System equipped with wide-area cell base station and terrestrial cell base station
The system addresses interference between sky-based and ground-based cell stations by employing synchronized communication and null scheduling, utilizing transmission weight matrices and interference models to optimize radio resource allocation, thereby improving SINR and communication quality.
Patent Information
- Application Number
- PCT/JP2024/009624
- Authority / Receiving Office
- WO · WO
- Patent Type
- Applications
- Current Assignee / Owner
- Priority Date
- 2023-03-29
- Filing Date
- 2024-03-12
- Publication Date
- 2024-10-03
AI Technical Summary
Interference between sky-based relay communication stations and ground-based cell stations using the same frequency band significantly reduces throughput in both systems, with existing methods struggling to effectively suppress interference, especially at the edge of ground cells.
A system where a wide area cell base station and terrestrial cell base stations perform synchronized service link communication, using null scheduling to direct a null beam from the sky-based station, with the terrestrial base stations estimating and mitigating interference through a transmission weight matrix and interference model-based methods to optimize radio resource allocation.
This approach effectively reduces residual interference, improving the signal-to-interference and noise power ratio (SINR) in ground cells and enhancing overall communication quality by dynamically managing interference across the network.
Smart Images

Figure JP2024009624_03102024_PF_FP_ABST
Abstract
Description
System with wide-area cell base station and terrestrial cell base station
[0001] The present invention relates to a technique for suppressing interference from a relay communication station mounted on an airborne HAPS or the like to a ground cell.
[0002] Conventionally, base stations (hereinafter referred to as "wide-area cell base stations") that form wide-area cells toward the ground or sea from repeater-type or base station device-type relay communication stations mounted on high altitude platform stations (HAPS) (also referred to as "high altitude pseudo satellites") located in the sky, low Earth orbit (LEO) satellites, geostationary orbit (GEO) satellites, etc., are known. In an environment where a system in which such wide-area cell base stations communicate with UEs (terminals) via service links (hereinafter referred to as "airborne system") and a system in which existing terrestrial cell base stations communicate with UEs (terminals) via service links (hereinafter referred to as "terrestrial system") coexist, when simultaneous communications are performed using the same frequency band, signals from relay communication stations of the airborne system interfere with the terrestrial system. When this interference from the airborne system occurs, the throughput of the terrestrial system is significantly reduced. Similarly, signals from the terrestrial system also interfere with the airborne system. When this interference from the terrestrial system occurs, the throughput of the airborne system is reduced.
[0003] Patent Document 1 discloses a technology for eliminating or avoiding areas covered by terrestrial cells and suppressing (reducing) interference with terrestrial systems by adjusting the antenna system of a HAP in the sky to form a directional beam by directing a null toward a terrestrial cell base station based on a map of the eNB (terrestrial cell base station).
[0004] US Patent Application Publication No. 2017 / 0272131
[0005] When forming a directional beam by directing a null from the aerial system to a terrestrial cell base station of the terrestrial system in a mixed environment of aerial systems and terrestrial systems, there is a problem that in areas near the cell edge of the terrestrial cell, the downlink (DL) signal from the terrestrial cell base station is small and it is desirable to reduce the downlink (DL) residual interference from the aerial system.
[0006] A system according to one aspect of the present invention includes a wide-area cell base station that forms a wide-area cell toward the ground or sea from a service link antenna of a relay communication station installed on an air vehicle or floating body located in the sky, and one or more terrestrial cell base stations that form terrestrial cells from antennas located on the ground or sea. The wide-area cell base station and the one or more terrestrial cell base stations communicate over a service link in the same frequency band using radio frames that are time-synchronized with each other. The wide-area cell base station acquires information about terrestrial cell base stations located within the wide-area cell, determines null scheduling related to the allocation of nulls on the time axis and the frequency axis based on the information about the terrestrial cell base station, and transmits the null scheduling information to the terrestrial cell base station. The terrestrial cell base station receives the null scheduling information from the wide-area cell base station, determines user scheduling related to the allocation of user terminal devices on the time axis and the frequency axis based on the null scheduling information, and communicates with user terminal devices located within its own cell based on the user scheduling information.
[0007] In the system, the null scheduling information includes information on a transmission weight matrix Wr to be applied to the antenna of the wide-area cell base station when forming the null, and the terrestrial cell base station may estimate a propagation path response hg between the antenna of the wide-area cell base station and a terminal device of a user g located in its own cell, and may estimate interference power I(r, g) from the wide-area cell to the terminal device of a user g located in its own cell for a radio resource r, based on the estimated transmission weight matrix Wr and the propagation path response hg, using the following equation (1):
[0008] Here, the information on the transmission weight matrix Wr included in the null scheduling information may be information (for example, an average value or a median value) obtained by statistically processing elements of a plurality of transmission weight matrices Wr.
[0009] In the system, the null scheduling information includes information on interference estimation parameters determined based on an interference model that models a spatial distribution of interference power from the wide-area cell to a terminal device of a user residing in the terrestrial cell, with a position corresponding to a null point formed by the wide-area cell base station as the origin, and the terrestrial cell base station may estimate interference power I(r, g) from the wide-area cell to a terminal device of a user g residing in its own cell for a radio resource r, based on the information on the interference estimation parameters.
[0010] Here, the information on the interference estimation parameters included in the null scheduling information may be information (for example, an average value or a median value) obtained by statistically processing values of a plurality of interference estimation parameters.
[0011] In the system, the interference model is an interference model in which the power of the interference is in the z direction in an orthogonal coordinate system (x, y, z) with the position corresponding to the null point as the origin, and the distribution of the power of the interference at positions on the xy plane is approximated by an elliptical paraboloid, and the information on the interference estimation parameters is a coefficient a r , b r and c r The terrestrial cell base station calculates the coefficient a r , b r and c r Based on the value of g , y g ) to the terminal device of user g located at modelA (r, g) may be estimated.
[0012] Here, the information on the interference estimation parameters is the coefficient a r , b r and c r The terrestrial cell base station calculates the coordinate position (x g , y g) may be estimated.
[0013] For example, the information on the interference estimation parameters is a coefficient b r / a r and c r / a r The terrestrial cell base station uses the following equation (3) and the coefficient b r / a r and c r / a r Based on the value of g , y g ) is used as an estimate of the interference power to the terminal device of user g located at modelA A normalized value of (r, g) may be calculated.
[0014] In the system, the interference model is a Cartesian coordinate system (x, y, z) having a position corresponding to the null point as the origin, in which the power of the interference is in the z direction, the distribution of the power of the interference at positions on the x-y plane is approximated by an elliptical paraboloid, and the Cartesian coordinates are rotated by an angle φ so that the x axis coincides with the minor axis of an ellipse having equal power when the elliptical paraboloid is projected onto the x-y plane. r The information on the interference estimation parameters is the coefficient a in the following equation (4) defined in the rotated orthogonal coordinate system (x', y', z): r ', and the terrestrial cell base station calculates the coefficient a r ', the coordinate position (x g ',y g The interference power I modelB (r, g) may be estimated.
[0015] Here, the terrestrial cell base station calculates the equation (4) using a coefficient a r Based on the following equation (5) divided by ', the coordinate position (x g ',y gThe interference power I is used as an estimate of the interference power to the terminal device of user g located at modelB A normalized value of (r, g) may be calculated.
[0016] In the system, the interference model is an interference model in which the power of the interference is in the z direction in an orthogonal coordinate system (x, y, z) with the position corresponding to the null point as the origin, and the distribution of the power of the interference at positions on the xy plane is approximated by a paraboloid of revolution, and the information on the interference estimation parameters is a coefficient a r '', and the terrestrial cell base station uses the following equation (6) and the coefficient a r ” and the coordinate position (x g , y g ) to the terminal device of user g located at modelC (r, g) may be estimated.
[0017] Here, the above equation (6) is changed to coefficient a r The coordinate position (x g ',y g As an estimate of the interference power from the wide-area cell to the terminal device of the user g located in the own cell for the radio resource r in modelB A normalized value of (r, g) may be calculated.
[0018] In the system, each of the plurality of terrestrial cell base stations performs service link communication using a time division duplex (TDD) method, and transmits uplink (UL) and downlink (DL) switching information of its own cell to the wide-area cell base station, and the wide-area cell base station receives the uplink (UL) and downlink (DL) switching information from each of the plurality of terrestrial cell base stations, acquires information on terrestrial cell base stations located within the wide-area cell from a terrestrial cell base station database, and performs a switching operation based on the uplink (UL) and downlink (DL) switching information received from each of the plurality of terrestrial cell base stations and the information on the terrestrial cell base station acquired from the terrestrial cell base station database. and determining null scheduling relating to the allocation of nulls on the time axis and the frequency axis for each of the terrestrial cell base stations, and transmitting information about the null scheduling to each of the plurality of terrestrial cell base stations, each of the plurality of terrestrial cell base stations receiving information about null scheduling relating to its own terrestrial cell base station from the wide-area cell base station, estimating interference from the wide-area cell to terminal equipment of users located in its own cell based on the information about null scheduling, determining user scheduling relating to the allocation of terminal equipment of users on the time axis and the frequency axis, and communicating with the terminal equipment of users located in its own cell based on the information about user scheduling.
[0019] Here, the terrestrial cell base station, in the user scheduling, sets a first set of user numbers g of terminal devices of a plurality (Nu) of unallocated users and a plurality (Nr=r max ) of the second set of wireless resources in the order of resource number r, and max ), the r-th resource number r of the second set is set as the resource number r to be assigned to the user, the interference power when the radio resource of resource number r is assigned is calculated, and the user number g of the terminal device of the user for which the calculated value of the interference power or the decision index value corresponding to the calculated value of the interference power is the smallest is determined as the user number g to be assigned to the resource number r.r The assigned user number g is r from the first set.
[0020] In the system, each of the plurality of terrestrial cell base stations may perform service link communication using a frequency division duplex (FDD) method, and the wide-area cell base station may acquire information on a plurality of terrestrial cell base stations located within the wide-area cell from a terrestrial cell base station database, determine null scheduling regarding allocation of nulls on the time axis and the frequency axis for each of the terrestrial cell base stations based on the information on the terrestrial cell base stations acquired from the terrestrial cell base station database, and transmit the null scheduling information to each of the plurality of terrestrial cell base stations, and each of the plurality of terrestrial cell base stations may receive null scheduling information related to itself from the wide-area cell base station, estimate interference from the wide-area cell to terminal equipment of users located in its own cell based on the null scheduling information, determine user scheduling regarding allocation of user terminal equipment on the time axis and the frequency axis, and communicate with the terminal equipment of users located in its own cell based on the user scheduling information.
[0021] Here, the terrestrial cell base station, in the user scheduling, sets a first set of user numbers g of terminal devices of a plurality (Nu) of unallocated users and a plurality (Nr=r max ) of the second set of wireless resources in the order of resource number r, and max ), the r-th resource number r of the second set is set as the resource number r to be assigned to the user, the interference power when the radio resource of resource number r is assigned is calculated, and the user number g of the terminal device of the user for which the calculated value of the interference power or the decision index value corresponding to the calculated value of the interference power is the smallest is determined as the user number g to be assigned to the resource number r. r The assigned user number g is rfrom the first set.
[0022] According to the present invention, it is possible to reduce residual interference when a null of a directional beam is formed from an overhead relay communication station that forms a wide-area cell toward an antenna of a terrestrial cell base station.
[0023] FIG. 1 is a schematic diagram illustrating an example of the overall configuration of a communication system including a HAPS according to an embodiment. FIG. 2 is a perspective view illustrating an example of a HAPS according to an embodiment. FIG. 3 is a side view illustrating another example of a HAPS according to an embodiment. FIG. 4 is a perspective view illustrating an example of an array antenna for a service link of a HAPS according to an embodiment. FIG. 5 is a perspective view illustrating another example of an array antenna for a service link of a HAPS according to an embodiment. FIG. 6 is an explanatory diagram illustrating an issue when performing beamforming in MU-MIMO using a HAPS array antenna. FIG. 7 is an explanatory diagram illustrating an issue when forming a null of beamforming from a HAPS toward a terrestrial base station (antenna). FIG. 8 is an explanatory diagram illustrating an example of null sweeping that changes the position of a null of beamforming formed from a HAPS toward a terrestrial cell according to an embodiment. FIG. 9A is an explanatory diagram illustrating an example of null sweeping when switching between two nulls for each radio resource formed from a HAPS toward a terrestrial cell according to an embodiment. FIG. 9B is an explanatory diagram illustrating an example of the relationship between radio resources of user scheduling, nulls, and terminal devices of terrestrial cell users in the null sweeping. Fig. 10 is an explanatory diagram showing an example of a user scheduling algorithm in the case of an exact method for estimating interference power of a terrestrial cell user (terminal device) using a transmission weight matrix applied to an array antenna of a service link of a HAPS according to an embodiment. Fig. 11A is an explanatory diagram showing an example of an interference power distribution model that models the spatial distribution of interference power from a HAPS centered on a null point of a terrestrial cell according to an embodiment. Fig. 11B is an explanatory diagram showing an example of an interference power distribution model that models the spatial distribution of interference power from a HAPS centered on a null point of a terrestrial cell according to an embodiment. Fig. 11C is an explanatory diagram showing an example of an interference power distribution model that models the spatial distribution of interference power from a HAPS centered on a null point of a terrestrial cell according to an embodiment. Fig. 12A is an explanatory diagram showing a two-dimensional representation of the relationship between contour lines of interference power and coordinates in interference estimation method A using the interference model of Fig. 11A. Fig. 12B is an explanatory diagram showing a two-dimensional representation of the relationship between contour lines of interference power and coordinates in interference estimation method B using the interference model of Fig. 11B.12C is an explanatory diagram showing a two-dimensional representation of the relationship between contour lines of interference power and coordinates in interference estimation method C using the interference model of FIG. 11C . FIG. 13 is an explanatory diagram showing an example of a coefficient determination method for determining coefficients in a calculation formula for interference power in interference estimation method A applicable to null sweeping according to the embodiment. FIG. 14 is an explanatory diagram showing an example of propagation path vectors between each element of an array antenna of a HAPS service link and a target point of a terrestrial cell. FIG. 15 is an explanatory diagram showing an example of a coefficient determination method for determining coefficients in a calculation formula for interference power in interference estimation method B applicable to null sweeping according to the embodiment. FIG. 16A is an explanatory diagram showing an example of rotation of coordinate axes in the coefficient determination method of interference estimation method B. FIG. 16B is an explanatory diagram showing an example of rotation of coordinate axes in the coefficient determination method of interference estimation method B. FIG. 17 is an explanatory diagram showing an example of a coefficient determination method for determining coefficients in a calculation formula for interference power in interference estimation method C applicable to null sweeping according to the embodiment. Fig. 18 is an explanatory diagram showing an example of the flow of control information in the entire system when a user scheduling method using interference power estimated by a rigorous method using a transmission weight matrix according to an embodiment is applied. Fig. 19 is an explanatory diagram showing an example of the flow of control information in the entire system when a user scheduling method using interference power estimated by interference estimation method A according to an embodiment is applied. Fig. 20 is an explanatory diagram showing an example of the flow of control information in the entire system when a user scheduling method using interference power estimated by interference estimation method B according to an embodiment is applied. Fig. 21 is an explanatory diagram showing an example of the flow of control information in the entire system when a user scheduling method using interference power estimated by interference estimation method C according to an embodiment is applied. Fig. 22A is an explanatory diagram showing setting conditions in an example of a computer simulation of interference power estimation using each of the rigorous method, interference estimation method A, interference estimation method B, and interference estimation method C according to an embodiment. Fig. 22B is an explanatory diagram showing setting conditions in an example of a computer simulation of interference power estimation using each of the rigorous method, interference estimation method A, interference estimation method B, and interference estimation method C according to an embodiment.23A is an explanatory diagram showing an example of the results of a computer simulation in which interference power is estimated using the strict method according to the embodiment under the setting conditions of FIGS. 22A and 22B . FIG. 23B is an explanatory diagram showing an example of the results of a computer simulation in which interference power is estimated using interference estimation method A according to the embodiment under the setting conditions of FIGS. 22A and 22B . FIG. 23C is an explanatory diagram showing an example of the results of a computer simulation in which interference power is estimated using interference estimation method B according to the embodiment under the setting conditions of FIGS. 22A and 22B . FIG. 23D is an explanatory diagram showing an example of the results of a computer simulation in which interference power is estimated using each of interference estimation methods C according to the embodiment under the setting conditions of FIGS. 22A and 22B . FIG. 24A is an explanatory diagram showing setting conditions in another example of a computer simulation in which interference power is estimated using each of the strict method, interference estimation method A, interference estimation method B, and interference estimation method C according to the embodiment. FIG. 24B is an explanatory diagram showing setting conditions in another example of a computer simulation in which interference power is estimated using each of the strict method, interference estimation method A, interference estimation method B, and interference estimation method C according to the embodiment. Fig. 25A is an explanatory diagram showing an example of the results of a computer simulation in which interference power is estimated using the rigorous method according to the embodiment under the setting conditions of Figs. 24A and 24B. Fig. 25B is an explanatory diagram showing an example of the results of a computer simulation in which interference power is estimated using interference estimation method A according to the embodiment under the setting conditions of Figs. 24A and 24B. Fig. 25C is an explanatory diagram showing an example of the results of a computer simulation in which interference power is estimated using interference estimation method B according to the embodiment under the setting conditions of Figs. 24A and 24B. Fig. 25D is an explanatory diagram showing an example of the results of a computer simulation in which interference power is estimated using each of interference estimation method C according to the embodiment under the setting conditions of Figs. 24A and 24B. Fig. 26 is an explanatory diagram showing an example of a common algorithm for user scheduling methods that apply interference estimation method A, interference estimation method B, and interference estimation method C based on an interference model according to the embodiment. Fig. 27A is an explanatory diagram showing an example of the relationship between contour lines of interference power and coordinates for interference estimation method A that combines a reduction in the number of parameters.FIG. 27B is an explanatory diagram showing an example of an algorithm for user scheduling method A-2 that combines interference estimation method A with a reduced number of parameters. FIG. 28A is an explanatory diagram showing an example of the relationship between contour lines and coordinates of interference power for interference estimation method B that combines a reduced number of parameters. FIG. 28B is an explanatory diagram showing an example of an algorithm for user scheduling method B-2 that combines interference estimation method B with a reduced number of parameters. FIG. 29A is an explanatory diagram showing an example of the relationship between contour lines and coordinates of interference power for interference estimation method C that combines a reduced number of parameters. FIG. 29B is an explanatory diagram showing an example of an algorithm for user scheduling method C-2 that combines interference estimation method C with a reduced number of parameters. FIG. 30 is an explanatory diagram showing an example of the flow of control parameter information in the entire system when user scheduling method A-2 according to the embodiment is applied. FIG. 31 is an explanatory diagram showing an example of the flow of control parameter information in the entire system when user scheduling method B-2 according to the embodiment is applied. FIG. 32 is an explanatory diagram showing an example of the flow of control parameter information in the entire system when user scheduling method C-2 according to the embodiment is applied. FIG. 33 is an explanatory diagram showing an example of a computer simulation result that calculates the improvement effect of SINR in a terrestrial cell when user scheduling is performed by estimating interference power using interference estimation methods A-2 and B-2C-2 using the rigorous method and model according to the embodiment. FIG. 34 is an explanatory diagram showing another example of a computer simulation result that calculates the improvement effect of SINR in a terrestrial cell when user scheduling is performed by estimating interference power using interference estimation methods A-2 and B-2C-2 using the rigorous method and model according to the embodiment. FIG. 35 is an explanatory diagram showing an example of the overall configuration of a communication system having a terrestrial base station database according to the embodiment. FIG. 36 is a block diagram showing an example of the main configuration of a relay communication station mounted on a HAPS in the communication system of FIG. 35. FIG. 37 is a block diagram showing another example of the main configuration of a relay communication station mounted on a HAPS in the communication system of FIG. 35. FIG. 38 is a block diagram showing an example of the main configuration of a terrestrial cell base station in the communication system of FIG. 35.FIG. 39 is a flowchart showing an example of a processing flow in a HAPS base station and a terrestrial cell base station when performing beamforming control and service link communication involving null formation in the communication system according to the embodiment.
[0024] Hereinafter, an embodiment of the present invention will be described with reference to the drawings. The system according to the embodiment described herein is a communication system (HAPS system) equipped with an airborne communication relay device (HAPS), which is an aircraft or floating body equipped with a relay communication station of a wide-area cell base station (HAPS base station) that can form a cell on the ground or sea and perform MU-MIMO communication using a multi-element array antenna between multiple terminal devices (UE) located in the cell. When a terrestrial cell (second cell) formed by an existing terrestrial base station using the same frequency band is located within a wide-area HAPS cell (first cell), this communication system (HAPS system) can reduce residual interference when forming a null of a directional beam from the HAPS relay communication station toward the antenna of the terrestrial cell base station to suppress interference. The communication system according to this embodiment is suitable for realizing a three-dimensional network for next-generation mobile communications, such as the fifth generation, that supports simultaneous connection to multiple terminal devices and low latency.
[0025] In particular, in the system of this embodiment, null sweeping is performed to change the position of the null of the directional beam formed from the HAPS relay communication station toward the terrestrial cell for each radio resource, thereby suppressing (reducing) interference with downlink communication of terminal devices at both the center and the cell edge of the terrestrial cell, and improving the SINR (signal-to-interference-and-noise power ratio) throughout the terrestrial cell.
[0026] FIG. 1 is a schematic diagram illustrating an example of the overall configuration of a communication system including a HAPS (airborne communication relay device) according to an embodiment. In FIG. 1 , the HAPS system constituting the communication system of this embodiment includes a high-altitude platform station (hereinafter also referred to as a "HAPS" or "airborne PF (platform)") 10 (also referred to as a "high-altitude pseudosatellite" or "stratospheric platform") as an airborne communication relay device (wireless relay device) that is an airborne or floating body on which a relay communication station is mounted. The HAPS 10 is located in an airspace at a predetermined altitude and forms a three-dimensional cell (hereinafter also referred to as a "HAPS cell") 100C as a wide-area cell (first cell). The HAPS (airborne PF) 10 is an airborne or floating body (e.g., a solar plane, airship, drone, or balloon) that is controlled by autonomous control or external control to float or fly and position in an airspace (floating airspace) at a predetermined altitude above the ground or sea level. The relay communication station is mounted on the airborne or floating body. The HAPS (air PF) 10, which can function as an airborne communication relay device, may be a relay communication station mounted on an artificial satellite such as a low Earth orbit (LEO) satellite or a geostationary orbit (GEO) satellite. The communication system of this embodiment may include one or more terminal devices with which the HAPS 10 communicates, or may include a gateway station (feeder station) described below.
[0027] The airspace in which HAPS 10 is located is, for example, stratospheric airspace at an altitude of 11 km or more and 50 km or less above the ground (or above water such as the sea or lake). This airspace may also be an airspace at an altitude of 15 km or more and 25 km or less where meteorological conditions are relatively stable, and may particularly be an airspace at an altitude of approximately 20 km.
[0028] HAPS flies at a lower altitude than general artificial satellites but at a higher altitude than terrestrial or marine base stations, ensuring high visibility while minimizing propagation loss compared to satellite communications. This feature makes it possible for HAPS to provide communication services to terminal devices (mobile stations) 61, which are user devices such as terrestrial or marine cellular mobile terminals. Providing communication services from HAPS allows a small number of HAPS stations to cover a wide area that was previously covered by many terrestrial or marine base stations at once, offering the advantage of providing stable communication services at low cost.
[0029] The relay communication station of HAPS 10 forms a beam for wireless communication with a user terminal device (hereinafter referred to as "UE" (user device)) toward the ground (or sea surface), thereby forming a HAPS cell 100C capable of wireless communication with UE 61. The radius of a service area (also referred to as a "HAPS service area") 100A consisting of a footprint 100F on the ground (or sea) of this HAPS cell 100C is, for example, several tens of kilometers to 100 kilometers.
[0030] In this embodiment, the relay communication station of HAPS10 may form multiple three-dimensional cells (for example, three cells or seven cells) and form a service area 100A consisting of multiple footprints on the ground (or sea) of the multiple three-dimensional cells.
[0031] The communication system of this embodiment is an environment in which a HAPS 10 equipped with an aerial relay communication station that constitutes a wide-area cell base station (hereinafter also referred to as a "HAPS base station") and a low-position base station (hereinafter referred to as a "terrestrial cell base station" or "terrestrial base station") 30 that forms a cell located on the ground or sea and is subject to interference suppression coexist. In the example of Fig. 1 , antennas of a plurality of low-position terrestrial base stations 30 (hereinafter also referred to as "base station antennas") are located inside a HAPS cell 100C, and a cell (hereinafter referred to as a "terrestrial cell") 300C of the terrestrial base station 30 that is smaller than the footprint 100F of the cell 100C is formed inside a service area 100A formed by a three-dimensional footprint 100F of the cell 100C.
[0032] The wide-area cell base station including the relay communication station mounted on the HAPS 10 and the terrestrial base station (e.g., eNodeB, gNodeB) 30 use time-synchronized radio frames and the same frequency band for wireless communication of service links between the UEs 61 and 65 located in the cells 100C and 300C of the respective terrestrial base stations. The terrestrial base station 30 may be configured by connecting an RRH (remote radio head) having a base station antenna and a BBU (baseband unit) via an optical line. In this case, the RRH having the base station antenna is located at the position of the base station 30 in FIG. 1 .
[0033] The relay communication station mounted on HAPS 10 is, for example, a base station (e.g., eNodeB, gNodeB) that wirelessly communicates with a gateway station (also referred to as a "feeder station") 70, which is connected to a core network of a terrestrial (or marine) mobile communication network 80 and serves as a relay station having an antenna 71 facing the sky. The relay communication station of HAPS 10 is connected to the core network of mobile communication network 80 via a feeder station 70 installed on land or sea. Communication between HAPS 10 and the feeder station 70 may be performed by wireless communication using radio waves such as microwaves, or by optical communication using laser light or the like.
[0034] The relay communication station (also referred to as a "wireless relay station") mounted on the HAPS 10 may be a repeater-type relay communication station or a base station device-type relay communication station. The repeater-type relay communication station is combined with the base station device mounted on the feeder station 70 to form a wide-area cell base station. The base station device-type relay communication station functions as a wide-area cell base station.
[0035] The repeater-type relay communication station includes, for example, a repeater and a frequency converter. The repeater includes a low-noise amplifier that amplifies a service link signal received via a service link antenna, a power amplifier that amplifies a transmission signal transmitted via the service link antenna, and the like. The frequency converter converts between the service link frequency and the feeder link frequency. The feeder station 70 includes, for example, a base station device and a frequency converter. The base station device includes a baseband processing device that processes a service link baseband signal, a communication interface unit for communicating with the core network via a backhaul line, and the like. The frequency converter converts between the frequency of the service link signal input / output to / from the base station device and the frequency of the feeder link signal.
[0036] A base station type relay communication station includes, for example, a base station and a feeder link transceiver. The base station includes a low-noise amplifier that amplifies a received signal of the service link, a power amplifier that amplifies a transmission signal to be transmitted via the service link antenna, and a baseband processing device that processes baseband signals of the service link. The feeder link transceiver transmits and receives signals on the backhaul line transmitted to and from a feeder station 70. The feeder station 70 transmits and receives signals on the backhaul line transmitted to and from a relay communication station in the sky.
[0037] HAPS 10 may autonomously control its own floating movement (flight) and processing at the relay communication station by executing a control program using a control unit configured by an internally incorporated computer, etc. For example, HAPS 10 may each acquire its own current location information (e.g., GPS location information), pre-stored location control information (e.g., flight schedule information), location information of other HAPSs located in the vicinity, and autonomously control its floating movement (flight) and processing at the relay communication station based on this information.
[0038] The flight (flight) of the HAPS 10 and processing at the relay communication station may be controlled by a management device (also referred to as a "remote control device") provided in a communication center or the like of the mobile communication network 80. The management device may be configured, for example, as a computer device such as a PC, a server, or the like. In this case, the HAPS 10 may be equipped with a control communication terminal device (e.g., a mobile communication module) so that it can receive control information from the management device and transmit various information such as monitoring information to the management device, and may be assigned terminal identification information (e.g., an IP address, a telephone number, etc.) so that it can be identified by the management device. The MAC address of the communication interface may be used to identify the control communication terminal device. The HAPS 10 may also transmit monitoring information, such as information regarding the flight (flight) of its own or surrounding HAPS and processing at relay communication stations, information regarding the status of the HAPS 10, and observation data acquired by various sensors, to a predetermined destination such as the management device. The control information may include target flight route information for the HAPS. The monitoring information may include at least one of the current position of the HAPS 10, historical flight route information, airspeed, ground speed and thrust direction, wind speed and direction of airflow around the HAPS 10, and air pressure and temperature around the HAPS 10.
[0039] FIG. 2 is a perspective view showing an example of a HAPS 10 used in the communication system of the embodiment. The HAPS 10 of FIG. 2 is a solar-plane type HAPS and includes a main wing section 101 with both longitudinal end portions curved upward, and a plurality of motor-driven propellers 103 as a bus power system propulsion device at one lateral edge of the main wing section 101. A photovoltaic power generation panel (hereinafter referred to as a "solar panel") 102 serving as a solar power generation unit with a solar power generation function is provided on the upper surface of the main wing section 101. Furthermore, a plurality of pods 105 serving as equipment housings for accommodating mission equipment are connected to two longitudinal locations on the underside of the main wing section 101 via plate-shaped connectors 104. Each pod 105 houses a relay communication station 110 and a battery 106 as mission equipment. Furthermore, wheels 107 used during takeoff and landing are provided on the underside of each pod 105. The power generated by the solar panel 102 is stored in the battery 106, and the power supplied from the battery 106 drives the motor of the propeller 103 to rotate, and the relay communication station 110 performs wireless relay processing.
[0040] FIG. 3 is a side view showing another example of a HAPS 10 used in the communication system of the embodiment. The HAPS 10 in FIG. 3 is an unmanned airship-type HAPS with a large payload, which allows it to be equipped with a large-capacity battery. The HAPS 10 includes an airship main body 201 filled with a gas such as helium gas for buoyancy, a motor-driven propeller 202 as a bus power system propulsion device, and an equipment housing 203 for housing mission equipment. The equipment housing 203 houses a relay communication station 110 and a battery 204. The motor of the propeller 202 is driven and rotated by power supplied from the battery 204, and wireless relay processing is performed by the relay communication station 110. Note that a solar panel with a photovoltaic power generation function may be provided on the top surface of the airship main body 201, and power generated by the solar panel may be stored in the battery 204.
[0041] In the following embodiment, the airborne communication relay device that communicates wirelessly with UE 61 is illustrated and described as either the solar plane type HAPS 10 or the unmanned airship type HAPS 20 shown in Fig. 2, but the airborne communication relay device may also be the unmanned airship type HAPS 10 shown in Fig. 3. The following embodiment can also be applied to airborne communication relay devices other than HAPS 10.
[0042] Furthermore, the links FL(F) and FL(R) between the HAPS 10 and a gateway station (hereinafter abbreviated as "GW station") 70 serving as a feeder station are called "feeder links," and the link between the HAPS 10 and the UE 61 is called "service links." In particular, the section between the HAPS 10 and the GW station 70 is called "wireless section of the feeder link." Furthermore, the downlink of communication from the GW station 70 to the UE 61 via the HAPS 10 is called "forward link" FL(F), and the uplink of communication from the UE 61 to the GW station 70 via the HAPS 10 is called "reverse link" FL(R).
[0043] In the communication system of this embodiment, the duplexing method for the uplink and downlink of the wireless communication between the terrestrial base station 30 and the UE 65 is not limited to a specific method, and may be, for example, a time division duplex (TDD) method or a frequency division duplex (FDD) method. Furthermore, the access method for wireless communication between the terrestrial base station 30 and the UE 65 is not limited to a specific method, and may be, for example, an FDMA (Frequency Division Multiple Access) method, a TDMA (Time Division Multiple Access) method, a CDMA (Code Division Multiple Access) method, or an OFDMA (Orthogonal Frequency Division Multiple Access) method.
[0044] Similarly, the duplexing method for the uplink and downlink of the wireless communication with the UE 61 via the relay communication station 110 is not limited to a specific method and may be, for example, a time division duplexing (TDD) method or a frequency division duplexing (FDD) method. Also, the access method for the wireless communication with the UE 61 via the relay communication station 110 is not limited to a specific method and may be, for example, an FDMA method, a TDMA method, a CDMA method, or an OFDMA method.
[0045] In addition, the wireless communication of the service link in this embodiment has functions such as diversity coding, transmit beamforming, and spatial division multiplexing (SDM: Spatial Division Multiplexing), and uses a massive MIMO (Multiple-Input Multiple-Output) transmission method that performs multi-layer transmission using an array antenna having a large number of antenna elements. In particular, in this embodiment, in downlink communication from the relay communication station of HAPS10 to multiple UEs 61 within the cell, MU-MIMO (Multi-User MIMO) technology is used, which transmits signals to multiple different UEs 61 at the same time and frequency. By performing MU-MIMO transmission using an array antenna having a large number of antenna elements, it is possible to communicate by directing an appropriate beam to each UE 61 according to the communication environment of each UE 61, thereby improving the communication quality of the entire cell. Furthermore, since communication with a plurality of UEs 61 can be performed using the same radio resources (time and frequency resources), the system capacity can be expanded.
[0046] 4 and 5 are perspective views each showing an example of an array antenna 130 configured with multiple elements that can be used in the MU-MIMO transmission method in the HAPS 10 of this embodiment.
[0047] Array antenna 130 in FIG. 4 is a planar array antenna having a flat antenna substrate, in which a large number of antenna elements 130a such as patch antennas are two-dimensionally arranged in axial directions perpendicular to each other along the planar antenna surface of the antenna substrate.
[0048] The array antenna 130 in Fig. 5 is a cylindrical array antenna having a cylindrical or columnar antenna base and a number of antenna elements 130a such as patch antennas arranged along the axial and circumferential directions of a circumferential side surface serving as a first antenna surface of the antenna base. In the array antenna 130 in Fig. 5, as shown, a number of antenna elements 130a such as patch antennas may be arranged in a circular shape along the bottom surface serving as a second antenna surface. The antenna base in Fig. 5 may also be a polygonal cylindrical or polygonal cylindrical antenna base.
[0049] The shape of array antenna 130 and the number, type and arrangement of antenna elements are not limited to those exemplified in FIGS.
[0050] 6 is an explanatory diagram illustrating the issues that arise when beamforming is performed in a MU-MIMO transmission scheme using the array antenna 130 of the HAPS 10. In the service link SL between the array antenna 130 of the HAPS 10 and the service area 100A (footprint 100F of cell 100C) in FIG. 6, the MU-MIMO transmission scheme is used to perform beamforming, which compensates for long-distance propagation loss by individually directing appropriate high-gain beams 100B(1) to 100B(4) to each UE 61(1) to 61(4) according to the communication environment of each UE 61, thereby improving communication quality. In particular, when the MU-MIMO transmission scheme is used to communicate with multiple UEs 61 using the same radio resources (e.g., the same time-frequency resource blocks (RBs)) in the service link SL, system capacity can be improved.
[0051] However, in an environment where the HAPS 10 and the terrestrial base stations 30(1) and 30(2) coexist as shown in Figure 6, when the HAPS 10 and the terrestrial base stations 30(1) and 30(2) simultaneously communicate with UEs 61 and 65 located in each cell using the same frequency band, the downlink radio transmission signal transmitted from the HAPS 10 may interfere with service link communications (hereinafter also referred to as "terrestrial system communications") between the terrestrial base stations 30(1) and 30(2) and UEs 65(1) and 65(2) located in the terrestrial cells 300C(1) and 300C(2). When this interference from the HAPS 10 occurs, the throughput of communications between the terrestrial base stations 30(1) and 30(2) and the UEs 65 significantly decreases.
[0052] In this embodiment, the HAPS 10 performs beamforming control of the HAPS cell based on the position information of the base station antenna of the terrestrial base station so that the null of the beam pattern (profile of the spatial distribution of the beam) is directed toward the terrestrial base station (antenna) located within the HAPS cell. This suppresses interference that the HAPS 10 causes to communications in the terrestrial system without causing a significant degradation in the communication quality of transmitting a desired signal by multibeams to each of the multiple UEs 61 present in the HAPS cell.
[0053] 7 is an explanatory diagram showing the problem of forming a beamforming null from the HAPS toward a terrestrial base station (antenna). As shown in FIG. 7, when a beam pattern null 100N is formed from the array antenna 130 of the HAPS 10 toward a terrestrial base station (antenna) 30 located within the HAPS service area 100A, a UE 65(1) located at the center of the cell where the terrestrial base station 30 of the terrestrial cell 300C is located receives a strong signal from the terrestrial base station 30 and receives little interference from the array antenna 130 of the HAPS 10 above. However, for UEs 65(2) and 65(3) located near the cell edges of the terrestrial cell 300C, the signal received from the terrestrial base station 30 is weak and receives a strong interference from the array antenna 130 of the HAPS 10 above, resulting in poor communication quality (e.g., SINR) throughout the terrestrial cell 300C.
[0054] 8 is an explanatory diagram showing an example of null sweeping that changes the position of the null 100N of the beamforming formed from the HAPS 10 toward the terrestrial cell 300C according to the embodiment. In order to improve the overall communication quality (e.g., SINR) of the terrestrial cell 300C, in this embodiment, null sweeping is performed to change the position of the null 100N of the directional beam formed from the array antenna 130 of the HAPS 10 toward the terrestrial cell 300C for each radio resource, as shown in FIG. 8. This suppresses (reduces) interference with the downlink communications of UEs 65(1) to 65(3) at the center and cell edges of the terrestrial cell 300C.
[0055] FIG. 9A is an explanatory diagram showing an example of null sweeping when two nulls are formed by switching between each radio resource from the HAPS 10 toward the terrestrial cell 300C according to the embodiment. FIG. 9B is an explanatory diagram showing an example of the relationship between the radio resources 40(1) to 40(3) of user scheduling, the null #1 point, the null #2 point, and the terrestrial cell user UEs (terminal devices) 65(1) to 65(3) in the same null sweeping. The multiple radio resources 40(1) to 40(3) differ from each other in time, frequency, or both time and frequency. In the examples of FIGS. 9A and 9B, the terrestrial cell base station 30 assigns the UE 65(1) to the radio resource 40(1) in which the HAPS 10 forms the null 100N(1) of the directional beam toward the null #1 point. In addition, the terrestrial cell base station 30 allocates the UE 65(3) to the radio resource 40(2) where the HAPS 10 forms the null 100N(2) of the directional beam toward the null #2 point. In addition, the terrestrial cell base station 30 allocates the UE 65(2) to the radio resource 40(3) where the HAPS 10 forms the null 100N(1) of the directional beam toward the null #1 point.
[0056] [Exact Method] In the system of this embodiment, when null sweeping by the HAPS 10 and user scheduling by the terrestrial base station 30 are performed, it is necessary to estimate (calculate) the interference power at the UE 65 of the terrestrial cell user g present in the target terrestrial cell 300A. As a method for estimating the interference power, the transmission weight matrix applied to the array antenna 130 of the HAPS 10 is used. and the propagation path response between the array antenna 130 of the HAPS 10 and the terrestrial cell user g (UE 65). Here, the transmission weight matrix Wr is expressed as the product of the precoding matrix and the transmission power control matrix. Furthermore, Nt is the number of elements in the array antenna (service link antenna) 130 of the HAPS 10, and Nu is the spatial multiplexing number (the number of HAPS users).
[0057] 10 is an explanatory diagram showing an example of a user scheduling algorithm (greedy algorithm) in the case of a strict method for estimating the interference power of a UE 65 of a terrestrial cell user g using a transmission weight matrix Wr to be applied to the array antenna 130 of the service link of the HAPS 10 according to the embodiment. In the example of FIG. 10, the greedy algorithm can be used to sequentially select a user g that minimizes the interference power when assigned to a certain resource r.
[0058] In the example of the user scheduling algorithm of FIG. 10, first, a first set of user numbers g of terminal devices of a plurality (Nu) of unallocated users is set, and a plurality (Nr=r max Next, the first (r=1) to the Nrth (r=r) resource numbers r in the second set are set. max ), the r-th resource number r of the second set is set as the resource number r to be assigned to the user, and for the terrestrial cell user g, the HAPS 10 calculates the interference power I(r, g) of the terrestrial cell user g when the radio resource of the resource number r is assigned by the following equation (10), and the terrestrial cell user g with the minimum interference power is selected as the user number g to be assigned to the resource number r. r The process of assigning the user number g r from the first set.
[0059] Thereafter, the above user scheduling algorithm is repeatedly executed until all remaining users have been assigned radio resources, thereby completing the assignment of radio resources to all terrestrial base station users (terrestrial cell users) serving the terrestrial cell 300C.
[0060] In the user scheduling algorithm of FIG. 10, the terrestrial base station 30 needs to estimate (calculate) the interference power I(r, g) from the HAPS 10 to the terrestrial cell user g (UE 65) for each radio resource (time, frequency) as shown in the following equation (10):
[0061] However, the terrestrial base station 30 cannot estimate the interference power by itself. For example, the propagation path response hg between the array antenna 130 of HAPS 10 and the terrestrial cell user g (UE 65) included in the above equation (10) can be theoretically calculated by assuming a propagation environment (model) based on the location information of the terrestrial cell user g (UE 65) and information notified from HAPS 10. The information notified from HAPS 10 that is necessary for estimating the propagation path response hg includes, for example, information on the specifications of the array antenna 130 of HAPS 10 and information on the position and attitude of the HAPS aircraft that is periodically notified from HAPS 10, and the number of parameters that need to be notified from HAPS 10 is small.
[0062] Furthermore, the transmission weight matrix Wr applied to the array antenna 130 of the HAPS 10, which is included in the above equation (10), is known only by the HAPS 10 and is therefore notified from the HAPS 10 to the terrestrial base station 30. This transmission weight matrix Wr may be simply notified, but the amount of data for the parameters (matrix elements) that need to be notified becomes enormous. For example, if the number of elements Nt of the array antenna 130 is several hundred and the number of multiplexed users Nu is several tens, the parameters (matrix elements) of the notified transmission weight matrix Wr will be several thousand complex numbers. Furthermore, since the transmission weight matrix Wr changes for each radio (time, frequency) resource, it must be constantly updated.
[0063] [Interference Model Method] As described above, when the interference power at the UE 65 of the terrestrial cell user g used in the null sweeping is estimated using the strict method, the amount of information of parameters (elements of the transmission weight matrix) notified from the HAPS 10 to the terrestrial base station 30 becomes enormous. In order to reduce the amount of control information notified from the HAPS 10 to the terrestrial base station 30 and shared between the HAPS 10 and the terrestrial base station 30, an interference estimation method may be used in the terrestrial base station 30 using location information of the terrestrial cell user and a small number of parameters, based on an interference model that models the interference from the HAPS (aerial PF) 10 to the terrestrial cell user around the null, as shown below, as the interference estimation method in this embodiment. Then, by applying interference estimation based on this interference model, the control information notified from the HAPS (aerial PF) 10 to the terrestrial system's terrestrial base station 30 may be reduced, and user scheduling for each radio resource for the terrestrial cell user may be performed using a scheduling method in the terrestrial system's terrestrial base station 30 that takes into account the null formed by the HAPS (aerial PF) 10.
[0064] 11A, 11B, and 11C are explanatory diagrams showing examples of models of interference power distribution, which are models of the spatial distribution of interference power I from the HAPS 10 centered on the null point of the ground cell 300A according to the embodiment. The z-axis in the diagrams represents the interference power I received from the HAPS 10, and the x-axis and y-axis represent coordinates in the planar direction centered on the null point in the ground cell.
[0065] The interference model 50A in Fig. 11A is an example of an elliptical paraboloid interference model in which the interference power I is minimized at the null point and the contour line of the interference power I is elliptical. The interference model 50B in Fig. 11B is an example of a parabolic interference model in which the interference power I is constant in the y-axis direction and the distribution shape of the interference power I in the z-x plane direction is parabolic. The interference model 50C in Fig. 11C is an example of a paraboloid of revolution interference model in which the interference power I is minimized at the null point and the contour line of the interference power I is circular and the distribution shape of the interference power I in the vertical plane (plane including the z-axis) direction is parabolic.
[0066] 12A, 12B, and 12C are explanatory diagrams showing two-dimensional representations of the relationship between the contour lines of interference power I and coordinates in interference estimation methods A, B, and C using the interference models of FIGS. 11A, 11B, and 11C, respectively. The solid lines in the figures are the contour lines of interference power I, and the differences in image density represent the magnitude of interference power I. The positions of the "x" marks in the figures are null points of the directional beam formed by HAPS 10.
[0067] [Interference Estimation Method A] In interference estimation method A, based on the elliptic paraboloid type interference model 50A shown in FIGS. 11A and 12A, the interference power I from the HAPS 10 is calculated using the following equation (11): modelA Calculate and estimate.
[0068] Interference estimation method A can be easily extended to higher-order terms of second or higher order. In addition, since a transmission weight matrix is not required for interference estimation in the terrestrial base station 30, the amount of control information notified from the HAPS 10 to the terrestrial base station 30 can be reduced. Furthermore, the terrestrial base station 30 can estimate the propagation path response h between the HAPS 10 and the terrestrial cell user. g does not need to be estimated.
[0069] Coefficient a as an interference estimation parameter included in the above equation (11) r , b r , c r The coefficient a differs for each null formed toward the ground cell. r , b r , c r can be calculated using only the HAPS (airborne PF) 10 based on the theoretically calculated propagation path vector and the transmission weight applied to the target radio resource. For example, the coefficient a r , b r , c r For each wireless resource r, the interference power I at eight points that are a predetermined distance Δx, Δy away from the null point shown in FIG. 13 is determined by the theoretical formula shown in the following formula (12), and the interference power I at the eight points can be determined by applying the values of the interference power I at the eight points to the following formulas (13), (14), and (15).
[0070] FIG. 14 shows the coefficient a r , b r , c r 14 is an explanatory diagram showing an example of a propagation path vector 52 between each element of the array antenna 130 of the service link of the HAPS 10 and the target point of the terrestrial cell 300A, which is used to determine the propagation path response h between each element n (130a) of the array antenna 130 and the point (x, y) to be calculated. n (x, y) can be calculated using the following equation (16).
[0071] The path length Dn, elevation angle θn, and azimuth angle φn in the above equation (16) can be calculated from the coordinates (x, y) of the point to be calculated, the position and attitude of the HAPS 10 aircraft, the configuration of the array antenna 130, etc.
[0072] The propagation path response h calculated for each element n (130a) of the array antenna 130 n By combining (x, y), the propagation path vector h(x, y) of the following equation (17) can be obtained.
[0073] [Interference Estimation Method B] In interference estimation method B, based on the parabolic interference model 50B of FIGS. 11B and 12B, the interference power I from the HAPS 10 is calculated using the following equation (18): modelB Calculate and estimate.
[0074] The interference estimation method B uses the coefficients of the above-mentioned interference estimation method A as r = 0, c r In the interference model 50B used in the interference estimation method B, the x-axis is rotated by a predetermined angle φ r In general, x g ≠x g ' is.
[0075] In interference estimation method B, similar to the above-mentioned interference estimation method A, it is easy to expand to higher-order terms of second or higher order. Also, since a transmission weight matrix is not required for interference estimation in the terrestrial base station 30, the amount of control information (amount of control parameter information) notified from the HAPS 10 to the terrestrial base station 30 can be reduced. In particular, the number of parameters for interference estimation in the calculation formula is smaller than that of interference estimation method A, and the coefficient a r ' and the rotation angle φ for coordinate rotation r Therefore, the amount of control information to be notified to the terrestrial base station 30 can be further reduced. Furthermore, the terrestrial base station 30 can further reduce the amount of control information to be notified to the terrestrial cell user by using the propagation path response h g does not need to be estimated.
[0076] The coefficient a included in the above formula (18) r ' and rotation angle φ r is different for each null formed toward the ground cell and can be calculated only by the HAPS (air PF) 10.
[0077] FIG. 15 shows the coefficient a of the calculation formula for interference power in the interference estimation method B applicable to the null sweeping according to the embodiment. r 15 is an explanatory diagram showing an example of a coefficient determination method for determining the coefficient a′ included in equation (11) in the interference model 50A of the above-mentioned interference estimation method A. r , b r , c r Next, the Cartesian coordinates are rotated by an angle φ so that the x-axis of the coordinates coincides with the minor axis of the ellipse representing the contour lines of the interference power in the interference model 50A. r Next, only the contribution of the minor axis of the ellipse representing the contour line of the interference power is extracted, and the coefficient a r ' to determine.
[0078] 16A and 16B are explanatory diagrams showing an example of rotation of coordinate axes in the coefficient determination method of interference estimation method B. modelA When the calculation formula (11) is written in matrix form, it becomes the following formula (19) (the subscripts r and g are omitted).
[0079] Here, when diagonalized using the rotation matrix R shown in the following equations (20) and (21), the interference power I modelA can be expressed by the following equation (22).
[0080] In the above equation (22), if a'≧c', the x' axis after rotation coincides with the minor axis as shown in FIG. 16A, so c'=0 can be ignored in equation (22) to obtain the above-mentioned equation (18).
[0081] In the above equation (22), if a'<c', the x' axis after rotation may not coincide with the minor axis as shown in Figure 16B, so by substituting φ←φ+90° and a'←c', we obtain the above-mentioned equation (18).
[0082] [Interference Estimation Method C] In interference estimation method C, based on the paraboloid of revolution type interference model 50C shown in FIGS. 11C and 12C, the interference power I from the HAPS 10 is calculated using the following equation (23): modelC Calculate and estimate.
[0083] The interference estimation method C uses the coefficients of the above-mentioned interference estimation method A as r = c r , b r = 0. The interference power I calculated by the interference model 50C used in the interference estimation method C is modelC increases with distance from the null point.
[0084] In interference estimation method C, similar to the above-mentioned interference estimation method A, it is easy to expand to higher-order terms of second or higher order. Also, since a transmission weight matrix is not required for interference estimation in the terrestrial base station 30, the amount of control information notified from the HAPS 10 to the terrestrial base station 30 can be reduced. In particular, the number of coefficients in the calculation formula is smaller than that of interference estimation method A, and the coefficient a r '', the amount of control information to be notified to the terrestrial base station 30 can be further reduced. Furthermore, the terrestrial base station 30 can further reduce the amount of control information to be notified to the terrestrial cell user by using the propagation path response h g does not need to be estimated.
[0085] The coefficient a included in the above formula (23) r'' differs for each null formed toward the ground cell and can be calculated only by the HAPS (airborne PF) 10. In addition, in the interference estimation method C, unlike the above-mentioned interference estimation method B, the interference model 50C is rotationally symmetric, so the rotation angle φ r There is no need to notify
[0086] FIG. 17 shows the coefficient a of the calculation formula for interference power in the interference estimation method C applicable to the null sweeping according to the embodiment. r 17 is an explanatory diagram showing an example of a coefficient determination method for determining the coefficient a ′′ included in the equation (11) in the interference model 50A of the above-mentioned interference estimation method B. r , c r Next, calculate the coefficient a r , c r The coefficient a obtained by statistically processing r , c r The coefficient a as an interference estimation parameter in equation (23) of the interference model 50C is calculated by the average value (or median value) of r '' to determine.
[0087] [Overall System of Each Interference Estimation Method] Figure 18 is an explanatory diagram showing an example of the flow of information in the entire system when a user scheduling method using interference power estimated by a rigorous method using a transmission weight matrix Wr according to an embodiment is applied. In the rigorous method, the transmission weight matrix Wr calculated for each radio resource by the HAPS (aerial PF) 10 is notified to each of the multiple terrestrial base stations 30(1) to 30(3) located within the wide-area cell 100C via the gateway station 70 and the mobile communication network 80, and is used to estimate the interference power I(r, g) using the above-mentioned equation (11). Here, the information on the transmission weight matrix Wr notified to the terrestrial base stations 30(1) to 30(3) may be information on the transmission weight matrix Wr consisting of an average or median value obtained by statistically processing the elements of the multiple transmission weight matrices Wr.
[0088] 19 is an explanatory diagram showing an example of the flow of information in the entire system when a user scheduling method using interference power estimated by an interference estimation method A using an interference model according to the embodiment is applied. In the case of interference estimation method A, N BS (Number of terrestrial base stations) Set of coefficients a r (1) , b r (1) , c r (1) , a r (2) , b r (2) , c r (2) , a r (3) , b r (3) , c r (3) is notified to each of the plurality of terrestrial base stations 30(1) to 30(3) located within the wide-area cell 100C via the gateway station 70 and the mobile communication network 80, and the interference power I modelA Here, the coefficients as parameters for interference estimation notified to the terrestrial base stations 30(1) to 30(3) may be information such as the average or median of the coefficients obtained by statistically processing a plurality of the coefficients.
[0089] 20 is an explanatory diagram showing an example of the flow of information in the entire system when a user scheduling method using interference power estimated by an interference estimation method B using an interference model according to the embodiment is applied. In the case of interference estimation method B, N calculated for each radio resource for each ground base station 30(1) to 30(3) by the HAPS (airborne PF) 10 is used. BS (Number of terrestrial base stations) Set of coefficients a r ' (1) and rotation angle φ r (1) , a r ' (2) and rotation angle φ r (2) , a r ' (3) and rotation angle φ r(3) is notified to each of the plurality of terrestrial base stations 30(1) to 30(3) located within the wide-area cell 100C via the gateway station 70 and the mobile communication network 80, and the interference power I modelB Here, the coefficients and rotation angles as parameters for interference estimation notified to the terrestrial base stations 30(1) to 30(3) may be information such as the average or median of the coefficients and rotation angles obtained by statistically processing a plurality of the coefficients and rotation angles.
[0090] 21 is an explanatory diagram showing an example of the flow of information in the entire system when a user scheduling method using interference power estimated by an interference estimation method C using an interference model according to the embodiment is applied. In the case of interference estimation method C, N calculated for each radio resource for each ground base station 30(1) to 30(3) by the HAPS (airborne PF) 10 is used. BS (Number of terrestrial base stations) Set of coefficients a r ''(1) , a r ''(2) , a r ''(3) , is notified to each of the plurality of terrestrial base stations 30(1) to 30(3) located within the wide-area cell 100C via the gateway station 70 and the mobile communication network 80, and the interference power I modelC Here, the coefficients as parameters for interference estimation notified to the terrestrial base stations 30(1) to 30(3) may be information such as the average or median of the coefficients obtained by statistically processing a plurality of the coefficients.
[0091] [Computer Simulation of Estimation of Interference Power] Figures 22A and 22B are explanatory diagrams showing setting conditions in an example of a computer simulation of interference power estimation using the rigorous method, interference estimation method A, interference estimation method B, and interference estimation method C according to the embodiment. In the computer simulation of this example, as shown in the side view of Figure 22A, the horizontal distance D (e.g., 40 km) between the HAPS (airborne PF) 10 and the terrestrial base station 30 is twice the altitude H (e.g., 20 km) of the HAPS 10, and as shown in the top view of Figure 22B, the azimuth angle φ of the direction of the terrestrial base station 30 relative to the HAPS 10 is 30°. When the terrestrial base station 30 is far from the HAPS 10 as in these setting conditions, the change in the downward elevation / depression angle θ as seen from the HAPS 10 in the sky is small, and therefore the null area 100AN tends to extend in the radial direction, as shown in Figures 23A, 23B, and 23C.
[0092] 24A and 24B are explanatory diagrams showing setting conditions in another example of a computer simulation of interference power estimation using the strict method, interference estimation method A, interference estimation method B, and interference estimation method C according to the embodiment. In the computer simulation of this example, as shown in the side view of FIG. 24A , the horizontal distance D′ (e.g., 20 km) between the HAPS (airborne PF) 10 and the terrestrial base station 30 is equal to the altitude H (e.g., 20 km) of the HAPS 10, and as shown in the top view of FIG. 24B , the azimuth angle φ of the direction of the terrestrial base station 30 relative to the HAPS 10 is 30°. When the terrestrial base station 30 is close to the HAPS 10 as in these setting conditions, the change in the downward elevation / depression angle θ as seen from the HAPS 10 in the sky is large, and therefore, as shown in FIGS. 25A , 25B, and 25C , the null area 100AN is more likely to shrink in the radial direction than in FIG. 23 .
[0093] [User scheduling methods A-1, B-1, C-1] Fig. 26 is an explanatory diagram showing an example of a common algorithm (greedy algorithm) for user scheduling methods A-1, B-1, and C-1 that apply interference estimation method A, interference estimation method B, and interference estimation method C based on the interference model according to the embodiment. Note that in Fig. 26, descriptions of parts common to the above-mentioned Fig. 10 will be omitted.
[0094] In the user scheduling methods A-1, B-1, and C-1 of this example, the interference power calculated using the interference estimation method A, the interference estimation method B, or the interference estimation method C is used as the interference power I(r, g) in the user scheduling algorithm. Specifically, the interference power I calculated using the above-mentioned equation (11) modelA , the interference power I calculated by equation (18) modelB , or the interference power I calculated by equation (23) modelC is used as the interference power I(r, g) in the user scheduling algorithm.
[0095] In addition, in the user scheduling methods A-1, B-1, and C-1 of this example, the interference power I modelX (For example, I modelA , I modelB or I modelC ) and information that can be acquired or calculated by the terrestrial base station 30 (for example, desired signal power S, inter-cell or inter-sector interference power I 0 , noise power N, etc.) as a function of the selection criterion used to determine user selection. For example, the desired signal power S and the inter-cell or inter-sector interference power I 0 , noise power N, or the like.
[0096] In the user scheduling methods A-1, B-1, and C-1 of this example, coordinates (x g , y g), if the positions of the nulls formed in each radio resource are shared in advance between the HAPS 10 and the terrestrial system (terrestrial base station) 30, there is no need to notify the terrestrial base station 30 for each radio resource. Furthermore, one null is formed for each ground cell 300A per radio resource (time / frequency resource).
[0097] In FIG. 26, after the above-mentioned initialization process is performed, the first (r=1) to Nrth (r=r max ), the r-th resource number r in the second set is set as the resource number r to be assigned to a user, and for all terrestrial cell users g included in the first set, the interference power I modelX (r, g) is calculated using the above-mentioned formula (11), formula (18), or formula (23), and the cost (Cost(r, g)) is calculated as a judgment index value in the user selection rule. The terrestrial cell user g with the smallest cost is selected as the user number g to be assigned to the resource number r. r The process of assigning the user number g r from the first set.
[0098] Here, the cost (Cost(r, g)) is, for example, a desired signal power S, an inter-cell or inter-sector interference power I 0 , the noise power N, etc., can be used.
[0099] Thereafter, the above user scheduling algorithm is repeatedly executed until all remaining users have been assigned resources, thereby completing the assignment of resources to all terrestrial base station users (terrestrial cell users) serving the terrestrial cell 300C.
[0100] In the user scheduling method of this embodiment, a normalized value of interference power may be used, in which parameters are further defined in each of the interference models so as to be able to be reduced, as will be shown below.
[0101] [User scheduling method A-2] Fig. 27A is an explanatory diagram showing an example of the relationship between the contour lines of interference power and coordinates in interference estimation method A that combines a reduction in the number of parameters. Fig. 27B is an explanatory diagram showing an example of an algorithm (greedy algorithm) in user scheduling method A-2 that combines interference estimation method A and a reduction in the number of parameters. Note that in Fig. 27B, descriptions of parts common to the above-mentioned Figs. 10 and 26 will be omitted.
[0102] In the user scheduling method A-2 of this example, the magnitude relationship does not change even if the interference power calculated in the interference model shown in FIG. 27A is divided by a constant, and one parameter to be notified can be eliminated if only the magnitude comparison is performed. Therefore, the above-mentioned equation (11) is changed to a constant (for example, coefficient a r , b r or c r ) is used to determine user selection. In this example, as an example, the coefficient a r The normalized value of the interference power calculated by the following equation (25) divided by is used for determining user selection. In addition, in the calculation formula (25), the coefficient of the x-squared term is fixed to 1, so the remaining two coefficients b r / a r and c r / a r The value of is notified to the terrestrial base station 30 as information of the control parameter (parameter for interference estimation). Note that, as a normalized value of the interference power, the above-mentioned equation (11) is used with the coefficient b r or c r The value obtained by dividing by may also be used.
[0103] In the user scheduling method A-2 of this example, the coordinates (x g , y g ), if the positions of the nulls formed in each radio resource are shared in advance between the HAPS 10 and the terrestrial system (terrestrial base station) 30, there is no need to notify the terrestrial base station 30 for each radio resource. Furthermore, one null is formed for each ground cell 300A per radio resource (time / frequency resource).
[0104] In FIG. 27B, after the above-described initialization process is performed, the first (r=1) to Nrth (r=r max ), the r-th resource number r in the second set is set as the resource number r to be assigned to a user, and for all terrestrial cell users g included in the first set, the interference power I modelA The normalized values of (r, g) are calculated using the above equation (25), and the interference power I modelA The terrestrial cell user g whose normalized value of (r, g) is smallest is assigned to the resource number r. r The process of assigning the user number g r from the first set.
[0105] Thereafter, the above user scheduling algorithm is repeatedly executed until all remaining users have been assigned resources, thereby completing the assignment of resources to all terrestrial base station users (terrestrial cell users) serving the terrestrial cell 300C.
[0106] [User scheduling method B-2] Fig. 28A is an explanatory diagram showing an example of the relationship between the contour lines of interference power and coordinates in interference estimation method B that combines a reduction in the number of parameters. Fig. 28B is an explanatory diagram showing an example of an algorithm (greedy algorithm) in user scheduling method B-2 that combines interference estimation method B and a reduction in the number of parameters. Note that in Fig. 28B, descriptions of parts common to the above-mentioned Figs. 10 and 26 will be omitted.
[0107] In the user scheduling method B-2 of this example, the magnitude relationship does not change even if the interference power calculated in the interference model shown in FIG. 28A is divided by a constant, and the parameter to be notified can be eliminated if only the magnitude comparison is performed. rThe normalized value of the interference power calculated by the following equation (26) divided by ' is used for determining user selection. In addition, in the calculation formula (26), the terrestrial base station 30 calculates the coordinates of the terrestrial cell user g (UE) as x g ', the rotation angle φ of the coordinates for each wireless resource can be calculated. r The value of is notified to the terrestrial base station 30 as information of the control parameter (parameter for interference estimation).
[0108] In the user scheduling method B-2 of this example, the coordinates (x g , y g ), if the positions of the nulls formed in each radio resource are shared in advance between the HAPS 10 and the terrestrial system (terrestrial base station) 30, there is no need to notify the terrestrial base station 30 for each radio resource. Furthermore, one null is formed for each ground cell 300A per radio resource (time / frequency resource).
[0109] In FIG. 28B, after the above-described initialization process is performed, the first (r=1) to Nrth (r=r max ), the r-th resource number r in the second set is set as the resource number r to be assigned to a user, and for all terrestrial cell users g included in the first set, the interference power I modelB The normalized value of (r, g) is calculated using the above equation (26), and the interference power I modelB The terrestrial cell user g whose normalized value of (r, g) is smallest is assigned to the resource number r. r The process of assigning the user number g r from the first set.
[0110] Thereafter, the above user scheduling algorithm is repeatedly executed until all remaining users have been assigned resources, thereby completing the assignment of resources to all terrestrial base station users (terrestrial cell users) serving the terrestrial cell 300C.
[0111] [User scheduling method C-2] Fig. 29A is an explanatory diagram showing an example of the relationship between the contour lines of interference power and coordinates in interference estimation method C that combines a reduction in the number of parameters. Fig. 29B is an explanatory diagram showing an example of an algorithm (greedy algorithm) in user scheduling method C-2 that combines interference estimation method C and a reduction in the number of parameters. Note that in Fig. 29B, descriptions of parts common to the above-mentioned Figs. 10 and 26 will be omitted.
[0112] In the user scheduling method C-2 of this example, the magnitude relationship does not change even if the interference power calculated in the interference model shown in FIG. 29A is divided by a constant, and the parameter to be notified can be eliminated if only the magnitude comparison is performed. r The normalized value of the interference power calculated by the following equation (27) divided by '' is used for determining user selection. The normalized value of the interference power in equation (27) is also calculated based on the distance (coordinate x g , y g ), so there is no information on the control parameters notified to the terrestrial base station 30.
[0113] In the user scheduling method C-2 of this example, the coordinates (x g , y g ), if the positions of the nulls formed in each radio resource are shared in advance between the HAPS 10 and the terrestrial system (terrestrial base station) 30, there is no need to notify the terrestrial base station 30 for each radio resource. Furthermore, one null is formed for each ground cell 300A per radio resource (time / frequency resource).
[0114] In FIG. 29B, after the above-described initialization process is performed, the first (r=1) to Nrth (r=r max), the r-th resource number r in the second set is set as the resource number r to be assigned to a user, and for all terrestrial cell users g included in the first set, the interference power I modelC The normalized value of (r, g) is calculated using the above equation (27), and the interference power I modelC The terrestrial cell user g whose normalized value of (r, g) is smallest is assigned to the resource number r. r The process of assigning the user number g r from the first set.
[0115] Thereafter, the above user scheduling algorithm is repeatedly executed until all remaining users have been assigned resources, thereby completing the assignment of resources to all terrestrial base station users (terrestrial cell users) serving the terrestrial cell 300C.
[0116] [Overall system combining interference estimation methods based on each interference model and parameter reduction] Figure 30 is an explanatory diagram showing an example of the flow of control parameter information in the entire system when the user scheduling method A-2 according to the embodiment is applied. When the interference estimation method A and parameter reduction are combined, N BS (Number of terrestrial base stations) Coefficient b of the set r (1) / a r (1) , c r (1) / a r (1) , b r (2) / a r (2) , c r (2) / a r (2) , b r (3) / a r (3) , c r (3) / a r (3) is notified to each of the plurality of terrestrial base stations 30(1) to 30(3) located within the wide-area cell 100C via the gateway station 70 and the mobile communication network 80, and the interference power I modelA Here, the coefficients as parameters for interference estimation notified to the terrestrial base stations 30(1) to 30(3) may be information such as the average or median of the coefficients obtained by statistically processing a plurality of the coefficients.
[0117] 31 is an explanatory diagram showing an example of the flow of control parameter information in the entire system when the user scheduling method B-2 according to the embodiment is applied. When the interference estimation method B and parameter reduction are combined, the HAPS (airborne PF) 10 calculates N for each radio resource for each ground base station 30(1) to 30(3). BS (Number of terrestrial base stations) set rotation angle φ r (1) , φ r (2) , φ r (3) is notified to each of the plurality of terrestrial base stations 30(1) to 30(3) located within the wide-area cell 100C via the gateway station 70 and the mobile communication network 80, and the interference power I modelB Here, the rotation angle as an interference estimation parameter notified to the terrestrial base stations 30(1) to 30(3) may be information such as the average or median of the rotation angles obtained by statistically processing a plurality of the rotation numbers.
[0118] 32 is an explanatory diagram showing an example of the flow of control parameter information in the entire system when the user scheduling method C-2 according to the embodiment is applied. When the interference estimation method C is combined with parameter reduction, no control parameter information is notified from the HAPS (airborne PF) 10 to the terrestrial base stations 30(1) to 30(3).
[0119] Table 1 shows the comparison results between the rigorous method and interference estimation methods A, B, and C using an interference model. In Table 1, Nt and Nu are the number of antenna elements of the array antenna 130 in the HAPS (airborne PF) 10 and the number of spatially multiplexed users, respectively. N BS is the number of terrestrial base stations 30 located within the wide-area cell 100C.
[0120]
[0121] Due to the degree of freedom of the array antenna 130, Nu+N BS ≦Nt. Also, NtNu≧Nu(Nu+N BS ) > NuN BS ≧N BS Therefore, NtNu>N BS Therefore, the interference estimation methods A, B, and C using the parameter-reduced interference model generally have fewer parameters than the rigorous method. For example, Nt=196, Nu=12, N BS When = 6, the number of parameters in interference estimation methods A and B that combine parameter reduction is approximately 1 / 400 and 1 / 800 of the number of parameters in the exact method, respectively.
[0122] 33 is an explanatory diagram showing an example of the results of a computer simulation that calculates the improvement in SINR in a terrestrial cell when user scheduling is performed by estimating interference power using interference estimation methods A, B, and C that combine the rigorous method and parameter reduction according to the embodiment. Figure 33 shows the calculation results of the SINR cumulative distribution when the horizontal distance D between the HAPS (aerial PF) 10 and the terrestrial base station 30 is 40 km and there are two candidate null points to sweep per terrestrial cell. As shown in Figure 33 , by applying the greedy algorithms of user scheduling methods A-2, B-2, and C-2, which combine the aforementioned interference estimation methods A, B, and C with a reduced number of parameters, to null sweeping, the amount of control parameter information notified from the HAPS (aerial PF) 10 to the terrestrial base station 30 is reduced, while an improvement in SINR is observed compared to the case without null sweeping.
[0123] 34 is an explanatory diagram showing another example of the results of a computer simulation that calculates the improvement in SINR in a terrestrial cell when user scheduling is performed by estimating interference power using interference estimation methods A, B, and C that combine the rigorous method and parameter reduction according to the embodiment. FIG. 34 shows the calculation results of the SINR cumulative distribution when the horizontal distance D between the HAPS (aerial PF) 10 and the terrestrial base station 30 is 20 km and there are two candidate null points to sweep per terrestrial cell. As shown in FIG. 34 , even when the distance between the HAPS (aerial PF) 10 and the terrestrial base station 30 is short, by applying the greedy algorithms of user scheduling methods A-2, B-2, and C-2, which combine the aforementioned interference estimation methods A, B, and C with a reduced number of parameters, to null sweeping, the amount of control parameter information notified from the HAPS (aerial PF) 10 to the terrestrial base station 30 is reduced, and an improvement in SINR is observed compared to the case without null sweeping.
[0124] [Overall System Configuration and Processing Flow] Figure 35 is an explanatory diagram showing an example of the overall configuration of a system including a terrestrial base station database 82 according to an embodiment. Note that in Figure 35, parts similar to those in Figure 1 described above are denoted by the same reference numerals, and descriptions thereof will be omitted. Also, Figure 35 shows a case where the relay communication station 110 mounted on the HAPS 10 is a base station-type relay communication station including a base station device, but the relay communication station 110 mounted on the HAPS 10 may be a repeater-type relay communication station. In this case, base station devices are provided in the relay communication station 110 mounted on the HAPS 10 and in terrestrial feeder stations (gateway stations) 70, etc., and the wide-area cell base station (HAPS base station) includes the repeater-type relay communication station mounted on the HAPS 10 and the terrestrial base station device.
[0125] 35 , HAPS (airborne PF) 10 can notify terrestrial base station 30 via feeder station (gateway station) 70, mobile communication network 80, and backhaul line 81. HAPS 10 can also access terrestrial base station database 82 via feeder station (gateway station) 70 and mobile communication network 80 to acquire information on terrestrial base station 30. Terrestrial base station 30 can notify HAPS 10 of UL and DL switching information in terrestrial cell 300C via backhaul line 81, mobile communication network 80, and feeder station (gateway station) 70.
[0126] HAPS10 and terrestrial base station 30 share, for example, information I1 (hereinafter referred to as "notification information") that is periodically notified from HAPS10 to terrestrial base station 30, and information I2 (hereinafter referred to as "DB information") that is stored in terrestrial base station database 82.
[0127] The notification information I1 depends on the user scheduling algorithm of the terrestrial base station 30, and may be, for example, the following information (I1-1) to (I1-3): (I1-1) Position information and three-dimensional rotation information of the HAPS 10 body at time t (I1-2) Number for identifying nulls applied to radio resource (time / frequency resource) r (I1-3) Information required for estimating interference power from HAPS 10 in radio resource (time / frequency resource) r
[0128] The information (I1-3) necessary for estimating the interference power from the HAPS 10 is, for example, the following information (I1-3-1) to (I1-3-4): (I1-3-1) A precoding weight matrix (transmission weight matrix) applied to the radio resource (time / frequency resource) r or control parameter information of the above-mentioned interference estimation method; (I1-3-2) A precoding weight matrix (transmission weight matrix) obtained by statistically processing the above-mentioned information (I1-3-1) in order to reduce the amount of information to be notified or control parameter information of the above-mentioned interference estimation method; (I1-3-3) Information sufficient to reconstruct the shape of a null formed in the radio resource (time / frequency resource) r two-dimensionally or three-dimensionally on the terrestrial base station side; (I1-3-4) Information obtained by statistically processing the above-mentioned information (I1-3-3) in order to reduce the amount of information to be notified.
[0129] The information I2 stored in the terrestrial base station database 82 is information referenced by the HAPS 10, and is, for example, the following information (I2-1) to (I2-3): (I2-1) Coordinates of the terrestrial base station 30 (I2-2) Cell radius of the terrestrial base station 30 (I2-1) Geographical distribution of users connected to the terrestrial base station 30 (changes over time)
[0130] Fig. 36 is a block diagram showing an example of the main components of a base station-type relay communication station 110 mounted on the HAPS 10 in the system of Fig. 35. Fig. 36 shows an example of the configuration when operating in a TDD communication system. In Fig. 36, the relay communication station 110 includes a UL / DL switching information receiver 1101, a terrestrial base station information acquirer 1102, a null scheduling unit 1103, and a null scheduling information transmitter 1104. The UL / DL switching information receiver 1101 receives UL / DL switching information from each ground base station 30 via the feeder link FL. The terrestrial base station information acquirer 1102 accesses the terrestrial base station database 82 via the feeder link FL to acquire information about terrestrial base stations located within its own service area 100A (HAPS cell 100C). The null scheduling unit 1103 determines null allocation (scheduling) on the time axis and frequency axis for each terrestrial base station based on UL / DL switching information received from each ground base station 30 and terrestrial base station information acquired from the terrestrial base station database 82. The null scheduling information transmitter 1104 notifies each ground base station 30 of null scheduling information including information on transmission weight matrices via the feeder link FL and the mobile communication network (network) 80. The transmission weight matrix calculator 1105 calculates a transmission weight matrix to be applied to the array antenna 130, which is used for estimating interference power using the above-mentioned rigorous method, etc.
[0131] In FIG. 36, when operating in the FDD communication system, the UL / DL switching information receiving unit 1101 is not required.
[0132] Figure 37 is a block diagram showing another example of the main configuration of a base station type relay communication station 110 mounted on HAPS 10 in the system of Figure 35. Figure 37 shows an example of the configuration when operating in a TDD communication system. In Figure 37, parts that are common to Figure 36 above are given the same reference numerals, and descriptions thereof will be omitted.
[0133] 37 , a transmission weight matrix calculation unit 1105 calculates a transmission weight matrix to be applied to the array antenna 130. A parameter calculation unit 1106 calculates parameters such as coefficients of the above-mentioned calculation formula used to estimate interference power by the interference estimation method A, B, or C according to the above-mentioned interference model. A null scheduling information transmission unit 1104 notifies each ground base station 30 of null scheduling information including information on the parameters used to estimate interference power via the feeder link FL and the mobile communication network (network) 80.
[0134] FIG. 38 is a block diagram showing an example of the main components of the terrestrial base station 30 in the communication system of FIG. 35. FIG. 38 shows an example of the configuration when operating in a TDD communication scheme. In FIG. 38, the terrestrial base station 30 includes a UL / DL switching information transmitter 3001, a null scheduling information receiver 3002, an interference estimation unit 3003, and a terrestrial cell user scheduling unit 3004. The UL / DL switching information transmitter 3001 notifies the HAPS 10 of UL / DL switching information in the terrestrial cell of the terrestrial base station 30 itself. The null scheduling information receiver 3002 receives null scheduling information from the HAPS 10, including information on a transmission weight matrix or parameters used to estimate interference power for the above-mentioned user scheduling, related to the terrestrial base station 30 itself. The interference estimation unit 3003 estimates interference from the HAPS 10 to a user (UE 65) residing in the terrestrial cell of the terrestrial base station 30 itself, based on the null scheduling information. The terrestrial cell user scheduling unit 3004 determines the allocation (scheduling) of users on the time axis and frequency axis.
[0135] In FIG. 38, when operating in the FDD communication system, the UL / DL switching information transmitting unit 3001 is not required.
[0136] 39 is a flowchart showing an example of a processing flow in a HAPS base station and a terrestrial cell base station when performing beamforming control and service link communication involving null formation in the communication system according to the embodiment. FIG. 39 is an example of a processing flow when operating in a TDD communication scheme.
[0137] In FIG. 39, each ground base station 30 notifies the HAPS 10 of UL / DL switching information in its own cell (S101).
[0138] Next, the HAPS 10 receives UL / DL switching information from each ground base station 30 via the feeder link FL (S102).
[0139] Next, the HAPS 10 accesses the terrestrial base station database 82 via the feeder link FL to acquire information about the terrestrial base stations 30 located within its own service area 100A (HAPS cell 100C) (S103). The acquired information includes the coordinates of the terrestrial base stations 30, the cell radius, the user distribution, etc.
[0140] Next, based on the UL / DL switching information received from each terrestrial base station 30 and the information on the terrestrial base station 30 acquired from the terrestrial base station database 82, the HAPS 10 determines, for each terrestrial base station, information on the transmission weight matrix or parameters used for the allocation of nulls (scheduling) on the time axis and the frequency axis and for estimating the interference power for user scheduling at the terrestrial base station 30 (S104).
[0141] Next, the HAPS 10 notifies each of the ground base stations 30 of null scheduling information including information on the transmission weight matrix or parameters used to estimate interference power for user scheduling at the above-mentioned terrestrial base stations 30 via the feeder link FL and the mobile communication network (network) 80 (S105).
[0142] Next, the terrestrial base station 30 receives null scheduling information from the HAPS 10 regarding its own terrestrial base station 30, including information on the transmission weight matrix or parameters used to estimate the interference power for user scheduling at the own station (S106).
[0143] Next, the terrestrial base station 30 estimates the interference from HAPS 10 to a user (UE 65) residing in its own cell based on the null scheduling information including the above-mentioned transmission weight matrix or parameter information, and determines the allocation (scheduling) of users on the time axis and frequency axis (S107).
[0144] Next, the terrestrial base station 30 communicates with a user (UE 65) located in its own cell based on the scheduling information determined in step S107 (S108).
[0145] In FIG. 39, when operating in the FDD communication system, the steps of transmitting and receiving the UL / DL switching information (S101, S102) are not required.
[0146] As described above, according to this embodiment, when a terrestrial cell formed by the antenna of a terrestrial base station using the same frequency band is located within cell 100C formed from HAPS 10 in the sky toward the ground or sea, interference from HAPS 10 to the terrestrial cell (terrestrial base station 30 and UE 65 connected to that terrestrial base station) can be suppressed.
[0147] Furthermore, according to this embodiment, it is possible to reduce residual interference when forming a null of a directional beam from the relay communication station 110 mounted on the HAPS 10 in the sky toward the coverage area of the terrestrial base station 30.
[0148] In particular, according to this embodiment, it is possible to reduce the amount of control parameter information notified from the HAPS (airborne PF) 10 to the terrestrial base station 30, while improving the SINR in the entire terrestrial cell compared to the case without null sweeping.
[0149] The present invention can provide a system that can reduce residual interference when forming a null of a directional beam from a relay communication station 110 mounted on a HAPS 10 in the sky toward the coverage area of a terrestrial base station 30, thereby contributing to the achievement of Goal 9 of the Sustainable Development Goals (SDGs), which is to "build resilient infrastructure, promote inclusive and sustainable industrialization and foster innovation."
[0150] The processing steps described herein and the components of the relay communication station, feeder station, gateway station, management device, monitoring device, remote control device, server, terminal device (UE: user equipment, mobile station, communication terminal), base station, and base station device of a communication relay device such as HAPS 10 can be implemented by various means. For example, these steps and components may be implemented by hardware, firmware, software, or a combination thereof.
[0151] For hardware implementation, means such as processing units used to realize the steps and components in an entity (e.g., a relay communication station, a feeder station, a gateway station, a base station, a base station device, a relay communication station device, a terminal device (UE: user equipment, mobile station, communication terminal), a management device, a monitoring device, a remote control device, a server, a hard disk drive device, or an optical disk drive device) may be implemented in one or more application specific integrated circuits (ASICs), digital signal processors (DSPs), digital signal processing devices (DSPDs), programmable logic devices (PLDs), field programmable gate arrays (FPGAs), processors, controllers, microcontrollers, microprocessors, electronic devices, other electronic units designed to perform the functions described herein, computers, or combinations thereof.
[0152] Furthermore, with regard to firmware and / or software implementations, the means, such as a processing unit, used to realize the components may be implemented with a program (e.g., code, such as procedures, functions, modules, instructions, etc.) that performs the functions described herein. In general, any computer / processor-readable medium tangibly embodying firmware and / or software code may be used to implement the means, such as a processing unit, used to realize the steps and components described herein. For example, the firmware and / or software code may be stored in a memory and executed by a computer or processor, such as in a controller. The memory may be implemented within the computer or processor, or external to the processor. The firmware and / or software code may also be stored on a computer or processor readable medium such as, for example, random access memory (RAM), read-only memory (ROM), non-volatile random access memory (NVRAM), programmable read-only memory (PROM), electrically erasable programmable read-only memory (EEPROM), flash memory, floppy disk, compact disk (CD), digital versatile disk (DVD), magnetic or optical data storage device, etc. The code may be executed by one or more computers or processors and may cause the computers or processors to perform certain aspects of the functionality described herein.
[0153] The medium may be a non-transitory recording medium. The program code may be in any format as long as it can be read and executed by a computer, processor, or other device or machine. For example, the program code may be in any of source code, object code, and binary code, or may be a mixture of two or more of these codes.
[0154] Moreover, the description of the embodiments disclosed herein is provided to enable any person skilled in the art to make or use the present disclosure. Various modifications to the present disclosure will be readily apparent to those skilled in the art, and the general principles defined herein may be applied to other variations without departing from the spirit or scope of the present disclosure. Thus, the present disclosure is not intended to be limited to the examples and designs described herein, but is to be accorded the widest scope consistent with the principles and novel features disclosed herein.
[0155] 10: HAPS 30: Terrestrial base station (terrestrial cell base station) 40: Radio resources 50A to 50C: Interference model 61: UE (terminal device) connecting to wide-area cell 65: UE (terminal device) connecting to terrestrial cell 70: Feeder station (GW station) 71: Antenna 80: Mobile communication network (network) 81: Backhaul line 82: Terrestrial base station database 100A: Wide-area cell service area 100AN: Null area 100B: Beam 100C: HAPS cell (three-dimensional cell) 100F: Footprint 100N: Null 110: Relay communication station 130: Array antenna (service link antenna) 130a: Antenna element 300C: Terrestrial cell 300A: Terrestrial cell service area
Claims
1. A system comprising a wide-area cell base station which forms a wide-area cell toward the ground or sea from a service link antenna of a relay communication station installed on an aircraft or floating body located in the sky, and one or more terrestrial cell base stations which form terrestrial cells from antennas located on the ground or sea, wherein the wide-area cell base station and the one or more terrestrial cell base stations communicate using the same frequency band service links in radio frames which are time-synchronized with each other, the wide-area cell base station obtains information about terrestrial cell base stations located within the wide-area cell, and determines null scheduling regarding the allocation of nulls on the time axis and the frequency axis based on the information about the terrestrial cell base station, and transmits the null scheduling information to the terrestrial cell base station, the terrestrial cell base station receives the null scheduling information from the wide-area cell base station, and determines user scheduling regarding the allocation of user terminal devices on the time axis and the frequency axis based on the null scheduling information, and communicates with terminal devices of users present in its own cell based on the user scheduling information.
2. A system according to claim 1, characterized in that the null scheduling information includes information on a transmission weight matrix Wr to be applied to the antenna of the wide-area cell base station when forming the null, and the terrestrial cell base station estimates a propagation path response hg between the antenna of the wide-area cell base station and a terminal device of a user g located in its own cell, and estimates interference power I(r, g) from the wide-area cell to the terminal device of user g located in its own cell for radio resource r based on the transmission weight matrix Wr and the estimated result of the propagation path response hg, using the following equation (1):
3. A system according to claim 2, wherein the information on the transmission weight matrix Wr included in the null scheduling information is information obtained by statistically processing elements of a plurality of transmission weight matrices Wr.
4. A system according to claim 1, characterized in that the null scheduling information includes information on interference estimation parameters determined based on an interference model which models a spatial distribution of interference power from the wide area cell to a terminal device of a user residing in the terrestrial cell, with a position corresponding to a null point formed by the wide area cell base station as the origin, and the terrestrial cell base station estimates interference power I(r, g) from the wide area cell to the terminal device of a user g residing in its own cell for radio resource r, based on the information on the interference estimation parameters.
5. A system according to claim 4, characterized in that the information on the interference estimation parameters included in the null scheduling information is information obtained by statistically processing values of a plurality of interference estimation parameters.
6. A system according to claim 4, wherein the interference model is an interference model in which the power of the interference is in the z direction in an orthogonal coordinate system (x, y, z) with the position corresponding to the null point as the origin, and the distribution of the power of the interference at positions on the x-y plane is approximated by an elliptical paraboloid, and the information on the interference estimation parameters is a coefficient a r , b r and c r The terrestrial cell base station calculates the coefficient a r , b r and c r Based on the value of g , y g ) to the terminal device of user g located modelA and estimating (r, g).
7. In the system according to claim 6, the information on the interference estimation parameters is r , b r and c r and the terrestrial cell base station calculates the coordinate position (x g , y g and estimating interference power to a terminal device of a user g located in the base station.
8. A system according to claim 4, wherein the interference model is a Cartesian coordinate system (x, y, z) with the position corresponding to the null point as the origin, the power of the interference is in the z direction, the distribution of the power of the interference at positions on the x-y plane is approximated by an elliptical paraboloid, and the Cartesian coordinates are rotated by an angle φ so that the x axis coincides with the minor axis of an ellipse having equal power when the elliptical paraboloid is projected onto the x-y plane. r The information on the interference estimation parameters is the coefficient a of the following equation (3) defined in the rotated orthogonal coordinate system (x', y', z): r ', and the terrestrial cell base station calculates the coefficient a r Based on the value of , the coordinate position (x g ',y g The interference power I modelB and estimating (r, g).
9. In the system according to claim 8, the terrestrial cell base station calculates the formula (3) by a coefficient a r Based on the following equation (4) divided by ', the coordinate position (x g ',y g The interference power I modelB calculating a normalized value of (r, g).
10. A system according to claim 4, wherein the interference model is an interference model in which the power of the interference is in the z direction in an orthogonal coordinate system (x, y, z) with the position corresponding to the null point as the origin, and the distribution of the power of the interference at positions on the x-y plane is approximated by a paraboloid of revolution, and the information on the interference estimation parameters is the coefficient a r '', and the terrestrial cell base station calculates the coefficient a r Based on the values of and for each radio resource r, the coordinate position (x g , y g ) to the terminal device of user g located modelC and estimating (r, g).
11. In the system according to claim 10, the terrestrial cell base station calculates the formula (5) by a coefficient a r Based on the following equation (6) divided by '', the coordinate position (x g , y g ) is used as an estimate of the interference power to the terminal device of user g located at modelC calculating a normalized value of (r, g).
12. In any one of the systems according to claims 2 to 11, the terrestrial cell base station, in the user scheduling, sets a first set of user numbers g of terminal devices of a plurality (Nu) of unallocated users, and processes a plurality (Nr = r max An initialization process including setting a second set of wireless resources in the order of resource number r for the first (r=1) to the Nrth (r=r max ), the r-th resource number r of the second set is set as the resource number r to be assigned to the user, the interference power when the radio resource of the resource number r is assigned is calculated, and the user number g of the terminal device of the user for which the calculated value of the interference power or the judgment index value corresponding to the calculated value of the interference power is the smallest is determined as the user number g to be assigned to the resource number r. r The user number g whose allocation has been confirmed is r from the first set.
