Feedback considerations for low band carrier aggregation with receiver switching
By enabling SPS HARQ-ACK deferral and defining rules for target PUCCH slots during receiver switching, the method addresses missed HARQ-ACK feedback in low band carrier aggregation, enhancing uplink control reliability and reducing retransmissions.
Patent Information
- Application Number
- PCT/US2026/027302
- Authority / Receiving Office
- WO · WO
- Patent Type
- Applications
- Current Assignee / Owner
- Priority Date
- 2025-05-09
- Filing Date
- 2026-05-08
- Publication Date
- 2026-11-12
AI Technical Summary
Existing wireless communication systems face challenges in managing hybrid automatic repeat request (HARQ) feedback during receiver switching in low band carrier aggregation, particularly for frequency division duplexing (FDD) and supplemental downlink (SDL) carriers, leading to missed HARQ-ACK feedback due to overlapping PUCCH resources and switching gaps.
Implementing a method for UE to indicate support for SPS HARQ-ACK deferral across FDD and SDL during receiver switching, with rules for determining target PUCCH slots and deferral budgets, allowing deferred HARQ-ACK feedback to be transmitted after resolving overlaps and switching gaps, and combining deferred bits with dynamic grant PDSCH feedback.
Enhances uplink control reliability and reduces retransmissions by ensuring consistent HARQ-ACK feedback, improving system throughput and UE performance in low band carrier aggregation scenarios with receiver switching.
Smart Images

Figure US2026027302_12112026_PF_FP_ABST
Abstract
Description
Attorney Docket No. 56990-0097W01 / P71792WO1FEEDBACK CONSIDERATIONS FOR LOW BAND CARRIER AGGREGATION WITH RECEIVER SWITCHING CROSS-REFERENCE TO RELATED APPLICATIONS
[0001] This application claims priority to and the benefit of U.S. Provisional Patent Application No. 63 / 802,975, filed May 9, 2025, the entire contents of which are incorporated herein by reference.TECHNICAL FIELD
[0002] The present disclosure relates generally to wireless communication, and more specifically to hybrid automatic repeat request (HARQ) considerations for low band (LB)-LB carrier aggregation (CA) with receiver (Rx) switching.BACKGROUND
[0003] Wireless communication networks provide integrated communication platforms and telecommunication services to wireless user devices. Example telecommunication services include telephony, data (e.g., voice, audio, video), messaging, and / or other services. The wireless communication networks have wireless access nodes that exchange wireless signals with the wireless user devices using one or more wireless network protocols, such as protocols described in various telecommunication standards promulgated by the European Telecommunications Standards Institute (ETSI) Third Generation Partnership Project (3GPP). The wireless communication networks facilitate mobile broadband service using technologies such as orthogonal frequency -division multiple access (OFDMA), multiple input multiple output (MIMO), advanced channel coding, massive MIMO, beamforming, and / or other features.Attorney Docket No. 56990-0097W01 / P71792WO1SUMMARY
[0004] One aspect of the present disclosure relates to a method including: receiving an indication of a switching pattern for a user equipment (UE) configured for carrier aggregation via switching between a frequency division duplexing (FDD) carrier and a supplemental downlink (SDL) carrier; determining a first time duration associated with: (i) a first antenna configuration enabling communication on the FDD carrier, and (ii) a second time duration associated with a second antenna configuration enabling communication on the SDL carrier based at least on the switching pattern; and transmitting feedback for a downlink message via one or more uplink resources in the first time duration or the second time duration based at least on the switching pattern and a carrier on which the downlink message is scheduled.
[0005] In some implementations, the method further involves receiving the downlink message via a dynamic grant (DG) physical downlink shared channel (PDSCH) or a semi -persistent scheduled (SPS) PDSCH, wherein the feedback comprises hybrid automatic repeat request (HARQ) acknowledgement (ACK) feedback for the downlink message.
[0006] In some implementations, the FDD carrier: (i) includes a downlink frequency band and a paired uplink frequency band and (ii) is used for both uplink and downlink on a primary cell (PCell).
[0007] In some implementations, the SDL carrier: (i) includes an unpaired downlink frequency band and (ii) is used for downlink on a secondary cell (SCell).
[0008] In some implementations, the method further involves deferring transmission of the feedback in response to determining that a physical uplink control channel (PUCCH) slot corresponding to an SPS-PDSCH overlaps with one or more symbols that are in a switching gap or in the second time duration.
[0009] In some implementations, the method further involves performing an uplink control information (UCI) multiplexing operation prior to deferring transmission of the feedback.
[0010] In some implementations, the method further involves transmitting a message indicating a capability of the UE to support deferral of SPS HARQ-ACK feedback for FDD and SDL carriers with receiver (Rx) switching.
[0011] In some implementations, the one or more uplink resources include a target PUCCH slot in the first time duration or the second time duration.Attorney Docket No. 56990-0097W01 / P71792WO1
[0012] In some implementations, the method further involves deferring transmission of the feedback to the target PUCCH slot in response to determining that a deferral budget of the UE is not exceeded.
[0013] In some implementations, the target PUCCH slot is a first FDD slot on which the UE is scheduled to transmit a PUCCH with HARQ-ACK feedback.
[0014] In some implementations, the target PUCCH slot is a first usable uplink FDD slot.
[0015] In some implementations, the first usable uplink FDD slot is a slot that supports FDD and does not include a symbol that is in a switching gap or in the second time duration.
[0016] In some implementations, the method further involves transmitting the feedback for the downlink message comprises transmitting, in the first usable uplink FDD slot, accumulated SPS HARQ-ACK information via a PUCCH resource provided by SPS-PUCCH-AN-List or nlPUCCH-AN.
[0017] In some implementations, up to two instances of deferred HARQ-ACK feedback can be sent over a PUCCH resource provided by nlPUCCH-AN when SPS-PUCCH-AN-List is not provided.
[0018] In some implementations, the method further involves receiving DCI that schedules a DG-PDSCH transmission on an SDL carrier; and determining a PUCCH resource to use for transmission of HARQ-ACK feedback for the DG-PDSCH transmission based at least on a KI value indicated by the DCI.
[0019] In some implementations, the KI value is counted from an end of the second time duration associated with the second antenna configuration, the second time duration comprising a slot that includes an end of a switching gap, wherein the UE is configured to switch from the second antenna configuration to the first antenna configuration during the switching gap.
[0020] In some implementations, the method further involves receiving control signaling that configures a value of semi-static for pdsch-HARQ-ACK-Codebook and determining whether to generate HARQ-ACK feedback for a slot in the first time duration or the second time duration based at least on the control signaling.
[0021] Another aspect of the present disclosure relates to one or more processors configured to, when executing instructions stored in a memory, perform any of the foregoing operations.Attorney Docket No. 56990-0097W01 / P71792WO1
[0022] Another aspect of the present disclosure relates to a user equipment (UE) configured to perform any of the foregoing operations.
[0023] Another aspect of the present disclosure relates to a non-transitory computer-readable medium storing instructions that, when executed by one or more processors, cause the one or more processors to perform any of the foregoing operations.
[0024] The details of one or more embodiments of these systems and methods are set forth in the accompanying drawings and the description below. Other features, objects, and advantages of these systems and methods will be apparent from the description and drawings, and from the claims.Attorney Docket No. 56990-0097W01 / P71792WO1BRIEF DESCRIPTION OF THE FIGURES
[0025] FIG. 1 illustrates an example wireless network, according to some implementations.
[0026] FIG. 2 illustrates an example antenna switching pattern, according to some implementations.
[0027] FIG. 3 illustrates an example frequency band configuration, according to some implementations.
[0028] FIG. 4 illustrates an example hybrid automatic repeat request acknowledgement (HARQ-ACK) deferral scheme, according to some implementations.
[0029] FIGs. 5 A and 5B illustrate example HARQ-ACK deferral schemes, according to some implementations.
[0030] FIGs. 6A-6C illustrate example HARQ-ACK deferral schemes, according to some implementations.
[0031] FIGs. 7A-7C illustrate example HARQ-ACK deferral schemes, according to some implementations.
[0032] FIG. 8 illustrates another example HARQ-ACK deferral scheme, according to some implementations.
[0033] FIG. 9 illustrates another example HARQ-ACK deferral scheme, according to some implementations.
[0034] FIG. 10 illustrates a flowchart of an example HARQ-ACK transmission scheme for low band (LB)-LB carrier aggregation (CA) with receiver (Rx) switching, according to some implementations.
[0035] FIG. 11 illustrates an example user equipment (UE), according to some implementations.
[0036] FIG. 12 illustrates an example access node, according to some implementations.Attorney Docket No. 56990-0097W01 / P71792WO1DETAILED DESCRIPTION
[0037] The present disclosure relates to scheduling enhancements for lower-band (LB) to lower-band carrier aggregation (CA) with receiver (Rx) switching. LB carriers typically offer higher coverage and reduced bandwidth, while supplemental downlink (SDL) carriers can provide additional downlink capacity. To avoid the complexity and interference associated with simultaneous reception on adjacent frequency division duplex (FDD) and SDL bands, a semi-static antenna switching pattern may be configured via radio resource control (RRC) signaling. For example, a user equipment (UE) can alternate between a first antenna configuration (“Case 1”) where transmission / reception is enabled on an FDD carrier (such as band n5) and SDL reception (on band n29) is disabled, and a second antenna configuration (“Case 2”) where reception on the SDL carrier is enabled and transmission / reception on the FDD carrier is disabled. As described herein, a Case 1 duration refers to a time period in which the first antenna configuration is active, and a Case 2 duration refers to a time period in which the second antenna configuration is active. This approach can help simplify UE antenna design and ensure that peak antenna gain is tuned to at most one downlink band at any given time.
[0038] However, switching between Case 1 and Case 2 may cause issues with transmission of hybrid automatic repeat request acknowledgement (HARQ-ACK) feedback on physical uplink control channel (PUCCH) resources. In Release 15 and 16 of 3rd Generation Partnership Project (3GPP) technical standards, HARQ-ACK for a semi-persistent scheduling physical downlink shared channel (SPS-PDSCH) is dropped if the PUCCH carrying the HARQ-ACK feedback overlaps with a control resource set (CORESET) or a downlink symbol. Although Release 17 introduces a HARQ-ACK deferral mechanism where feedback for an SPS-PDSCH can be postponed to a later PUCCH slot within a configured deferral window (sps-HARQ-DeferraT), this deferral is limited to time division duplex (TDD) bands, and may not be applicable to FDD or SDL. Consequently, during a Case 2 duration when the UE is tuned to SDL (e.g., when the UE is using the second antenna configuration), HARQ-ACK for an SPS-PDSCH on an FDD carrier or for an SPS-PDSCH on the SDL carrier can be missed.
[0039] In accordance with aspects of the present disclosure, a UE may indicate support for SPS HARQ-ACK deferral across both FDD and SDL during Rx switching. If this capability is signaled and the configured deferral budget is not exceeded, HARQ-ACK feedback may beAttorney Docket No. 56990-0097W01 / P71792WO1deferred to a target PUCCH slot that is determined according to one or more rules. For example, the target PUCCH slot can be the first FDD slot with a valid PUCCH resource after overlap resolution is complete. Alternatively, the target PUCCH slot may be the first usable uplink slot in FDD after the UE switches back to Case 1 and resolves SDL overlap, where deferred HARQ-ACK bits are carried on the PUCCH resource provided by an SPS-PUCCH-AN-List or by nlPUCCH-AN if no list is provided. When an SPS-PDSCH is received on the SDL, the UE can defer transmission of HARQ-ACK feedback according to the slot offset KI and PUCCH resource indicator (PRI) from the activation downlink control information (DCI), counted from the end of the switching gap. Similar logic may be extended to dynamic grant PDSCH (DG-PDSCH) feedback. In some implementations, the KI value in the DCI may be (i) interpreted relative to the end of the Case 2 duration, (ii) ignored in favor of minimum or maximum configured values, or (iii) combined with a deferral budget. These procedures can be combined to construct a unified HARQ-ACK codebook in which deferred SPS bits are appended to DG-PDSCH feedback.
[0040] As an example, a UE may be configured with a Case 1 duration of two slots and a Case 2 duration of three slots, with sps-HARQ-Deferral set to four slots. If the UE receives an SPS-PDSCH on the SDL carrier during a Case 2 duration and the corresponding PUCCH overlaps with SDL symbols or a switching gap (one slot), the UE may drop the initial PUCCH but defer the HARQ-ACK bits. In one scenario, the UE switches back to Case 1, identifies the first available FDD uplink slot with a valid PUCCH resource (per SPS-PUCCH-AN-List), and transmits the accumulated HARQ-ACK bits there. If no list is provided, up to two deferred bits may be sent on the nlPUCCH-AN resource. This ensures that HARQ-ACK feedback for the SPS-PDSCH (which would otherwise be dropped) is still delivered to the network.
[0041] By enabling HARQ-ACK deferral for both FDD and SDL during Rx switching, the UE can provide feedback to the network more consistently, thereby reducing retransmissions and the associated latency. The semi-static switching pattern described herein can also reduce antenna complexity and improve peak gain alignment, while the deferral budgets and target slot identification rules described herein can help mitigate resource conflicts. Additionally, supporting both Type-1 and Type-2 HARQ-ACK codebook construction by appending deferred HARQ-ACK bits can preserve backward compatibility with legacy systems. The scheduling enhancements described herein can thus improve uplink control reliability in LB-Attorney Docket No. 56990-0097W01 / P71792WO1LB CA scenarios with Rx switching, leading to better system throughput and UE performance.
[0042] FIG. 1 illustrates an example wireless network 100, according to some implementations. The wireless network 100 includes a UE 102 and a base station 104, which are connected via one or more channels 106A, 106B across an air interface 108. The UE 102 and base station 104 communicate using a system that supports controls for managing the access of the UE 102 to a network via the base station 104.
[0043] In some implementations, the wireless network 100 is a standalone (SA) network, e.g., that incorporates Fifth Generation (5G) New Radio (NR). In some other implementations, the wireless network 100 is a non-standalone (NSA) network that incorporates Long Term Evolution (LTE) and 5GNR. In these implementations, the wireless network 100 may be an Evolved Universal Terrestrial Radio Access (E-UTRA)-NR Dual Connectivity (EN-DC) network, or an NR-EUTRA Dual Connectivity (NE-DC) network. Furthermore, wireless networks implementing one or more other types of communication standards are possible, including future 3GPP systems (e.g., Sixth Generation “6G”), Institute of Electrical and Electronics Engineers (IEEE) 802.11 technology, or the like. While aspects may be described herein using terminology commonly associated with 5G NR, aspects of the present disclosure can be applied to other systems, such as systems subsequent to 5G (e.g., 6G).
[0044] In the wireless network 100, the UE 102 and any other UE in the system may be, for example, any of a laptop computer, smartphone, tablet computer, machine-type device (such as smart meters or specialized devices for healthcare), intelligent transportation system, or any other wireless device. In network 100, the base station 104 provides the UE 102 network connectivity to a broader network (not shown). This UE 102 connectivity is provided via the air interface 108 in a base station service area provided by the base station 104. In some implementations, such a broader network may be a wide area network operated by a cellular network provider, or may be the Internet. Each base station service area associated with the base station 104 is supported by one or more antennas integrated with the base station 104. The service areas can be divided into a number of sectors associated with one or more particular antennas. Such sectors may be physically associated with one or more fixed antennas or may be assigned to a physical area with one or more tunable antennas or antenna settings adjustable in a beamforming process used to direct a signal to a particular sector.Attorney Docket No. 56990-0097W01 / P71792WO1
[0045] The UE 102 includes control circuitry 110 coupled with transmit circuitry 112 and receive circuitry 114. The transmit circuitry 112 and receive circuitry 114 may each be coupled with one or more antennas. The control circuitry 110 may include applicationspecific circuitry, baseband circuitry, or any of various combinations thereof. The transmit circuitry 112 and receive circuitry 114 may be adapted to transmit and receive data, respectively, and may include radio frequency (RF) circuitry and / or front-end module (FEM) circuitry.
[0046] In various implementations, aspects of the transmit circuitry 112, receive circuitry 114, and / or control circuitry 110 may be integrated in various ways to implement the operations described herein. The control circuitry 110 may be adapted or configured to perform various operations, such as those described elsewhere in this disclosure related to a UE. For example, the control circuitry 110 can determine a PUCCH resource to use for transmission of deferred HARQ-ACK feedback.
[0047] The transmit circuitry 112 can perform various operations described herein. For example, the transmit circuitry 112 can transmit the deferred HARQ-ACK feedback via the determined PUCCH resource. Additionally, the transmit circuitry 112 may transmit using multiplexed uplink physical channels. The uplink physical channels can be multiplexed, e.g., according to time division multiplexing (TDM) or frequency division multiplexing (FDM), and in some implementations, along with carrier aggregation. The transmit circuitry 112 may be configured to receive block data from the control circuitry 110 for transmission on the air interface 108.
[0048] The receive circuitry 114 can perform various operations described herein. For example, the receive circuitry 114 can receive a DG-PDSCH or SPS-PDSCH from the base station 104 via an SDL or FDD carrier. Additionally, the receive circuitry 114 may receive multiplexed downlink physical channels from the air interface 108 and relay the physical channels to the control circuitry 110. The downlink physical channels can be multiplexed, e.g., according to TDM or FDM, e.g., along with carrier aggregation. The transmit circuitry 112 and the receive circuitry 114 may transmit and receive, respectively, both control data and content data (e.g., messages, images, video) structured within data blocks that are carried by the physical channels.
[0049] FIG. 1 also illustrates the base station 104. In some implementations, the base station 104 may be a 5G radio access network (RAN), a next generation RAN, a E-UTRAN, a nonAttorney Docket No. 56990-0097W01 / P71792WO1terrestrial cell, or a legacy RAN, such as a UTRAN. As used herein, the term “5G RAN” or the like may refer to the base station 104 that operates in an NR wireless network 100, and the term “E-UTRAN” or the like may refer to a base station 104 that operates in an LTE wireless network 100. The UE 102 utilizes connections (or channels) 106 A, 106B, each of which includes a physical communications interface or layer.
[0050] The base station 104 circuitry may include control circuitry 116 coupled (directly or indirectly) with transmit circuitry 118 and / or receive circuitry 120. The transmit circuitry 118 and receive circuitry 120 may each be coupled (directly or indirectly) with one or more antennas that may be used to enable communications via the air interface 108. The transmit circuitry 118 and receive circuitry 120 may be adapted to transmit and receive data, respectively, addressed to any UE connected to the base station 104. The receive circuitry 120 may receive uplink physical channel transmissions from one or more UEs, including the UE 102.
[0051] In FIG. 1, the one or more channels 106 A, 106B are illustrated as an air interface to enable communicative coupling, and may be consistent with cellular communications protocols, such as an LTE protocol, Advanced LTE (LTE-A) protocol, LTE-based access to unlicensed spectrum (LTE-U), NR protocol, NR-based access to unlicensed spectrum (NR-U) protocol, and / or any other communications protocol(s). In some implementations, the UE 102 may directly exchange communication data via a ProSe interface. The ProSe interface may alternatively be referred to as a sidelink (SL) interface and may include one or more logical channels, including but not limited to a physical sidelink control channel (PSCCH), a physical sidelink discovery channel (PDSCH), or a physical sidelink broadcast channel (PSBCH).
[0052] The present disclosure generally relates to scheduling enhancements for LB-LB CA with Rx switching. LB typically provides higher coverage and smaller bandwidth. SDL may be configured to use higher traffic for downlink. In LB, however, SDL may be in the vicinity of other bands (typically FDD). This is shown in FIG. 3, for example. Rx switching can simplify the UE antenna design and more effectively utilize peak antenna gain, which can be tuned to at most one downlink band. UE parameters, including at least a switching gap (if needed), and corresponding physical layer procedures may be defined to allow switching between Tx / Rx on FDD carrier 1 and no Rx on SDL carrier 2 (Case 1) and Rx on SDL carrier 2 and no Tx / Rx on FDD carrier 1 (Case 2). A semi-static switching pattern may be definedAttorney Docket No. 56990-0097W01 / P71792WO1based on an RRC configuration of the UE 102. An example antenna switching pattern is shown in FIG. 2.
[0053] HARQ-ACK deferral can be used for SPS-PDSCH. In some implementations, HARQ-ACK for SPS-PDSCH is sent on a PUCCH resource that is semi-statically configured for the UE 102. The time gap between the PUCCH resource and the slot in which the PDSCH ends (KI) is determined by the DCI that activates the SPS-PDSCH. In 3GPP Release 15 and 16, for a TDD band, a configured uplink channel (e.g., PUCCH) is dropped if it overlaps with a symbol that (i) is indicated as downlink by tdd-UL-DL-ConfigurationCommon or tdd-UL-DL-ConfigDedicated, or (ii) is indicated for an SS / PBCH block by ssb-PositionsInBurst, or (iii) belongs to a CORESET associated with a TypeO-PDCCH CSS set. This is shown in FIG.4, for example.
[0054] In 3 GPP Release 17, HARQ-ACK for SPS-PDSCH that cannot be transmitted initially can be deferred to the first target PUCCH slot, which is defined as the slot with a valid resource for HARQ-ACK transmission on PUCCH or PUSCH, after UCI multiplexing is complete. A deferral window sps-HARQ-Deferral may be configured, where HARQ-ACK for an SPS-PDSCH is dropped after +sps-HARQ-Deferral. In some cases, the deferred bits are ordered based on codebook construction and appended to the HARQ-ACK bits originally assigned to the resource in the target PUCCH slot.
[0055] Some aspects of the present disclosure relate to SPS HARQ deferral with LB-CA switching. In some cases, the UE 102 cannot transmit HARQ-ACK for an SPS-PDSCH configured on an FDD carrier when the corresponding PUCCH is within a Case 2 duration. FIG. 5A shows an example where a PUCCH resource carrying HARQ-ACK for a third SPS-PDSCH cannot be sent. Additionally, the UE 102 may be unable to transmit HARQ-ACK for an SPS-PDSCH configured on an SDL carrier when the corresponding PUCCH is within a Case 2 duration. FIG. 5B shows an example where PUCCH resources carrying HARQ-ACK for a first and second SPS-PDSCH cannot be sent. SPS HARQ-ACK deferral may be limited to TDD bands, and may not be supported / defined for FDD and SDL.
[0056] For LB-LB CA with Rx switching, if (after UCI multiplexing) the PUCCH slot corresponding to an SPS-PDSCH overlaps with SDL symbols or a switching gap, the PUCCH can be dropped and the HARQ-ACK may be deferred. A new UE capability information element (IE) may be defined to indicate whether the UE 102 supports SPS HARQ-ACK deferral for FDD and SDL with Rx switching.Attorney Docket No. 56990-0097W01 / P71792WO1
[0057] If the UE 102 indicates a capability to support SPS HARQ-ACK deferral for FDD and SDL with Rx switching, the HARQ feedback can be deferred to a target PUCCH slot, if the configured deferral budget is not exceeded. The target PUCCH slot can be determined as follows. FIG. 6A shows an example where the target PUCCH slot is the first slot in FDD on which the UE 102 is configured to transmit a PUCCH with HARQ-ACK. This PUCCH is the resultant PUCCH resource after resolving overlapping PUCCH resources. The resultant PUCCH may overlap with another PUSCH.
[0058] FIG. 6B shows an example where the target PUCCH slot is the first usable uplink slot in FDD, which is defined as the first slot in FDD (e.g., after the UE 102 switches back to Case 1) that does not overlap with SDL (considering TA and switching gap). In this case, the UE 102 transmits in the first usable uplink slot the accumulated SPS HARQ-ACK bits over the PUCCH resource provided by SPS-PUCCH-AN-List, or by nlPUCCH-AN if SPS-PUCCH-AN-List is not provided. If SPS-PUCCH-AN-List is not provided, up to 2 deferred HARQ-ACK bits can be sent over the resource provide by nlPUCCH-AN.
[0059] FIG. 6C (which is applicable to SPS-PDSCH reception in SDL) shows an example where KI and PRI in the activation DCI indicate the slot and PUCCH resource that carry SPS HARQ-ACK for all SPS-PDSCHs within the SDL. The indicated KI in DCI is counted from the end of the switching gap from Case 2 to Case 1. In the example shown, KI is 2. Any SPS HARQ-ACK that exceeds the deferral budget may be dropped.
[0060] Other aspects of the present disclosure relate to LB-CA switching for DG-PDSCH HARQ-ACK. In some cases, the UE 102 cannot transmit HARQ-ACK for a DG-PDSCH received on FDD when the corresponding PUCCH is within a Case 2 duration. Also, the UE 102 may be unable to transmit HARQ-ACK for a DG-PDSCH received on an SDL carrier when the corresponding PUCCH is within a Case 2 duration. Although the list of possible KI values (for the slot offset between end of PDSCH and start of PUCCH) is somewhat limited, it may be undesirable to extend this list. Unlike SPS-PDSCH, HARQ-ACK for DG-PDSCH may not support deferral.
[0061] For LB-LB CA with Rx switching, the KI value in the DCI that schedules a DG-PDSCH on SDL may be interpreted as follows. FIG. 7A shows an example where KI is counted from the end of a Case 2 duration, including the slot in which the switching gap ends. FIG. 7B shows an example where the KI in DCI is ignored / disregarded and the UE 102 applies the minimum (or maximum) configured KI values from the end of the Case 2Attorney Docket No. 56990-0097W01 / P71792WO1duration, including the slot in which switching gap ends. FIG. 7C shows an example where HARQ-ACK deferral can be used for DG-PDSCH if the indicated KI overlaps with SDL or a switching gap. In this example, a deferral budget may be introduced for DG-PDSCH.
[0062] For PUCCH resource determination when PDSCHs (SPS-PDSCH and / or DG-PDSCH) are received on SDL in a Case 2 duration, the UE 102 may implement a combination of the foregoing operations. For example, the UE may determine the target PUCCH slot as a slot within a Case 1 duration with the first valid PUCCH resource (after multiplexing) scheduled for HARQ-ACK transmission. FIG. 8 shows an example where DG-PDSCH2 with Kl=2 indicates the target PUCCH slot. In turn, the UE 102 constructs DG HARQ-ACK bits (following the DAI indication) and appends the deferred SPS HARQ-ACK bits to the codebook associated with the previously identified PUCCH. In FIG. 8, the HARQ-ACK bits for SPS-PDSCHO and SPS-PDSCH1 are appended to the HARQ-ACK originally intended for transmission on the target PUCCH slot.
[0063] Some aspects of the present disclosure relate to (i) determining the PUCCH resource corresponding to a PDSCH in SDL within a Case 2 duration and (i) determining a HARQ-ACK codebook for the PUCCH. Type-2 HARQ-ACK codebook construction follows legacy protocol, where the number and location of HARQ-ACK bits corresponding to DG-PDSCH(s) are indicated by DAI, and HARQ-ACK bits corresponding to SPS-PDSCH are appended. Type-1 HARQ-ACK codebook construction is typically associated with a set of KI values.
[0064] For LB-LB CA with Rx switching, if the UE 102 is configured with pdsch-HARQ-ACK-Codebook = semi-static, the UE 102 may generate HARQ-ACK as follows. In a given slot, for a PDSCH in a TDRA corresponding to SDL, the UE 102 may not generate HARQ-ACK if the PDSCH occasion is in a Case 1 duration and / or if the PDSCH occasion overlaps with a switching gap. Alternatively, for a PDSCH in TDRA corresponding to FDD, the UE 102 may not generate HARQ-ACK in a given slot if the PDSCH occasion is in a Case 2 duration and / or if the PDSCH occasion overlaps with a switching gap. The foregoing operations are applicable to PDSCH without repetition. For PDSCH with repetitions, no HARQ-ACK is generated if all repetitions are dropped.
[0065] If the UE 102 is configured with pdsch-HARQ-ACK-Codebook = semi-static, the UE 102 may operate as follows. In a given slot within a Case 2 duration, each PDSCH in a TDRA corresponding to SDL that does not overlap with a switching gap may be consideredAttorney Docket No. 56990-0097W01 / P71792WO1one candidate PDSCH reception on SDL, for which the UE can transmit corresponding HARQ-ACK information in the target PUCCH slot. In some implementations, the PDSCH occasion corresponding to SDL must be within a latency budget, which is defined as the gap between the end of the slot in which the PDSCH ends and the start of the target PUCCH slot.
[0066] FIG. 9 shows an example where a TDRA corresponding to SDL includes only one PDSCH from 0-7 and the set of KI has just two values {1, 2}. In the example shown, the Case 2 duration is 5 slots and the switching gap is included within the Case 2 duration. In some implementations, the HARQ-ACK bits corresponding to SDL will be {A / N (slot 4), 0 (slot 3), A / N (slot 2), 0 (slot 1), A / N (slot 0)}. In other implementations, assuming the latency budget from the PDSCH slot to the PUCCH slot is 4 slots, the HARQ-ACK bits corresponding to SDL will be {A / N (slot 4), 0 (slot 3), A / N (slot 2)}.
[0067] FIG. 2 illustrates an example antenna switching pattern 200, according to some implementations. As shown in FIG. 2, the UE 102 may alternate between two semi-static antenna configurations. In a first antenna port configuration 202 (Case 1), the UE 102 can perform both communication (e.g., transmission and / or reception) on an FDD carrier (n5), while reception on the SDL carrier (n29) is disabled. In a second antenna port configuration 204 (Case 2), the UE 102 can receive on the SDL carrier (n29), but communication may be disabled on the FDD carrier (n5). The UE 102 may be configured (via RRC signaling) with a switching duration for antenna port configuration 202 and a switching duration for antenna port configuration 204, ensuring that the antenna of the UE 102 is tuned to at most one downlink band at any given time.
[0068] FIG. 3 illustrates an example frequency band configuration 300, according to some implementations. In the frequency band configuration 300, a lower-band FDD carrier (e.g., band nl2) is used for both uplink and downlink on the PCell while an unpaired SDL carrier (e.g., band n29) is used for SDL on the SCell. This arrangement shows that an SDL carrier may be adjacent to one or more FDD carriers, which can lead to interference or complicate simultaneous reception. FIG. 3 illustrates why Rx switching (e.g., between the two antenna configurations shown in FIG. 2) can be beneficial for LB-LB CA.
[0069] FIG. 4 illustrates an example HARQ-ACK deferral scheme 400 for SPS PDSCH, according to some implementations. As described herein, a PUCCH carrying HARQ-ACK 402 for an SPS-PDSCH 404 may be dropped in 3GPP Release 15 and 16 if the PUCCH overlaps with semi-static downlink symbols 406. In 3GPP Release 17, a DG-PUCCH 410Attorney Docket No. 56990-0097W01 / P71792WO1associated with a DG-PDSCH 408 carries HARQ-ACK for both the DG-PDSCH 408 and deferred HARQ-ACK for an SPS-PDSCH.
[0070] FIGs. 5A and 5B illustrate an example HARQ-ACK deferral scheme 500 and an example HARQ-ACK deferral scheme 501, according to some implementations. As described above, the UE 102 may be unable to transmit HARQ-ACK for an SPS-PDSCH 502 configured on an FDD carrier when the corresponding PUCCH is within a Case 2 duration. In the HARQ-ACK deferral scheme 500, a PUCCH resource carrying HARQ-ACK for the SPS-PDSCH 502 cannot be sent. Similarly, the UE 102 may be unable to transmit HARQ-ACK for an SPS-PDSCH configured on an SDL carrier when the corresponding PUCCH is within a Case 2 duration. In the HARQ-ACK deferral scheme 501, PUCCH resources carrying HARQ-ACK for an SPS-PDSCH 504 and an SPS-PDSCH 506 cannot be sent. SPS HARQ-ACK deferral may be limited to TDD bands, and may not be supported / defined for FDD and SDL.
[0071] FIGs. 6A-6C illustrate an example HARQ-ACK deferral scheme 600, an example HARQ-ACK deferral scheme 601, and an example HARQ-ACK deferral scheme 602, according to some implementations. As described herein, if the UE 102 indicates a capability to support SPS HARQ-ACK deferral for FDD and SDL with Rx switching, HARQ-ACK feedback can be deferred to a target PUCCH slot if the configured deferral budget is not exceeded. The target PUCCH slot can be determined as follows. In the HARQ-ACK deferral scheme 600, the target PUCCH slot is the first slot in FDD on which the UE 102 is configured to transmit a PUCCH with HARQ-ACK. This PUCCH is the resultant PUCCH resource after overlap is resolved. The resultant PUCCH may overlap with another PUSCH.
[0072] In the HARQ-ACK deferral scheme 601, the target PUCCH slot is the first usable uplink slot in FDD, which is defined as the first slot in FDD (e.g., after the UE 102 switches back to Case 1) that does not overlap with SDL (considering TA and switching gap). In this case, the UE 102 transmits in the first usable uplink slot the accumulated SPS HARQ-ACK bits over the PUCCH resource provided by SPS-PUCCH-AN-List, or by nlPUCCH-AN if SPS-PUCCH-AN-List is not provided. If SPS-PUCCH-AN-List is not provided, up to 2 deferred HARQ-ACK bits can be sent over the resource provide by nlPUCCH-AN.
[0073] In the HARQ-ACK deferral scheme 602 (which is applicable to SPS-PDSCH reception in SDL), KI and PRI in the activation DCI indicate the slot and PUCCH resource that carry SPS HARQ-ACK for all SPS-PDSCHs within the SDL. The indicated KI in DCI is countedAttorney Docket No. 56990-0097W01 / P71792WO1from the end of the switching gap from Case 2 to Case 1. In the example shown, KI is 2. Any SPS HARQ-ACK that exceeds the deferral budget may be dropped.
[0074] FIGs. 7A-7C illustrate an example HARQ-ACK deferral scheme 700, an example HARQ-ACK deferral scheme 701, and an example HARQ-ACK deferral scheme 702, according to some implementations. For LB-LB CA with Rx switching, the KI value in the DCI that schedules a DG-PDSCH on SDL may be interpreted as follows. In the HARQ-ACK deferral scheme 700, KI is counted from the end of a Case 2 duration, including the slot in which the switching gap ends. In the HARQ-ACK deferral scheme 701, the KI in DCI is ignored / disregarded and the UE 102 applies the minimum (or maximum) configured KI values from the end of the Case 2 duration, including the slot in which switching gap ends. In the HARQ-ACK deferral scheme 702, HARQ-ACK deferral can be used for DG-PDSCH if the indicated KI overlaps with SDL or a switching gap. In this example, a deferral budget may be introduced for DG-PDSCH.
[0075] FIG. 8 illustrates another example HARQ-ACK deferral scheme 800, according to some implementations. For PUCCH resource determination when PDSCHs (e.g., SPS-PDSCH and / or DG-PDSCH) are received on SDL in a Case 2 duration, the UE 102 may implement a combination of the operations described herein. For example, the UE may determine the target PUCCH slot as a slot within a Case 1 duration with the first valid PUCCH resource (after multiplexing) scheduled for HARQ-ACK transmission. FIG. 8 shows an example where DG-PDSCH2 (with Kl=2) indicates the target PUCCH slot. In turn, the UE 102 constructs DG HARQ-ACK bits (following the DAI indication) and appends the deferred SPS HARQ-ACK bits to the codebook associated with the previously identified PUCCH. In FIG. 8, the HARQ-ACK bits for SPS-PDSCH0 and SPS-PDSCH1 are appended to the HARQ-ACK originally intended for transmission on the target PUCCH slot.
[0076] FIG. 9 illustrates another example HARQ-ACK deferral scheme 900, according to some implementations. If the UE 102 is configured with pdsch-HARQ-ACK-Codebook = semi-static, the UE 102 may operate as follows. In a given slot within a Case 2 duration, each PDSCH in a TDRA corresponding to SDL that does not overlap with a switching gap may be considered one candidate PDSCH reception on SDL, for which the UE can transmit corresponding HARQ-ACK information in the target PUCCH slot. In some implementations, the PDSCH occasion corresponding to SDL must be within a latency budget, which isAttorney Docket No. 56990-0097W01 / P71792WO1defined as the gap between the end of the slot in which the PDSCH ends and the start of the target PUCCH slot.
[0077] In the HARQ-ACK deferral scheme 900, a TDRA corresponding to SDL includes only one PDSCH from 0-7 and the set of KI has just two values {1, 2}. In the example shown, the Case 2 duration is 5 slots and the switching gap is included within the Case 2 duration. In some implementations, the HARQ-ACK bits corresponding to SDL will be {A / N (slot 4), 0 (slot 3), A / N (slot 2), 0 (slot 1), A / N (slot 0)}. In other implementations, assuming the latency budget from the PDSCH slot to the PUCCH slot is 4 slots, the HARQ-ACK bits corresponding to SDL will be {A / N (slot 4), 0 (slot 3), A / N (slot 2)}.
[0078] FIG. 10 illustrates a flowchart of an example HARQ-ACK transmission scheme for LB-LB CA with Rx switching, according to some implementations. For clarity of presentation, the method 1000 is described in the context of the preceding figures. For example, the method 1000 can be performed by a UE, such as the UE 102 of FIG. 1. The method 1000 can also be performed by any suitable system, environment, software, hardware, or combination thereof. In some implementations, operations of the method 1000 can be run in parallel, in combination, in loops, or in any order. The example method 1000 shown in FIG. 10 can be modified or reconfigured to include additional, fewer, or different steps (not shown in FIG. 10), which can be performed in the order shown or in a different order.
[0079] At 1002, the UE receives an indication of a switching pattern for a user equipment (UE) configured for carrier aggregation via switching between a frequency division duplexing (FDD) carrier and a supplemental downlink (SDL) carrier.
[0080] At 1004, the UE determines a first time duration associated with: (i) a first antenna configuration enabling communication on the FDD carrier, and (ii) a second time duration associated with a second antenna configuration enabling communication on the SDL carrier based at least on the switching pattern.
[0081] At 1006, the UE transmits feedback for a downlink message via one or more uplink resources in the first time duration or the second time duration based at least on the switching pattern and a carrier on which the downlink message is scheduled.
[0082] FIG. 11 illustrates an example UE 1100, according to some implementations. The UE 1100 may be similar to and / or substantially interchangeable with the UE 102 of FIG. 1. TheAttorney Docket No. 56990-0097W01 / P71792WO1UE 1100 can be any mobile or non-mobile computing device, such as, for example, a mobile phone, computer, tablet, industrial wireless sensor, video device (for example, a camera or video camera), wearable device (for example, a smart watch), relaxed-IoT device, etc.
[0083] The UE 1100 can include processor 1102, RF interface circuitry 1104, memory / storage 1106, user interface 1108, sensors 1110, driver circuitry 1112, power management integrated circuit (PMIC) 1114, one or more antenna(s) 1116, and / or battery 1118. The components of the UE 1100 can be implemented as integrated circuits (ICs), portions thereof, discrete electronic devices, or other modules, logic, hardware, software, firmware, or a combination thereof. The block diagram of FIG. 11 shows a high-level view of some of the components of the UE 1100. However, some of the components shown can be omitted, additional components may be present, and a different arrangement of the components shown can be used in other implementations.
[0084] The components of the UE 1100 may be coupled with various other components over one or more interconnects 1120, which can represent any type of interface, input / output, bus (local, system, or expansion), transmission line, trace, optical connection, etc., that allows various circuit components (on common or different chips or chipsets) to interact with one another.
[0085] The processor 1102 may include one or more processors. For example, the processor 1102 may include processor circuitry such as, for example, baseband processor circuitry (BB) 1122A, central processor unit circuitry (CPU) 1122B, and graphics processor unit circuitry (GPU) 1122C. The processor 1102 may include any type of circuitry or processor circuitry that executes or otherwise operates computer-executable instructions, such as program code, software modules, or functional processes from memory / storage 1106 to cause the UE 1100 to perform operations described herein.
[0086] In some implementations, the baseband processor circuitry 1122 A may access a communication protocol stack 1124 in the memory / storage 1106 to communicate over a 3 GPP compatible network. In general, the baseband processor circuitry 1122 A may access the communication protocol stack to: perform user plane functions at a physical (PHY) layer, medium access control (MAC) layer, radio link control (RLC) layer, packet data convergence protocol (PDCP) layer, service data adaptation protocol (SDAP) layer, and protocol data unit (PDU) layer; and perform control plane functions at a PHY layer, MAC layer, RLC layer, PDCP layer, RRC layer, and a non-access stratum (NAS) layer. In some implementations, theAttorney Docket No. 56990-0097W01 / P71792WO1PHY layer operations may additionally / alternatively be performed by the components of the RF interface circuitry 1104. The baseband processor circuitry 1122A may generate or process baseband signals or waveforms that carry information in 3 GPP-compatible networks. In some implementations, the waveforms for NR may be based cyclic prefix orthogonal frequency division multiplexing (CP-OFDM) in the uplink or downlink, and discrete Fourier transform spread OFDM (DFT-S-OFDM) in the uplink.
[0087] The memory / storage 1106 may include one or more non-transitory, computer-readable media that includes instructions (for example, communication protocol stack 1124) that can be executed by the processor 1102 to cause the UE 1100 to perform various operations described herein. The memory / storage 1106 can include any type of volatile or non-volatile memory that may be distributed throughout the UE 1100. In some implementations, the memory / storage 1106 can be located on the processor 1102 itself (for example, LI and L2 cache), while other memory / storage 1106 is external to the processor 1102 but accessible thereto via a memory interface. The memory / storage 1106 may include any suitable volatile or non-volatile memory such as, but not limited to, dynamic random access memory (DRAM), static random access memory (SRAM), erasable programmable read only memory (EPROM), electrically erasable programmable read only memory (EEPROM), Flash memory, solid-state memory, or any other type of memory device technology.
[0088] The RF interface circuitry 1104 may include transceiver circuitry and radio frequency front module (RFEM) that allows the UE 1100 to communicate with other devices over a radio access network. The RF interface circuitry 1104 can include various elements arranged in transmit or receive paths. These elements may include, for example, switches, mixers, amplifiers, filters, synthesizer circuitry, control circuitry, etc.
[0089] In the receive path, the RFEM may receive a radiated signal from an air interface via antenna(s) 1116 and proceed to filter and amplify (with a low-noise amplifier) the signal. The signal may be provided to a receiver of the transceiver that downconverts the RF signal into a baseband signal that is provided to the baseband processor.
[0090] In the transmit path, the transmitter of the transceiver up-converts the baseband signal received from the baseband processor and provides the RF signal to the RFEM. The RFEM may amplify the RF signal through a power amplifier prior to the signal being radiated across the air interface via the antenna(s) 1116. In various implementations, the RF interfaceAttorney Docket No. 56990-0097W01 / P71792WO1circuitry 1104 may be configured to transmit / receive signals in a manner compatible with NR access technologies.
[0091] The antenna(s) 1116 may include one or more antenna elements to convert electrical signals into radio waves to travel through the air and to convert received radio waves over the air into electrical signals. In some implementations, the antenna elements may be arranged into one or more antenna panels. The antenna(s) 1116 may have antenna panels that are omnidirectional, directional, or a combination thereof, to enable beamforming and multiple input, multiple output communications. The antenna(s) 1116 can include any / all of microstrip antennas, printed antennas fabricated on the surface of one or more printed circuit boards, patch antennas, phased array antennas, etc. The antenna(s) 1116 may have one or more panels designed for one or more specific frequency bands, such as bands in FR1 or FR2.
[0092] The user interface 1108 includes various input / output (VO) devices designed to enable user interaction with the UE 1100. The user interface 1108 includes input device circuitry and output device circuitry. Input device circuitry includes any physical or virtual means for accepting an input including, inter alia, one or more physical or virtual buttons (for example, a reset button), a physical keyboard, keypad, mouse, touchpad, touchscreen, microphones, scanner, headset, or the like. The output device circuitry includes any physical or virtual means for showing information or otherwise conveying information, such as sensor readings, actuator position(s), or other like information. Output device circuitry may include any number or combinations of audio or visual display, including, inter alia, one or more simple visual outputs / indicators (for example, binary status indicators such as light emitting diodes “LEDs” and multi-character visual outputs), or more complex outputs such as display devices or touchscreens (for example, liquid crystal displays “LCDs,” LED displays, quantum dot displays, projectors), with the output of characters, graphics, multimedia objects, and the like being generated or produced from the operation of the UE 1100.
[0093] The sensors 1110 may include devices, modules, or subsystems whose purpose is to detect events or changes in its environment and send the information (sensor data) about the detected events to some other device, module, subsystem, etc. Examples of such sensors include, inter alia, inertia measurement units including accelerometers, gyroscopes, or magnetometers; microelectromechanical systems or nanoelectromechanical systems including 3-axis accelerometers, 3-axis gyroscopes, or magnetometers; level sensors; temperature sensors (for example, thermistors); pressure sensors; image capture devices (forAttorney Docket No. 56990-0097W01 / P71792WO1example, cameras or lensless apertures); light detection and ranging sensors; proximity sensors (for example, infrared radiation detector and the like); depth sensors; ambient light sensors; ultrasonic transceivers; microphones or other like audio capture devices; etc.
[0094] The driver circuitry 1112 may include software and hardware elements that operate to control particular devices that are embedded in the UE 1100, attached to the UE 1100, or otherwise communicatively coupled with the UE 1100. The driver circuitry 1112 may include individual drivers allowing other components to interact with or control various input / output (EO) devices that may be present within, or connected to, the UE 1100. For example, driver circuitry 1112 may include a display driver to control and allow access to a display device, a touchscreen driver to control and allow access to a touchscreen interface, sensor drivers to obtain sensor readings of sensors 1110 and control and allow access to sensors 1110, drivers to obtain actuator positions of electro-mechanic components or control and allow access to the electro-mechanic components, a camera driver to control and allow access to an embedded image capture device, audio drivers to control and allow access to one or more audio devices.
[0095] The PMIC 1114 can manage power provided to various components of the UE 1100. In particular, with respect to the processor 1102, the PMIC 1114 may control power-source selection, voltage scaling, battery charging, or DC-to-DC conversion.
[0096] In some implementations, the PMIC 1114 may control, or otherwise be part of, various power saving mechanisms of the UE 1100. A battery 1118 may power the UE 1100, although in some examples the UE 1100 may be mounted deployed in a fixed location and may have a power supply coupled to an electrical grid. The battery 1118 may be a lithium ion battery, a metal-air battery, such as a zinc-air battery, an aluminum-air battery, a lithium-air battery, and the like. In some implementations, such as in vehicle-based applications, the battery 1118 may be a typical lead-acid automotive battery.
[0097] FIG. 12 illustrates an example access node 1200, according to some implementations. The access node 1200 (also referred to as a base station or gNB) may be similar to and / or substantially interchangeable with base station 104. The access node 1200 can include one or more of processor 1202, RF interface circuitry 1204, core network (CN) interface circuitry 1206, memory / storage circuitry 1208, and one or more antenna(s) 1210. The processor 1202 may include any type of circuitry or processor circuitry that executes or otherwise operates computer-executable instructions, such as program code, software modules, or functionalAttorney Docket No. 56990-0097W01 / P71792WO1processes from memory / storage circuitry 1208 to cause the access node 1200 to perform operations as described herein.
[0098] The components of the access node 1200 may be coupled with various other components over one or more interconnects 1212. The processor 1202, RF interface circuitry 1204, memory / storage circuitry 1208 (including communication protocol stack 1214), antenna(s) 1210, and interconnects 1212 may be similar to like-named elements shown and described with respect to FIG. 11. For example, the processor 1202 may include processor circuitry such as, for example, baseband processor circuitry (BB) 1216A, central processor unit circuitry (CPU) 1216B, and graphics processor unit circuitry (GPU) 1216C.
[0099] The CN interface circuitry 1206 may provide connectivity to a core network, for example, a 5th Generation Core network (5GC) using a 5GC-compatible network interface protocol such as carrier Ethernet protocols, or some other suitable protocol. Network connectivity may be provided to / from the access node 1200 via a fiber optic or wireless backhaul. The CN interface circuitry 1206 may include one or more dedicated processors or FPGAs to communicate using one or more of the aforementioned protocols. In some implementations, the CN interface circuitry 1206 may include multiple controllers to provide connectivity to other networks using the same or different protocols.
[0100] As used herein, the terms “access node,” “access point,” or the like refers to equipment that provides the radio baseband functions for data and / or voice connectivity between a network and one or more users. An access node may also be referred to as a base station (BS), gNB, RAN node, eNB, NodeB, roadside unit (RSU), transmission and reception point (TRP), TRxP, and so on. An access node can include ground stations (e.g., terrestrial access points) or satellite stations providing coverage within a geographic area (e.g., a cell). As used herein, the term “NG RAN node” or the like refers to an access node 1200 that operates in an NR or 5G system (for example, a gNB), and the term “E-UTRAN node” or the like refers to an access node 1200 that operates in an LTE or 4G system (e.g., an eNB). According to various implementations, the access node 1200 can be implemented as one or more of a dedicated physical device, such as a macrocell base station, and / or a low power base station for providing femtocells, picocells or other cells with smaller coverage areas, smaller user capacity, or higher bandwidth (compared to macrocells).
[0101] In some implementations, the access node 1200 can be implemented as one or more software entities running on server computers as part of a virtual network, which may beAttorney Docket No. 56990-0097W01 / P71792WO1referred to as a cloud RAN (CRAN) and / or a virtual baseband unit pool (vBBUP). In vehicle-to-everything (V2X) scenarios, the access node 1200 may be or act as an RSU, which refers to any transportation infrastructure entity used for V2X communications. An RSU can be implemented in or by a suitable RAN node or a stationary (or relatively stationary) UE, where an RSU implemented in or by a UE is referred to as a “UE-type RSU,” an RSU implemented in or by an eNB is referred to as an “eNB-type RSU,” an RSU implemented in or by a gNB is referred to as a “gNB-type RSU,” and so forth.
[0102] In the preceding description, various components are described as performing a task or tasks. Such descriptions should be interpreted as including the phrase “configured to.” Reciting a component that is configured to perform one or more tasks is expressly intended not to invoke 35 U.S. C. § 112(f) interpretation for that component.
[0103] In some embodiments, one or more of the components described in the preceding figures may be configured to perform one or more operations, techniques, processes, or methods set forth in the examples section below. For example, the baseband circuitry described in connection with one or more of the preceding figures may be configured to operate in accordance with one or more of the examples set forth below. For another example, circuitry associated with a UE, access node, base station, or network element may be configured to operate in accordance with one or more of the examples set forth below.
[0104] Example l is a method including: receiving an indication of a switching pattern for a user equipment (UE) configured for carrier aggregation via switching between a frequency division duplexing (FDD) carrier and a supplemental downlink (SDL) carrier; determining a first time duration associated with: (i) a first antenna configuration enabling communication on the FDD carrier, and (ii) a second time duration associated with a second antenna configuration enabling communication on the SDL carrier based at least on the switching pattern; and transmitting feedback for a downlink message via one or more uplink resources in the first time duration or the second time duration based at least on the switching pattern and a carrier on which the downlink message is scheduled.
[0105] Example 2 includes the method of example 1, further including receiving the downlink message via a DG PDSCH or a SPS PDSCH, where the feedback includes HARQ ACK feedback for the downlink message.Attorney Docket No. 56990-0097W01 / P71792WO1
[0106] Example 3 includes the method of any of examples 1-2, further including deferring transmission of the feedback in response to determining that a PUCCH slot corresponding to an SPS PDSCH overlaps with one or more symbols in the second time duration.
[0107] Example 4 includes the method of example 3, further including performing a UCI multiplexing operation prior to deferring transmission of the feedback.
[0108] Example 5 includes the method of any of examples 1-4, further including transmitting a message indicating a capability of the UE to support deferral of SPS HARQ-ACK feedback for FDD and SDL carriers with receiver (Rx) switching.
[0109] Example 6 includes the method of any of examples 1-5, where the one or more uplink resources include a target PUCCH slot in the first time duration or the second time duration.
[0110] Example 7 includes the method of example 1-6, further including deferring transmission of the feedback to the target PUCCH slot in response to determining that a deferral budget of the UE is not exceeded.
[0111] Example 8 includes the method of example 7, where the target PUCCH slot is a first FDD slot on which the UE is scheduled to transmit a PUCCH with HARQ-ACK feedback.
[0112] Example 9 includes the method of any of examples 7-8, where the target PUCCH slot is a resultant PUCCH resource identified after the UE resolves overlapping PUCCH resources.
[0113] Example 10 includes the method of example 9, where the resultant PUCCH resource overlaps with a PUSCH resource.
[0114] Example 11 includes the method of any of examples 7-10, where the target PUCCH slot is a first usable uplink FDD slot.
[0115] Example 12 includes the method of example 11, where the first usable uplink FDD slot is a slot that supports FDD and does not overlap with SDL.
[0116] Example 13 includes the method of any of examples 11-12, where transmitting the feedback for the downlink message includes transmitting, in the first usable uplink FDD slot, accumulated SPS HARQ-ACK information via a PUCCH resource provided by SPS-PUCCH-AN-List or nlPUCCH-AN.Attorney Docket No. 56990-0097W01 / P71792WO1
[0117] Example 14 includes the method of example 13, where up to two instances of deferred HARQ-ACK feedback can be sent over a PUCCH resource provided by nlPUCCH-AN when SPS-PUCCH-AN-List is not provided.
[0118] Example 15 includes the method of any of examples 1-14, further including: receiving activation DCI for SPS-PDSCH reception on an SDL carrier; and determining a slot and PUCCH resource to use for transmission of the feedback based on a KI value and a PRI associated with the activation DCI.
[0119] Example 16 includes the method of example 15, where the KI value indicated by the activation DCI is counted from an end of a switching gap between the second time duration and the first time duration.
[0120] Example 17 includes the method of any of examples 1-16, further including dropping an SPS HARQ-ACK transmission that exceeds a deferral budget of the UE.
[0121] Example 18 includes the method of any of examples 1-17, further including: receiving DCI that schedules a DG-PDSCH transmission on an SDL carrier; and determining a PUCCH resource to use for transmission of HARQ-ACK feedback for the DG-PDSCH transmission based on a KI value indicated by the DCI.
[0122] Example 19 includes the method of example 18, where the KI value is counted from an end of the second time duration associated with the second antenna configuration, the second time duration including a slot that includes an end of a switching gap, where the UE is configured to switch from the second antenna configuration to the first antenna configuration during the switching gap.
[0123] Example 20 includes the method of example 19, further including applying a minimum or maximum KI value to an end of the second time duration to determine the PUCCH resource, the second time duration including the slot that includes the end of the switching gap.
[0124] Example 21 includes the method of any of examples 19-20, further including enabling HARQ-ACK deferral for the DG-PDSCH transmission in response to determining that the KI value overlaps with SDL or the switching gap.
[0125] Example 22 includes the method of example 21, where enabling HARQ-ACK deferral includes maintaining a deferral budget for DG-PDSCH transmissions.Attorney Docket No. 56990-0097W01 / P71792WO1
[0126] Example 23 includes the method of any of examples 1-22, further including receiving the downlink message via one or more SPS-PDSCH or DG-PDSCH resources on an SDL carrier during the second time duration.
[0127] Example 24 includes the method of example 23, where the one or more uplink resources include a target PUCCH slot in the first time duration with a valid PUCCH resource for HARQ-ACK transmission.
[0128] Example 25 includes the method of example 24, further including: generating a codebook for the target PUCCH slot according to a DAI, the codebook including one or more DG HARQ-ACK bits; and appending one or more deferred SPS HARQ-ACK bits to the DG HARQ-ACK bits in the codebook.
[0129] Example 26 includes the method of any of examples 1-25, further including receiving control signaling that configures a value of semi-static for pdsch-HARQ-ACK-Codebook and determining whether to generate HARQ-ACK feedback for a slot in the first time duration or the second time duration based on the control signaling.
[0130] Example 27 includes the method of example 26, where HARQ-ACK feedback for a PDSCH occasion in a TDRA corresponding to an SDL carrier is not generated if the PDSCH occasion is in the first time duration or the PDSCH occasion overlaps with a switching gap.
[0131] Example 28 includes the method of any of examples 26-27, where HARQ-ACK feedback for a PDSCH occasion in a TDRA corresponding to an FDD carrier is not generated if the PDSCH occasion is in the second time duration or the PDSCH occasion overlaps with a switching gap.
[0132] Example 29 includes the method of any of examples 26-28, where HARQ-ACK feedback for PDSCH with repetitions is not generated if all repetitions of the PDSCH are dropped by the UE.
[0133] Example 30 includes the method of any of examples 1-29, where for a slot in the second time duration, each PDSCH occasion in a TDRA corresponding to an SDL carrier that does not overlap with a switching gap is considered one candidate PDSCH reception on the SDL carrier for which the UE can transmit HARQ-ACK feedback in a target PUCCH slot.
[0134] Example 31 includes the method of example 30, further including determining whether a PDSCH occasion corresponding to the SDL carrier is within a latency budget of the UE.Attorney Docket No. 56990-0097W01 / P71792WO1
[0135] Example 32 includes the method of example 31, where the latency budget includes a gap between (i) an end of a slot in which the PDSCH occasion is scheduled and (ii) a start of the target PUCCH slot.
[0136] Example 33 includes the method of any of examples 30-32, further including generating a codebook for transmission in the target PUCCH slot, the codebook including HARQ-ACK feedback for at least one PDSCH reception on the SDL carrier.
[0137] Example 34 includes one or more processors configured to, when executing instructions stored in a memory, perform the method of any of examples 1-33.
[0138] Example 35 is a UE configured to perform the method of any of examples 1-33.
[0139] Example 36 is a non-transitory computer-readable medium storing instructions that, when executed by one or more processors, cause the one or more processors to perform the method of any of examples 1-33.
[0140] Any of the examples described above may be combined with any other example (or combination of examples), unless explicitly stated otherwise. The foregoing description of one or more implementations provides illustration and description, but is not intended to be exhaustive or to limit the scope of embodiments to the precise form disclosed. Modifications and variations are possible in light of the above teachings or may be acquired from practice of various embodiments.
[0141] Although the embodiments above have been described in considerable detail, numerous variations and modifications will become apparent to those skilled in the art once the above disclosure is fully appreciated. It is intended that the following claims be interpreted to embrace all such variations and modifications.
[0142] It is well understood that the use of personally identifiable information should follow privacy policies and practices that are generally recognized as meeting or exceeding industry or governmental requirements for maintaining the privacy of users. In particular, personally identifiable information data should be managed and handled so as to minimize risks of unintentional or unauthorized access or use, and the nature of authorized use should be clearly indicated to users.
Claims
Attorney Docket No. 56990-0097W01 / P71792WO1CLAIMSWe Claim:
1. A method comprising:receiving an indication of a switching pattern for a user equipment (UE) configured for carrier aggregation via switching between a frequency division duplexing (FDD) carrier and a supplemental downlink (SDL) carrier;determining a first time duration associated with: (i) a first antenna configuration enabling communication on the FDD carrier, and (ii) a second time duration associated with a second antenna configuration enabling communication on the SDL carrier based at least on the switching pattern; andtransmitting feedback for a downlink message via one or more uplink resources in the first time duration or the second time duration based at least on the switching pattern and a carrier on which the downlink message is scheduled.
2. The method of claim 1, further comprising: receiving the downlink message via a dynamic grant (DG) physical downlink shared channel (PDSCH) or a semi-persistent scheduled (SPS) PDSCH, wherein the feedback comprises hybrid automatic repeat request (HARQ) acknowledgement (ACK) feedback for the downlink message.
3. The method of claim 1, wherein the FDD carrier: (i) comprises a downlink frequency band and a paired uplink frequency band and (ii) is used for both uplink and downlink on a primary cell (PCell).
4. The method of claim 3, wherein the SDL carrier: (i) comprises an unpaired downlink frequency band and (ii) is used for downlink on a secondary cell (SCell).
5. The method of claim 1, further comprising: deferring transmission of the feedback in response to determining that a physical uplink control channel (PUCCH) slot corresponding to a semi-persistent scheduled (SPS) physical downlink shared channel (PDSCH) overlaps with one or more symbols that are in a switching gap or in the second time duration.
6. The method of claim 5, further comprising: performing an uplink control information (UCI) multiplexing operation prior to deferring transmission of the feedback.Attorney Docket No. 56990-0097W01 / P71792WO17. The method of claim 1, further comprising: transmitting a message indicating a capability of the UE to support deferral of semi -persistent scheduled (SPS) hybrid automatic repeat request (HARQ) acknowledgement (ACK) feedback for FDD and SDL carriers with receiver (Rx) switching.
8. The method of claim 1, wherein the one or more uplink resources comprise a target physical uplink control channel (PUCCH) slot in the first time duration or the second time duration.
9. The method of claim 8, further comprising: deferring transmission of the feedback to the target PUCCH slot in response to determining that a deferral budget of the UE is not exceeded.
10. The method of claim 9, wherein the target PUCCH slot is a first FDD slot on which the UE is scheduled to transmit a PUCCH with hybrid automatic repeat request (HARQ) acknowledgement (ACK) feedback.
11. The method of claim 9, wherein the target PUCCH slot is a first usable uplink FDD slot.
12. The method of claim 11, wherein the first usable uplink FDD slot is a slot that supports FDD and does not include a symbol that is in a switching gap or in the second time duration.
13. The method of claim 11, wherein transmitting the feedback for the downlink message comprises transmitting, in the first usable uplink FDD slot, accumulated SPS HARQ-ACK information via a PUCCH resource provided by SPS-PUCCH-AN-List or nlPUCCH-AN.
14. The method of claim 13, wherein up to two instances of deferred HARQ-ACK feedback can be sent over a PUCCH resource provided by nlPUCCH-AN when SPS-PUCCH-AN-List is not provided.
15. The method of claim 1, further comprising:receiving DCI that schedules a DG PDSCH transmission on an SDL carrier; andAttorney Docket No. 56990-0097W01 / P71792WO1determining a PUCCH resource to use for transmission of HARQ-ACK feedback for the DG-PDSCH transmission based at least on a KI value indicated by the DCI.
16. The method of claim 15, wherein the KI value is counted from an end of the second time duration associated with the second antenna configuration, the second time duration comprising a slot that includes an end of a switching gap, wherein the UE is configured to switch from the second antenna configuration to the first antenna configuration during the switching gap.
17. The method of claim 1, further comprising:receiving control signaling that configures a value of semi-static for pdsch-HARQ-ACK-Codebook anddetermining whether to generate HARQ-ACK feedback for a slot in the first time duration or the second time duration based at least on the control signaling.
18. The method of claim 17, wherein HARQ-ACK feedback for a PDSCH occasion in a TDRA corresponding to an FDD carrier is not generated if the PDSCH occasion is in the second time duration or the PDSCH occasion overlaps with a switching gap.
19. One or more processors configured to, when executing instructions stored in a memory, perform the method of any of claims 1-18.
20. A user equipment (UE) comprising the one or more processors of claim 19.
