Offshore infrastructure management system and method for reducing damage to ocean farm

The marine infrastructure management system addresses the challenge of unstable power supply to marine fish farms by integrating real-time data from sensors and weather forecasts to dynamically manage power, ensuring stable operations and reducing damage from changing conditions.

WO2024219928A1PCT designated stage expired Publication Date: 2024-10-24I ON COMM CO LTD
View PDF 6 Cites 0 Cited by

Patent Information

Application Number
PCT/KR2024/095648
Authority / Receiving Office
WO · WO
Patent Type
Applications
Current Assignee / Owner
Priority Date
2023-04-18
Filing Date
2024-04-01
Publication Date
2024-10-24

AI Technical Summary

Technical Problem

Marine fish farms face challenges in maintaining stable operations due to unpredictable water quality and weather conditions, leading to potential damage and loss of marine products, as existing power management systems fail to adaptively supply power in response to these conditions.

Method used

A marine infrastructure management system that connects fish farm facilities, power generation devices, and energy storage devices through a network, utilizing a fish farm information unit, power generation information unit, power consumption management unit, power consumption prediction unit, and power supply management unit to dynamically manage and supply power based on real-time data from sensors and weather forecasts.

Benefits of technology

This system enables stable operation of marine fish farms by adaptively managing power supply, reducing damage and ensuring stable cultivation of marine products by responding to changing conditions, such as water quality and weather forecasts.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure KR2024095648_24102024_PF_FP_ABST
    Figure KR2024095648_24102024_PF_FP_ABST
Patent Text Reader

Abstract

An offshore infrastructure management system according to an embodiment of the present invention may comprise: a farm information unit that stores farm information about farm facilities; a power generation information unit that generates and stores power generation information about a power generation device and generates and stores power storage information, corresponding to the power generation information, about an energy storage device; a power consumption management unit that generates and stores operation information about each of the farm facilities and generates and stores current storage state information based on the operation information and power storage information; a power consumption prediction unit that generates operation pattern information on the basis of sensing information and the farm information; and a power supply management unit that generates management pattern information based on the operation pattern information about each of the farm facilities and the farm information, generates power supply information based on the operation pattern information about each of the farm facilities and the current storage state information corresponding to the energy storage device, and controls the energy storage device to supply power from the energy storage device to the farm facilities according to the power supply information.
Need to check novelty before this filing date? Find Prior Art

Description

Marine infrastructure management system and method for reducing damage to marine aquaculture farms

[0001] The present invention relates to an infrastructure management system and method, and more particularly, to a marine infrastructure management system and method capable of appropriately operating the equipment of a marine aquaculture farm in response to the state of the marine aquaculture farm (e.g., water quality, weather conditions, etc.) and supplying power to the equipment of the marine aquaculture farm in an appropriate and stable manner, thereby reducing damage to the marine aquaculture farm.

[0002] Interest in renewable energy has been growing recently. One of the most successful renewable energy sources is wind power. Wind power is a method of generating electricity by converting the kinetic energy of the wind (i.e., wind energy) into mechanical energy through windmills, which then operate generators to generate electricity. This type of wind power is installed in areas with strong winds, with onshore wind farms built on high mountains and offshore wind farms located offshore or in the sea.

[0003] In particular, offshore wind farms are built by densely installing multiple wind turbines on shore or in the sea. Unlike power generation methods that utilize fuels like crude oil, natural gas, coal, and uranium, they do not emit environmental pollutants such as carbon dioxide or radioactive waste. Investments in these offshore wind farms are occurring around the world. In South Korea, due to its relatively small land area, there is considerable interest in offshore wind farms, which can generate electricity by installing wind turbines on shore or in the sea.

[0004] Furthermore, offshore wind farms are not limited to power generation. For example, offshore aquaculture farms are installed in the sea space between the wind turbines of offshore wind farms. These aquaculture farms cultivate a variety of aquatic products, such as seaweed, shellfish, and fish, and take different forms depending on the type of aquatic product being farmed.

[0005] Meanwhile, offshore aquaculture farms can experience varying conditions, influenced by factors such as the terrain, water temperature, and weather conditions of the area where they are located, and can even be at risk of fish mortality. Therefore, appropriate measures must be taken to prevent fish mortality based on the conditions of the offshore aquaculture farm. To operate an offshore aquaculture farm, electricity must be supplied to the facility. In this case, electricity generated by offshore wind farms can be used to supply the facility.

[0006] However, there is no management of the power generated by offshore wind farms and the power supplied to offshore aquaculture farms, and the power is not supplied to the offshore aquaculture farm facilities in accordance with the conditions of the offshore aquaculture farms.

[0007] The technical problem to be solved by the marine infrastructure management system and method according to the technical idea of ​​the present invention is to provide a marine infrastructure management system and method that can appropriately operate the facilities of a marine aquaculture farm in response to the state of the marine aquaculture farm.

[0008] In addition, the technical task to be achieved by the marine infrastructure management system and method according to the technical idea of ​​the present invention is to provide a marine infrastructure management system and method that stores and manages power produced from a power generation device in an energy storage device, thereby stably supplying power to the facilities of a marine aquaculture farm.

[0009] In addition, the technical task to be achieved by the marine infrastructure management system and method according to the technical idea of ​​the present invention is to provide a marine infrastructure management system and method that enable stable cultivation of marine products in marine aquaculture farms using the power of a power generation device.

[0010] The technical tasks to be achieved by the maritime infrastructure management system and method according to the technical idea of ​​the present invention are not limited to the tasks mentioned above, and other tasks not mentioned will be clearly understood by those skilled in the art from the description below.

[0011] According to one embodiment of the technical idea of ​​the present invention, a marine infrastructure management system is provided that is connected to a plurality of aquaculture facilities, a plurality of power generation devices, and an energy storage device through a network, and is characterized by including: an aquaculture information unit that stores aquaculture information for each of the aquaculture facilities; a power generation information unit that generates and stores power generation information according to the operation of each of the power generation devices, and generates and stores power storage information for the energy storage device corresponding to the stored power generation information; a power consumption management unit that generates and stores operation information according to the operation of each of the aquaculture facilities, and generates and stores storage status information based on the stored operation information and the power storage information of the power generation information unit; a power consumption prediction unit that generates operation pattern information based on the aquaculture information of the aquaculture information unit and detection information corresponding to the aquaculture information; and a power supply management unit that generates management pattern information based on the operation pattern information and the aquaculture information corresponding to each of the aquaculture facilities, generates power supply information based on the management pattern information corresponding to each of the aquaculture facilities and the storage status information corresponding to the energy storage device, and controls the energy storage device to supply power from the energy storage device to the aquaculture facility according to the power supply information.

[0012] In addition, each aquaculture facility includes a aquaculture body, at least one aquaculture sensor, at least one aquaculture air curtain, and at least one aquaculture oxygen supply, and the aquaculture information includes the location of the aquaculture body, the size of the aquaculture body, the type of the aquaculture body, the number of aquaculture sensors, the number of aquaculture air curtains, the power consumption of the aquaculture air curtain per unit time, the number of aquaculture oxygen supplies, the power consumption of the aquaculture oxygen supplies per unit time, target water quality information, operating water quality information, and standard operating time, and the type of the aquaculture body varies depending on the type of aquatic product to be cultured, and the number of aquaculture sensors, the number of aquaculture air curtains, and the number of aquaculture oxygen supplies are calculated depending on the size of the aquaculture body and the type of the aquaculture body, and the power generation information includes the location of the power generation device, the power generation time zone, the power generation amount per power generation time zone, and the weather information per power generation time zone, and the power storage information may include the location of the energy storage device, the storage time zone that is the same as the power generation time zone of the power generation information, the total storage amount per storage time zone, the weather information per storage time zone, and the total power storage amount.

[0013] In addition, the operating information includes the location of the aquaculture facility, the operating time of the aquaculture facility, and the operating power consumption of the aquaculture facility, and the operating time of the aquaculture facility is calculated through the operation start time of the aquaculture air curtain and the aquaculture oxygen supply when the aquaculture air curtain and the aquaculture oxygen supply are in operation and the operation stop time of the aquaculture air curtain and the aquaculture oxygen supply, and the operating power consumption of the aquaculture facility is calculated by adding the values ​​obtained by multiplying the operating time calculated by the power consumption management unit by the power consumption of the aquaculture air curtain per unit time and the power consumption of the aquaculture oxygen supply per unit time, respectively, and the storage status information includes the location and power remaining amount of the energy storage device, and the power remaining amount can be calculated by subtracting the operating power consumption in real time from the total power storage amount of the power storage information.

[0014] In addition, the detection information includes detected water quality information and sea forecast information, and the detected water quality information is generated by detecting the water quality of the main body of the aquaculture farm by the aquaculture farm sensor and transmitted to the power consumption prediction unit, and the sea forecast information includes a red tide advisory, a red tide warning, a jellyfish advisory, and a jellyfish alert, and when a sea forecast is issued, the administrator terminal receives the sea forecast information according to the sea forecast from the weather management server and transmits it to the power consumption prediction unit, and the operation pattern information includes the location of the main body of the aquaculture farm, detected water quality information, predicted operation time, and predicted power consumption, and when the detection information includes detected water quality information corresponding to the operation water quality information, or when the sea forecast information is included, the power consumption prediction unit calculates the predicted operation time based on the detected water quality information and target water quality information generated and transmitted by the aquaculture farm sensor, and calculates the predicted power consumption corresponding to the detected water quality information by adding up the values ​​obtained by multiplying the calculated predicted operation time by the power consumption of the aquaculture air curtain per unit time and the power consumption of the aquaculture oxygen supply per unit time, respectively.

[0015] In addition, the management pattern information includes the type of the aquaculture farm body, predicted power consumption, and predicted power total, and when the power consumption prediction unit generates the operation pattern information, the power supply management unit extracts the predicted power consumption of the generated operation pattern information, extracts the type of the aquaculture farm body of the aquaculture farm information corresponding to the extracted predicted power consumption, and adds up the predicted power consumption corresponding to each of the aquaculture farm facilities to calculate the predicted power total.

[0016] In addition, the power supply information includes a power supply method and an equipment operation order, and the power supply method is generated by comparing the power remaining amount of the storage status information with the predicted power sum amount of the operation pattern information, and when the power remaining amount is greater than the predicted power sum amount, the power supply method is generated as a simultaneous supply method, and the power supply management unit controls the energy storage device to simultaneously supply power to the aquaculture equipment, and when the power remaining amount is less than the predicted power sum amount, the power supply method is generated as a sequential supply method, and the power supply management unit can control the energy supply device to sequentially supply power to the aquaculture equipment according to the equipment operation order.

[0017] In addition, the equipment operation order is set according to the type of the farm body and the predicted power consumption of the farm information corresponding to the operation pattern information, and the power supply management unit sets the equipment operation order in the order of fish, shellfish, and seaweed based on the target aquatic products for aquaculture according to the type of the farm body, and for the same type of farm body, the lower the predicted power consumption, the higher the priority in the equipment operation order.

[0018] In addition, when the power supply management unit generates the management pattern information, the power supply management unit receives weather information and maritime forecast information corresponding to the generation time of the management pattern information from the manager terminal, extracts weather information and power generation amount of the power generation time zone of the power generation information corresponding to the received weather information and maritime forecast information, calculates the power generation amount per unit time using the extracted power generation time zone and power generation amount of the power generation time zone, and calculates the predicted power generation amount by multiplying the calculated power generation amount per unit time and the predicted operation time of the operation pattern information, and the power supply management unit generates a corrected power residual amount by adding the calculated predicted power generation amount to the power residual amount, and generates a power supply method by comparing the corrected power residual amount and the predicted power sum of the operation pattern information.

[0019] In addition, a method for managing marine infrastructure according to an embodiment of the technical idea of ​​the present invention comprises: (a) a step in which an aquaculture information unit stores aquaculture information for each aquaculture facility; (b) a step in which a power generation storage unit generates and stores power generation information according to the operation of each power generation device; (c) a step in which the power generation storage unit generates and stores power storage information for an energy storage device corresponding to the stored power generation information; (d) a step in which a power consumption management unit generates and stores operation information according to the operation of each aquaculture facility; (e) a step in which the power consumption management unit generates and stores storage status information based on the stored operation information and the power storage information of the power generation information unit; (f) a step in which a power consumption prediction unit generates operation pattern information based on the aquaculture information of the aquaculture information unit and detection information corresponding to the aquaculture information; (g) a step in which a power supply management unit generates management pattern information based on the operation pattern information and the aquaculture information corresponding to each aquaculture facility; And (h) the power supply management unit may be characterized by including a step of generating power supply information based on management pattern information corresponding to each of the aquaculture farm facilities and storage status information corresponding to the energy storage device, and controlling the energy storage device to supply power from the energy storage device to the aquaculture farm facilities according to the power supply information.

[0020] In addition, the operating information includes the location of the aquaculture facility, the operating time of the aquaculture facility, and the operating power consumption of the aquaculture facility, and in step (d), the operating time of the aquaculture facility is calculated through the operation start time of the aquaculture air curtain and the aquaculture oxygen supply when the aquaculture air curtain and the aquaculture oxygen supply are in operation and the operation stop time of the aquaculture air curtain and the aquaculture oxygen supply, and the operating power consumption of the aquaculture facility is calculated by adding the values ​​obtained by multiplying the operating time calculated by the power consumption management unit by the power consumption of the aquaculture air curtain per unit time and the power consumption of the aquaculture oxygen supply per unit time, respectively, and the storage status information includes the location and power remaining amount of the energy storage device, and in step (e), the power remaining amount can be calculated by subtracting the operating power consumption in real time from the total power storage amount of the power storage information.

[0021] In addition, the detection information includes detected water quality information and sea forecast information, and in step (f), the detected water quality information is generated by detecting the water quality of the main body of the aquaculture farm by the aquaculture farm sensor and transmitted to the power consumption prediction unit, and the sea forecast information includes a red tide advisory, a red tide warning, a jellyfish advisory, and a jellyfish alert, and when a sea forecast is issued, the manager terminal receives the sea forecast information according to the sea forecast from the weather management server and transmits it to the power consumption prediction unit, and the operation pattern information includes the location of the main body of the aquaculture farm, detected water quality information, predicted operation time, and predicted power consumption, and when the detection information includes detected water quality information corresponding to the operation water quality information, or when the sea forecast information is included, the power consumption prediction unit calculates the predicted operation time based on the detected water quality information and target water quality information generated and transmitted by the aquaculture farm sensor, and calculates the predicted power consumption corresponding to the detected water quality information by adding up the values ​​obtained by multiplying the calculated predicted operation time by the power consumption of the aquaculture air curtain per unit time and the power consumption of the aquaculture oxygen supply per unit time, respectively.

[0022] In addition, the management pattern information includes the type of the aquaculture farm body, predicted power consumption, and predicted power total, and when the power consumption prediction unit generates the operation pattern information, in step (g), the power supply management unit extracts the predicted power consumption of the generated operation pattern information, extracts the type of the aquaculture farm body of the aquaculture farm information corresponding to the extracted predicted power consumption, and adds up the predicted power consumption corresponding to each of the aquaculture farm facilities to calculate the predicted power total.

[0023] In addition, the power supply information includes a power supply method and an equipment operation order, and in step (h), the power supply method is generated by comparing the power remaining amount of the storage status information with the predicted power sum of the operation pattern information, and when the power remaining amount is greater than the predicted power sum, the power supply method is generated as a simultaneous supply method, and the power supply management unit controls the energy storage device to simultaneously supply power to the aquaculture equipment, and when the power remaining amount is less than the predicted power sum, the power supply method is generated as a sequential supply method, and the power supply management unit can control the energy supply device to sequentially supply power to the aquaculture equipment according to the equipment operation order.

[0024] In addition, in step (h), the equipment operation order is set according to the type of the aquaculture farm body and the predicted power consumption of the aquaculture farm information corresponding to the operation pattern information, and the power supply management unit sets the equipment operation order in the order of fish, shellfish, and seaweed based on the aquaculture target marine products according to the type of the aquaculture farm body, and for the same type of aquaculture farm body, the lower the predicted power consumption, the higher the priority in the equipment operation order.

[0025] In addition, in step (h), when the power supply management unit generates the management pattern information, the power supply management unit receives weather information and maritime forecast information corresponding to the generation time of the management pattern information from the manager terminal, extracts weather information and power generation amount of the power generation time zone of the power generation information corresponding to the received weather information and maritime forecast information, calculates the power generation amount per unit time using the extracted power generation time zone and power generation amount of the power generation time zone, and calculates the predicted power generation amount by multiplying the calculated power generation amount per unit time and the predicted operation time of the operation pattern information, and the power supply management unit generates a corrected power residual amount by adding the calculated predicted power generation amount to the power residual amount, and generates a power supply method by comparing the corrected power residual amount and the predicted power sum of the operation pattern information.

[0026] The maritime infrastructure management system and method according to embodiments of the technical idea of ​​the present invention have the following effects.

[0027] (1) The facilities of the offshore aquaculture farm can be operated appropriately to respond to the conditions of the offshore aquaculture farm.

[0028] (2) Electricity can be stably supplied to the facilities of offshore aquaculture farms by being produced from a power generation device, stored in an energy storage device, and managed.

[0029] (3) It is possible to ensure that marine products from offshore farms are farmed stably using the power of power generation equipment.

[0030] However, the effects that can be achieved by the maritime infrastructure management system and method according to one embodiment of the present invention are not limited to those mentioned above, and other effects not mentioned will be clearly understood by those skilled in the art from the description below.

[0031] To facilitate a more thorough understanding of the drawings cited herein, a brief description of each drawing is provided.

[0032] FIG. 1 is a diagram illustrating a maritime infrastructure management system according to one embodiment of the present invention.

[0033] FIG. 2 is a flowchart illustrating a method for managing maritime infrastructure according to one embodiment of the present invention.

[0034] The present invention is susceptible to various modifications and embodiments. Specific embodiments are illustrated in the drawings and described in detail. However, this is not intended to limit the invention to specific implementations, and it should be understood that the invention encompasses all modifications, equivalents, and alternatives falling within the spirit and technical scope of the invention.

[0035] In describing the present invention, detailed descriptions of related known technologies will be omitted if they are deemed to unnecessarily obscure the gist of the present invention. Furthermore, numbers (e.g., "first," "second," etc.) used throughout the description of this specification are merely identifiers used to distinguish one component from another.

[0036] Additionally, in this specification, when a component is referred to as being “connected” or “connected” to another component, it should be understood that the component may be directly connected or connected to the other component, but may also be connected or connected via another component in between, unless there is a specific description to the contrary.

[0037] In addition, the components expressed as "~part" in this specification may be two or more components combined into one component, or one component may be divided into two or more components with more detailed functions. In addition, each component described below may additionally perform some or all of the functions performed by other components in addition to its own main function, and of course, some of the main functions performed by each component may be exclusively performed by other components.

[0038] Hereinafter, embodiments according to the technical idea of ​​the present invention will be described in detail one by one.

[0039] FIG. 1 is a diagram illustrating a maritime infrastructure management system (100) according to one embodiment of the present invention.

[0040] As illustrated in FIG. 1, a marine infrastructure management system (100) according to one embodiment of the present invention may be connected to a fish farm facility (10), a power generation device (20), an energy storage device (30), and an administrator terminal (40) via a network (1), and may include an aquaculture information unit (101), a power generation information unit (102), a power consumption management unit (103), a power consumption prediction unit (104), and a power supply management unit (105). Here, an administrator may mean a person who manages marine infrastructure including a fish farm facility (10), a power generation device (20), and an energy storage device (30) by accessing the marine infrastructure management system (100) of the present embodiment via an administrator terminal (40).

[0041] In addition, the aquaculture facility (10) of the present embodiment is composed of a plurality of units, each of which is installed at sea and used to cultivate aquatic products such as seaweed, shellfish, and fish, and may include a fish farm main body (11), a fish farm sensor (12), a fish farm air curtain (13), and a fish farm oxygen supply device (14). Here, the aquaculture farm main body (11) forms a space for cultivating aquatic products, and can be designed and manufactured differently depending on the type of aquatic products to be cultivated, and the aquaculture farm sensor (12) can be installed in the aquaculture farm main body (11) to detect the conditions of the aquaculture farm main body (11) and the surroundings of the aquaculture farm main body (11), particularly the water quality, and the aquaculture farm air curtain (13) can be installed around the aquaculture farm main body (11) to generate air bubbles, thereby preventing aquatic products other than the aquaculture target products from approaching or flowing into the aquaculture farm main body (11), and the aquaculture farm oxygen supply device (14) can be installed in the water of the aquaculture farm main body (11) to supply oxygen and increase dissolved oxygen in the water of the aquaculture farm main body (11), and can be formed in the form of an oxygen generator, an oxygen dissolver, a combination of an oxygen generator and an oxygen dissolver, etc.

[0042] In addition, the power generation device (20) may be composed of multiple units, each of which may be a wind power generator installed at sea or on the coast to generate electricity. Here, the power generation device (20) may be positioned to be connected to the aquaculture facility (10), particularly, the aquaculture farm main body (11), may be positioned inside the aquaculture farm main body (11), or may be positioned between aquaculture farm main bodies (11).

[0043] In addition, the energy storage device (30) can be installed at sea or on the coast and connected to a plurality of aquaculture facilities (10) and a plurality of power generation devices (20). Here, the energy storage device (30) can receive and store power produced from the power generation devices (20) and supply power to the aquaculture facilities (10). That is, the energy storage device (30) can be used to supply power produced from the power generation devices (20) to the aquaculture facilities (10) as needed, and can be controlled by the marine infrastructure management system (100).

[0044] Meanwhile, the plurality of aquaculture farm facilities (10) and the plurality of power generation devices (20) of the present embodiment are positioned to correspond to a predetermined area along the sea or coast, and one energy storage device (30) can be positioned for a predetermined area.

[0045] In addition, the farm information unit (101), power generation information unit (102), power consumption management unit (103), power consumption prediction unit (104), and power supply management unit (105) may include at least one of a processor, a memory, and a data transceiver.

[0046] An administrator can use an administrator terminal (40) to access the marine infrastructure management system (100) and exchange signals with the marine infrastructure management system (100). The marine infrastructure management system (100) can display a web page through a web browser run on the administrator terminal (40) and allow the administrator to log in on the web page and then access the marine infrastructure management system (100), or an application capable of accessing the marine infrastructure management system (100) can be installed and run on the administrator terminal (40). In addition, the administrator terminal (40) can be connected to a weather management server (not shown) to receive weather information (i.e., current weather, temperature, wind speed, etc.), marine forecast information (e.g., red tide advisory, red tide warning, jellyfish advisory, jellyfish warning, etc.), etc.) in real time, and can transmit weather information to the marine infrastructure management system (100) in real time.

[0047] The administrator terminal (40) may be implemented as a computer capable of connecting to a remote server or terminal via a network (1). Here, the computer may include, for example, a notebook, desktop, or laptop equipped with a web browser. In addition, the administrator terminal (40) may be implemented as a terminal device capable of connecting to a remote server or terminal via the network (1). The terminal device may include all types of handheld-based wireless communication devices such as, for example, a wireless communication device that guarantees portability and mobility, such as a PCS (Personal Communication System), GSM (Global System for Mobile communications), PDC (Personal Digital Cellular), PHS (Personal Handyphone System), PDA (Personal Digital Assistant), IMT (International Mobile Telecommunication)-2000, CDMA (Code Division Multiple Access)-2000, W-CDMA (W-Code Division Multiple Access), Wibro (Wireless Broadband Internet) terminal, smartphone, smartpad, tablet PC, etc.

[0048] Here, the network (1) refers to a connection structure that enables information exchange between each node, such as multiple terminals and servers, and examples of such networks include, but are not limited to, a 3GPP (3rd Generation Partnership Project) network, an LTE (Long Term Evolution) network, a 5G network, a WIMAX (World Interoperability for Microwave Access) network, the Internet, a LAN (Local Area Network), a Wireless LAN (Wireless Local Area Network), a WAN (Wide Area Network), a PAN (Personal Area Network), a Bluetooth network, a satellite broadcasting network, an analog broadcasting network, and a DMB (Digital Multimedia Broadcasting) network.

[0049] The aquaculture information unit (101) can store aquaculture information for each of a plurality of aquaculture facilities (10). Here, the aquaculture information can include the location of the aquaculture main body (11), the size of the aquaculture main body (11), the type of the aquaculture main body (11) according to the type of aquaculture target aquatic product (e.g., fish, shellfish, seaweed, etc.), the number of aquaculture sensors (12), the number of aquaculture air curtains (13), the power consumption of the aquaculture air curtains (13) per unit time, the number of aquaculture oxygen suppliers (14), the power consumption of the aquaculture oxygen suppliers (14) per unit time, target water quality information, operating water quality information, standard operating time, etc. In addition, the number of aquaculture sensors (12), the number of aquaculture air curtains (13), and the number of aquaculture oxygen suppliers (14) can be set according to the type and size of the aquaculture main body (11), and the number of aquaculture air curtains (13) can determine the amount of air bubbles generated, and the number of aquaculture oxygen suppliers (14) can determine the amount of oxygen generated.

[0050] In the above-described aquaculture farm information, the location of the aquaculture farm main body (11) may be a GPS coordinate value for the center of the aquaculture farm main body (11) in the aquaculture farm equipment (10), and may be used as an identifier for the aquaculture farm information, and the target water quality information is information corresponding to the best water quality state in which the aquaculture target aquaculture product can be stably cultivated in the aquaculture farm main body (11), and may include water temperature, salinity concentration, dissolved oxygen, hydrogen sulfide, chemical oxygen demand, etc. of the best water quality state, and the operating water quality information is information corresponding to a polluted water quality state such as a eutrophication state, a state in which the aquaculture target aquaculture product may die, and may include water temperature, salinity concentration, dissolved oxygen, hydrogen sulfide, chemical oxygen demand, etc. of the polluted water quality state, and the standard operating time may mean the operating time of the aquaculture farm air curtain (13) and the aquaculture farm oxygen supply (14) until the water quality of the aquaculture farm main body (11) reaches the target water quality information in the operating water quality information.

[0051] The above-mentioned form information can be entered into the administrator terminal (40) and transmitted to the form information section (101) and stored.

[0052] The power generation information unit (102) can generate and store power generation information according to the operation of each power generation device (20). Here, the power generation information can include the location of the power generation device (20), power generation time zone, power generation amount by power generation time zone, weather information by power generation time zone, etc.

[0053] In the above-described power generation information, the location of the power generation device (20) may be a GPS coordinate value for the power generation device (20) and may be used as an identifier for the power generation information, and the power generation time zone is set in units of time for which power is generated in the power generation device (20), for example, from 8:00 to 9:00 on January 3, 2022, from 14:00 to 15:00 on January 3, 2022, etc. in 1-hour units, from 8:30 to 9:00 on January 3, 2022, from 15:30 to 16:00 on January 3, 2022, etc. in 30-hour units, from 16:40 to 17:00 on January 3, 2022, from 20:40 to 21:00 on January 3, 2022, etc. in 20-minute units, from 17:00 on January 3, 2022 It can be set in 10-minute units, such as from 50 minutes to 18:00, and the power generation amount by power generation time zone can mean the sum of the power generation amount according to the production of electricity from the power generation device (20) during each power generation time zone, and the weather information by power generation time zone can include the weather, temperature, wind speed, etc. for each power generation time zone.

[0054] Meanwhile, when each power generation device (20) produces electricity, the electricity can be transmitted and stored in the energy storage device (30) from each of the power generation devices (20). Here, the power generation information unit (102) generates the amount of electricity generated during the power generation period between the power generation start time and the power production end time according to the power generation of the power generation device (20), generates a power generation time zone based on the generated power production start time and the power production end time, and divides the amount of electricity generated during the power generation period into each power generation time zone to calculate the amount of electricity generated for each power generation time zone.

[0055] In addition, the power generation information unit (102) can generate and store power storage information for the energy storage device (30) corresponding to the stored power generation information. Here, the power storage information can include the location of the energy storage device (30), storage time zone, total storage amount by storage time zone, weather information by storage time zone, total power storage amount, etc.

[0056] In the power storage information as described above, the location of the energy storage device (30) may be a GPS coordinate value for the energy storage device (30), the storage time zone may be the same as the generation time zone of the power generation information, and the total storage amount by storage time zone may mean the amount of power produced by the power generation device (20) and stored in the energy storage device (30) during each storage time zone, that is, the total value of the generation amounts of multiple power generation devices (20) connected to the energy storage device (30) during each generation time zone, and the weather information by storage time zone may include weather, temperature, wind speed, etc. during each storage time zone. In particular, the total power storage amount may mean the total amount of power produced from the power generation devices (20) and stored in the energy storage device (30).

[0057] The power consumption management unit (103) can generate and store operation information according to the operation of each aquaculture facility (10). Here, the operation information can include the location of the aquaculture facility (10), the operation time of the aquaculture facility (10), the operating power consumption of the aquaculture facility (10), etc.

[0058] When the aquaculture air curtain (13) and the aquaculture oxygen supply device (14) in the aquaculture facility (10) are operated, the power consumption management unit (103) can calculate and store the operating time of each of the operated aquaculture facilities (10). Here, the operating time of the aquaculture facility (10) can be calculated through the operation start time of the aquaculture air curtain (13) and the aquaculture oxygen supply device (14) and the operation stop time of the aquaculture air curtain (13) and the aquaculture oxygen supply device (14). In addition, the operating power consumption of the aquaculture facility (10) can be calculated by combining the operating time calculated by the power consumption management unit (103) with the power consumption of the aquaculture air curtain (13) per unit time and the power consumption of the aquaculture oxygen supply device (14) per unit time. For example, the operating power consumption of the aquaculture facility (10) can be calculated by adding the product of the operating time calculated by the power consumption management unit (103) and the power consumption of the aquaculture air curtain (13) per unit time, and the product of the operating time calculated by the power consumption management unit (103) and the power consumption of the aquaculture oxygen supply device (14) per unit time. In addition, the operating time of the aquaculture facility (10) can mean the actual operating time of the aquaculture facility (10), and the operating power consumption of the aquaculture facility (10) can mean the actual power consumption according to the operation of the aquaculture facility (10).

[0059] In addition, the power consumption management unit (103) can generate and store storage status information based on power storage information and operation information. Here, the storage status information can include the location of the energy storage device (30), the remaining power amount, etc. In addition, the remaining power amount can mean the amount of power stored in the energy storage device (30) at the current time, and can be calculated by subtracting the operating power consumption in real time from the total power storage amount of the power storage information. In other words, the storage status information can be used to check the amount of power stored in the energy storage device (30) at the current time.

[0060] The power consumption prediction unit (104) can generate operation pattern information based on the aquaculture farm information of the aquaculture farm information unit (101) and the detection information corresponding to the aquaculture farm information. Here, the detection information can include detected water quality information, marine forecast information, etc., and the detected water quality information is generated by detecting the water quality of the aquaculture farm main body (11) by the aquaculture farm sensor (12) installed underwater in the aquaculture farm main body (11) in the aquaculture farm equipment (10) and transmitted to the power consumption prediction unit (104), and as information corresponding to the water quality state, can include water temperature, salinity concentration, dissolved oxygen amount, hydrogen sulfide amount, chemical oxygen demand, etc., and the marine forecast information can include red tide advisory, red tide warning, jellyfish advisory, jellyfish alert, etc. In addition, the detected water quality information can correspond between the operating water quality information of the aquaculture farm information and the target water quality information, and when a marine forecast is issued, the manager terminal (40) can receive marine forecast information according to the marine forecast from a weather management server (not shown) and transmit it to the power consumption prediction unit (104). The power consumption prediction unit (104) can generate detection information based on the received detected water quality information and marine forecast information, and can generate operation pattern information based on the detection information and the aquaculture farm information of the aquaculture farm equipment (10) corresponding to the detection information.

[0061] Additionally, the operating pattern information may include the location of the formwork body (11), detected water quality information, predicted operating time, predicted power consumption, etc.

[0062] When the detection information includes detection water quality information corresponding to the operating water quality information, or when the marine forecast information is included, the power consumption prediction unit (104) calculates the predicted operating time based on the detection water quality information and target water quality information generated and transmitted from the aquaculture sensor (12), and calculates the predicted power consumption corresponding to the detected water quality information by adding the values ​​obtained by multiplying the calculated predicted operating time by the power consumption of the aquaculture air curtain (13) per unit time and the power consumption of the aquaculture oxygen supply (14) per unit time. Accordingly, the power consumption prediction unit (104) can generate and store operation pattern information including the location of the aquaculture equipment (10), the detected water quality information, the predicted operating time, the predicted power consumption, etc., so as to correspond to the aquaculture equipment (10) requiring the operation of the aquaculture air curtain (13) and the aquaculture oxygen supply (14).

[0063] The power supply management unit (105) can generate management pattern information based on operation pattern information and farm information corresponding to each of the aquaculture facilities (10). Here, the management pattern information can include the type of the aquaculture facility main body (11), predicted power consumption, predicted power total, etc. In addition, the type of the aquaculture facility main body (11) and predicted power consumption are generated from the operation pattern information and farm information corresponding to each of the aquaculture facilities (10), and the predicted power total can mean a value obtained by adding up the predicted power consumption of each of a plurality of aquaculture facilities (10).

[0064] When the power consumption prediction unit (104) generates the operation pattern information, the power supply management unit (105) can extract the predicted power consumption of the generated operation pattern information and extract the type of the aquaculture farm main body (11) of the aquaculture farm information corresponding to the extracted predicted power consumption. In particular, the power supply management unit (105) can calculate the predicted power total by adding up the predicted power consumption corresponding to each of the aquaculture farm facilities (10). Accordingly, the power supply management unit (105) can generate management pattern information including the type of the aquaculture farm main body (11), the predicted power consumption, the predicted power total, etc., at the time when the operation of the aquaculture farm air curtain (13) and the aquaculture farm oxygen supply device (14) is required.

[0065] In addition, the power supply management unit (105) can generate power supply information based on management pattern information corresponding to each aquaculture facility (10) and storage status information corresponding to the energy storage device (30). Here, the power supply information can include a power supply method and facility operation order, etc.

[0066] In the power supply information described above, the power supply method can be generated by comparing the remaining power amount in the storage status information with the predicted power amount in the operating pattern information. Here, the power supply method can be either a simultaneous supply method or a sequential supply method.

[0067] In particular, when the remaining power is greater than the predicted power sum, the power supply method is generated as a simultaneous supply method, and the power supply management unit (105) can control the energy storage device (30) to simultaneously supply power to the aquaculture equipment (10). On the other hand, when the remaining power is less than the predicted power sum, the power supply method is generated as a sequential supply method, and the power supply management unit (105) can control the energy storage device (30) to sequentially supply power to the aquaculture equipment (10) according to the equipment operation order to operate the aquaculture equipment (10), particularly the aquaculture air curtain (13) and the aquaculture oxygen supply device (14).

[0068] In addition, the equipment operation order can be set according to the type of the aquaculture farm main body (11) of the aquaculture farm information of the aquaculture farm equipment (10) corresponding to the operation pattern information and the predicted power consumption. Here, the power supply management unit (105) sets the equipment operation order in the order of fish, shellfish, and seaweed based on the aquaculture target marine products according to the type of the aquaculture farm main body (11), and for the same type of aquaculture farm main body (11), the lower the predicted power consumption, the higher the priority in the equipment operation order.

[0069] For example, the equipment operation order may be set in the following order: a fish farm facility (10) in which the aquatic product to be farmed is fish and the predicted power consumption is relatively low; a fish farm facility (10) in which the aquatic product to be farmed is fish and the predicted power consumption is relatively high; a shellfish farm facility (10) in which the aquatic product to be farmed is shellfish and the predicted power consumption is relatively low; a shellfish farm facility (10) in which the aquatic product to be farmed is seaweed and the predicted power consumption is relatively high; and a seaweed farm facility (10) in which the aquatic product to be farmed is seaweed and the predicted power consumption is relatively high. That is, the equipment operation order may be set in the first order for the aquaculture facility facility (10) that includes the aquaculture facility main body (11) for the aquatic product to be farmed, which is fish, and the predicted power consumption is the lowest; and a fish farm facility (10) that includes the aquaculture facility main body (11) for the aquatic product to be farmed, which is seaweed, and the predicted power consumption is the highest; Accordingly, the power supply management unit (105) selects the aquaculture facility (10) that can be supplied with power and operated to reach the target water quality information by considering the remaining power of the energy storage device (30), and controls the energy storage device (30) so that the power of the energy storage device (30) can be supplied to the aquaculture facility (10) according to the facility operation sequence.

[0070] Meanwhile, the power supply management unit (105) can generate a predicted power generation amount using the operating pattern information and power generation information corresponding to the management pattern information, and generate a corrected power surplus by adding the generated predicted power generation amount to the power surplus. The generated corrected power surplus can be used to generate power supply information in place of the power surplus.

[0071] In particular, when the power supply management unit (105) generates management pattern information, the power supply management unit (105) can receive weather information and maritime forecast information corresponding to the generation time of the management pattern information from the manager terminal (40). Here, the power supply management unit (105) can extract weather information and power generation amount of the power generation time zone of the power generation information corresponding to the weather information and maritime forecast information, calculate power generation amount per unit time using the extracted power generation time zone and power generation amount of the power generation time zone, and calculate the predicted power generation amount by multiplying the calculated power generation amount per unit time and the predicted operation time of the operation pattern information. Accordingly, the power supply management unit (105) can generate power supply information by taking into account the power generation amount according to power production by the power generation device (20) while the aquaculture air curtain (13) and the aquaculture oxygen supply device (14) of the aquaculture facility (10) are in operation.

[0072] The marine infrastructure management system (100) according to the present embodiment is connected to a plurality of aquaculture facilities (10), a plurality of power generation devices (20), an energy storage device (30), and an administrator terminal (40), and stores and manages power generated from each of the plurality of power generation devices (20) in the energy storage device (30). Here, the power can be controlled so that it can be supplied to the aquaculture facility (10) requiring operation while stored in the energy storage device (30). Accordingly, the marine infrastructure management system (100) according to the present embodiment can stably supply power to the aquaculture facility (10) through the energy storage device (30).

[0073] In addition, in the aquaculture facility (10) of the marine infrastructure management system (100) according to the present embodiment, the aquaculture facility main body (11) can receive and cultivate aquatic products to be cultured, the aquaculture facility sensor (12) can detect the water quality of the aquaculture facility main body (11), and the aquaculture facility air curtain (13) and the aquaculture facility oxygen supply device (14) can be operated according to the water quality detected by the aquaculture facility sensor (12). Accordingly, the marine infrastructure management system (100) according to the present embodiment can appropriately operate the aquaculture facility (10) to respond to the state of the marine aquaculture facility, particularly, the water quality of the aquaculture facility (10), thereby enabling stable cultivation of aquaculture target products.

[0074] In particular, the marine infrastructure management system (100) according to the present embodiment manages the amount of power stored in the energy storage device (30) based on the power produced by the power generation device (20) and consumed by the aquaculture facility (10) through the power consumption management unit (103), calculates a predicted power sum by adding up the amount of power required for the operation of a plurality of aquaculture facilities (10) through the power consumption prediction unit (104) based on the water quality or sea forecast detected by the aquaculture sensor (12) included in the detection information, and compares the calculated predicted power sum with the remaining power corresponding to the energy storage device (30) to generate a power supply method from the energy storage device (30) to the aquaculture facility (10), and sets the operation order of the aquaculture facility (10) based on the type of the aquaculture facility body (11) and the predicted power consumption for each of the aquaculture facilities (10). Accordingly, the marine infrastructure management system (100) according to the present embodiment can stably supply power to the aquaculture facility (10) by considering the amount of power stored in the energy storage device (30) and the type and condition of the aquaculture facility (10), thereby stably cultivating target aquaculture products.

[0075] FIG. 2 is a flowchart illustrating a method for managing maritime infrastructure according to one embodiment of the present invention.

[0076] As illustrated in FIG. 2, a marine infrastructure management method according to an embodiment of the present invention manages marine product farming and power through a marine infrastructure management system (100) connected to at least one aquaculture facility (10) for cultivating marine products, at least one power generation device (20) for generating electricity through wind power generation, an energy storage device (30) for storing electricity produced from the power generation device (20), and an administrator terminal (40) of an administrator who manages the aquaculture facility (10), the power generation device (20), and the energy storage device (30). The marine infrastructure management method of this embodiment intends to utilize the aforementioned marine infrastructure management system.

[0077] First, a step (S101) may be performed in which the aquaculture information unit (101) stores aquaculture information for each of a plurality of aquaculture facilities (10). In step S101, the aquaculture information may include the location of the aquaculture main body (11), the size of the aquaculture main body (11), the type of the aquaculture main body (11) according to the type of aquaculture target aquatic product (e.g., fish, shellfish, seaweed, etc.), the number of aquaculture sensors (12), the number of aquaculture air curtains (13), the power consumption of the aquaculture air curtains (13) per unit time, the number of aquaculture oxygen suppliers (14), the power consumption of the aquaculture oxygen suppliers (14) per unit time, target water quality information, operating water quality information, standard operating time, etc. In addition, the number of aquaculture sensors (12), the number of aquaculture air curtains (13), and the number of aquaculture oxygen suppliers (14) can be set according to the type and size of the aquaculture main body (11), and the number of aquaculture air curtains (13) can determine the amount of air bubbles generated, and the number of aquaculture oxygen suppliers (14) can determine the amount of oxygen generated.

[0078] In the above-described aquaculture farm information, the location of the aquaculture farm main body (11) may be a GPS coordinate value for the center of the aquaculture farm main body (11) in the aquaculture farm equipment (10), and may be used as an identifier for the aquaculture farm information, and the target water quality information is information corresponding to the best water quality state in which the aquaculture target aquaculture product can be stably cultivated in the aquaculture farm main body (11), and may include water temperature, salinity concentration, dissolved oxygen, hydrogen sulfide, chemical oxygen demand, etc. of the best water quality state, and the operating water quality information is information corresponding to a polluted water quality state such as a eutrophication state, a state in which the aquaculture target aquaculture product may die, and may include water temperature, salinity concentration, dissolved oxygen, hydrogen sulfide, chemical oxygen demand, etc. of the polluted water quality state, and the standard operating time may mean the operating time of the aquaculture farm air curtain (13) and the aquaculture farm oxygen supply (14) until the water quality of the aquaculture farm main body (11) reaches the target water quality information in the operating water quality information.

[0079] At step S101, the administrator can input the form information into the administrator terminal (40), and the form information can be transmitted to and stored in the form information section (101).

[0080] Next, a step (S102) may be performed in which the power generation information unit (102) generates and stores power generation information according to the operation of each power generation device (20). In step S102, the power generation information may include the location of the power generation device (20), power generation time zone, power generation amount by power generation time zone, weather information by power generation time zone, etc.

[0081] In the above-described power generation information, the location of the power generation device (20) may be a GPS coordinate value for the power generation device (20) and may be used as an identifier for the power generation information, and the power generation time zone is set in units of time for which power is generated in the power generation device (20), for example, from 8:00 to 9:00 on January 3, 2022, from 14:00 to 15:00 on January 3, 2022, etc. in 1-hour units, from 8:30 to 9:00 on January 3, 2022, from 15:30 to 16:00 on January 3, 2022, etc. in 30-hour units, from 16:40 to 17:00 on January 3, 2022, from 20:40 to 21:00 on January 3, 2022, etc. in 20-minute units, from 17:00 on January 3, 2022 It can be set in 10-minute units, such as from 50 minutes to 18:00, and the power generation amount by power generation time zone can mean the sum of the power generation amount according to the production of electricity from the power generation device (20) during each power generation time zone, and the weather information by power generation time zone can include the weather, temperature, wind speed, etc. for each power generation time zone.

[0082] Meanwhile, in step S102, each power generation device (20) generates power, and the power can be transmitted and stored in the energy storage device (30) from each of the power generation devices (20). Here, the power generation information unit (102) generates power generation during the power generation period between the power generation start time and the power production end time according to the power generation of the power generation device (20), generates a power generation time zone based on the generated power production start time and the power production end time, and divides the power generation during the power generation period into each power generation time zone to calculate the power generation amount for each power generation time zone.

[0083] Next, a step (S103) may be performed in which the power generation information unit (102) generates and stores power storage information for the energy storage device (30) corresponding to the stored power generation information. In step S103, the power storage information may include the location of the energy storage device (30), storage time zone, total storage amount by storage time zone, weather information by storage time zone, total power storage amount, etc.

[0084] In the power storage information as described above, the location of the energy storage device (30) may be a GPS coordinate value for the energy storage device (30), the storage time zone may be the same as the generation time zone of the power generation information, and the total storage amount by storage time zone may mean the amount of power produced by the power generation device (20) and stored in the energy storage device (30) during each storage time zone, that is, the total value of the generation amounts of multiple power generation devices (20) connected to the energy storage device (30) during each generation time zone, and the weather information by storage time zone may include weather, temperature, wind speed, etc. during each storage time zone. In particular, the total power storage amount may mean the total amount of power produced from the power generation devices (20) and stored in the energy storage device (30).

[0085] Next, a step (S104) may be performed in which the power consumption management unit (103) generates and stores operation information according to the operation of each aquaculture facility (10). In step S104, the operation information may include the location of the aquaculture facility (10), the operation time of the aquaculture facility (10), the operation power consumption of the aquaculture facility (10), etc.

[0086] In step S104, the aquaculture air curtain (13) and the aquaculture oxygen supply device (14) are operated in the aquaculture facility (10), and the power consumption management unit (103) can calculate and store the operating time of each of the aquaculture facilities (10) that are in operation. Here, the operating time of the aquaculture facility (10) can be calculated through the operation start time of the aquaculture air curtain (13) and the aquaculture oxygen supply device (14) and the operation stop time of the aquaculture air curtain (13) and the aquaculture oxygen supply device (14). In addition, the operating power consumption of the aquaculture facility (10) can be calculated by combining the operating time calculated by the power consumption management unit (103) with the power consumption of the aquaculture air curtain (13) per unit time and the power consumption of the aquaculture oxygen supply device (14) per unit time. For example, the operating power consumption of the aquaculture facility (10) can be calculated by adding the product of the operating time calculated by the power consumption management unit (103) and the power consumption of the aquaculture air curtain (13) per unit time, and the product of the operating time calculated by the power consumption management unit (103) and the power consumption of the aquaculture oxygen supply device (14) per unit time. In addition, the operating time of the aquaculture facility (10) can mean the actual operating time of the aquaculture facility (10), and the operating power consumption of the aquaculture facility (10) can mean the actual power consumption according to the operation of the aquaculture facility (10).

[0087] Next, a step (S105) may be performed in which the power consumption management unit (103) generates and stores storage status information based on power storage information and operation information. In step S105, the storage status information may include the location of the energy storage device (30), the remaining power amount, etc. In addition, the remaining power amount may mean the amount of power stored in the energy storage device (30) at the current time, and may be calculated by subtracting the operating power consumption amount in real time from the total power storage amount of the power storage information. In other words, the storage status information may be used to check the amount of power stored in the energy storage device (30) at the current time.

[0088] Next, a step (S106) may be performed in which the power consumption prediction unit (104) generates operation pattern information based on the farm information of the farm information unit (101) and the detection information corresponding to the farm information.

[0089] In step S106, the detection information may include detection water quality information, marine forecast information, etc., and the detection water quality information is generated by detecting the water quality of the aquaculture farm main body (11) by the aquaculture farm sensor (12) installed underwater in the aquaculture farm main body (11) in the aquaculture farm equipment (10) and transmitted to the power consumption prediction unit (104). As information corresponding to the water quality state, it may include water temperature, salinity concentration, dissolved oxygen content, hydrogen sulfide content, chemical oxygen demand, etc., and the marine forecast information may include red tide advisory, red tide warning, jellyfish advisory, jellyfish warning, etc. In addition, the detection water quality information may correspond between the operating water quality information of the aquaculture farm information and the target water quality information, and when a marine forecast is issued, the administrator terminal (40) may receive marine forecast information according to the marine forecast from a weather management server (not shown) and transmit it to the power consumption prediction unit (104).

[0090] In step S106, the power consumption prediction unit (104) can generate detection information based on the received detection water quality information and sea forecast information, and can generate operation pattern information based on the detection information and the aquaculture farm information of the aquaculture farm equipment (10) corresponding to the detection information. In step S106, the operation pattern information can include the location of the aquaculture farm main body (11), detection water quality information, predicted operation time, predicted power consumption, etc.

[0091] In step S106, if the detection information includes detection water quality information corresponding to the operating water quality information, or if the marine forecast information is included, the power consumption prediction unit (104) calculates a predicted operating time based on the detection water quality information and target water quality information generated and transmitted from the aquaculture sensor (12), and calculates a predicted power consumption corresponding to the detected water quality information by adding up the values ​​obtained by multiplying the calculated predicted operating time by the power consumption of the aquaculture air curtain (13) per unit time and the power consumption of the aquaculture oxygen supply (14) per unit time. Accordingly, the power consumption prediction unit (104) can generate and store operation pattern information including the location of the aquaculture equipment (10), the detected water quality information, the predicted operating time, the predicted power consumption, etc., so as to correspond to the aquaculture equipment (10) requiring the operation of the aquaculture air curtain (13) and the aquaculture oxygen supply (14).

[0092] Next, a step (S107) may be performed in which the power supply management unit (105) generates management pattern information based on the operation pattern information and the farm information corresponding to each of the aquaculture facilities (10). In step S107, the management pattern information may include the type of the aquaculture main body (11), the predicted power consumption, the predicted power sum, etc. In addition, the type of the aquaculture main body (11) and the predicted power consumption are generated from the operation pattern information and the farm information corresponding to each of the aquaculture facilities (10), and the predicted power sum may mean a value obtained by summing the predicted power consumption of each of the plurality of aquaculture facilities (10).

[0093] When the power consumption prediction unit (104) generates the operation pattern information, in step S107, the power supply management unit (105) can extract the predicted power consumption of the generated operation pattern information and extract the type of the aquaculture farm main body (11) of the aquaculture farm information corresponding to the extracted predicted power consumption. In particular, the power supply management unit (105) can calculate the predicted power total by adding up the predicted power consumption corresponding to each of the aquaculture farm facilities (10). Accordingly, the power supply management unit (105) can generate management pattern information including the type of the aquaculture farm main body (11), the predicted power consumption, the predicted power total, etc., at the time when the operation of the aquaculture farm air curtain (13) and the aquaculture farm oxygen supply device (14) is required.

[0094] Next, a step (S108) may be performed in which the power supply management unit (105) generates power supply information based on management pattern information corresponding to each aquaculture facility (10) and storage status information corresponding to the energy storage device (30). In step S108, the power supply information may include a power supply method and facility operation order, etc.

[0095] In step S108, the power supply method can be generated from the power supply information by comparing the remaining power amount in the storage status information with the predicted power amount in the operating pattern information. Here, the power supply method can be either a simultaneous supply method or a sequential supply method.

[0096] In particular, when the remaining power is greater than the predicted power sum, the power supply method is generated as a simultaneous supply method, and the power supply management unit (105) can control the energy storage device (30) to simultaneously supply power to the aquaculture equipment (10). On the other hand, when the remaining power is less than the predicted power sum, the power supply method is generated as a sequential supply method, and the power supply management unit (105) can control the energy storage device (30) to sequentially supply power to the aquaculture equipment (10) according to the equipment operation order to operate the aquaculture equipment (10), particularly the aquaculture air curtain (13) and the aquaculture oxygen supply device (14).

[0097] In step S108, the equipment operation order can be set according to the type of the aquaculture farm main body (11) of the aquaculture farm information of the aquaculture farm equipment (10) corresponding to the operation pattern information and the predicted power consumption. Here, the power supply management unit (105) sets the equipment operation order in the order of fish, shellfish, and seaweed based on the aquaculture target marine products according to the type of the aquaculture farm main body (11), and for the same type of aquaculture farm main body (11), the lower the predicted power consumption, the higher the priority in the equipment operation order.

[0098] For example, the equipment operation order may be set in the following order: a fish farm facility (10) in which the aquatic product to be farmed is fish and the predicted power consumption is relatively low; a fish farm facility (10) in which the aquatic product to be farmed is fish and the predicted power consumption is relatively high; a shellfish farm facility (10) in which the aquatic product to be farmed is shellfish and the predicted power consumption is relatively low; a shellfish farm facility (10) in which the aquatic product to be farmed is seaweed and the predicted power consumption is relatively high; and a seaweed farm facility (10) in which the aquatic product to be farmed is seaweed and the predicted power consumption is relatively high. That is, the equipment operation order may be set in the first order for the aquaculture facility facility (10) that includes the aquaculture facility main body (11) for the aquatic product to be farmed, which is fish, and the predicted power consumption is the lowest; and a fish farm facility (10) that includes the aquaculture facility main body (11) for the aquatic product to be farmed, which is seaweed, and the predicted power consumption is the highest; Accordingly, the power supply management unit (105) selects the aquaculture facility (10) that can be supplied with power and operated to reach the target water quality information by considering the remaining power of the energy storage device (30), and controls the energy storage device (30) so that the power of the energy storage device (30) can be supplied to the aquaculture facility (10) according to the facility operation sequence.

[0099] At step S108, the power supply management unit (105) can generate a predicted power generation amount using the operating pattern information and power generation information corresponding to the management pattern information, and generate a corrected power residual amount by adding the generated predicted power generation amount to the power residual amount. The generated corrected power residual amount can be used to generate power supply information in place of the power residual amount.

[0100] When the power supply management unit (105) generates management pattern information, in step S108, the power supply management unit (105) can receive weather information and maritime forecast information corresponding to the generation time of the management pattern information from the manager terminal (40). Here, the power supply management unit (105) can extract weather information and power generation amount of the power generation time zone of the power generation information corresponding to the weather information and the maritime forecast information, calculate power generation amount per unit time using the extracted power generation time zone and power generation amount of the power generation time zone, and calculate the predicted power generation amount by multiplying the calculated power generation amount per unit time and the predicted operation time of the operation pattern information. Accordingly, the power supply management unit (105) can generate power supply information by taking into account the power generation amount according to power production by the power generation device (20) while the aquaculture air curtain (13) and the aquaculture oxygen supply device (14) of the aquaculture facility (10) are in operation.

[0101] The marine infrastructure management method according to the present embodiment is connected to a plurality of aquaculture facilities (10), a plurality of power generation devices (20), an energy storage device (30), and an administrator terminal (40), so as to store and manage power generated from each of the plurality of power generation devices (20) in the energy storage device (30). Here, the power can be controlled so that it can be supplied to the aquaculture facility (10) requiring operation while stored in the energy storage device (30). Accordingly, the marine infrastructure management method according to the present embodiment can stably supply power to the aquaculture facility (10) through the energy storage device (30).

[0102] In addition, in the marine infrastructure management method according to the present embodiment, the aquaculture facility (10) can accommodate and cultivate target aquatic products, the aquaculture facility main body (11) can detect the water quality of the aquaculture facility main body (11), and the aquaculture facility air curtain (13) and the aquaculture facility oxygen supply device (14) can be operated according to the water quality detected by the aquaculture facility sensor (12). Accordingly, the marine infrastructure management method according to the present embodiment can operate the aquaculture facility (10) appropriately to respond to the state of the marine aquaculture facility, particularly, the water quality of the aquaculture facility (10), thereby enabling stable cultivation of target aquaculture products.

[0103] In particular, the marine infrastructure management method according to the present embodiment manages the amount of power stored in the energy storage device (30) based on the power produced by the power generation device (20) and consumed by the aquaculture facility (10) through the power consumption management unit (103), calculates a predicted power sum by adding up the amount of power required for the operation of a plurality of aquaculture facilities (10) through the power consumption prediction unit (104) based on the water quality or sea forecast detected by the aquaculture sensor (12) included in the detection information, and compares the calculated predicted power sum with the remaining power corresponding to the energy storage device (30) to generate a power supply method from the energy storage device (30) to the aquaculture facility (10), and sets the facility operation order of the aquaculture facility (10) based on the type of the aquaculture facility body (11) and the predicted power consumption for each of the aquaculture facility (10). Accordingly, the marine infrastructure management method according to the present embodiment can stably supply power to the aquaculture facility (10) by considering the amount of power stored in the energy storage device (30) and the type and condition of the aquaculture facility (10), thereby stably cultivating target aquaculture products.

[0104] The functional operations and performance forms related to the subject matter described in this specification may be implemented in digital electronic circuits, computer software, firmware, or hardware, or in a combination of one or more of these, including the structures disclosed in this specification and their structural equivalents.

[0105] The subject matter described herein may be implemented as one or more computer program products, i.e., one or more modules of computer program instructions encoded on a tangible program medium for execution by or controlling the operation of a data processing device. The tangible program medium may be a radio signal or a computer-readable medium. A radio signal is an artificially generated signal, such as a machine-generated electrical, optical, or electromagnetic signal, that is generated to encode information for transmission to a suitable receiver device for execution by a computer. The computer-readable medium may be a machine-readable storage device, a machine-readable storage substrate, a memory device, a combination of materials that affect a machine-readable radio signal, or a combination of one or more of these.

[0106] A computer program (also known as a program, software, software application, script or code) may be written in any programming language, including compiled or interpreted languages, a priori or procedural languages, and may be deployed in any form, including as a standalone program, a module, a component, a subroutine or other unit suitable for use in a computing environment.

[0107] Computer programs do not necessarily correspond to files in a file system. A program may be stored within a single file provided to the requested program, within multiple interacting files (e.g., a file storing one or more modules, subprograms, or portions of code), or within a file containing other programs or data (e.g., one or more scripts stored within a markup language document).

[0108] A computer program may be deployed to run on a single computer or on multiple computers located at a single site or distributed across multiple sites and interconnected by a communications network.

[0109] Additionally, the logical flow and structural block diagrams described herein describe corresponding functions and corresponding acts and / or specific methods supported by the disclosed structural means, and can also be used to construct corresponding software structures and algorithms and their equivalents.

[0110] The processes and logic flows described herein are executable by one or more programmable processors executing one or more computer programs to perform functions by operating on input data and generating output.

[0111] Processors suitable for executing computer programs include, for example, general-purpose and special-purpose microprocessors, as well as any one or more processors of any type of digital computer. Typically, the processor will receive instructions and data from read-only memory, random-access memory, or both.

[0112] The core elements of a computer are one or more memory devices for storing instructions and data, and a processor for executing instructions. Additionally, a computer will typically be coupled to or include one or more mass storage devices, such as magnetic, magneto-optical, or optical disks, to receive data from, transfer data to, or both of these operations. However, a computer need not include such devices.

[0113] This description presents the best mode of the invention and provides examples to illustrate the invention and to enable those skilled in the art to make and use the invention. The specification, as written, is not intended to limit the invention to the specific terms set forth herein.

[0114] Accordingly, while the present invention has been described in detail with reference to the above-described examples, those skilled in the art will appreciate that modifications, variations, and variations can be made to these examples without departing from the scope of the present invention. In short, it is to be understood that to achieve the intended effects of the present invention, not all functional blocks depicted in the drawings must be separately included, nor must all orders depicted in the drawings be followed in the exact order depicted. Even if this is not the case, the technical scope of the present invention as set forth in the claims may still be encompassed.

[0115] [Explanation of symbols]

[0116] 100: Maritime Infrastructure Management System

[0117] 101: Farm Information Department

[0118] 102: Development Information Department

[0119] 103: Power Consumption Management Department

[0120] 104: Power Consumption Prediction Unit

[0121] 105: Power Supply Management Department

Claims

1. In a marine infrastructure management system that is connected to multiple aquaculture farm facilities, multiple power generation units, and energy storage units through a network, A farm information section that stores farm information for each farm facility; A power generation information unit that generates and stores power generation information according to each operation of a power generation device, and generates and stores power storage information for an energy storage device corresponding to the stored power generation information; A power consumption management unit that generates and stores operation information according to the operation of each aquaculture facility, and generates and stores storage status information based on the stored operation information and power storage information of the power generation information unit; A power consumption prediction unit that generates operation pattern information based on the farm information of the farm information unit and the detection information corresponding to the farm information; and A marine infrastructure management system characterized by comprising a power supply management unit that generates management pattern information based on operation pattern information and farm information corresponding to each farm facility, generates power supply information based on management pattern information corresponding to each farm facility and storage status information corresponding to an energy storage device, and controls an energy storage device to supply power from the energy storage device to the farm facility according to the power supply information.

2. In paragraph 1, Each farm facility comprises a farm body, at least one farm sensor, at least one farm air curtain, and at least one farm oxygen supply; The farm information includes the location of the farm body, the size of the farm body, the type of the farm body, the number of farm sensors, the number of farm air curtains, the power consumption of the farm air curtains per unit time, the number of farm oxygen supplies, and the power consumption of the farm oxygen supplies per unit time. It also includes target water quality information, operating water quality information, and standard operating time. The type of the aquaculture farm body varies depending on the type of aquatic product being farmed, and the number of aquaculture farm sensors, the number of aquaculture farm air curtains, and the number of aquaculture farm oxygen supply devices are calculated based on the size of the aquaculture farm body and the type of the aquaculture farm body. Power generation information includes the location of the power generation device, power generation time zone, power generation amount by power generation time zone, and weather information by power generation time zone. A marine infrastructure management system characterized in that the power storage information includes the location of the energy storage device, the storage time zone identical to the generation time zone of the power generation information, the total storage amount by storage time zone, weather information by storage time zone, and the total power storage amount.

3. In paragraph 2, Operation information includes the location of the farm equipment, the operating hours of the farm equipment, and the operating power consumption of the farm equipment. The operating time of the aquaculture facility is calculated by the start time of the operation of the aquaculture air curtain and the aquaculture oxygen supply when the aquaculture air curtain and the aquaculture oxygen supply are in operation and the stop time of the aquaculture air curtain and the aquaculture oxygen supply, and the operating power consumption of the aquaculture facility is calculated by adding the product of the operating time calculated by the power consumption management department and the power consumption of the aquaculture air curtain per unit time and the power consumption of the aquaculture oxygen supply per unit time, respectively. A marine infrastructure management system characterized in that the storage status information includes the location and remaining power of an energy storage device, and the remaining power is calculated by subtracting the operating power consumption in real time from the total power storage amount of the power storage information.

4. In paragraph 3, Detection information includes detection water quality information and marine forecast information. The water quality information is generated by detecting the water quality of the aquaculture farm body by a farm sensor and is transmitted to the power consumption prediction unit. Marine forecast information includes red tide advisory, red tide warning, jellyfish advisory, and jellyfish alert. When a marine forecast is issued, the administrator terminal receives marine forecast information according to the marine forecast from the weather management server and transmits it to the power consumption prediction unit. The operating pattern information includes the location of the farm body, detected water quality information, predicted operating time, and predicted power consumption. A marine infrastructure management system characterized in that, when the detection information includes detection water quality information corresponding to the operating water quality information, or when the marine forecast information is included, the power consumption prediction unit calculates a predicted operating time based on the detection water quality information and target water quality information generated and transmitted from the aquaculture sensor, and calculates a predicted power consumption corresponding to the detected water quality information by adding up the values ​​obtained by multiplying the calculated predicted operating time by the power consumption of the aquaculture air curtain per unit time and the power consumption of the aquaculture oxygen supply per unit time, respectively.

5. In paragraph 4, Management pattern information includes the type of farm body, predicted power consumption, and predicted power total. A marine infrastructure management system characterized in that when a power consumption prediction unit generates operation pattern information, a power supply management unit extracts a predicted power consumption amount from the generated operation pattern information, extracts the type of aquaculture farm body from the aquaculture farm information corresponding to the extracted predicted power consumption amount, and calculates a predicted power total amount by adding up the predicted power consumption amounts corresponding to each of the aquaculture farm facilities.

6. In paragraph 5, Power supply information includes power supply method and equipment operation sequence. The power supply method is generated by comparing the remaining power of the storage status information and the predicted power sum of the operating pattern information. When the remaining power is greater than the predicted power total, the power supply method is generated as a simultaneous supply method, and the power supply management unit controls the energy storage device to supply power to the aquaculture farm facilities simultaneously. A marine infrastructure management system characterized in that when the remaining power is less than the predicted power total, the power supply method is generated in a sequential supply method, and the power supply management unit controls the energy supply device to sequentially supply power to the aquaculture facilities according to the facility operation order.

7. In paragraph 6, The equipment operation sequence is set according to the type of the farm body and the predicted power consumption of the farm information corresponding to the operation pattern information. A marine infrastructure management system characterized in that the power supply management unit sets the order of equipment operation in the order of fish, shellfish, and seaweed based on the target aquaculture product according to the type of the aquaculture farm body, and for the same type of aquaculture farm body, sets the order of equipment operation as priority according to the lower predicted power consumption.

8. In paragraph 6, When the power supply management unit generates management pattern information, the power supply management unit receives weather information and marine forecast information corresponding to the time of generation of the management pattern information from the manager terminal, extracts weather information and power generation amount of the power generation time zone of the power generation information corresponding to the received weather information and marine forecast information, calculates the power generation amount per unit time using the extracted power generation time zone and power generation amount of the power generation time zone, and calculates the predicted power generation amount by multiplying the calculated power generation amount per unit time and the predicted operation time of the operation pattern information. A marine infrastructure management system characterized in that the power supply management unit generates a corrected power surplus by adding the calculated predicted power generation amount to the power surplus, and generates a power supply method by comparing the corrected power surplus and the predicted power sum of the operating pattern information. 9.(a) A step in which the aquaculture farm information department stores aquaculture farm information for each aquaculture farm facility; (b) a step in which the power generation storage unit generates and stores power generation information according to each operation of the power generation device; (c) a step of generating and storing power storage information for an energy storage device corresponding to the stored power generation information in the power storage unit; (d) A step in which the power consumption management unit generates and stores operation information according to the operation of each aquaculture facility; (e) A step of generating and storing storage status information based on the stored operation information of the power consumption management unit and the power storage information of the power generation information unit; (f) a step of generating operation pattern information based on the farm information of the farm information section and the detection information corresponding to the farm information by the power consumption prediction section; (g) a step in which the power supply management unit generates management pattern information based on the operation pattern information and the farm information corresponding to each of the farm facilities; and (h) A method for managing marine infrastructure, characterized in that it includes a step of generating power supply information based on management pattern information corresponding to each aquaculture facility and storage status information corresponding to an energy storage device, and controlling an energy storage device to supply power from the energy storage device to the aquaculture facility according to the power supply information.

10. In paragraph 9, Each farm facility comprises a farm body, at least one farm sensor, at least one farm air curtain, and at least one farm oxygen supply; The farm information includes the location of the farm body, the size of the farm body, the type of the farm body, the number of farm sensors, the number of farm air curtains, the power consumption of the farm air curtains per unit time, the number of farm oxygen supplies, and the power consumption of the farm oxygen supplies per unit time. It also includes target water quality information, operating water quality information, and standard operating time. The type of the aquaculture farm body varies depending on the type of aquatic product being farmed, and the number of aquaculture farm sensors, the number of aquaculture farm air curtains, and the number of aquaculture farm oxygen supply devices are calculated based on the size of the aquaculture farm body and the type of the aquaculture farm body. Power generation information includes the location of the power generation device, power generation time zone, power generation amount by power generation time zone, and weather information by power generation time zone. A method for managing marine infrastructure, characterized in that the power storage information includes the location of the energy storage device, the storage time zone identical to the generation time zone of the power generation information, the total storage amount by storage time zone, weather information by storage time zone, and the total power storage amount.

11. In paragraph 10, Operation information includes the location of the farm equipment, the operating hours of the farm equipment, and the operating power consumption of the farm equipment. (d) In step (d), the operating time of the aquaculture facility is calculated through the start time of the operation of the aquaculture facility air curtain and the aquaculture facility oxygen supply when the aquaculture facility air curtain and the aquaculture facility oxygen supply are in operation and the stop time of the operation of the aquaculture facility air curtain and the aquaculture facility oxygen supply, and the operating power consumption of the aquaculture facility is calculated by adding the product of the operating time calculated by the power consumption management department and the power consumption of the aquaculture facility air curtain per unit time and the power consumption of the aquaculture facility oxygen supply per unit time, respectively. Storage status information includes the location and remaining power of the energy storage device. (e) A method for managing marine infrastructure, characterized in that, in step (e), the power remaining amount is calculated by subtracting the operating power consumption in real time from the total power storage amount of the power storage information.

12. In paragraph 11, Detection information includes detection water quality information and marine forecast information. At step (f), The detection water quality information is generated by detecting the water quality of the aquaculture farm body by the aquaculture farm sensor and is transmitted to the power consumption prediction unit, and the marine forecast information includes red tide advisory, red tide warning, jellyfish advisory, and jellyfish warning. When a maritime forecast is issued, the administrator terminal receives maritime forecast information from the weather management server and transmits it to the power consumption prediction unit, and the operation pattern information includes the location of the aquaculture farm main body, detected water quality information, predicted operation time, and predicted power consumption. A marine infrastructure management method characterized in that, when the detection information includes detection water quality information corresponding to the operating water quality information, or when the marine forecast information is included, the power consumption prediction unit calculates a predicted operating time based on the detection water quality information and target water quality information generated and transmitted from the aquaculture sensor, and calculates a predicted power consumption corresponding to the detected water quality information by adding up the values ​​obtained by multiplying the calculated predicted operating time by the power consumption of the aquaculture air curtain per unit time and the power consumption of the aquaculture oxygen supply per unit time, respectively.

13. In paragraph 12, Management pattern information includes the type of farm body, predicted power consumption, and predicted power total. A method for managing marine infrastructure, characterized in that when the power consumption prediction unit generates operating pattern information, in step (g), the power supply management unit extracts the predicted power consumption of the generated operating pattern information, extracts the type of the aquaculture farm body from the aquaculture farm information corresponding to the extracted predicted power consumption, and calculates the predicted power total by adding up the predicted power consumption corresponding to each aquaculture farm facility.

14. In paragraph 13, Power supply information includes power supply method and equipment operation sequence. At step (h), The power supply method is generated by comparing the remaining power of the storage status information and the predicted power sum of the operating pattern information. When the remaining power is greater than the predicted power total, the power supply method is generated as a simultaneous supply method, and the power supply management unit controls the energy storage device to supply power to the aquaculture farm facilities simultaneously. A method for managing marine infrastructure, characterized in that when the remaining power is less than the predicted power total, the power supply method is generated in a sequential supply method, and the power supply management unit controls the energy supply device to sequentially supply power to the aquaculture equipment according to the equipment operation order.

15. In paragraph 14, At step (h), The equipment operation sequence is set according to the type of the farm body and the predicted power consumption of the farm information corresponding to the operation pattern information. A marine infrastructure management method characterized in that the power supply management unit sets the order of equipment operation in the order of fish, shellfish, and seaweed based on the target aquaculture product according to the type of the aquaculture farm body, and for the same type of aquaculture farm body, sets the order of equipment operation as priority according to the lower predicted power consumption.

16. In paragraph 14, At step (h), When the power supply management unit generates management pattern information, the power supply management unit receives weather information and marine forecast information corresponding to the time of generation of the management pattern information from the manager terminal, extracts weather information and power generation amount of the power generation time zone of the power generation information corresponding to the received weather information and marine forecast information, calculates the power generation amount per unit time using the extracted power generation time zone and power generation amount of the power generation time zone, and calculates the predicted power generation amount by multiplying the calculated power generation amount per unit time and the predicted operation time of the operation pattern information. A method for managing marine infrastructure, characterized in that the power supply management unit generates a corrected power surplus by adding the calculated predicted power generation amount to the power surplus, and generates a power supply method by comparing the corrected power surplus and the predicted power sum of the operating pattern information.

Citation Information

Patent Citations

  • Power supply apparatus for marine farms

    KR1020130063797A

  • Method for power management of Energy Storage System connected renewable energy

    KR1020170095580A

  • Total system of Internet of Things(IoT) for energy management by marine­nursery facilities based on intelligence

    KR1020180099995A

  • Coir net

    KR1020230143284A

  • Method for power management of Energy Storage System connected renewable energy

    KR102503382B1