Protection method for local scouring of bridge pier
A bridge pier and partial technology, which is applied in the protection field of partial erosion of bridge piers, can solve problems such as service life that has not yet reached the specification, hidden dangers of bridge safe operation, and bridge failure to reach, etc., to achieve good protection effect, improve anti-scouring ability, and long service life Effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0046] This embodiment takes a bridge in a mountainous area in Anhui Province as an example. The bridge pier to be reinforced also includes an enlarged foundation 3 arranged under the pier body 2. The central axis of the enlarged foundation 3 coincides with the central axis of the pier body 2, and the enlarged foundation The area of the upper surface of 3 is larger than the area of the pier body 2 and the surface in contact with it; the pier body 2 and the enlarged foundation 3 are both rectangular. Since the bridge is located in a mountainous area, the flood season surges and falls, scouring the river bed surface 1, and the scouring force is extremely strong. After inspection, it was found that the local scouring depth of the bridge was close to the buried depth of the expanded foundation 3. According to a protection method for partial scouring of bridge piers, the specific steps are as follows:
[0047] S1. Determine the reinforcement depth H of the pier to be reinforced ...
Embodiment 2
[0063] This embodiment takes a bridge in a mountainous area of Guangxi Province as an example. The bridge pier to be reinforced also includes an enlarged foundation 3 arranged below the pier body 2. The central axis of the enlarged foundation 3 coincides with the central axis of the pier body 2, and the enlarged foundation The area of the upper surface of 3 is greater than the area of the surface in contact with the pier body 2; wherein the pier body 2 is cylindrical with a diameter of 2.5m, the enlarged foundation 3 is square, and the riverbed is mainly cohesive soil. Affected by the flood, the bridge pier has severe local erosion. According to a protection method for the partial erosion of the bridge pier, the specific steps are as follows:
[0064] S1. Determine the reinforcement depth H of the pier to be reinforced according to the depth h of the scoured pit, such as figure 1 and image 3 As shown, the specific steps are as follows:
[0065] S11, determine the pit ...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com