System and method for predicting risk in construction projects based on design data
An automated system for electrical equipment design using BIM/CAD data addresses human error and interference issues, improving accuracy and efficiency by integrating load calculation, layout, and regulatory review, and facilitating collaboration.
Patent Information
- Authority / Receiving Office
- KR · KR
- Patent Type
- Patents
- Current Assignee / Owner
- GAIN ENGINEERING CO LTD
- Filing Date
- 2025-12-11
- Publication Date
- 2026-07-21
AI Technical Summary
Conventional electrical equipment design in buildings is prone to human error, time-consuming, and often results in interference issues between disciplines, leading to material loss and construction delays due to the lack of integrated design automation and objective evaluation of design quality.
An automated system utilizing Building Information Modeling (BIM) or CAD data for load calculation, equipment layout, interference detection, and regulatory review, with modules for automated design tasks, collision detection, and collaboration approval, providing a quantitative evaluation of design quality and complexity.
The system reduces human error, improves design accuracy and efficiency, minimizes rework and delays, and enhances collaboration, enabling data-driven decision-making for improved project management.
Smart Images

Figure 112025139956127-PAT00001_ABST