Asphalt pavement rear-implanted sensing monitoring system

By inserting mechanical response, temperature and traffic shaft load test rods into asphalt pavement, combined with fiber grating sensors and layered elastic theory, the damage and complexity of sensor burial on the pavement is solved, and high-precision pavement data monitoring is achieved and vehicle information identification are suitable for existing road surfaces, improving the accuracy of maintenance decisions.

CN119043424AActive Publication Date: 2024-11-29HARBIN INST OF TECH

Patent Information

Application Number
CN202411228075.5
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-09-03
Publication Date
2024-11-29
Estimated Expiration
2044-09-03

AI Technical Summary

Technical Problem

In the performance monitoring of existing asphalt pavements, sensor burial damages the original pavement structure, affecting the accuracy of the monitoring result, and is difficult to implement in existing pavements. There are many types of sensors and complex layout, and the number of equipment channels is required.

Method used

Using mechanical response test rods, temperature test rods and traffic shaft load test rods, preset hole slots are inserted in vertical and horizontal directions, fiber grating sensors are embedded, and road mechanical response data is obtained through the data acquisition system, combined with layered Elastic system mechanics theory and optimization algorithm, calculate modulus and vehicle information on each layer of the pavement, and reduce the type of sensors and layout complexity.

Benefits of technology

It improves the accuracy of pavement data processing, can be implemented in existing pavement, reduces the damage to the original pavement structure, simplifies sensor layout, expands the scope of data acquisition, and provides a more accurate reference for road maintenance.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119043424A_ABST
    Figure CN119043424A_ABST
Patent Text Reader

Abstract

The invention discloses a rear-implanted sensing monitoring system for an asphalt pavement, and belongs to the technical field of pavement monitoring. The problems that in existing asphalt pavement performance monitoring, a sensor is buried in a pavement structure, damage to an original pavement is large, and the monitoring result is affected are solved. Comprising the steps that a mechanical response test rod piece is inserted into a preset pavement mechanical monitoring hole in the vertical direction, and the mechanical response amplitude of each pavement layer in the longitudinal position under the action of an external load is measured; the temperature testing rod piece is inserted into a preset pavement temperature monitoring hole in the vertical direction to measure the temperature of each pavement layer; the traffic axle load test rod pieces are arranged in a preset pavement surface layer monitoring groove in the horizontal direction, and the mechanical response amplitude of the pavement surface layer in the transverse position under the action of an external load is measured; and the data acquisition system is used for acquiring monitoring data of the mechanical response test rod piece, the temperature test rod piece and the traffic axle load test rod piece. The method is used for road surface state monitoring.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to a post-implantation sensor monitoring system for an asphalt pavement, belonging to the technical field of pavement monitoring. Background Art

[0002] As the focus of highway development shifts from large-scale construction to large-scale maintenance, the road surface's service performance gradually deteriorates under repeated traffic loads and complex environmental conditions. By embedding various sensors in each layer of the road surface, the vehicle's axle weight, axle number and other information as well as the mechanical response of the road surface can be monitored in real time, thereby helping to assess the remaining service life of the road surface.

[0003] In the evaluation of road performance, most of the road surface inspections are carried out using tools such as inspection vehicles, and the identification of vehicle information such as axle weight, number of axles, and speed is also mostly completed based on strain sensors, dynamic weighing platforms, etc. The road surface data processing and analysis methods have the following shortcomings:

[0004] 1) Vertical strain sensors, horizontal strain sensors, temperature sensors, etc. need to be buried in newly built or expanded roads, which cannot be implemented in many existing roads that urgently need performance evaluation as a guide for subsequent maintenance; 2) In the past, sensor-based road data analysis required the cooperation of multiple types of sensors, and the number of sensors buried was large, the cable layout was relatively complex, and the number of equipment channels required for subsequent data collection was high; 3) The layout of sensors caused great damage to the original road structure, affecting the test accuracy of vehicle information recognition and internal mechanical response of the road surface. Summary of the invention

[0005] Aiming at the problem that in the existing asphalt pavement performance monitoring, burying sensors in the pavement structure is highly destructive to the original pavement and affects the monitoring results, the present invention provides an asphalt pavement post-implantation sensor monitoring system.

[0006] The present invention provides an asphalt pavement post-implantation sensor monitoring system, comprising a mechanical response test rod, a temperature test rod, a traffic axle load test rod and a data acquisition system.

[0007] The mechanical response test rod is inserted into a pre-set pavement mechanical monitoring hole in the vertical direction; the mechanical response test rod has the same number of segments as the monitored pavement layers, and the length and setting position of the segments correspond to the pavement layers; the material modulus of each segmented rod is close to the modulus of the corresponding pavement layer; the axis of the mechanical response test rod is embedded with a fiber grating string, and a grating is engraved at the center point of each segmented rod to measure the mechanical response amplitude of each pavement layer in the longitudinal position under the action of external load;

[0008] The temperature test rod is inserted into a pre-set road surface temperature monitoring hole in the vertical direction; the length of the temperature test rod is the same as that of the mechanical response test rod; a fiber grating string is embedded in the axis of the temperature test rod, and a grating is engraved on the fiber grating string at a position corresponding to the center point of each road surface layer to measure the temperature of each road surface layer;

[0009] The traffic axle load test rod is arranged in a preset road surface monitoring groove along the horizontal direction; the thickness of the traffic axle load test rod is less than the road surface, and the material modulus is close to the road surface modulus; the axis of the traffic axle load test rod is embedded with a fiber grating string, and the grating is engraved at a preset interval to measure the mechanical response amplitude of the road surface at the lateral position under the action of external load;

[0010] The data acquisition system is used to collect monitoring data of mechanical response test rods, temperature test rods, and traffic axle load test rods;

[0011] The monitoring data is analyzed to obtain the asphalt pavement monitoring results.

[0012] According to the asphalt pavement post-implantation sensor monitoring system of the present invention, at least two mechanical response test rods are arranged at a set distance along the same wheel track.

[0013] According to the asphalt pavement post-implantation sensor monitoring system of the present invention, the traffic axle load test rod is arranged along the width direction of the pavement surface layer, and the length of the traffic axle load test rod is the same as the width of the pavement surface layer.

[0014] According to the asphalt pavement post-implantation sensor monitoring system of the present invention, the mechanical response amplitude of the longitudinal position and the mechanical response amplitude of the lateral position obtained by the mechanical response test rod and the traffic axle load test rod when the vehicle travels along the wheel track of the asphalt pavement are used to draw a pavement mechanical response measurement value image.

[0015] According to the asphalt pavement post-implanted sensor monitoring system of the present invention, based on the mechanical response measurement value image, the time difference is obtained according to the occurrence time corresponding to the mechanical response amplitude of the longitudinal position obtained by two adjacent mechanical response test rods, and then combined with the set distance between the two adjacent mechanical response test rods, the vehicle speed is calculated.

[0016] According to the asphalt pavement post-implantation sensor monitoring system of the present invention, based on the mechanical response measurement value image, the action point corresponding to the maximum mechanical response amplitude of the lateral position is used as the lateral action position of the current vehicle on the asphalt pavement.

[0017] According to the asphalt pavement post-implantation sensor monitoring system of the present invention, based on the mechanical response measurement value image, the current vehicle axle load type is determined according to the number of response peaks in the mechanical response amplitude at the lateral position.

[0018] According to the asphalt pavement post-implantation sensor monitoring system of the present invention, the modulus of each pavement layer is back-calculated based on the monitoring data:

[0019] A vehicle with a known axle load is driven along the wheel track of the asphalt pavement at a set speed, and a sample image of the pavement mechanical response measurement value is drawn based on the mechanical response amplitude at the longitudinal position and the mechanical response amplitude at the lateral position obtained by the mechanical response test rod and the traffic axle load test rod;

[0020] The mechanics theory of layered elastic system is adopted to set the initial design value of each pavement layer modulus, and calculate the theoretical value of the mechanical response of each pavement layer in the longitudinal position; the error is calculated from the theoretical value of the mechanical response and the corresponding measurement value in the sample image of the mechanical response measurement value; based on the error, the optimization algorithm is used for iterative calculation to update the design value of each pavement layer modulus, until the error between the calculated theoretical value of the mechanical response and the corresponding measurement value is less than the preset threshold, and the current design value of each pavement layer modulus is used as the final value of each pavement layer modulus.

[0021] According to the asphalt pavement post-implantation sensor monitoring system of the present invention, the final value of the modulus of each pavement layer is analyzed in combination with the temperature of each pavement layer and the time-temperature equivalence principle of viscoelastic materials, and a change law curve of the modulus of each pavement layer at different temperatures is obtained.

[0022] According to the asphalt pavement post-implantation sensor monitoring system of the present invention, the calculation method of the unknown axle load is:

[0023] The obtained pavement base modulus is taken as a fixed value;

[0024] Based on the mechanical theory of layered elastic system, the initial design value of the unknown axle load is set, and the theoretical value of the mechanical response of each pavement layer in the longitudinal position is calculated. The error value is obtained by comparing the calculated theoretical value with the corresponding measured value. The optimization algorithm is used for iterative calculation based on the error value to update the unknown axle load design value until the error value is less than the amplitude threshold. The current unknown axle load design value is used as the final calculated value of the unknown axle load.

[0025] The beneficial effects of the present invention are as follows: the present invention collects and processes the mechanical response data generated by known vehicle loads, draws an image of the pavement mechanical response measurement value, and realizes the calculation and evaluation of the speed, lateral action position, axle load type, axle weight and other information of an unknown vehicle; and iteratively calculates the modulus of each layer of the pavement under the elastic and viscoelastic systems through an optimization algorithm to ensure that the error between the theoretical value and the measured value is less than a set threshold, and can calculate the axle load of vehicles with unknown axle loads during subsequent use, thereby expanding the scope of pavement data acquisition, further improving the accuracy of pavement data processing, and providing a reference for subsequent road maintenance decision-making.

[0026] The present invention embeds fiber grating sensors in mechanical response test rods, temperature test rods and traffic axle load information test pieces, thereby reducing the types and quantities of sensors, simplifying the complexity of sensor and cable layout, and lowering the requirement for the number of equipment channels. At the same time, the present invention can be directly applied to existing pavements, solving the problem that traditional methods cannot be implemented in existing pavements, and causes less damage to the original pavement structure, thereby preserving the integrity of the pavement and reducing the impact on the pavement structure. BRIEF DESCRIPTION OF THE DRAWINGS

[0027] Figure 1 It is a top view of the arrangement of the asphalt pavement rear implantable sensor monitoring system in the pavement structure of the present invention;

[0028] Figure 2 yes Figure 1 Schematic diagram of longitudinal section;

[0029] Figure 3 It is a flow chart of the modulus back calculation method based on monitoring data;

[0030] Figure 4 It is a flow chart of vehicle information identification and axle load back calculation based on monitoring data. DETAILED DESCRIPTION

[0031] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0032] It should be noted that, in the absence of conflict, the embodiments of the present invention and the features in the embodiments may be combined with each other.

[0033] The present invention will be further described below in conjunction with the accompanying drawings and specific embodiments, but they are not intended to limit the present invention.

[0034] Specific implementation method 1. Combination Figure 1 and Figure 2 As shown, the present invention provides an asphalt pavement post-implantation sensor monitoring system, including a mechanical response test rod 1, a temperature test rod 2, a traffic axle load test rod 3 and a data acquisition system.

[0035] The mechanical response test rod 1 is used for mechanical response testing and is inserted into a pre-set pavement mechanical monitoring hole along its vertical direction; the mechanical response test rod 1 has the same number of segments as the monitored pavement layers, and the length and setting position of the segments correspond to the pavement stratification; the material modulus of each segmented rod approaches or is close to the modulus of the corresponding pavement stratification; the axis of the mechanical response test rod 1 is embedded with a fiber grating string, and a grating is engraved at the center point of each segmented rod to measure the mechanical response amplitude of each pavement stratification at the longitudinal position under the action of external load; the pavement mechanical monitoring hole needs to be set on the pavement wheel track; the mechanical response amplitude at the longitudinal position is the vertical strain;

[0036] The temperature test rod 2 is inserted into the pre-set road surface temperature monitoring hole in the vertical direction; the length of the temperature test rod 2 is the same as that of the mechanical response test rod 1; the axis of the temperature test rod 2 is embedded with a fiber grating string, and a grating is engraved on the fiber grating string at a position corresponding to the center point of each road surface layer to measure the temperature of each road surface layer; the length of each section of the temperature test rod 2 corresponds to the thickness of the road surface layer, base layer and soil base; the road surface temperature monitoring hole can be set at the roadside;

[0037] The traffic axle load test rod 3 is arranged in the horizontal direction in the preset road surface monitoring groove; the thickness of the traffic axle load test rod 3 is less than the road surface, and the material modulus is close to or close to the road surface modulus; the axis of the traffic axle load test rod 3 is embedded with a fiber grating string, and the grating is engraved at a preset interval to measure the mechanical response amplitude of the road surface at the lateral position under the external load; the preset interval can be 5 mm;

[0038] The data acquisition system is used to collect monitoring data of the mechanical response test rod 1, the temperature test rod 2, and the traffic axle load test rod 3;

[0039] The monitoring data is analyzed to obtain the asphalt pavement monitoring results.

[0040] In this embodiment, the mechanical response test rod 1 is divided into sections according to the number and thickness of the road surface, base layer and soil base layer.

[0041] The length of the temperature test rod 2 corresponds to the sum of the thickness of the road surface layer, the base layer and the soil foundation, and its outer material is a steel pipe. The temperature of the road surface layer, the base layer and the soil foundation is monitored by a grating.

[0042] In this embodiment, at least two mechanical response test rods 1 are arranged at a set distance along the same wheel track.

[0043] The traffic axle load test rod 3 is arranged along the width direction of the road surface layer, and the length of the traffic axle load test rod 3 is the same as the width of the road surface layer.

[0044] Furthermore, the mechanical response amplitudes at the longitudinal position and the mechanical response amplitudes at the lateral position obtained by the mechanical response test rod 1 and the traffic axle load test rod 3 when the vehicle travels along the wheel track of the asphalt pavement are used to draw a pavement mechanical response measurement value image.

[0045] Combination Figure 4 As shown, based on the mechanical response measurement value image, the time difference is obtained according to the occurrence time corresponding to the mechanical response amplitude of the longitudinal position obtained by two adjacent mechanical response test rods 1, and then combined with the set distance between the two adjacent mechanical response test rods 1, the vehicle speed is calculated.

[0046] Combination Figure 4 As shown, based on the mechanical response measurement value image, the maximum mechanical response amplitude at the lateral position is determined, and combined with the initial buried position of the traffic axle load test rod 3, the lateral action position of the current vehicle on the asphalt pavement is determined.

[0047] Based on the mechanical response measurement value image, the current vehicle axle load type is determined according to the number of response peaks in the mechanical response amplitude at the lateral position.

[0048] Combination Figure 3 As shown in the figure, the layered modulus of each pavement is back-calculated based on the monitoring data:

[0049] A vehicle with a known axle load is driven along the wheel track of the asphalt road surface at a set speed, and a sample image of the pavement mechanical response measurement value is drawn based on the mechanical response amplitude at the longitudinal position and the mechanical response amplitude at the lateral position obtained by the mechanical response test rod 1 and the traffic axle load test rod 3;

[0050] The mechanics theory of layered elastic system is adopted to set the initial design value of each pavement layer modulus, and calculate the theoretical value of the mechanical response of each pavement layer in the longitudinal position; the error is calculated from the theoretical value of the mechanical response and the corresponding measurement value in the sample image of the mechanical response measurement value; based on the error, the optimization algorithm is used for iterative calculation to update the design value of each pavement layer modulus, until the error between the calculated theoretical value of the mechanical response and the corresponding measurement value is less than the preset threshold, and the current design value of each pavement layer modulus is used as the final value of each pavement layer modulus.

[0051] Furthermore, combined with the temperature of each pavement layer, the final value of the pavement layer modulus was analyzed using the time-temperature equivalence principle of viscoelastic materials, and the change curve of the pavement layer modulus at different temperatures was obtained.

[0052] The time-temperature equivalence principle of viscoelastic materials includes the principle of analytical solution method.

[0053] Going a step further, combined Figure 4 As shown, the calculation method for unknown axle load is:

[0054] In the pavement structure, the base modulus basically does not change with the passage of time due to its material reasons. Therefore, the pavement base modulus obtained by back-calculation can be used as a fixed value input. Based on the mechanical theory of layered elastic system, the initial design value of the unknown axle load is set, and the theoretical value of the mechanical response of each pavement layer in the longitudinal position is calculated. The error value is obtained by the calculated theoretical value and the corresponding measured value. The optimization algorithm is used for iterative calculation based on the error value to update the unknown axle load design value. The criterion is that the error between the calculated value of the mechanical response amplitude and the actual measured value of the mechanical response amplitude collected by the current sensor is less than the amplitude threshold. It is repeated until the error value is less than the amplitude threshold, and the current unknown axle load design value is used as the final calculated value of the unknown axle load.

[0055] This implementation method collects the mechanical response amplitude data of each point of the mechanical response test rod and the traffic axle load information test piece of the wheel track of the road to be tested when the vehicle with known axle load passes through, and draws a pavement mechanical response measurement value image; then identifies the time when the mechanical response amplitude is generated, the maximum value point and the number of peaks, calculates the vehicle speed and determines the lateral position of the vehicle and the type of vehicle axle load; finally, the modulus of each layer of the pavement under the elastic and viscoelastic systems is iteratively calculated through an optimization algorithm, and combined with the calculation results of the above-mentioned pavement base modulus and the basic information of the pavement, the axle load of the unknown vehicle is obtained by inverse calculation through the measured pavement mechanical response.

[0056] In this embodiment, the sensing elements in the mechanical response test rod, the temperature test rod and the traffic axle load test rod may be, in addition to the fiber grating, a resistance strain gauge, a piezoelectric ceramic or a thermocouple.

[0057] The optimization algorithms used in this embodiment include Newton's method, pattern search, genetic algorithm, particle swarm algorithm or agent model method.

[0058] In this embodiment, the mechanical theory method of the layered elastic system includes an analytical solution method or a finite element method.

[0059] In actual use, vehicles with known axle loads can be used regularly to perform modulus back calculations according to the above back calculation method to obtain the pavement modulus attenuation time curve, and then evaluate the pavement service performance. The recommended cycle is once every 6 months.

[0060] Based on the regularly updated pavement base modulus, more accurate vehicle axle load calculation values ​​can be further obtained.

[0061] Embodiment 1:

[0062] Combination Figure 1As shown in the figure, taking a 7-layer pavement structure as an example, the thickness of each layer of the pavement from top to bottom is 0.05, 0.06, 0.07, 0.2, 0.2, 0.2, +∞m, the Poisson's ratio of each layer from top to bottom is 0.25, 0.25, 0.25, 0.25, 0.25, 0.25, 0.35, and the density of each layer from top to bottom is 2400, 2400, 2400, 2200, 2200, 2200, 1900kg / m 3 .

[0063] The length of the mechanical response test rod 1, the traffic axle load test rod 3 and the temperature test rod 2 are all 0.98m. The fiber grating string is embedded in the axis of the test rod. The fiber grating points are respectively at 0.025, 0.08, 0.145, 0.28, 0.48, 0.68 and 0.88m of the test rod. Two holes are drilled at a distance of 5m in the right wheel track of the road surface, and the two mechanical response test rods are vertically inserted and fixed into the two holes respectively. A hole is drilled on the road side parallel to the right wheel track, and the temperature test rod is vertically inserted and fixed into the hole, and the fiber grating point is ensured to be at the midpoint of each layer of the road surface.

[0064] The length of the traffic axle load test rod is 1.3m. A fiber grating string is embedded in the axis of the traffic axle load test piece. The grating is engraved every 0.05m. A groove is cut in the road surface layer perpendicular to the right wheel track. The traffic axle load test piece is buried horizontally and fixed in the groove. Figure 1 shown.

[0065] Combination Figure 2 , to process the real-time road data:

[0066] In the first step, a known moving load is applied to the road surface. The load form is a standard axle load of a double-circle single wheel group, the tire ground stress is 0.7MPa, the load circle radius is 0.1065m, the double-circle spacing is 0.3195m, the moving speed is 10m / s, and one of the wheel tracks of the load is just above the mechanical response test rod. The mechanical response amplitude of each grating point of the mechanical response test rod is collected, and the mechanical response image is drawn. At the midpoints of each layer of the mechanical response test rod 1, that is, 0.025, 0.08, 0.145, 0.28, 0.48, 0.68, and 0.88m, the mechanical response amplitudes are -65.8, -92.7, -65.1, -16.3, -8.7, -6.4, and -28.3με, respectively. Combining the analytical solution of the mechanics of the layered elastic system and the particle swarm optimization algorithm, the theoretical value of the mechanical response of the midpoint of each layer of the pavement is calculated based on the set initial modulus of each layer of the pavement. The measured value of the mechanical response amplitude of the midpoint of each layer of the pavement obtained by the fiber grating string test of the mechanical response test rod is consistent with the theoretical value of the mechanical response amplitude of the midpoint of each layer of the pavement obtained by the mechanics theory of the layered elastic system as much as possible. The modulus of each layer is back-calculated after repeated iterations. The back-calculated results of the modulus of layers 1 to 7 are 7551, 5245, 4834, 8234, 6785, 6235, and 153 MPa, respectively.

[0067] Step 2. For vehicles with unknown axle loads, identify that the difference in the measured time of the mechanical response amplitude in the two mechanical response test rods 1 is 0.48s. The vehicle speed is calculated to be 10.42m / s based on the displacement-time formula in kinematics. Identify the mechanical response amplitude at each grating in the traffic axle load information test piece. The maximum value of the mechanical response amplitude is the seventh grating from left to right, that is, the lateral position of the vehicle's double-circle single-wheel group is 0.35m. Identify the number of mechanical response peaks in the traffic axle load information test piece as 1, and determine that the vehicle is single-axle loaded.

[0068] Step 3. For vehicles with unknown axle loads, first use the vehicle speed, lateral action position, axle load type calculated in Step 2 and the pavement base modulus back-calculated in Step 1 (assuming that the modulus of the fourth layer remains basically unchanged during short-term service) as input, combined with the thickness, density and Poisson's ratio of each pavement layer, and use the layered elastic system mechanical model to assume the vehicle axle load to calculate the theoretical value of the mechanical response amplitude at the midpoint of the pavement base. Then, according to the optimization algorithm, the measured value of the mechanical response amplitude at the midpoint of the pavement base obtained by the mechanical response test rod test is as close as possible to the calculated value of the mechanical response amplitude obtained by the above model as the criterion, and iterate repeatedly to back-calculate the modulus of each layer except the fourth layer and the tire ground stress back-calculation results. The modulus back-calculation results of the 1st, 2nd, 3rd, 5th, 6th, and 7th layers are 7389, 5132, 4645, 6785, 6123, and 142 MPa, respectively, and the tire ground stress back-calculation result is 0.75 MPa.

[0069] Although the present invention is described herein with reference to specific embodiments, it should be understood that these embodiments are merely examples of the principles and applications of the present invention. It should therefore be understood that many modifications may be made to the exemplary embodiments and that other arrangements may be devised without departing from the spirit and scope of the present invention as defined by the appended claims. It should be understood that the various dependent claims and features described herein may be combined in a manner different from that described in the original claims. It should also be understood that the features described in conjunction with a single embodiment may be used in other described embodiments.

Claims

1. A post-implantation sensor monitoring system for asphalt pavement, characterized in that: It includes a mechanical response test rod (1), a temperature test rod (2), a traffic axle load test rod (3) and a data acquisition system. The mechanical response test rod (1) is inserted into a pre-set pavement mechanical monitoring hole in the vertical direction; the mechanical response test rod (1) has the same number of segments as the number of monitored pavement layers, and the length and setting position of the segments correspond to the pavement layers; the material modulus of each segmented rod is close to the modulus of the corresponding pavement layer; the axis of the mechanical response test rod (1) is embedded with a fiber grating string, and a grating is engraved at the center point of each segmented rod, so as to measure the mechanical response amplitude of each pavement layer at a longitudinal position under the action of an external load; The temperature test rod (2) is inserted into a pre-set road surface temperature monitoring hole in a vertical direction; the length of the temperature test rod (2) is the same as the length of the mechanical response test rod (1); a fiber grating string is embedded in the axis of the temperature test rod (2), and a grating is engraved on the fiber grating string at a position corresponding to the center point of each road surface layer, so as to measure the temperature of each road surface layer; The traffic axle load test rod (3) is arranged in a preset road surface monitoring groove along the horizontal direction; the thickness of the traffic axle load test rod (3) is less than the road surface, and the material modulus is close to the modulus of the road surface; the axis of the traffic axle load test rod (3) is embedded with a fiber grating string, and the grating is engraved at a preset interval to measure the mechanical response amplitude of the road surface at a lateral position under the action of an external load; The data acquisition system is used to collect monitoring data of a mechanical response test rod (1), a temperature test rod (2), and a traffic axle load test rod (3); The monitoring data is analyzed to obtain the asphalt pavement monitoring results.

2. The asphalt pavement post-implantation sensor monitoring system according to claim 1 is characterized in that: At least two mechanical response test rods (1) are arranged at a set distance along the same wheel track.

3. The asphalt pavement post-implantation sensor monitoring system according to claim 1 or 2, characterized in that: The traffic axle load test rod (3) is arranged along the width direction of the road surface layer, and the length of the traffic axle load test rod (3) is the same as the width of the road surface layer.

4. The asphalt pavement post-implantation sensor monitoring system according to claim 3 is characterized in that: A pavement mechanical response measurement value image is drawn based on the mechanical response amplitude at the longitudinal position and the mechanical response amplitude at the lateral position obtained by the mechanical response test rod (1) and the traffic axle load test rod (3) when the vehicle travels along the wheel track of the asphalt pavement.

5. The asphalt pavement post-implantation sensor monitoring system according to claim 4 is characterized in that: Based on the mechanical response measurement value image, the time difference is obtained according to the occurrence time corresponding to the mechanical response amplitude at the longitudinal position obtained by two adjacent mechanical response test rods (1), and then combined with the set distance between the two adjacent mechanical response test rods (1), the vehicle speed is calculated.

6. The asphalt pavement post-implantation sensor monitoring system according to claim 5 is characterized in that: Based on the mechanical response measurement value image, the action point corresponding to the maximum mechanical response amplitude of the lateral position is used as the lateral action position of the current vehicle on the asphalt road surface.

7. The asphalt pavement post-implantation sensor monitoring system according to claim 6, characterized in that: Based on the mechanical response measurement value image, the current vehicle axle load type is determined according to the number of response peaks in the mechanical response amplitude at the lateral position.

8. The asphalt pavement post-implantation sensor monitoring system according to claim 7 is characterized in that: The layered modulus of each pavement is back-calculated based on the monitoring data: A vehicle with a known axle load is driven along a wheel track of an asphalt pavement at a set speed, and a sample image of a pavement mechanical response measurement value is drawn based on the mechanical response amplitude at a longitudinal position and the mechanical response amplitude at a lateral position obtained by a mechanical response test rod (1) and a traffic axle load test rod (3); Adopting the mechanical theory of layered elastic system, the initial design value of each pavement layer modulus is set, and the theoretical value of mechanical response of each pavement layer longitudinal position is calculated; The error is calculated from the theoretical value of the mechanical response and the corresponding measured value in the sample image of the mechanical response measurement value. The optimization algorithm is used to iteratively calculate based on the error to update the design value of the layered modulus of each pavement until the error between the calculated theoretical value of the mechanical response and the corresponding measured value is less than a preset threshold. The current design value of the layered modulus of each pavement is used as the final value of the layered modulus of each pavement.

9. The asphalt pavement post-implantation sensor monitoring system according to claim 8, characterized in that: Combined with the temperature of each pavement layer, the final value of the pavement layer modulus was analyzed using the time-temperature equivalence principle of viscoelastic materials, and the change curve of the pavement layer modulus at different temperatures was obtained.

10. The asphalt pavement post-implantation sensor monitoring system according to claim 8, characterized in that: The calculation method for unknown axle load is: The obtained pavement base modulus is taken as a fixed value; Based on the mechanical theory of layered elastic system, the initial design value of the unknown axle load is set, and the theoretical value of the mechanical response of each pavement layer in the longitudinal position is calculated. The error value is obtained by comparing the calculated theoretical value with the corresponding measured value. The optimization algorithm is used for iterative calculation based on the error value to update the unknown axle load design value until the error value is less than the amplitude threshold. The current unknown axle load design value is used as the final calculated value of the unknown axle load.

Citation Information

Patent Citations

  • Method for calibrating optical fiber grating sensor by measuring practical pavement temperature

    CN103234663A

  • Invrese calculation device and method for asphalt pavement modulus of highway airport based on road monitoring

    CN107064476A

  • Intelligent system and method for predicting service performance of pavement structure

    CN114088933A

  • Optical fiber sensor for monitoring axle load information of vehicle and monitoring structure

    CN115014475A

  • Method and device for judging development stage of high-temperature performance of asphalt pavement

    CN116952757A

Cited By

  • Vehicle dynamic axle load monitoring system considering self-adaptive correction of pavement structure modulus

    CN121677896A