Display device, warning output method for display device, and program
The display device accurately predicts button battery replacement in digital cinema projectors by measuring voltage changes over time and outputting warnings, addressing the unpredictability in existing methods and ensuring secure movie playback.
Patent Information
- Application Number
- PCT/JP2023/018303
- Authority / Receiving Office
- WO · WO
- Patent Type
- Applications
- Current Assignee / Owner
- Filing Date
- 2023-05-16
- Publication Date
- 2024-11-21
AI Technical Summary
Digital cinema projectors face challenges in accurately determining when to replace button batteries powering nonvolatile memory, as existing methods fail to consider the relationship between operating time and voltage change, leading to unpredictable battery replacement timing and potential loss of confidential information.
A display device and method that measure and display voltage values along with date and time, calculate voltage change rates, and output warnings when the rate falls below a threshold, predicting the scheduled replacement time based on these measurements to ensure timely battery replacement.
This approach allows for more accurate prediction of battery replacement timing, preventing data loss and ensuring continuous secure playback of movie content by considering the voltage change over time.
Smart Images

Figure JP2023018303_21112024_PF_FP_ABST
Abstract
Description
Display device, warning output method for display device, and program
[0001] The present invention relates to a display device, a warning output method for a display device, and a program.
[0002] Digital cinema projectors use public key cryptography and symmetric key cryptography to protect movie content and security. Confidential information, such as the private key, public key, and symmetric key, used in these cryptography methods is stored in nonvolatile memory powered by a button battery to prevent eavesdropping. In nonvolatile memory, confidential information volatilizes when the remaining capacity of the button battery decreases and the button battery can no longer maintain a constant voltage. This makes it impossible for the digital cinema projector to decrypt movie content or play the movie content. Therefore, to prevent confidential information from volatilizing in nonvolatile memory, the button battery should be replaced when it can no longer maintain a constant voltage due to a decrease in remaining capacity. However, users of digital cinema projectors have no way of knowing when to replace the button battery.
[0003] For reference, Patent Document 1 below discloses a technology for predicting the battery life of a wireless terminal device in order to operate the wireless terminal device for a longer period of time. This technology measures and stores the remaining capacity of the battery, calculates an approximation formula based on the remaining capacity measured in the past, and calculates the predicted time when the battery will run out and the predicted remaining time until the battery runs out from the approximation formula.
[0004] Japanese Patent Application Laid-Open No. 2008-278308
[0005] To determine when to replace button batteries used in digital cinema projectors, it is conceivable to apply the technology of Patent Document 1 to predict the replacement timing from the voltage of the button battery. However, the technology of Patent Document 1 does not take into account the relationship between the usage time of the button battery and voltage changes. For example, a button battery maintains a constant voltage for a certain period of time after use begins, but after a certain period of time, the voltage begins to gradually decrease and then drops sharply. Therefore, during the period when the button battery voltage is maintained constant, the voltage remains constant, making it impossible to accurately predict when to replace the battery. This has caused problems for users, as they are unable to accurately determine when to replace the battery.
[0006] In view of the above-mentioned problems, an object of the present invention is to provide a display device, a method for outputting a warning from a display device, and a program that enable a user to more accurately grasp the timing for battery replacement.
[0007] In order to solve the above-mentioned problems, a display device according to one embodiment of the present invention is a display device that includes a measurement information acquisition unit that acquires measurement information indicating the voltage value of a power supply unit that supplies power to a non-volatile memory that stores confidential information and the date and time at which the voltage value was measured, a voltage change rate calculation unit that calculates the voltage change rate per unit time in the power supply unit based on the acquired multiple pieces of measurement information, and a prediction unit that predicts the scheduled date and time at which a warning urging replacement of the power supply unit will be output if the voltage change rate is less than a first threshold value.
[0008] A warning output method for a display device according to one embodiment of the present invention is a method for outputting a warning for a display device, which acquires measurement information indicating the voltage value of a power supply unit that supplies power to a non-volatile memory that stores confidential information and the date and time when the voltage value was measured, calculates a voltage change rate per unit time in the power supply unit based on the measurement information, and if the voltage change rate is less than a first threshold value, outputs a warning urging the user to replace the power supply unit.
[0009] A program according to one aspect of the present invention causes a computer to function as: a measurement information acquisition means for acquiring measurement information indicating the voltage value of a power supply unit that supplies power to a non-volatile memory that stores confidential information and the date and time at which the voltage value was measured; a voltage change rate calculation means for calculating the voltage change rate per unit time in the power supply unit based on the acquired multiple pieces of measurement information; and a prediction means for predicting the scheduled date and time at which a warning urging the replacement of the power supply unit will be issued if the calculated voltage change rate is less than a first threshold value.
[0010] According to the present invention, the timing of battery replacement can be predicted with higher accuracy.
[0011] 1 is a block diagram showing an example of the hardware configuration of a digital cinema projector according to a first embodiment. FIG. 2 is a block diagram showing an example of the functional configuration of a control board included in the digital cinema projector according to the first embodiment. FIG. 3 is a diagram showing an example of measurement information according to the first embodiment. FIG. 4 is a diagram showing the relationship between usage time and voltage of a button battery according to the first embodiment. FIG. 5 is a flowchart showing an example of the flow of a warning output process for a button battery according to the first embodiment. FIG. 6 is a flowchart showing an example of the flow of a noise reduction process during voltage measurement according to the first embodiment. FIG. 7 is a flowchart showing an example of the flow of a prediction process for a warning output date and time according to the first embodiment. FIG. 8 is a diagram showing an example of the configuration of a warning output control system according to a second embodiment. FIG. 9 is a block diagram showing an example of the functional configuration of a control board included in a digital cinema projector according to the second embodiment. FIG. 10 is a block diagram showing an example of the functional configuration of an external terminal according to the second embodiment. FIG. 11 is a sequence diagram showing an example of the flow of an optimization process for a voltage value threshold according to the second embodiment. FIG. 12 is a sequence diagram showing an example of the flow of an optimization process for a voltage change rate threshold according to the second embodiment. FIG. 13 is a flowchart showing an example of the flow of an optimization process for a prediction formula for a warning output date and time according to the second embodiment. FIG. 14 is a block diagram showing an example of the configuration of a display device according to a third embodiment.
[0012] Hereinafter, each embodiment of the present invention will be described in detail with reference to the drawings.
[0013] 1 to 7 , a first embodiment will be described. In the first embodiment, as an example, a display device is a digital cinema projector, but the present invention is not limited to this example. The display device may be, for example, a general projector or display.
[0014] <1-1. Hardware Configuration of Digital Cinema Projector> The hardware configuration of a digital cinema projector according to the first embodiment will be described with reference to Fig. 1. Fig. 1 is a block diagram showing an example of the hardware configuration of a digital cinema projector according to the first embodiment. As shown in Fig. 1, the digital cinema projector 1 includes a control board 10, a video processing device 20, a projection device 30, a projection lens 40, an operation device 50, a communication device 60, and an output device 70.
[0015] (1) Control Board 10 The control board 10 is a board that controls the overall operation of the digital cinema projector 1. As shown in Fig. 1 , the control board 10 includes a flash memory 11, a non-volatile memory 12, a button battery 13, a voltage measurement circuit 14, an ADC (Analog-Digital Converter) 15, an RTC (Real Time Clock) 16, and a CPU (Central Processing Unit) 17.
[0016] (1-1) Flash Memory 11 The flash memory 11 is a non-volatile storage device that stores information related to the control of the digital cinema projector 1 (hereinafter also referred to as "control information"). The control information includes, for example, set information, threshold information, measurement information, voltage change rate information, and scheduled warning output date and time information. The set information includes, for example, the serial number and usage time of the digital cinema projector 1, and a warning output (alert) history. The threshold information includes, for example, information indicating thresholds used in various controls of the digital cinema projector 1. The measurement information includes information indicating a measured voltage value (voltage measurement value) indicating the voltage of the button battery 13 and the date and time (measurement date and time) when the voltage value was measured. The voltage change rate information includes information indicating the rate of voltage change per unit time of the button battery 13. The scheduled warning output date and time information includes information indicating a scheduled date and time when a warning urging replacement of the button battery 13 will be output (hereinafter also referred to as the "scheduled warning output date and time").
[0017] (1-2) Non-Volatile Memory 12 The non-volatile memory 12 is a non-volatile storage device that stores confidential information of the digital cinema projector 1. Confidential information is, for example, information used to protect the video content (e.g., movies) output (played) by the digital cinema projector 1 and to protect security. For this protection, the digital cinema projector 1 uses encryption methods such as public key encryption and common key encryption. Examples of confidential information include the private key, public key, and common key used in these encryption methods. Confidential information is stored in the non-volatile memory 12 to prevent eavesdropping. The confidential information stored in the non-volatile memory 12 is maintained (backed up) by a button battery 13.
[0018] (1-3) Button Battery 13 The button battery 13 is a power source that supplies power to the non-volatile memory 12. The non-volatile memory 12 can retain confidential information by receiving power at a constant voltage from the button battery 13. If the non-volatile memory 12 loses power at a constant voltage, it will no longer be able to retain the confidential information, and the confidential information will volatilize. This prevents the digital cinema projector 1 from being disassembled, the non-volatile memory 12 removed, and the confidential information extracted from the removed non-volatile memory 12. However, if the voltage of the button battery drops, the digital cinema projector 1 will no longer be able to use the confidential information and will no longer be able to play video content. For this reason, it is recommended that users replace the button battery 13 before it runs out of power.
[0019] (1-4) Voltage Measurement Circuit 14 The voltage measurement circuit 14 is a circuit that measures voltage. The voltage measurement circuit 14 is connected to measure the voltage of the button battery 13. The voltage measurement circuit 14 outputs the measured voltage value to the ADC 15.
[0020] (1-5) ADC 15 The ADC 15 is a device that converts the voltage measurement value measured by the voltage measurement circuit 14 from an analog value to a digital value. The ADC 15 outputs the converted voltage measurement value to the CPU 17.
[0021] (1-6) RTC 16 The RTC 16 is a device that acquires the current date and time. For example, the RTC 16 acquires the current date and time at the time of voltage measurement by the voltage measurement circuit 14 as the measurement date and time. The CPU 17 acquires the measurement date and time from the RTC 16. In other words, the RTC 16 outputs the acquired measurement date and time to the CPU 17.
[0022] (1-7) CPU 17 The CPU 17 is a device that controls the overall operation of the digital cinema projector 1. The CPU 17 executes various control processes based on various information stored in the flash memory 11 and non-volatile memory 12, voltage measurement values measured by the voltage measurement circuit 14 and converted by the ADC 15, measurement date and time acquired by the RTC 16, etc.
[0023] (2) Video Processing Device 20 The video processing device 20 is a device that plays video content. The video processing device 20 is, for example, an IMB (Image Media Block). The video processing device 20 plays the video content by decrypting the encrypted video content using confidential information stored in the non-volatile memory 12 of the control board 10.
[0024] (3) Projection Device 30 The projection device 30 generates a display image to be projected onto a projection surface based on the processed video signal input from the video processing device 20 .
[0025] (4) Projection Lens 40 The projection lens 40 is an electrically operated lens or a manual lens. The projection lens 40 projects the display image generated by the projection device 30 onto a projection surface.
[0026] (5) Operation Device 50 The operation device 50 accepts user input. Examples of the operation device 50 include keys and buttons arranged on the digital cinema projector 1, a remote controller, and various pointing devices. The user operates the operation device 50 to make inputs for operating the digital cinema projector 1. For example, the user inputs operations such as turning the power of the digital cinema projector 1 on or off, or making the digital cinema projector 1 emit light. When an input is received, the operation device 50 inputs a request corresponding to the input to the control board 10.
[0027] (6) Communication Device 60 The communication device 60 is a device that transmits and receives various information to and from external terminals. For example, the communication device 60 transmits information related to a warning (hereinafter also referred to as "warning information") to a user terminal via a network. The warning information may be, for example, information on the scheduled date and time of warning output. For example, SNMP (Simple Network Management Protocol) or the like may be used to transmit the warning information.
[0028] (7) Output Device 70 The output device 70 is a device that outputs various types of information. The output device 70 is, for example, a display device or a touch screen (touch panel), an audio output device such as a speaker, or a light-emitting device such as an LED (Light-Emitting Diode). The output device 70 notifies the user of a warning, for example, by displaying warning information on the display device. The output device 70 may also notify the user of a warning by, for example, sounding a buzzer or lighting up an LED.
[0029] <1-2. Functional Configuration of Control Board> The hardware configuration of the digital cinema projector 1 according to the first embodiment has been described above. Next, the functional configuration of the control board 10 according to the first embodiment will be described with reference to FIGS. 2 to 4. FIG. 2 is a block diagram showing an example of the functional configuration of the control board 10 included in the digital cinema projector 1 according to the first embodiment. As shown in FIG. 2, the control board 10 includes a control information storage unit 110, a confidential information storage unit 120, a power supply unit 130, a voltage measurement unit 140, a voltage conversion unit 150, a current date and time acquisition unit 160, and a control unit 170.
[0030] (1) Control Information Storage Unit 110 The control information storage unit 110 has a function of storing control information. The function of the control information storage unit 110 is realized by the flash memory 11.
[0031] (2) Confidential Information Storage Unit 120 The confidential information storage unit 120 has a function of storing confidential information. The function of the confidential information storage unit 120 is realized by the non-volatile memory 12.
[0032] (3) Power Supply Unit 130 The power supply unit 130 has a function of supplying power to the confidential information storage unit 120 (non-volatile memory) that stores confidential information used for outputting content. The function of the power supply unit 130 is realized by the button battery 13.
[0033] (4) Voltage Measurement Unit 140 The voltage measurement unit 140 has a function of measuring the voltage of the power supply unit 130. The function of the voltage measurement unit 140 is realized by the voltage measurement circuit 14. The voltage measurement unit 140 measures a voltage value indicating the voltage of the power supply unit 130, and outputs the measured voltage value to the voltage conversion unit 150.
[0034] When measuring the voltage of the power supply unit 130, the voltage measurement unit 140 may use a measurement method that reduces measurement errors due to noise, etc. For example, the voltage measurement unit 140 performs multiple measurements (M times) in one voltage measurement. The voltage measurement unit 140 performs M measurements, for example, at intervals of one second. The voltage measurement unit 140 defines the voltage measurement value at each measurement as Vi (i=0 to M-1), and calculates the maximum value (V max ) and minimum value (V min ) and then averaged (V ave ) is calculated. This allows the voltage measurement unit 140 to take measures against noise on the voltage measurement results.
[0035] (5) Voltage Conversion Unit 150 The voltage conversion unit 150 has a function of converting a voltage value from an analog value to a digital value. The function of the voltage conversion unit 150 is realized by the ADC 15. The voltage conversion unit 150 converts the voltage measurement value measured by the voltage measurement unit 140 from an analog value to a digital value, and outputs the converted voltage measurement value to the control unit 170.
[0036] (6) Current Date and Time Acquisition Unit 160 The current date and time acquisition unit 160 is a device that acquires the current date and time. The function of the current date and time acquisition unit 160 is realized by the RTC 16. The current date and time acquisition unit 160 acquires, for example, the current date and time at the time of voltage measurement by the voltage measurement unit 140 as the measurement date and time. The current date and time acquisition unit 160 outputs the acquired measurement date and time to the control unit 170.
[0037] (7) Control Unit 170 The control unit 170 has a function of controlling the overall operation of the digital cinema projector 1. The functions of the control unit 170 are realized by causing the CPU 17 to execute a program. As shown in FIG. 2 , the control unit 170 includes a measurement information acquisition unit 171, a voltage change rate calculation unit 172, a prediction unit 173, a warning necessity determination unit 174, and an output control unit 175.
[0038] (7-1) Measurement Information Acquisition Unit 171 The measurement information acquisition unit 171 has a function of acquiring measurement information. The measurement information acquisition unit 171 acquires, as measurement information, the voltage measurement value of the power supply unit 130 output from the voltage conversion unit 150 and the measurement date and time output from the current date and time acquisition unit 160. After acquisition, the measurement information acquisition unit 171 associates the corresponding estimated voltage value with the measurement date and time, and stores the association in the control information storage unit 110.
[0039] The measurement information will now be described with reference to Fig. 3. Fig. 3 is a diagram showing an example of the measurement information according to the first embodiment.
[0040] As shown in FIG. 3, the measurement information is information that associates measurement dates and times with voltage measurements. As an example, the voltage measurement value "3.00V" measured at measurement date and time "2022 / 12 / 11 9:00", the voltage measurement value "3.00V" measured at measurement date and time "2022 / 12 / 12 9:00", the voltage measurement value "2.50V" measured at measurement date and time "2025 / 12 / 13 9:00", and the voltage measurement value "2.48V" measured at measurement date and time "2025 / 12 / 13 9:00" are shown. From this, it can be seen that the voltage value of the power supply unit 130 gradually decreases according to the usage time. Note that the measurement date and time "T N-1 " is used to express a certain date and time (for example, the current date and time) as "T N " In the case of "T N " is the measurement date and time immediately before the voltage measurement value "V N-1 " is a date and time "T N (for example, the current date and time) is N " In the case of "T N " The measurement date and time just before "T N-1In this way, the measurement information stores voltage measurement values measured up to the measurement date and time immediately preceding the current date and time.
[0041] Here, the relationship between the usage time and voltage of the button battery 13 will be described with reference to Fig. 4. Fig. 4 is a diagram showing the relationship between the usage time and voltage of the button battery 13 according to the first embodiment. In the graph shown in Fig. 4, the horizontal axis represents usage time (H) and the vertical axis represents voltage (V). In the example shown in Fig. 4, it is assumed that there is no fluctuation in power consumption per unit time.
[0042] As shown in FIG. 4 , the voltage of the button battery 13 fluctuates depending on the time of use. For example, as shown in the graph for section 1, the voltage of the button battery 13 remains constant for a certain period of time after use begins. After the time of use in section 1 has elapsed, the voltage of the button battery 13 begins to gradually decrease, as shown in the graph for section 2. After the time of use in section 2 has elapsed, the voltage of the button battery 13 drops sharply, as shown in the graph for section 3. When the voltage of the button battery 13 reaches its limit, the non-volatile memory 12 can no longer retain confidential information. For this reason, the digital cinema projector 1 needs to output a warning to the user to have the button battery 13 replaced before the voltage of the button battery 13 reaches its limit. The timing to output the warning can be determined, for example, when the voltage of the button battery 13 reaches the threshold V TH This is the timing when the threshold V TH is a second threshold indicating that a warning is necessary. TH is a predetermined time T from the time when the nonvolatile memory 12 can no longer store confidential information. alert The threshold value V is set assuming that a warning is output before the TH For example, the voltage value at which a sudden drop in the voltage value of the power supply unit 130 starts (the boundary value between section 2 and section 3 in FIG. 4) is set as the threshold value V TH A specific value of the time T is, for example, 2.5 V. alert A specific value of is, for example, 200 hours (H). THThe timing (date and time) at which this occurs can be predicted based on the rate of voltage change per unit time in the button battery 13 and the measurement information.
[0043] (7-2) Voltage Change Rate Calculation Unit 172 The voltage change rate calculation unit 172 has a function of calculating the voltage change rate in the power supply unit 130. For example, the voltage change rate calculation unit 172 calculates the voltage change rate per unit time in the power supply unit 130 based on a plurality of pieces of measurement information acquired by the measurement information acquisition unit 171. For example, the voltage change rate calculation unit 172 calculates the voltage change rate per unit time in the power supply unit 130 at a certain measurement date and time T N , T N-1 The voltage measurement values of the power supply unit 130 at N , V N-1 The voltage change rate (slope) is defined as α, and the voltage change rate α is calculated using the following formula (1): α=(V N -V N-1 ) / (T N -T N-1 ) ... (1)
[0044] Using the above formula (1), the voltage change rate calculation unit 172 calculates the voltage change rate α per unit time using linear approximation (first-order approximation). N-1 and the measured voltage V N-1 The measurement information paired with the measurement date and time T N and the measured voltage V N The measurement information, which is a pair of , may be obtained by directly acquiring a measured value or may be acquired from the control information storage unit 110. Note that the voltage change rate calculation unit 172 may calculate the voltage change rate α per unit time using a quadratic approximation instead of a linear approximation.
[0045] (7-3) Prediction Unit 173 The prediction unit 173 has a function of predicting a scheduled warning output date and time. The prediction unit 173 determines whether or not prediction is necessary based on the voltage change rate α calculated by the voltage change rate calculation unit 172. For example, the prediction unit 173 determines whether or not prediction is necessary based on the threshold value α, which indicates that the voltage value is not constant and that the power supply unit 130 is being worn out. TH Whether or not prediction is necessary is determined based on a comparison between the voltage change rate α and the first threshold value α. TH is stored in advance in the control information storage unit 110.TH is, for example, −0.0007.
[0046] The calculated voltage change rate α is equal to or less than the threshold value α TH or more (for example, α = -0.0001). In this case, the prediction unit 173 determines not to predict the scheduled warning output date and time because the voltage of the power supply unit 130 is constant, consumption is not progressing, and the remaining capacity of the power supply unit 130 is sufficient. This is because when the remaining capacity of the power supply unit 130 is sufficient, the power supply unit 130 maintains a constant voltage (interval 1 in FIG. 4), and therefore, if the scheduled warning output date and time were predicted in this state, an accurate prediction would not be possible. On the other hand, if the calculated voltage change rate α is less than the threshold value α TH In this case, the prediction unit 173 determines that the voltage of the power supply unit 130 is not constant and is being consumed, and the remaining capacity of the power supply unit 130 is insufficient, and therefore predicts the scheduled date and time for issuing a warning.
[0047] When predicting the expected date and time of warning output, the prediction unit 173 determines a V TH The prediction unit 173 calculates the time until the voltage value of the power supply unit 130 reaches the second threshold value (second threshold value), and calculates the estimated date and time from the calculated time. N The voltage measurement value V of the power supply unit 130 at N The warning output scheduled date and time is T W The warning output scheduled date and time T is calculated using the following formula (2): W Calculate T W =T N + (V TH -V N ) / α (2) In the above formula (2), the prediction unit 173 calculates (V TH -V N ) / α indicates that a warning is required. TH (second threshold) N The prediction unit 173 calculates the time until the measurement date and time T N The date and time to which the above is added is the warning output scheduled date and time T W It is calculated as:
[0048] (7-4) Warning Necessity Determination Unit 174 The warning necessity determination unit 174 has a function of determining whether a warning is necessary. For example, the warning necessity determination unit 174 determines whether a voltage measurement value V N and threshold V TH The voltage measurement value V is compared with the voltage V to determine whether or not a warning is required. N is the threshold V TH If the voltage measurement value V is equal to or greater than the threshold voltage V, the warning necessity determining unit 174 determines that the remaining capacity of the power supply unit 130 is sufficient and therefore a warning is not necessary. N is the threshold V TH If it is less than this, the warning necessity determining unit 174 determines that the remaining capacity of the power supply unit 130 is insufficient and therefore a warning is necessary.
[0049] (7-5) Output Control Unit 175 The output control unit 175 has a function of controlling the output of various types of information. The output control unit 175 controls the output of warning information in the digital cinema projector 1. For example, the output control unit 175 outputs warning information to the communication device 60 or the output device 70, and causes each device to output the warning information.
[0050] <1-3. Processing Flow> The functional configuration of the control board 10 according to the first embodiment has been described above. Next, the processing flow according to the first embodiment will be described with reference to FIGS.
[0051] (1) Flow of Warning Output Processing for Button Battery First, the flow of warning output processing for the button battery 13 will be described with reference to Fig. 5. Fig. 5 is a flowchart showing an example of the flow of warning output processing for the button battery 13 according to the first embodiment.
[0052] 5, first, the current date and time acquisition unit 160 acquires the current date and time (step S101). Specifically, the current date and time acquisition unit 160 acquires the current date and time when the digital cinema projector 1 is turned on.
[0053] Next, the voltage measurement unit 140 measures the voltage of the power supply unit 130 (step S102). Specifically, the voltage measurement unit 140 measures the voltage of the power supply unit 130 when the digital cinema projector 1 is turned on.
[0054] Next, the measurement information acquisition unit 171 acquires the measurement information and stores it in the control information storage unit 110 (step S103). Specifically, the measurement information acquisition unit 171 acquires, as the measurement date and time, the current date and time acquired by the current date and time acquisition unit 160 when the digital cinema projector 1 is powered on, and acquires, as the voltage measurement value, the measurement value measured by the voltage measurement unit 140 and converted by the voltage conversion unit 150. The measurement information acquisition unit 171 then associates the acquired measurement date and time with the voltage measurement value and stores them in the control information storage unit 110.
[0055] Next, the warning necessity determination unit 174 calculates the voltage measurement value V N and threshold V TH The voltage measurement value V is compared with the voltage measurement value V to determine whether or not a warning is required (step S104). N is the threshold V TH If the voltage measurement value V is less than the threshold voltage V (YES in step S104), the warning necessity determining unit 174 determines that a warning is necessary and proceeds to step S105. N is the threshold V TH If it is not less than the predetermined value (NO in step S104), the warning necessity determining unit 174 determines that a warning is not necessary and ends the process.
[0056] If the process proceeds to step S105, the output control unit 175 causes the output device 70 to output a warning (step S105), and ends the process.
[0057] (2) Flow of Noise Reduction Processing During Voltage Measurement Next, the flow of noise reduction processing during voltage measurement will be described with reference to Fig. 6. Fig. 6 is a flowchart showing an example of the flow of noise reduction processing during voltage measurement according to the first embodiment.
[0058] 6, first, the control unit 170 initializes variables (step S201). After the initialization, the voltage measurement unit 140 measures the voltage (step S202). After the measurement, the voltage measurement unit 140 outputs the measured voltage value V i is the voltage measurement value V that is the maximum value among the voltage measurement values that have been measured. max (Step S203). max If the voltage measurement value V is greater than the reference voltage V (YES in step S203), the voltage measurement unit 140 proceeds to step S204. max If the voltage measurement value V is equal to or less than the reference voltage V (NO in step S103), the voltage measurement unit 140 advances the process to step S205. i The maximum voltage measurement value V max and the process proceeds to step S205 (step S204).
[0059] When the process proceeds to step S205, the voltage measurement unit 140 measures the measured voltage V i is the voltage measurement value V that is the smallest among the voltage measurement values that have been measured. min (Step S205). min If the voltage measurement value V is greater than the reference voltage V (YES in step S205), the voltage measurement unit 140 proceeds to step S206. min If it is equal to or greater than the voltage measurement value V (NO in step S205), the voltage measurement unit 140 proceeds to step S207. i The minimum voltage measurement value V min and the process proceeds to step S207 (step S206).
[0060] When the process proceeds to step S207, the voltage measurement unit 140 calculates a voltage measurement value V sum Measured voltage V i(Step S207). Next, the voltage measurement unit 140 counts up the variable i by 1 (Step S208). After counting up, the voltage measurement unit 140 determines whether the variable i is equal to the number of measurements M, which indicates the number of times the voltage has been measured up to that point (Step S209). If the variable i is equal to the number of measurements M (Step S209 / YES), the voltage measurement unit 140 proceeds to Step S210. On the other hand, if the variable i is not equal to the number of measurements M (Step S209 / NO), the voltage measurement unit 140 repeats the process from Step S202. If the process proceeds to Step S210, the voltage measurement unit 140 calculates the voltage measurement value V, which is the average value of the measured voltage values. ave Specifically, the voltage measurement unit 140 calculates the voltage measurement value V ave Calculate V ave = (V sum -V max -V min ) / (M-2) (3) After the calculation, the voltage measurement unit 140 ends the process. Note that the voltage measurement value V calculated by the voltage measurement unit 140 ave is converted by the voltage conversion unit 150 and acquired as measurement information by the measurement information acquisition unit 171.
[0061] (3) Flow of Warning Output Date and Time Prediction Process Next, the flow of warning output date and time prediction process will be described with reference to Fig. 7. Fig. 7 is a flowchart showing an example of the flow of warning output date and time prediction process according to the first embodiment.
[0062] 7, first, the control unit 170 initializes variables (step S301). After the initialization, the measurement information acquisition unit 171 acquires measurement information (step S302). Specifically, the measurement information acquisition unit 171 acquires measurement information at a certain measurement date and time T N Voltage measurement value V N and measurement date and time T N-1 Voltage measurement value V N-1 The measurement information indicating the above is read and acquired from the control information storage unit 110.
[0063] After acquiring the measurement information, the voltage change rate calculation unit 172 calculates the voltage change rate α (step S303). Specifically, the voltage change rate calculation unit 172 calculates the voltage change rate α from the above formula (1) using the measurement information acquired by the measurement information acquisition unit 171. After calculating the voltage change rate α, the prediction unit 173 checks whether the voltage change rate α calculated by the voltage change rate calculation unit 172 is equal to or lower than the threshold value α. TH It is determined whether the threshold value α is less than the threshold value α (step S304). TH If it is less than the predetermined time (step S304 / YES), the prediction unit 173 sets the warning output scheduled time T W It is determined that prediction of the threshold value α is necessary, and the process proceeds to step S305. TH If it is not less than (step S304 / NO), the prediction unit 173 calculates the warning output scheduled date and time T W It is determined that prediction of is unnecessary, and the process ends.
[0064] When the process proceeds to step S305, the prediction unit 173 calculates the warning output scheduled date and time T W Specifically, the prediction unit 173 predicts the warning output scheduled date and time T from the above formula (2) using the measurement information acquired by the measurement information acquisition unit 171 and the voltage change rate α calculated by the voltage change rate calculation unit 172. W After the prediction, the prediction unit 173 predicts the warning output scheduled date and time T W (Step S306). After updating, the prediction unit 173 ends the process.
[0065] As described above, the digital cinema projector 1 according to the first embodiment comprises a measurement information acquisition unit 171 that acquires measurement information indicating the voltage value of the button battery 13 (power supply unit) that supplies power to the non-volatile memory 12 that stores confidential information and the date and time at which the voltage value was measured, a voltage change rate calculation unit 172 that calculates the voltage change rate per unit time of the button battery 13 based on the acquired multiple pieces of measurement information, and a prediction unit 173 that predicts the scheduled date and time at which a warning urging the user to replace the button battery 13 will be issued if the voltage change rate is less than a first threshold value.
[0066] With this configuration, the digital cinema projector 1 predicts the scheduled date and time of warning output, taking into account the relationship between the usage time of the button battery 13 and voltage changes. For example, the digital cinema projector 1 does not predict the scheduled date and time of warning output during the period when the voltage of the button battery 13 remains constant after it is first used. On the other hand, during the period when the voltage value is not constant and the button battery 13 is becoming depleted, the digital cinema projector 1 predicts the scheduled date and time of warning output based on measurement information acquired during that period. Therefore, the digital cinema projector 1 according to the first embodiment can predict the timing of battery replacement with higher accuracy. This allows the user to more accurately determine when it is time to replace the battery.
[0067] <<2. Second Embodiment>> The first embodiment has been described above. Next, a second embodiment will be described with reference to FIGS. 8 to 13. In the first embodiment described above, an example was described in which the scheduled date and time of warning output is predicted from the measurement results of the voltage of the button battery 13 in one digital cinema projector 1, but the present invention is not limited to this example. In the second embodiment, an example is described in which the scheduled date and time of warning output is predicted using the measurement results of the voltage of the button batteries 13 in multiple digital cinema projectors 1. Note that, below, descriptions that overlap with the first embodiment will be omitted as appropriate.
[0068] 2-1. Configuration of Warning Output Control System The configuration of a warning output control system according to the second embodiment will be described with reference to Fig. 8. Fig. 8 is a diagram showing an example of the configuration of a warning output control system according to the second embodiment. The warning output control system 1000 shown in Fig. 8 is a system that predicts a scheduled warning output date and time using measurement results of the voltages of button batteries 13 in multiple digital cinema projectors 1. As shown in Fig. 8, the warning output control system 1000 includes multiple digital cinema projectors 1-1 to 1-L (L is a natural number) and an external terminal 2.
[0069] (1) Digital Cinema Projectors 1-1 to 1-L Digital cinema projectors 1-1 to 1-L according to the second embodiment are connected to an external terminal 2 via a network NW so as to be able to communicate with the external terminal 2. In communication with the external terminal 2, each of the digital cinema projectors 1-1 to 1-L transmits information necessary for analysis by the external terminal 2 and receives the analysis results. The external terminal 2 calculates a threshold V TH and threshold α TH An analysis is performed to find the optimal value of . Information required for the analysis includes measurement information acquired by the digital cinema projector 1 and information indicating the calculated voltage change rate (hereinafter also referred to as "voltage change rate information"). The analysis result is the optimal value of the threshold value V TH’ and threshold α TH’ This is information indicating the above (hereinafter also referred to as "optimum value information").
[0070] (2) External Terminal 2 The external terminal 2 is a terminal that performs analysis based on information received from the digital cinema projectors 1-1 to 1-L. The external terminal 2 is, for example, a PC (Personal Computer), a server, a smartphone, or a tablet terminal. The external terminal 2 is connected to the digital cinema projectors 1-1 to 1-L via the network NW so that it can communicate with them. In communication with each of the digital cinema projectors 1-1 to 1-L, the external terminal 2 receives information necessary for analysis and transmits the analysis results.
[0071] 2-2. Configuration of Digital Cinema Projector The configuration of the warning output control system 1000 according to the second embodiment has been described above. The hardware configuration of the digital cinema projector 1 according to the second embodiment is similar to the hardware configuration of the digital cinema projector 1 according to the first embodiment described with reference to FIG. 1 , and therefore a description thereof will be omitted.
[0072] <2-3. Functional Configuration of Control Board> Next, the functional configuration of the control board 10a according to the second embodiment will be described with reference to FIG. 9. FIG. 9 is a block diagram showing an example of the functional configuration of the control board 10a included in the digital cinema projector 1 according to the second embodiment. The functional configuration of the control board 10a according to the second embodiment differs from the functional configuration of the control board 10 according to the first embodiment in that the control unit 170a further includes a voltage value optimization unit 176 and a voltage change rate optimization unit 177. Below, the functional configuration of the control board 10a according to the second embodiment will be described, focusing only on the differences from the functional configuration of the control board 10 according to the first embodiment.
[0073] (1) Voltage Value Optimization Unit 176 The voltage value optimization unit 176 optimizes the threshold V TH For example, the voltage value optimization unit 176 optimizes the threshold value V (second threshold value) based on measurement information for each of the digital cinema projectors 1-1 to 1-L. TH Optimize the threshold V TH The initial value of is set to a predetermined time T alert This is set assuming that a warning will be output before the time T alert The time T alert A specific value of V is, for example, 200 hours (H). In other words, the timing at which the warning is actually output may be earlier or later than the timing intended by the user. TH By optimizing the above depending on the situation, the accuracy of prediction of the scheduled warning output date and time can be improved.
[0074] (2) Voltage Change Rate Optimizer 177 The voltage change rate optimizer 177 optimizes the voltage change rate by setting a threshold value α TH For example, the voltage change rate optimization unit 177 optimizes the threshold value α based on the voltage change rate α in each of the digital cinema projectors 1-1 to 1-L. TH Optimize the threshold α THThe initial value of is the threshold V TH Similarly, the voltage change rate α must be calculated from the data sheet of the button battery 13 and stored in advance in the flash memory 11. Therefore, the voltage change rate α may differ from what the user expects. TH By optimizing the above depending on the situation, the accuracy of prediction of the scheduled warning output date and time can be improved.
[0075] In the first embodiment described above, the prediction unit 173 uses the voltage change rate α calculated each time by the voltage change rate calculation unit 172. However, if there is variation in the measurement results of the voltage of the button battery 13, the voltage change rate α will fluctuate each time the scheduled warning output date and time is predicted, resulting in variation in the predicted results of the scheduled warning output date and time. Therefore, in the second embodiment, the prediction unit 173 uses the threshold value α when predicting the scheduled warning output date and time. TH This allows the prediction unit 173 to predict the scheduled warning output date and time more stably than when the voltage change rate α is calculated each time.
[0076] The prediction unit 173 uses the voltage change rate α calculated by the voltage change rate calculation unit 172 or the threshold value α as the voltage change rate used to predict the scheduled date and time. TH The prediction unit 173 uses either the voltage change rate α or the threshold value α to predict the scheduled warning output date and time depending on the situation. TH The prediction unit 173 switches between the voltage change rate α and the threshold value α TH The switching between the two is performed using, for example, a switching flag that is prepared in advance by the user and stored in the flash memory 11. For example, when the flag is 0, the voltage change rate α is used, and when the flag is 1, the threshold value α TH This allows the prediction unit 173 to improve the prediction accuracy of the warning output scheduled date and time. When the voltage change rate α is used, the prediction unit 173 calculates the warning output scheduled date and time T W On the other hand, the threshold α TH When using the voltage change rate α, the prediction unit 173 sets the threshold value α THBased on the measurement information, the warning output scheduled date and time T is calculated using the following formula (4): W Predict (calculate) T W =T N + (V TH -V N ) / α TH ...(4) That is, the prediction unit 173 optimizes the prediction formula used to predict the scheduled warning output date and time. TH The threshold value α before optimization is TH Alternatively, the optimized threshold value α TH’ may also be used.
[0077] <2-4. Functional Configuration of External Terminal> The functional configuration of the control board 10a according to the second embodiment has been described above. Next, the functional configuration of the external terminal 2 according to the second embodiment will be described with reference to FIG. 10. FIG. 10 is a block diagram showing an example of the functional configuration of the external terminal 2 according to the second embodiment. As shown in FIG. 2, the external terminal 2 includes an input unit 210, a communication unit 220, a storage unit 230, a control unit 240, and an output unit 250.
[0078] (1) Input Unit 210 The input unit 210 has a function of receiving input from a user. The input unit 210 is configured by, for example, an input device provided as hardware in the external terminal 2, such as a button, a touch panel, a microphone, a mouse, a keyboard, etc.
[0079] (2) Communication Unit 220 The communication unit 220 has the function of transmitting and receiving various types of information. For example, in communication with digital cinema projectors 1-1 to 1-L, the communication unit 220 receives measurement information, voltage change rate information, and the like, and transmits optimum value information.
[0080] (3) Storage Unit 230 The storage unit 230 has a function of storing various types of information. The storage unit 230 is configured by a storage medium provided as hardware in the external terminal 2, such as a hard disk drive (HDD), a solid state drive (SSD), a flash memory, an electrically erasable programmable read-only memory (EEPROM), a random access read / write memory (RAM), a read-only memory (ROM), or any combination of these storage media.
[0081] (4) Control Unit 240 The control unit 240 has a function of controlling the overall operation of the external terminal 2. The control unit 240 is realized, for example, by causing a CPU or GPU provided as hardware in the external terminal 2 to execute a program. As shown in FIG. 10 , the control unit 240 includes a measurement information collection unit 241, a voltage change rate information collection unit 242, an optimum value calculation unit 243, and an output control unit 244.
[0082] (4-1) Measurement Information Collector 241 The measurement information collector 241 has a function of collecting measurement information. For example, the measurement information collector 241 collects measurement information transmitted from multiple digital cinema projectors 1-1 to 1-L via the network NW.
[0083] (4-2) Voltage Change Rate Information Collector 242 The voltage change rate information collector 242 has a function of collecting voltage change rate information. For example, the voltage change rate information collector 242 collects voltage change rate information transmitted from multiple digital cinema projectors 1-1 to 1-L via the network NW.
[0084] (4-3) Optimal Value Calculation Unit 243 The optimal value calculation unit 243 has a function of calculating an optimal value for optimization. TH and threshold α TH Calculate the optimal value of
[0085] Threshold V THWhen calculating the optimum value of the threshold V TH In this case, the optimum value calculation unit 243 calculates the optimum value of the voltage measurement value V id (id: unique number of the digital cinema projector) id The optimum value calculation unit 243 calculates the median value of the measured voltage V id The median of TH The optimal threshold value V TH’ The result is stored in the storage unit 230.
[0086] Threshold α TH When calculating the optimum value of , the optimum value calculation unit 243 calculates the threshold value α based on the voltage change rate information collected by the voltage change rate information collection unit 242. TH In this case, the optimum value calculation unit 243 calculates the optimum value of the voltage change rate α id (id: unique number of the digital cinema projector) based on the voltage change rate α id The optimum value calculation unit 243 calculates the median value of the voltage change rate α id The median of TH The optimal value of the threshold α TH’ The result is stored in the storage unit 230.
[0087] (4-4) Output Control Unit 244 The output control unit 244 has a function of controlling the output of various information. For example, the output control unit 244 controls whether or not the optimum value calculated by the optimum value calculation unit 243 is transmitted to the digital cinema projectors 1-1 to 1-L in accordance with the user's selection. TH When the optimization of the threshold V is selected, the output control unit 244 TH’ is transmitted to each of the digital cinema projectors 1-1 to 1-L. TH When the optimization of the threshold value α is selected, the output control unit 244 selects the threshold value α TH’is transmitted to each of digital cinema projectors 1-1 to 1-L.
[0088] (5) Output Unit 250 The output unit 250 has a function of outputting various information. The output unit 250 is configured, for example, by an output device provided as hardware in the external terminal 2, such as a display device or a touch screen (touch panel), or an audio output device such as a speaker. The output unit 250 displays, on the display device, for example, the measurement information collected by the measurement information collecting unit 241, the voltage change rate information collected by the voltage change rate information collecting unit 242, the optimal value calculated by the optimal value calculating unit 243, a screen on which the user can select whether to perform optimization, and the like, in accordance with control from the output control unit 244.
[0089] 2-5. Processing Flow The functional configuration of the control board 10a according to the second embodiment has been described above. Next, the processing flow according to the second embodiment will be described with reference to FIGS.
[0090] (1) Flow of the voltage threshold optimization process First, referring to FIG. 11, the voltage threshold V TH 11 is a flow chart of the optimization process for the threshold voltage V TH 11 is a sequence diagram showing an example of the flow of optimization processing of V. In the example shown in FIG. 11, when the timing of outputting a warning is earlier than the intended timing, TH An example of optimizing the above will be described as an example.
[0091] 11 , first, the control unit 170a of each of the digital cinema projectors 1-1 to 1-L initializes variables (step S401). After initialization, the voltage measurement unit 140 of each of the digital cinema projectors 1-1 to 1-L measures the voltage of the power supply unit 130 (step S402). Steps S401 and S402 are performed, for example, when the power of each of the digital cinema projectors 1-1 to 1-L is turned on.
[0092] The voltage value optimization unit 176 of the digital cinema projectors 1-1 to 1-L optimizes the voltage measurement value V measured by the voltage measurement unit 140. N and threshold V TH(Step S403). N is the threshold V TH If it is less than (YES in step S403), the voltage value optimization unit 176 proceeds to step S404. N is the threshold V TH If it is not less than (step S403 / NO), the voltage value optimization unit 176 ends the process.
[0093] When the process proceeds to step S404, the voltage value optimization unit 176 calculates the elapsed time T id (step S404). Next, the voltage value optimization unit 176 calculates the calculated elapsed time T id and time T alert (Step S405). id is time T alert If the elapsed time T id is time T alert If not (step S405 / NO), the voltage value optimization unit 176 ends the process.
[0094] When the process proceeds to step S406, the voltage value optimization unit 176 selects a voltage value (elapsed time T id - Time T alert ) The voltage measurement value V at time point V id (Step S406). id - Time T alert If there is no voltage measurement value at the time point V ), the voltage value optimization unit 176 may extract a voltage measurement value at a nearby date and time as a substitute value. After extraction, the voltage value optimization unit 176 may use the extracted voltage measurement value V id is transmitted as measurement information from the communication device 60 to the external terminal 2 (step S407).
[0095] The measurement information collection unit 241 of the external terminal 2 collects the measurement information transmitted from each of the digital cinema projectors 1-1 to 1-L (step S408). Next, the optimum value calculation unit 243 calculates the threshold value V TH The optimal threshold value V TH’ (Step S409). After the calculation, the optimum value calculation unit 243 calculates the calculated threshold value V TH’ is stored in the storage unit 230 (step S410).
[0096] The output control unit 244 determines the threshold V TH The user confirms whether or not to perform optimization of the threshold V (step S411). TH If the user selects to perform optimization of the threshold V (YES in step S411), the output control unit 244 proceeds to step S412. TH If the output control unit 244 selects not to perform optimization of the threshold V (NO in step S411), the output control unit 244 ends the process. TH The optimal threshold value V TH’ is read from storage unit 230 and transmitted to each of digital cinema projectors 1-1 to 1-L (step S412).
[0097] The voltage value optimization unit 176 of the digital cinema projectors 1-1 to 1-L optimizes the voltage value of the threshold V TH’ The threshold V TH After the optimization, the voltage value optimization unit 176 ends the process.
[0098] In this way, the voltage value optimization unit 176 optimizes the voltage measurement value V indicated by the measurement information extracted from each digital cinema projector 1. N The optimum threshold value V is calculated based on TH’ The threshold V TH The measurement information extracted from each digital cinema projector 1 is the voltage measurement value V of the power supply unit 130 measured when the power of each digital cinema projector 1 is turned on. N is the threshold VTH Less than or equal to the elapsed time T from the time the warning was output to the present id is a predetermined time T alert If the current date and time T is greater than or equal to the value of the N From a predetermined time T alert This is the voltage measurement value at the time just past. alert This will allow warnings to be output at the specified time (hours before the event).
[0099] (2) Flow of Optimization Process for Threshold of Voltage Change Rate Next, the flow of optimization process for threshold of voltage change rate will be described with reference to Fig. 12. Fig. 12 is a sequence diagram showing an example of the flow of optimization process for threshold of voltage change rate according to the second embodiment. In the example shown in Fig. 12, when the voltage change rate α is not an expected value, α TH An example of optimizing the above will be described as an example.
[0100] 12, first, the control unit 170a of each of the digital cinema projectors 1-1 to 1-L initializes variables (step S501). After initialization, the voltage measurement unit 140 of each of the digital cinema projectors 1-1 to 1-L measures the voltage of the power supply unit 130 (step S502). Steps S501 and S502 are performed, for example, when the power of each of the digital cinema projectors 1-1 to 1-L is turned on.
[0101] The voltage change rate optimization unit 177 of the digital cinema projectors 1-1 to 1-L calculates the voltage change rate V measured by the voltage measurement unit 140. N and a constant voltage value V S (Step S503). S is a voltage value when the voltage is maintained constant as in section 1 shown in FIG. 4, and is, for example, 3.0 V. N is a constant voltage value V S If it is less than (YES in step S503), the voltage change rate optimization unit 177 proceeds to step S504. N is a constant voltage value V SIf it is not less than (step S503 / NO), the voltage change rate optimization unit 177 ends the process.
[0102] When the process proceeds to step S504, the voltage change rate optimization unit 177 calculates the voltage change rate V measured by the voltage measurement unit 140. N and threshold V TH (Step S504). N is the threshold V TH If it is equal to or greater than this (step S504 / YES), the voltage change rate optimization unit 177 proceeds to step S505. N is the threshold V TH If not (step S504 / NO), the voltage change rate optimization unit 177 ends the process.
[0103] When the process proceeds to step S505, the voltage change rate optimization unit 177 calculates the measured voltage V N and the corresponding measurement date and time T N and a constant voltage value V S The voltage measurement value V when it first falls below S and the corresponding measurement date and time T s Using this, the voltage change rate α id (Step S505). After the calculation, the voltage change rate optimization unit 177 calculates the calculated voltage change rate α id is transmitted as voltage change rate information from the communication device 60 to the external terminal 2 (step S506).
[0104] The voltage change rate information collecting unit 242 of the external terminal 2 collects the voltage change rate information transmitted from each of the digital cinema projectors 1-1 to 1-L (step S507). Next, the optimum value calculating unit 243 calculates the threshold value α based on the plurality of pieces of voltage change rate information collected by the voltage change rate information collecting unit 242. TH The optimal value of the threshold α TH’ (step S508). After the calculation, the optimum value calculation unit 243 calculates the calculated threshold value α TH’ is stored in the storage unit 230 (step S509).
[0105] The output control unit 244 sets a threshold value α THThe user checks whether or not to perform optimization of the threshold α (step S510). TH If the user selects to perform optimization of the threshold value α (step S510 / YES), the output control unit 244 proceeds to step S511. TH If the output control unit 244 selects not to perform the optimization (step S510 / NO), the output control unit 244 ends the process. TH The optimal value of the threshold α TH’ is read from storage unit 230 and transmitted to each of digital cinema projectors 1-1 to 1-L (step S511).
[0106] The voltage change rate optimization unit 177 of the digital cinema projectors 1-1 to 1-L calculates the optimum threshold value α TH’ The threshold α TH After the optimization, the voltage change rate optimization unit 177 ends the process.
[0107] In this way, the voltage value optimization unit 176 optimizes the threshold value α , which is an optimal value calculated based on the voltage change rate α of each digital cinema projector 1 . TH’ The threshold α TH The voltage change rate α calculated in each digital cinema projector 1 is calculated based on the voltage measurement value V of the power supply unit 130 measured when the power supply of each digital cinema projector 1 is turned on. N is a constant voltage value V S Less than threshold V TH If this is the case, the voltage change rate α is calculated by each digital cinema projector 1. This makes it possible to start predicting the scheduled date and time for warning output at the correct timing.
[0108] (3) Flow of Optimization Process of Warning Output Date and Time Prediction Formula Next, the flow of the warning output date and time prediction process will be described with reference to Fig. 13. Fig. 13 is a flowchart showing an example of the flow of the optimization process of the warning output date and time prediction formula according to the second embodiment.
[0109] 13, first, the control unit 170a initializes variables (step S601). After the initialization, the measurement information acquisition unit 171 acquires measurement information (step S602). Specifically, the measurement information acquisition unit 171 acquires measurement information at a certain measurement date and time T N Voltage measurement value V N and measurement date and time T N-1 Voltage measurement value V N-1 The measurement information indicating the above is read and acquired from the control information storage unit 110.
[0110] After acquiring the measurement information, the voltage change rate calculation unit 172 calculates the voltage change rate α (step S603). Specifically, the voltage change rate calculation unit 172 calculates the voltage change rate α from equation (1) using the measurement information acquired by the measurement information acquisition unit 171. After calculating the voltage change rate α, the prediction unit 173 calculates the voltage change rate α calculated by the voltage change rate calculation unit 172 and the threshold value α. TH (Step S604). When the voltage change rate α is equal to or lower than the threshold value α TH If it is less than the predetermined time (step S604 / YES), the prediction unit 173 calculates the warning output scheduled time T W On the other hand, when the voltage change rate α is greater than the threshold value α TH If it is not less than (step S604 / NO), the prediction unit 173 calculates the warning output scheduled date and time T W It is determined that prediction of is unnecessary, and the process ends.
[0111] When the process proceeds to step S605, the prediction unit 173 checks the value of the flag (step S605). The flag can be set to "0" indicating that the value calculated by the voltage change rate calculation unit 172 is used as the voltage change rate α, or "0" indicating that the value calculated by the voltage change rate calculation unit 172 is used as the voltage change rate α. TH If the flag is 0 (YES in step S605), the prediction unit 173 proceeds to step S606. On the other hand, if the flag is 1 (NO in step S605), the prediction unit 173 proceeds to step S607.
[0112] When the process proceeds to step S606, the prediction unit 173 uses the value calculated by the voltage change rate calculation unit 172 as the voltage change rate α to predict the expected warning output date and time T W (step S606). When the process proceeds to step S607, the prediction unit 173 predicts the voltage change rate α using the threshold value α TH Using this, the warning output scheduled date and time T W After the prediction, the prediction unit 173 predicts the warning output scheduled date and time T W (Step S608). After updating, the prediction unit 173 ends the process.
[0113] As described above, the digital cinema projector 1 according to the second embodiment comprises a measurement information acquisition unit 171 that acquires measurement information indicating the voltage value of the button battery 13 (power supply unit) that supplies power to the non-volatile memory 12 that stores confidential information and the date and time at which the voltage value was measured, a voltage change rate calculation unit 172 that calculates the voltage change rate per unit time of the button battery 13 based on the acquired multiple pieces of measurement information, and a prediction unit 173 that predicts the scheduled date and time at which a warning urging the user to replace the button battery 13 will be output if the voltage change rate is less than a first threshold value.
[0114] With this configuration, the digital cinema projector 1 predicts the scheduled date and time of warning output, taking into account the relationship between the usage time of the button battery 13 and voltage changes. For example, the digital cinema projector 1 does not predict the scheduled date and time of warning output during the period when the voltage of the button battery 13 remains constant after it has started to be used. On the other hand, the digital cinema projector 1 predicts the scheduled date and time of warning output during the period when the voltage value is not constant and the button battery 13 is becoming increasingly depleted, based on measurement information acquired during that period. Thus, the digital cinema projector 1 according to the second embodiment is able to predict the timing of battery replacement with greater accuracy. This allows the user to more accurately grasp the timing of battery replacement. Furthermore, the warning output control system 1000 according to the second embodiment calculates a threshold V based on information acquired by each of the multiple digital cinema projectors 1-1 to 1-L. TH , threshold α THBy optimizing either the prediction formula for the scheduled warning output date and time, or the prediction formula for the scheduled warning output date and time, the prediction accuracy of the scheduled warning output date and time can be improved compared to when predicting the scheduled warning output date and time using a single digital cinema projector 1.
[0115] <<3. Third Embodiment>> The second embodiment has been described above. Next, a third embodiment will be described with reference to FIG. 14. FIG. 14 is a block diagram showing an example of the configuration of a display device according to the third embodiment. As shown in FIG. 14, the display device 3 according to the third embodiment includes a measurement information acquisition unit 310, a voltage change rate calculation unit 320, and a prediction unit 330.
[0116] The measurement information acquisition unit 310 acquires measurement information indicating the voltage value of a power supply unit that supplies power to a nonvolatile memory that stores confidential information, and the date and time when the voltage value was measured.
[0117] The voltage change rate calculation unit 320 calculates the voltage change rate per unit time in the power supply unit based on the acquired plurality of pieces of measurement information.
[0118] If the voltage change rate is less than the first threshold, the prediction unit 330 predicts the scheduled date and time at which a warning urging replacement of the power supply unit will be issued.
[0119] With this configuration, the display device 3 according to the third embodiment predicts the scheduled date and time for outputting a warning, taking into account the relationship between the usage time of the power supply unit and voltage changes. For example, the display device 3 does not predict the scheduled date and time for outputting a warning during a period in which the voltage remains constant after the power supply unit is first used. On the other hand, the display device 3 predicts the scheduled date and time for outputting a warning during a period in which the voltage value is not constant and the power supply unit is becoming worn out, based on measurement information acquired during that period. Thus, the display device 3 according to the third embodiment can more accurately predict the timing of battery replacement.
[0120] The above describes each embodiment of the present invention. Note that some or all of the functions of the digital cinema projector 1, external terminal 2, display device 3, control board 10, control board 10a, and warning output control system 1000 in each of the above-described embodiments may be implemented by a computer. In this case, a program for implementing this function may be recorded on a computer-readable recording medium, and the program recorded on the recording medium may be loaded into a computer system and executed. Note that the term "computer system" as used herein includes hardware such as an OS and peripheral devices. Furthermore, the term "computer-readable recording medium" refers to portable media such as flexible disks, optical magnetic disks, ROMs, and CD-ROMs, as well as storage devices such as hard disks built into a computer system. Furthermore, the term "computer-readable recording medium" may also include media that dynamically store programs for a short period of time, such as communication lines used when transmitting programs via networks such as the Internet or communication lines such as telephone lines, and media that store programs for a fixed period of time, such as volatile memory within the computer systems that serve as the server or client in such cases. Furthermore, the above program may be one that realizes part of the above-mentioned functions, or may be one that can realize the above-mentioned functions in combination with a program already recorded in a computer system, or may be one that is realized using a programmable logic device such as an FPGA (Field Programmable Gate Array).
[0121] The embodiments of the present invention have been described in detail above with reference to the drawings, but the specific configuration is not limited to that described above, and various design changes can be made within the scope of the gist of the present invention.
[0122] 1 (1-1 to 1-L)...Digital cinema projector, 2...External terminal, 3...Display device, 10, 10a...Control board, 11...Flash memory, 12...Non-volatile memory, 13...Button battery, 14...Voltage measurement circuit, 20...Video processing device, 30...Projection device, 40...Projection lens, 50...Operation device, 60...Communication device, 70...Output device, 110...Control information storage unit, 120...Confidential information storage unit, 130...Power supply unit, 140...Voltage measurement unit, 150...Voltage conversion unit, 160...Current date and time acquisition unit, 170, 170a...Control unit, 171 ...measurement information acquisition unit, 172...voltage change rate calculation unit, 173...prediction unit, 174...warning necessity determination unit, 175...output control unit, 176...voltage value optimization unit, 177...voltage change rate optimization unit, 210...input unit, 220...communication unit, 230...storage unit, 240...control unit, 241...measurement information collection unit, 242...voltage change rate information collection unit, 243...optimum value calculation unit, 244...output control unit, 250...output unit, 310...measurement information acquisition unit, 320...voltage change rate calculation unit, 330...prediction unit, 1000...warning output control system, NW...network
Claims
1. A display device comprising: a measurement information acquisition unit that acquires measurement information indicating a voltage value of a power supply unit that supplies power to a non-volatile memory that stores confidential information and a date and time when the voltage value was measured; a voltage change rate calculation unit that calculates a voltage change rate per unit time in the power supply unit based on multiple pieces of acquired measurement information; and a prediction unit that predicts a scheduled date and time at which a warning will be issued to prompt replacement of the power supply unit if the voltage change rate is less than a first threshold value.
2. The display device described in claim 1, wherein the prediction unit calculates the time until the voltage value of the power supply unit reaches a second threshold indicating the need for the warning based on the voltage change rate and the measurement information, and calculates the scheduled date and time from the calculated time.
3. The display device according to claim 2, wherein the second threshold value is a voltage value at which a rapid drop in the voltage value of the power supply unit begins.
4. The display device according to claim 2, further comprising a voltage change rate optimization section that optimizes the first threshold value based on the voltage change rates in a plurality of the display devices.
5. The display device according to claim 4, wherein the voltage change rate in a plurality of display devices is a voltage change rate calculated in each display device when the voltage value of the power supply unit measured when each display device is turned on is less than a certain voltage value and is equal to or greater than the second threshold value, and the voltage change rate optimization unit optimizes the first threshold value by setting a median value calculated based on the voltage change rate of each display device as an optimal value.
6. The display device according to claim 1, wherein the prediction unit switches between using either the voltage change rate calculated by the voltage change rate calculation unit or the first threshold value as the voltage change rate used to predict the scheduled date and time.
7. The display device according to claim 2, further comprising: a voltage value optimization section that optimizes the second threshold value based on the measurement information of a plurality of the display devices.
8. The display device described in claim 7, wherein the second threshold is set assuming that the warning will be output a predetermined time before the non-volatile memory will no longer be able to retain the confidential information, the measurement information in the multiple display devices is measurement information at a point in time the predetermined time prior to the current date and time extracted from past measurement information when the voltage value of the power supply unit measured when each display device is turned on is less than the second threshold and the elapsed time from the output of the warning to the present is equal to or greater than the predetermined time, and the voltage value optimization unit optimizes the second threshold by setting as an optimal value a median value calculated based on the voltage values indicated by the measurement information extracted by each display device.
9. A warning output method for a display device, comprising: acquiring measurement information indicating a voltage value of a power supply unit that supplies power to a non-volatile memory that stores confidential information and a date and time when the voltage value was measured; calculating a voltage change rate per unit time in the power supply unit based on the measurement information; and outputting a warning to encourage replacement of the power supply unit if the voltage change rate is less than a first threshold value.
10. A program for causing a computer to function as: a measurement information acquisition means for acquiring measurement information indicating a voltage value of a power supply unit that supplies power to a non-volatile memory that stores confidential information and the date and time when the voltage value was measured; a voltage change rate calculation means for calculating a voltage change rate per unit time in the power supply unit based on a plurality of pieces of acquired measurement information; and a prediction means for predicting a scheduled date and time at which a warning recommending replacement of the power supply unit will be output if the calculated voltage change rate is less than a first threshold value.
Citation Information
Patent Citations
Semiconductor device
JP2001195307A
Rechargeable battery evaluating method and rechargeable battery
JP2004138586A
Degradation determination method of secondary battery and portable information processor
JP2009216681A
Battery cell for a battery of a motor vehicle, battery, motor vehicle, and method for operating a battery cell
US20180026255A1
Storage battery management device
WO2016162900A1
