies Npc, is equal to or greater than the required number of participating companies Npc* (Npc≧Npc*) (step S122), and if the number of participating companies Npc is equal to or greater than the required number of participating companies Npc*, closes the recruitment for the new system development, notifies the proposing company, participating companies, and platform provider that the new system development has been established, stores the new system development information 48 as recruitment-ended system development information 49, and executes a process to make the recruitment-ended system development information 49 public (step S124). Here, the required number of participating companies Npc* is input in advance by the proposing company when the proposing company registers the new system development.
[0076] The member companies and platform providers can know that the application for new system development has been closed by publishing the application closed system development information 49 instead of publishing the new system development information 48. The notification unit 38 may be configured to notify the member company terminals 6A, 6B, 6C, 6D and the platform provider terminal 4 that the application for new system development has been closed.
[0077] After the server 2 has performed the process of step S216 in this way, the server 2 executes a process of determining whether there is a company introduced by a DX support company among the participating companies (step S126). The determination of whether there is a company introduced by a DX support company among the participating companies can be made using the "presence or absence of an introducer" included in the participating company information. If there is a company introduced by a DX support company among the participating companies, a process of calculating the referral fee Fr is executed (step S128), and a process of notifying the calculated referral fee Fr to the DX support company that is the introducer of the participating company is executed (step S130), and this processing routine is terminated. Here, in this embodiment, the referral fee Fr is the value obtained by dividing the total referral fee Frt by the number of introducing companies Nic (Fr = Frt / Nic). That is, when the total referral fee Frt is "1 / (1 - h)×(1 - g) / g×Cm" as described above, the referral fee Fr paid to each introducing company (DX support company) is "1 / (1 - h)×(1 - g) / g×Cm×1 / Nic". Note that if the server 2 determines in step S126 that there is no company introduced by a DX support company among the participating companies, it does nothing and terminates this processing routine.
[0078] On the other hand, in step S106, if there is no participation registration for the publicly announced new system development, or in step S124, if the number of participating companies Npc is less than the required number of participating companies Npc* (Npc < Npc*), a process of determining whether the participation recruitment period Pp has elapsed is executed (step S132). If the participation recruitment period Pp has elapsed, it is notified to the proposing company, the participating companies, and the platform that the new system development has not been established. If the participation recruitment period Pp has not elapsed, a process of returning to step S106 is executed. That is, when the number of participating companies Npc is less than the pre-registered required number of participating companies Npc* (Npc < Npc*), the recruitment for participation in the new system development continues until the pre-registered participation recruitment period Pp elapses. Here, the participation recruitment period Pp is pre-input by the proposing company when the proposing company registers the new system development.
[0079] Furthermore, in step S110, if there is no order registration for the new system development, a process is executed to determine whether or not the participation solicitation period Pp has elapsed (step S136), and if the participation solicitation period Pp has elapsed, a process is executed to notify the proposing company, participating companies, and platform provider that the new system development has not been concluded (step S138), and if the participation solicitation period Pp has not elapsed, a process is executed to return to step S106. In other words, if there is no order registration for the new system development, the solicitation of participants and the solicitation of contracts for the new system development will continue until the previously registered participation solicitation period Pp has elapsed.
[0080] <Return cost calculation process> The return cost calculation process is executed at predetermined time intervals after the closed system development information 49 is made public in step S124 of the new system development order placement and receipt process. When the return cost calculation process routine is executed, the server 2, as shown in Fig. 8, first executes a process to determine whether or not a member company has registered to participate in the closed system development (step S200), and if a member company has registered to participate in the closed system development, executes a process to recalculate the shared cost Es and calculate the return cost Er to each existing participating company (step S202), and if no member company has registered to participate in the closed system development, does nothing and ends this processing routine. Here, in this embodiment, the recalculation of the shared cost Es is performed by dividing the total cost "1 / g×Cm+CI+(1-g) / g×CI" obtained by adding the development cost Cd "1 / g×Cm" required for developing a new system, the introduction cost CI required when an additional participating company introduces the closed system, and the platform profit "(1-g) / g×CI" by introducing the closed system to the additional participating company, by the total number of participating companies Npct including the additional participating companies (the sum of the number of existing participating companies Npc and the number of additional participating companies Npca) ({1 / g×Cm+Ci+(1-g) / g×CI} / Npct). In addition, in this embodiment, the return cost Er is calculated by subtracting the recalculated shared cost Es from the initial shared cost Es shared by the participating companies when they participated in the new system development. In other words, the reflux cost Er is calculated as "(1 / g × Cm × 1 / Npc) - {1 / g × Cm + CI + (1 - g) / g × CI} / Npct".
[0081] Then, server 2 notifies the additional participating companies of the recalculated shared cost Es({1 / g×Cm+CI+(1-g) / g×CI} / Npct), and also executes a process of notifying existing participating companies (participating companies that registered to participate from the new system development) and the platform operator of the calculated return cost Er((1 / g×Cm×1 / Npc)-{1 / g×Cm+CI+(1-g) / g×CI} / Npct) (step S204).
[0082] Next, the server 2 executes a process to determine whether or not there is a company introduced by the DX support company among the additional participating companies (step S206). The determination of whether or not there is a company introduced by the DX support company among the additional participating companies can be determined using the "presence or absence of an introducer" included in the participating company information. If there is a company introduced by the DX support company among the additional participating companies, a process to calculate the introduction fee Fr is executed (step S208), and a process to notify the DX support company that is the introducer of the additional participating company of the calculated introduction fee Fr is executed (step S210), and this processing routine is terminated. Here, the total introduction fee Frt is "1 / (1-h) x (1-g) / g x CI" in this embodiment, so the introduction fee Fr paid to each introducing company (DX support company) is "1 / (1-h) x (1-g) / g x CI x 1 / Nic".
[0083] In this way, after the server 2 executes the process of notifying the DX support company that introduced the additional participating company of the introduction fee Fr, or if the server 2 determines in step S206 that there is no company introduced by the DX support company among the participating companies, the server 2 executes a process of updating the recruitment end system development information 49 using the recalculated shared expenses Es and the return expenses Er, etc. (a process of adding and storing the recalculated shared expenses Es and the return expenses Er, etc. to the recruitment end system development information 49) (step S212), executes a process of publishing the updated recruitment end system development information 49 (a process of updating the public information) (step S214), and ends this processing routine. By publishing the updated recruitment end system development information 49 (updating the public information), the member companies can view the updated recruitment end system development information 49, particularly the recalculated shared expenses Es, by executing an application on the member company terminals 6A, 6B, 6C, and 6D to display a predetermined screen. As a result, it is possible to encourage member companies that would like to register to participate in closed system development but are hesitant to do so because of the shared cost Es, to register to participate in closed system development.
[0084] As described above, according to the new project order system 1 according to the embodiment of the present invention, a member company can register a new system development and can also register to participate in a new system development registered by another member company, so that the burden of development costs can be kept low compared to when a proposing company develops a new system alone. This can reduce the occurrence of a situation where the realization of a new system development has to be abandoned due to costs. As a result, the number of proposing companies proposing new system development can be increased. In addition, a vendor (a platformer in this embodiment) can register an order for the new system development. That is, since orders can be placed for the registered new system development, the new system development can be realized. Note that, if the new system development is feasible, the share of the development costs required to realize the new system development of each of the participating companies, including the proposing company, is calculated and notified to the proposing company and the participating companies, so that the proposing company and the participating companies can know the share of the costs to be borne by each of them. On the other hand, if the new system development is not feasible, the proposing company and the participating companies are notified, so that the proposing company and the participating companies can know that the new system development is not feasible.
[0085] Furthermore, according to the new project order-taking and placing system 1 of the embodiment of the present invention, when an additional participating company appears in the closed system development, the costs to be borne by the additional participating company are recalculated and notified to the additional participating company, and the costs to be returned to the proposing company and existing participating companies (participating companies that have been participating since the new system development) are calculated in accordance with their shared costs and notified of the returned costs to the proposing company and existing participating companies, so that the additional participating company can know its shared costs for participating in the closed system development and the proposing company and existing participating companies can know the returned costs.
[0086] Furthermore, according to the new project order-taking system 1 of the embodiment of the present invention, when an existing participating company, additional participating company, or vendor is introduced by a DX support company, the introduction fee to be paid to the DX support company is calculated and the DX support company is notified of the introduction fee, so that the DX support company can know the introduction fee it can receive by introducing a company to this system.
[0087] In addition, according to the new planning and ordering system 1 of the embodiment of the present invention, the current shared costs for realizing new system development are made public to member companies, so that member companies who would like to participate in the new system development but are hesitant to do so because of the shared costs can be encouraged to participate in the new system development.
[0088] Furthermore, according to the new project order-taking and ordering system 1 of the embodiment of the present invention, it is possible to accept customization requests from participating companies and additional participating companies for new system development, and calculate the shared costs taking into consideration the accepted customization requests, thereby lowering the hurdle for registering to participate in new system development or the development of a system for which recruitment has ended, and enabling appropriate shared costs to be calculated.
[0089] Furthermore, according to the new project order-taking and ordering system 1 of the embodiment of the present invention, the proposing company sets in advance the participation solicitation period Pp and the required number of participating companies Npc* for the new system development, and if the number of participating companies Npc does not reach the required number of participating companies Npc* within the participation solicitation period Pp, it is determined that the new system development is impossible to realize, thereby effectively preventing the new system development from being carried out at a cost higher than the proposed company's desired share of the costs.
[0090] In the embodiment of the present invention, the vendor is only the platformer, but may be composed of multiple vendors. In this case, the server 2 may be configured to calculate the development cost using the contract fee calculated by the platformer and the contract fee calculated by each vendor (note that the platformer and each vendor undertake (contract) different parts in the new system development). Alternatively, the platformer may collect the contract fee calculated by the platformer and the contract fee calculated by each vendor, input it as the contract fee Cm for the new system development using the platformer terminal 4, and the server 2 may calculate the development cost using the contract fee Cm. In addition, when there are multiple vendors and the vendor is introduced by the DX support company, the server 2 may be configured to calculate the introduction fee Fr and notify the DX support company of the introduction fee Fr, as in the case where the participating company is introduced by the DX support company. In this case, for example, a predetermined percentage of the commission fee Cmi calculated by the vendor can be set as the introduction fee Fr.
[0091] In an embodiment of the present invention, when a participating company is referred by a DX support company, the referral fee is calculated based on the ratio (h:(1-h)) of the platform usage fee Fps to the total referral fee Frt, regardless of whether or not there is a request for customization. In addition, a predetermined percentage of the option cost for realizing the customization request can be included in the referral fee Fr.
[0092] In the embodiment of the present invention, the new project ordering system 1 of the present invention is applied to new system development, but the present invention is not limited to this and may be applied to, for example, product development or holding of an exhibition as a new project.
[0093] In the embodiment of the present invention, the shared cost Es is calculated by dividing the development cost Cd by the number of participating companies Npc, but this is not limited to the above. For example, the shared cost Es may be calculated by multiplying the development cost Cd by a ratio predetermined for each participating company.
[0094] In the embodiment of the present invention, the present invention has been described as a new planning order system 1 that matches a proposing company that proposed a new system development with a participating company that wants to participate in the new system development and places an order for the new system development after the matching is established, a server 2 as a new planning order device that matches a proposing company that proposed a new system development with a participating company that wants to participate in the new system development and places an order for the new system development after the matching is established, or a new planning order method that matches a proposing company that proposed a new system development with a participating company that wants to participate in the new system development and places an order for the new system development after the matching is established, but it may also be applied to, for example, a program that causes the server 2 to function as a new planning order device or a program for executing the new planning order method. This program may be recorded on a computer-readable recording medium (for example, a hard disk, a ROM, an SSD, a flash memory (USB memory, SD card, etc.), a floppy disk, a CD, a DVD, etc.), or may be distributed from one computer to another computer via a transmission medium (a communication network such as the Internet or a LAN), or may be transferred in any other form. By executing this program on one computer or by having multiple computers share the individual steps, each step of the new system development ordering and purchase processing routine and the return cost calculation processing routine described above will be executed, thereby obtaining the same effects as the new planning and purchase order system 1, the server 2 as a new planning and purchase order device, and the new planning and purchase order method of this embodiment.
[0095] The present embodiment shows an example of a mode for carrying out the present invention, and therefore the present invention is not limited to the configuration of the present embodiment.
[0096] <Additional Notes> In consideration of the above-mentioned gist of the invention, the new project ordering system, the new project ordering device, the new project ordering method, and the new project ordering program according to the present invention can be configured in the following forms. (Aspect 1) "A new project ordering device that matches a proposer who proposes a new project with a participant who wants to participate in the new project, and that orders the new project for which a match has been made, a plan receiving unit that receives the new plan and acquires proposer information regarding the proposer; a plan publishing unit that publishes new plan information regarding the received new plan; a plan participation reception unit that receives participation in the new plan and acquires participant information regarding participants in the new plan; a storage unit that stores the proposer information, the participant information, and contractor information regarding a contractor of the new project; a feasibility determination unit that determines whether the new project can be realized based on the proposer information, the participant information, and the contractor information; a realization cost calculation unit that calculates a plan realization cost, which is a cost required to realize the new plan, based on the contractor information when the realization feasibility determination unit determines that the new plan is feasible; an allocation cost calculation unit that calculates allocation costs of the proposer and the participants with respect to the plan realization costs based on the plan realization costs, the proposer information, and the participant information; A new planning and ordering device equipped with the above. (Aspect 2) "The plan disclosure unit can disclose accomplished plan information regarding the accomplished plan, which is the realized new plan, The plan participation acceptance unit is capable of accepting participation in the achievement plan and acquiring additional participant information regarding an additional participant who is a participant in the achievement plan; The storage unit is capable of storing the additional participant information, The shared cost calculation unit recalculates the shared costs based on the project realization costs and the additional participant information, and calculates a return cost corresponding to the shared costs. The new project ordering device according to aspect 1. (Aspect 3) "An introduction determination unit that determines whether the participant and / or the contractor is an introduction from an introducer; an introduction fee calculation unit that calculates an introduction fee to be paid to the introducer; Further equipped with The introduction fee calculation unit calculates the introduction fee when the feasibility determination unit determines that the new project is feasible and the participant and / or the contractor was introduced by the introducer. The new project ordering device according to aspect 1 or 2. (Aspect 4) "The introduction determination unit determines whether the additional participant is an introduction from the introducer, The introduction fee calculation unit calculates the introduction fee when the feasibility determination unit determines that the new plan is feasible and the additional participant is introduced by the introducer. The new project ordering device according to the third aspect, which is dependent on the second aspect. (Aspect 5) "The system further includes a notification unit that notifies the proposer and the participants of the calculated shared expenses when the feasibility determination unit determines that the new plan is feasible, and notifies the proposer and the participants that the new plan is not feasible when the feasibility determination unit determines that the new plan is not feasible. The new project ordering device according to any one of the first to fourth aspects. (Aspect 6) The notification unit notifies the additional participant of the recalculated shared costs and notifies the proposer and the participant of the return costs. The new project ordering device according to aspect 5, which is dependent on aspect 2. (Aspect 7) The notification unit notifies the additional participant of the recalculated shared costs and notifies the proposer and the participant of the return costs. The new project ordering device according to aspect 5, which is dependent on aspect 4. (Aspect 8) The notification unit notifies the introducer of the introduction fee. The new project ordering device according to the aspect 5 dependent on the aspect 3, the aspect 5 dependent on the aspect 4, or the aspect 7. (Aspect 9) "The system further includes a shared cost disclosure unit that discloses the shared costs calculated by the shared cost calculation unit. The new project ordering device according to any one of aspects 1 to 8. (Aspect 10) "The project participation reception unit acquires the participant information and is capable of receiving unique requests from the participants for the new project, The storage unit is capable of storing unique request information relating to the unique request, The shared cost calculation unit calculates the shared cost taking into account the unique request information. 10. The new project ordering device according to any one of aspects 1 to 9. (Aspect 11) "Further comprising a contract reception unit that receives the contractor and acquires the contractor information, The realization feasibility determination unit determines that the new project is impossible to realize if a predetermined number of the participants do not appear within a predetermined period of time, or if the contractor does not appear. A new planning and ordering device according to any one of claims 1 to 10. (Aspect 12) "A new project ordering system that matches a proposer who proposes a new project with a participant who wants to participate in the new project, and that orders the new project after a match is made. A new planning and ordering device according to any one of claims 1 to 11, a proposer terminal connected to the new-planning ordering device via a network and capable of transmitting the proposer information and the new plan information to the new-planning ordering device; a participant terminal connected to the new project ordering device via a network and capable of transmitting the participant information to the new project ordering device; a contractor terminal connected to the new project ordering device via a network and capable of transmitting the contractor information to the new project ordering device; A new planning and ordering system equipped with the above. (Aspect 13) "A method for placing and receiving orders for new projects that matches a proposer who has proposed a new project with a participant who wants to participate in the new project, and that places and receives orders for the new project for which a match has been made, a plan receiving step of receiving the new plan and acquiring proposer information regarding the proposer; a plan publishing step of publishing new plan information, which is information regarding the received new plan; a plan participation acceptance step of accepting participation in the new plan and acquiring participant information regarding participants to the new plan; a storage step of storing the proposer information, the participant information, and contractor information regarding a contractor of the new project; a feasibility determination step of determining whether the new project can be realized based on the proposer information, the participant information, and the contractor information; a realization cost calculation step of calculating a plan realization cost, which is a cost required to realize the new plan, based on the contractor information when the new plan is determined to be feasible by the realization feasibility determination step; an allotted cost calculation step of calculating the allotted costs of the proposer and the participants for the project realization cost based on the project realization cost, the proposer information, and the participant information; A new planning and ordering method that includes the above. (Aspect 14) "The plan disclosure step includes a step of disclosing accomplished plan information regarding the accomplished plan, which is the realized new plan, The plan participation acceptance step includes a step of accepting participation in the achievement plan and accepting additional participant information regarding an additional participant who is a participant in the achievement plan; The storing step includes a step of storing the additional participant information; The shared cost calculation step includes a step of recalculating the shared cost based on the project realization cost and the additional participant information, and calculating a return cost corresponding to the shared cost. The new project ordering method according to aspect 13. (Aspect 15) "The method further includes a shared cost disclosure step of disclosing the shared cost calculated by the shared cost calculation step. The new project ordering method according to aspect 13 or 14. (Aspect 16) "A new project ordering program that matches a proposer who proposes a new project with a participant who wants to participate in the new project, and that orders the new project after a match is made. A method for ordering a new project, comprising the steps of: New planning and ordering program. [Explanation of symbols]
[0097] 1 New planning and ordering system 2 Server (new project ordering device) 4 Platformer terminal (contractor terminal) 6A Member company terminal (proposer terminal, participating company terminal) 6B Member company terminal (proposer terminal, participating company terminal) 6C Member company terminals (proposer terminals, participating company terminals) 6D Member company terminals (proposer terminals, participating company terminals) 8. DX Support Corporate Terminals 20 Planning Reception Department (Planning Reception Department) 22 Planning and Public Relations Department (Planning and Public Relations Department) 24 Planning Participation Reception Department (Planning Participation Reception Department) 26 Contract Reception Department (Contract Reception Department) 28 Realization feasibility determination unit (realization feasibility determination unit) 30 Realization Cost Calculation Department (Realization Cost Calculation Department) 32 Cost Allocation Calculation Department (Cost Allocation Calculation Department) 34 Referral Determination Department (Referral Determination Department) 36 Referral Fee Calculation Department (Referral Fee Calculation Department) 38 Notification Department (Notification Department) 40 Storage section (Storage section) 42 Member Company Information 44 Vendor Information 46 DX support company information 48 New System Development Information 49 System Development Information Cm New system development contract fee Cmi Contract Vendor Fees CD development costs (planning realization costs) Pp Participation recruitment period (prescribed period) Npc* Required number of participating companies (predetermined number) Es Shared cost (Shared cost) Er Reflux cost (reflux cost) Fr Referral fee (referral fee) Rp Platform Revenue Fps platform usage fee Frt Total Referral Fee Frt Number of companies participating in NPC Number of additional Npca participating companies Number of companies introduced by Nic CI implementation costs
Claims
1. A new plan ordering device that matches a proposer who has proposed a new plan with a participant who wants to participate in the new plan, and that orders the new plan for which a match has been made, comprising: a plan receiving unit that receives the new plan and acquires proposer information regarding the proposer; a plan publishing unit that publishes new plan information regarding the received new plan; a plan participation reception unit that receives participation in the new plan and acquires participant information regarding participants in the new plan; a storage unit that stores the proposer information, the participant information, and contractor information regarding a contractor of the new project; a feasibility determination unit that determines whether the new project can be realized based on the proposer information, the participant information, and the contractor information; a realization cost calculation unit that calculates a plan realization cost, which is a cost required to realize the new plan, based on the contractor information when the realization feasibility determination unit determines that the new plan is feasible; an allocation cost calculation unit that calculates allocation costs of the proposer and the participants with respect to the plan realization costs based on the plan realization costs, the proposer information, and the participant information; Equipped with the project participation reception unit is capable of acquiring the participant information and receiving unique requests from the participants for the new project; The storage unit is capable of storing unique request information relating to the unique request, The shared cost calculation unit calculates the shared cost taking into account the unique request information. New planning and ordering device.
2. The plan disclosure unit is capable of disclosing accomplished plan information regarding an accomplished plan, which is the realized new plan; The plan participation acceptance unit is capable of accepting participation in the achievement plan and acquiring additional participant information regarding an additional participant who is a participant in the achievement plan; The storage unit is capable of storing the additional participant information, The shared cost calculation unit recalculates the shared costs based on the project realization costs and the additional participant information, and calculates a return cost corresponding to the shared costs. The new planning and ordering device according to claim 1.
3. an introduction determination unit that determines whether the participant and / or the contractor is an introduction from an introducer; an introduction fee calculation unit that calculates an introduction fee to be paid to the introducer; Further equipped with The introduction fee calculation unit calculates the introduction fee when the feasibility determination unit determines that the new project is feasible and the participant and / or the contractor was introduced by the introducer.
3. The new planning and ordering device according to claim 1 or 2.
4. The introduction determination unit determines whether the additional participant is an introduction from the introducer, The introduction fee calculation unit calculates the introduction fee when the feasibility determination unit determines that the new plan is feasible and the additional participant is introduced by the introducer. The new project ordering device according to claim 3 dependent on claim 2.
5. The system further includes a notification unit that notifies the proposer and the participants of the calculated shared expenses when the feasibility determination unit determines that the new plan is feasible, and notifies the proposer and the participants that the new plan is not feasible when the feasibility determination unit determines that the new plan is not feasible.
3. The new planning and ordering device according to claim 1 or 2.
6. The method further includes a notification unit that notifies the proposer and the participants of the calculated shared costs when the feasibility determination unit determines that the new plan is feasible, and notifies the proposer and the participants that the new plan is not feasible when the feasibility determination unit determines that the new plan is not feasible. The new planning and ordering device according to claim 4.
7. The notification unit notifies the additional participant of the recalculated shared cost and notifies the proposer and the participant of the return cost.
6. A new planning and ordering device according to claim 5 dependent on claim 2.
8. The notification unit notifies the additional participant of the recalculated shared costs and notifies the proposer and the participant of the return costs.
7. The new planning and ordering device according to claim 6.
9. The notification unit notifies the introducer of the introduction fee. The new project ordering device according to claim 8.
10. The system further includes an allocated cost disclosure unit that discloses the allocated cost calculated by the allocated cost calculation unit.
3. The new planning and ordering device according to claim 1 or 2.
11. A contract receiving unit that receives the contractor and acquires the contractor information, The realization feasibility determination unit determines that the new project is impossible to realize if a predetermined number of the participants do not appear within a predetermined period of time, or if the contractor does not appear.
3. The new planning and ordering device according to claim 1 or 2.
12. A new project ordering system that matches a proposer who proposes a new project with a participant who wants to participate in the new project, and that orders the new project for which a match has been made, comprising: The new planning and ordering device according to claim 1 or 2, a proposer terminal connected to the new-planning ordering device via a network and capable of transmitting the proposer information and the new plan information to the new-planning ordering device; a participant terminal connected to the new project ordering device via a network and capable of transmitting the participant information to the new project ordering device; a contractor terminal connected to the new project ordering device via a network and capable of transmitting the contractor information to the new project ordering device; A new planning and ordering system equipped with the above.
13. A method for placing and receiving orders for new plans, which matches a proposer who has proposed a new plan with a participant who wants to participate in the new plan, and places and receives orders for the new plan for which a match has been established, comprising the steps of: a plan receiving step in which the new plan is received and proposer information relating to the proposer is acquired by a plan receiving unit; a plan publishing step in which a plan publishing unit publishes new plan information, which is information regarding the new plan accepted by the plan accepting unit; a plan participation acceptance step in which participation in the new plan is accepted and participant information regarding the participants to the new plan is acquired by a plan participation acceptance unit; A storage step in which the storage unit stores the proposer information, the participant information, and contractor information regarding a contractor of the new project; a feasibility determination step in which a feasibility determination unit determines whether the new project can be realized based on the proposer information, the participant information, and the contractor information; a realization cost calculation step in which, when it is determined that the new plan is feasible by the realization feasibility determination step, a realization cost calculation unit calculates a plan realization cost, which is a cost required to realize the new plan, based on the contractor information; an allocation cost calculation step in which an allocation cost calculation unit calculates the allocation costs of the proposer and the participants for the plan realization cost based on the plan realization cost, the proposer information, and the participant information; Equipped with The project participation acceptance step includes a step of acquiring the participant information and accepting, by the project participation acceptance unit, a unique request from the participant for the new project; The storing step includes a step of storing unique request information related to the unique request by the storage unit, The shared cost calculation step includes a step in which the shared cost calculation unit calculates the shared cost by taking into account the unique request information. How to place orders for new projects.
14. The plan disclosure step includes a step of the plan disclosure unit disclosing accomplished plan information regarding the accomplished plan, which is the realized new plan, The plan participation acceptance step includes a step of accepting participation in the achievement plan and accepting additional participant information regarding the additional participant who is the participant in the achievement plan by the plan participation acceptance unit; The storing step includes a step of storing the additional participant information in the storage unit, The shared cost calculation step includes a step of recalculating the shared cost based on the project realization cost and the additional participant information, and the shared cost calculation unit calculates a return cost corresponding to the shared cost. The new project ordering method according to claim 13.
15. The method further includes an allocated cost disclosure step in which an allocated cost disclosure unit discloses the allocated cost calculated by the allocated cost calculation step. The new project ordering method according to claim 13 or 14.
16. A new project ordering program that matches a proposer who has proposed a new project with a participant who wants to participate in the new project, and that orders the new project for which a match has been made, A method for ordering a new project by a computer, comprising: New planning and ordering program.
Citation Information
Patent Citations
Event planning and actualization system
JP2003058690A
New business plan contract system
JP2003132237A
Group participation planning system
JP2008052571A
Contractor introduction system
JP2008310794A
Unfunded business support device, unfunded business support system, unfunded business support method, and unfunded business support program
WO2020209218A1