Operation assistance device and operation assistance method for electric work machine

The operation support device optimizes battery life and work efficiency by strategically allocating electric working machines based on workload and deterioration states, addressing the issue of unaccounted battery deterioration in conventional systems.

WO2024202497A1PCT designated stage expired Publication Date: 2024-10-03HITACHI CONSTRUCTION MACHINERY CO LTD
View PDF 4 Cites 0 Cited by

Patent Information

Application Number
PCT/JP2024/002808
Authority / Receiving Office
WO · WO
Patent Type
Applications
Current Assignee / Owner
Priority Date
2023-03-31
Filing Date
2024-01-30
Publication Date
2024-10-03

AI Technical Summary

Technical Problem

Conventional power supply systems for construction machinery do not account for battery deterioration variations, leading to reduced battery life and inefficiencies in work efficiency and battery usage.

Method used

An operation support device and method that includes a server allocating electric working machines to work sites based on workload and battery deterioration states, using a state acquisition unit, state prediction unit, and operation planning unit to optimize battery usage and extend battery life by assigning machines with minimal deterioration to high-workload sites.

Benefits of technology

The solution effectively suppresses battery deterioration and extends battery life by strategically allocating electric working machines, thereby improving work efficiency and battery utilization.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure JP2024002808_03102024_PF_FP_ABST
    Figure JP2024002808_03102024_PF_FP_ABST
Patent Text Reader

Abstract

The present disclosure provides an operation assistance device capable of suppressing deterioration of a battery of an electric work machine and prolonging the service life of the battery. Provided is an operation assistance device 1 that allocates each of a plurality of electric work machines EWM1, EWM2, ... , EWMn to each of a plurality of work sites WS1, WS2, ... , WSn. The operation assistance device 1 comprises: an information storage unit 11 that stores information relating to the work load for each of the work sites WS; a state acquisition unit 12 that acquires the deterioration states of batteries B mounted on respective electric work machines EWM; a state estimation unit 13 that calculates estimated deterioration states of the batteries B for when each electric work machine EWM works at each work site WS; and an operation planning unit 14. The operation planning unit 14 selects the work sites WS in order from the highest work load on the basis of the information stored in the information storage unit 11 and, from among the plurality of electric work machines EWM1, EWM2, ... , EWMn, allocates specific electric work machines EWM to the selected work sites WS on the basis of the estimated deterioration states.
Need to check novelty before this filing date? Find Prior Art

Description

Operation support device and operation support method for electric powered working machine

[0001] The present disclosure relates to an operation support device and an operation support method for an electric powered working machine.

[0002] There has been known an invention relating to a power supply system for a construction machine equipped with a battery-powered electric motor (see Patent Document 1 below). The power supply system for a construction machine described in Patent Document 1 includes a plurality of towed vehicles, at least one construction machine, a charging facility, at least one transport vehicle, and a computer (paragraph 0009 and claim 1).

[0003] Each of the plurality of towed vehicles is equipped with a battery. The at least one construction machine tows one of the plurality of towed vehicles and has an electric motor driven by power from the battery of the towed vehicle and a hydraulic pump driven by the electric motor. The charging facility is facility for charging the batteries equipped on the plurality of towed vehicles.

[0004] The at least one transport vehicle tows a charged towable vehicle among the plurality of towable vehicles that has been charged by a charging facility to the vicinity of any one of at least one construction machine, and tows the towable vehicle that has been towed by the construction machine to the charging facility in place of the charged towable vehicle.

[0005] The computer predicts the number of times and times at which at least one construction machine will replace a towed vehicle during a predetermined period based on a work volume plan for the construction machine during that predetermined period. The computer also calculates the time at which at least one transport vehicle will arrive near the construction machine towing a charged towed vehicle in time for each replacement time.

[0006] JP 2016-084633 A

[0007] According to the above-mentioned conventional power supply system for construction machinery, it is possible to estimate the time for battery replacement based on the work volume plan of the construction machinery, thereby improving the work efficiency and battery utilization efficiency of the construction machinery (Patent Document 1, paragraph 0010). However, because this conventional system does not take into account the variation in the progression of battery deterioration in each construction machinery, there is room for improvement in terms of suppressing battery deterioration and extending battery life.

[0008] The present disclosure provides an operation support device and operation support method for an electric work machine that can suppress deterioration of the battery of the electric work machine and extend its lifespan.

[0009] One aspect of the present disclosure is an operation support device for electric work machines that includes a server that allocates a plurality of electric work machines to a plurality of work sites, the server comprising: an information storage unit that stores workload information for each of the plurality of work sites; a status acquisition unit that acquires the degradation state of the batteries installed in each of the plurality of electric work machines; a status prediction unit that calculates a predicted degradation state of the batteries when each of the plurality of electric work machines works at one of the plurality of work sites; and an operation planning unit that selects work sites in order of highest workload based on the workload information stored in the information storage unit, and allocates a specific electric work machine from among the plurality of electric work machines to the selected work sites in the order of the work sites based on the degradation state of the battery acquired by the status acquisition unit and the predicted degradation state of the battery calculated by the status prediction unit.

[0010] It is possible to provide an operation support device for an electric work machine that can suppress deterioration of the battery of the electric work machine and extend its lifespan.

[0011] 1A is a schematic diagram illustrating a first embodiment of an operation assistance device according to the present disclosure; FIG. 1B is a flow diagram illustrating an example of the operation of the operation assistance device shown in FIG. 1A; FIG. 1C is a flow diagram illustrating a second embodiment of a driving assistance device according to the present disclosure; FIG. 1D is a flow diagram illustrating a third embodiment of a driving assistance device according to the present disclosure; FIG. 1E is a flow diagram illustrating a fourth embodiment of a driving assistance device according to the present disclosure; and FIG. 1F is a flow diagram illustrating a fifth embodiment of a driving assistance device according to the present disclosure.

[0012] Hereinafter, embodiments of an operation support device and an operation support method for an electric powered working machine according to the present disclosure will be described with reference to the drawings.

[0013] 1A is a schematic diagram showing a first embodiment of an operation support device for electric powered working machines according to the present disclosure. The operation support device 1 of this embodiment is, for example, configured by a computer equipped with a central processing unit (CPU) and a storage device (not shown), and is a server connected to a network N such as the Internet. The operation support device 1 is a device that assigns each of a plurality of electric powered working machines EWM1, EWM2, ..., EWMn to each of a plurality of work sites WS1, WS2, ..., WSn.

[0014] Each electric work machine EWM is equipped with, for example, a battery B, and generates driving force by rotating a motor using the electric power stored in the battery B. The multiple electric work machines EWM1, EWM2, ..., EWMn include, for example, at least one of an electric hydraulic excavator, an electric dump truck, or an electric material handling machine. Before being assigned to each work site WS by the operation support device 1, the multiple electric work machines EWM1, EWM2, ..., EWMn wait, for example, at a machine station MS.

[0015] Each electric work machine EWM is equipped with a communication device (not shown), such as a wireless communication device or a satellite communication device, and a controller (not shown) that calculates the state of deterioration of battery B. As the state of deterioration of battery B, for example, the "State of Health (SOH)" which is the ratio of the full charge capacity of battery B at the time of deterioration to the initial full charge capacity of battery B can be used. The state of deterioration SOH of battery B is expressed, for example, as a percentage where the initial full charge capacity is 100, and decreases as battery B deteriorates. Note that the state of deterioration SOH may also be calculated based on, for example, the charge / discharge capacity of battery B when the electric work machine EWM is in operation, or the charge capacity charged to battery B by a charging device.

[0016] The communication device mounted on each electric work machine EWM is connected to be able to communicate information with the operation support device 1 via, for example, a radio communication line RCL including a radio base station WBS, or a satellite communication line SCL including a communication satellite CS and a satellite base station SBS, and the network N. The controller mounted on each electric work machine EWM transmits, for example, the state of health SOH of the battery B mounted on each electric work machine EWM to the operation support device 1 via the communication device mounted on each electric work machine EWM.

[0017] The operation support device 1 includes, for example, an information storage unit 11, a status acquisition unit 12, a status prediction unit 13, and an operation planner 14. These units of the operation support device 1 represent functions of the operation support device 1 that are realized, for example, by the CPU of the operation support device 1 executing a program stored in a storage device of the operation support device 1. Below, with reference to Fig. 1B, the operation of the operation support device 1 of this embodiment and the operation support method OSM for an electric work machine EWM of this embodiment will be described.

[0018] 1B is a flow diagram showing the operation of the operation support device 1 shown in FIG. 1A, and is a flow diagram explaining each step of the operation support method OSM of this embodiment. The operation support method OSM of this embodiment is a method of assigning each of a plurality of electric work machines EWM1, EWM2, ..., EWMn to each of a plurality of work sites WS1, WS2, ..., WSn, for example, using the operation support device 1.

[0019] 1B , the operations support device 1 first executes an information storage step S1. In this step S1, the information storage unit 11 stores, for example, information on the workload of each work site WS. The workload information is input to the input / output unit of the operations support device 1 via the network N from, for example, an information terminal (not shown) owned by the user of the electric work machine EWM, and is stored in the memory device of the operations support device 1 by the information storage unit 11. An example of the workload information of each work site WS stored by the information storage unit 11 is shown in Table 1A below.

[0020]

[0021] In the example shown in Table 1A, the workload information includes, for example, the number of working days, the average temperature when the electric work machine EWM is in operation (daytime), the average temperature when the electric work machine EWM is not in operation (nighttime), the amount of charge and discharge per day, the discharge power, and the charge power. Furthermore, the workload information may include, for example, the discharge current and the charge current instead of the discharge power and the charge power. Next, the operation support device 1 executes a state acquisition step S2 to acquire the state of health SOH of the battery B mounted on each electric work machine EWM.

[0022] In this step S2, the status acquisition unit 12 of the operation support device 1 acquires the state of health SOH of the battery B mounted on each electric work machine EWM. The controller of each electric work machine EWM acquires the state of health SOH of the battery B mounted on each electric work machine EWM, for example, at a predetermined cycle, and transmits it to the operation support device 1 via the communication device, the wireless communication line RCL or the satellite communication line SCL, and the network N. The status acquisition unit 12 acquires the state of health SOH of the battery B of each electric work machine EWM transmitted from each electric work machine EWM via the input / output unit of the operation support device 1.

[0023] Next, the operation support device 1 executes a work feasibility prediction step S3 for predicting whether each electric work machine EWM can work. In this step S3, the state prediction unit 13 predicts whether each electric work machine EWM can work at each work site WS, for example, based on information about the workload of each work site WS stored by the information storage unit 11.

[0024] More specifically, the state prediction unit 13 acquires the specifications of the battery B of each electric work machine EWM stored in the storage device by the information storage unit 11, and compares them with the daily charge / discharge amount and discharge power required at each work site WS. If the result shows that the battery B of a certain electric work machine EWM cannot satisfy the daily charge / discharge amount and discharge power required at a certain work site WS, it records that the electric work machine EWM is incompatible with that work site WS.

[0025] Next, the operation support device 1 executes a state prediction step S4 in which the predicted state of degradation ESOH of battery B is calculated. In this step S4, the state prediction unit 13 of the operation support device 1 calculates the predicted state of degradation ESOH of battery B when each electric work machine EWM works at each work site WS. The predicted state of degradation ESOH is a predicted value of the state of degradation SOH of battery B of each electric work machine EWM after each electric work machine EWM has performed predetermined work at each work site WS.

[0026] The state prediction unit 13 predicts the predicted state of degradation ESOH of battery B of each electric work machine EWM, for example, using all or some of the workload items shown in Table 1A above as degradation factors. More specifically, the state prediction unit 13 calculates the predicted state of degradation ESOH using, for example, the following equations (1) to (3).

[0027]

[0028]

[0029]

[0030] In the above formula (1), a_st is the storage deterioration rate of battery B [ / d 0.5 ] (d: days). Furthermore, T_st on the right side of equation (1) is the storage absolute temperature [K], SOC_st is the storage SOC (0≦SOC_st<1), a0 to a2 are coefficients, and a3 is a constant.

[0031] In the above equation (2), a_cyc is the deterioration rate [ / d] of battery B. On the right side of equation (2), T_op is the average operating temperature [°C], D_day is the daily discharge amount, Dp is the discharge power, and Cp is the charge power. Q_bat is the battery capacity of battery B, a4 to a7 are coefficients, and a8 is a constant.

[0032] In the above formula (3), ESOH is the predicted deterioration state [%]. Also, a_st on the right side of formula (3) is the storage deterioration rate [ / d 0.5], a_cyc is the deterioration rate [ / day] of battery B calculated by the above formula (2), and d is the number of operating days of the electric work machine EWM.

[0033] That is, the predicted state of deterioration ESOH is calculated based on a storage deterioration rate a_st, which is the rate of deterioration when battery B is stored or idle without being charged or discharged, and a deterioration rate a_cyc, which is the rate of cycle deterioration due to charging and discharging of battery B. Note that the coefficients a0, a1, a3 to a7 and the constants a3 and a8 in equations (1) and (2) differ depending on battery B. Therefore, these coefficients and constants for each battery B are stored in advance in a storage device by the information storage unit 11 of the operation support device 1, for example.

[0034] Next, the operations support device 1 executes an operation plan creation step S5 for allocating electric work machines EWM to each work site WS. In this step S5, the operations planner 14 of the operations support device 1 first selects the work site WS in descending order of workload based on the workload information of each work site WS stored in the storage device (see Table 1A).

[0035] In step S5, the operation planner 14 further assigns a specific electric work machine EWM from among the multiple electric work machines EWM to the selected work site WS based on the predicted state of deterioration ESOH. An example of the procedure by which the operation planner 14 assigns each electric work machine EWM to each work site WS will be described with reference to Table 1B below.

[0036]

[0037] In Table 1B, the machine number is, for example, the identification number of each of the multiple electric work machines EWM1, EWM2, ..., EWMn. The battery manufacturer, battery capacity, and SOH are, for example, the manufacturer, battery capacity, and latest state of health SOH of the battery B installed in each electric work machine EWM.

[0038] ESOH is the predicted state of degradation of battery B after each electric work machine EWM has performed a predetermined task at each work site WS. The predicted state of degradation ESOH is calculated for each combination of a plurality of work sites WS1, WS2, ..., WSn selected from left to right in descending order of workload and a plurality of electric work machines EWM1, EWM2, ..., EWMn.

[0039] ΔSOH is the amount of battery degradation calculated based on the current state of degradation SOH and the predicted state of degradation ESOH of battery B of each electric work machine EWM. Specifically, the amount of battery degradation ΔSOH is the amount of change in the state of degradation SOH from the current state of degradation SOH of battery B of each electric work machine EWM to the predicted state of degradation ESOH when each electric work machine EWM works at each work site WS.

[0040] That is, the operation planner 14 calculates the amount of battery degradation ΔSOH when each electric work machine EWM works at each work site WS based on the state of degradation SOH and the predicted state of degradation ESOH of battery B. Furthermore, the operation planner 14 selects, for example, the work site WS1 with the highest workload, and assigns to that work site WS1, from among the multiple electric work machines EWM1, EWM2, ..., EWMn, the electric work machine EWM2 with a battery degradation amount ΔSOH of -5[%] and the smallest decrease in the state of degradation SOH.

[0041] In the example shown in Table 1B, the electric work machine EWM3 of machine No. 3 is predicted to be unable (NA) to handle the work at the work site WS1 in the above-mentioned process S3 of predicting whether the electric work machine EWM can perform the work. In this case, the operation planner 14 does not allocate the electric work machine EWM3 to the work site WS1.

[0042] After step S5 is completed, the operation planner 14 executes step S6, for example, of determining whether or not the allocation of all electric work machines EWM to work sites WS has been completed. If the operation planner 14 determines in step S6 that the allocation of at least one electric work machine EWM has not been completed (NO), step S5 of allocating each electric work machine EWM to each work site WS is repeated.

[0043] In the second step S5, the operation planner 14 selects the work site WS2 with the second highest workload. The operation planner 14 assigns to the selected work site WS2 the electric work machine EWMn with a battery degradation amount ΔSOH of -5% and the smallest decrease in the state of degradation SOH from among the multiple electric work machines EWM1, EWM3, ..., EWMn excluding the electric work machine EWM2 assigned to the work site WS1.

[0044] Similarly, in the third step S5, the electric work machine EWM1 is assigned to the work site WS3 with the third highest workload, and in the fourth step S5, the electric work machine EWM3 is assigned to the work site WS4 with the fourth highest workload. Thereafter, when the operation planner 14 determines in step S6 that the assignment of electric work machines EWM to all work sites WS has been completed (YES), the operation planner 14 ends the operation support method OSM shown in Fig. 1B.

[0045] The operation planner 14, for example, creates an operation plan for the electric work machine EWM that includes information on each work site WS assigned to each electric work machine EWM, and transmits this to the information terminal of the user of the electric work machine EWM via the network N. Furthermore, the operation planner 14, for example, transmits information on each work site WS assigned to each electric work machine EWM to each electric work machine EWM via the network N and the satellite communication line SCL or the radio communication line RCL.

[0046] The operation of the operation support device 1 and operation support method OSM for an electric work machine EWM according to this embodiment will be described below.

[0047] The operation support device 1 of this embodiment is a device equipped with a server that allocates a plurality of electric work machines EWM1, EWM2, ..., EWMn to a plurality of work sites WS1, WS2, ..., WSn. The server is equipped with an information storage unit 11, a state acquisition unit 12, a state prediction unit 13, and an operation planner 14. The information storage unit 11 stores information on the workload of each of the plurality of work sites WS1, WS2, ..., WSn. The state acquisition unit 12 acquires the degradation state of the battery B mounted on each of the plurality of electric work machines EWM1, EWM2, ..., EWMn. The state prediction unit 13 calculates the predicted state of degradation ESOH of the battery B when each of the plurality of electric work machines EWM1, EWM2, ..., EWMn works at one of the plurality of work sites WS1, WS2, ..., WSn. The operation planning unit 14 selects work sites WS in descending order of workload based on the workload information stored in the information storage unit 11, and assigns a specific electric work machine EWM from among the multiple electric work machines EWM1, EWM2, ..., EWMn to the selected work sites WS in the order selected, based on the degradation state of battery B acquired by the state acquisition unit 12 and the predicted degradation state ESOH of battery B calculated by the state prediction unit 13.

[0048] In other words, as described above, the operation support device 1 of this embodiment is a server that assigns each of a plurality of electric work machines EWM1, EWM2, ..., EWMn to a plurality of work sites WS1, WS2, ..., WSn. The operation support device 1 includes an information storage unit 11, a state acquisition unit 12, a state prediction unit 13, and an operation planner 14. The information storage unit 11 stores information on the workload of each work site WS. The state acquisition unit 12 acquires the state of deterioration SOH of the battery B mounted on each electric work machine EWM. The state prediction unit 13 calculates the predicted state of deterioration ESOH of the battery B when each electric work machine EWM works at each work site WS. The operation planner 14 selects work sites WS in descending order of workload based on the information stored by the information storage unit 11, and assigns a specific work site WS from the plurality of electric work machines EWM to the selected work site WS based on the predicted state of deterioration ESOH.

[0049] With this configuration, the operations support device 1 of this embodiment can allocate appropriate electric work machines EWM from among a plurality of electric work machines EWM1, EWM2, ..., EWMn for a plurality of work sites WS1, WS2, ..., WSn, in order from work sites WS with high workloads to work sites WS with low workloads, based on the predicted state of health ESOH of battery B. This makes it possible to prevent the state of health SOH of battery B in each electric work machine EWM from decreasing too much, making it possible to suppress deterioration of battery B and extend its lifespan.

[0050] Furthermore, in the operation support device 1 of this embodiment, the operation planner 14 calculates the amount of battery degradation ΔSOH when a plurality of electric work machines EWM1, EWM2, ..., EWMn work at a plurality of work sites WS1, WS2, ..., WSn, based on the state of degradation SOH of battery B and the predicted state of degradation ESOH of battery B. Furthermore, the operation planner 14 selects, as the specific electric work machine WS, the electric work machine EWM having the smallest amount of battery degradation ΔSOH from the plurality of electric work machines EWM1, EWM2, ..., EWMn.

[0051] In other words, in the operation support device 1 of this embodiment, the operation planner 14 calculates the amount of battery degradation ΔSOH when each electric work machine EWM works at each work site WS, based on the state of degradation SOH and predicted state of degradation ESOH of battery B, as shown in Table 1B, for example. Furthermore, the operation planner 14 assigns the electric work machine EWM with the smallest amount of battery degradation ΔSOH from among the plurality of electric work machines EWM1, EWM2, ..., EWMn to the work site WS selected in descending order of workload.

[0052] With this configuration, the operation support device 1 of this embodiment can minimize the decrease in the state of health SOH of the battery B after each electric work machine EWM has worked at each work site WS. As a result, it is possible to suppress the overall deterioration of the multiple batteries B mounted on the multiple electric work machines EWM1, EWM2, ..., EWMn, and extend the overall lifespan of these batteries B.

[0053] Furthermore, the operation support method OSM of this embodiment is a method of allocating a plurality of electric work machines EWM1, EWM2, ..., EWMn to a plurality of work sites WS1, WS2, ..., WSn. As described above, the operation support method OSM of this embodiment has an information storage process S1, a state acquisition process S2, a state prediction process S4, and an operation plan creation process S5. The information storage process S1 is a process of storing information on the workloads of the plurality of work sites WS1, WS2, ..., WSn. The state acquisition process S2 is a process of acquiring the state of health (SOH) of the battery B mounted on each of the plurality of electric work machines EWM1, EWM2, ..., EWMn. The state prediction process S4 is a process of calculating a predicted state of health (ESOH) of the battery B when each of the plurality of electric work machines EWM1, EWM2, ..., EWMn works at one of the plurality of work sites WS1, WS2, ..., WSn. The operation plan creation process S5 is a process of selecting work sites WS in descending order of workload based on the workload information stored in the information storage process S1, and allocating a specific electric work machine EWM to each of the multiple electric work machines EWM1, EWM2, ..., EWMn in the selected work site WS order based on the state of degradation SOH of battery B acquired in the state acquisition process S2 and the predicted state of degradation ESOH of battery B calculated in the state prediction process S4.

[0054] In other words, the operation support method OSM of this embodiment is a method of assigning each of a plurality of electric work machines EWM1, EWM2, ..., EWMn to each of a plurality of work sites WS1, WS2, ..., WSn. As described above, the operation support method OSM of this embodiment has an information storage process S1, a status acquisition process S2, a status prediction process S4, and an operation plan creation process S5. The information storage process S1 is a process of storing information about the workload of each work site WS. The status acquisition process S2 is a process of acquiring the state of health SOH of the battery B mounted on each electric work machine EWM. The status prediction process S4 is a process of calculating the predicted state of health ESOH of the battery B when each electric work machine EWM works at each work site WS. The operation plan creation process S5 is a process of selecting work sites WS in descending order of workload based on the information stored in the information storage process S1, and allocating a specific electric work machine EWM from among a plurality of electric work machines EWM1, EWM2, ..., EWMn to the selected work site WS based on the predicted state of deterioration ESOH of the battery B.

[0055] With this configuration, the operation support method OSM of this embodiment makes it possible to allocate appropriate electric work machines EWM from among a plurality of electric work machines EWM1, EWM2, ..., EWMn for a plurality of work sites WS1, WS2, ..., WSn, in order from work sites WS with high workloads to work sites WS with low workloads, based on the predicted state of health ESOH of battery B. This makes it possible to prevent the state of health SOH of battery B in each electric work machine EWM from decreasing too much, making it possible to suppress deterioration of battery B and extend its lifespan.

[0056] As described above, according to this embodiment, it is possible to provide an operation support device 1 and an operation support method OSM for an electric work machine that are capable of suppressing deterioration and extending the life of the battery B of the electric work machine EWM.

[0057] [Embodiment 2] Hereinafter, a second embodiment of an operation support device and an operation support method for an electric powered working machine according to the present disclosure will be described with reference to Figures 1A, 2, and Table 2. Figure 2 is a flow diagram explaining the operation of the operation support device 1 of this embodiment, and is a flow diagram explaining each step of an operation support method OSM2 of this embodiment.

[0058] The operation support device 1 and operation support method OSM2 of this embodiment differ from the operation support device 1 and operation support method OSM of the above-described embodiment 1 in the operation of the operation planner 14 in the operation plan creation step S5a. Other points of the operation support device 1 and operation support method OSM2 of this embodiment are similar to those of the operation support device 1 and operation support method OSM of the above-described embodiment 1, so similar parts are denoted by the same reference numerals and description thereof will be omitted.

[0059] 2 starts, the operations support device 1 of this embodiment executes the information storage step S1 to the state prediction step S4 in the same way as the operations support method OSM described above. As a result, as shown in Table 2, the predicted state of deterioration ESOH and the amount of battery deterioration ΔSOH are calculated when each of the plurality of electric work machines EWM1, EWM2, ..., EWMn works at each of the plurality of work sites WS1, WS2, ..., WSn.

[0060]

[0061] Thereafter, the operation planner 14 of the operation support device 1 executes an operation plan creation step S5a. In the operation support method OSM2 of this embodiment, the operation plan creation step S5a includes, for example, the following steps S51a to S55a. In step S51a, the operation planner 14 determines whether there is any electric work machine EWM for which the predicted state of deterioration ESOH of battery B will be equal to or greater than a predetermined value when each of the plurality of electric work machines EWM1, EWM2, ..., EWMn works at the selected work site WS.

[0062] Here, the operation planner 14 sets the predetermined value used in the determination in step S51a to, for example, 80%. Then, in step S51, the operation planner 14 determines whether there is any electric work machine EWM whose predicted state of deterioration ESOH will be equal to or greater than a predetermined value when each of the plurality of electric work machines EWM1, EWM2, ..., EWMn works at the initially selected work site WS1, as shown in Table 2.

[0063] At work site WS1, the predicted state of deterioration ESOH of batteries B of electric work machines EWM1 and EWM4 of machine Nos. 1 and 4 is equal to or greater than a predetermined value of 80%. Therefore, in step S51a, the operation planner 14 determines that there is an electric work machine EWM whose predicted state of deterioration ESOH is equal to or greater than the predetermined value (YES), and executes the next step S52a.

[0064] In step S52a, the operation planner 14 determines whether there are multiple electric work machines EWMs whose predicted state of deterioration ESOH is equal to or greater than a predetermined value. At work site WS1, the predicted state of deterioration ESOH of batteries B of electric work machines EWM1 and EWM4 of machine Nos. 1 and 4 is equal to or greater than 80%, which is a predetermined value. Therefore, in step S52a, the operation planner 14 determines that there are multiple electric work machines EWMs whose predicted state of deterioration ESOH is equal to or greater than the predetermined value (YES), and executes the next step S53a.

[0065] In step S53a, the operation planner 14 assigns a specific electric work machine EWM from among the multiple electric work machines EWM1, EWM2, ..., EWMn to the selected work site WS1 based on the predicted state of degradation ESOH of the battery B when each electric work machine EWM works at that work site WS1. More specifically, for example, as shown in Table 2, the electric work machine EWM4 with the smallest amount of battery degradation ΔSOH calculated based on the state of degradation SOH and the predicted state of degradation ESOH of the battery B of each electric work machine EWM is assigned to the work site WS1.

[0066] In step S53a, the operation planner 14 excludes the work site WS3 that was determined in step S3 to be unable to handle the work at the work site WS1 (NA) from the multiple electric work machines EWM1, EWM2, ..., EWMn to be assigned to the work site WS1, as in the previously described embodiment 1. Next, the operation planner 14 executes step S6, as in the previously described embodiment 1, and if it determines that the assignment of electric work machines EWM to all work sites WS has not been completed (NO), it repeats the previously described step S51a and subsequent steps.

[0067] In the second step S51a, the operation planner 14 selects the work site WS2 with the second highest workload, for example, as shown in Table 2. Then, it is determined whether or not there is an electric work machine EWM whose predicted state of deterioration ESOH when working at the work site WS2 is equal to or greater than a predetermined value among the plurality of electric work machines EWM1, EWM2, ..., EWMn, excluding the electric work machine EWM4 that has already been assigned to another work site WS1.

[0068] Here, as shown in Table 2, for example, if the predetermined value is 80%, then, excluding electric work machine EWM4, only electric work machine EWM1 has a predicted state of deterioration ESOH that is equal to or greater than the predetermined value when working at work site WS2. Therefore, in this second step S51a, the operation planner 14 determines that there is an electric work machine EWM whose predicted state of deterioration ESOH is equal to or greater than the predetermined value (YES), and further determines in the second step S52a that there are not multiple electric work machines EWM whose predicted state of deterioration ESOH is equal to or greater than the predetermined value (NO).

[0069] In this case, the operation planner 14 executes step S54a of assigning an electric work machine EWM1 whose predicted state of deterioration ESOH is equal to or greater than a predetermined value to the selected work site WS2, then executes step S6 a second time, determines that the assignment of electric work machines EWM to all work sites WS has not been completed (NO), and executes step S51a a third time. In this third step S51a, the operation planner 14 selects the work site WS3 with the third highest workload.

[0070] Here, as shown in Table 2, if the predetermined value is, for example, 80%, then, excluding the electric work machines EWM4 and EWM1 that have already been assigned to the other work sites WS1 and WS2, there are no electric work machines EWM whose predicted state of degradation ESOH of battery B after work at work site WS3 is equal to or greater than the predetermined value. Therefore, in this third step S51a, the operation planner 14 determines that there are no electric work machines EWM whose predicted state of degradation ESOH is equal to or greater than the predetermined value (NO), and executes the next step S55a.

[0071] In this step S55a, the operation planner 14 assigns to the selected work site WS3 the electric work machine EWM3 having the greatest predicted state of deterioration ESOH of battery B from among the plurality of electric work machines EWM2, EWM3, ..., EWMn excluding the electric work machines EWM4, EWM1 assigned to the other work sites WS1, WS2. Thereafter, the operation planner 14 executes step S6 and a fourth time step S51a, and then executes a second time step S55a.

[0072] In this second step S55a, the operation planner 14 selects the work site WS4 with the fourth highest workload. The operation planner 14 also excludes the electric work machines EWM4, EWM1, and EM3 assigned to the other work sites WS1, WS2, and WS3 from the candidates for the electric work machine EWM to be assigned to the selected work site WS4. Furthermore, the operation planner 14 assigns the electric work machine EWMn with the greatest predicted state of deterioration ESOH of battery B from among the multiple electric work machines EWM2, ..., EWMn to the selected work site WS4.

[0073] Thereafter, in step S6, when the operation planner 14 determines that allocation of electric work machines EWM to all work sites WS has been completed (YES), the operation support device 1 terminates the operation support method OSM2 shown in Figure 2.

[0074] As described above, in the operation support device 1 of this embodiment, the operation planner 14 determines whether or not there is an electric work machine EWM among the multiple electric work machines EWM1, EWM2, ..., EWMn whose predicted state of degradation ESOH of battery B is equal to or greater than a predetermined value. Furthermore, if such an electric work machine EWM is present, the operation planner 14 selects, as the specific electric work machine EWM, an electric work machine EWM4 from the multiple electric work machines EWM1, EWM2, ..., EWMn whose predicted state of degradation ESOH of battery B is equal to or greater than a predetermined value and whose battery degradation amount ΔSOH is the smallest.

[0075] In other words, in the operation support device 1 of this embodiment, the operation planner 14 determines whether or not there are multiple electric work machines EWM1, EWM2, ..., EWMn among the multiple electric work machines EWM whose predicted state of degradation ESOH is equal to or greater than a predetermined value. Furthermore, if there are multiple electric work machines EWM, the operation planner 14 assigns to the selected work site WS1, from the multiple electric work machines EWM1, EWM2, ..., EWMn, an electric work machine EWM4 whose predicted state of degradation ESOH of battery B is equal to or greater than a predetermined value and whose battery degradation amount ΔSOH is the smallest.

[0076] With this configuration, the operations support device 1 of this embodiment can assign an electric work machine EWM4 whose battery B has a predicted state of deterioration ESOH equal to or greater than a predetermined value and a minimum amount of battery deterioration ΔSOH to a work site WS1 that has a higher workload than the other work sites WS2, WS3, ..., Wsn. Therefore, the operations support device 1 of this embodiment can suppress deterioration and extend the life of the batteries B of each of the multiple electric work machines EWM1, EWM2, ..., EWMn, compared to assigning electric work machines EWM1, EWM2, ..., EWMn equipped with batteries B that have a relatively low predicted state of deterioration ESOH and a large amount of battery deterioration ΔSOH to a work site WS1 that has a relatively high workload.

[0077] Furthermore, in the operation support device 1 of this embodiment, when the operation planning unit 14 determines that there is only one electric work machine EWM1 whose predicted state of deterioration ESOH is equal to or greater than a predetermined value among the multiple electric work machines EWM1, EWM2, ..., EWMn, it allocates the electric work machine EWM1 whose predicted state of deterioration ESOH is equal to or greater than a predetermined value to the selected work site WS2.

[0078] With this configuration, the operations support device 1 of this embodiment can assign an electric work machine EWM1 whose battery B has a predicted state of degradation ESOH that is equal to or greater than a predetermined value to a work site WS2 that has a higher workload than the other work sites WS3, WS4. Therefore, the operations support device 1 of this embodiment can suppress deterioration and extend the life of the battery B of each of the multiple electric work machines EWM2, EWM3, ..., EWMn, compared to when electric work machines EWM2, EWM3, ..., EWMn equipped with batteries B that have a relatively low predicted state of degradation ESOH are assigned to a work site WS2 that has a relatively high workload.

[0079] Furthermore, in the operation support device 1 of this embodiment, if there is no electric work machine EWM with a predicted state of degradation ESOH of battery B that is equal to or greater than a predetermined value among the multiple electric work machines EWM2, EWM3, ..., EWMn, the operation planner 14 selects, as the specific electric work machine EWM, the electric work machine EWM with the greatest predicted state of degradation ESOH of battery B from the multiple electric work machines EWM2, EWM3, ..., EWMn.

[0080] In other words, in the operation support device 1 of this embodiment, the operation planner 14 allocates the electric work machine EWM3 having the largest predicted state of deterioration ESOH from among the multiple electric work machines EWM2, EWM3, ..., EWMn to the selected work site WS3. Similarly, the operation planner 14 allocates the electric work machine EWMn having the largest predicted state of deterioration ESOH from among the multiple electric work machines EWM2, ..., EWMn to the selected work site WS4.

[0081] With this configuration, the operations support device 1 of this embodiment can assign an electric work machine EWM3 having the greatest predicted state of deterioration ESOH of its battery B to a work site WS3 that has a higher workload than the other work sites WS4. Similarly, an electric work machine EWMn having the greatest predicted state of deterioration ESOH of its battery B can be assigned to a work site WS4 that has a higher workload than the other work sites WS. Therefore, the operations support device 1 of this embodiment can suppress deterioration and extend the lifespan of the batteries B of each of the multiple electric work machines EWM2, EWM3, ..., EWMn.

[0082] As described above, according to this embodiment, similar to the first embodiment described above, it is possible to provide an operation support device 1 and an operation support method OSM2 for an electric work machine that are capable of suppressing deterioration of the battery B of the electric work machine EWM and extending its lifespan.

[0083] [Embodiment 3] Hereinafter, a third embodiment of an operation support device and an operation support method for an electric powered working machine according to the present disclosure will be described with reference to Figures 1A, 3, Table 3A, and Table 3B. Figure 3 is a flow diagram illustrating the operation of the operation support device 1 of this embodiment, and is a flow diagram illustrating each step of an operation support method OSM3 of this embodiment.

[0084] The operation support device 1 and operation support method OSM3 of this embodiment differ from the operation support device 1 and operation support method OSM of the above-described embodiment 1 in that the operation plan unit 14 executes the sales appraisal step S7 and in the operation of the operation plan unit 14 in the subsequent operation plan creation step S5b. The other points of the operation support device 1 and operation support method OSM3 of this embodiment are similar to those of the operation support device 1 and operation support method OSM of the above-described embodiment 1, and therefore similar parts are denoted by the same reference numerals and description thereof will be omitted.

[0085] When the operations support device 1 of this embodiment starts the operations support method OSM3 shown in Fig. 3, it executes steps S1 to S4, similar to the previously described first embodiment. Thereafter, the operations support device 1 executes a sales appraisal step S7. This step S7 includes, for example, the following steps S71 to S73. In step S71, the operations planning unit 14 of the operations support device 1 determines whether each of the multiple electric working machines EWM1, EWM2, ..., EWMn satisfies the evaluation index of the secondhand market.

[0086] More specifically, for example, as shown in Table 3A below, the operation planner 14 acquires the state of health SOH, period of use, and total operating time of battery B of each electric work machine EWM stored in the storage device by the information storage unit 11. In addition, for example, as shown in Table 3B below, the operation planner 14 acquires the secondhand market evaluation index of each of the plurality of electric work machines EWM1, EWM2, ..., EWMn stored in the storage device by the information storage unit 11.

[0087]

[0088]

[0089] The secondhand market evaluation index for each electric work machine EWM includes, for example, as shown in Table 3B, the conditions set for each of the plurality of electric work machines EWM1, EWM2, ..., EWMn: the period of use, the total operating time, and the state of health SOH of battery B. These conditions can be set, for example, to any conditions that allow each electric work machine EWM to be sold at a price equal to or higher than a predetermined price on the secondhand market.

[0090] The state of health (SOH), period of use, total operating time, and second-hand market evaluation index of each electric work machine EWM change over time, and so can be updated, for example, periodically. Furthermore, when the battery manufacturer and battery capacity are changed due to, for example, replacement of battery B, this information is also updated.

[0091] In step S71, the operation planner 14 excludes, for example, the electric work machine EWM3 that was determined to be unable to handle the work site WS1 (NA) in step S3 from the objects of determination. Furthermore, in step S71, the operation planner 14 compares, for example, the state of health SOH, period of use, and total operating time of the battery B of each of the plurality of electric work machines EWM1, EWM2, ..., EWMn shown in Table 3A with the conditions of each electric work machine EWM shown in Table 3B.

[0092] In the example shown in Table 3A, the state of health SOH, period of use, and total operating time of battery B of electric work machines EWM1, EWM2, EWM4 of machine Nos. 1, 2, 4 surrounded by thick frames, excluding electric work machine EWM3, satisfy the secondhand market evaluation indexes of each electric work machine EWM1, EWM2, EWM4 surrounded by thick frames in Table 3B. In this case, the operation planner 14 determines in step S71 that electric work machines EWM1, EWM2, EWM4 satisfy the secondhand market evaluation indexes (YES).

[0093] Furthermore, the operation planning unit 14 determines in step S71 that the electric work machines EWM3, EWMn do not satisfy the evaluation indexes of the secondhand market (NO). Thereafter, the operation planning unit 14 executes step S72 of determining whether or not the electric work machines EWM1, EWM2, EWM4 that satisfy the evaluation indexes of the secondhand market can be sold.

[0094] More specifically, in step S72, the operation planner 14, for example, sends an inquiry to the user's terminal about whether the electric work machines EWM1, EWM2, EWM4 can be sold, and receives input of whether the electric work machines EWM1, EWM2, EWM4 can be sold from the user's terminal. In step S72, the operation planner 14, for example, determines whether the electric work machines EWM1, EWM2, EWM4 can be sold based on the input whether the electric work machines EWM1, EWM2, EWM4 can be sold. Here, if the operation planner 14 determines in step S72 that the electric work machines EWM1, EWM2, EWM4 cannot be sold (NO), a first step S5b is executed.

[0095] In this first step S5b, the operation planner 14 selects the work site WS1 with the highest workload, as in the previously described embodiment 1. Furthermore, the operation planner 14 assigns to the selected work site WS1 the electric work machine EWM2 that will have the least amount of battery degradation ΔSOH of Battery B when working at the selected work site WS1, as shown in Table 3A. The operation planner 14 then performs step S6 and then step S71 for the second time.

[0096] In this second step S71, the operation planner 14 determines that the electric work machines EWM1, EWM4 satisfy the evaluation indexes of the secondhand market (YES), and executes a second step S72. If in this second step S72 the operation planner 14 determines that the electric work machines EWM1, EWM4 are not sellable (NO), a second step S5b is executed. In this second step S5b, the operation planner 14 assigns the electric work machine EWM4, which has the smallest amount of battery degradation ΔSOH, from among the remaining plurality of electric work machines EWM1, EWM3, EWM4, EWMn, to the work site WS2, which has the second highest workload.

[0097] Thereafter, the operation planning unit 14 passes through step S6 and executes step S71 for the third time. In this third step S71, the operation planning unit 14 determines that the electric work machines EWM1, EWM3 satisfy the evaluation indexes of the secondhand market (YES), and executes step S72 for the third time. In this third step S72, if the operation planning unit 14 determines, for example, that the electric work machine EWM1 is not sellable (NO) and that the electric work machine EWM3 is sellable (YES), the next step S73 is executed.

[0098] In this step S73, the operation planner 14 records information about the electric work machine EWM3 to be sold in a storage device, for example, via the information storage unit 11. Thereafter, step S5b is executed a third time. In this third step S5b, the operation planner 14 allocates, for example, the electric work machine EWM3 to be sold that was determined to be saleable (YES) in the previous step S72 to the work site WS3 with the third highest workload. Note that the electric work machine EWM3 to be sold is sold, for example, on the secondhand market after work at the work site WS3 is completed. Thereafter, the operation planner 14 executes step S6 and then executes step S71 a fourth time.

[0099] In this fourth step S71, the operation planner 14 determines that the electric work machine EWM1 satisfies the evaluation index of the secondhand market (YES), and executes the fourth step S72. If in this fourth step S72 the operation planner 14 determines, for example, that the electric work machine EWM1 is not sellable (NO), the fourth step S5b is executed. In this fourth step S5b, the operation planner 14 assigns, for example, from the remaining plurality of electric work machines EWM1, EWMn, to the work site WS4 with the fourth highest workload.

[0100] As described above, in the operations support device 1 of this embodiment, the operations planner 14 records, among a plurality of electric work machines EWM1, EWM2, ..., EWMn, the electric work machine EWM4 that satisfies predetermined secondhand market evaluation indexes and that has been determined by the user to be sellable, as a target for sale. With this configuration, the operations support device 1 and operations support method OSM3 of this embodiment not only achieve the same effects as the operations support device 1 and operations support method OSM of the first embodiment described above, but also make it possible to select an electric work machine EWM with high market value and sell it at a high price on the secondhand market.

[0101] [Fourth Embodiment] Hereinafter, a fourth embodiment of an operation support device and an operation support method for an electric powered working machine according to the present disclosure will be described with reference to Fig. 1A, Fig. 4, and Table 4. Fig. 4 is a flow diagram explaining the operation of the operation support device 1 of this embodiment, and is a flow diagram explaining each step of an operation support method OSM4 of this embodiment.

[0102] The operation support device 1 and operation support method OSM4 of this embodiment differ from the operation support device 1 and operation support method OSM of the above-described embodiment 1 in the operation of the operation planner 14 in the operation plan creation step S5c. Other points of the operation support device 1 and operation support method OSM4 of this embodiment are similar to those of the operation support device 1 and operation support method OSM of the above-described embodiment 1, so similar parts are denoted by the same reference numerals and description thereof will be omitted.

[0103] 4 starts, the operations support device 1 of this embodiment executes steps S1 to S4, similar to the previously described embodiment 1. Thereafter, the operations support device 1 executes an operation plan creation step S5c. In this step S5c, the operations planner 14 of the operations support device 1 selects work sites WS in descending order of workload based on the information stored in the information storage unit 11, similar to the previously described embodiment 1.

[0104] Furthermore, the operation planner 14 allocates a specific electric work machine EWM based on the predicted state of deterioration ESOH from among the multiple electric work machines EWM to the selected work site WS in the same way as in the above-described embodiment 1. Here, the operation planner 14 allocates the electric work machine EWM with the largest predicted state of deterioration ESOH from among the multiple electric work machines EWM to the selected work site WS, for example, as shown in Table 4 below.

[0105]

[0106] As shown in Table 4, at the work site WS1 with the highest workload, the electric work machine EWM1 with the greatest predicted state of deterioration ESOH is assigned from among the multiple electric work machines EWM1, EWM2, ..., EWMn excluding the electric work machine EWM3 which has been excluded as not available (NA). Similarly, at the work site WS2, the electric work machine EWM2 is assigned, at the work site WS3, the electric work machine EWMn is assigned, and at the work site WS4, the electric work machine EWM3 is assigned.

[0107] According to the operation support device 1 and operation support method OSM4 of this embodiment, it is possible to sequentially allocate electric work machines EWMs for which the predicted state of deterioration ESOH of their batteries B after work is greatest, from work sites WS with high workloads to work sites WS with low workloads. Therefore, according to this embodiment, as with the first embodiment described above, it is possible to provide an electric work machine operation support device 1 and operation support method OSM4 that are able to suppress deterioration and extend the life of the batteries B of the electric work machines EWM.

[0108] 1A, 5, Table 5A, and Table 5B, a fifth embodiment of an operation support device and an operation support method for an electric powered working machine according to the present disclosure will be described below. Fig. 5 is a flow diagram illustrating the operation of the operation support device 1 of this embodiment, and is a flow diagram illustrating each step of an operation support method OSM5 of this embodiment.

[0109] The operation support device 1 and operation support method OSM5 of this embodiment differ from the operation support device 1 and operation support method OSM of the above-described embodiment 1 in the operation of the operation planner 14 in the operation plan creation step S5d. Other points of the operation support device 1 and operation support method OSM5 of this embodiment are similar to those of the operation support device 1 and operation support method OSM of the above-described embodiment 1, so similar parts are denoted by the same reference numerals and description thereof will be omitted.

[0110] 5, the operations support device 1 of this embodiment executes steps S1 to S4, similar to the first embodiment. The operations support device 1 then executes an operations plan creation step S5d. In the operations support method OSM5 of this embodiment, the operations plan creation step S5d includes, for example, the following steps S51d to S55d. The operations plan creation step S5d performed by the operations support device 1 of this embodiment will be described below with reference to Tables 5A and 5B.

[0111]

[0112]

[0113] In step S51d, after selecting the work site WS1 with the highest workload, the operation planner 14 determines whether there is an electric work machine EWM that satisfies predetermined evaluation indices. Here, the evaluation indices for the electric work machines EWM include, for example, the conditions of the period of use, total operating time, and state of health SOH set for each electric work machine EWM, as shown in Table 5B.

[0114] Here, the predicted state of deterioration ESOH of battery B of each electric work machine EWM when working at work site WS1 shown in Table 5A is referenced. It is found that the predicted state of deterioration ESOH of electric work machine EWM1 satisfies the conditions for the state of deterioration SOH shown in Table 5B, and also satisfies the conditions for the period of use and total operating time. Furthermore, the predicted state of deterioration ESOH of battery B of the other electric work machines EWM does not satisfy the state of deterioration SOH of the evaluation index of each electric work machine EWM.

[0115] In this case, the operation planner 14 determines in step S51d that there is an electric work machine EWM that satisfies the evaluation index (YES), and determines in the next step S52d that multiple electric work machines EWM do not satisfy the evaluation index (NO). Furthermore, the operation planner 14 executes step S54d and allocates an electric work machine EWM1 that satisfies the evaluation index to the selected work site WS1. Thereafter, the operation planner 14 executes step S51d a second time via step S6.

[0116] In this second step S51d, the operation planner 14 selects the work site WS2 with the second highest workload. Furthermore, the operation planner 14 determines whether there is an electric work machine EWM whose usage period, total operating time, and predicted state of deterioration ESOH of battery B when work is performed at the selected work site WS2 satisfy the evaluation index. At work site WS2, only electric work machine EWM4, machine No. 4, satisfies the evaluation index.

[0117] In this case, the operation planner 14 determines in the second process S51d that there is an electric work machine EWM that satisfies the evaluation index (YES), and determines in the second process S52d that multiple electric work machines EWM do not satisfy the evaluation index (NO). Furthermore, the operation planner 14 executes the second process S54d and allocates an electric work machine EWM4 that satisfies the evaluation index to the selected work site WS2. Thereafter, the operation planner 14 executes the third process S51d via process S6.

[0118] In this third step S51d, the operation planner 14 selects the work site WS3 with the third highest workload. Furthermore, the operation planner 14 determines whether there is an electric work machine EWM whose usage period, total operating time, and predicted state of deterioration ESOH of battery B when work is performed at the selected work site WS3 satisfy the evaluation index. At work site WS3, only electric work machine EWM3, machine No. 3, satisfies the evaluation index.

[0119] In this case, the operation planner 14 determines in the third step S51d that there is an electric work machine EWM that satisfies the evaluation index (YES), and determines in the third step S52d that multiple electric work machines EWM do not satisfy the evaluation index (NO). Furthermore, the operation planner 14 executes the third step S54d and allocates the electric work machine EWM3 that satisfies the evaluation index to the selected work site WS3. Thereafter, the operation planner 14 executes the fourth step S51d via step S6.

[0120] In this fourth step S51d, the operation planner 14 selects the work site WS4 with the fourth highest workload. Furthermore, the operation planner 14 determines whether there is an electric work machine EWM whose usage period, total operating time, and predicted state of deterioration ESOH of battery B when work is performed at the selected work site WS4 satisfy the evaluation index. At work site WS4, two electric work machines EWM2 and EWMn, machine numbers 2 and n, satisfy the evaluation index.

[0121] In this case, the operation planner 14 determines in the fourth step S51d that there is an electric work machine EWM that satisfies the evaluation index (YES), and determines in the fourth step S52d that a plurality of electric work machines EWM satisfy the evaluation index (YES). Furthermore, the operation planner 14 executes the next step S53d and allocates, to the selected work site WS4, the electric work machine EWM2 with the largest predicted state of deterioration ESOH out of the plurality of electric work machines EWM2, EWMn that satisfy the evaluation index.

[0122] On the other hand, if the operation planner 14 determines in S51d that there is no work machine that satisfies the evaluation index (NO), it executes step S55d of allocating the electric work machine EWM with the smallest amount of battery degradation ΔSOH to the selected work site WS. Thereafter, when the operation planner 14 determines in step S6 that the allocation of electric work machines EWM to all work sites WS has been completed, the operation support device 1 ends the operation support method OSM5 shown in FIG.

[0123] As described above, in the operation support device 1 of this embodiment, when there is an electric work machine EWM that satisfies a predetermined evaluation index among the multiple electric work machines EWM, the operation planner 14 selects, as the specific electric work machine EWM, the electric work machine EWM that satisfies the evaluation index and has the greatest predicted state of degradation ESOH of battery B from the multiple electric work machines EWM.

[0124] In other words, in the operations support device 1 of this embodiment, when there are multiple electric work machines EWM that satisfy a predetermined evaluation index among multiple operation support devices 1, the operations planner 14 allocates to the selected work site WS an electric work machine EWM that satisfies the evaluation index and has the largest predicted state of deterioration ESOH from among the multiple electric work machines EWM. With this configuration, the operations support device 1 and operations support method OSM5 of this embodiment can not only achieve the same effects as in the first embodiment described above, but can also appropriately manage the specifications of the electric work machines EWM allocated to each work site WS.

[0125] The above has described in detail, using the drawings, embodiments of the operation support device and operation support method for an electric work machine according to the present disclosure, but the specific configuration is not limited to this embodiment, and even if there are design changes and the like within the scope that does not deviate from the gist of the present disclosure, they are included in the present disclosure.

[0126] 1: Server (operation support device) 11: Information storage unit 12: Status acquisition unit 13: Status prediction unit 14: Operation planning unit B: Battery ESOH: Predicted degradation state EWM, EWM1-EWMn: Electric work machine OSM, OSM2-OSM5: Operation support method S1: Information storage process S2: Status acquisition process S4: Status prediction process S5, S5a-S5d: Operation plan creation process SOH: Degradation state WS, WS1-WSn: Work site ΔSOH: Amount of battery degradation

Claims

1. An operation support device comprising a server which allocates a plurality of electric work machines to a plurality of work sites, the server comprising: an information storage unit which stores information on the workload of each of the plurality of work sites; a status acquisition unit which acquires the degradation state of a battery mounted on each of the plurality of electric work machines; a status prediction unit which calculates a predicted degradation state of the battery when each of the plurality of electric work machines works at any of the plurality of work sites; and an operation planning unit which selects work sites in order of highest workload based on the workload information stored in the information storage unit, and allocates a specific electric work machine from among the plurality of electric work machines to the selected work sites in the order of the work sites based on the degradation state of the battery acquired by the status acquisition unit and the predicted degradation state of the battery calculated by the status prediction unit.

2. The electric work machine operation support device described in claim 1, characterized in that the operation planning unit calculates the amount of battery deterioration when multiple electric work machines work at multiple work sites based on the battery's deterioration state and the predicted battery deterioration state, and selects, as the specific electric work machine, an electric work machine with the smallest amount of battery deterioration from among the multiple electric work machines.

3. The electric work machine operation support device described in claim 2, characterized in that when there is an electric work machine among the multiple electric work machines whose predicted battery deterioration state is equal to or greater than a predetermined value, the operation planning unit selects, as the specific electric work machine, from the multiple electric work machines, an electric work machine whose predicted battery deterioration state is equal to or greater than a predetermined value and whose battery deterioration amount is the smallest.

4. The electric work machine operation support device as described in claim 2, characterized in that when there is no electric work machine among the multiple electric work machines whose predicted battery deterioration state is equal to or greater than a predetermined value, the operation planning unit selects, as the specific electric work machine, from the multiple electric work machines, the electric work machine whose predicted battery deterioration state is the greatest.

5. The electric work machine operation support device as described in claim 3, characterized in that when there is no electric work machine among the multiple electric work machines whose predicted battery deterioration state is equal to or greater than a predetermined value, the operation planning unit selects, as the specific electric work machine, from the multiple electric work machines, the electric work machine whose predicted battery deterioration state is the greatest.

6. The electric work machine operation support device as described in claim 1, characterized in that, when an electric work machine that satisfies a predetermined evaluation index is present among the multiple electric work machines, the operation planning unit selects, as the specific electric work machine, from the multiple electric work machines, an electric work machine that satisfies the evaluation index and has the greatest predicted deterioration state of the battery.

7. The electric work machine operation support device as described in claim 1, characterized in that the operation planning unit records as sale targets those electric work machines among the plurality of electric work machines that satisfy specified secondhand market evaluation indexes and are determined by the user to be available for sale.

8. An operation support method for allocating a plurality of electric work machines to a plurality of work sites, comprising: an information storage step for storing information on the workload of each of the plurality of work sites; a status acquisition step for acquiring the degradation state of the battery mounted on each of the plurality of electric work machines; a status prediction step for calculating a predicted degradation state of the battery when each of the plurality of electric work machines works at any of the plurality of work sites; and an operation plan creation step for selecting work sites in order of highest workload based on the workload information stored in the information storage step, and allocating a specific electric work machine from among the plurality of electric work machines to the selected work sites based on the degradation state of the battery acquired in the status acquisition step and the predicted degradation state of the battery calculated in the status prediction step.

Citation Information

Patent Citations

  • Power supply system for construction machine

    JP2016084633A

  • Task allocation

    US20190370712A1

  • Power storage system and abnormality predictor diagnostic system

    WO2020137553A1

  • Information processing device and program

    WO2021192043A1