Method and apparatus for multi-carrier uplink transmit switching

By identifying a subset of uplink bands and determining the switching period location based on band priorities, the proposed method addresses unpredictable UE behavior in multi-carrier uplink transmit switching, improving wireless communication reliability.

WO2025020937A1PCT designated stage expired Publication Date: 2025-01-30MEDIATEK SINGAPORE PTE LTD +1
View PDF 4 Cites 0 Cited by

Patent Information

Application Number
PCT/CN2024/104873
Authority / Receiving Office
WO · WO
Patent Type
Applications
Current Assignee / Owner
Priority Date
2023-07-26
Filing Date
2024-07-11
Publication Date
2025-01-30

AI Technical Summary

Technical Problem

Existing mechanisms for determining the switching period location in multi-carrier uplink transmit switching in 5G-Advanced systems can lead to unpredictable user equipment (UE) behavior, impacting the reliability of wireless communication.

Method used

An apparatus identifies a subset of uplink bands where each band is either a switch-from band or a switch-to band but not both, and determines the switching period location based on the band priority associated with this subset, excluding the highest priority band if it is both switch-from and switch-to.

Benefits of technology

This approach stabilizes UE behavior by determining a consistent switching period location based on band priorities, enhancing the reliability of wireless communication in multi-carrier uplink transmit switching scenarios.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN2024104873_30012025_PF_FP_ABST
    Figure CN2024104873_30012025_PF_FP_ABST
Patent Text Reader

Abstract

Various solutions for multi-carrier uplink transmit switching in mobile communications are described. An apparatus may receive a configuration identified multiple uplink bands for an uplink switching. The apparatus may identify a subset of the uplink bands in an event that the uplink switching is triggered. Each uplink band in the identified subset is either a switch-from band or a switch-to band but not both. The apparatus may determine a switching period location based on a band priority associated with the identified subset. The apparatus may perform the uplink switching according to the switching period location.
Need to check novelty before this filing date? Find Prior Art

Description

METHOD AND APPARATUS FOR MULTI-CARRIER UPLINK TRANSMIT SWITCHING

[0001] CROSS REFERENCE TO RELATED PATENT APPLICATION (S)

[0002] The present disclosure is part of a non-provisional application claiming the priority benefit of U.S. Patent Application No. 63 / 515,605, filed 26 July 2023, the content of which herein being incorporated by reference in its entirety.TECHNICAL FIELD

[0003] The present disclosure is generally related to mobile communications and, more particularly, to multi-carrier uplink (UL) transmit (Tx) switching with respect to user equipment (UE) in mobile communications.BACKGROUND

[0004] Unless otherwise indicated herein, approaches described in this section are not prior art to the claims listed below and are not admitted as prior art by inclusion in this section.

[0005] Wireless communication technologies have grown exponentially over the years. In 5th Generation (5G) New Radio (NR) systems or 5G-Advanced systems, a powerful technique, carrier aggregation (CA) , is used for increasing data rate per user equipment (UE) . To increase the flexibility of CA framework, multi-carrier uplink (UL) transmit (Tx) switching can be applied. In 5G-Advanced systems, when a UE implementation supports multi-carrier uplink transmit switching, the UE may dynamically switch across three or more bands. However, the existing mechanism for determining the switching period location associated with the uplink switching may lead to unpredictable UE behavior in certain scenarios, and the reliability of wireless communication may be impacted.

[0006] Accordingly, how to prevent the unpredictable UE behavior has become an important issue for newly developed wireless communication systems. Therefore, there is a need to provide proper schemes to solve this issue.SUMMARY

[0007] The following summary is illustrative only and is not intended to be limiting in any way. That is, the following summary is provided to introduce concepts, highlights, benefits and advantages of the novel and non-obvious techniques described herein. Select implementations are further described below in the detailed description. Thus, the following summary is not intended  to identify essential features of the claimed subject matter, nor is it intended for use in determining the scope of the claimed subject matter.

[0008] An objective of the present disclosure is to propose solutions or schemes that address the aforementioned issue pertaining to multi-carrier uplink (UL) transmit (Tx) switching in mobile communications.

[0009] In one aspect, a method may involve an apparatus identifying a subset of multiple uplink bands in an event that an uplink switching configured with the uplink bands is triggered, wherein each uplink band in the identified subset is either a switch-from band or a switch-to band but not both. The method may also involve the apparatus determining a switching period location based on a band priority associated with the identified subset. The method may further involve the apparatus performing the uplink switching according to the switching period location.

[0010] In one aspect, an apparatus may comprise a transceiver which, during operation, wirelessly communicates with a network node of a wireless network. The apparatus may also comprise a processor communicatively coupled to the transceiver. The processor, during operation, may perform operations comprising receiving, via the transceiver, a configuration identified multiple uplink bands for an uplink switching. The processor may perform operations comprising identifying a subset of the uplink bands in an event that the uplink switching is triggered, wherein each uplink band in the identified subset is either a switch-from band or a switch-to band but not both. The processor may also perform operations comprising determining a switching period location based on a band priority associated with the identified subset. The processor may further perform operations comprising performing the uplink switching according to the switching period location.

[0011] It is noteworthy that, although description provided herein may be in the context of certain radio access technologies, networks and network topologies such as LTE, LTE-Advanced, LTE-Advanced Pro, 5G, NR, 5G-Advanced, Internet-of-Things (IoT) , Narrow Band Internet of Things (NB-IoT) , Industrial Internet of Things (IIoT) , beyond 5G (B5G) , and 6th Generation (6G) , the proposed concepts, schemes and any variation (s)  / derivative (s) thereof may be implemented in, for and by other types of radio access technologies, networks and network topologies. Thus, the scope of the present disclosure is not limited to the examples described herein.BRIEF DESCRIPTION OF THE DRAWINGS

[0012] The accompanying drawings are included to provide a further understanding of the disclosure and are incorporated in and constitute a part of the present disclosure. The drawings illustrate implementations of the disclosure and, together with the description, serve to explain the principles of the disclosure. It is appreciable that the drawings are not necessarily in scale as some  components may be shown to be out of proportion than the size in actual implementation in order to clearly illustrate the concept of the present disclosure.

[0013] FIG. 1 is a diagram depicting an example scenario of a communication environment in which various solutions and schemes in accordance with the present disclosure may be implemented.

[0014] FIG. 2 is a diagram depicting scenarios of determining the switching period location in accordance with different band priority order.

[0015] FIG. 3 is a diagram depicting scenarios of the highest priority bands being involved in both switch-from band and switch-to band.

[0016] FIG. 4 is a diagram depicting example scenarios of multi-carrier uplink transmit switching in accordance with an implementation of the present disclosure.

[0017] FIG. 5 is a diagram depicting example scenarios of multi-carrier uplink transmit switching in accordance with another implementation of the present disclosure.

[0018] FIG. 6 is a block diagram of an example communication apparatus in accordance with an implementation of the present disclosure.

[0019] FIG. 7 is a flowchart of an example process in accordance with an implementation of the present disclosure.

[0020] DETAILED DESCRIPTION OF PREFERRED IMPLEMENTATIONS

[0021] Detailed embodiments and implementations of the claimed subject matters are disclosed herein. However, it shall be understood that the disclosed embodiments and implementations are merely illustrative of the claimed subject matters which may be embodied in various forms. The present disclosure may, however, be embodied in many different forms and should not be construed as limited to the exemplary embodiments and implementations set forth herein. Rather, these exemplary embodiments and implementations are provided so that description of the present disclosure is thorough and complete and will fully convey the scope of the present disclosure to those skilled in the art. In the description below, details of well-known features and techniques may be omitted to avoid unnecessarily obscuring the presented embodiments and implementations.

[0022] Overview

[0023] Implementations in accordance with the present disclosure relate to various techniques, methods, schemes and / or solutions pertaining to multi-carrier uplink (UL) transmit (Tx) switching in mobile communications. According to the present disclosure, a number of possible solutions may be implemented separately or jointly. That is, although these possible solutions may be described below separately, two or more of these possible solutions may be implemented in one combination or another.

[0024] FIG. 1 illustrates an example scenario 100 of a communication environment in which various solutions and schemes in accordance with the present disclosure may be implemented. Scenario 100 involves a user equipment (UE) 110 in wireless communication with a wireless network (e.g., a 5G NR network) consisting of an access network 120 and a core network 130. The UE 110 may be a smart phone, a wearable device, an IoT device, and a tablet, etc. Alternatively, the UE 110 may be a notebook (NB) or personal computer (PC) inserted or installed with a data card which includes a modem and radio frequency (RF) transceiver (s) to provide the functionality of wireless communication. In 5G NR, the access network 120 is connected to the core network 130 by means of the NG interface, more specifically to a user plane function (UPF) by means of the NG user-plane part (NG-u) , and to a mobility management function (AMF) by means of the NG control-plane part (NG-c) . One bBS (e.g., a next generation Node-B (gNB) ) can be connected to multiple UPFs / AMFs for the purpose of load sharing and redundancy. In addition, the core network may include other entities, such as session management function (SMF) and unified data management (UDM) , etc.

[0025] The access network 120 may include multiple base stations (BSs) , such as the BS 121 and the BS 122, each of which may provide communication coverage for a geographic coverage area where communications with the UE 110 is supported.

[0026] In one embodiment, when a UE supports multi-carrier uplink transmit switching, the UE may dynamically switch across all configured 3 or 4 uplink bands. For example, when the UE supports dynamically switching across uplink bands A, B, and C, the UE may switch between uplink bands A and B, between uplink bands A and C, and between uplink bands B and C. The time period required by the UE to complete the uplink switching from one band to another is called the switching period. The switching period location may be in the band that is in effect before the switching or after the switching. The band in effect before the switching is referred to as the switch-from band, while the band in effect after the switching is referred to as the switch-to band. In current mechanism, the UE determines the switching period location based on the priority levels of all the configured uplink bands. For example, if the band having the highest band priority is a switch-to band, then the switching period is determined to be in the switch-from band (s) . Alternatively, if the band having the highest band priority is a switch-from band, then the switching period is determined to be in the switch-to band (s) . The priority level of each uplink bands is configured by a network node (e.g., the base station) via a radio resource control (RRC) message. FIG. 2 illustrates scenarios 210-220 of determining the switching period location in current mechanism. In scenario 210, the UE may switch from band A to band C, and may switch from band B to band C. That is, bands A and B are the switch-from band and band C is the switch-to band. Among bands A, B and C, band C has the highest band priority while band A has the lowest  band priority. As the band with the highest band priority is the switch-to band (i.e., band C) , the UE may determine that the switching period location is in the switch-from bands (i.e., bands A and B) . Alternatively, in scenario 220, band A has the highest band priority while band C has the lowest band priority. As the band with the highest band priority is the switch-from band (i.e., band A) , the UE may determine that the switching period location is in the switch-to bands (i.e., band C) .

[0027] The current mechanism for determining the switching period location may cause unpredictable UE behavior in several scenarios. For example, in the scenarios 310 to 330 shown in FIG. 3, it is assumed that band A has the highest band priority among the uplink bands configured for the uplink switching. While band A is both the switch-from band and the switch-to band, it is not possible to predict UE behavior for where to locate the switching period in accordance with the conventional mechanism. This ambiguous UE behavior may occur when the band having the highest band priority is involved in both switch-from band (s) and switch-to band (s) and leads to negative impacts on the mobile communication reliability.

[0028] In view of the above, the present disclosure proposes a number of schemes pertaining to multi-carrier uplink transmit switching in mobile communications. According to the schemes of the present disclosure, in an event that an uplink switching configured with multiple uplink bands is triggered, the UE identifies a subset of the configured uplink bands (also referred to as the band subset) , wherein each uplink band in the identified band subset is either a switch-from band or a switch-to band but not both. Specifically, the uplink band having the highest band priority among the configured uplink bands is not included in the band subset in an event that the uplink band with the highest band priority is both the switch-from band and the switch-to band. Then, the UE determines the switching period location based on the band priority associated with the band subset, and performs the uplink switching according to the switching period location.

[0029] FIG. 4 illustrates example scenarios 410 and 420 of multi-carrier uplink transmit switching in accordance with an implementation of the present disclosure. In scenarios 410 and 420, bands A, B and C are the configured uplink bands for the uplink switching that may be performed by the UE. The UE may switch from bands A and B to bands A and C. That is, bands A and B are the switch-from band, and bands A and C are the switch-to band. The priority level represents the priority of the band, the larger the level the higher is its priority.

[0030] In scenario 410, among bands A, B and C, band A has the highest band priority, band B has the second highest band priority, and band C has the lowest band priority. In this embodiment, in an event that an uplink switching configured with the bands A, B and C is triggered, the UE identifies the band subset that includes bands B and C, as band A having the highest band priority is both the switch-from band and the switch-to band. The UE then specifies an uplink  band having the highest band priority among the band subset and determines the switching period location based on whether the specified uplink band is the switch-from band or the switch-to band. As shown in scenario 410, band B is the band having the highest band priority among the band subset. As it is a switch-from band, the UE determines that the switching period location is in the switch-to band set associated with the configured uplink bands (i.e., the switch-to bands A and C) .

[0031] On the other hand, in scenario 420, band A has the highest band priority, band C has the second highest band priority, and band B has the lowest band priority. In this embodiment, in an event that an uplink switching configured with the bands A, B and C is triggered, the UE identifies the band subset that includes bands B and C, as band A having the highest band priority is both the switch-from band and the switch-to band. Among the band subset, the UE specifies band C as the band having the highest band priority. Band C is a switch-to band; thus the UE determines that the switching period location is in the switch-from band set associated with the configured uplink bands (i.e., the switch-from bands A and B) .

[0032] In other words, the UE determines the switching period location based on the second highest priority band among the configured uplink bands. To be specific, under the circumstances that the highest priority band among the configured uplink bands is both the switch-from band and the switch-to band, in an event that the highest and the second highest priority bands are the switch-from band, the UE determines that the switching period location is in the switch-to band set associated with the configured uplink bands. Alternatively, in an event that the highest and the second highest priority bands are the switch-to band, the UE determines that the switching period location is in the switch-from band set associated with the configured uplink bands.

[0033] In some embodiments, the UE determines the switching period location based on the lowest priority band among the configured uplink bands. When the highest priority band among the configured uplink bands is both the switch-from band and the switch-to band, in an event that the lowest priority band is a switch-from band, the switching period location is determined to be in the switch-from band set associated with the configured uplink bands. Alternatively, in an event that the lowest priority band is a switch-to band, the switching period location is determined to be in the switch-to band set associated with the configured uplink bands.

[0034] FIG. 5 illustrates another example scenarios 510 and 520 of multi-carrier uplink transmit switching in accordance with an implementation of the present disclosure, in which bands A, B, C and D are the configured uplink bands for the uplink switching that may be performed by the UE. The priority level represents the priority of the band, the larger the level the higher is its priority.

[0035] In scenario 510, the UE may switch from bands A, B and D to bands A and C. That is, bands A, B and D are the switch-from band, and bands A and C are the switch-to band. Among bands A, B, C and D, band A has the highest band priority while band D has the lowest band priority. In this embodiment, in an event that an uplink switching configured with the bands A, B, C and D is triggered, the UE identifies the band subset that includes bands B, C and D, as band A having the highest band priority is both the switch-from band and the switch-to band. The UE determines a first value according to the priority level of each band belonging to the switch-from band set associated with the band subset. Also, the UE determines a second value according to the priority level of each band belonging to the switch-to band set associated with the band subset. Then, the switching period location is determined based on the first value and the second value. In scenario 510, the switch-from band set associated with the band subset includes bands B and D, thus the first value is determined according to the priority level of bands B and D. The first value is, for example and without limitation, the sum of the priority level of each band in the switch-from band set (i.e., 3+1=4) . The switch-to band set associated with the band subset includes band C, thus the second value is determined according to the priority level of band C. The second value is, for example and without limitation, the sum of the priority level of each band in the switch-to band set (i.e., 2) . In an event that the first value is greater than the second value, the switching period location is determined to be in the switch-to band set associated with the configured uplink bands (i.e., the switch-to bands A and C) .

[0036] In scenario 520, the UE may switch from bands A and B to bands A, C and D. That is, bands A and B are the switch-from band, while bands A, C and D are the switch-to band. The first value of 1 and the second value of 5 may be determined in a way similar to the foregoing embodiment. In an event that the first value is smaller than the second value, the switching period location is determined to be in the switch-from band set associated with the configured uplink bands (i.e., the switch-from bands A and B) .

[0037] In the foregoing embodiments, the switch-to band set associated with the configured uplink bands may include one or more bands in effect after the switching. The switch-from band set associated with the configured uplink bands may include one or more band in effect before the switching.

[0038] Illustrative Implementations

[0039] FIG. 6 illustrates an example communication apparatus 610 in accordance with an implementation of the present disclosure. The communication apparatus 610 may perform various functions to implement schemes, techniques, processes and methods described herein pertaining to multi-carrier uplink transmit switching in mobile communications, including scenarios / schemes described above as well as process 700 described below.

[0040] Communication apparatus 610 may be a part of an electronic apparatus, which may be a UE such as a portable or mobile apparatus, a wearable apparatus, a wireless communication apparatus or a computing apparatus. For instance, communication apparatus 610 may be implemented in a smartphone, a smartwatch, a personal digital assistant, a digital camera, or a computing equipment such as a tablet computer, a laptop computer or a notebook computer. Communication apparatus 610 may also be a part of a machine type apparatus, which may be an IoT, NB-IoT, or IIoT apparatus such as an immobile or a stationary apparatus, a home apparatus, a wire communication apparatus or a computing apparatus. For instance, communication apparatus 610 may be implemented in a smart thermostat, a smart fridge, a smart door lock, a wireless speaker or a home control center. Alternatively, communication apparatus 610 may be implemented in the form of one or more integrated-circuit (IC) chips such as, for example and without limitation, one or more single-core processors, one or more multi-core processors, one or more reduced-instruction set computing (RISC) processors, or one or more complex-instruction-set-computing (CISC) processors. Communication apparatus 610 may include at least some of those components shown in FIG. 6 such as a processor 612, for example. Communication apparatus 610 may further include one or more other components not pertinent to the proposed scheme of the present disclosure (e.g., internal power supply, display device and / or user interface device) , and, thus, such component (s) of communication apparatus 610 are neither shown in FIG. 6 nor described below in the interest of simplicity and brevity.

[0041] In one aspect, processor 612 may be implemented in the form of one or more single-core processors, one or more multi-core processors, or one or more CISC processors. That is, even though a singular term “a processor” is used herein to refer to processor 612, processor 612 may include multiple processors in some implementations and a single processor in other implementations in accordance with the present disclosure. In another aspect, processor 612 may be implemented in the form of hardware (and, optionally, firmware) with electronic components including, for example and without limitation, one or more transistors, one or more diodes, one or more capacitors, one or more resistors, one or more inductors, one or more memristors and / or one or more varactors that are configured and arranged to achieve specific purposes in accordance with the present disclosure. In other words, in at least some implementations, processor 612 is a special-purpose machine specifically designed, arranged and configured to perform at least a part of the specific tasks including multi-carrier uplink transmit switching in a UE (e.g., as represented by communication apparatus 610) in accordance with various implementations of the present disclosure.

[0042] In some implementations, communication apparatus 610 may also include a transceiver 616 coupled to processor 612 and capable of wirelessly transmitting and receiving data.  In some implementations, transceiver 616 may be capable of wirelessly communicating with different types of wireless networks of different radio access technologies (RATs) . In some implementations, transceiver 616 may be equipped with a plurality of antenna ports (not shown) such as, for example, four antenna ports. That is, transceiver 616 may be equipped with multiple transmit antennas and multiple receive antennas for multiple-input multiple-output (MIMO) wireless communications.

[0043] In some implementations, communication apparatus 610 may further include a memory 614 coupled to processor 612 and capable of being accessed by processor 612 and storing data therein. Memory 614 may include a type of random-access memory (RAM) such as dynamic RAM (DRAM) , static RAM (SRAM) , thyristor RAM (T-RAM) and / or zero-capacitor RAM (Z-RAM) . Alternatively, or additionally, memory 614 may include a type of read-only memory (ROM) such as mask ROM, programmable ROM (PROM) , erasable programmable ROM (EPROM) and / or electrically erasable programmable ROM (EEPROM) . Alternatively, or additionally, memory 614 may include a type of non-volatile random-access memory (NVRAM) such as flash memory, solid-state memory, ferroelectric RAM (FeRAM) , magnetoresistive RAM (MRAM) and / or phase-change memory.

[0044] Communication apparatus 610 may be a communication entity capable of using various proposed schemes in accordance with the present disclosure. For illustrative purposes and without limitation, descriptions of capabilities of communication apparatus 610, implemented in or as a UE are provided below with process 700.

[0045] Illustrative Processes

[0046] FIG. 7 illustrates an example process 700 in accordance with an implementation of the present disclosure. Process 700 may be an example implementation of above scenarios / schemes, whether partially or completely, with respect to multi-carrier uplink transmit switching in mobile communications. Process 700 may represent an aspect of implementation of features of communication apparatus 610. Process 700 may include one or more operations, actions, or functions as illustrated by one or more of blocks 710, 720, and 730. Although illustrated as discrete blocks, various blocks of process 700 may be divided into additional blocks, combined into fewer blocks, or eliminated, depending on the desired implementation. Moreover, the blocks of process 700 may be executed in the order shown in FIG. 7 or, alternatively, in a different order. Process 700 may be implemented by communication apparatus 610 or any suitable UE or machine type devices. Solely for illustrative purposes and without limitation, process 700 is described below in the context of communication apparatus 610 as a UE. Process 700 may begin at block 710.

[0047] At 710, process 700 may involve processor 612 of communication apparatus 610 identifying a subset of multiple uplink bands in an event that an uplink switching configured with the uplink bands is triggered, wherein each uplink band in the identified subset is either a switch-from band or a switch-to band but not both. Process 700 may proceed from 710 to 720.

[0048] At 720, process 700 may involve processor 612 determining a switching period location based on a band priority associated with the identified subset. Process 600 may proceed from 720 to 730.

[0049] At 730, process 700 may involve processor 612 performing the uplink switching according to the switching period location.

[0050] In some implementations, the uplink band having a highest band priority among the uplink bands is not included in the identified subset in an event that the uplink band with the highest band priority is both the switch-from band and the switch-to band.

[0051] In some implementations, process 700 may further involve processor 612 specifying an uplink band having a highest band priority among the identified subset (e.g., band B in scenario 410 of FIG. 4, or band C in scenario 420 of FIG. 4) . Additionally, process 700 may further involve processor 612 determining the switching period location based on whether the specified uplink band is the switch-from band or the switch-to band.

[0052] In some implementations, the switching period location is determined to be in a switch-to band set associated with the uplink bands (e.g., bands A and C in scenario 410 of FIG. 4) in an event that the specified uplink band is the switch-from band, and the switching period location is determined to be in a switch-from band set associated with the uplink bands (e.g., bands A and B in scenario 420 of FIG. 4) in an event that the specified uplink band is the switch-to band.

[0053] In some implementations, process 700 may further involve processor 612 determining a first value according to a priority level of each uplink band belonging to a switch-from band set associated with the identified subset (e.g., bands B and D in scenario 510 of FIG. 5, or band B in scenario 520 of FIG. 5) . Additionally, process 700 may further involve processor 612 determining a second value according to the priority level of each uplink band belonging to a switch-to band set associated with the identified subset (e.g., band C in scenario 510 of FIG. 5, or bands C and D in scenario 520 of FIG. 5) . Further, process 700 may further involve processor 612 determining the switching period location based on the first value and the second value.

[0054] In some implementations, the switching period location is determined to be in a switch-to band set associated with the uplink bands (e.g., bands A and C in scenario 510 of FIG. 5) in an event that the first value is greater than the second value, and the switching period location is determined to be in a switch-from band set associated with the uplink bands (e.g., bands A and B in scenario 520 of FIG. 5) in an event that the first value is smaller than the second value.

[0055] In some implementations, the priority level of each uplink band is configured by a network node via a radio resource control (RRC) message.

[0056] In some implementations, the switching period location associates with a time period required by the apparatus to complete the uplink switching from one band to another.

[0057] In some implementations, the uplink switching comprises multi-carrier uplink (UL) transmit (Tx) switching.

[0058] In some implementations, the uplink bands comprise 3 or 4 uplink bands.

[0059] Additional Notes

[0060] The herein-described subject matter sometimes illustrates different components contained within, or connected with, different other components. It is to be understood that such depicted architectures are merely examples, and that in fact many other architectures can be implemented which achieve the same functionality. In a conceptual sense, any arrangement of components to achieve the same functionality is effectively "associated" such that the desired functionality is achieved. Hence, any two components herein combined to achieve a particular functionality can be seen as "associated with" each other such that the desired functionality is achieved, irrespective of architectures or intermedial components. Likewise, any two components so associated can also be viewed as being "operably connected" , or "operably coupled" , to each other to achieve the desired functionality, and any two components capable of being so associated can also be viewed as being "operably couplable" , to each other to achieve the desired functionality. Specific examples of operably couplable include but are not limited to physically mateable and / or physically interacting components and / or wirelessly interactable and / or wirelessly interacting components and / or logically interacting and / or logically interactable components.

[0061] Further, with respect to the use of substantially any plural and / or singular terms herein, those having skill in the art can translate from the plural to the singular and / or from the singular to the plural as is appropriate to the context and / or application. The various singular / plural permutations may be expressly set forth herein for sake of clarity.

[0062] Moreover, it will be understood by those skilled in the art that, in general, terms used herein, and especially in the appended claims, e.g., bodies of the appended claims, are generally intended as “open” terms, e.g., the term “including” should be interpreted as “including but not limited to, ” the term “having” should be interpreted as “having at least, ” the term “includes” should be interpreted as “includes but is not limited to, ” etc.  It will be further understood by those within the art that if a specific number of an introduced claim recitation is intended, such an intent will be explicitly recited in the claim, and in the absence of such recitation no such intent is present. For example, as an aid to understanding, the following appended claims may contain usage of the introductory phrases "at least one" and "one or more" to introduce claim recitations. However, the  use of such phrases should not be construed to imply that the introduction of a claim recitation by the indefinite articles "a" or "an" limits any particular claim containing such introduced claim recitation to implementations containing only one such recitation, even when the same claim includes the introductory phrases "one or more" or "at least one" and indefinite articles such as "a" or "an, " e.g., “a” and / or “an” should be interpreted to mean “at least one” or “one or more; ” the same holds true for the use of definite articles used to introduce claim recitations. In addition, even if a specific number of an introduced claim recitation is explicitly recited, those skilled in the art will recognize that such recitation should be interpreted to mean at least the recited number, e.g., the bare recitation of "two recitations, " without other modifiers, means at least two recitations, or two or more recitations. Furthermore, in those instances where a convention analogous to “at least one of A, B, and C, etc. ” is used, in general such a construction is intended in the sense one having skill in the art would understand the convention, e.g., “a system having at least one of A, B, and C” would include but not be limited to systems that have A alone, B alone, C alone, A and B together, A and C together, B and C together, and / or A, B, and C together, etc. In those instances where a convention analogous to “at least one of A, B, or C, etc. ” is used, in general such a construction is intended in the sense one having skill in the art would understand the convention, e.g., “a system having at least one of A, B, or C” would include but not be limited to systems that have A alone, B alone, C alone, A and B together, A and C together, B and C together, and / or A, B, and C together, etc. It will be further understood by those within the art that virtually any disjunctive word and / or phrase presenting two or more alternative terms, whether in the description, claims, or drawings, should be understood to contemplate the possibilities of including one of the terms, either of the terms, or both terms. For example, the phrase “A or B” will be understood to include the possibilities of “A” or “B” or “A and B. ”

[0063] From the foregoing, it will be appreciated that various implementations of the present disclosure have been described herein for purposes of illustration, and that various modifications may be made without departing from the scope and spirit of the present disclosure. Accordingly, the various implementations disclosed herein are not intended to be limiting, with the true scope and spirit being indicated by the following claims.

Claims

1.A method, comprising:identifying, by a processor of an apparatus, a subset of a plurality of uplink bands in an event that an uplink switching configured with the plurality of uplink bands is triggered, wherein each uplink band in the identified subset is either a switch-from band or a switch-to band but not both;determining, by the processor, a switching period location based on a band priority associated with the identified subset; andperforming, by the processor, the uplink switching according to the switching period location.2.The method of Claim 1, wherein an uplink band having a highest band priority among the plurality of uplink bands is not included in the identified subset in an event that the uplink band with the highest band priority is both the switch-from band and the switch-to band.3.The method of Claim 1, wherein the determining of the switching period location further comprises:specifying, by the processor, an uplink band having a highest band priority among the identified subset; anddetermining, by the processor, the switching period location based on whether the specified uplink band is the switch-from band or the switch-to band.4.The method of Claim 3, wherein the switching period location is determined to be in a switch-to band set associated with the plurality of uplink bands in an event that the specified uplink band is the switch-from band, and the switching period location is determined to be in a switch-from band set associated with the plurality of uplink bands in an event that the specified uplink band is the switch-to band.5.The method of Claim 1, wherein the determining of the switching period location further comprises:determining, by the processor, a first value according to a priority level of each uplink band belonging to a switch-from band set associated with the identified subset;determining, by the processor, a second value according to the priority level of each uplink band belonging to a switch-to band set associated with the identified subset; anddetermining, by the processor, the switching period location based on the first value and the second value.6.The method of Claim 5, wherein the switching period location is determined to be in a switch-to band set associated with the plurality of uplink bands in an event that the first value is greater than the second value, and the switching period location is determined to be in a switch-from band set associated with the plurality of uplink bands in an event that the first value is smaller than the second value.7.The method of Claim 1, wherein a priority level of each of the plurality of uplink bands is configured by a network node via a radio resource control (RRC) message.8.The method of Claim 1, wherein the switching period location associates with a time period required by the apparatus to complete the uplink switching from one band to another.9.The method of Claim 1, wherein the uplink switching comprises multi-carrier uplink (UL) transmit (Tx) switching.10.The method of Claim 1, wherein the plurality of uplink bands comprise 3 or 4 uplink bands.11.An apparatus, comprising:a transceiver which, during operation, wirelessly communicates with a network node; anda processor communicatively coupled to the transceiver such that, during operation, the processor performs operations comprising:receiving, via the transceiver, a configuration identified a plurality of uplink bands for an uplink switching;identifying a subset of the plurality of uplink bands in an event that the uplink switching is triggered, wherein each uplink band in the identified subset is either a switch-from band or a switch-to band but not both;determining a switching period location based on a band priority associated with the identified subset; andperforming the uplink switching according to the switching period location.12.The apparatus of Claim 11, wherein an uplink band having a highest band priority among the plurality of uplink bands is not included in the identified subset in an event that the uplink band with the highest band priority is both the switch-from band and the switch-to band.13.The apparatus of Claim 11, wherein, during operation, the processor further performs operations comprising:specifying an uplink band having a highest band priority among the identified subset; anddetermining the switching period location based on whether the specified uplink band is the switch-from band or the switch-to band.14.The apparatus of Claim 13, wherein the switching period location is determined to be in a switch-to band set associated with the plurality of uplink bands in an event that the specified uplink band is the switch-from band, and the switching period location is determined to be in a switch-from band set associated with the plurality of uplink bands in an event that the specified uplink band is the switch-to band.15.The apparatus of Claim 11, wherein, during operation, the processor further performs operations comprising:determining a first value according to a priority level of each uplink band belonging to a switch-from band set associated with the identified subset;determining a second value according to the priority level of each uplink band belonging to a switch-to band set associated with the identified subset; anddetermining the switching period location based on the first value and the second value.16.The apparatus of Claim 5, wherein the switching period location is determined to be in a switch-to band set associated with the plurality of uplink bands in an event that the first value is greater than the second value, and the switching period location is determined to be in a switch-from band set associated with the plurality of uplink bands in an event that the first value is smaller than the second value.17.The apparatus of Claim 11, wherein a priority level of each of the plurality of uplink bands is configured by the network node via a radio resource control (RRC) message.18.The apparatus of Claim 11, wherein the switching period location associates with a time period required by the apparatus to complete the uplink switching from one band to another.19.The apparatus of Claim 11, wherein the uplink switching comprises multi-carrier uplink (UL) transmit (Tx) switching.20.The apparatus of Claim 11, wherein the plurality of uplink bands comprise 3 or 4 uplink bands.

Citation Information

Patent Citations

  • Frequency switching method, frequency switching device and storage medium

    CN114365517A

  • System and method for communication sub-channel bandwidth adjustment in a millimeter wave (MMW) communication system

    WO2019226442A1