Distributed photovoltaic new energy grid-connected access control method and system
Through networking requests and link quality evaluation between edge computing terminals and grid-connected control nodes, combined with probability functions, automated access and orderly management of distributed photovoltaic new energy is realized, and the cumbersome problem of traditional manual access is solved. , improve access efficiency and standardization.
Patent Information
- Application Number
- CN202410841534.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-06-27
- Publication Date
- 2024-11-15
AI Technical Summary
The traditional manual access method in the prior art has led to the complicated access work of massive intelligent terminals and distributed new energy grid-connected switches in large-scale station areas and the inability to achieve timely updates, the degree of standardization is not high, and the associated topology maintenance is difficult.
Through multiple edge computing terminals and grid-connected control nodes, network-group request frames are sent to each other, link quality is obtained, adjoining link tables are established, and orderly control of new energy grid-connected by introducing probability functions, supporting plug-in and action-oriented control Use, actively organize networks, register and configure proactively to ensure the rapid deployment and high concurrent access of distributed new energy grid connection.
It realizes the rapid deployment and high concurrent access of distributed new energy grid connection, supports orderly control of large-scale distributed new energy grid connection, reduces manual intervention, and improves access efficiency and standardization.
Smart Images

Figure CN118971115A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of power grid network security, and in particular to a distributed photovoltaic new energy grid-connected access control method and system. Background Art
[0002] The current power distribution Internet of Things has formed a "cloud-pipe-edge-end" system architecture. The introduction of edge computing devices such as massive intelligent terminals in substations and end devices such as new smart meters can provide a large amount of status monitoring data and user energy consumption information for the power distribution Internet of Things, thereby providing a reliable decision-making basis for the power distribution system to achieve panoramic situation awareness, intelligent operation and maintenance, demand-side management, and intelligent energy use solution recommendations. However, at this stage, the access of massive intelligent terminals in substations and distributed new energy grid-connected switches and other end devices to the power distribution Internet of Things still has the disadvantages of huge manual access workload, low standardization, and difficulty in maintaining the associated topology.
[0003] As the bottom-level terminal equipment of the power distribution Internet of Things, the "end" generally includes new smart meters with broadband carrier communication modules and micro-power wireless communication modules, photovoltaic grid-connected switches, and various types of sensor units. It is responsible for the monitoring, perception, and collection functions of the power distribution Internet of Things, and responds to the execution and protection functions of the "edge" layer of the power distribution Internet of Things. Due to the wide variety of distributed new energy points, the topology of the connection between the end equipment and the edge nodes such as the intelligent terminal in the substation changes all the time. The traditional manual access method is complicated and cannot achieve timely update of substation information when various end devices are connected. Summary of the invention
[0004] The main technical problem solved by the present invention is to provide a distributed photovoltaic new energy grid-connected access control method and system to solve the problem that the traditional manual access method in the prior art is complicated and cannot realize the timely update of the area information when various terminal devices are connected.
[0005] In order to solve the above technical problems, a technical solution adopted by the present invention is to provide a distributed photovoltaic new energy grid-connected access control method, which is characterized by comprising the following steps:
[0006] Step 1: Multiple edge computing terminals and grid-connected control nodes send networking request frames to each other and obtain the link quality with neighboring nodes, reply with networking confirmation frames to neighboring nodes with high link quality, establish adjacent links, and form an adjacent link table;
[0007] Step 2: Determine whether there is an edge computing terminal in the adjacent link table of the grid control node. If yes, the grid control node exchanges information with the edge computing terminal to complete the network access and registration of the grid control node; if no, proceed to step 3;
[0008] Step 3: Determine whether there is a registered grid control node in the adjacent link table of the unregistered grid control node. If yes, the unregistered grid control node exchanges information with the edge computing terminal through the registered grid control node to complete the network access and registration of the unregistered grid control node; if no, proceed to step 4;
[0009] Step 4: Determine whether all grid-connected control nodes in the network have been registered. If yes, generate a message with their own basic configuration information and send it to the edge computing terminal; if not, proceed to step 2;
[0010] Step 5: The edge computing terminal introduces a probability function based on the received message containing basic configuration information to smooth the dense grid connection of distributed new energy and realize orderly management and control of new energy grid connection.
[0011] Furthermore, in step one, the edge computing terminal is deployed on the distribution transformer side, the grid-connected control node is deployed at the new energy grid-connected point, and the edge computing terminal and / or the grid-connected control node form a local communication network through HPLC or micro-power wireless communication.
[0012] Furthermore, in step one, the method for obtaining the link quality with the neighboring nodes is: 1) extracting neighbor node attribute information and link quality parameters; the link quality parameters include signal strength and signal-to-noise ratio of micro-power wireless RF and high-speed power line carrier HPLC.
[0013] 2) All nodes count the number of their neighbor nodes and calculate the link quality between node i and neighbor node j according to the following formula;
[0014]
[0015] In the formula, Q RF is the wireless link quality, Q HPLC is the signal quality of high-speed power line carrier; I RF is the wireless signal strength, SNR RF is the wireless signal-to-noise ratio; I HPLC is the high-speed power line carrier signal strength, SNR HPLC is the high-speed power line carrier signal-to-noise ratio; α and β are the wireless channel weight factor and the carrier channel weight factor respectively.
[0016] Furthermore, in the step 2, the process of the grid connection control node accessing the network and registering is as follows: 1) if there is an edge computing terminal in the adjacent link table of the grid connection control node, a registration request message is directly sent to the edge computing terminal;
[0017] 2) The edge computing terminal receives the registration request message, extracts the ID of the grid-connected control node to be registered, and sends a registration confirmation frame to the grid-connected control node in a multicast manner;
[0018] 3) The grid-connected control node receives the registration confirmation frame, extracts the ID of the same-level node and its upper-level node, and marks itself as a registered node, completing the network access and registration of the grid-connected control node.
[0019] Further, in the step 3, the process of the unregistered grid control node completing the network access and registration of the unregistered grid control node by exchanging information with the edge computing terminal through the registered grid control node is as follows: 1) the unregistered grid control node sends a registration request frame to the registered node;
[0020] 2) If a registered grid-connected control node receives a registration request frame from other nodes, it merges the registration requests of these nodes into one registration request message and sends it to the edge computing terminal;
[0021] 3) The edge computing terminal replies a registration confirmation frame to the unregistered grid-connected control node, and the unregistered grid-connected control node marks itself as a registered node, completing its network access and registration.
[0022] Furthermore, in step 5, the process of smoothing the dense grid-connection of distributed new energy by introducing a probability function is as follows: 1) the edge computing terminal assigns a logical number i to each grid-connected control node, and informs it of the total number of photovoltaic access nodes N, and the edge computing terminal divides the grid-connection access time window of the photovoltaic node into W time slots according to the number of nodes N;
[0023] 2) The grid connection control node calculates the probability of each node connecting to the grid in each time slot according to the following formula;
[0024]
[0025] Where P i is the grid connection probability of node i, and α is the access probability factor.
[0026] In order to solve the above technical problems, a technical solution adopted by the present invention is: a distributed photovoltaic new energy grid-connected access control system, which is characterized by: comprising a control module, a node interaction module and a communication network module, wherein:
[0027] Node interaction module: multiple edge computing terminals and grid-connected control nodes send networking request frames to each other and obtain the link quality with neighboring nodes, reply networking confirmation frames to neighboring nodes with high link quality, establish adjacent links, and form an adjacent link table; the grid-connected control node exchanges information with other grid-connected control nodes and edge computing terminals according to the adjacent link table until all grid-connected control nodes have been registered, and generate messages with their own basic configuration information and send them to the edge computing terminals;
[0028] Control module: After all grid-connected control nodes have been registered in the node interaction module, the edge computing terminal receives the message containing basic configuration information. According to the message containing basic configuration information received, the probability function is introduced to smooth the dense grid connection of distributed new energy, so as to realize the orderly control of new energy grid connection;
[0029] Communication network module: used for interaction and coordination between edge computing terminals and / or grid-connected control nodes.
[0030] Further, the node interaction module includes: a direct registration module and an indirect registration module;
[0031] The direct registration module: if there is an edge computing terminal in the adjacent link table of the grid-connected control node, a registration request message is directly sent to the edge computing terminal. The edge computing terminal receives the registration request message, extracts the id of the grid-connected control node to be registered, and sends a registration confirmation frame to the grid-connected control node in a multicast manner. The grid-connected control node receives the registration confirmation frame, extracts the id of the same-level node and its upper-level node id, and marks itself as a registered node, completing the network access and registration of the grid-connected control node;
[0032] The indirect registration module: the unregistered grid-connected control node sends a registration request frame to the registered node. If the registered grid-connected control node receives registration request frames from other nodes, it merges the registration requests of these nodes into one registration request message and sends it to the edge computing terminal. The edge computing terminal replies with a registration confirmation frame to the unregistered grid-connected control node. The unregistered grid-connected control node marks itself as a registered node to complete its network access and registration.
[0033] The beneficial effects of the present invention are:
[0034] The present invention designs the plug-and-play active networking, active registration and active configuration interaction of new energy grid-connected control nodes, supports the intensive access and rapid deployment of distributed new energy grid-connected services, and at the same time, smoothes the intensive grid-connected access of distributed new energy by introducing a probability function, thereby realizing orderly management and control of new energy grid-connected, thereby providing the distribution Internet of Things with high concurrent access support capabilities for large-scale distributed new energy grid-connected.
[0035] In order to make the above and other purposes, features and advantages of the present application more obvious and easy to understand, the following specifically cites preferred embodiments and describes them in detail with reference to the accompanying drawings. BRIEF DESCRIPTION OF THE DRAWINGS
[0036] In order to more clearly illustrate the technical solutions in the present invention or the prior art, the drawings required for use in the description of the embodiments will be briefly introduced below. Obviously, the drawings described below are only two of the drawings in the present application. For ordinary technicians in this field, other drawings can be obtained based on these drawings without creative work.
[0037] Figure 1 It is a flowchart of the application method;
[0038] Figure 2 It is a connection diagram of this application. DETAILED DESCRIPTION
[0039] In order to facilitate the understanding of the present invention, the present invention is described in more detail below in conjunction with the accompanying drawings and specific embodiments. Preferred embodiments of the present invention are provided in the accompanying drawings. However, the present invention can be implemented in many different forms and is not limited to the embodiments described in this specification. On the contrary, the purpose of providing these embodiments is to make the understanding of the disclosure of the present invention more thorough and comprehensive.
[0040] It should be noted that, unless otherwise defined, all technical and scientific terms used in this specification have the same meaning as those commonly understood by those skilled in the art of the present invention. The terms used in the specification of the present invention are only for the purpose of describing specific embodiments and are not intended to limit the present invention. The term "and / or" used in this specification includes any and all combinations of one or more related listed items.
[0041] See also Figure 1 and Figure 2 As shown, Figure 1 The invention shows a distributed photovoltaic new energy grid-connected access control method, which is characterized by comprising the following steps:
[0042] Step S1: Multiple edge computing terminals and grid-connected control nodes send networking request frames to each other and obtain link quality with neighboring nodes, reply networking confirmation frames to neighboring nodes with high link quality, establish adjacent links, and form an adjacent link table;
[0043] Step S2: determine whether there is an edge computing terminal in the adjacent link table of the grid control node. If yes, the grid control node exchanges information with the edge computing terminal to complete the network access and registration of the grid control node; if no, proceed to step S3;
[0044] Step S3: determine whether there is a registered grid control node in the adjacent link table of the unregistered grid control node. If yes, the unregistered grid control node completes the network access and registration of the unregistered grid control node by exchanging information with the edge computing terminal through the registered grid control node; if no, proceed to step S4;
[0045] Step S4: Determine whether all grid-connected control nodes in the network have completed registration. If yes, generate a message with its own basic configuration information and send it to the edge computing terminal; if no, proceed to step S2;
[0046] Step S5: The edge computing terminal introduces a probability function to smooth the dense grid-connected access of distributed new energy sources based on the received message containing basic configuration information, thereby achieving orderly management and control of the grid-connected new energy sources.
[0047] Among them, the definitions of the networking request frame, networking confirmation frame, registration request frame and registration confirmation frame in this application are as follows:
[0048] 1) Networking request frame: used for network neighbor node discovery and exchange of neighbor node information when the grid control node is initialized;
[0049] 2) Networking confirmation frame: used to confirm the network neighbor node when the grid control node is initialized, and to confirm the networking interaction request between the two nodes;
[0050] 3) Registration request frame: a registration request message sent by the grid-connected flexible control node to its edge computing terminal;
[0051] 4) Registration confirmation frame: contains the ID list of the grid-connected flexible control nodes registered in this round.
[0052] In the above-mentioned step S1, the edge computing terminal is deployed on the distribution transformer side, the grid-connected control node is deployed at the new energy grid-connected point, and the edge computing terminal and / or the grid-connected control node and the grid-connected control nodes form a local communication network through HPLC or micro-power wireless communication.
[0053] The way to obtain the link quality with the neighboring nodes is:
[0054] 1) Extract neighbor node attribute information and link quality parameters; link quality parameters include signal strength and signal-to-noise ratio of micro-power wireless RF and high-speed power line carrier HPLC.
[0055] 2) All nodes count the number of their neighbor nodes and calculate the link quality between node i and neighbor node j according to the following formula;
[0056]
[0057] In the formula, QRF is the wireless link quality, Q HPLC is the signal quality of high-speed power line carrier; I RF is the wireless signal strength, SNR RF is the wireless signal-to-noise ratio; I HPLC is the high-speed power line carrier signal strength, SNR HPLC is the high-speed power line carrier signal-to-noise ratio; α and β are the wireless channel weight factor and the carrier channel weight factor respectively.
[0058] In the above-mentioned step S2, the process of the grid connection control node accessing and registering is as follows:
[0059] 1) If there is an edge computing terminal in the adjacent link table of the grid-connected control node, a registration request message is directly sent to the edge computing terminal;
[0060] 2) The edge computing terminal receives the registration request message, extracts the ID of the grid-connected control node to be registered, and sends a registration confirmation frame to the grid-connected control node in a multicast manner;
[0061] 3) The grid-connected control node receives the registration confirmation frame, extracts the ID of the same-level node and its upper-level node, and marks itself as a registered node, completing the network access and registration of the grid-connected control node.
[0062] In the above-mentioned step S3, the process of the unregistered grid control node completing the network access and registration of the unregistered grid control node by exchanging information with the edge computing terminal through the registered grid control node is as follows:
[0063] 1) The non-registered grid-connected control node sends a registration request frame to the registered node;
[0064] 2) If a registered grid-connected control node receives a registration request frame from other nodes, it merges the registration requests of these nodes into one registration request message and sends it to the edge computing terminal;
[0065] 3) The edge computing terminal replies a registration confirmation frame to the unregistered grid-connected control node, and the unregistered grid-connected control node marks itself as a registered node, completing its network access and registration.
[0066] In the above step S5, the process of smoothing the dense grid connection of distributed new energy sources by introducing a probability function is as follows:
[0067] 1) The edge computing terminal assigns a logical number i to each grid-connected control node and informs it of the total number of photovoltaic access nodes N. The edge computing terminal divides the grid-connected access time window of the photovoltaic node into W time slots according to the number of nodes N;
[0068] 2) The grid connection control node calculates the probability of each node connecting to the grid in each time slot according to the following formula;
[0069]
[0070] Where P i is the grid connection probability of node i, and α is the access probability factor.
[0071] like Figure 2 As shown, in order to solve the above technical problems, a technical solution adopted by the present invention is: a distributed photovoltaic new energy grid-connected access control system, which is characterized by: comprising a control module, a node interaction module and a communication network module, wherein:
[0072] Node interaction module: multiple edge computing terminals and grid-connected control nodes send networking request frames to each other and obtain the link quality with neighboring nodes, reply networking confirmation frames to neighboring nodes with high link quality, establish adjacent links, and form an adjacent link table; the grid-connected control node exchanges information with other grid-connected control nodes and edge computing terminals according to the adjacent link table until all grid-connected control nodes have been registered, and generate messages with their own basic configuration information and send them to the edge computing terminals;
[0073] Control module: After all grid-connected control nodes have been registered in the node interaction module, the edge computing terminal receives a message containing basic configuration information. According to the message containing basic configuration information received, the probability function is introduced to smooth the dense grid connection of distributed new energy, so as to realize the orderly control of new energy grid connection;
[0074] Communication network module: used for interaction and coordination between edge computing terminals and / or grid-connected control nodes.
[0075] Further, the node interaction module includes: a direct registration module and an indirect registration module;
[0076] The direct registration module: if there is an edge computing terminal in the adjacent link table of the grid-connected control node, a registration request message is directly sent to the edge computing terminal. The edge computing terminal receives the registration request message, extracts the id of the grid-connected control node to be registered, and sends a registration confirmation frame to the grid-connected control node in a multicast manner. The grid-connected control node receives the registration confirmation frame, extracts the id of the same-level node and its upper-level node id, and marks itself as a registered node, completing the network access and registration of the grid-connected control node;
[0077] The indirect registration module: the unregistered grid-connected control node sends a registration request frame to the registered node. If the registered grid-connected control node receives registration request frames from other nodes, it merges the registration requests of these nodes into one registration request message and sends it to the edge computing terminal. The edge computing terminal replies with a registration confirmation frame to the unregistered grid-connected control node. The unregistered grid-connected control node marks itself as a registered node to complete its network access and registration.
[0078] This patent proposes a plug-and-play device structure and system architecture for terminal nodes; the system mainly includes edge computing terminals deployed on the distribution transformer side, grid-connected control nodes deployed at new energy grid-connected points, and a local communication network formed through HPLC or micro-power wireless communication. The edge computing terminals interact with the grid-connected control nodes and execute configuration strategies to achieve stable operation of the distribution station area.
[0079] The above description of the various embodiments tends to emphasize the differences between the various embodiments. The same or similar aspects can be referenced to each other, and for the sake of brevity, this application will not go into details.
[0080] The above are only embodiments of the present invention, and are not intended to limit the patent scope of the present invention. Any equivalent structural transformations made using the contents of the specification and drawings of the present invention, or directly or indirectly applied in other related technical fields, are also included in the patent protection scope of the present invention.
Claims
1. A distributed photovoltaic new energy grid-connected access control method, characterized in that: The following steps are involved: Step 1: Multiple edge computing terminals and grid-connected control nodes send networking request frames to each other and obtain the link quality with neighboring nodes, reply with networking confirmation frames to neighboring nodes with high link quality, establish adjacent links, and form an adjacent link table; Step 2: Determine whether there is an edge computing terminal in the adjacent link table of the grid control node. If yes, the grid control node exchanges information with the edge computing terminal to complete the network access and registration of the grid control node. If not, proceed to step 3; Step 3: Determine whether there is a registered grid control node in the adjacent link table of the unregistered grid control node. If yes, the unregistered grid control node exchanges information with the edge computing terminal through the registered grid control node to complete the network access and registration of the unregistered grid control node; If not, proceed to step 4; Step 4: Determine whether all grid-connected control nodes in the network have been registered. If yes, generate a message with their own basic configuration information and send it to the edge computing terminal; If not, proceed to step 2; Step 5: The edge computing terminal introduces a probability function based on the received message containing basic configuration information to smooth the dense grid connection of distributed new energy and realize orderly management and control of new energy grid connection.
2. The distributed photovoltaic new energy grid-connected access control method according to claim 1 is characterized in that: In step one, the edge computing terminal is deployed on the distribution transformer side, the grid-connected control node is deployed at the new energy grid-connected point, and the edge computing terminal and / or the grid-connected control node form a local communication network through HPLC or micro-power wireless communication.
3. The distributed photovoltaic new energy grid-connected access control method according to claim 1 is characterized in that: In the step 1, the method of obtaining the link quality with the adjacent nodes is: 1) extracting the neighbor node attribute information and link quality parameters; the link quality parameters include the signal strength and signal-to-noise ratio of the micro-power wireless RF and the high-speed power line carrier HPLC. 2) All nodes count the number of their neighbor nodes and calculate the link quality between node i and neighbor node j according to the following formula; In the formula, Q RF is the wireless link quality, Q HPLC is the signal quality of high-speed power line carrier; I RF is the wireless signal strength, SNR RF is the wireless signal-to-noise ratio; I HPLC is the high-speed power line carrier signal strength, SNR HPLC is the high-speed power line carrier signal-to-noise ratio; α and β are the wireless channel weight factor and the carrier channel weight factor respectively.
4. The distributed photovoltaic new energy grid-connected access control method according to claim 1 is characterized in that: In the step 2, the process of the grid connection control node accessing the network and registering is as follows: 1) if there is an edge computing terminal in the adjacent link table of the grid connection control node, a registration request message is directly sent to the edge computing terminal; 2) The edge computing terminal receives the registration request message, extracts the ID of the grid-connected control node to be registered, and sends a registration confirmation frame to the grid-connected control node in a multicast manner; 3) The grid-connected control node receives the registration confirmation frame, extracts the ID of the same-level node and its upper-level node, and marks itself as a registered node, completing the network access and registration of the grid-connected control node.
5. The distributed photovoltaic new energy grid-connected access control method according to claim 1 is characterized in that: In the step 3, the process of the unregistered grid control node completing the network access and registration of the unregistered grid control node by exchanging information with the edge computing terminal through the registered grid control node is as follows: 1) the unregistered grid control node sends a registration request frame to the registered node; 2) If a registered grid-connected control node receives a registration request frame from other nodes, it merges the registration requests of these nodes into one registration request message and sends it to the edge computing terminal; 3) The edge computing terminal replies a registration confirmation frame to the unregistered grid-connected control node, and the unregistered grid-connected control node marks itself as a registered node, completing its network access and registration.
6. The distributed photovoltaic new energy grid-connected access control method according to claim 1, characterized in that: In step 5, the process of smoothing the dense grid-connection of distributed new energy by introducing a probability function is as follows: 1) the edge computing terminal assigns a logical number i to each grid-connected control node and informs it of the total number of photovoltaic access nodes N. The edge computing terminal divides the grid-connection time window of the photovoltaic node into W time slots according to the number of nodes N; 2) The grid connection control node calculates the probability of each node connecting to the grid in each time slot according to the following formula; Where P i is the grid connection probability of node i, and α is the access probability factor.
7. A distributed photovoltaic new energy grid-connected control system according to the control method according to any one of claims 1 to 6, characterized in that: It includes a control module, a node interaction module and a communication network module, wherein: Node interaction module: multiple edge computing terminals and grid-connected control nodes send networking request frames to each other and obtain the link quality with neighboring nodes, reply networking confirmation frames to neighboring nodes with high link quality, establish adjacent links, and form an adjacent link table; the grid-connected control node exchanges information with other grid-connected control nodes and edge computing terminals according to the adjacent link table until all grid-connected control nodes have been registered, and generate messages with their own basic configuration information and send them to the edge computing terminals; Control module: After all grid-connected control nodes have been registered in the node interaction module, the edge computing terminal receives the message containing basic configuration information. According to the message containing basic configuration information received, the probability function is introduced to smooth the dense grid connection of distributed new energy, so as to realize the orderly control of new energy grid connection; Communication network module: used for interaction and coordination between edge computing terminals and / or grid-connected control nodes.
8. The distributed photovoltaic new energy grid-connected access control system according to claim 7 is characterized in that: The node interaction module includes: a direct registration module and an indirect registration module; The direct registration module: if there is an edge computing terminal in the adjacent link table of the grid-connected control node, a registration request message is directly sent to the edge computing terminal. The edge computing terminal receives the registration request message, extracts the id of the grid-connected control node to be registered, and sends a registration confirmation frame to the grid-connected control node in a multicast manner. The grid-connected control node receives the registration confirmation frame, extracts the id of the same-level node and its upper-level node id, and marks itself as a registered node, completing the network access and registration of the grid-connected control node; The indirect registration module: the unregistered grid-connected control node sends a registration request frame to the registered node. If the registered grid-connected control node receives registration request frames from other nodes, it merges the registration requests of these nodes into one registration request message and sends it to the edge computing terminal. The edge computing terminal replies with a registration confirmation frame to the unregistered grid-connected control node. The unregistered grid-connected control node marks itself as a registered node to complete its network access and registration.
Citation Information
Cited By
Power generation enterprise grid-connected communication operation and maintenance monitoring system based on data collaboration technology
CN120601613A
Grid-connected management and control system based on photovoltaic module abandoned light energy recovery
CN122338906A