An intelligent monitoring system for abnormal property facilities
The intelligent monitoring system addresses the lack of real-time monitoring in property facilities by using AI and 5G communication to enhance supervision and maintenance efficiency.
Patent Information
- Application Number
- CN202311179121.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2023-09-13
- Publication Date
- 2024-12-27
- Estimated Expiration
- 2043-09-13
AI Technical Summary
Current property facility monitoring systems lack real-time monitoring capabilities and effective supervision mechanisms, allowing for potential inspection fraud and inadequate maintenance of critical equipment.
An intelligent monitoring system utilizing an AI property equipment and facility model calculation and analysis terminal, sensor data acquisition and preprocessing module, multi-point signal wireless transmission base station, and zigbee signal control terminal to collect, process, and transmit data on security, power supply, and water supply facilities, enabling real-time monitoring and remote supervision.
Enhances monitoring feasibility, flexibility, and accuracy while eliminating the need for independent channels, facilitating easy networking and improving supervision efficiency through 5G communication.
Smart Images

Figure CN117499881B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the field of property facility monitoring, and in particular to a property facility abnormality intelligent monitoring system and method. Background Art
[0002] Property management refers to the activities of the owners jointly managing the common parts of the separate buildings and the common buildings, places and facilities within the building area, or entrusting property service companies or other managers to manage the buildings, facilities, equipment, places and venues shared by the owners. The Property Law stipulates that owners can manage their properties themselves or entrust property service companies or other managers to manage them.
[0003] With the progress and development of society, the management work of all walks of life tends to be standardized, sustainable and computerized. The monitoring of property facilities is one of the major projects of property management. For example, the elevator room, power distribution room and heating system in the community. These important equipment need to be inspected regularly to ensure their normal operation. At present, the equipment inspection in the community is just to check on the inspection form. In this way, someone else can check the inspection instead of the inspection, and it is impossible to really know whether the inspection is really carried out, and it is impossible to monitor the work of the inspectors. Moreover, there is no corresponding punishment measure for the inspectors who overdue the inspection, so that the inspected equipment cannot be inspected. Summary of the invention
[0004] In order to overcome the shortcomings and deficiencies of the prior art, the present invention provides a property facility abnormality intelligent monitoring system and method.
[0005] The technical solution of the present invention to solve the above technical problems is as follows:
[0006] An intelligent monitoring system for abnormal property facilities includes: a property equipment and facility abnormal operation management platform, and also includes: a sensor data acquisition and preprocessing module, and an AI property equipment and facility model calculation and analysis terminal and a multi-point signal wireless transmission base station respectively connected to the sensor data acquisition and preprocessing module, and a zigbee signal control terminal connected to the multi-point signal wireless transmission base station, wherein:
[0007] The AI property equipment and facility model calculation and analysis terminal is connected to the property equipment and facility abnormal operation management platform, and is used to obtain the measurement data of the security, power supply, and water supply facilities of the property equipment and facility abnormal operation management platform, and modulate the measurement data of the security, power supply, and water supply facilities into a property equipment and facility zigbee signal and send it to the sensor data acquisition and preprocessing module, and send the property equipment and facility zigbee signal to the multi-point signal wireless transmission base station through the sensor data acquisition and preprocessing module;
[0008] The multi-point signal wireless transmission base station is used to receive the Zigbee signal of the property equipment and facilities, demodulate the Zigbee signal of the property equipment and facilities, and then send it to the Zigbee signal control terminal.
[0009] Based on the above technical solution, the present invention can also be improved as follows.
[0010] Furthermore, the AI property equipment facility model calculation and analysis terminal includes:
[0011] A real-time monitoring unit for security, power supply and water supply facilities, which is used to monitor the abnormal operation management platform of the property equipment and facilities, obtain the facility operation feedback signal information and real-time property equipment and facility change information of the abnormal operation management platform of the property equipment and facilities, and compare the facility operation feedback signal information and the real-time property equipment and facility change information with the preset facility operation feedback signal setting value and the preset real-time property equipment and facility change setting value, respectively, to obtain the status data of the abnormal operation management platform of the property equipment and facilities;
[0012] The set value of the facility operation feedback signal is expressed as:
[0013]
[0014] Where f(x) represents the facility operation feedback signal setting function, x represents the category of the measured facility, A represents the change factor of the facility, i represents the operation feedback signal of the measured facility, Q represents the total operation feedback signal of the measured facility, and U c Represents the limit operation feedback signal of the sensor data acquisition and preprocessing module, V d represents the impact factor of the sensor data acquisition and preprocessing module operation feedback signal, P j represents the noise matrix of the operation feedback signal, ζ represents the normal operation feedback signal of the facility, and γ represents the design life matrix of different facilities;
[0015] The real-time property equipment and facility change setting value is expressed as:
[0016]
[0017] Where y(s) represents the real-time property equipment and facility change setting function, r represents the property equipment and facility change factor, i represents the operation feedback signal of the measured facility, Q represents the total operation feedback signal of the measured facility, and K s Indicates the property equipment facility thresholds of different facilities, G s Indicates the altitude of the measured area, M s Represents the noise matrix that affects changes in property equipment and facilities;
[0018] The underground property equipment and facility ZigBee signal communication unit is used to transmit the facility operation feedback signal information, the real-time property equipment and facility change information and the status data
[0019] The measurement data of security, power supply and water supply facilities are modulated into the ZigBee signal of the property equipment and facilities, and sent to the sensor data acquisition and preprocessing module, and then sent to the multi-point signal wireless transmission base station in the form of 5G signal.
[0020] Furthermore, the underground property equipment facility ZigBee signal communication unit includes:
[0021] A signal analysis unit, configured to determine a carrier signal extraction rule for the measurement data according to the signal transmission distance and the frequency corresponding to each carrier, and extract the carrier signal from the measurement data based on the carrier signal extraction rule to obtain a first carrier signal;
[0022] A signal correction unit, configured to obtain extraction information of a carrier signal extraction rule, determine a phase offset of a target carrier signal based on the extraction information, and perform phase correction on the first carrier signal based on the phase offset to obtain a second carrier signal;
[0023] a signal superposition unit, configured to extract pulse data from the measurement data to obtain a target pulse signal, superimpose the target pulse signal with a second carrier signal to obtain an initial transmission signal, and perform capacitive coupling on the initial transmission signal to obtain a second transmission signal;
[0024] a signal verification unit, configured to use the voltage level of the second transmission signal as a sequence code to obtain a verification sequence, and record an interval between the sequence code and a previous sequence code as a delay time of the corresponding sequence code, to determine whether the verification sequence meets a preset threshold;
[0025] If yes, determine whether each delay time of each sequence code exceeds a predetermined delay time value; if yes, it indicates that the second transmission signal meets the Zigbee signal requirement, and the second transmission signal is used as the target transmission signal; otherwise, it indicates that the second transmission signal meets the Zigbee signal requirement;
[0026] Otherwise, it indicates that the second transmission signal meets the ZigBee signal requirement;
[0027] A signal modulation unit, configured to re-modulate the second transmission signal when the second transmission signal does not meet the Zigbee signal requirement, so as to obtain a target transmission signal that meets the Zigbee signal requirement;
[0028] The signal transmission unit is used to send the target transmission signal to the sensor data acquisition and preprocessing module, and send it to the multi-point signal wireless transmission base station in the form of a 5G signal.
[0029] Furthermore, the AI property equipment facility model calculation and analysis terminal also includes:
[0030] The underground data storage and calling unit is used to store the facility operation feedback signal information, the real-time property equipment facility change information and the status data.
[0031] Furthermore, the AI property equipment facility model calculation and analysis terminal also includes:
[0032] A microprocessor control unit is used to control the real-time monitoring unit for security, power supply and water supply facilities to monitor the abnormal operation management platform of the property equipment and facilities, and obtain the monitored feedback signal information of the facility operation, the real-time property equipment and facilities change information and the status data; and control the underground data storage and call unit to store the feedback signal information of the facility operation, the real-time property equipment and facilities change information and the status data; and package the feedback signal information of the facility operation, the real-time property equipment and facilities change information and the status data into a data packet, and send it to the underground property equipment and facilities Zigbee signal communication unit;
[0033] The underground property equipment and facility zigbee signal communication unit is specifically used to modulate the data packet into the property equipment and facility zigbee signal, and send it to the sensor data acquisition and preprocessing module, and send it to the multi-point signal wireless transmission base station in the form of a 5G signal.
[0034] Furthermore, the AI property equipment facility model calculation and analysis terminal also includes:
[0035] The first data storage unit is used to obtain the energy consumption value from the sensor data acquisition and preprocessing module, convert it into an electrical signal, and then call and back up the data for the AI property equipment facility model calculation and analysis terminal.
[0036] Furthermore, the multi-point signal wireless transmission base station includes: at least one property equipment facility zigbee signal generator and at least one property equipment facility zigbee signal modulator respectively connected to the sensor data acquisition and preprocessing module, wherein:
[0037] The property equipment and facility zigbee signal generator is used to obtain the property equipment and facility zigbee signal from the sensor data acquisition and preprocessing module, and send it to the upper-level property equipment and facility zigbee signal generator or the property equipment and facility zigbee signal modulator;
[0038] The property equipment and facility zigbee signal modulator is used to receive the property equipment and facility zigbee signal, demodulate the property equipment and facility zigbee signal to obtain the measurement data of the security, power supply and water supply facilities, and convert the measurement data of the security, power supply and water supply facilities into a data form that can communicate with the zigbee signal control end, and send it to the zigbee signal control end.
[0039] Furthermore, the property equipment and facility zigbee signal generator includes:
[0040] A property equipment and facility zigbee signal transmission unit, used to obtain the property equipment and facility zigbee signal from the sensor data acquisition and preprocessing module, and send it to the upper-level property equipment and facility zigbee signal generator or the property equipment and facility zigbee signal modulator;
[0041] The second data storage unit is used to obtain the energy consumption value from the sensor data acquisition and preprocessing module, convert it into an electrical signal, and then call and back up the data for the property equipment and facility Zigbee signal transmission unit.
[0042] Furthermore, the property equipment facility zigbee signal modulator includes:
[0043] A zigbee signal modulation unit, used for receiving the zigbee signal of the property equipment and facilities, demodulating the zigbee signal of the property equipment and facilities, and obtaining a data packet containing the measurement data of the security, power supply and water supply facilities;
[0044] A data packet conversion unit, used for converting the data packet into a TCP / IP data packet and sending the data packet to the zigbee signal control terminal;
[0045] The third data storage unit is used to obtain the energy consumption value from the sensor data acquisition and preprocessing module, convert it into an electrical signal, and then call and back up the data for the ZigBee signal mediation unit and the data packet conversion unit.
[0046] Furthermore, the data packet conversion unit comprises:
[0047] A model building unit, used to instantiate the data packet, determine the initial data packet object, and determine the TCP / IP model data value corresponding to the initial data packet object according to a preset reference data table and the following formula;
[0048] K=1+A*ln(3+δ*B)
[0049] Wherein, K represents the TCP / IP model data value corresponding to the initial data packet object, A represents the matching value between the preset data comparison table and the initial data packet instance, and its value is (1,10), δ represents the type value of the initial data packet, and its value is (1,10), and B represents the attribute value of the initial data packet object, and its value is (1,10);
[0050] Determine the TCP / IP model data corresponding to the value range of the TCP / IP model data value corresponding to the initial data packet object in the preset comparison data table, and construct a TCP / IP object model based on the TCP / IP model data corresponding to all the initial data packet objects;
[0051] The data packet conversion unit is used to input the initial data packet object into the TCP / IP object model to obtain the corresponding TCP / IP object, and obtain the conversion value of the initial data packet based on the TCP / IP object and according to the following formula;
[0052]
[0053] Where, F represents the conversion value of the initial data packet, P represents the object attribute value of the TCP / IP instance of the initial data packet, and its value is (1,10), e represents the natural constant, and its value is 2.72, τ represents the model characteristic value of the TCP / IP object model, and its value is (0,1), Q represents the type value of the TCP / IP data packet, and its value is (1,10);
[0054] Based on the conversion value of the initial data packet, a TCP / IP data packet corresponding to the initial data packet is obtained.
[0055] Furthermore, the monitoring system further comprises:
[0056] The cloud data service unit is used to obtain and store the TCP / IP data packets.
[0057] Another technical solution of the present invention to solve the above technical problems is as follows:
[0058] A method for intelligently monitoring abnormalities of property facilities, comprising the following steps:
[0059] Step 1: monitor the property equipment and facility abnormal operation management platform to obtain facility operation feedback signal information and real-time property equipment and facility change information of the property equipment and facility abnormal operation management platform;
[0060] Step 2, respectively comparing the facility operation feedback signal information and the real-time property equipment facility change information with a preset facility operation feedback signal setting value and a preset real-time property equipment facility change setting value to obtain status data of the property equipment facility abnormal operation management platform;
[0061] Step 3, modulating the measurement data of the security, power supply and water supply facilities including the facility operation feedback signal information, the real-time property equipment and facility change information and the status data into a property equipment and facility ZigBee signal, and sending it to the sensor data acquisition and preprocessing module;
[0062] Step 4, acquiring the ZigBee signal of the property equipment and facilities from the sensor data acquisition and preprocessing module and demodulating it to obtain the measurement data of the security, power supply and water supply facilities;
[0063] Step 5: Send the measurement data of the security, power supply and water supply facilities to a preset ZigBee signal control terminal.
[0064] The beneficial effects of the present invention are:
[0065] The present invention provides an intelligent monitoring system for property facility abnormalities, which monitors the property equipment and facility abnormal operation management platform through an AI property equipment and facility model calculation and analysis terminal, and transmits the measurement data of the property equipment and facility abnormal operation management platform on the security, power supply and water supply facilities through a sensor data acquisition and preprocessing module, and processes the measurement data of the property equipment and facility abnormal operation management platform on the security, power supply and water supply facilities transmitted in the sensor data acquisition and preprocessing module through a multi-point signal wireless transmission base station, and sends it to the zigbee signal control terminal, which can improve the feasibility of the system, has the advantages of high flexibility, high measurement accuracy and easy networking, and does not need to build an independent channel. Data forwarding is realized through the sensor data acquisition and preprocessing module, which is convenient for later networking expansion, and remote monitoring is performed through the communication method of 5G signals, which can improve the effectiveness and real-time nature of monitoring, facilitate the use of property management personnel, and improve the supervision efficiency of property management personnel. BRIEF DESCRIPTION OF THE DRAWINGS
[0066] Figure 1 A structural framework diagram of a property facility abnormality intelligent monitoring system provided by an embodiment of the present invention;
[0067] Figure 2A flowchart of a method for intelligently monitoring abnormalities of property facilities provided in an embodiment of the present invention. DETAILED DESCRIPTION
[0068] It should be noted that, in the absence of conflict, the embodiments and features in the embodiments of the present application may be combined with each other. The present application is further described in detail below in conjunction with the accompanying drawings and specific embodiments.
[0069] like Figure 1 As shown, a structural framework diagram of an abnormal intelligent monitoring system for property facilities is shown.
[0070] The monitoring system includes: a property equipment and facility abnormal operation management platform 1, an AI property equipment and facility model calculation and analysis terminal 2, a sensor data acquisition and preprocessing module 3, a multi-point signal wireless transmission base station 4 and a zigbee signal control terminal 5, which are connected in sequence, wherein:
[0071] The AI property equipment and facility model calculation and analysis terminal 2 is used to obtain the measurement data of the security, power supply, and water supply facilities of the property equipment and facility abnormal operation management platform 1, and modulate the measurement data of the security, power supply, and water supply facilities into the property equipment and facility zigbee signal and send it to the sensor data acquisition and preprocessing module 3, and send the property equipment and facility zigbee signal to the multi-point signal wireless transmission base station 4 through the sensor data acquisition and preprocessing module 3.
[0072] It should be noted that the measurement data of security, power supply and water supply facilities refers to the usage status of the equipment. For example, by collecting the facility operation feedback signal of the property equipment and facility abnormal operation management platform 1 or the real-time property equipment and facility changes, it can be judged whether the property equipment and facility abnormal operation management platform 1 is in the running operation status data, or the measurement status data of not running but ready to run at any time, or the abnormal operation status data of stopped operation, etc.
[0073] The property equipment and facility abnormal operation management platform 1 refers to the instruments and equipment that need to be monitored for usage. There are many specific application scenarios, such as instruments and equipment that need to be monitored in the fields of industry, military, medical care, and the Internet.
[0074] The AI property equipment and facility model calculation and analysis terminal 2 refers to a device that can collect the facility operation feedback signals and real-time property equipment and facility changes of the property equipment and facility abnormal operation management platform 1 in real time, and can modulate the information into the zigbee signal of the power property equipment and facility.
[0075] The sensor data acquisition and preprocessing module 3 refers to a conductor that can conduct real-time changes in property equipment and facilities, for example, it can be an electric wire.
[0076] The multi-point signal wireless transmission base station 4 is used to receive the property equipment and facility zigbee signal, demodulate the property equipment and facility zigbee signal and send it to the zigbee signal control terminal 5. The zigbee signal control terminal 5 here can be a terminal used by the user, such as a mobile phone, a computer, etc., or it can refer to a cloud data service unit, a wireless collection node, etc.
[0077] It should be noted that in the monitoring system provided in this embodiment, the property equipment and facility abnormal operation management platform 1, the AI property equipment and facility model calculation and analysis terminal 2, the sensor data acquisition and preprocessing module 3 and the multi-point signal wireless transmission base station 4 can be set locally, and the zigbee signal control terminal 5 can be set locally or in the cloud, etc. The AI property equipment and facility model calculation and analysis terminal 2 can monitor the property equipment and facility abnormal operation management platform 1 by wired or wireless means, the AI property equipment and facility model calculation and analysis terminal 2 and the multi-point signal wireless transmission base station 4 are respectively connected to the sensor data acquisition and preprocessing module 3, and the signal is transmitted through the sensor data acquisition and preprocessing module 3, and the multi-point signal wireless transmission base station 4 can communicate with the zigbee signal control terminal 5 by wired or wireless means.
[0078] The beneficial effects of the present invention are as follows: the present invention provides an intelligent monitoring system for property facility abnormalities, which monitors the property equipment facility abnormal operation management platform 1 through the AI property equipment facility model calculation and analysis terminal 2, and transmits the measurement data of the property equipment facility abnormal operation management platform 1 on the security, power supply and water supply facilities through the sensor data acquisition and preprocessing module 3, and processes the measurement data of the property equipment facility abnormal operation management platform 1 on the security, power supply and water supply facilities transmitted in the sensor data acquisition and preprocessing module 3 through the multi-point signal wireless transmission base station 4, and sends it to the zigbee signal control terminal 5, which can improve the feasibility of the system, has the advantages of high flexibility and easy networking, and does not need to build an independent channel. The data forwarding is realized through the sensor data acquisition and preprocessing module 3, which is convenient for the later networking expansion, and remote monitoring is carried out through the communication method of 5G signals, which can improve the effectiveness and real-time performance of monitoring.
[0079] Another embodiment of the present invention provides a structural framework diagram of a property facility abnormality intelligent monitoring system, the monitoring system includes: a property equipment facility abnormal operation management platform 1, an AI property equipment facility model calculation and analysis terminal 2, a sensor data acquisition and preprocessing module 3, a multi-point signal wireless transmission base station 4 and a zigbee signal control terminal 5 connected in sequence, wherein:
[0080] The AI property equipment and facility model calculation and analysis terminal 2 is used to obtain the measurement data of the security, power supply and water supply facilities of the property equipment and facility abnormal operation management platform 1, and modulate the measurement data of the security, power supply and water supply facilities into the property equipment and facility zigbee signal and send it to the sensor data acquisition and preprocessing module 3. The property equipment and facility zigbee signal is sent to the multi-point signal wireless transmission base station 4 through the sensor data acquisition and preprocessing module 3. The AI property equipment and facility model calculation and analysis terminal 2 is described in detail below.
[0081] AI property equipment and facility model calculation and analysis terminal 2 includes:
[0082] The real-time monitoring unit 21 for security, power supply and water supply facilities is used to monitor the abnormal operation management platform 1 for property equipment and facilities, obtain the facility operation feedback signal information and real-time property equipment and facility change information of the abnormal operation management platform 1 for property equipment and facilities, and compare the facility operation feedback signal information and the real-time property equipment and facility change information with the preset facility operation feedback signal setting value and the preset real-time property equipment and facility change setting value, respectively, to obtain the status data of the abnormal operation management platform 1 for property equipment and facilities.
[0083] The set value of the facility operation feedback signal is expressed as:
[0084]
[0085] Where f(x) represents the facility operation feedback signal setting function, x represents the category of the measured facility, A represents the change factor of the facility, i represents the operation feedback signal of the measured facility, Q represents the total operation feedback signal of the measured facility, and U c Represents the limit operation feedback signal of the sensor data acquisition and preprocessing module, V d represents the impact factor of the sensor data acquisition and preprocessing module operation feedback signal, P j represents the noise matrix of the operation feedback signal, ζ represents the normal operation feedback signal of the facility, and γ represents the design life matrix of different facilities;
[0086] The real-time property equipment and facility change setting value is expressed as:
[0087]
[0088] Where y(s) represents the real-time property equipment and facility change setting function, r represents the property equipment and facility change factor, i represents the operation feedback signal of the measured facility, Q represents the total operation feedback signal of the measured facility, and K s Indicates the property equipment facility thresholds of different facilities, G s Indicates the altitude of the measured area, M sRepresents the noise matrix that affects changes in property equipment and facilities;
[0089] For example, the status data of the property equipment and facility abnormal operation management platform 1 can be divided into three types, namely, operating status data that is in operation, measurement status data that is not in operation but can be run at any time, and abnormal operation status data that has stopped running. The real-time property equipment and facility change setting value can be set to two values, A and B, and the facility operation feedback signal setting value can be set to two values, C and D.
[0090] After obtaining the real-time property equipment and facility change information and facility operation feedback signal information of the property equipment and facility abnormal operation management platform 1, the real-time monitoring unit 21 of security, power supply and water supply facilities first judges the real-time property equipment and facility change information with the real-time property equipment and facility change setting value. When the real-time property equipment and facility change information is greater than or equal to B, the status data of the property equipment and facility abnormal operation management platform 1 is obtained as operation status data; when the real-time property equipment and facility change information is greater than A and less than B, the status data of the property equipment and facility abnormal operation management platform 1 is obtained as measurement status data; when the real-time property equipment and facility change information is equal to A, the facility operation feedback signal information is judged with the facility operation feedback signal setting value. When the facility operation feedback signal information is greater than C and less than D, the status data of the property equipment and facility abnormal operation management platform 1 is obtained as abnormal operation status data.
[0091] The property facilities proposed in the present invention are not limited to security, power supply, and water supply facilities, but also include elevators, water pumps, water tanks, lightning protection facilities, fire-fighting equipment, corridor lights, TV antennas, generators, power distribution equipment, water supply and drainage pipelines, gas supply pipelines, electrical wires, heating and air-conditioning equipment, roads, green spaces, artificial landscapes, walls, gates, mailboxes, bulletin boards, street lights, drainage ditches, channels, pools, sewage wells, septic tanks, sewage treatment facilities, leisure and entertainment facilities, security monitoring facilities, civil air defense facilities, etc.
[0092] The microprocessor control unit 22 is used to control the real-time monitoring unit 21 for security, power supply and water supply facilities to monitor the abnormal operation management platform 1 of the property equipment and facilities, and obtain the monitored facility operation feedback signal information, real-time property equipment and facilities change information and status data. The underground data storage and call unit 23 is controlled to store the facility operation feedback signal information, real-time property equipment and facilities change information and status data. The facility operation feedback signal information, real-time property equipment and facilities change information and status data are packaged into a data packet and sent to the underground property equipment and facilities zigbee signal communication unit 24. For example, these information can be packaged into a data packet of a specific byte and sent to the underground property equipment and facilities zigbee signal communication unit 24.
[0093] The underground data storage and calling unit 23 is used to store facility operation feedback signal information, real-time property equipment and facility change information and status data.
[0094] The underground property equipment and facility zigbee signal communication unit 24 is used to receive the data packet of the specific byte, modulate the data packet into the property equipment and facility zigbee signal, and send it to the sensor data acquisition and preprocessing module 3, and send it to the multi-point signal wireless transmission base station 4 in the form of a 5G signal.
[0095] The present invention provides an embodiment, wherein the underground property equipment facility ZigBee signal communication unit comprises:
[0096] A signal analysis unit, configured to determine a carrier signal extraction rule for the measurement data according to the signal transmission distance and the frequency corresponding to each carrier, and extract the carrier signal from the measurement data based on the carrier signal extraction rule to obtain a first carrier signal;
[0097] A signal correction unit, configured to obtain extraction information of a carrier signal extraction rule, determine a phase offset of a target carrier signal based on the extraction information, and perform phase correction on the first carrier signal based on the phase offset to obtain a second carrier signal;
[0098] a signal superposition unit, configured to extract pulse data from the measurement data to obtain a target pulse signal, superimpose the target pulse signal with a second carrier signal to obtain an initial transmission signal, and perform capacitive coupling on the initial transmission signal to obtain a second transmission signal;
[0099] a signal verification unit, configured to use the voltage level of the second transmission signal as a sequence code to obtain a verification sequence, and record an interval between the sequence code and a previous sequence code as a delay time of the corresponding sequence code, to determine whether the verification sequence meets a preset threshold;
[0100] If yes, determine whether each delay time of each sequence code exceeds a predetermined delay time value; if yes, it indicates that the second transmission signal meets the Zigbee signal requirement, and the second transmission signal is used as the target transmission signal; otherwise, it indicates that the second transmission signal meets the Zigbee signal requirement;
[0101] Otherwise, it indicates that the second transmission signal meets the ZigBee signal requirement;
[0102] A signal modulation unit, configured to re-modulate the second transmission signal when the second transmission signal does not meet the Zigbee signal requirement, so as to obtain a target transmission signal that meets the Zigbee signal requirement;
[0103] The signal transmission unit is used to send the target transmission signal to the sensor data acquisition and preprocessing module, and send it to the multi-point signal wireless transmission base station in the form of a 5G signal.
[0104] In this embodiment, the modulation method for re-modulating the second transmission signal is consistent with the modulation of the measurement data, and is obtained through signal analysis, correction, superposition and verification.
[0105] The beneficial effects of the above design scheme are: the target transmission signal is obtained by signal analysis, correction, superposition and verification of the measured data, and the matching between the obtained target transmission signal and the measured data is ensured, and finally sent to the ZigBee signal control terminal, which can improve the feasibility of the system, has the advantages of high flexibility, high measurement accuracy and easy networking, and there is no need to build an independent channel. Data forwarding is realized through the sensor data acquisition and preprocessing module, which is convenient for later networking expansion.
[0106] The first data storage unit 25 is used to obtain the energy consumption value from the sensor data acquisition and preprocessing module 3, convert it into an electrical signal, and then call and back up the data for the AI property equipment and facility model calculation and analysis terminal 2. For example, the original data obtained by the sensor data acquisition and preprocessing module 3 can be converted into a data packet to call and back up the data for the AI property equipment and facility model calculation and analysis terminal 2.
[0107] The multi-point signal wireless transmission base station 4 is used to receive the zigbee signal of property equipment and facilities, demodulate the zigbee signal of property equipment and facilities, and send it to the zigbee signal control terminal 5. The multi-point signal wireless transmission base station 4 is described in detail below.
[0108] The multi-point signal wireless transmission base station 4 includes: at least one property equipment and facility zigbee signal generator 41 and at least one property equipment and facility zigbee signal modulator 42 respectively connected to the sensor data acquisition and preprocessing module 3. The property equipment and facility zigbee signal generator 41 is used to obtain the property equipment and facility zigbee signal from the sensor data acquisition and preprocessing module 3, and send it to the upper-level property equipment and facility zigbee signal generator 41 or the property equipment and facility zigbee signal modulator 42. The property equipment and facility zigbee signal modulator 42 is used to receive the property equipment and facility zigbee signal, demodulate the property equipment and facility zigbee signal to obtain the measurement data of the security, power supply and water supply facilities, and convert the measurement data of the security, power supply and water supply facilities into a data form that can communicate with the zigbee signal control terminal 5, and send it to the zigbee signal control terminal 5. Among them, the number of property equipment and facility zigbee signal generators 41 can be set according to the transmission distance of the property equipment and facility zigbee signal in the sensor data acquisition and preprocessing module 3, and the property equipment and facility zigbee signal modulator 42 can be set to one, and the AI property equipment and facility model calculation and analysis terminal 2, at least one property equipment and facility zigbee signal generator 41 and one property equipment and facility zigbee signal modulator 42 are arranged in sequence on the sensor data acquisition and preprocessing module 3, that is, the property equipment and facility zigbee signal generator 41 is between the AI property equipment and facility model calculation and analysis terminal 2 and the property equipment and facility zigbee signal modulator 42.
[0109] Property equipment and facilities zigbee signal generator 41 includes:
[0110] The property equipment and facility zigbee signal transmission unit 411 is used to obtain the property equipment and facility zigbee signal from the sensor data acquisition and preprocessing module 3 and send it to the upper-level property equipment and facility zigbee signal generator 41 or the property equipment and facility zigbee signal modulator 42. The upper-level property equipment and facility zigbee signal generator 41 here refers to the property equipment and facility zigbee signal generator 41 between the property equipment and facility zigbee signal generator 41 and the property equipment and facility zigbee signal modulator 42.
[0111] The second data storage unit 412 is used to obtain the energy consumption value from the sensor data acquisition and preprocessing module 3, and convert it into an electrical signal for the property equipment and facility zigbee signal transmission unit 411 to call and back up the data.
[0112] Property equipment and facility zigbee signal moderator 42 includes:
[0113] The zigbee signal modulation unit 421 is used to receive the zigbee signal of the property equipment and facilities, demodulate the zigbee signal of the property equipment and facilities, and obtain a data packet containing the measurement data of the security, power supply and water supply facilities.
[0114] The data packet conversion unit 422 is used to convert the data packet into a TCP / IP data packet and send it to the zigbee signal control terminal 5. The reason for converting the data packet into a TCP / IP data packet here is to meet the communication protocol between the zigbee signal control terminal 5. The specific form of the data converted can be set according to the needs.
[0115] The present invention provides an embodiment, wherein the data packet conversion unit comprises:
[0116] A model building unit, used to instantiate the data packet, determine the initial data packet object, and determine the TCP / IP model data value corresponding to the initial data packet object according to a preset reference data table and the following formula;
[0117] K=1+A*ln(3+δ*B)
[0118] Wherein, K represents the TCP / IP model data value corresponding to the initial data packet object, A represents the matching value between the preset data comparison table and the initial data packet instance, and its value is (1,10), δ represents the type value of the initial data packet, and its value is (1,10), and B represents the attribute value of the initial data packet object, and its value is (1,10);
[0119] Determine the TCP / IP model data corresponding to the value range of the TCP / IP model data value corresponding to the initial data packet object in the preset comparison data table, and construct a TCP / IP object model based on the TCP / IP model data corresponding to all the initial data packet objects;
[0120] The data packet conversion unit is used to input the initial data packet object into the TCP / IP object model to obtain the corresponding TCP / IP object, and obtain the conversion value of the initial data packet based on the TCP / IP object and according to the following formula;
[0121]
[0122] Among them, F represents the conversion value of the initial data packet, P represents the object attribute value of the TCP / IP object, and its value is (1,10), e represents the natural constant, and its value is 2.72, τ represents the model characteristic value of the TCP / IP object model, and its value is (0,1), and Q represents the type value of the TCP / IP data packet, and its value is (1,10);
[0123] Based on the conversion value of the initial data packet, a TCP / IP data packet corresponding to the initial data packet is obtained.
[0124] In this embodiment, the TCP / IP model data value corresponding to the initial data packet object can be matched to the TCP / IP model data corresponding to the value range satisfied in the preset comparison data table.
[0125] In this embodiment, the TCP / IP object model is used to realize the automatic conversion of the initial data packet object to the TCP / IP object.
[0126] In this embodiment, the matching value between the preset data comparison table and the initial data packet instance is determined by the instance feature of the initial data packet instance.
[0127] The beneficial effects of the above design scheme are: by instantiating the data packet, determining the initial data packet object, and determining the corresponding TCP / IP model data according to the initial data packet object and a specific algorithm, and constructing a TCP / IP object model based on the TCP / IP model data corresponding to all the initial data packet objects, a model basis is provided for determining the TCP / IP object, the conversion value of the initial data packet is determined based on the TCP / IP object and a specific algorithm, based on the conversion value of the initial data packet, the TCP / IP data packet corresponding to the initial data packet is obtained, the conversion from the initial data packet to the TCP / IP data packet is realized, the calling and storage of the data packet by the ZigBee signal control terminal is realized, and remote monitoring of abnormal property facilities is realized, which can improve the effectiveness and real-time nature of monitoring and facilitate the use of property management personnel.
[0128] The third data storage unit 423 is used to obtain the energy consumption value from the sensor data acquisition and preprocessing module 3, and convert it into an electrical signal for the Zigbee signal mediation unit and the data packet conversion unit to call and back up the data.
[0129] For example, the zigbee signal control terminal 5 can be a cloud data service unit, which is used to obtain and store TCP / IP data packets. After receiving the TCP / IP data packets, the data packets are parsed to obtain the usage status of the property equipment and facility abnormal operation management platform 1. The usage status of the property equipment and facility abnormal operation management platform 1 can be stored in the cloud data service unit, and can also be sent to the terminal used by the user through the cloud data service unit.
[0130] like Figure 2 FIG. 1 is a flow chart of a method for intelligently monitoring abnormal property facilities according to another embodiment of the present invention. The method comprises:
[0131] Step S1, the AI property equipment and facility model calculation and analysis terminal monitors the property equipment and facility abnormal operation management platform, and obtains the facility operation feedback signal information and real-time property equipment and facility change information of the property equipment and facility abnormal operation management platform. The acquisition method and acquisition frequency here can be set according to actual needs. For example, the facility operation feedback signal information and real-time property equipment and facility change information of the property equipment and facility abnormal operation management platform are obtained at preset intervals. The property equipment and facility abnormal operation management platform can also be monitored according to control commands. For example, after receiving the control instruction sent from the sensor data acquisition and preprocessing module, the facility operation feedback signal information and real-time property equipment and facility change information of the property equipment and facility abnormal operation management platform are obtained according to the control instruction.
[0132] Step S2, the AI property equipment and facility model calculation and analysis terminal compares the facility operation feedback signal information and the real-time property equipment and facility change information with the preset facility operation feedback signal setting value and the preset real-time property equipment and facility change setting value, and obtains the status data of the property equipment and facility abnormal operation management platform.
[0133] For example, the status data of the property equipment and facility abnormal operation management platform can be divided into three types, namely, operating status data that is in operation, measurement status data that is not in operation but can be run at any time, and abnormal operation status data that has stopped running. The real-time property equipment and facility change setting value can be set to two values, A and B, and the facility operation feedback signal setting value can be set to two values, C and D.
[0134] Step S2 can be refined into the following steps:
[0135] After obtaining the real-time property equipment and facility change information and facility operation feedback signal information of the property equipment and facility abnormal operation management platform, the real-time monitoring unit of the security, power supply and water supply facilities first judges the real-time property equipment and facility change information with the real-time property equipment and facility change setting value. When the real-time property equipment and facility change information is greater than or equal to B, the status data of the property equipment and facility abnormal operation management platform is obtained as operation status data; when the real-time property equipment and facility change information is greater than A and less than B, the status data of the property equipment and facility abnormal operation management platform is obtained as measurement status data; when the real-time property equipment and facility change information is equal to A, the facility operation feedback signal information is judged with the facility operation feedback signal setting value. When the facility operation feedback signal information is greater than C and less than D, the status data of the property equipment and facility abnormal operation management platform is obtained as operation abnormal status data.
[0136] Step S3, the AI property equipment and facility model calculation and analysis terminal modulates the measurement data of the security, power supply, and water supply facilities, including the facility operation feedback signal information, real-time property equipment and facility change information, and status data, into a property equipment and facility zigbee signal, and sends it to the sensor data acquisition and preprocessing module. The AI property equipment and facility model calculation and analysis terminal can temporarily store the measurement data of the security, power supply, and water supply facilities. When receiving the control instruction sent from the sensor data acquisition and preprocessing module, it modulates the measurement data of the security, power supply, and water supply facilities into a property equipment and facility zigbee signal according to the control instruction, and then sends it to the sensor data acquisition and preprocessing module. It can also periodically modulate the measurement data of the security, power supply, and water supply facilities into a property equipment and facility zigbee signal according to a preset time interval, and send it to the sensor data acquisition and preprocessing module.
[0137] Step S4, the multi-point signal wireless transmission base station obtains the ZigBee signal of the property equipment and facilities from the sensor data acquisition and preprocessing module and demodulates it to obtain the measurement data of the security, power supply and water supply facilities.
[0138] Step S5, the multi-point signal wireless transmission base station sends the measurement data of the security, power supply and water supply facilities to the preset zigbee signal control terminal. It should be understood that before the multi-point signal wireless transmission base station and the zigbee signal control terminal communicate and transmit, the measurement data of the security, power supply and water supply facilities need to be converted into a transmittable signal format.
[0139] In the description of the present invention, it should be noted that, unless otherwise clearly specified and limited, the terms "set", "install", "connect", "connect", and "fix" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, or it can be the internal communication of two elements. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood by specific circumstances.
[0140] Although embodiments of the present invention have been shown and described, it will be understood by those skilled in the art that various equivalent changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.
Claims
1. A property facility abnormality intelligent monitoring system, the system comprising: Property equipment and facility abnormal operation management platform, sensor data acquisition and preprocessing module, and AI property equipment and facility model calculation and analysis terminal and multi-point signal wireless transmission base station respectively connected to the sensor data acquisition and preprocessing module, and zigbee signal control terminal connected to the multi-point signal wireless transmission base station, wherein: The AI property equipment and facility model calculation and analysis terminal is connected to the property equipment and facility abnormal operation management platform, and is used to obtain the measurement data of the security, power supply, and water supply facilities of the property equipment and facility abnormal operation management platform, and modulate the measurement data of the security, power supply, and water supply facilities into a property equipment and facility zigbee signal and send it to the sensor data acquisition and preprocessing module, and send the property equipment and facility zigbee signal to the multi-point signal wireless transmission base station through the sensor data acquisition and preprocessing module; The multi-point signal wireless transmission base station is used to receive the property equipment and facility Zigbee signal, demodulate the property equipment and facility Zigbee signal and send it to the Zigbee signal control terminal; The AI property equipment facility model calculation and analysis terminal includes: A real-time monitoring unit for security, power supply and water supply facilities, which is used to monitor the abnormal operation management platform of the property equipment and facilities, obtain the facility operation feedback signal information and real-time property equipment and facility change information of the abnormal operation management platform of the property equipment and facilities, and compare the facility operation feedback signal information and the real-time property equipment and facility change information with the preset facility operation feedback signal setting value and the preset real-time property equipment and facility change setting value, respectively, to obtain the status data of the abnormal operation management platform of the property equipment and facilities, the status data including: operation status data, measurement status data and abnormal operation status data; The set value of the facility operation feedback signal is expressed as: Where f(x) represents the facility operation feedback signal setting function, x represents the category of the measured facility, A represents the change factor of the facility, i represents the operation feedback signal of the measured facility, Q represents the total operation feedback signal of the measured facility, and U c Represents the limit operation feedback signal of the sensor data acquisition and preprocessing module, V d represents the impact factor of the sensor data acquisition and preprocessing module operation feedback signal, P j represents the noise matrix of the operation feedback signal, ζ represents the normal operation feedback signal of the facility, and γ represents the design life matrix of different facilities; The real-time property equipment and facility change setting value is expressed as: Where y(s) represents the real-time property equipment and facility change setting function, r represents the property equipment and facility change factor, i represents the operation feedback signal of the measured facility, Q represents the total operation feedback signal of the measured facility, and K s Indicates the property equipment facility thresholds of different facilities, G s Indicates the altitude of the measured area, M s Represents the noise matrix that affects changes in property equipment and facilities; The underground property equipment and facility zigbee signal communication unit is used to modulate the measurement data of the security, power supply and water supply facilities including the facility operation feedback signal information, the real-time property equipment and facility change information and the status data into the property equipment and facility zigbee signal, and send it to the sensor data acquisition and preprocessing module, and send it to the multi-point signal wireless transmission base station in the form of 5G signal; The real-time monitoring unit for security, power supply and water supply facilities is specifically used to first compare the real-time property equipment and facility change information with the preset real-time property equipment and facility change setting value. When the real-time property equipment and facility change information is greater than or equal to the first-level real-time property equipment and facility change setting value, the state data of the abnormal operation management platform of the property equipment and facilities is obtained as the operation state data; When the real-time property equipment and facility change information is less than the first-level real-time property equipment and facility change setting value and greater than the second-level real-time property equipment and facility change setting value, the state data of the property equipment and facility abnormal operation management platform is obtained as measurement state data; When the real-time property equipment and facility change information is equal to the secondary real-time property equipment and facility change setting value, the facility operation feedback signal information is compared with the preset facility operation feedback signal setting value. When the facility operation feedback signal information is greater than the first facility operation feedback signal setting value and less than the second facility operation feedback signal setting value, the status data of the property equipment and facility abnormal operation management platform is obtained as abnormal operation status data.
2. The property facility abnormality intelligent monitoring system according to claim 1 is characterized in that: The AI property equipment facility model calculation and analysis terminal also includes: an underground data storage and calling unit, which is used to store the facility operation feedback signal information, the real-time property equipment facility change information and the status data.
3. The property facility abnormality intelligent monitoring system according to claim 1 is characterized in that: The AI property equipment facility model calculation and analysis terminal also includes: A microprocessor control unit is used to control the real-time monitoring unit for security, power supply and water supply facilities to monitor the abnormal operation management platform of the property equipment and facilities, and obtain the monitored feedback signal information of the facility operation, the real-time property equipment and facilities change information and the status data; and control the underground data storage and call unit to store the feedback signal information of the facility operation, the real-time property equipment and facilities change information and the status data; and package the feedback signal information of the facility operation, the real-time property equipment and facilities change information and the status data into a data packet, and send it to the underground property equipment and facilities Zigbee signal communication unit; The underground property equipment and facility zigbee signal communication unit is specifically used to modulate the data packet into the property equipment and facility zigbee signal, and send it to the sensor data acquisition and preprocessing module, and send it to the multi-point signal wireless transmission base station in the form of a 5G signal; The AI property equipment facility model calculation and analysis terminal also includes: The first data storage unit is used to obtain the energy consumption value from the sensor data acquisition and preprocessing module, convert it into an electrical signal, and then call and back up the data for the AI property equipment facility model calculation and analysis terminal.
4. The property facility abnormality intelligent monitoring system according to claim 1 is characterized in that: The multi-point signal wireless transmission base station includes: at least one property equipment facility zigbee signal generator and at least one property equipment facility zigbee signal modulator respectively connected to the sensor data acquisition and preprocessing module, wherein: The property equipment and facility zigbee signal generator is used to obtain the property equipment and facility zigbee signal from the sensor data acquisition and preprocessing module, and send it to the upper-level property equipment and facility zigbee signal generator or the property equipment and facility zigbee signal modulator; The property equipment and facility zigbee signal modulator is used to receive the property equipment and facility zigbee signal, demodulate the property equipment and facility zigbee signal to obtain the measurement data of the security, power supply and water supply facilities, and convert the measurement data of the security, power supply and water supply facilities into a data form that can communicate with the zigbee signal control end, and send it to the zigbee signal control end.
5. The property facility abnormality intelligent monitoring system according to claim 4 is characterized in that: The property equipment and facility zigbee signal generator includes: A property equipment and facility zigbee signal transmission unit, used to obtain the property equipment and facility zigbee signal from the sensor data acquisition and preprocessing module, and send it to the upper-level property equipment and facility zigbee signal generator or the property equipment and facility zigbee signal modulator; The second data storage unit is used to obtain the energy consumption value from the sensor data acquisition and preprocessing module, convert it into an electrical signal, and then call and back up the data for the property equipment and facility Zigbee signal transmission unit.
6. The property facility abnormality intelligent monitoring system according to claim 4 is characterized in that: The property equipment facility zigbee signal moderator includes: A zigbee signal modulation unit, used for receiving the zigbee signal of the property equipment and facilities, demodulating the zigbee signal of the property equipment and facilities, and obtaining a data packet containing the measurement data of the security, power supply and water supply facilities; A data packet conversion unit, used for converting the data packet into a TCP / IP data packet and sending the data packet to the zigbee signal control terminal; The third data storage unit is used to obtain the energy consumption value from the sensor data acquisition and preprocessing module, convert it into an electrical signal, and then call and back up the data for the ZigBee signal mediation unit and the data packet conversion unit.
7. The property facility abnormality intelligent monitoring system according to claim 6 is characterized in that: Also includes: The cloud data service unit is used to obtain and store the TCP / IP data packets.
8. A property facility abnormality intelligent monitoring system according to any one of claims 1 to 7, characterized in that: The system is operated through a method for intelligently monitoring abnormalities of property facilities, which includes the following steps: Step 1: monitor the property equipment and facility abnormal operation management platform to obtain facility operation feedback signal information and real-time property equipment and facility change information of the property equipment and facility abnormal operation management platform; Step 2, respectively comparing the facility operation feedback signal information and the real-time property equipment facility change information with a preset facility operation feedback signal setting value and a preset real-time property equipment facility change setting value, to obtain status data of the property equipment facility abnormal operation management platform, the status data including: operation status data, measurement status data and operation abnormality status data; Step 3, modulating the measurement data of the security, power supply and water supply facilities including the facility operation feedback signal information, the real-time property equipment and facility change information and the status data into a property equipment and facility ZigBee signal, and sending it to the sensor data acquisition and preprocessing module; Step 4, acquiring the ZigBee signal of the property equipment and facilities from the sensor data acquisition and preprocessing module and demodulating it to obtain the measurement data of the security, power supply and water supply facilities; Step 5, sending the measurement data of the security, power supply and water supply facilities to a preset ZigBee signal control terminal; Wherein, step 2 specifically includes: First, compare the real-time property equipment and facility change information with the preset real-time property equipment and facility change setting value. When the real-time property equipment and facility change information is greater than or equal to the first-level real-time property equipment and facility change setting value, the status data of the property equipment and facility abnormal operation management platform is obtained as operation status data; when the real-time property equipment and facility change information is less than the first-level real-time property equipment and facility change setting value and greater than the second-level real-time property equipment and facility change setting value, the status data of the property equipment and facility abnormal operation management platform is obtained as measurement status data; when the real-time property equipment and facility change information is equal to the second-level real-time property equipment and facility change setting value, compare the facility operation feedback signal information with the preset facility operation feedback signal setting value. When the facility operation feedback signal information is greater than the first facility operation feedback signal setting value and less than the second facility operation feedback signal setting value, the status data of the property equipment and facility abnormal operation management platform is obtained as operation abnormal status data.
Citation Information
Patent Citations
Smart home security method based on Internet of Things technology
CN104407517A
Internet of things-based property security and protection management system and method
CN107703849A
An intelligent community property management system
CN109922450A