An electric vehicle park having a management system
The management system in electric vehicle parks optimizes vehicle parking and charging by using capacitive power transmission and impedance management to address efficiency issues in 'one-to-many' systems, ensuring efficient power use and allocation across different vehicle types and locations.
Patent Information
- Application Number
- PCT/EP2024/064956
- Authority / Receiving Office
- WO · WO
- Patent Type
- Applications
- Current Assignee / Owner
- Priority Date
- 2023-11-09
- Filing Date
- 2024-05-30
- Publication Date
- 2024-12-05
AI Technical Summary
Conventional wireless electric vehicle charging systems, especially 'one-to-many' systems, face efficiency issues due to varying vehicle locations and types, leading to suboptimal power transmission and management within electric vehicle parks.
A management system that provides park status data and charging requirement data to determine the most suitable parking space for arriving vehicles, adjusting the power supply's impedance and capacitance to optimize system efficiency, using capacitive power transmission systems with an impedance management system to direct vehicles to efficient charging points.
This approach enhances the efficiency of electric vehicle park operations by optimizing power use, reducing voltage losses, and ensuring efficient allocation and charging of vehicles, regardless of their type or location, thereby improving overall system performance.
Smart Images

Figure EP2024064956_05122024_PF_FP_ABST
Abstract
Description
[0001] An Electric Vehicle Park Having A Management System
[0002] Introduction
[0003] The present invention relates to an electric vehicle park having a management system, to the management system and to a method of operating an electric vehicle park. In particular, it relates to electric vehicle parks for wireless charging of electric vehicles using a capacitive power transmission system.
[0004] The present invention relates especially to systems and methods for directing electric vehicles to certain parking spaces I charging points at electric vehicle charging stations in the vehicle park.
[0005] Background
[0006] Electric vehicles and wireless charging pads for charging such vehicles are known.
[0007] Historically, electric vehicles designed to be charged via wireless power transfer from a ground pad of a wireless electric vehicle charging system each comprise a rectifier component separate to an onboard charger (“OBC”). This rectifier component converts high frequency alternating current from the electric vehicle’s car pad (which receives power from the ground pad) to direct current which the OBC can then use to charge the battery. Thus, wireless electric vehicle charging systems were designed to be suitable for charging such electric vehicles. Some newer electric vehicles have OBCs which can receive high frequency alternating current directly, so do not require rectifier components separate to the OBCs. Thus, it is desirable to provide wireless electric vehicle charging systems that can be used to charge different types of electric vehicles having different components I vehicle assemblies.
[0008] Conventional wireless electric vehicle charging systems typically have one ground pad connected to, and supplied with power by, a frequency converter, such systems typically being known as “one-to-one” systems. However, some newer wireless electric vehicle charging systems, such as that disclosed in WO 2022 / 258782, may have a plurality of ground pads connected to, and supplied with power by, a single converter. Such systems may suitably be described as “one-to-many” systems. The system efficiency of such “one-to-many” electric vehicle charging parks can, however, be adversely affected by the locations and types of vehicles charging.
[0009] Capacitive cables for transmitting power between a power source and a load are known in the art and are described in, for example, WO 2010 / 026380, WO 2019 / 234449, WO 2021 / 094783, WO 2021 / 094782, WO 2020 / 120932, and EP 23175297.3.
[0010] Capacitive cables are known to be advantageous in certain situations because these can exhibit lower voltage losses when power is transmitted along their lengths than conventional power transmission cables, which means capacitive cables can be used to improve the efficiency of power transmission systems. This advantage is possible because capacitive cables exhibit much lower reactance than conventional cables.
[0011] Accordingly, it is desirable to make provision in such one-to-many systems to maximise efficiency of the system.
[0012] An aim of the invention is to provide alternative electric vehicle park systems and management therefor, and an aim of particular embodiments is to provide improved such parks and operation thereof.
[0013] Summary of the Invention
[0014] The invention provides a method for operating an electric vehicle park, said vehicle park comprising a plurality of parking spaces and a plurality of wireless charging points each associated with one of said parking spaces, said method comprising providing park status data relating to the status of the vehicle park; receiving charging requirement data from a parked electric vehicle, or from an arriving electric vehicle, the data relating to one or more charging requirements of the vehicle; and processing the park status data and the charging requirement data to determine a selected parking space for an arriving vehicle and / or whether to adjust the park status. The invention further provides said management system for operating the electric vehicle park, and still further provides an electric vehicle park, comprising a plurality of parking spaces and a plurality of wireless charging points each associated with one of said parking spaces; and the management system for operating the vehicle park.
[0015] Determining a selected parking space may comprise taking into account one or more criteria including whether parking of the vehicle at the selected parking space and charging of the vehicle at that space will result in a need to change park status; parking of the vehicle at the selected parking space and charging of the vehicle at that space will result in a need for a lesser change in park status compared with the vehicle parking at a different parking space; convenience for the driver overrides other criteria; one or more dimensions of the vehicle limit parking of that vehicle to a subset of spaces; a desired future use of the vehicle overrides other criteria
[0016] Hence, an arriving vehicle can be directed appropriately.
[0017] Adjusting park status may comprise adjusting system efficiency; changing impedance in one or more components of a power supply backbone, or a ground or central / inverter assembly throughout the vehicle park; changing capacitance in one or more components of the power supply backbone, or a ground or central / inverter assembly throughout the vehicle park; compensating for a change in the park status caused by a change in a charging status of the electric vehicle; and compensating for an anticipated change in the park status caused by an anticipated change in a charging status of the electric vehicle.
[0018] Hence, park status can be adjusted to promote efficient operation and power use. The present invention is suitable for use in conjunction with a power transmission system, especially one comprising:
[0019] (a) a power source,
[0020] (b) one or more load(s), e.g. wireless charging pads at wireless charging points,
[0021] (c) a capacitive cable having:
[0022] (i) a first conductor connected to the power source but not to the one or more load(s),
[0023] (ii) a second conductor connected to the one or more load(s) but not to the power source, and
[0024] (iii) a dielectric material between the first conductor and the second conductor, and
[0025] (d) an impedance management system for modifying an impedance of the capacitive cable.
[0026] In particular embodiments, a combination of the above power transmission system with the present invention is advantageous because impedance within the system can be modified in accordance with desired operating parameters taking into account locations of vehicles within the vehicle park and providing data for use in determining the selected parking space where an arriving vehicle is to be parked and charged.
[0027] Detailed Description of the Invention
[0028] According to a first aspect of the invention, there is provided a method for operating a vehicle park. Herein, reference to a vehicle park or in context a park is reference to a park where electric vehicles can be charged wirelessly, via power supplied to wireless charging ground pads that transfer power to wireless charging pads on the vehicles. In the method, said vehicle park comprises a plurality of parking spaces and a plurality of wireless charging points each associated with one of said parking spaces, said method comprising providing park status data relating to the status of the vehicle park; receiving charging requirement data from a parked electric vehicle, or from an arriving electric vehicle, the data relating to one or more charging requirements of the vehicle; and processing the park status data and the charging requirement data to determine a selected parking space for an arriving vehicle and / or whether to adjust the park status.
[0029] Thus in use of the invention the management system can allocate a parking space and / or intervene to effect a change in the park status.
[0030] Where data comes from and what is it used for?
[0031] Charging requirement data can be used to allocate a parking space. The management system generates a decision as to where the next vehicle should park and charge. It may implement an intervention in the power supply. Thus, for example the method comprises receiving the charging requirement data from an electric vehicle arriving at the vehicle park, and processing the park status data and the charging requirement data to determine a selected parking space for an arriving vehicle.
[0032] In practice, the arriving car may then not go to that selected parking space, e.g. not go where it is sent. The method may also comprise receiving the charging requirement data from an electric vehicle arriving at a given parking space (i.e. rather than, say, at the park entrance) of the vehicle park and processing the park status data and the charging requirement data to determine whether to adjust the park status. In these methods, the method may continue to monitor the vehicle’s movements up to determining its arrival as directed or, on the other hand, noting it has arrived at a different space, i.e. not the allocated one. Arrival and then charging at a space other than that initially allocated by the management system may then necessitate determining a different adjustment to the park status.
[0033] The system can also take into account changes arising not due to arrival of new vehicles into the park but following charging changes at one or more charging vehicles. Accordingly, the method may comprise receiving the charging requirement data from an electric vehicle parked at a given parking space at the vehicle park, and processing the park status data and the charging requirement data to determine whether to adjust the park status. A charging vehicle may finish charging or change its rate of charging. These and similar events change the overall power use and distribution of power use. The management system processes these changes to determine whether to adjust park status.
[0034] How to direct and monitor an arriving vehicle
[0035] As well as determining a selected space for an incoming vehicle, the system of preferred embodiments also directs the vehicle to the selected space and can check for satisfactory arrival; monitoring can include monitoring for movement of the vehicle away from a park entrance and, separately, towards the selected space. Accordingly, the method may comprise determining a selected parking space for an arriving vehicle and directing the electric vehicle to the selected parking space. The park may have multiple entrances, and all are preferably monitored. The directing may comprise providing direction data relating to the selected parking space to the vehicle or to a driver of the vehicle. The driver can be given a parking bay identifier, e.g. a number, e.g. orally or electronically, including as data sent to a smartphone. The system can also work with an autonomous vehicle, providing data relating to the selected parking space so the autonomous vehicle can then guide itself until arrival. Suitable monitoring systems, as used in a specific example described below, for vehicle arrival use Wi-Fi and for subsequent vehicle movement use ultrawide band technology.
[0036] The method preferably also comprises determining whether the directed electric vehicle has reached its selected parking space, and, separately, whether it has started charging. A unique identifier associated with each parking space and / or wireless charging point communicates back to the management system, separately, arrival at the space and that charging has commenced. Feedback may further include charging rate and anticipated charging rate against time. Noting the directed vehicle has, in fact, arrived at, and then started charging at, a different space is used as further feedback to the management system, processed to determine if a separate or different park status adjustment is needed.
[0037] In embodiments of the invention, directing the electric vehicle may comprise exchange of data between the electric vehicle and a parking space selection management system; determination of the allocated parking space by the parking space selection management system; and direction of the electric vehicle to the allocated parking space. Upon a vehicle’s arrival at the park the management system preferably establishes communication with the vehicle, such as by using Wi-Fi, to alert the management system to the presence of the vehicle and exchange data as described. Subsequently, vehicle movement can be tracked, for example using UWB. Examples of and criteria for operation of the space selection management system are described elsewhere herein.
[0038] Change in park status due to parked vehicle
[0039] In operation of the present invention, park status can be adjusted or updated, or it can be determined that no change is currently needed, according to certain criteria, to promote efficiencies such as efficient use of spaces, efficient power consumption, efficient power distribution and efficient allocation of spaces according to needs not related to vehicle charging.
[0040] Generally, the method comprises processing data relating to a change in park status due to a change in charging status of a parked electric vehicle and determining whether to adjust park status.
[0041] The change or changes may be actual or anticipated. Typical changes include whether the vehicle is no longer charging, and a rate of charging of the vehicle has changed.
[0042] Nature and number of spaces, and how to adjust park status
[0043] In use of the electric vehicle park, power is supplied to one or more or all of the wireless charging points, and vehicles are charged. The invention is not limited as to the nature or number of the vehicles though typically the parking spaces and wireless charging points, and the wireless charging pads located there, are sized and spaced for cars and good vehicles, especially light goods vehicles. The park usually can charge more than one type of vehicle though some spaces are sized, say just for cars while others are larger and can accommodate goods vehicles, light goods vehicles, vans, large vans etc. Despite difference in vehicle sizes, the location of the vehicle charging pad, also referred to simply as the vehicle pad or vehicle assembly, is usually in approximately the same position with reference to one end of the vehicle so that electric vehicles with different wheel bases and widths can still park with the vehicle assembly correctly positioned over the ground pad (also referred to as the ground assembly) for charging to occur.
[0044] In preferred embodiments the vehicle park comprises parking spaces for cars, and it may be that all spaces are for cars. In other embodiments the vehicle park comprises spaces for good vehicles and / or small goods vehicles, and there may additionally be parking spaces sized for cars. In further embodiments the park is for rental cars or taxis in a taxi-despatch lot. In still further embodiments the vehicle park is for medium goods vehicles (MGVs) and / or heavy goods vehicles (HGVs).
[0045] Park status typically comprises the amount of power, the load, being supplied to the wireless charging points and the distribution of the load between wireless charging points. The power supply through the vehicle park comprises a plurality of components, one or more of each of which can be individually controlled by the management system. Generally, there is an electrical backbone to which wireless charging points are individually connected in series and / or parallel. Connection of a wireless charging point to the power supply backbone is one component. A ground assembly is one component. A central assembly is one component, which may comprise an inverter, distinct from the central assembly and normally referred to as the central inverter when there is just one. The backbone itself is one component. Capacitive connections between two such components represent a further component.
[0046] In embodiments of the method of the invention, adjusting park status comprises adjusting system efficiency; changing impedance in one or more components of the power supply backbone, or a ground or central / inverter assembly throughout the vehicle park; changing capacitance in one or more components of the power supply backbone, or a ground or central / inverter assembly throughout the vehicle park; compensating for a change in the park status caused by a change in a charging status of an electric vehicle; and / or compensating for an anticipated change in the park status caused by an anticipated change in a charging status of an electric vehicle. Adjusting load distribution across the park power backbone is one way to adjust efficiency. A parking space for an arriving vehicle can be selected so as to balance the load across the backbone. Alternatively, an imbalance of charging load due to an imbalance of vehicles in one portion of the vehicle park can be balanced through the ability individually to adjust the individual power supply components.
[0047] Adjusting park status suitably comprises changing the impedance or capacitance of a component once an arriving vehicle has parked and started to charge; it may also comprise changing the impedance or capacitance of a component in anticipation of the arriving electric vehicle parking at its selected parking space. A compensation may be injected via the backbone, via a ground assembly (e.g. via a ground coil or secondary coil) or via a central assembly. Intervention can be via two of these or all of these. As will be appreciated, the park management system in one mode may be programmed to allocate new parking spaces to so to retain power load balance as much as possible across the whole vehicle park so that local changes in impedance and / or capacitance are not needed or are kept to a minimum.
[0048] Data from previous vehicle park uses, adjusted if necessary according to day of the week, allowing for holidays, etc can conveniently be used to populate a look up table of typical daily patterns of use of the vehicle park. Adjusting park status may thus comprise taking into account predetermined expectation of or a record of historic arrival of vehicles at the vehicle park. It is also expected that drivers may contact the vehicle park management system in advance, whether electronically through a smart phone or via a human operator or otherwise, providing advance information as to arrival time and vehicle charging requirements. Adjusting park status may in certain embodiments comprises changing the impedance or capacitance of one or more components in anticipation of one or more electric vehicles arriving at the vehicle park.
[0049] Methods of the invention can also include assessing current park status and predetermining a desired location for a next arriving vehicle. This is especially possible for vehicle parks designed for the same or similar vehicles, as the charging requirement of the next vehicle will be largely known. In a specific embodiment of the invention, an electric park for wireless charging of a fleet of like vehicles is provided; as the vehicles are the same the charging requirement of the next is known and a parking space can be pre-allocated.
[0050] Different charging requirements
[0051] More commonly, the vehicle park accommodates different vehicles that have varying batteries, capacities, charging rates, etc. and prior to charging an exchange is needed to communicate such details to the management system. Thus, in typical methods of the invention the charging requirement data of an electric vehicle comprises data relating to one or more of
[0052] (i) time of arrival the electric vehicle;
[0053] (ii) identification of the electric vehicle;
[0054] (iii) the battery of the electric vehicle, such as one or more of a. battery capacity, b. state of charge, c. target state of charge, including desired state of charge against time, and d. charge and discharge power limits;
[0055] (iv) desired future use of the electric vehicle, such as one or more of a. need to depart the park at or by a particular time, b. anticipated period of non-use after charging;
[0056] (v) convenience or special needs of a driver of the electric vehicle, such as a. desired location for reasons other than related to charging, such as i. choice of location limited for specific use of the vehicle now or in the future ii. choice of location limited for specific non-charging related use of the vehicle now or in the future b. disability of driver, c. rank of driver entitling driver to choose a space;
[0057] (vi) dimensions of the electric vehicle and / or any attachments such as a trailer, a roof-mounted element, a side-mounted element, including a. need to exit vehicle on a particular side, b. attachment of a drag-along trailer, c. presence of a roof box on the vehicle. More typically, the charging requirement data of an electric vehicle comprises data relating to one or more of
[0058] (i) the battery of the electric vehicle, such as one or more of a. battery capacity, b. state of charge, c. target state of charge, including desired state of charge against time, and d. charge and discharge power limits;
[0059] (ii) choice of location limited for specific non-charging related use of the vehicle now or in the future
[0060] (iii) dimensions of the electric vehicle and / or any attachments such as a trailer, a roof-mounted element, a side-mounted element, including a. need to exit vehicle on a particular side, b. attachment of a drag-along trailer, c. presence of a roof box on the vehicle.
[0061] By integration of park status data with the charging requirement data of an arriving electric vehicle, the management system can identify a preferred parking space for that vehicle to charge, and calculate the associated change, if any, needed in the settings of one or more power supply components. The space can be selected to minimise the need for changes. If a criterion of the vehicle charging requirement overrides the initial space selection based on, say, efficiency considerations then the management system can calculate park status adjustment to compensate for such a non-ideal charging location; overall park operation is then more efficient than if no such changes were made.
[0062] Types of park status data
[0063] Vehicle park status data may comprise data relating to (i) current park status, and / or (ii) anticipated future park status, for example due to additional vehicles charging in known locations, additional vehicles charging in unknown locations, change in a charging status of a charging vehicle and departure of a vehicle. Vehicle park status data may also comprise data relating to mis-parked or erroneously positioned vehicles. Such vehicles can include those incapable of wireless charging but nevertheless parked in a space. Such vehicles can include, for a system that tracks the vehicles in the park, those that are not trackable but are taking up a parking space.
[0064] Furthermore, park status data may comprise data relating to impedance in one or more components of the power supply backbone, or a ground or central / inverter assembly throughout the vehicle park; changing impedance is preferably used in response to vehicles arriving and departing and changes in charging rate, etc to maintain efficiency of power supply and balance of distribution of load across the whole wireless charging system.
[0065] Park status data may additionally or separately comprise data relating to capacitance in one or more components of the power supply backbone, or a ground or central / inverter assembly throughout the vehicle park; similarly, changing capacitance can be used in response to vehicles arriving and departing and changes in charging rate, etc to maintain efficiency of power supply and balance of distribution of load across the whole wireless charging system.
[0066] Park status data may additionally or separately comprise data relating to power consumption by the vehicle park. Monitoring and adjusting the power consumption is used to provide efficient, usually maximum levels where available, at least initially when all parking spaces are not taken, power to charge vehicles without exceeding safe limits for charging any one vehicle or for power consumption by the whole system
[0067] Determining a selected parking space
[0068] Determining a selected parking space typically comprises taking into account one or more criteria including whether parking of the vehicle at the selected parking space and charging of the vehicle at that space will result in a need to change park status; parking of vehicle at the selected parking space and charging of the vehicle at that space will result in a need for a lesser change in park status compared with the vehicle parking at a different parking space; convenience for the driver overrides other criteria; one or more dimensions of the vehicle limit parking of that vehicle to a subset of spaces; a desired future use of the vehicle overrides other criteria.
[0069] An output from integration of the above factors is the selected parking space for an arriving vehicle.
[0070] General monitoring while no vehicles are arriving
[0071] The vehicle park generally operates continually, the method comprising monitoring the status of the vehicle park, optionally monitoring for a change in charging status of one or more of the charging vehicles, monitoring for vehicles arriving at the park, monitoring for arrival at the parking space selected for an arriving, directed vehicle, monitoring for arrival of the directed vehicle at a parking space other than the selected parking space and / or monitoring for a change caused by arrival of a directed vehicle at a parking space other than the selected parking space.
[0072] Power Supply
[0073] As described elsewhere, the invention is especially for use with capacitive power transmission systems. The electric vehicle park thus suitably comprises a power supply or connections to a power supply, for example the local power grid; a plurality of charging points for wireless charging of electric vehicles; one or more capacitive power transmission lines each comprising at least first and second conductors in a capacitive relationship to each other and separated by dielectric, the first conductor being connected to source and not to load, and the second being connected to load and not source; wherein the charging points are connected to the power supply or the connections to a power supply via the one or more of power transmission lines.
[0074] As also described elsewhere, the invention is especially for use with capacitive power transmission systems comprising a plurality of ground pads connected to, and supplied with power by, a single converter. Preferably, there are at least 5, or at least 10 ground pads connected to a single converter, and there may be many more connected to the single converter.
[0075] The Electric Vehicle Park Also provided by the present invention is an electric vehicle park, comprising a plurality of parking spaces and a plurality of wireless charging points each associated with one of said parking spaces; and a management system for operating the vehicle park and programmed for providing park status data relating to the status of the vehicle park; receiving charging requirement data from a parked electric vehicle, or from an arriving electric vehicle, the data relating to one or more charging requirements of the vehicle; and processing the park status data and the charging requirement data to determine a selected parking space for an arriving vehicle and / or whether to adjust the park status.
[0076] The electric vehicle park may comprise a power source, in the form of a power supply or connections to a power supply, for example the local power grid; one or more capacitive power transmission lines each comprising at least first and second conductors in a capacitive relationship to each other and separated by dielectric, the first conductor being connected to source and not to load, and the second being connected to load and not source; wherein the charging points are connected to the power supply or the connections to a power supply via the one or more the power transmission lines.
[0077] The management system for the park is suitably programmed for carrying out a method of the invention as described herein.
[0078] The electric vehicle park also preferably comprises an impedance management system, as described below in more detail. Adjustment of park status may comprise operation of the impedance management system. The electric vehicle park also generally comprises a central inverter for providing power at frequencies for wireless charging. An impedance management system is also described in more detail in PCT / EP2024 / 064946 filed on 30 May 2024, the contents of which are hereby incorporated by reference.
[0079] The Management System Still further the present invention provides the management system for operating an electric vehicle park, as described herein, said vehicle park comprising a plurality of parking spaces and a plurality of wireless charging points each associated with one of said parking spaces wherein the management system is programmed for providing park status data relating to the status of the vehicle park; receiving charging requirement data from a parked electric vehicle, or from an arriving electric vehicle, the data relating to one or more charging requirements of the vehicle; and processing the park status data and the charging requirement data to determine a selected parking space for an arriving vehicle and / or whether to adjust the park status.
[0080] Again, the management system is programmed for carrying out a method of the invention as described elsewhere herein. The management system is also referred to herein as the park management system when required to distinguish it from the impedance management system.
[0081] Operation with impedance management system
[0082] As noted, the present invention is preferably used with a power transmission system, comprising:
[0083] (a) a power source,
[0084] (b) one or more, preferably a plurality of, load(s), e.g. wireless charging pads,
[0085] (c) a capacitive cable having:
[0086] (i) a first conductor connected to the power source but not to the one or more load(s),
[0087] (ii) a second conductor connected to the one or more load(s) but not to the power source, and
[0088] (iii) a dielectric material between the first conductor and the second conductor, and
[0089] (d) an impedance management system for modifying an impedance of the capacitive cable. As used herein, the term “power source” is intended to mean an electrical component capable of suppling power. The power source does not need to be active, i.e. supplying power, to be considered a “power source”.
[0090] As used herein, the term “load” is intended to mean an electrical component that may draw power from the power source. The load does not need to be active, i.e. drawing power, to be considered a “load”. An example of a load is a ground pad of a wireless electric vehicle charging system, which may be active, i.e. drawing power from the power supply when an electric vehicle is parked at the ground pad, but may also be inactive, i.e. not drawing power from the power supply when no electric vehicle is parked at the ground pad.
[0091] Systems of the invention are preferably intended to be run at a constant voltage, with frequency typically being nominally 85kHz (and likely to be very close to that in practice). Per J2954, it can vary from 79kHz to 90kHz as part of the efficiency compensation. As described in an example below, in one park the entire system (all charging points) operates at the same frequency as there is a single inverter. Further, systems run at a substantially constant voltage, usually within the range 350V - 1000V. Certain batteries are designed for 400V, others for 800V, so systems at each of these voltages are specifically envisaged.
[0092] The impedance management system can manage and / or control impedance within one or more capacitive cables of the vehicle park. Preferably the impedance management system comprises a receiver adapted to receive data about the one or more load(s), a processor adapted to determine a target impedance of the capacitive cable based on the data, and a controller adapted to modify the impedance of the capacitive cable in accordance with the target impedance. The receiver may receive data in any form, such as via wireless communications or via wired communications. Including a receiver is advantageous because this enables the impedance management system to be continuously (or regularly) updated regarding the status of the one or more load(s) and thus an actual or anticipated change therein. Including a processor is advantageous because this enables the impedance management system to integrate the data received by the receiver, thereby enabling the impedance management system to determine how (if at all) the impedance needs to be modified to be optimal. Including a controller is advantageous because this enables the impedance to be modified as required to approximate (or reach) the target impedance.
[0093] The data about the one or more load(s) may be data about an impedance state or inductive value of each load. As described elsewhere the system suitably modifies impedance, inductance and / or capacitance. A change in impedance state usually is applied at a system level. A change in inductive value is usually applied at the level of an individual component or components. Though, of course, each has an effect on the other.
[0094] A typical system of the invention comprises a plurality or capacitors and inductors, for system-level and / or component-level adjustment of capacitance and impedance. These can be centralised (e.g. in the inverter) or in ground assemblies or elsewhere in the system power supply backbone, or a combination or all the aforementioned. In a specific embodiment of the invention described in an example below, a bank of capacitors and inductors is centralised in an inverter cabinet in a central assembly of the system. In other embodiments there are localised capacitors and inductors associated with individual system components.
[0095] Alternatively or additionally, the data about the one or more load(s) may be data about the current and / or the voltage at each load. This is advantageous because providing the impedance management system with data about the impedance state of each load and / or the current and / or the voltage at each load enables the processor to determine changes in the impedance that may be needed to achieve the target impedance.
[0096] The impedance management system may modify an overall impedance of the capacitive cable or one or more local impedance(s) at one or more point(s) along the capacitive cable. Modifying the overall impedance of the capacitive cable is advantageous because this enables large-scale changes in impedance across the whole system, which may be faster than modifying the impedance at lots of individual points along the length of the cable. Modifying one or more local impedance(s) at one or more point(s) along the capacitive cable is advantageous because this enables fine tuning of the impedance at specific points, as well as enabling different impedances at different points along the length of the cable, which is advantageous if there are different loads connected to the cable and thus different impedances are required; this differentiation may not be possible by modifying the overall impedance only. Thus, preferably the impedance management system may modify both an overall impedance of the capacitive cable and one or more local impedance(s) at one or more point(s) along the capacitive cable. Such embodiments are advantageous as they allow for both large-scale, fast changes in impedance, as well as fine tuning of impedance at specific points, where required.
[0097] The one or more point(s) along the capacitive cable may be associated with the one or more load(s). For example, the one or more point(s) along the capacitive cable may be one or more points(s) at which the one or more load(s) is / are connected to the second conductor of the capacitive cable. Such embodiments are advantageous as these allow the impedance at each load to be readily modified.
[0098] The impedance management system may modify the impedance of the capacitive cable in response to a change in the one or more load(s). This is advantageous because this allows the impedance to be modified to optimise the efficiency of power transmission to the load(s). This is also advantageous because modifying the impedance of the power transmission system in response to a change in the one or more load(s) means the capacitive cable does not need to be replaced by a different capacitive cable having a different impedance every time the load is changed; instead, the same capacitive cable can be used with different impedance, which is easier and cheaper to manage.
[0099] Alternatively or additionally, the impedance management system may modify the impedance of the capacitive cable in anticipation of a change in the one or more load(s). In this context, “anticipation” of a change in the one or more load(s) may be caused by, for example, a scheduled change in the one or more load(s) being reported to the controller, an analysis of the state(s) of each load and thus determination of how the state(s) may be expected to change over time. Such embodiments are advantageous because these enable the impedance at each load to be modified before the load is changed. This means that, once the change has occurred, the impedance may be at or near optimal straight away, rather than time then being taken to reach the optimum. This is advantageous because it may reduce the amount of time during which the power transmission system is operating in a sub-optimal manner, which increases the overall efficiency of the power transmission system.
[0100] The impedance management system may be adapted to modify the impedance of the capacitive cable by modifying a capacitive reactance of the capacitive cable, an inductive reactance of the capacitive cable, or both. This is advantageous because it allows the operator of the power transmission system to select which electrical parameter is easiest to modify based on the particular application for which the power transmission system is employed and thus modify that parameter accordingly.
[0101] The capacitive cable may comprise one or more electrical connection(s) between the first conductor and the second conductor, each of which can be individually controlled. This individual control is advantageous because it allows for fine tuning of the impedance at specific points along the length of the capacitive cable. Having a plurality of such electrical connections is also advantageous because this provides more than one way of modifying the impedance, which may be useful if modifying one of the other connections is not practicable or desirable.
[0102] The one or more electrical connection(s) may each have variable capacitance, variable inductance, or both. This is advantageous because it allows the operator of the power transmission system to select which electrical parameter is easiest to modify based on the particular application for which the power transmission system is employed and thus modify that parameter accordingly.
[0103] The one or more electrical connection(s) may be selected from the group consisting of one or more capacitor(s), one or more inductor(s), and a combination thereof. Using such components is advantageous because the capacitor(s) may be used to readily modify the capacitive reactance, whilst the inductor(s) may be used to readily modify the inductive reactance. These components are also relatively simple, and thus cheap, electrical components to acquire and use, which is advantageous.
[0104] Example
[0105] A system is now described to illustrate the invention, accompanied by drawings in which: Fig. 1 is a schematic diagram of an electric vehicle park and system of the invention; and
[0106] Fig. 2 shows a communications protocol between the park infrastructure and a vehicle.
[0107] System
[0108] Referring to system shown in the figures, UWB Anchors are positioned around the parking area, in communication with (taking command from) the central supply equipment communications controller (SECC), and UWB Tags mounted to the vehicles (either in the VAs, as independent modules mounted to the vehicles, or embedded UWB fitted by the vehicle OEM) in communication with the VA-situated electric vehicle communications controller (EVCC). The system is located within an electric vehicle charging park and performs parking space allocation of vehicles entering the charging area based upon the overall system efficiency state communicated by inter alia an impedance management system and managed overall by a park management system. Individual wireless ground assemblies (comprising charging coils) at wireless charging points are connected via take-offs from a capacitive power supply circuit I system in which the pads are all connected via capacitive cables to a centrally located converter. The capacitive power cables have least first and second conductors in a capacitive relationship to each other and separated by a dielectric material. According to different location of charging vehicles the system compensates by adjustment of capacitance or inductance.
[0109] An arriving vehicle enters the park and detects a Wi-F access point conforming to ISO15118-8 (IEEE 802.1x can optionally be used for authentication and access control) and connects. Communication between the vehicle and the management system continues conventionally, e.g. via ISO15118-20, for exchange of charging requirement data and data relating to the parking space then selected.
[0110] In more detail, as the vehicle enters the park, it detects the SECC’s 802.11 n (or later) WiFi access point (AP). AP is broadcasting SSID prefixed with “AWC” (automotive wireless communication) as per ISO 15118-8 recommendation (section 7.2.6). AP includes vendor specific element for WPT in its beacon frames and probe response frames as per ISO 15118-8. When the EVCC detects a suitable AP, it attempts to connect. EVCC includes vendor specific element in its association request frames as per ISO 15118-8. EVCC should only associate with networks broadcasting appropriate vendor specific elements. SECC should only allow connections from clients broadcasting appropriate vendor specific elements.
[0111] As suggested by ISO 15118-20 (section 7.5.1 ), 802.1x authentication can be used to authenticate vehicles attempting to join the network. The EVCC uses WPA3- Enterprise or WPA2-Enterprise according to IEEE 802.1x. In this way, mutual authentication can occur helping to protect both SECC and EVCC from bad actors. Additionally, both SECC and EVCC should be running strict firewalls to prevent any traffic but that defined in ISO 15118 (ISO 15118-20, section 7.3.5).
[0112] Once connected, the EVCC initiates application layer communications with the SECC, largely following ISO 15118-20 with modifications and additions where needed.
[0113] Parking Spot assignment and Guidance
[0114] The EVCC uses the EG_GuidanceSetupReq message to request parking allocation and guidance from the SECC. This message may include vehicle information including, but not limited to vehicle dimensions, battery capacity, state of charge, and charge and discharge power limits. It may also include vehicle specific requirements such as the need for disabled parking or pull through parking for trailers, et cetera.
[0115] The SECC uses the EG_GuidanceSetupRes message to communicate UWB set-up parameters so that it can locate and track the vehicle as well as indicating the allocated parking position. These messages may be repeated more than once until all information is ready.
[0116] The EVCC then repeatedly sends EG_GuidanceReq messages requesting updated guidance information and the SECC responds with EG_GuidanceRes messages providing directions to the allocated parking which is then displayed on a human machine interface providing driving directions to the driver. In the case of driverless vehicles, the data in the EG_GuidanceRes messages can be used directly to guide the vehicle to the parking. These request and response messages continue until the vehicle is close enough to the ground assembly for the fine alignment process (as per SAE J2954 and ISO 15118-20) to take over: typically, as the nose of the vehicle is entering the parking space.
[0117] Interface with CSMS
[0118] For each vehicle charging requirement data is provided to and processed by the charge station management software (CSMS) with the requirements ultimately coming from a user app (in the case of individual customers) or a management dashboard (in the case of fleet operations). Several types of information can come from either the vehicle, itself, or from the CSMS including, but not limited to, departure time, required charge, special parking needs, and other preferences.
[0119] Decision Engine
[0120] The decision engine, as a part of the DiVa IBC system, takes the data from the vehicle and from the CSMS combined with the impedance balancing needs of the charging system, and allocates an appropriate parking spot, e.g. based on certain protocols. This process must be completed quickly as the parking allocation must be sent back to the SECC so that it can be communicated to the EVCC as described above.
[0121] Ultrawide band (UWB) technology is used for performing subsequent vehicle spatial monitoring and tracking. Incorporation of UWB Tags within the VA (vehicle coil assembly) or elsewhere on the vehicle (e.g. UWB Tags integrated by the vehicle OEM) of tracked vehicles, and UWB Anchors within the depot, allows arrival at the park to be registered and then travel to the selected parking space, or not, to be monitored. Thus, the system works with tagged vehicles and associated anchors spaced around the park, usually towards its peripheries, communications being managed by the park management system.
[0122] The system runs at a constant voltage of 400V, with frequency being nominally 85kHz. There is a single, centralised inverter, so all wireless pads operate at the same frequency. The inverter (in the central power supply) is rated for 125kW peak, 110kW nominal, at 85kHz (79 - 90kHz range, as per SAE J2954); input: 3PH 400 / 415 VAC and output: 1 PH 300 - 1 kV VAC. Ground assembles (GA) are WPT3 Z2, as per SAE J2954, i.e. suitable for 11 .1 kVA (power) or 11 kW with approximately a 18cm airgap to the vehicle assembly (VA). VAs on the vehicles are also WPT3 Z2. Parking Space Allocation Based on Impedance Management System
[0123] The impedance management system (DiVa IBC) dynamically compensates for variance in system impedance by injecting into the circuit (“the system”) either capacitance or inductance as is appropriate for the given compensation required. In doing so, the impedance management system is interfaced directly with the overall wireless power transfer (“WPT”) system, taking voltage and current measurements from each coil system (each ground assembly) present on the overall system, thus compensating for variations in impedance at each specific coil system and further for the WPT system overall. Thus, the impedance management system is capable of monitoring the overall state of efficiency of the entire system, and either internally compensating for the impedance state by injecting additional capacitance or inductance for cases in which the necessary impedance compensation is relatively minimal, and / or compensating via external factors which can vary impedance at necessary points of the system via communication with actors outside of the system. In terms of the WPT system proposed herein, those external actors are the vehicles entering the parking / charging area in which the WPT system is installed. The WPT system operates more efficiently when loads (vehicles being charged) are more evenly distributed throughout the system, in terms of distance away from the converter in the central assembly, and more specifically when impedance is distributed relatively equally along the distribution backbone. In order to minimise the necessary amount of external capacitance and impedance necessary for injection into the system (the physical impedance management device has a limited amount of capacitive and inductive devices for insertion into the WPT system, and further the insertion of external devices is inherently inefficient in terms of resistance introduced into the system) and / or optimise the overall power delivery efficiency of the WPT system, the impedance management system indicates how the loading scenario can be made more ideal at any particular point in time and any particular scenario of system loading. Notably, a loading scenario, or system loading, can be defined as the distribution of electrical loads (vehicles being charged) at different locations along the backbone of the WPT system - a front-heavy loading scenario is an instance in which electrical load (vehicles charging) is concentrated towards the beginning of the distribution system or closest to the converter, and a back-heavy loading scenario is an instance in which electrical load is concentrated towards the end of the distribution system or furthest from the converter.
[0124] It should further be noted that the additional applications related to parking space allocation which this system enables for the WPT system include:
[0125] 1. Parking space tracking for impedance management system pre-compensation: in a system installed in a depot / parking area for autonomous vehicles (“AVs”), the impedance management system- determined, system-issued parking space allocated for an entering vehicle will most probably be obeyed. In a system installed in a depot / parking area for traditional vehicles, the parking space allocated by the system I impedance management system may not be heeded by the driver of said vehicle. In that case, the system is able to track the heading of the vehicle to determine which parking space it actually will park in, and convey this information to the impedance management system such that it may prepare compensation for the resultant system inductance and thus loading scenario. To expand upon this pre-compensation by the impedance management system based on vehicle tracking by the system - when internally inserting capacitance and / or inductance into the system, the impedance management system may make a break in the circuit of the WPT system and insert the appropriate devices, which takes time (milliseconds / seconds). Elimination of down time, however minute, contributes to continuous successful operation and efficiency of the system. Thus, system efficiency is best conserved by the impedance management system being alerted as to the destination parking space of an entering vehicle as soon as that can be determined, which is with immediacy (as soon as the vehicle’s attitude and heading are consistent vectors) by the system.
[0126] 2. Parking space tracking for user convenience: in a system installed in a depot / parking area for traditional vehicles (vehicles driven by people), the system may be used to allocate parking spaces based upon user conveniences such as (i) parking space nearest a particular amenity or loading bay / access point, (ii) avoidance of a parking space in which another vehicle has been misparked (vehicles’ positioning may make it impossible for an incoming vehicle to open doors or park), with said mis-parking also being determined by the tracking capabilities of the system, and / or (iii) parking space characteristics such as an extra-wide bay or a disabled bay.
[0127] 3. Future loading scenario for system efficiency optimisation: once a particular WPT system has been operated for a time, it becomes possible to predict approximately the duty cycle (demand in power as well as time) of the vehicles which said system is charging. Given a model of average duty cycle (regardless of how predictable this duty cycle may actually be), the system is then able to predict the relevant consumption characteristics of incoming vehicles - specifically, vehicle arrival timings, quantity of incoming vehicles, power demand of incoming vehicles, and time before vehicle departure (time available for charging). With this predictive model, the system is able to deduce the optimal future state of system inductance (future loading scenario) for maintenance of system efficiency, and system herein may direct an incoming vehicle according to the projected optimal load positioning for the impedance management system.
[0128] Parking Space Type / Standard
[0129] Parking spaces for WPT systems are defined by the relevant WPT standards to have particular dimensions and locations for the ground assembly (“GA”) (primary coil). For example, SAE J2954 and IEC 61980 both define parking spaces which are similar, but are not exactly the same. There further may be WPT parking spaces which do not match either of these definitions, such as those with the GA positioning justified opposite (towards the front of the parking space, as opposed to the back). The present WPT system enables vehicle assignment according to the appropriate WPT charging space type (such as the case in which a vehicle made to charge on SAE J2954 spaces enters a parking area with IEC 61980 parking spots; that vehicle can be directed via the system to park in an IEC 61980 parking spot, or can be directed to a particular charging space in the parking area which may be formatted in the SAE J2954 fashion), and further allows for vehicles not designed explicitly for operation with a particular WPT parking spot layout to perform coarse alignment relative to that topology regardless. System Operation
[0130] One specific system as described above has a connection to the AC grid power supply connected to an inverter, the output of which is connected via a capacitive backbone with individual distributed power take-offs to a wireless ground pad at each of 10 light goods vehicle parking spaces - a fleet of commercial vans. Parking space 1 is closest to the converter and space 10 furthest away. A vehicle arrives within Parking Space 8, with the system being aware of its attitude and heading, and present location. This parking is not necessarily allocated, but rather occurs at the volition of the driver.
[0131] Next, the vehicle is within the parking space and is logged as starting to charge. The management system processes this change and determines no park status adjustment is needed.
[0132] Next, an additional vehicle enters the parking area, provides its charging requirement data to the management system and is directed to a particular parking space as per the ideal loading scenario of the WPT system based upon the impedance efficiency state as deduced and dictated by the impedance management system. Prior to this new vehicle, which has been allocated to Parking Space 1 , all load on the system was present at Parking Space 8 for charging the vehicle parked there. Thus, to maintain the overall power efficiency of the system, the new vehicle has been directed to the closest possible loading point to the converter of the system, which is Parking Space 1 . After the first vehicle has parked in Parking Space 8, the impedance management system made the determination of the ideal next parking space allocation to balance the system based on live voltage and current measurements across the system, and requested the system to allocate the next parking space to be populated and charged on.
[0133] Next, the vehicle in Parking Space 8 stops charging and departs, and two additional vehicles arrive in the system. The first of the two new vehicles is allocated Parking Space 9 as that space is a charging space further away from the converter as the system was front heavy with only the vehicle in Parking Space 1 consuming power. The second of the two new vehicles is allocated Parking Space 3 because its charging requirement indicated a need for access to loading amenities adjacent that space as it is scheduled for a loading operation as well as charging. Afurther vehicle then arrives and is allocated Parking Space 10 because this is the driver’s personal request, for convenience, and the charging requirement data for this vehicle is programmed to override system load and balance criteria. The impedance management system adjusts impedance to compensate for this non-ideal charging location, maintaining system efficiency.
[0134] System operation is in accordance with a protocol for selecting spaces and adjusting park status.
[0135] Protocol A
[0136] One protocol for selecting a parking space is as follows:
[0137] 1 - Start with set of all unoccupied parking spaces
[0138] 2 - Exclude possible parking spaces based on physical limitations (too small for arriving vehicle).
[0139] If no spaces remaining, unable to allocate parking. There are no suitable spaces.
[0140] 3 - Exclude possible parking spaces based on operational limitations (disabled space required, or loading dock required, CEO parking, et cetera).
[0141] If no spaces remaining, optionally continue with all spaces while reporting unable to meet above requirements
[0142] 4 - Determine "best" remaining spaces based on impedance matching (no or limited change to impedance management, or the change needed moves in neutral direction leaving more capacity for future compensation)
[0143] This considers power capabilities, energy requirements, et cetera.
[0144] 5 - Exclude unneeded "special" spaces (larger than necessary, near to amenities) If no spaces remaining, optionally allocate including "special" spaces.
[0145] Protocol B
[0146] An alternative protocol for selecting a parking space is as follows:
[0147] 1 - Start with set of all unoccupied parking spaces, then allocate a space based on the following criteria in descending order of importance
[0148] 2 - Driver convenience
[0149] 3 - Vehicle has non-charging requirement, such as need to load, unload at a specific location 4 - Vehicle has size I dimensions requirement, and needs a space with sufficient space to accommodate the vehicle
[0150] 5 - Vehicle is allocated to space requiring least adjustment of impedance (whether at system-level or component-level) 6 - 2 or more spaces meet the same criteria, choose the one closest to park entrance.
[0151] Thus, parking spaces are allocated based on, inter alia, a combination of charging needs of an arriving vehicle and system efficiency needs, with overrides available for certain conditions and balancing system and component-level interventions made and adjusted accordingly.
Claims
Claims1 . A method for operating an electric vehicle park, said vehicle park comprising a plurality of parking spaces and a plurality of wireless charging points each associated with one of said parking spaces, said method comprising providing park status data relating to the status of the vehicle park; receiving charging requirement data from a parked electric vehicle, or from an arriving electric vehicle, the data relating to one or more charging requirements of the vehicle; and processing the park status data and the charging requirement data to determine a selected parking space for an arriving vehicle and / or whether to adjust the park status.
2. A method according to claim 1 , comprising receiving the charging requirement data from an electric vehicle arriving at the vehicle park, and processing the park status data and the charging requirement data to determine a selected parking space for an arriving vehicle.
3. A method according to claim 1 , comprising receiving the charging requirement data from an electric vehicle arriving at a given parking space of the vehicle park, and processing the park status data and the charging requirement data to determine whether to adjust the park status.
4. A method according to claim 1 , comprising receiving the charging requirement data from an electric vehicle parked at a given parking space of the vehicle park, and processing the park status data and the charging requirement data to determine whether to adjust the park status.
5. A method according to any previous claim, comprising determining a selected parking space for an arriving vehicle; and directing the electric vehicle to the selected parking space.
6. A method according to any previous claim, comprising providing direction data relating to the selected parking space to the vehicle or to a driver of the vehicle.
7. A method according to claim 5 or 6, comprising determining whether the directed electric vehicle has reached its selected parking space, and, separately, whether it has started charging.
8. A method according to any of claims 5 to 7, wherein directing the electric vehicle comprises exchange of data between the electric vehicle and a parking space selection management system; determination of the selected parking space by the parking space selection management system; direction of the electric vehicle to the selected parking space.
9. A method according to any previous claim, comprising processing data relating to a change in park status due to a change in charging status of a parked electric vehicle and determining whether to adjust park status.
10. A method according to claim 9, wherein the change in charging status is selected from the vehicle is no longer charging, and a rate of charging of the vehicle has changed.
11. A method according to any previous claim, wherein adjusting park status comprises adjusting system efficiency; changing impedance and / or inductance in one or more components of the power supply backbone, ground assembly or central inverter throughout the vehicle park; changing capacitance in one or more components of the power supply backbone, ground assembly or central inverter throughout the vehicle park;compensating for a change in the park status caused by a change in a charging status of the electric vehicle; and compensating for an anticipated change in the park status caused by an anticipated change in a charging status of the electric vehicle.
12. A method according to claim 11 , wherein adjusting park status comprises changing the impedance or inductance or capacitance in anticipation of the arriving electric vehicle parking at its selected parking space.
13. A method according to claim 11 or 12, wherein adjusting park status comprises changing the impedance or inductance or capacitance in anticipation of one or more electric vehicles arriving at the vehicle park.
14. A method according to any of claims 11 to 13, wherein adjusting park status comprises taking into account predetermined expectation of or a record of historic arrival of vehicles at the vehicle park.
15. A method according to any previous claim, wherein the charging requirement data of an electric vehicle comprises data relating to one or more of(i) time of arrival the electric vehicle;(ii) identification of the electric vehicle;(iii) the battery of the electric vehicle, such as one or more of a. battery capacity, b. state of charge, c. target state of charge, including desired state of charge against time, and d. charge and discharge power limits;(iv) desired future use of the electric vehicle, such as one or more of a. need to depart the park at or by a particular time, b. anticipated period of non-use after charging;(v) convenience or special needs of a driver of the electric vehicle, such as a. desired location for reasons other than related to charging i. choice of location limited for specific use of the vehicle now or in the futureii. choice of location limited for specific non-charging related use of the vehicle now or in the future b. disability of driver, c. rank of driver entitling driver to choose a space;(vi) dimensions of the electric vehicle and / or any attachments such as a trailer, a roof-mounted element, a side-mounted element; a. need to exit vehicle on a particular side, b. attachment of a drag-along trailer, c. presence of a roof box on the vehicle.
16. A method according to claim 15, wherein the charging requirement data of an electric vehicle comprises data relating to one or more of(i) the battery of the electric vehicle, such as one or more of a. battery capacity, b. state of charge, c. target state of charge, including desired state of charge against time, and d. charge and discharge power limits;(ii) choice of location limited for specific non-charging related use of the vehicle now or in the future(iii) dimensions of the electric vehicle and / or any attachments such as a trailer, a roof-mounted element, a side-mounted element; a. need to exit vehicle on a particular side, b. attachment of a drag-along trailer, c. presence of a roof box on the vehicle.
17. A method according to any previous claim, wherein park status data may comprise data relating to current park status anticipated future park status, for example due to additional vehicles charging in known locations, additional vehicles charging in unknown locations, change in a charging status of a charging vehicle, departure of a vehicle.
18. A method according to any previous claim, wherein park status data may comprise data relating to impedance or inductance of one or more components of the power supply backbone, or a ground or central / inverter assembly throughout the vehicle park; capacitance of one or more components of the power supply backbone, or a ground or central / inverter assembly throughout the vehicle park; power consumption by the vehicle park.
19. A method according to any previous claim, wherein determining a selected parking space comprises taking into account one or more criteria including whether parking of the vehicle at the selected parking space and charging of the vehicle at that space will result in no need to change park status; parking of vehicle at the selected parking space and charging of the vehicle at that space will result in a need for a lesser change in park status compared with the vehicle parking at a different parking space; convenience for the driver overrides other criteria; one or more dimensions of the vehicle limit parking of that vehicle to a subset of spaces; a desired future use of the vehicle overrides other criteria20. A method according to any previous claim, comprising monitoring the status of the vehicle park.21 . A method according to claim 20, comprising monitoring for a change in charging status of one or more of the charging vehicles.
22. A method according to claim 20 or 21 , comprising monitoring for arrival at the parking space selected for the directed vehicle.
23. A method according to claim 20, 21 or 22, comprising monitoring for arrival of the directed vehicle at a parking space other than the selected parking space.
24. A method according to any of claims 20 to 23, comprising monitoring for a change caused by arrival of a directed vehicle at a parking space other than the selected parking space.
25. A method according to any previous claim, wherein the electric vehicle park further comprises a power supply or connections to a power supply, for example the local power grid; and one or more capacitive power transmission lines each comprising at least first and second conductors in a capacitive relationship to each other and separated by a dielectric material, the first conductor being connected to source and not to load, and the second being connected to load and not source; wherein the charging points are connected to the power supply or the connections to a power supply via the one or more of power transmission lines.
26. An electric vehicle park, comprising a plurality of parking spaces and a plurality of wireless charging points each associated with one of said parking spaces; and a park management system for operating the vehicle park and programmed for providing park status data relating to the status of the vehicle park; receiving charging requirement data from a parked electric vehicle, or from an arriving electric vehicle, the data relating to one or more charging requirements of the vehicle; and processing the park status data and the charging requirement data to determine a selected parking space for an arriving vehicle and / or whether to adjust the park status.
27. An electric vehicle park according to claim 26, comprising a power supply or connections to a power supply, for example the local power grid; one or more capacitive power transmission lines each comprising at least first and second conductors in a capacitive relationship to each other and separated by a dielectric material, the first conductor being connected to source and not to load, and the second being connected to load and not source;RECTIFIED SHEET (RULE 91) ISA / EPwherein the charging points are connected to the power supply or the connections to a power supply via the one or more the power transmission lines.
28. An electric vehicle park according to claim 26 or 27, wherein the electric vehicle park also comprises an impedance management system for management of impedance of the one or more capacitive power transmission lines.
29. An electric vehicle park according to any of claims 26 to 28, wherein the park management system is programmed for carrying out a method according to any of claims 1 to 24.
30. A park management system for operating an electric vehicle park, said vehicle park comprising a plurality of parking spaces and a plurality of wireless charging points each associated with one of said parking spaces wherein the management system is programmed for providing park status data relating to the status of the vehicle park; receiving charging requirement data from a parked electric vehicle, or from an arriving electric vehicle, the data relating to one or more charging requirements of the vehicle; and processing the park status data and the charging requirement data to determine a selected parking space for an arriving vehicle and / or whether to adjust the park status.31 . A park management system according to claim 30, wherein the management system is programmed for carrying out a method according to any of claims 1 to 24.RECTIFIED SHEET (RULE 91) ISA / EP
Citation Information
Patent Citations
A charge transfer zero loss power and signal transmission cable
WO2010026380A1
Capacitive power transmission cable
WO2019234449A1
Capacitive cable
WO2020120932A1
Capacitive power transmission cable
WO2021094782A1
Capacitive power transmission cable
WO2021094783A1