Vertical Freezing - Shield Tunnel Construction Method for Crossing Ventilation Shaft in Mengtui Station Section
By using a vertical freezing-Montui-passing-station tunnel system with ventilation shafts, and employing freezing pipe structures, layered backfilling, and portal slag removal technology, the problem of ventilation shaft crossing during shield tunneling was solved, enabling the shield machine to cross quickly and safely and improving construction efficiency.
Patent Information
- Application Number
- CN202410408692.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-04-07
- Publication Date
- 2026-11-10
- Estimated Expiration
- 2044-04-07
AI Technical Summary
During shield tunneling, especially under complex geological and hydrological conditions, problems such as collapse and leakage are prone to occur when the shield is launched or received. Furthermore, the shield tunneling through ventilation shafts presents challenges due to the limited construction environment, making it difficult to achieve rapid and safe passage.
The vertical freezing-Montui tunnel crossing section ventilation shaft shield tunnel system is adopted, including new freezing pipe structure, segmented chiseling and simultaneous layered backfilling and counter-pressure of ventilation shaft portal, temporary sealing of reserved holes and removal of negative ring for portal slag removal and sealing, etc., to form a freezing curtain and ensure the smooth passage of the shield machine.
Through the ingenious design of the freezing pipe and the layered backfilling technology, the tunnel boring machine was able to pass through the ventilation shaft quickly and safely, reducing the difficulty of removing the freezing pipe, ensuring the tunnel alignment and construction safety, avoiding the need for a secondary starting reaction frame device, and improving construction efficiency.
Smart Images

Figure CN118375432B_ABST
Abstract
Description
Technical Field
[0001] This invention belongs to the field of tunnel engineering, and in particular relates to a vertical freezing-Montui cross-station ventilation shaft shield tunnel and its construction method. Background Technology
[0002] With the continuous development of underground space and transportation, my country's rail transit construction has entered a stage of vigorous development, and the shield tunneling method is a widely used construction technique in rail transit construction. As a new type of subway tunnel construction method, the shield tunneling method has advantages such as fast construction efficiency, minimal disturbance to the surrounding environment, and strong adaptability to geological formations.
[0003] During the construction of subway tunnels using shield tunneling, complex geological and hydrological conditions make the shield highly susceptible to collapse and leakage during launch and reception. Reinforcement of the launch and reception ends is essential for shield tunneling, and this reinforcement must meet the strength requirements, stability, and permeability of the soil. Freezing methods, due to their good water-stopping properties, high frozen soil strength, and adaptability to complex strata, have become a crucial reinforcement method. Using freezing pipes to transfer low temperatures to the soil and rock mass creates a frozen curtain, which is particularly effective in reinforcing complex strata, controlling deformation of nearby soil, and improving the strength of the surrounding rock in the excavation area. Furthermore, due to limitations imposed by the construction environment and surrounding conditions, shield tunneling through ventilation shafts presents certain challenges. Therefore, solving the problem of enabling shield tunneling to quickly and safely pass through intermediate ventilation shafts constrained by the construction environment is a pressing technical challenge that needs to be addressed. Summary of the Invention
[0004] The purpose of this invention is to overcome the shortcomings of the prior art and provide a vertical freezing-Montui overpass tunnel ventilation shaft tunnel and its construction method.
[0005] This vertical freezing-Montui-passing-station-crossing-section ventilation shaft shield tunnel system includes a new freezing pipe structure system, a ventilation shaft portal segmented chiseling and synchronous layered backfilling counter-pressure system, a middle plate reserved hole temporary sealing system, and a portal slag removal and sealing negative ring removal system.
[0006] The new freezing pipe structure system includes freezing pipes; the outer edge of the freezing pipe is provided with a liquid inlet, and the middle of the freezing pipe is provided with a liquid outlet. The lower part of the multi-row new freezing pipe structure system is located outside the water-stop curtain at the tunnel entrance, forming a freezing curtain.
[0007] The ventilation shaft portal segmented excavation and synchronous layered backfilling counter-pressure system includes reserved holes, first layer backfill, second layer backfill, third layer backfill, and grouting pipes;
[0008] The ventilation shaft's central plate has pre-reserved holes, and a temporary sealing system for these holes is used to temporarily seal them.
[0009] The portal slag removal and sealing negative ring demolition system includes negative ring segments, battery-powered vehicles, arc-shaped steel plates, and segment hoisting connectors. The negative ring segments form a tunnel in the ventilation shaft, the battery-powered vehicles move within the tunnel, and the segment hoisting connectors penetrate and fix the negative ring segments to be hoisted.
[0010] Preferably, the novel freezing pipe structure system is arranged in multiple rows perpendicularly on the outside of the portal water-stop curtain, forming a freezing curtain after freezing; vertical temperature measuring holes and horizontal temperature measuring holes are respectively provided at the two side boundaries of the freezing curtain.
[0011] Preferably, the ventilation shaft includes ventilation shaft structural columns, ventilation shaft structural beams, ventilation shaft bottom plate, ventilation shaft side walls, and ventilation shaft middle plate. The ventilation shaft structural columns are located at the bottom of the ventilation shaft bottom plate, the ventilation shaft structural beams are located at the ventilation shaft side walls, and the ends of the ventilation shaft middle plate are fixed to the ventilation shaft structural beams. The ventilation shaft side walls are provided with receiving portals. The inner side of the receiving portals is provided with horizontally arranged probe holes, and the outer side is provided with ordinary pipe segments, grouting layer, portal steel ring, and portal insulation layer in sequence.
[0012] As a preferred embodiment, the temporary sealing system for the reserved holes in the medium plate includes angle steel, steel plate, steel plate backing beam, bolts and gaskets; the reserved holes are surrounded by hole edge reinforcement sections; the angle steel is anchored to the hole edge reinforcement sections, the steel plate is fully welded to the angle steel to cover the reserved holes, and the steel plate backing beam is fixed to the steel plate by pre-embedded bolts and gaskets.
[0013] The construction method for this vertical freezing-Montui overpass tunnel system includes the following steps:
[0014] Step 1: Install portal steel rings on the side wall of the ventilation shaft; set up a water-stop curtain and a new type of freezing pipe structure system to locally freeze the strata and form a freezing curtain;
[0015] Step 2: Construct a concrete curved guide platform on the bottom slab of the ventilation shaft;
[0016] Step 3: Remove the receiving portal in two stages inside the ventilation shaft, and backfill through the pre-reserved holes in the ventilation shaft slab; temporarily seal the pre-reserved holes in the slab during construction;
[0017] Step 4: Circulate hot brine in the freezing pipes of the new freezing pipe structure system to loosen the perimeter of the freezing pipes, and remove all freezing pipes within the cross-section of the tunnel boring machine in one go.
[0018] Step 5: The tunnel boring machine enters the concrete curved guide platform through the receiving portal until it leaves the ventilation shaft through the receiving portal on the other side; assemble the negative ring segments within the ventilation shaft area;
[0019] Step 6: Open the reserved holes, clean the backfill soil layer by layer, and remove the negative ring segments from top to bottom.
[0020] As a preferred embodiment, step one specifically involves the following: the ventilation shaft includes ventilation shaft structural columns, ventilation shaft structural beams, a ventilation shaft bottom plate, ventilation shaft side walls, and a ventilation shaft middle plate. The ventilation shaft structural columns are located at the bottom of the ventilation shaft bottom plate, the ventilation shaft structural beams are located at the ventilation shaft side walls, and the ends of the ventilation shaft middle plate are fixed to the ventilation shaft structural beams. Before the shield tunnel passes through the ventilation shaft, the outline of the receiving tunnel entrance is positioned on the ventilation shaft side wall, and the entrance steel ring is installed. A water-stop curtain is set outside the receiving tunnel entrance, and three rows of new freezing pipe structure systems are arranged crosswise outside the water-stop curtain to locally freeze the strata, forming a freezing curtain. Vertical temperature measuring holes, horizontal temperature measuring holes, and probe holes are drilled to detect the freezing effect.
[0021] Preferably, the ventilation shaft slab has pre-reserved holes. Step three specifically involves chiseling the receiving door in two stages within the ventilation shaft. The first chiseling is carried out from top to bottom, starting with the middle and then the sides, mainly removing the outer protective layer of concrete and cutting off the outer reinforcing bars of the receiving door. The second chiseling is carried out in three sections, starting from bottom to top, starting with the middle and then the sides, mainly removing the remaining concrete structure of the receiving door. After each section is chiseled, backfill with silty sand and water through the pre-reserved holes for counter-pressure backfilling. Only after the backfilling is compacted can the next section of concrete be chiseled. In the silty sand backfilling and water counter-pressure backfilling in step three, grouting pipes with grouting holes are pre-embedded at the four corners of the ventilation shaft, with the grouting pipes reaching the bottom slab of the ventilation shaft. After each layer of silty sand is backfilled, water pumps are placed at the four corners of the ventilation shaft slab to add water and flush sand into the ventilation shaft through the pre-reserved holes until the backfill is compacted, and then excess water is pumped out.
[0022] Preferably, the temporary sealing system for pre-reserved holes in the medium plate includes angle steel, steel plate, steel plate backing beam, bolts, and gaskets; a hole edge reinforcement section is provided around the pre-reserved hole; the angle steel is anchored to the hole edge reinforcement section, the steel plate is fully welded to the angle steel to cover the pre-reserved hole, and the steel plate backing beam is fixed to the steel plate by pre-embedded bolts and gaskets; in step three, the temporary sealing system for pre-reserved holes in the medium plate is constructed by temporarily sealing the pre-reserved hole with steel plate, the steel plate and the angle steel are fully welded together, and then the steel plate backing beam is installed on top of the steel plate; when the backfill in the ventilation shaft is not compacted or there are local voids, grouting is carried out later through pre-embedded grouting pipes.
[0023] Preferably, the novel freezing pipe structure system includes an inlet, an outlet, an annular insulation material layer, an annular brine bladder, and a freezing pipe. Both the inlet and outlet are located along the length of the freezing pipe. The inlet is located at the outer edge of the freezing pipe, and the outlet is located in the middle. The annular insulation material layer is sealed and wrapped around the upper non-frozen section of the freezing pipe, and the annular brine bladder is sealed and wrapped around the lower frozen section. In step four, hot brine circulates within the freezing pipe of the novel freezing pipe structure system, causing the brine in the annular brine bladder to melt rapidly, reducing the bladder's volume and loosening the perimeter of the freezing pipe. All freezing pipes within the shield machine's cross-section are then removed in one go. After removal, the remaining holes are promptly backfilled with cement mortar.
[0024] Preferably, step five involves the tunnel boring machine advancing along the thrust direction, entering the concrete arc-shaped guide platform through the receiving portal, and exiting the ventilation shaft through the receiving portal on the other side. During this process, the negative ring segments within the ventilation shaft area are assembled using a continuous joint method. The top negative ring segments consist of K segments, which are placed at the top of the tunnel. The negative ring segments at the receiving portal are backed with steel plates. A grouting layer is formed by injecting a dual-liquid grout into the back wall of the segments, thus initially sealing the receiving portal. Step six involves opening the pre-reserved holes and symmetrically cleaning layer by layer. To clean the backfill, first remove the upper half of the negative ring segment, then use the segment hoisting connector to clamp segment K through it. The segment hoisting connector is lifted by a hand-operated hoist. Then remove the lower half of the negative ring segment, and use a battery-powered vehicle to transport the segments and backfill horizontally to the wellhead. In step six, when the slag is cleared in layers to the receiving tunnel entrance, an arc-shaped steel plate is used to weld and connect the backing steel plate segment and the tunnel entrance steel ring until the entire tunnel ring is sealed. The arc-shaped steel plate is pre-installed with grouting ball valves. During this process, the grouting layer is further filled and compacted through the pre-installed grouting ball valves on the arc-shaped steel plate.
[0025] The beneficial effects of this invention are:
[0026] 1) This invention innovates the structure of the freezing pipe. The inlet is located on the outer edge of the pipe structure, and the outlet is located in the middle. The ingenious spatial design helps to give full play to the low-temperature freezing characteristics of brine and improve the freezing effect. The insulation material layer of the upper non-freezing section reduces unnecessary loss of cold energy, while the brine annular bag in the lower freezing section is lowered synchronously with the freezing pipe after the hole is formed. Taking advantage of the low freezing and melting points of brine, the brine in the bag can be quickly melted after heating inside the pipe. After the solid to liquid state, the volume decreases and the freezing pipe loosens around its perimeter, which facilitates the rapid removal of the freezing pipe within the cross-section of the tunnel boring machine.
[0027] 2) This invention adopts the technology of segmented chiseling and synchronous layered backfilling and counter-pressure of ventilation shaft portal. After the portal is chiseled in segments, silty sand is used to backfill the bottom layer of the ventilation shaft through the reserved holes. The backfill soil is then watered and compacted in layers to ensure the balance of water and soil pressure inside and outside the ventilation shaft.
[0028] 3) This invention adopts the technology of temporarily sealing the reserved holes in the middle plate. After backfilling and counter-pressure at the bottom layer of the ventilation shaft, it forms a closed system, which enables the shield to smoothly push through the ventilation shaft. This makes it possible to launch the shield for the second time without the need to set up a reaction frame device. The reaction force can be provided by the formed tunnel after the segments are assembled, resulting in a good overall tunnel alignment.
[0029] 4) This invention adopts the technology of tunnel portal cleaning, sealing, and negative ring removal. Through layered cleaning, sealing of the tunnel portal, and removal of the negative ring, the tunnel portal is quickly sealed and the interior of the shaft is cleaned and restored after the shield tunnel passes through the ventilation shaft. Attached Figure Description
[0030] Figure 1 This is a structural diagram of a freezer tube;
[0031] Figure 2 yes Figure 1 Cross-sectional view of the unfrozen section of the AA freezing pipe;
[0032] Figure 3 yes Figure 1 Cross-sectional view of the frozen section of the BB freezing pipe;
[0033] Figure 4 This is a plan view of the vertical freezing pipes;
[0034] Figure 5 yes Figure 4 CC section diagram in the middle;
[0035] Figure 6 This is a schematic diagram of the cross-section of the receiving tunnel portal;
[0036] Figure 7 This is a schematic diagram of the longitudinal section of the area to be excavated at the entrance to the receiving tunnel;
[0037] Figure 8 This is a schematic diagram showing the sequence of the first tunnel entrance removal.
[0038] Figure 9 This is a schematic diagram of the second tunnel entrance removal sequence;
[0039] Figure 10 This is a schematic diagram of the backfill cross-section of the ventilation shaft;
[0040] Figure 11 This is a cross-sectional structural diagram of the grouting pipe;
[0041] Figure 12 This is a schematic diagram of the layered backfill soil with water flushing.
[0042] Figure 13 This is a schematic diagram of the temporary sealing system for pre-reserved holes in the ventilation shaft's central plate;
[0043] Figure 14This is a schematic cross-sectional view of the temporary sealing system for the reserved holes in the ventilation shaft's central plate;
[0044] Figure 15 This is a schematic diagram of the cross-section of the tunnel portal slag removal and sealing negative ring demolition system;
[0045] Figure 16 This is a schematic diagram of the longitudinal section of the tunnel portal sealing.
[0046] Figure 17 This is a schematic diagram of the segment hoisting connection components;
[0047] Figure 18 This is a schematic diagram of the hoisting of segment K.
[0048] In the diagram: 1-New type of freezing pipe structure system, 101-Inlet, 102-Outlet, 103-Annular insulation material layer, 104-Annular brine bag, 105-Freezing pipe, 201-First layer of backfill, 202-Second layer of backfill, 203-Third layer of backfill, 204-Grouting pipe, 301-Angle steel, 302-Steel plate, 303-Steel plate backing beam, 304-Screw rod, 305-Gasket 1, 401-Negative ring segment, 402-Battery vehicle, 4021-Battery vehicle roller, 403-Arc-shaped steel plate, 404-Backing steel plate, 405-Segment hoisting connector, 4051-Hoisting hole, 4052-Iron plate hoist, 4053-Thread, 4054-Gasket 2, 4055-Nut, 5-Waterstop 6-Vertical temperature measuring hole, 7-Receiving portal, 8-Frozen curtain, 9-Horizontal temperature measuring hole, 10-Exploration hole, 11-Portal steel ring, 12-Grouting layer, 13-Ordinary segment, 14-Portal insulation layer, 15-Ventilation shaft structural column, 16-Ventilation shaft structural beam, 17-Ventilation shaft bottom plate, 18-Ventilation shaft side wall, 19-Ventilation shaft middle plate, 20-Reserved hole, 21-Reinforced section at the edge of the hole, 22-Grouting hole, 23-Water pipe, 24-Railway, 25-Railway sleeper, 26-Cleared slag, 27-K-block segment, 28-Steel plate backing segment, 29-Grouting ball valve, 30-Hand-operated hoist, 31-First excavation range, 32-Second excavation range, 33-Tunnel centerline, 34-Shield tunneling direction, 35-Concrete arc-shaped guide platform. Detailed Implementation
[0049] The present invention will be further described below with reference to embodiments. The description of the embodiments below is only for the purpose of helping to understand the present invention. It should be noted that those skilled in the art can make several modifications to the present invention without departing from the principle of the present invention, and these improvements and modifications also fall within the protection scope of the claims of the present invention.
[0050] Example 1
[0051] As one example, this method for constructing a large-diameter shield tunnel through a vertical freezing-Montui station crossing section ventilation shaft includes the following steps:
[0052] Step 1: Before the shield tunnel passes through the ventilation shaft, locate the outline of the receiving portal 7 on the side wall 18 of the ventilation shaft and install the portal steel ring 11; set up a water-stop curtain 5 on the outside of the receiving portal 7, and arrange three rows of new freezing pipe structure system 1 on the outside of the water-stop curtain 5 to locally freeze the stratum, forming a freezing curtain 8; drill vertical temperature measuring holes 6, horizontal temperature measuring holes 9 and probe holes 10 to test the freezing effect.
[0053] Step 2: Construct a concrete arc-shaped guide platform 35 on the bottom plate 17 of the ventilation shaft. The cross-sectional shape of the guide platform is similar to that of the shield machine shell, and the radius is the same as that of the shield machine cutting ring.
[0054] Step 3: Segmented removal and simultaneous layered backfilling of the counter-pressure system for the construction ventilation shaft portal. The receiving portal 7 is removed in two stages within the ventilation shaft. The first stage, covering area 31, is carried out from top to bottom, starting with the middle and then the sides, primarily removing the outer protective layer of concrete and cutting off the outer reinforcing steel bars. The second stage, covering area 32, is removed in three segments, from bottom to top, starting with the middle and then the sides, primarily removing the remaining concrete structure of the receiving portal 7. After each segment is removed, it is immediately backfilled with silty sand through the pre-reserved holes 20 and then filled with water for counter-pressure backfilling. Only after the backfill is compacted can the next segment of concrete removal proceed.
[0055] After each layer of silty sand is backfilled, water pumps are placed at the four corners of the ventilation shaft slab 19. Water is added into the ventilation shaft through the reserved holes 20 to flush away the sand until the backfill is compacted, and then excess water is pumped out. During backfilling, grouting pipes 204 with grouting holes 22 are pre-embedded at the four corners of the ventilation shaft, with the grouting pipes 204 extending to the bottom slab 17 of the ventilation shaft.
[0056] After backfilling is completed, a temporary sealing system is implemented for the pre-reserved holes in the slab during construction. The pre-reserved holes 20 are temporarily sealed using steel plate 302, with the steel plate 302 and angle steel 301 fully welded together. Subsequently, a steel plate backing beam 303 is installed above the steel plate 302. If the backfill in the ventilation shaft is not compacted or if there are local voids, subsequent grouting can be performed through pre-embedded grouting pipes 204.
[0057] Step 4: Remove the freezing pipes. Circulate hot brine within the freezing pipe 105 to rapidly melt the brine in the annular brine bag 104, reducing the bag's volume and loosening the perimeter of the freezing pipe 105. Remove all freezing pipes within the tunnel boring machine's cross-section in one go. After removal, promptly backfill the remaining holes with cement mortar.
[0058] Step 5: The tunnel boring machine advances along the thrust direction 34, passing through the receiving portal 7 onto the concrete arc-shaped guide platform 35, until it exits the ventilation shaft through the receiving portal 7 on the other side. During this process, the negative ring segments 401 within the ventilation shaft area are assembled using a continuous joint method, with K segments 27 placed at the top of the tunnel. The negative ring segments at the receiving portal 7 are backed with steel plate segments 28. A grouting layer 12 is formed by injecting grout into the back wall of the segments using a dual-liquid grout, thus initially sealing the receiving portal.
[0059] Step 6: The reaction force used by the tunnel boring machine to start again from the ventilation shaft section is provided by the pre-assembled pre-formed tunnel segments. After the shield tail leaves the ventilation shaft, the reserved hole 20 is opened, and the backfill soil in the ventilation shaft is cleaned symmetrically layer by layer.
[0060] When the slag is cleared in layers to the depth of the receiving portal 7, the backing steel plate segment 28 and the portal steel ring 11 are welded together using arc-shaped steel plates 403 until the entire portal ring is sealed. During this process, the grouting layer 12 is further filled and compacted through the grouting ball valve 29 pre-installed in the arc-shaped steel plates 403.
[0061] When the slag is cleared in layers to the depth of the negative ring segment 401, the upper part of the negative ring segment 401 is removed first. The segment hoisting connector 405 is used to clamp the K segment 27 through the segment. The hand hoist 30 is used to lift the segment. Then the lower part of the negative ring segment 401 is removed. The segment and backfill soil are transported horizontally to the wellhead using the battery vehicle 402.
[0062] Example 2
[0063] As another embodiment, this second embodiment, based on the first embodiment, proposes a vertical freezing-Montek over-station tunnel ventilation shaft shield tunnel system, such as... Figures 1 to 18 As shown, it includes a new type of freezing pipe structure system 1, a ventilation shaft portal segmented chiseling and synchronous layered backfilling counter-pressure system 2, a medium plate reserved hole temporary sealing system 3, and a portal slag removal and sealing negative ring removal system 4;
[0064] like Figure 1 , Figure 2 and Figure 3 As shown, the novel freezing pipe structure system 1 includes an inlet 101, an outlet 102, an annular insulation material layer 103, an annular brine bladder 104, and a freezing pipe 105. The inlet 101 is located at the outer edge of the pipe structure, and the outlet 102 is located in the middle position, which is conducive to making full use of the lower temperature of the brine entering the freezing pipe. The upper non-freezing section is provided with an annular insulation material layer 103, and a vertical local freezing method is adopted to reduce unnecessary loss of cold energy. The lower freezing section is wrapped with a sealed annular brine bladder 104, which is lowered synchronously with the freezing pipe after being perforated. Taking advantage of the low freezing and melting points of brine, the brine in the bladder can be quickly melted after heating inside the pipe. After the solid to liquid state, the volume decreases, and the freezing pipe loosens around its perimeter, making it easy to quickly remove the freezing pipe within the cross-section of the tunnel boring machine.
[0065] like Figure 4 , Figure 5 and Figure 6 As shown, the new freezing pipe structure system 1 is arranged behind the water-stop curtain 5 at the tunnel entrance. The freezing pipes are arranged in three rows in a cross pattern. Three vertical temperature measuring holes 6 are set at the left and right boundaries of the freezing pipes. A certain number of horizontal temperature measuring holes 9 are arranged at the left and right boundaries of the freezing curtain 8 formed by the receiving tunnel entrance 7. A certain number of probe holes 10 are arranged in the circumference and middle of the receiving tunnel entrance 7. The probe holes 10 are drilled through the trench wall using a drilling machine. The depth of the probe holes 10 into the frozen soil is controlled at 5-10cm. The temperature is measured using a high-precision thermometer or thermometer. The actual temperature of each probe hole 10 must be lower than -5℃. The horizontal temperature measuring holes 9, probe holes 10 and the new freezing pipe structure system 1 do not intersect. The receiving tunnel entrance 7 is provided with ordinary pipe segments 13, grouting layer 12 and tunnel entrance steel ring 11 from the inside to the outside. When constructing in high-temperature weather, a tunnel entrance insulation layer 14 needs to be laid on the trench wall. The tunnel entrance insulation layer 14 is made of plastic foam soft board.
[0066] like Figure 7 As shown, the receiving portal 7 was excavated in two stages. The first excavation of area 31 was carried out vertically from top to bottom, starting with the middle and then moving to the sides. Figure 8 As shown; the second removal area 32 adopts a segmented removal method from bottom to top, as follows: Figure 9 As shown.
[0067] like Figure 10 , Figure 11 and Figure 12 As shown, during the second excavation of the receiving portal 7, silty sand was simultaneously used for backfilling and water injection to ensure that the water and soil pressure inside and outside the tunnel boring machine remained balanced after entering the ventilation shaft. After each section of silty sand was backfilled, water was added at the backfill opening to flush away the sand. Water pumps were placed at the four corners of the ventilation shaft's central plate to pump out excess water. This layered compaction was carried out to avoid local voids and incomplete backfilling. The silty sand backfilling was carried out in three layers. The ventilation shaft includes ventilation shaft structural columns 15, ventilation shaft structural beams 16, ventilation shaft bottom plate 17, and ventilation shaft... Side wall 18, ventilation shaft middle plate 19, reserved holes 20 and hole edge reinforcement section 21; ventilation shaft structural column 15 is set at the bottom of ventilation shaft bottom plate 17, ventilation shaft structural beam 16 is set at ventilation shaft side wall 18, ventilation shaft middle plate 19 end and ventilation shaft structural beam 16 are fixed, ventilation shaft middle plate 19 is provided with reserved holes 20; when backfilling with sand, grouting pipes 204 with grouting holes 22 are pre-embedded at the four corners of the ventilation shaft to prevent local voids and incomplete backfilling, the depth of grouting pipes 204 reaches the ventilation shaft bottom plate 17.
[0068] like Figure 13 and Figure 14As shown, L50mm angle steel 301 is pre-embedded around the reserved hole 20, and a 2cm steel plate 302 is used for temporary sealing. The gap between the steel plate 302 and the ventilation shaft plate 19 is fully sealed by welding the pre-embedded angle steel 301. A screw rod 304 is pre-embedded along the length direction to facilitate the later installation of the steel plate backing beam 303.
[0069] like Figure 15 As shown, when cleaning the slag at the tunnel entrance, the reserved hole 20 on the ventilation shaft plate 19 must be opened first, and the slag and backfill soil must be cleaned and cleaned symmetrically layer by layer. Priority should be given to cleaning the slag at the tunnel entrance. Then, the upper part of the negative ring segment 401 of this part should be removed. All other slag cleaning is carried out inside the tunnel. The electric vehicle 402 transports the slag horizontally. The electric vehicle 402 slides on the track 24 through the electric vehicle rollers 4021. The track sleepers 25 are laid under the track 24.
[0070] like Figure 16 As shown, during the layered slag removal in the ventilation shaft, the backing steel plate segment 28 of the shield ordinary segment 13 of the tunnel portal section is simultaneously welded to the tunnel portal steel ring 11 until the entire tunnel ring is sealed. The arc-shaped steel plate 403 is equipped with a grouting ball valve 29, which is used to fill the gaps around the tunnel portal segment.
[0071] like Figure 17 and Figure 18 As shown, the segment hoisting connector 405 includes a hoisting hole 4051, a steel plate hoist 4052, a thread 4053, a second washer 4054, and a nut 4055. The segment hoisting connector 405 passes through the negative ring segment 401. The thread 4053 is located at the bottom of the segment hoisting connector 405. The nut 4055 and the second washer 4054 are fixed below the negative ring segment 401. The steel plate hoist 4052 is fixed on the segment hoisting connector 405 above the negative ring segment 401. The hoisting hole 4051 is located at the top of the segment hoisting connector 405. K segments 27 are clamped by the upper steel plate hoist 4052 and the lower washer 4054 and nut 4055. A special hoisting tool passes through the hoisting hole 4051, and a hand-operated hoist 30 lifts the segment.
[0072] It should be noted that the parts in this embodiment that are the same as or similar to those in Embodiment 1 can be referred to each other, and will not be repeated in this application.
[0073] The various embodiments in this specification are described in a progressive manner, with each embodiment focusing on the differences from other embodiments. The same or similar parts between the various embodiments can be referred to each other.
Claims
1. A vertical freezing-Montui overpass tunnel system for ventilation shafts in a tunnel section, characterized in that: This includes a new type of freezing pipe structure system, a ventilation shaft portal segmented chiseling and synchronous layered backfilling counter-pressure system, a medium plate reserved hole temporary sealing system, and a portal slag removal and sealing negative ring removal system; The new freezing pipe structure system includes freezing pipes; the outer edge of the freezing pipe is provided with a liquid inlet, and the middle of the freezing pipe is provided with a liquid outlet. The lower part of the multi-row new freezing pipe structure system is located outside the water-stop curtain at the tunnel entrance, forming a freezing curtain. The ventilation shaft portal segmented excavation and synchronous layered backfilling counter-pressure system includes reserved holes, first layer of backfill soil, second layer of backfill soil, third layer of backfill soil, and grouting pipes; The ventilation shaft's central plate has pre-reserved holes, and a temporary sealing system for these holes is used to temporarily seal them. The portal cleaning and sealing negative ring demolition system includes negative ring segments, battery-powered vehicles, arc-shaped steel plates, and segment hoisting connectors. The negative ring segments form a tunnel in the ventilation shaft, the battery-powered vehicles move in the tunnel, and the segment hoisting connectors penetrate and fix the negative ring segments to be hoisted. The novel freezing pipe structure system is arranged in multiple rows of intersecting vertically on the outside of the portal water-stop curtain, forming a freezing curtain after freezing; vertical temperature measuring holes and horizontal temperature measuring holes are respectively provided at the two side boundaries of the freezing curtain. The ventilation shaft includes ventilation shaft structural columns, ventilation shaft structural beams, ventilation shaft bottom plate, ventilation shaft side walls, and ventilation shaft middle plate. The ventilation shaft structural columns are located at the bottom of the ventilation shaft bottom plate, the ventilation shaft structural beams are located at the ventilation shaft side walls, and the ends of the ventilation shaft middle plate are fixed to the ventilation shaft structural beams. The ventilation shaft side walls are provided with receiving portals. The inner side of the receiving portals is provided with horizontally arranged probe holes, and the outer side is provided with ordinary pipe segments, grouting layer, portal steel ring, and portal insulation layer in sequence. The temporary sealing system for pre-reserved holes in the medium plate includes angle steel, steel plate, steel plate backing beam, bolts and gaskets; the pre-reserved holes are surrounded by hole edge reinforcement sections; the angle steel is anchored to the hole edge reinforcement sections, the steel plate is fully welded to the angle steel to seal and cover the pre-reserved holes, and the steel plate backing beam is fixed to the steel plate by pre-embedded bolts and gaskets.
2. The construction method of the vertical freezing-Montui overpass tunnel system for the ventilation shaft crossing section as described in claim 1, characterized in that, Includes the following steps: Step 1: Install portal steel rings on the side wall of the ventilation shaft; set up a water-stop curtain and a new type of freezing pipe structure system to locally freeze the strata and form a freezing curtain; Step 2: Construct a concrete curved guide platform on the bottom slab of the ventilation shaft; Step 3: Remove the receiving portal in two stages inside the ventilation shaft, and backfill through the pre-reserved holes in the ventilation shaft slab; temporarily seal the pre-reserved holes in the slab during construction; Step 4: Circulate hot brine in the freezing pipes of the new freezing pipe structure system to loosen the perimeter of the freezing pipes, and remove all freezing pipes within the cross-section of the tunnel boring machine in one go. Step 5: The tunnel boring machine enters the concrete curved guide platform through the receiving portal until it leaves the ventilation shaft through the receiving portal on the other side; assemble the negative ring segments within the ventilation shaft area; Step 6: Open the reserved holes, clean the backfill soil layer by layer, and remove the negative ring segments from top to bottom.
3. The construction method of the vertical freezing-Montui overpass tunnel system for the ventilation shaft crossing section according to claim 2, characterized in that: Step one specifically involves the following: The ventilation shaft includes ventilation shaft structural columns, ventilation shaft structural beams, ventilation shaft bottom plate, ventilation shaft side walls, and ventilation shaft middle plate. The ventilation shaft structural columns are located at the bottom of the ventilation shaft bottom plate, the ventilation shaft structural beams are located at the ventilation shaft side walls, and the ends of the ventilation shaft middle plate are fixed to the ventilation shaft structural beams. Before the shield tunnel passes through the ventilation shaft, the outline of the receiving tunnel entrance is positioned on the ventilation shaft side wall, and the entrance steel ring is installed. A water-stop curtain is set outside the receiving tunnel entrance, and three rows of new freezing pipe structure systems are arranged crosswise outside the water-stop curtain to locally freeze the strata, forming a freezing curtain. Vertical temperature measuring holes, horizontal temperature measuring holes, and probe holes are drilled to detect the freezing effect.
4. The construction method of the vertical freezing-Montui overpass tunnel system for the ventilation shaft crossing section according to claim 2, characterized in that: The ventilation shaft slab has pre-reserved holes. Step three specifically involves chiseling the receiving door in two stages within the ventilation shaft. The first chiseling is carried out from top to bottom, starting with the middle and then the sides, mainly removing the outer protective layer of concrete and cutting off the outer reinforcing bars of the receiving door. The second chiseling is carried out in three sections, starting from bottom to top, starting with the middle and then the sides, mainly removing the remaining concrete structure of the receiving door. After each section is chiseled, backfill with silty sand and water through the pre-reserved holes for counter-pressure backfilling. Only after the backfilling is compacted can the next section of concrete be chiseled. In the silty sand backfilling and water counter-pressure backfilling in step three, grouting pipes with grouting holes are pre-embedded at the four corners of the ventilation shaft, with the grouting pipes reaching the bottom slab of the ventilation shaft. After each layer of silty sand is backfilled, water pumps are placed at the four corners of the ventilation shaft slab to add water and flush sand into the ventilation shaft through the pre-reserved holes until the backfill is compacted, and then the excess water is pumped out.
5. The construction method of the vertical freezing-Montui overpass tunnel system for the ventilation shaft crossing section according to claim 2, characterized in that: The temporary sealing system for pre-reserved holes in the medium plate includes angle steel, steel plate, steel plate backing beam, bolts, and gaskets. Reinforcement sections are provided around the pre-reserved holes. The angle steel is anchored to the reinforcement sections, and the steel plate is fully welded to the angle steel to cover the pre-reserved holes. The steel plate backing beam is fixed to the steel plate using pre-embedded bolts and gaskets. In step three, the temporary sealing system for pre-reserved holes in the medium plate is constructed by temporarily sealing the pre-reserved holes with steel plates. The steel plate and angle steel are fully welded together, and then the steel plate backing beam is installed above the steel plate. When the backfill in the ventilation shaft is not compacted or there are local voids, grouting is performed later through pre-embedded grouting pipes.
6. The construction method of the vertical freezing-Montui overpass tunnel system for the ventilation shaft crossing section according to claim 2, characterized in that: The novel freezing pipe structure system includes an inlet, an outlet, an annular insulation material layer, an annular brine bladder, and a freezing pipe. Both the inlet and outlet are located along the length of the freezing pipe. The inlet is positioned at the outer edge of the freezing pipe, and the outlet is located in the middle. The annular insulation material layer is sealed around the upper, non-frozen section of the freezing pipe, and the annular brine bladder is sealed around the lower, frozen section. In step four, hot brine circulates within the freezing pipe of the novel freezing pipe structure system, causing the brine in the annular brine bladder to melt rapidly, reducing the bladder's volume and loosening the perimeter of the freezing pipe. All freezing pipes within the tunnel boring machine's cross-section are then removed in one go. After removal, the remaining holes are promptly backfilled with cement mortar.
7. The construction method of the vertical freezing-Montui overpass tunnel system for the ventilation shaft crossing section according to claim 2, characterized in that: Step five specifically involves the tunnel boring machine advancing along the thrust direction, entering the concrete arc-shaped guide platform through the receiving portal, and exiting the ventilation shaft through the receiving portal on the other side. During this process, the negative ring segments within the ventilation shaft area are assembled using a continuous joint method. The top negative ring segments consist of K segments, which are placed at the top of the tunnel. The negative ring segments at the receiving portal are backed with steel plates. A grouting layer is formed by injecting a dual-liquid grout into the back wall of the segments, initially sealing the receiving portal. Step six specifically involves opening the pre-reserved holes and symmetrically cleaning back the tunnel layer by layer. For backfilling, first remove the upper half of the negative ring segment, then use the segment hoisting connector to clamp segment K through it. The segment hoisting connector is lifted by a hand-operated hoist. Then remove the lower half of the negative ring segment, and use a battery-powered vehicle to transport the segments and backfill soil horizontally to the wellhead. In step six, when the slag is cleared in layers to the receiving tunnel entrance, arc-shaped steel plates are used to weld and connect the backing steel plate segment and the tunnel entrance steel ring until the entire tunnel ring is sealed. The arc-shaped steel plate is pre-installed with grouting ball valves. During this period, the grouting layer is further filled and compacted through the pre-installed grouting ball valves on the arc-shaped steel plate.
Citation Information
Patent Citations
Construction method enabling shield tunneling machine to underneath pass through existing station to start
CN110924961A
Shield split launching construction method for narrow launching working well combined with mine tunnel
CN116537799A