System and method for predicting risk in construction projects based on design data

An automated system for electrical equipment design using BIM/CAD data addresses human error and interference issues, improving accuracy and efficiency by integrating load calculation, layout, and regulatory review, and facilitating collaboration.

KR102991246B1Active Publication Date: 2026-07-21GAIN ENGINEERING CO LTD
View PDF 1 Cites 0 Cited by

Patent Information

Authority / Receiving Office
KR · KR
Patent Type
Patents
Current Assignee / Owner
GAIN ENGINEERING CO LTD
Filing Date
2025-12-11
Publication Date
2026-07-21

AI Technical Summary

Technical Problem

Conventional electrical equipment design in buildings is prone to human error, time-consuming, and often results in interference issues between disciplines, leading to material loss and construction delays due to the lack of integrated design automation and objective evaluation of design quality.

Method used

An automated system utilizing Building Information Modeling (BIM) or CAD data for load calculation, equipment layout, interference detection, and regulatory review, with modules for automated design tasks, collision detection, and collaboration approval, providing a quantitative evaluation of design quality and complexity.

Benefits of technology

The system reduces human error, improves design accuracy and efficiency, minimizes rework and delays, and enhances collaboration, enabling data-driven decision-making for improved project management.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 112025139956127-PAT00001_ABST
    Figure 112025139956127-PAT00001_ABST
Patent Text Reader

Abstract

The present invention relates to an automated system for electrical equipment design and supervision, and more specifically, to an automated system for electrical equipment design and supervision that utilizes Building Information Modeling (BIM) or CAD data in the electrical equipment design process of a building to integrally automate load calculation, equipment layout, regulatory review, detection of interference between work types, and collaboration-based approval procedures, and furthermore, quantitatively evaluates the quality, complexity, and impact of change history of the design proposal to dramatically improve the accuracy and efficiency of the design.
Need to check novelty before this filing date? Find Prior Art