Work sharing determination device, work sharing management system, computer-implemented method for determining work sharing, and program

The work division determining device and system efficiently allocate transport tasks between humans and robots, reducing the transition time for automated systems and improving productivity by calculating the best worker or robot for each task based on access ease, thus addressing the challenge of prolonged downtime in existing production systems.

WO2024241690A1PCT designated stage expired Publication Date: 2024-11-28MITSUBISHI ELECTRIC CORP
View PDF 4 Cites 0 Cited by

Patent Information

Application Number
PCT/JP2024/011393
Authority / Receiving Office
WO · WO
Patent Type
Applications
Current Assignee / Owner
Priority Date
2023-05-23
Filing Date
2024-03-22
Publication Date
2024-11-28

AI Technical Summary

Technical Problem

Existing production systems require a long time to transition from manual to automated transport systems, leading to increased downtime and reduced productivity when introducing automatic conveyance systems.

Method used

A work division determining device and system that allocates transport work between humans and robots based on ease of access calculations, allowing for a gradual introduction of automated transport systems by determining the most efficient worker or robot for specific tasks.

Benefits of technology

This approach reduces the time required to introduce automated transport systems, minimizing waiting times and enhancing productivity by optimizing the division of labor between humans and robots.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure JP2024011393_28112024_PF_FP_ABST
    Figure JP2024011393_28112024_PF_FP_ABST
Patent Text Reader

Abstract

Disclosed is a technology for supporting the sharing of conveying work between a person and a robot. A work instruction device (140) with which a system (10) is provided acquires information about a device (101) on which work is performed by a conveying robot (120) or a worker (110), positional information of the worker (110), and operation information of the conveying robot (120), and determines the sharing of work between the conveying robot (120) and the worker (110) on the basis of the information about the device (101), the positional information of the worker (110), and the operation information of the conveying robot (120). The work instruction device (140) uses the information about the device (101), the positional information of the worker (110), and the operation information of the conveying robot (120) to calculate a numerical value indicating the ease with which each of the conveying robot (120) and the worker (110) accesses the device (101), identifies the worker (110) or the conveying robot (120) for which the calculated numerical value indicates the best ease of access, and transmits a work instruction to the identified worker (110) or conveying robot (120).
Need to check novelty before this filing date? Find Prior Art

Description

Work allocation determination device, work allocation management system, computer-implemented method for determining work allocation, and program

[0001] The present disclosure relates to a work sharing device and a work sharing system that share work on a production line between workers and robots.

[0002] 2. Description of the Related Art Systems that use robots to automate transportation are known for efficiently transporting components on production lines.

[0003] For example, Japanese Patent Laid-Open Publication No. 2016-203354 (Patent Document 1) discloses a "production system and production method capable of suppressing declines in productivity even when producing multiple types of products" (see [Problem] in [Abstract]). According to the technology disclosed in Patent Document 1, "a production system 1 according to an embodiment includes a plurality of work robots 11-14 that perform tasks assigned to a workpiece 100; a transfer robot 15 that transfers the workpiece 100 between the plurality of work robots 11-14; and control units 15a, 22 that control the transfer operation of the transfer robot 15. The control units 15a, 22 change the transfer procedure used by the transfer robot 15 depending on the type of workpiece 100" (see [Solution] in [Abstract]).

[0004] Japanese Patent Application Laid-Open No. 2016-203354

[0005] In the production system disclosed in Patent Document 1, all components are transported by a transport robot. When all transport work is performed solely by a transport robot, it takes time to introduce the transport robot, and therefore the time required from introduction of the automated transport system to production operation is longer than the time required for a system in which transport robots are partially introduced. Therefore, there is a need for technology that shortens the time required from introduction of the automated transport system to production operation.

[0006] The present disclosure has been made in view of the above-described background. It is an object of the present disclosure in accordance with a certain aspect to provide a technique for sharing transportation work between humans and robots before an automated transportation system is introduced. It is another object of the present disclosure to provide a technique for supporting the gradual introduction of an automated transportation system.

[0007] According to one embodiment, there is provided a task allocation determination device. The device includes: an acquisition means for acquiring information about a device on which a robot or a worker performs work, location information about the worker, and operation information about the robot; and a determination means for determining the allocation of tasks to the robot and the worker based on the device information, location information about the worker, and operation information about the robot. The determination means uses the device information, location information about the worker, and operation information about the robot to calculate a value indicating the accessibility of the device for each of the robot and the worker, identifies the worker or robot with the calculated best accessibility value, and sends a task instruction to either the identified worker or robot.

[0008] According to another embodiment, there is provided a work allocation management system. This system includes the work allocation determination device described above, a storage device for storing work instructions, and a management device communicably connected to the storage device and for receiving input from outside. The management device receives input of a new work instruction to replace the old work instruction, stores the new work instruction in the storage device, and the determination means transmits the new work instruction to either a worker or a robot.

[0009] According to another embodiment, there is provided a computer-implemented method for determining work allocation. The method includes the steps of: a computer processor reading information about a device on which a robot or a worker performs work, location information about the worker, and operation information about the robot; and a processor determining work allocation for the robot and the worker based on the information about the device, location information about the worker, and operation information about the robot. The determining step includes the steps of calculating, for each of the robot and the worker, a numerical value indicating the accessibility of the device using the information about the device, location information about the worker, and operation information about the robot; identifying the worker or robot with the calculated best accessibility numerical value; and sending a work instruction to either the identified worker or robot.

[0010] According to yet another embodiment, there is provided a program for causing a computer to execute the above method.

[0011] In some respects, it makes it easier to divide the transportation work between humans and robots before introducing an automated transportation system. In other respects, it makes it easier to introduce an automated transportation system in stages.

[0012] The above and other objects, features, aspects and advantages of the present invention will become apparent from the following detailed description of the invention taken in conjunction with the accompanying drawings.

[0013] FIG. 1 is a diagram schematically showing the overall configuration of production system 10. FIG. 2 is a block diagram showing the hardware configuration of computer 200 functioning as work instructing device 140. FIG. 3 is a diagram showing the overall configuration of transport robot 120. FIG. 4 is a diagram schematically showing the overall configuration of load mechanism 102. FIG. 5 is a diagram showing the overall configuration of unload mechanism 103. FIG. 6 is a flowchart showing a part of the processing performed by load mechanism 102 or worker 110 to transport a workpiece. FIG. 7 is a flowchart showing a part of the processing performed in unload mechanism 103. FIG. 8 is a diagram conceptually showing one mode of data storage in hard disk 5 that realizes work master storage unit 150 according to an embodiment. FIG. 9 is a diagram conceptually showing one mode of data storage in hard disk 5 that realizes instruction information management unit 160 according to an embodiment. FIG. 10 is a diagram showing one mode of data storage in hard disk 5 of work instructing device 140. FIG. 11 is a flowchart showing a part of the processing executed by system 10. FIG. 10 is a diagram conceptually showing one mode of data storage on hard disk 5 of computer 200 functioning as work instructing device 140 according to the second embodiment. FIG. 11 is a flowchart showing part of the processing executed by computer 200 functioning as work instructing device 140 according to the second embodiment. FIG. 12 is a diagram conceptually showing one mode of data storage on hard disk 5 of computer 200 functioning as work instructing device 140 according to the third embodiment. FIG. 13 is a diagram conceptually showing one mode of data storage on hard disk 5 of computer 200 functioning as work master storage unit 150 according to the third embodiment. FIG. 14 is a flowchart showing part of the processing executed by computer 200 functioning as work instructing device 140 according to the third embodiment. FIG. 15 is a diagram showing an outline of the configuration of system 1700 according to the fourth embodiment. FIG. 16 is a diagram showing an outline of the configuration of system 1800 according to the fifth embodiment. FIG. 17 is a diagram conceptually showing one mode of data storage on hard disk 5 of computer 200 functioning as management device 1810 according to the fifth embodiment. FIG. 18 is a diagram conceptually showing one mode of data storage on hard disk 5 of computer 200 functioning as work instructing device 140 according to the sixth embodiment.13 is a flowchart showing a part of a process executed by computer 200 functioning as work instructing device 140 according to Embodiment 6. FIG. 14 is a diagram conceptually showing one mode of data storage in hard disk 5 of computer 200 functioning as work master storage unit 150 according to the present embodiment. FIG. 15 is a flowchart showing a part of a process executed by system 10 according to Embodiment 7.

[0014] Hereinafter, an embodiment of the present invention will be described with reference to the drawings. In the following description, the same components are denoted by the same reference numerals. The names and functions of the components are also the same. Therefore, detailed description thereof will not be repeated.

[0015] First Embodiment A system 10 according to the present embodiment will be described with reference to Fig. 1. Fig. 1 is a diagram schematically illustrating the configuration of system 10.

[0016] The system 10 includes one or more production lines 100. The production line 100 includes devices 101A and 101B (collectively referred to as devices 101), a loading mechanism 102 and an unloading mechanism 103 installed in each device 101, a transfer robot 120, a control unit mounted on the transfer robot 120 for controlling the transfer robot 120, a work instruction device 140, a work master storage unit 150, and an instruction information management unit 160. In the production line 100, in addition to the transfer robot 120, a worker 110 can also transport a workpiece.

[0017] The job master storage unit 150 is realized by a hard disk or other non-volatile storage device. The job master storage unit 150 holds master data for the worker 110 and the transport robot 120. The master data includes, for example, the name, area of ​​responsibility, device of responsibility, and other information of the worker 110, as well as the identification information, location, available operating hours, and other information of the transport robot 120.

[0018] The instruction information management unit 160 holds work instructions created by the work instructing device 140. The work instructions include instructions for transport work to be performed by the worker 110 or the transport robot 120. The work instructions may include, for example, identification information of the device 101 that is the target of the transport work, and the scheduled start time and scheduled end time of the transport work.

[0019] The work instructing device 140 is communicably connected to the management system 130. The communication may be wired or wireless. There are no particular limitations on the communication method. The work instructing device 140 includes an instruction unit 141, a determination unit 142, and an output unit 143. The instruction unit 141 communicates with the management device 131, the wearable terminal 132, and the control unit 133, respectively.

[0020] In one aspect, the instruction unit 141 transmits work instructions to the management device 131, the wearable terminal 132, and the control unit 133. In another aspect, the instruction unit 141 receives operation information of the device 101, the work status of the worker 110, and the operation status of the transport robot 120 from the management device 131, the wearable terminal 132, and the control unit 133, respectively.

[0021] The determination unit 142 determines whether the transport task should be performed by the worker 110 or the transport robot 120, based on the information on the device 101, the information on the worker, and the information on the transport robot 120 stored in the task master storage unit 150, as well as the operation information on the device 101, the work status of the worker 110, and the operation status of the transport robot 120. The determination unit 142 transmits a task instruction based on the determination to the worker 110 or the transport robot 120 via the instruction unit 141.

[0022] The output unit 143 outputs the content of the work instruction determined by the determination unit 142 to the instruction information management unit 160. The instruction information management unit 160 stores the content of the work instruction.

[0023] The management system 130 receives instructions from the work instructing device 140. The management system 130 transmits instructions to other devices communicatively connected thereto, acquires information from the other devices, and displays the acquired information. In one aspect, the management system 130 may include a management device 131, a wearable terminal 132, and a control unit 133.

[0024] The management device 131 is communicatively connected to the device 101 and the work instructing device 140. The management device 131 transmits commands to each device, including the device 101, the loading mechanism 102, and the unloading mechanism, and acquires information about the device. The acquired information includes, for example, the operation status of the device 101, whether it is operating, stopped normally, stopped abnormally, and other operating conditions, the content of the work instructed to be performed by the device 101, and the number or frequency of normal processing, but the acquired information is not limited to these exemplified pieces of information, and other information may also be acquired.

[0025] The management device 131 acquires information about each device, including the load mechanism 102 and the unload mechanism 103, from the device and displays the acquired information.

[0026] The wearable terminal 132 is worn by each worker 110. In one aspect, the wearable terminal 132 is a wristwatch-type terminal with a monitor that receives information from the work instructing device 140 and displays the information on the monitor. In another aspect, the wearable terminal 132 may be a head-mounted device, a glasses-type device, a power suit, or the like. In this case, the wearable terminal 132 has a GPS (Global Positioning System) module, an indoor positioning device, or other positioning circuitry. The wearable terminal 132 acquires location information of the worker wearing it and transmits the acquired location information to the management system 130. In another aspect, the wearable terminal 132 may accept information input by the worker and transmit the information to the work instructing device 140.

[0027] The control unit 133 is mounted on the transport robot. The control unit 133 acquires position information of the transport robot. In this embodiment, the position information may be either position information identified by a GPS signal or position information based on a displacement from a reference position set in advance in an area where the transport robot is used.

[0028] In another aspect, for example, a configuration may be employed in which a signal transmitter provided at a location in the area where position information has been specified in advance emits a signal including the position, a transport robot receives the signal, and the wearable terminal 132 receives the signal. In this case, when the transport robot receives the signal and transmits the position information included in the received signal to the management device 131 or the work instructing device 140, the management device 131 or the work instructing device 140 can identify the position of the transport robot. Furthermore, when the wearable terminal 132 receives the signal and transmits the position information included in the received signal to the management device 131 or the work instructing device 140, the management device 131 or the work instructing device 140 can identify the position of the wearable terminal 132.

[0029] The work instructing device 140 is realized, for example, as a computer having a known configuration. The wearable terminal 132 is communicably connected to the work instructing device 140 and transmits position information of the worker 110 to the work instructing device 140. In another aspect, the wearable terminal receives a work instruction from the work instructing device 140 and notifies the worker 110 that the work instruction has been received and the content of the work instruction.

[0030] The transport robot 120 includes a control unit 133 for controlling the transport robot 120. In one aspect, the control unit 133 is communicably connected to a work instructing device 140 and transmits position information of the transport robot 120 to the work instructing device 140. In another aspect, the control unit receives a work instruction from the work instructing device 140 and notifies the worker 110 that the work instruction has been received and the content of the work instruction. Details of the transport robot 120 will be described later ( FIG. 3 ).

[0031] The production line 100 is, for example, a line for assembling products such as semiconductor products. The production line 100 performs a plurality of processes on the products.

[0032] The device 101 is capable of performing at least one process. Each of the multiple devices is independently arranged for each process. After processing in the previous process, the workpiece is transported to the next process. The transport is achieved either by a transport robot 120 or by a worker 110.

[0033] It is also possible that the worker 110 and the transport robot 120 work together. To enable this, the production line 100 is equipped with a loading mechanism 102 and an unloading mechanism 103. Details of the loading mechanism 102 and the unloading mechanism 103 will be described later (FIGS. 3 and 4).

[0034] [Configuration of Work Instructing Device] The configuration of the work instructing device 140 will be described with reference to Fig. 2. Fig. 2 is a block diagram showing the hardware configuration of a computer 200 that functions as the work instructing device 140.

[0035] The computer 200 includes, as its main components, a CPU (Central Processing Unit) 1 that executes a program, a mouse 2 and keyboard 3 that receive instructions input by the user of the computer 200, a RAM 4 that volatilely stores data generated by the CPU 1 executing the program or data input via the mouse 2 or keyboard 3, a hard disk 5 that nonvolatilely stores data, an optical disk drive 6, a communication interface (I / F) 7, and a monitor 8. The components are interconnected by a data bus. A CD-ROM (Compact Disc-Read Only Memory) 9 or other optical disk is loaded into the optical disk drive 6.

[0036] The processing in computer 200 is realized by the various pieces of hardware and software executed by CPU 1. Such software may be pre-stored on hard disk 5. Alternatively, software may be stored on CD-ROM 9 or other recording media and distributed as a computer program. Alternatively, software may be provided as a downloadable application program by an information provider connected to the Internet. Such software is read from the recording media by optical disk drive 6 or other reading device, or downloaded via communication interface 7, and then temporarily stored on hard disk 5. The software is read from hard disk 5 by CPU 1 and stored in RAM 4 in the form of an executable program. CPU 1 executes the program.

[0037] Each component constituting the computer 200 shown in FIG. 2 is a general component. Therefore, one essential part of the technical idea of ​​the present disclosure can be said to be software stored in the RAM 4, hard disk 5, CD-ROM 9, or other recording medium, or software that can be downloaded via a network. The recording medium may include a non-transitory computer-readable data recording medium. Since the operation of each piece of hardware in the computer 200 is well known, detailed description thereof will not be repeated.

[0038] The recording medium is not limited to a CD-ROM, a FD (Flexible Disk), or a hard disk, but may also be a medium that carries a program in a fixed manner, such as an SSD (Solid State Drive), a magnetic tape, an optical disk (MO (Magnetic Optical Disc) / MD (Mini Disc) / DVD (Digital Versatile Disc)), an IC (Integrated Circuit) card (including a memory card), an optical card, a mask ROM, an EPROM (Electronically Programmable Read-Only Memory), an EEPROM (Electronically Erasable Programmable Read-Only Memory), or a semiconductor memory such as a flash ROM.

[0039] The program referred to here includes not only a program that can be directly executed by a CPU, but also a source program, a compressed program, an encrypted program, and the like.

[0040] The transport robot 120 will be described with reference to Fig. 3. Fig. 3 is a diagram showing an outline of the configuration of the transport robot 120. The transport robot 120 includes a stage 310, a moving mechanism 320, a control unit 330, a presence sensor 340, a gripping hand 350, and a vision sensor 360. In one aspect, the transport robot 120 has two axes, and can control the attitude of the gripping hand 350 around each axis as the center of rotation.

[0041] The stage 310 accommodates the workpiece to be transported. The moving mechanism 320 moves the transport robot 120 to a position within the reach of the gripping hand 350. The control unit 330 controls the operation of the transport robot 120. The operation includes movement by the moving mechanism 320, gripping or release by the gripping hand 350, raising and lowering the gripping hand 350, and rotation of the gripping hand 350. The presence sensor 340 detects whether a workpiece is present on the stage 310. The presence sensor 340 can be realized, for example, using an infrared light-emitting element and an infrared light-receiving element.

[0042] In one aspect, the transfer robot 120 grasps the position of a workpiece using a vision sensor 360 and grasps the workpiece with a grasping hand 350. The transfer robot 120 places the grasped workpiece on a stage 310 and moves within the production line 100 using a moving mechanism 320. The presence of the workpiece placed on the stage 310 is detected by a load sensor 340, and an output signal from the load sensor 340 is sent to a control unit 330. The control unit 330 transmits information based on the output signal as the work status of the transfer robot 120 to a work instruction device 140, and the information is accumulated in a database.

[0043] [Loading mechanism 102] The loading mechanism 102 will be described with reference to Figure 4. Figure 4 is a diagram showing a schematic configuration of the loading mechanism 102. The loading mechanism 102 includes a positioning mechanism 410, a width-aligning mechanism 420, a claw 430, a presence sensor 440, a light curtain 450, a two-dimensional code reader 460, a monitor 470, and a control unit 480. The positioning mechanism 410 includes the width-aligning mechanism 420 and the claw 430. In one aspect, a workpiece 490 is mounted on the loading mechanism 102.

[0044] The positioning mechanism 410 uses the width adjustment mechanism 420 and the claws 430 to place the workpiece at a predetermined position.

[0045] The presence sensor 440 detects whether or not a workpiece is present at a predetermined position in the loading mechanism 102 .

[0046] The light curtain 450 serves as a safety sensor and detects intrusion into a predetermined area of ​​the load mechanism 102. The predetermined area is determined in advance as an area where intrusion is prohibited for the safety of workers.

[0047] The two-dimensional code reader reads the two-dimensional code attached to the workpiece 490 or the container that contains the workpiece 490 .

[0048] Monitor 470 displays the details of the work to be performed by worker 110. Monitor 470 is realized by, for example, an organic EL (Electro Luminescence) monitor, a liquid crystal monitor, or the like.

[0049] The control unit 480 communicates with the work instructing device 140 and controls the operation of the loading mechanism 102 based on signals received from the work instructing device 140. The control unit 480 is realized by, for example, a control device having functions similar to those of the computer 200.

[0050] [Unloading Mechanism 103] The unloading mechanism 103 will be described with reference to Fig. 5. Fig. 5 is a diagram showing a schematic configuration of the unloading mechanism 103. The unloading mechanism 103 includes a stage 500, a presence sensor 510, a light curtain 520, and a control unit 530. The workpiece 490 is present on the stage 500.

[0051] The stage 500 accommodates and transports the workpiece 490. The stage 500 includes, for example, a belt conveyor (not shown).

[0052] The presence sensor 510 detects that the workpiece 490 is present on the stage 500. For example, the presence sensor 510 detects that the workpiece 490 has been carried onto the stage 500.

[0053] The light curtain 520 serves as a safety sensor and detects intrusion into a predetermined area of ​​the unloading mechanism 103. The predetermined area is determined in advance as an area where intrusion is prohibited for the safety of workers.

[0054] The control unit 530 communicates with the work instructing device 140 and controls the operation of the unloading mechanism 103 based on a signal received from the work instructing device 140. The control unit 480 is realized by, for example, a control device having functions similar to those of the computer 200.

[0055] [Loading Operation] The loading operation according to this embodiment will be described with reference to Fig. 6. Fig. 6 is a flowchart showing part of the process performed by the loading mechanism 102 or the worker 110 to transport a workpiece.

[0056] In step S610, the loading mechanism 102 or the worker 110 transports the workpiece to the device 101.

[0057] In step S620, the loading mechanism 102 or the worker 110 places the workpiece on the stage 310 of the loading mechanism 102. At this time, if the light curtain 450 detects the presence of a foreign object, for example, the hand of the worker 110 or the grasping hand 350 of the transport robot 120, inside the loading mechanism 102, the control unit 480 stops the operation of the loading mechanism 102.

[0058] In step S630, the presence sensor 440 of the loading mechanism 102 detects the workpiece 490 placed on the stage 400.

[0059] In step S640, the loading mechanism 102 or the operator 110 performs positioning in the x-axis direction using the width adjustment mechanism 420.

[0060] In step S650, the loading mechanism 102 or the operator 110 uses the claw 430 to perform positioning in the y-axis direction.

[0061] In step S660, the loading mechanism 102 or the worker 110 temporarily stops the transport of the workpiece 490 before loading the workpiece 490 into the device 101.

[0062] In step S670, the loading mechanism 102 or the worker 110 reads the two-dimensional code attached to the workpiece or the two-dimensional code attached to the container that contains the workpiece.

[0063] In step S680, the loading mechanism 102 or the worker 110 resumes the temporarily stopped transport and pulls the workpiece into the device 101. The presence sensor 440 detects that the workpiece has been removed from the stage 400.

[0064] In step S690, the control unit 480 of the loading mechanism 102 records that the loading operation of carrying the workpiece into the device 101 has been completed.

[0065] [Unloading Operation] The unloading operation according to this embodiment will be described with reference to Fig. 7. Fig. 7 is a flowchart showing part of the processing performed by unloading mechanism 103.

[0066] In step S710, the device 101 unloads the processed workpiece 490 to the unloading mechanism 103.

[0067] In step S720, the workpiece 490 is transferred to the stage 500 of the unloading mechanism 103.

[0068] In step S730, the presence sensor 510 of the unloading mechanism 103 detects the presence of the workpiece 490.

[0069] In step S740, the control unit 530 of the unloading mechanism 103 requests the collection of the workpiece 490. For example, the control unit 530 transmits a signal requesting the collection to the transport robot 120. Alternatively, the control unit 530 transmits the signal to the wearable terminal 132 worn by the worker 110.

[0070] In step S750, the transfer robot 120 or the worker 110 moves to the unloading mechanism 103.

[0071] In step S760, the transfer robot 120 inserts the gripping hand 350 through the light curtain 520 to retrieve the workpiece 490. Alternatively, the worker 110 inserts his / her hand through the light curtain 520 to retrieve the workpiece 490.

[0072] In step S 770 , the control unit 530 of the unloading mechanism 103 stops the operation of the unloading mechanism 103 based on the signal output from the light curtain 520 .

[0073] In step S780, the control unit 530 detects that the workpiece 490 has disappeared from the stage 500 based on the signal output from the presence sensor 510, and detects that the workpiece 490 has been collected from the unload mechanism 103.

[0074] In step S790, the control unit 530 records that the unloading operation of the workpiece 490 has been completed.

[0075] [Data Structure] The data structure of task master storage unit 150 will be described with reference to Fig. 8. Fig. 8 is a diagram conceptually showing one mode of data storage in hard disk 5 that realizes task master storage unit 150 according to an embodiment.

[0076] The job master storage unit 150 holds a table 800 that stores master data. The table 800 includes equipment names 810, job names 820, and processing times 830. The equipment names 810 are the names of the multiple pieces of equipment 101 that make up the production line 100.

[0077] The task name 820 indicates a task to be performed by the device identified by the device name. In a certain aspect, one device 101 can process one or more tasks.

[0078] The processing time 830 indicates the standard work time required to complete the work identified by the work name 820. The unit of the processing time is not particularly limited.

[0079] The data structure of instruction information management unit 160 will be described with reference to Fig. 9. Fig. 9 is a diagram conceptually showing one mode of data storage in hard disk 5 realizing instruction information management unit 160 according to an embodiment.

[0080] The instruction information management unit 160 stores information acquired by the work instructing device 140 and instructions given by the work instructing device 140 in a database. For example, the instruction information management unit 160 stores tables 910 and 920 as tables to be stored. Table 910 includes information about the device. Table 920 includes the work status and schedule of the worker and transport robot.

[0081] More specifically, the table 910 includes a device name 911, a status 912, and a task completion schedule 913. The device name 911 indicates the name of the device 101 that performs the task. The status 912 indicates the status of the device. The task completion schedule 913 indicates the scheduled time when the task will be completed.

[0082] Table 920 includes a task ID (Identification) 921, a worker name 922, a device name 923, a task schedule 924, a start time 925, an end time 926, and a status 927. The task ID 921 identifies the task to be performed on the device 101. The worker name 922 identifies the worker in charge of the task. The device name 923 indicates the device 101 (e.g., device 101A or device 101B) that will perform the task. The task schedule 924 indicates the content of the task scheduled for the device. The start time 925 indicates the time when the task began. The end time indicates the time when the task ended. In some cases, if the task has not yet ended, the end time 926 includes, for example, null or other management information instead of a specific time. The status 927 indicates whether the task identified by the task ID 927 is completed or in progress.

[0083] In another aspect, the instruction information management unit 160 may further store the operating rate, cycle time, production results, and error history of each device 101 from the information in the table 920, and display this information on the monitor 8 of the computer 200 functioning as the work instruction device 140.

[0084] The data structure of the work instructing device 140 will be described with reference to FIG. 10 . FIG. 10 is a diagram showing one mode of data storage on the hard disk 5 of the work instructing device 140. The hard disk 5 of the work instructing device 140 stores a table 1000. The table 1000 includes areas 1010 and 1020. Area 1010 stores scores. Area 1020 stores the time required before arrival at the device 101. For example, if the time is within one minute, one point is assigned. If the time is five minutes or more, five points are assigned. Points are defined in advance according to the length of the arrival time, and the work instructing device 140 selects a worker or a transport robot as the target of the work instruction depending on the score.

[0085] [Control Structure] The control structure of the system 10 will be described with reference to Fig. 11. Fig. 11 is a flowchart showing a part of the processing executed by the system 10. In a certain stage, the worker 110 and the transfer robot 120 cooperate with each other on the production line 100.

[0086] In step S1110, the management system 130 acquires information about the worker 110 and the transport robot 120. More specifically, the management system 130 acquires identification information and location information about the worker 110, who is the user, from the wearable terminal 132. The management system 130 also acquires identification information, status, and location information about the transport robot 120 from the control unit 133 of the transport robot 120.

[0087] In step S1120, management system 130 acquires information about each device from each device 101. The acquired information includes identification information of the device, its operating status, and other information indicating its status.

[0088] In step S1130, the management system 130 transmits the information acquired in steps S1110 and S1120 to the work instructing device 140. More specifically, the position information of the worker 110, the position information of the transport robot 120, and the identification information, operating status, and other information of each device 101 are transmitted to the work instructing device 140.

[0089] In step S1140, CPU 1 of computer 200 operating as work instructing device 140 functions as determination unit 142 to determine whether the acquired information includes a work request. If CPU 1 determines that the information includes a work request (YES in step S1140), it switches control to step S1150. Otherwise (NO in step S1140), CPU 1 returns control to step S1110.

[0090] In step S1150, the CPU 1, functioning as the determination unit 142, acquires the times until the worker 110 and the transport robot 120 arrive at the apparatus 101. For example, the determination unit 142 calculates the arrival times based on the distances between the positions identified based on the position information acquired from each of the worker 110 and the transport robot 120 and the apparatus 101 for which work is requested.

[0091] In step S1160, CPU 1, functioning as determination unit 142, accesses the database of table 1000 and calculates the score of each candidate that can be the target of instruction based on a predetermined evaluation point system. In this embodiment, in the evaluation point system, the evaluation point is calculated, for example, as follows: Evaluation point = Time to arrival × a, where a is a weight.

[0092] In one aspect, CPU 1 functions as determination unit 142 to determine the worker or transport robot with the smallest score obtained by calculation as the target of the work instruction.

[0093] In step S1170, CPU 1 as instructing unit 141 transmits a work instruction to the candidate determined as the target of the work instruction, that is, worker 110 or transport robot 120 with the lowest calculated evaluation points.

[0094] In step S1180, CPU 1 functions as output unit 143 to output the history of work instructions to the database of instruction information management unit 160 (table 910).

[0095] In step S1190, CPU 1 functioning as determination unit 142 determines whether or not to end the process. If CPU 1 determines to end the process (YES in step S1190), it ends the control. Otherwise (NO in step S1190), CPU 1 returns the control to step S1110.

[0096] As described above, according to this embodiment, the management system 130 determines, as a candidate for performing a task, either the worker 110 or the transport robot 120 that takes the shortest time to reach the device 101 that requires the task. This makes it possible to minimize transport wait times on the production line 100.

[0097] Second Embodiment A second embodiment will now be described with reference to Figures 12 and 13. System 10 according to this embodiment differs from system 10 according to the first embodiment in that it determines the target of work instructions by taking into consideration multiple factors, not just the time required for arrival.

[0098] The system according to the present embodiment is realized using a hardware configuration similar to that of system 10 according to embodiment 1. The system according to the present embodiment will be described below using the components exemplified in system 10 of embodiment 1.

[0099] In certain situations, in the production line 100, the workers 110 and the transport robots 120 are often in charge of multiple tasks. Therefore, there is a possibility that the workers 110 and the transport robots 120 are working near the area where the work is requested by the device 101. Therefore, the management system according to the present embodiment determines the target of the work instruction by further considering factors other than the time until arrival in the evaluation formula for determining the target.

[0100] [Data Structure] The data structure of work instructing device 140 will now be described with reference to Fig. 12. Fig. 12 is a diagram conceptually showing one mode of data storage on hard disk 5 of computer 200 functioning as work instructing device 140 according to the second embodiment. Hard disk 5 includes table 1200.

[0101] Table 1200 includes scores 1210 and work schedules 1220. Score 1210 is used to derive the scores used in the evaluation formula according to this embodiment. Work schedule 1220 represents a work schedule based on the current states of workers 110 and transport robots 120 in production line 100 according to this embodiment. For example, if a certain worker 110 or transport robot 120 does not currently have a work schedule, work schedule 1220 will be "no schedule" and the score will be 1 point.

[0102] Then, the system 10 according to the present embodiment uses the data in table 1200 in addition to table 1000 to determine the worker 110 or the transport robot 120 to whom work instructions will be given. In this case, the work instruction device 140 derives the evaluation score using the following formula: Evaluation score = Time until arrival × a + Work schedule × b, where a and b are weights.

[0103] The work instruction device 140 according to this embodiment takes into consideration two factors, namely, the time until arrival and the work schedule, and determines whether the person to whom instructions for the device 101 requiring work will be sent is either the worker 110 or the transport robot 120.

[0104] [Control Structure] The control structure of work instructing device 140 will now be described with reference to Fig. 13. Fig. 13 is a flowchart showing a part of the processing executed by computer 200 functioning as work instructing device 140 according to the second embodiment. Note that the same processes as those described above are denoted by the same reference numerals. Therefore, description of the same processes will not be repeated.

[0105] In step S1310 , CPU 1 functioning as determination unit 142 acquires the work schedule of worker 110 and transport robot 120 from table 1200 .

[0106] In step S1320, CPU 1 as determination unit 142 calculates a score for the instruction target candidate based on the time and the work schedule using the above-mentioned formula "time until arrival×a+work schedule×b".

[0107] Then, the judgment unit 142 sends the work instruction to the candidate determined as the target of the work instruction, i.e., the worker 110 or transport robot 120 with the lowest calculated evaluation points (step S1170), and outputs the history of the work instruction to the database of the instruction information management unit 160 (step S1180).

[0108] As described above, according to this embodiment, the management system 130 determines the target of a work instruction by taking into consideration the current work status and future work schedule of the worker 110 and the transport robot 120. Therefore, the work instructing device 140 can provide optimal work instructions by taking into consideration the overall load status of the worker 110 and the transport robot 120 that are the target of the work instruction.

[0109] Embodiment 3. Embodiment 3 will be described with reference to Figures 14 to 16. The management system according to this embodiment differs from management system 130 according to the above-described embodiment in that it has a function for instructing work taking into account the characteristics of worker 110 or transport robot 120.

[0110] That is, the evaluation point system in each of the above-described embodiments employs an algorithm that takes into consideration the time until the arrival of the worker 110 and the transport robot 120 and the worker load.

[0111] However, there are cases where it is desirable to give priority to the worker 110 or the transport robot 120 depending on the task. For example, when a small number of or lightweight members are to be transported over a short distance, transport by the worker 110 is more efficient than transport by the transport robot 120. Conversely, when a large number of members are to be transported over a long distance, transport by the transport robot 120 is more efficient than transport by the worker 110.

[0112] Therefore, taking into consideration that the efficiency of the transport means varies depending on the object to be transported and the transport distance, the management system according to this embodiment switches the formula for calculating the evaluation value depending on the transport means, as follows.

[0113] The management system according to the present embodiment is realized using a hardware configuration similar to that of management system 130 according to the first embodiment. Therefore, description of the hardware configuration will not be repeated. Below, the management system according to the present embodiment will be described using the components exemplified in production system 10 that uses management system 130 of the first embodiment.

[0114] [Data Structure] The data structure of work instructing device 140 will be described with reference to Fig. 14 . Fig. 14 is a diagram conceptually illustrating one mode of data storage on hard disk 5 of computer 200 functioning as work instructing device 140 according to the third embodiment. Hard disk 5 holds table 1400. Table 1400 includes task priority C. Task priority C specifies whether a person (e.g., worker 110) or transport robot 120 is to be prioritized as the transport means. In a certain aspect, when a user of work instructing device 140, for example, an administrator of system 10, inputs data specifying task priority C into work instructing device 140, work instructing device 140 stores the data in hard disk 5.

[0115] The data structure of task master storage unit 150 according to this embodiment will be described with reference to Fig. 15. Fig. 15 is a conceptual diagram showing one mode of data storage in hard disk 5 functioning as task master storage unit 150. Hard disk 5 holds table 1500. Table 1500 further includes task priority C in addition to the items included in table 800. The items included in table 800, namely, device name 810, task name 820, and processing time 830, are the same as those in embodiment 1, and therefore description thereof will not be repeated.

[0116] 14 is reflected in the task master storage unit 150. The task instruction device 140 according to this embodiment accesses the task master storage unit 150, reads out the table 1500, and calculates an evaluation value.

[0117] According to the present embodiment, when the value of task priority C is greater than 0 and less than 1, determination unit 142 calculates the evaluation points for each of worker 110 and transport robot 120 using the following formulas. - For worker: Evaluation point = (time until arrival × a + scheduled work × b) × C - For transport robot: Evaluation point = (time until arrival × a + scheduled work × b) × (1 - C) In another aspect, when the value of task priority C is 1, determination unit 142 determines that the instruction target is transport robot 120, and calculates the evaluation point using the formula according to embodiment 1 or 2. In another aspect, when the value of task priority C is 0, determination unit 142 determines that the instruction target is only worker 110, and calculates the evaluation point using the formula according to embodiment 1 or 2.

[0118] [Control Structure] Now, the control structure of work instructing device 140 according to the present embodiment will be described with reference to Fig. 16. Fig. 16 is a flowchart showing a part of the processing executed by computer 200 functioning as work instructing device 140. Note that the same processes as those described above are denoted by the same reference numerals. Therefore, description of the same processes will not be repeated.

[0119] In step S1610 , CPU 1 accesses the task priority C of worker 110 and transport robot 120 in table 1500 read from task master storage unit 150 .

[0120] In step S1620, CPU 1 as determination unit 142 calculates the evaluation score of the candidate to be instructed based on the time, the work schedule, and the work priority C using the above-mentioned formula.

[0121] Thereafter, the work instructing device 140 transmits a work instruction to the candidate with the lowest score (step S1170), and outputs the history of the work instruction to the database of the instruction information management unit 160 (step S1180).

[0122] As described above, according to this embodiment, work instructions are sent to the worker 110 or the transport robot 120 in consideration of the predetermined work priority C. If the work priority C is set in advance according to the work content, more efficient transport can be achieved.

[0123] Fourth Embodiment A fourth embodiment will be described with reference to Fig. 17. Fig. 17 is a diagram showing an outline of the configuration of a system 1700 according to the fourth embodiment. According to this embodiment, a manager 1720 of the production line 100 can use a monitoring device 1710 to monitor the state of each device 101 and the working status of the worker 110 and the transport robot 120.

[0124] The system according to the present embodiment is realized using a hardware configuration similar to that of system 10 according to embodiment 1. The system according to the present embodiment will be described below using the components exemplified in system 10 of embodiment 1.

[0125] 17 , system 1700 includes a monitoring device 1710 in addition to the components of system 10. Monitoring device 1710 is implemented by computer 200. Monitoring device 1710 is communicably connected to instruction information management unit 160 via network 1790. Network 1790 may be either the Internet or an intranet. Furthermore, communication may be either wired or wireless, and the communication format is not particularly limited.

[0126] The monitoring device 1710 receives the status of each of the above-mentioned devices 101 and the work status of the worker 110 and the transport robot 120 from the instruction information management unit 160, and displays the received information on the monitor 8. By visually checking the information displayed on the monitor 8, the manager 1720 of the production line 100 can easily grasp the operating status of the production line 100 and other information.

[0127] According to the system 1700 of the present embodiment, the monitoring device 1710 acquires in real time information on the operating status of each device 101 and other information, as well as the position information of the worker 110 or the transport robot 120, and accumulates information on the device 101 and data on the working status of the worker 110 or the transport robot 120. This makes it easier to improve the production line 100 and optimize the work rules.

[0128] Fifth Embodiment A fifth embodiment will be described with reference to Fig. 18. Fig. 18 is a diagram showing an outline of the configuration of a system 1800 according to the fifth embodiment. According to this embodiment, a manager 1720 of a production line 100 can use a management device 1810 to monitor the state of each device 101 and the work status of a worker 110 and a transport robot 120. Furthermore, the manager 1720 can use the management device 1810 to give work instructions to the worker 110 or the transport robot 120.

[0129] The same components as those described in the above embodiment are denoted by the same reference numerals. The functions of the respective components are also the same. Therefore, the description of the same components will not be repeated.

[0130] As shown in FIG. 18 , the system 1800 includes a management device 1810 instead of the monitoring device 1710 in the configuration of the system 1700. The management device 1810 is realized by the computer 200. The management device 1810 is communicatively connected to the work instructing device 140 via a network 1890. The network 1890 may be either the Internet or an intranet. Furthermore, communication may be either wired or wireless, and the communication format is not particularly limited. The management device 1810 accepts input of instructions from the administrator 1720. The instructions include instructions for the worker 110 or the transport robot 120.

[0131] According to this embodiment, the manager 1720 of the production line 100 can directly give instructions to the workers 110 and the transport robot 120. For example, there may be a case where a work instruction to worker A, who is scheduled to immediately perform a large, urgent task, is canceled and the instruction is changed to worker B. In this case, even if worker A is scheduled to perform an urgent event, the urgent event is not registered in the instruction information management unit 160. Therefore, the work instruction device 140 may determine that worker A has no work scheduled and select worker A as the target of the work instruction. In such a case, it is necessary to cancel the work instruction to worker A, who is confirmed to perform the large task, and give the work instruction to worker B, who is selected as the next candidate based on the evaluation points.

[0132] Therefore, the administrator 1720 of the system 1800 can use the management device 1810 to cancel the work instruction generated for the worker A and give the work instruction to the worker B. As a result, when it becomes necessary to deal with information that is not registered in the instruction information management unit 160, the administrator 1720 can cancel the work instruction generated by the work instructing device 140 or generate a new work instruction that the work instructing device 140 cannot generate, and give the work instruction to the target worker 110 or transport robot 120.

[0133] [Data Structure] The data structure of management device 1810 will be described with reference to Fig. 19. Fig. 19 is a diagram conceptually showing one mode of data storage on hard disk 5 of computer 200 functioning as management device 1810 according to the present embodiment. Hard disk 5 includes table 1900. Table 1900 includes a task ID 1921, a worker name 1922, a device name 1923, a task schedule 1924, a start time 1925, an end time 1926, and a status 1927.

[0134] The task ID 1921 corresponds to the task ID 921. The worker name 1922 corresponds to the worker name 922. The device name 1923 corresponds to the device name 923. The work schedule 1924 corresponds to the work schedule 924. The start time 1925 corresponds to the start time 925. The end time 1926 corresponds to the end time 926. The status 1927 corresponds to the status 927.

[0135] 19, the scheduled work "discharge material" by device C with a work ID of "3" is canceled due to a new interrupting work schedule "discharge material" (work ID = 5) by the same device C that is not registered in table 900. The administrator 1720 can register the new work schedule with work ID = 5 and create a work instruction to cancel the previously assigned work schedule (work ID = 3).

[0136] Specifically, the management device 1810 reads the data of table 900 from the instruction information management unit 160 and loads the read data into RAM 4. The manager 1720 can individually specify tasks that the work instructing device 140 cannot schedule, such as urgent interrupt tasks, and create new work instructions. The manager 1720 creates work instructions such as those shown in FIG. 19 while looking at the screen displayed on the monitor 8 of the management device 1810. When the manager 1720 outputs the work instructions, each work instruction is transmitted to the wearable terminal 132 of the worker 110 and the transport robot 120. Furthermore, table 1900 is stored in the instruction information management unit 160 as the latest database, replacing table 900.

[0137] As described above, according to this embodiment, the flexibility of operation of the system 1800 can be increased.

[0138] Sixth Embodiment A sixth embodiment will be described with reference to Figures 20 and 21. The work instruction device according to this embodiment differs from the work instruction device 140 according to the above-described embodiment in that it can create work instructions taking into consideration the workload of the worker.

[0139] The system according to the present embodiment is realized using a hardware configuration similar to that of system 10 according to the first embodiment. The same components are denoted by the same reference numerals. Therefore, the description of the same components will not be repeated. The system according to the present embodiment will be described below using the components exemplified in system 10 of the first embodiment.

[0140] [Data Structure] The data structure of work instructing device 140 will be described with reference to Fig. 20. Fig. 20 is a diagram conceptually showing one mode of data storage on hard disk 5 of computer 200 functioning as work instructing device 140 according to the present embodiment. Hard disk 5 holds table 2000. Table 2000 includes device name 810, work name 820, processing time 830, and workload rate 2010.

[0141] The workload rate 2010 indicates how much load is required of the worker 110 to perform the task. For example, the workload rate 2010 is the ratio of the time required to perform the task to the time the worker 110 or the transport robot 120 is available for operation. The workload rate 2010 is set in advance by the user of the work instructing device 140 based on the operation information of the worker 110 or the transport robot 120 and the standard time required to perform the task. The workload rate 2010 can be updated by the user as appropriate.

[0142] [Control Structure] The control structure of work instructing device 140 will be described with reference to Fig. 21. Fig. 21 is a flowchart showing a part of the processing executed by computer 200 functioning as work instructing device 140 according to the sixth embodiment. Note that the same processing as previously described is assigned the same step number. Therefore, description of the same processing will not be repeated.

[0143] In step S2110, CPU 1 accesses the master data of the work content of each device and reads out the workload rate for each work content of each device.

[0144] In step S2120, CPU 1 estimates the device on which each worker 110 is working, based on the position of each worker 110. For example, CPU 1 determines the device closest to worker 110 as the position at which worker 110 is working, based on the position information received from wearable terminal 132 worn by worker 110.

[0145] In step S2130, CPU 1 determines the workload rate of each worker 110. For example, based on the master data of a device determined as the device on which the worker 110 is working (step S2110), CPU 1 identifies the workload rate of the device and estimates the workload rate of the device as the workload rate of the worker 110.

[0146] In step S2140, CPU 1 calculates the score of the instruction candidate using the times until the worker and robot arrive at the device (step S1150) and the worker's workload rate (step S2130). As an example, if the workload rate of each worker is below a predetermined upper limit (e.g., 60%), CPU 1 calculates the lowest score for the worker who takes the shortest time to arrive at the device. On the other hand, if any of the workload rates exceeds the predetermined upper limit, CPU 1 calculates a score that is one digit higher as the instruction candidate score in order to exclude that worker from the candidate list.

[0147] In step S2150, CPU 1 transmits the determined work instruction to wearable terminal 132 worn by worker 110.

[0148] In one aspect, the work instructing device 140 acquires location information of each worker 110 from the wearable terminal 132 worn by the worker.

[0149] In a certain situation, if the state of device B is "material discharge", CPU 1 registers 10% as an example of the workload in the master data. Also, if the state of device A is "product type change", CPU 1 registers 60% as an example of the workload.

[0150] When a worker X is working on device A, the wearable terminal 132 worn by the worker X transmits its position information to the work instructing device 140 as the position information of the worker X. When another worker Y is working on device B, the wearable terminal 132 worn by the worker Y transmits its position information to the work instructing device 140 as the position information of the worker Y.

[0151] The CPU 1 of the computer 200 functioning as the work instructing device 140 determines that worker X is working at device A, and that worker Y is working at device B. Based on the workload rate 2010 in table 2000, the CPU 1 estimates that the workload rate of worker X is 60% and the workload rate of worker Y is 10%.

[0152] In this case, when new work is required at another device C, and the travel time from device A to device C and the travel time from device B to device C are the same, CPU 1 can identify either worker X near device A or worker Y near device B as candidates for work instructions.

[0153] According to this embodiment, the CPU 1 refers to the workload rate of each worker identified as a candidate for a work instruction, and determines whether instructing a new work task will cause the workload rate to exceed a predetermined upper limit value.

[0154] If the workload rate of any worker exceeds the upper limit, the CPU 1 excludes that worker from the list of workers to whom the new work instruction is to be given, and selects a worker whose workload rate does not exceed the upper limit as a candidate for the work instruction. In this case, if the workload rates of multiple workers do not exceed the upper limit, the CPU 1 determines the worker with the smallest workload rate as a candidate for the work instruction.

[0155] On the other hand, if the workload rate of any worker does not exceed the upper limit, the CPU 1 also determines the worker with the smallest workload rate as the candidate for work instruction.

[0156] In this way, the work instructing device 140 transmits work instructions according to the workload rate of each worker, which makes it easier to equalize the workload rates of each worker. Also, it is possible to prevent the workload rate of one worker from being significantly higher than the workload rates of other workers.

[0157] Seventh Embodiment Next, a seventh embodiment will be described. The work instruction device according to this embodiment differs from the work instruction device 140 according to the above-described embodiment in that it can create work instructions taking production priority into consideration. The production priority is defined based on which type of product among multiple types of products should be given priority in production over other types of products.

[0158] The system according to the present embodiment is realized using a hardware configuration similar to that of system 10 according to the first embodiment. The same components are denoted by the same reference numerals. Therefore, the description of the same components will not be repeated. The system according to the present embodiment will be described below using the components exemplified in system 10 of the first embodiment.

[0159] [Data Structure] The data structure of the system according to this embodiment will be described with reference to Fig. 22. Fig. 22 is a diagram conceptually showing one mode of data storage on hard disk 5 of computer 200 functioning as job master storage unit 150 according to this embodiment. Job master storage unit 150 holds table 2200. Table 2200 includes product classification 2210, product name 2220, monthly production plan quantity 2230, and production plan achievement rate 2240.

[0160] The product classification 2210 identifies a group of products classified according to their type. The product name 2220 identifies the product. The monthly production plan number 2230 indicates the quantity planned to be produced per month. The production plan achievement rate 2240 indicates the achievement rate of the monthly production plan number 2230. The production plan achievement rate 2240 is calculated as the ratio of the quantity that has been produced to the monthly production plan number 2230.

[0161] In one aspect, the instructing unit 141 of the work instructing device 140 accesses the table 2200 to check the production status of each product. The production status includes a monthly production plan quantity 2230 and a production plan achievement rate 2240 for each product.

[0162] The determination unit 142 derives a production priority for each product and determines the production sequence for each product. As an example, the production priority for each product is calculated as data having a quantity dimension, as shown in the following formula (1), based on the monthly production plan number 2230 of the product and the production plan achievement rate for the current month 2240. Production priority = monthly production plan number × (100 - production plan achievement rate) / 100 ... (1) Once the determination unit 142 determines the production sequence for the products based on the calculated production priority, the instruction unit 141 outputs an instruction to the device 101 to produce the products in accordance with the production sequence.

[0163] In a certain situation, when the production priority of a certain product is higher than the production priority of another product, the judgment unit 142 selects the certain product as the product to be next produced by the device 101. On the other hand, when the production priority of a certain product is lower than the production priority of another product, the other product takes priority over the certain product, and therefore the certain product is less likely to be selected as the product to be next produced by the device 101.

[0164] For example, if apparatus 101A is capable of producing both products with product classification A and products with product classification B, determination unit 142 calculates the production priority for each of product names A-1, A-2, A-3, B-1, and B-2 as follows: Production priority of product name A-1: ​​1,320 Production priority of product name A-2: 700 Production priority of product name A-3: 600 Production priority of product name B-1: 120 Production priority of product name B-2: 135 Therefore, instruction unit 141 outputs an instruction to management system 130 to have apparatus 101A produce the product with product name A-1 next. Thereafter, instruction unit 141 outputs an instruction to management system 130 to produce the products with product names A-2, A-3, B-2, and B-1 in that order.

[0165] On the other hand, if device 101B is capable of producing both products with product classification C and products with product classification D, determination unit 142 calculates the production priority for each of product names C-1, C-2, C-3, C-4, and D-1 as follows: Production priority of product name C-1: 300 Production priority of product name C-2: 420 Production priority of product name C-3: 475 Production priority of product name C-4: 300 Production priority of product name C-5: 100 Therefore, instruction unit 141 outputs an instruction to management system 130 to have device 101B produce a product with product name C-3 next. Thereafter, instruction unit 141 outputs an instruction to management system 130 to produce products with product names C-2, C-1, C-4, and C-5 in that order.

[0166] In another aspect, a configuration may be adopted in which work instructing device 140 includes work master storage unit 150 .

[0167] The device 101 (for example, device 101A or device 101B) that receives the instruction outputs a parts request for the product to the work instructing device 140. The work instructing device 140 determines the allocation of parts supply work for the product using an evaluation point system. In this way, work instructions are created that take into account the production plan for the product.

[0168] [Control Structure] The control structure of system 10 according to the present embodiment will now be described with reference to Fig. 23. Fig. 23 is a flowchart showing a part of the processing executed by system 10 according to the seventh embodiment. In this embodiment, work instructing device 140 outputs an instruction to start production with a product having a high production priority calculated as described above, to device 101 capable of producing that product.

[0169] More specifically, in step S2310, CPU 1 of computer 200 functioning as work instructing device 140 accesses work master storage unit 150 to acquire monthly production plan number 2230 and production plan achievement rate 2240.

[0170] In step S2320, CPU 1, functioning as determination unit 142, determines the production priority of each product using equation (1).

[0171] In step S2330, CPU 1, functioning as determination unit 142, determines whether the device is outputting a work request. If CPU 1 determines that the device is outputting a work request (YES in step S2330), control proceeds to step S2340. If not (NO in step S2330), CPU 1 returns control to step S2310.

[0172] In step S2340, CPU 1 functioning as instruction unit 141 instructs management system 130 to produce a product with a high production priority.

[0173] In step S2350, management system 130 calculates the quantity of materials required to produce the specified product, and outputs a request for materials according to the calculated quantity.

[0174] In step S2360, the system executes the process shown in FIG. 11. In this way, the system according to the present embodiment calculates production priorities and produces products based on instructions according to the production priorities. In this way, the production of multiple products is optimized, and production delays can be reduced.

[0175] The embodiments disclosed herein should be considered to be illustrative in all respects and not restrictive. The scope of the present invention is defined by the claims, not by the above description, and is intended to include all modifications within the meaning and scope of the claims.

[0176] The disclosed technical features are applicable to an apparatus for managing a production line having a device that can be operated by both a worker and the device.

[0177] 1 CPU, 2 Mouse, 3 Keyboard, 4 RAM, 5 Hard disk, 6 Optical disk drive, 7 Communication interface, 8, 470 Monitor, 9 CD-ROM, 10, 1700, 1800 System, 100 Production line, 120 Transport robot, 490 Work, 101, 101A, 101B Device, 102 Load mechanism, 103 Unload mechanism, 110 Worker, 130 Management system, 131, 1810 Management device, 132 Wearable terminal, 133, 330, 480, 530 Control unit, 140 Work instruction device, 141 Instruction unit, 142 Judgment unit, 143 Output unit, 150 Work master storage unit, 160 Instruction information management unit, 200 Computer, 310, 400, 500 Stage, 320 Moving mechanism, 340, 440, 510 inventory sensor, 350 gripping hand, 360 vision sensor, 410 positioning mechanism, 420 width adjustment mechanism, 430 claws, 450, 520 light curtain, 460 two-dimensional code reader, 800, 900, 910, 920, 1000, 1200, 1400, 1500, 1900, 2000 table, 1710 monitoring device, 1720 administrator, 1790, 1890 network.

Claims

1. A work allocation determination device comprising: an acquisition means for acquiring information of a device on which work is performed by a robot or a worker, location information of the worker, and operation information of the robot; and a determination means for determining the allocation of work by the robot and the worker based on the information of the device, the location information of the worker, and the operation information of the robot, wherein the determination means calculates a numerical value indicating the accessibility of the device for each of the robot and the worker using the information of the device, the location information of the worker, and the operation information of the robot, identifies the worker or the robot for which the numerical value for ease of access has been calculated, and sends work instructions to either the identified worker or robot.

2. A work allocation determination device as described in claim 1, wherein the device comprises: a stage on which the transported item is placed; a positioning mechanism for placing the transported item at a predetermined location; and a sensor for detecting intrusion into a predetermined range of the device, and work by the robot or worker includes placing the transported item on the stage.

3. A task allocation determination device as described in claim 1 or 2, wherein calculating a numerical value indicating the ease of access to the device includes calculating an evaluation point reflecting a time required for the worker or robot to reach the device.

4. A work allocation determination device as described in claim 1 or 2, wherein calculating a numerical value indicating the ease of access to the device includes calculating an evaluation score reflecting the time it takes for the worker or robot to reach the device and the work schedule of each of the worker or robot.

5. A work allocation determination device as described in claim 1 or 2, wherein calculating a numerical value indicating the ease of access to the device includes calculating an evaluation point reflecting the time it takes for the worker or robot to reach the device and the work priority of each of the workers or robots.

6. A task allocation determination device according to any one of claims 1 to 5, further comprising display means for displaying the status of said device, the status of said worker, and the status of said robot.

7. A work distribution determination device as described in any one of claims 1 to 6, wherein the determination means further calculates the workload of each of the workers based on position information of each of the workers, and identifying the workers or the robots includes, when a worker with a workload exceeding a predetermined upper limit is identified, determining other workers with a workload below the upper limit as targets for sending the work instructions.

8. A work allocation determination device as described in any one of claims 1 to 7, wherein the determination means further calculates a production priority of the product based on the monthly production plan quantity of the product and the production plan achievement rate, determines the product to be produced by each of the devices based on the production priority, and outputs an instruction to the device to produce the determined product.

9. A work allocation management system comprising: a work allocation determination device as claimed in any one of claims 1 to 8; a storage device for storing the work instructions; and a management device communicatively connected to the storage device and accepting input from outside, wherein the management device accepts input of new work instructions to replace the work instructions, stores the new work instructions in the storage device, and the determination means transmits the new work instructions to either the worker or the robot.

10. A method executed by a computer for determining work allocation, comprising: a step in which a processor of the computer reads out information of a device on which work is to be performed by a robot or a worker, location information of the worker, and operation information of the robot; and a step in which the processor determines the allocation of work by the robot and the worker based on the information of the device, the location information of the worker, and the operation information of the robot, the step of determining including the steps of: calculating a numerical value indicating the accessibility of the device for each of the robot and the worker using the information of the device, the location information of the worker, and the operation information of the robot; identifying the worker or the robot for which the best numerical value for accessibility has been calculated; and sending work instructions to either the identified worker or robot.

11. The method according to claim 10, wherein the apparatus comprises: a stage on which a transported object is placed; a positioning mechanism for placing the transported object at a predetermined location; and a sensor for detecting intrusion into a predetermined range of the apparatus; and the work by the robot or worker includes placing the transported object on the stage.

12. The method according to claim 10 or 11, wherein calculating a numerical value indicating the accessibility of the device includes calculating an evaluation score reflecting the time it takes for the worker or robot to reach the device.

13. The method according to claim 10 or 11, wherein calculating a numerical value indicating the accessibility of the device includes calculating an evaluation score reflecting the time it takes for the worker or robot to reach the device and the work schedule of each of the worker or robot.

14. The method according to claim 10 or 11, wherein calculating a numerical value indicating the ease of access to the device includes calculating an evaluation score reflecting the time it takes for the worker or robot to reach the device and the task priority of each of the worker or robot.

15. The method according to any one of claims 10 to 14, further comprising the step of displaying a status of the device, a status of the worker, and a status of the robot.

16. A method according to any one of claims 10 to 15, wherein the determining step further includes a step of calculating the workload of each of the workers based on position information of each of the workers, and identifying the worker or the robot includes, when a worker with a workload exceeding a preset upper limit is identified, determining other workers with a workload below the upper limit as targets for sending the work instruction.

17. A method according to any one of claims 10 to 16, further comprising the steps of: accessing a storage device for storing the work instructions; receiving an input of a new work instruction replacing the work instruction from a management device communicatively connected to the computer; and storing the new work instruction in the storage device, wherein the determining step includes a step of transmitting the new work instruction to either the worker or the robot.

18. A program for causing a computer to execute the method according to any one of claims 10 to 17.

Citation Information

Patent Citations

  • Automatic transfer system of workpiece in machine shop

    JP1982194861A

  • Work transport system

    JP2003345412A

  • Work instruction system, work instruction device, work instruction method and program

    JP2023003723A

  • Work instruction device for manufacturing plant, and work instruction method for manufacturing plant

    WO2020217861A1