Air conditioner operation control parameter generation method and device based on air outlet time

By determining the air outlet propagation route and operating time information of the air conditioner, and generating operation control parameters based on the additional operation time of the propagation node, the problem of inconsistent temperature regulation in different areas is solved, and user comfort and accuracy of air conditioner control are improved.

CN119103672AActive Publication Date: 2024-12-10FOSHAN VIOMI ELECTRICAL TECH
View PDF 8 Cites 0 Cited by

Patent Information

Application Number
CN202411443135.5
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-10-15
Publication Date
2024-12-10
Estimated Expiration
2044-10-15

AI Technical Summary

Technical Problem

The air outflow distance of air conditioners in different areas is different, resulting in differences in temperature regulation results and poor user comfort.

Method used

By determining the air outgoing propagation route and air outgoing running time information of the target air conditioner, the target operation control parameters are generated based on the target of each propagation node to improve the accuracy of air outgoing control.

Benefits of technology

The wind speed consistency of each node of the outgoing air transmission route is achieved, improving user comfort and intelligent control of air conditioners.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119103672A_ABST
    Figure CN119103672A_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of air conditioner control, and discloses an air conditioner operation control parameter generation method and device based on air outlet time, and the method comprises the steps that an air outlet propagation route of a target air conditioner is determined, the air outlet propagation route comprises at least one propagation node, and the propagation node is used for propagating air output by the target air conditioner; air outlet operation time information of the target air conditioner is determined, and according to the air outlet operation time information, the target additional operation duration of the target air conditioner for each propagation node is determined; and according to the target additional operation duration corresponding to each propagation node, target operation control parameters of the target air conditioner are generated. Therefore, the generation accuracy of the operation control parameters of the air conditioner can be improved, so that the air outlet control accuracy of the air conditioner can be improved, and the comfort level of a user can be improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of air conditioning control, and in particular to a method and device for generating air conditioning operation control parameters based on air outlet time. Background Art

[0002] In the prior art, the air conditioner is mainly controlled in the following way: by controlling the operating parameters of the air conditioner, the environment of the scene it is facing is adjusted, such as the temperature. During the operation of the air conditioner, the operating parameters are adjusted according to the user's perception of the temperature change in the scene to achieve uniformity of the user's perceived temperature.

[0003] However, it is found in practice that the air output by the air conditioner has different propagation distances in different areas of the scene it is regulating, which easily leads to differences in the temperature regulation results of the air conditioner in different areas, and thus easily leads to poor user comfort. For example, users may feel hot and cold when passing through different areas, and users may feel different temperatures in different directions when staying in a certain area. It can be seen that it is particularly important to propose a new technical solution for generating air conditioner operation control parameters to improve the accuracy of air conditioner air control. Summary of the invention

[0004] The present invention provides a method and device for generating air conditioner operation control parameters based on air outlet time, which can improve the generation accuracy of the air conditioner operation control parameters, is beneficial to improving the air outlet control accuracy of the air conditioner, and is beneficial to improving the comfort of users.

[0005] In order to solve the above technical problems, the first aspect of the present invention discloses a method for generating air-conditioning operation control parameters based on air outlet time, the method comprising:

[0006] Determine an air outlet propagation route of a target air conditioner, wherein the air outlet propagation route includes at least one propagation node, and the propagation node is used to propagate the air outlet output by the target air conditioner;

[0007] Determine the air outlet operation time information of the target air conditioner, and determine the target additional operation time of the target air conditioner for each of the propagation nodes according to the air outlet operation time information;

[0008] According to the target additional operation time corresponding to each of the propagation nodes, a target operation control parameter of the target air conditioner is generated.

[0009] As an optional implementation manner, in the first aspect of the present invention, determining the target additional operation time of the target air conditioner for each of the propagation nodes according to the air outlet operation time information includes:

[0010] Determining, according to the air outlet operation time information, a first additional operation time of the target air conditioner for each of the propagation nodes;

[0011] Acquire scene information of the scene where the target air conditioner is located;

[0012] According to the scene information, all propagation nodes of the wind propagation route are classified to obtain a classification result, wherein the classification result includes a first-category propagation node group and a second-category propagation node group, the first-category propagation node group is empty or all propagation nodes in the first-category propagation node group do not have corresponding airflow diffusion areas, the second-category propagation node group is empty or all propagation nodes in the second-category propagation node group have corresponding airflow diffusion areas, and the first-category propagation node group and the second-category propagation node group are not empty at the same time;

[0013] When the first type of propagation node group is not empty, determining the first additional running time as the target additional running time of each propagation node in the first type of propagation node group; and / or,

[0014] When the second type of propagation node group is not empty, the second additional running time of the propagation node is determined according to the airflow diffusion area corresponding to each propagation node in the second type of propagation node group and the first additional running time of the propagation node, as the target additional running time of the propagation node, and the second additional running time is greater than the first additional running time.

[0015] As an optional implementation manner, in the first aspect of the present invention, determining the first additional operation time of the target air conditioner for each of the propagation nodes according to the air outlet operation time information includes:

[0016] Determine the continuous air outlet time of the target air conditioner and the intermittent air outlet time of the target air conditioner according to the air outlet operation time information;

[0017] Determine a first current wind output effect of each of the propagation nodes according to the continuous wind output time and the intermittent wind output time, wherein the first current wind output effect includes a first current wind speed condition and an airflow condition;

[0018] According to a first current air outlet effect of each of the propagation nodes and the determined expected air outlet effect of each of the propagation nodes, a first additional operation time of the target air conditioner for each of the propagation nodes is determined.

[0019] As an optional implementation, in the first aspect of the present invention, determining the first additional operation time of the target air conditioner for each of the propagation nodes according to the first current air outlet effect of each of the propagation nodes and the determined expected air outlet effect of each of the propagation nodes includes:

[0020] For each of the propagation nodes, compare the first current air outlet effect of the propagation node with the determined expected air outlet effect of the propagation node to obtain an air outlet effect comparison result of the propagation node;

[0021] When the air outlet effect comparison result of the propagation node indicates that the first current air outlet effect of the propagation node has reached the expected air outlet effect of the propagation node, it is determined that the propagation node does not need additional operation of the target air conditioner;

[0022] When the wind outlet effect comparison result of the propagation node indicates that the first current wind outlet effect of the propagation node has not reached the expected wind outlet effect of the propagation node, the corresponding relationship between the wind outlet effect and the operating duration of the propagation node is determined according to the first current wind outlet effect of the propagation node and the current operating duration included in the current operating control parameters of the acquired target air conditioner;

[0023] According to the difference between the first current air outlet effect of the propagation node and the expected air outlet effect of the propagation node, and the correspondence between the air outlet effect and the operation duration of the propagation node, the first additional operation duration of the target air conditioner for the propagation node is determined.

[0024] As an optional implementation manner, in the first aspect of the present invention, classifying all propagation nodes of the wind propagation route according to the scene information to obtain a classification result includes:

[0025] According to the scene information and the wind propagation route, the scene information is divided to obtain the area information corresponding to each of the propagation nodes;

[0026] For each of the propagation nodes, judging whether the surrounding area of ​​the propagation node meets the target conditions for airflow diffusion control according to the area information corresponding to the propagation node;

[0027] When it is determined that the surrounding area of ​​the propagation node meets the target condition, determining the surrounding area of ​​the propagation node as the airflow diffusion area corresponding to the propagation node;

[0028] When it is determined that the surrounding area of ​​the propagation node does not meet the target condition, determining that the propagation node does not have a corresponding airflow diffusion area;

[0029] All propagation nodes without corresponding airflow diffusion areas among all the propagation nodes are classified into a first type of propagation node group, and all propagation nodes with corresponding airflow diffusion areas among all the propagation nodes are classified into a second type of propagation node group.

[0030] As an optional implementation, in the first aspect of the present invention, the determining, according to the airflow diffusion area corresponding to each propagation node in the second type propagation node group and the first additional running time of the propagation node, the second additional running time of the propagation node as the target additional running time of the propagation node includes:

[0031] For each propagation node in the second type of propagation node group, determining area information of the airflow diffusion region corresponding to the propagation node according to the region information corresponding to the propagation node;

[0032] Determine a second current air outlet effect of the airflow diffusion area corresponding to the propagation node;

[0033] The second additional operation time of the propagation node is determined according to the first additional operation time of the propagation node, the area information of the airflow diffusion area, and the second current air outlet effect.

[0034] As an optional implementation, in the first aspect of the present invention, determining the air outlet propagation route of the target air conditioner includes:

[0035] Obtain the current operating control parameters of the target air conditioner;

[0036] Determining an air outlet propagation route of the target air conditioner according to the current operation control parameter;

[0037] And, generating the target operation control parameters of the target air conditioner according to the target additional operation duration corresponding to each of the propagation nodes includes:

[0038] The target operation control parameters of the target air conditioner are generated according to the target additional operation duration corresponding to each of the propagation nodes and the current operation control parameters.

[0039] A second aspect of the present invention discloses a device for generating air-conditioning operation control parameters based on air outlet time, the device comprising:

[0040] A determination module, used to determine an air outlet propagation route of a target air conditioner, wherein the air outlet propagation route includes at least one propagation node, and the propagation node is used to propagate the air outlet output by the target air conditioner;

[0041] The determination module is further configured to determine the air outlet operation time information of the target air conditioner, and determine the target additional operation time of the target air conditioner for each of the propagation nodes according to the air outlet operation time information;

[0042] A generating module is used to generate a target operating control parameter of the target air conditioner according to the target additional operating time corresponding to each of the propagation nodes.

[0043] As an optional implementation, in the second aspect of the present invention, the determination module determines the target additional operation time of the target air conditioner for each of the propagation nodes according to the air outlet operation time information, specifically including:

[0044] Determining, according to the air outlet operation time information, a first additional operation time of the target air conditioner for each of the propagation nodes;

[0045] Acquire scene information of the scene where the target air conditioner is located;

[0046] According to the scene information, all propagation nodes of the wind propagation route are classified to obtain a classification result, wherein the classification result includes a first-category propagation node group and a second-category propagation node group, the first-category propagation node group is empty or all propagation nodes in the first-category propagation node group do not have corresponding airflow diffusion areas, the second-category propagation node group is empty or all propagation nodes in the second-category propagation node group have corresponding airflow diffusion areas, and the first-category propagation node group and the second-category propagation node group are not empty at the same time;

[0047] When the first type of propagation node group is not empty, determining the first additional running time as the target additional running time of each propagation node in the first type of propagation node group; and / or,

[0048] When the second type of propagation node group is not empty, the second additional running time of the propagation node is determined according to the airflow diffusion area corresponding to each propagation node in the second type of propagation node group and the first additional running time of the propagation node, as the target additional running time of the propagation node, and the second additional running time is greater than the first additional running time.

[0049] As an optional implementation, in the second aspect of the present invention, the determination module determines the first additional operation time of the target air conditioner for each of the propagation nodes according to the air outlet operation time information, specifically including:

[0050] Determine the continuous air outlet time of the target air conditioner and the intermittent air outlet time of the target air conditioner according to the air outlet operation time information;

[0051] Determine a first current wind output effect of each of the propagation nodes according to the continuous wind output time and the intermittent wind output time, wherein the first current wind output effect includes a first current wind speed condition and an airflow condition;

[0052] According to a first current air outlet effect of each of the propagation nodes and the determined expected air outlet effect of each of the propagation nodes, a first additional operation time of the target air conditioner for each of the propagation nodes is determined.

[0053] As an optional implementation, in the second aspect of the present invention, the determination module determines the first additional operation time of the target air conditioner for each of the propagation nodes according to the first current air outlet effect of each of the propagation nodes and the determined expected air outlet effect of each of the propagation nodes, including:

[0054] For each of the propagation nodes, compare the first current air outlet effect of the propagation node with the determined expected air outlet effect of the propagation node to obtain an air outlet effect comparison result of the propagation node;

[0055] When the air outlet effect comparison result of the propagation node indicates that the first current air outlet effect of the propagation node has reached the expected air outlet effect of the propagation node, it is determined that the propagation node does not need additional operation of the target air conditioner;

[0056] When the wind outlet effect comparison result of the propagation node indicates that the first current wind outlet effect of the propagation node has not reached the expected wind outlet effect of the propagation node, the corresponding relationship between the wind outlet effect and the operating duration of the propagation node is determined according to the first current wind outlet effect of the propagation node and the current operating duration included in the current operating control parameters of the acquired target air conditioner;

[0057] According to the difference between the first current air outlet effect of the propagation node and the expected air outlet effect of the propagation node, and the correspondence between the air outlet effect and the operation duration of the propagation node, the first additional operation duration of the target air conditioner for the propagation node is determined.

[0058] As an optional implementation, in the second aspect of the present invention, the determination module classifies all propagation nodes of the wind propagation route according to the scene information, and the method of obtaining the classification result specifically includes:

[0059] According to the scene information and the wind propagation route, the scene information is divided to obtain the area information corresponding to each of the propagation nodes;

[0060] For each of the propagation nodes, judging whether the surrounding area of ​​the propagation node meets the target conditions for airflow diffusion control according to the area information corresponding to the propagation node;

[0061] When it is determined that the surrounding area of ​​the propagation node meets the target condition, determining the surrounding area of ​​the propagation node as the airflow diffusion area corresponding to the propagation node;

[0062] When it is determined that the surrounding area of ​​the propagation node does not meet the target condition, determining that the propagation node does not have a corresponding airflow diffusion area;

[0063] All propagation nodes without corresponding airflow diffusion areas among all the propagation nodes are classified into a first type of propagation node group, and all propagation nodes with corresponding airflow diffusion areas among all the propagation nodes are classified into a second type of propagation node group.

[0064] As an optional implementation, in the second aspect of the present invention, the determination module determines the second additional running time of the propagation node according to the airflow diffusion area corresponding to each propagation node in the second type of propagation node group and the first additional running time of the propagation node, and the method of using the target additional running time of the propagation node specifically includes:

[0065] For each propagation node in the second type of propagation node group, determining area information of the airflow diffusion region corresponding to the propagation node according to the region information corresponding to the propagation node;

[0066] Determine a second current air outlet effect of the airflow diffusion area corresponding to the propagation node;

[0067] The second additional operation time of the propagation node is determined according to the first additional operation time of the propagation node, the area information of the airflow diffusion area, and the second current air outlet effect.

[0068] As an optional implementation, in the second aspect of the present invention, the manner in which the determination module determines the air outlet propagation route of the target air conditioner specifically includes:

[0069] Obtain the current operating control parameters of the target air conditioner;

[0070] Determining an air outlet propagation route of the target air conditioner according to the current operation control parameter;

[0071] And, the generation module generates the target operation control parameters of the target air conditioner according to the target additional operation duration corresponding to each of the propagation nodes, specifically including:

[0072] The target operation control parameters of the target air conditioner are generated according to the target additional operation duration corresponding to each of the propagation nodes and the current operation control parameters.

[0073] The third aspect of the present invention discloses another device for generating air-conditioning operation control parameters based on air outlet time, the device comprising:

[0074] A memory storing executable program code;

[0075] a processor coupled to the memory;

[0076] The processor calls the executable program code stored in the memory to execute the method for generating air-conditioning operation control parameters based on air outlet time disclosed in the first aspect of the present invention.

[0077] The fourth aspect of the present invention discloses a computer storage medium, which stores computer instructions. When the computer instructions are called, they are used to execute the method for generating air-conditioning operation control parameters based on air outlet time disclosed in the first aspect of the present invention.

[0078] Compared with the prior art, the embodiments of the present invention have the following beneficial effects:

[0079] In an embodiment of the present invention, an air outlet propagation route of a target air conditioner is determined, the air outlet propagation route includes at least one propagation node, and the propagation node is used to propagate the air output by the target air conditioner; the air outlet operation time information of the target air conditioner is determined, and based on the air outlet operation time information, the target additional operation time of the target air conditioner for each propagation node is determined; and based on the target additional operation time corresponding to each propagation node, the target operation control parameters of the target air conditioner are generated. It can be seen that the implementation of the present invention can determine the air outlet propagation route of the target air conditioner (the air outlet propagation route includes at least one propagation node), determine the air outlet operation time information of the target air conditioner, and based on the air outlet operation time information, determine the target additional operation time of the target air conditioner for each propagation node, and generate the target operation control parameters of the target air conditioner based on the target additional operation time corresponding to each propagation node, and can automatically determine the air outlet propagation route and air outlet operation time information of the target air conditioner, and can accurately determine the target additional operation time of the target air conditioner for each propagation node in the air outlet propagation route based on the air outlet operation time information, and can also accurately determine the target additional operation time for each propagation node The target additional operation duration can accurately generate the target operation control parameters of the target air conditioner, which can improve the generation accuracy of the operation control parameters of the target air conditioner, and is conducive to improving the accuracy of the subsequent air outlet control of the target air conditioner on the air outlet propagation route based on the accurately generated operation control parameters, and is conducive to accurately controlling the propagation distance of the target air conditioner at each propagation node on the air outlet propagation route, thereby facilitating the realization of consistent wind speed at each propagation node based on the accurately controlled propagation distance, and further conducive to improving the comfort of users in the area where the air outlet propagation route is located, and is conducive to meeting the user's demand for intelligent control of the target air conditioner, and is also conducive to improving the user's usage experience and usage stickiness. BRIEF DESCRIPTION OF THE DRAWINGS

[0080] In order to more clearly illustrate the technical solutions in the embodiments of the present invention, the following briefly introduces the drawings required for use in the description of the embodiments. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without creative work.

[0081] Figure 1 It is a schematic diagram of a scenario to which a method for generating air-conditioning operation control parameters based on air outlet time disclosed in an embodiment of the present invention is applicable;

[0082] Figure 2 It is a flow chart of a method for generating air-conditioning operation control parameters based on air outlet time disclosed in an embodiment of the present invention;

[0083] Figure 3 It is a flow chart of another method for generating air-conditioning operation control parameters based on air outlet time disclosed in an embodiment of the present invention;

[0084] Figure 4 It is a structural schematic diagram of a device for generating air-conditioning operation control parameters based on air outlet time disclosed in an embodiment of the present invention;

[0085] Figure 5 It is a structural schematic diagram of another device for generating air-conditioning operation control parameters based on air outlet time disclosed in an embodiment of the present invention. DETAILED DESCRIPTION

[0086] In order to enable those skilled in the art to better understand the scheme of the present invention, the technical scheme in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0087] The terms "first", "second", etc. in the specification and claims of the present invention and the above-mentioned drawings are used to distinguish different objects rather than to describe a specific order. In addition, the terms "including" and "having" and any variations thereof are intended to cover non-exclusive inclusions. For example, a process, method, device, product or end including a series of steps or units is not limited to the listed steps or units, but may optionally include steps or units that are not listed, or may optionally include other steps or units inherent to these processes, methods, products or ends.

[0088] Reference to "embodiments" herein means that a particular feature, structure, or characteristic described in conjunction with the embodiments may be included in at least one embodiment of the present invention. The appearance of the phrase in various places in the specification does not necessarily refer to the same embodiment, nor is it an independent or alternative embodiment that is mutually exclusive with other embodiments. It is explicitly and implicitly understood by those skilled in the art that the embodiments described herein may be combined with other embodiments.

[0089] The present invention discloses a method and device for generating air-conditioning operation control parameters based on air-outlet time, which can determine the air-outlet propagation route of a target air-conditioner (the air-outlet propagation route includes at least one propagation node), determine the air-outlet operation time information of the target air-conditioner, and determine the target additional operation time of the target air-conditioner for each propagation node according to the air-outlet operation time information, and generate the target operation control parameters of the target air-conditioner according to the target additional operation time corresponding to each propagation node, which can automatically determine the air-outlet propagation route and air-outlet operation time information of the target air-conditioner, and can accurately determine the target additional operation time of the target air-conditioner for each propagation node in the air-outlet propagation route according to the air-outlet operation time information, and can also determine the target additional operation time of the target air-conditioner for each propagation node in the air-outlet propagation route according to the air-outlet operation time information. Accurately determining the target additional operation time for each propagation node and accurately generating the target operation control parameters of the target air conditioner can improve the generation accuracy of the operation control parameters of the target air conditioner, which is conducive to improving the accuracy of the subsequent air outlet control of the air outlet propagation route by the target air conditioner based on the accurately generated operation control parameters, and is conducive to accurately controlling the propagation distance of each propagation node of the air outlet propagation route of the target air conditioner, thereby facilitating the consistent wind speed of each propagation node based on the accurately controlled propagation distance, and further facilitating improving the comfort of users in the area where the air outlet propagation route is located, and meeting the user's demand for intelligent control of the target air conditioner, and also helping to improve the user's experience and stickiness. The following are detailed explanations.

[0090] In order to better understand the method and device for generating air-conditioning operation control parameters based on air-outlet time described in the present invention, firstly, a family scene to which the method for generating air-conditioning operation control parameters based on air-outlet time is applicable is described. Specifically, the scene schematic diagram of the family scene can be as follows: Figure 1 As shown, Figure 1 is a schematic diagram of a scenario to which a method for generating air-conditioning operation control parameters based on air outlet time disclosed in an embodiment of the present invention is applicable, such as Figure 1 As shown, the home scene includes a living room area, in which an air conditioner and a sofa are placed. In addition, the home scene also includes a bedroom area and a kitchen area, in which a bed is placed, and a refrigerator, a stove and pots are placed in the kitchen area.

[0091] It should be noted that Figure 1 The scene diagram shown is only for showing one of the scenes to which the method and device for generating air-conditioning operation control parameters based on the air-outlet time are applicable, and it is not used to limit other scenes to which the method and device for generating air-conditioning operation control parameters based on the air-outlet time are applicable, and Figure 1 The air conditioners involved, Figure 1 The scene diagram shown does not limit the shape, size and location of the air conditioner, and Figure 1There is no restriction on the existence, form and area of ​​existence of related objects such as beds, pots and pans, stoves, refrigerators and sofas.

[0092] Embodiment 1

[0093] See also Figure 2 , Figure 2 1 is a flow chart of a method for generating air-conditioning operation control parameters based on air-out time disclosed in an embodiment of the present invention. Figure 2 The method for generating air-conditioning operation control parameters based on air-outlet time described above can be applied to a device for generating air-conditioning operation control parameters based on air-outlet time, wherein the device may include a generating device or a generating server, wherein the generating server may include a cloud server or a local server, which is not limited in the embodiments of the present invention. Figure 2 As shown, the method for generating air-conditioning operation control parameters based on air outlet time may include the following operations:

[0094] 101. Determine the air outlet route of the target air conditioner.

[0095] In the embodiment of the present invention, the number of the air outlet propagation routes of the target air conditioner may be one or more. Each air outlet propagation route includes at least one propagation node, and the propagation node is used to propagate the air outlet output by the target air conditioner. Optionally, each propagation node may correspond to at least one air outlet propagation route, which is not limited in the embodiment of the present invention.

[0096] For example, assume that there are wind propagation route A, wind propagation route B and wind propagation route C, and wind propagation route A includes propagation node a, propagation node b, propagation node c and propagation node d, wind propagation route B includes propagation node a and propagation node d, and wind propagation route C includes propagation node d. At this time, propagation node a belongs to wind propagation route A and wind propagation route B at the same time, propagation node b belongs to wind propagation route A, propagation node c belongs to wind propagation route A, and propagation node d belongs to wind propagation route A, wind propagation route B and wind propagation route C.

[0097] 102. Determine the air outlet operation time information of the target air conditioner.

[0098] In an embodiment of the present invention, optionally, the air outlet operation time information of the target air conditioner may include at least one air outlet operation time duration of the target air conditioner, and may also include the starting air outlet operation time of each air outlet operation time duration and the ending air outlet operation time of each air outlet operation time period.

[0099] 103. Determine a target additional operating time of the target air conditioner for each propagation node according to the air outlet operating time information.

[0100] In an embodiment of the present invention, the target additional operation duration can be used to indicate the duration for which the target air conditioner needs to continue to operate after the last air outlet operation duration. Optionally, the target additional operation duration can be zero, or any time value greater than zero. Specifically, when the target additional operation duration of a propagation node is zero, it can be used to indicate that the propagation node does not need additional operation of the target air conditioner; when the target additional operation duration of a propagation node is not zero, it can be used to indicate that the propagation node needs additional operation of the target air conditioner, which is not limited in the embodiment of the present invention.

[0101] Optionally, the current air outlet effect of each propagation node can be determined based on the air outlet operation time information; then the target additional operation time of the propagation node can be determined based on the current air outlet effect of the propagation node and the expected air outlet effect of the propagation node, or the regional temperature control result corresponding to the propagation node can be determined based on the current air outlet effect of the propagation node, and the target additional operation time of the propagation node can be determined based on the regional temperature control result. Among them, the expected air outlet effect of each propagation node can be obtained through the communication between the wireless communication module (for example: Wi-Fi module) built into the target air conditioner and the smart home platform (the smart home platform can be a platform where users upload their smart control requirements for each smart home device, for example: smart temperature adjustment requirements for smart air conditioners), or it can be obtained through the recognition of the voice command triggered by the user by the voice module built into the target air conditioner, which is not limited in the embodiments of the present invention.

[0102] 104. Generate target operation control parameters of the target air conditioner according to the target additional operation duration corresponding to each propagation node.

[0103] It can be seen that the implementation Figure 2The described method for generating air-conditioning operation control parameters based on air outlet time can determine the air outlet propagation route of the target air-conditioner (the air outlet propagation route includes at least one propagation node), determine the air outlet operation time information of the target air-conditioner, and determine the target additional operation time of the target air-conditioner for each propagation node based on the air outlet operation time information, and generate the target operation control parameters of the target air-conditioner based on the target additional operation time corresponding to each propagation node, and can automatically determine the air outlet propagation route and air outlet operation time information of the target air-conditioner, and can accurately determine the current air outlet effect of the target air-conditioner for each propagation node in the air outlet propagation route based on the air outlet operation time information, which is conducive to improving the accuracy of determining the current air outlet effect of each propagation node, and can quickly and accurately determine the target additional operation time for the propagation node through the current air outlet effect of each propagation node and its expected air outlet effect, or through the current air outlet effect of each propagation node The regional temperature control result brought about by the result can realize accurate and reliable determination of the target additional operation time for the propagation node, which is conducive to improving the flexibility and diversity of determining the target additional operation time for each propagation node, and can also accurately generate the target operation control parameters of the target air conditioner according to the accurate determination of the target additional operation time for each propagation node, which can improve the generation accuracy and flexibility of the operation control parameters of the target air conditioner, and is conducive to improving the accuracy of the subsequent air outlet control of the air outlet propagation route by the target air conditioner based on the accurately generated operation control parameters, and is conducive to accurately controlling the propagation distance of the target air conditioner at each propagation node on the air outlet propagation route, so as to achieve consistent wind speed at each propagation node based on the accurately controlled propagation distance, and then is conducive to improving the comfort of users in the area where the air outlet propagation route is located, and is conducive to meeting the user's demand for intelligent control of the target air conditioner, and is also conducive to improving the user's usage experience and usage stickiness.

[0104] In an optional embodiment, the step 101 of determining the air outlet propagation route of the target air conditioner may include:

[0105] Obtain the current operating control parameters of the target air conditioner;

[0106] According to the current operation control parameters, the air outlet propagation route of the target air conditioner is determined.

[0107] In an embodiment of the present invention, optionally, the current operating control parameters of the target air conditioner may include one or more combinations of the current air outlet temperature of the target air conditioner, the current air outlet direction of the target air conditioner, the current air outlet angle in the corresponding air outlet direction, the current air outlet speed in the corresponding air outlet direction, the current air outlet distance in the corresponding air outlet direction and the current air outlet volume in the corresponding air outlet direction, which is not limited by the embodiment of the present invention.

[0108] Specifically, determining the air outlet propagation route of the target air conditioner according to the current operation control parameters may include:

[0109] Acquire spatial information of the scene where the target air conditioner is located, and determine the influence of the scene on the air output parameters of the target air conditioner from the spatial information;

[0110] According to the air outlet parameter influence information, the influence degree of the air outlet parameter influence information on the current operation control parameters is analyzed, and according to the influence degree of the air outlet parameter influence information on the current operation control parameters and the current operation control parameters, the air outlet propagation route of the target air conditioner is determined.

[0111] Optionally, the air outlet parameter influencing information may include one or more combinations of the spatial layout information of the scene contained in the spatial information, the shape of the scene, and the wall material of the scene, etc., which are not limited in the embodiments of the present invention. For example, assuming that there are multiple target objects (such as other household appliances other than the target air conditioner) that can block the wind or change the wind direction in the scene, the air output by the target air conditioner is likely to change when it reaches the target object, thereby forming a new air outlet propagation route of the target air conditioner; assuming that the corner point of the scene happens to be the windward point, the air output by the target air conditioner is also likely to deviate from the wind direction when it reaches the corner point; assuming that the wall of the scene is a non-smooth wall, the air output by the target air conditioner may be diffusely reflected when it reaches the wall, thereby easily causing the air outlet direction to deviate.

[0112] It can be seen that this optional embodiment can obtain the current operating control parameters of the target air conditioner, and determine the air outlet propagation route of the target air conditioner based on the current operating control parameters, and can quickly and accurately determine the air outlet propagation route of the target air conditioner based on the acquired current operating control parameters of the target air conditioner, or, based on the determined information on the influence of the scene on the air outlet parameters of the target air conditioner, analyze the degree of influence of the air outlet parameter influence information on the current operating control parameters, and then determine the air outlet propagation route of the target air conditioner based on the influence degree and the current operating control parameters, and can accurately determine the degree of influence of the air outlet parameter influence information on the current operating control parameters, so that the air outlet propagation route of the target air conditioner can be accurately and reliably determined based on the accurately determined influence degree and the current operating control parameters, which is conducive to improving the flexibility and diversity of determining the air outlet propagation route for the target air conditioner, and further conducive to improving the accuracy of subsequent determination of the target additional operating time based on the accurately determined air outlet propagation route.

[0113] In this optional embodiment, as an optional implementation, the above step 104 generates the target operation control parameters of the target air conditioner according to the target additional operation time corresponding to each propagation node, which may include:

[0114] The target operation control parameters of the target air conditioner are generated according to the target additional operation time corresponding to each propagation node and the current operation control parameters.

[0115] In an embodiment of the present invention, specifically, for each propagation node, when the target additional operating time corresponding to the propagation node is zero, the current operating control parameters are determined as the target operating control parameters of the target air conditioner; when the target additional operating time corresponding to the propagation node is not zero, the current operating time control parameters included in the current operating control parameters are updated according to the target additional operating time corresponding to the propagation node to obtain the target operating control parameters of the target air conditioner.

[0116] It can be seen that this optional implementation method can generate the target operation control parameters of the target air conditioner according to the target additional operation time corresponding to each propagation node and the current operation control parameters, and can flexibly and accurately generate the target operation control parameters of the target air conditioner based on the current operation control parameters according to the target additional operation time with diversified values.

[0117] Embodiment 2

[0118] See also Figure 3 , Figure 3 1 is a flow chart of a method for generating air-conditioning operation control parameters based on air-out time disclosed in an embodiment of the present invention. Figure 3 The method for generating air-conditioning operation control parameters based on air-outlet time described above can be applied to a device for generating air-conditioning operation control parameters based on air-outlet time, wherein the device may include a generating device or a generating server, wherein the generating server may include a cloud server or a local server, which is not limited in the embodiments of the present invention. Figure 3 As shown, the method for generating air-conditioning operation control parameters based on air outlet time may include the following operations:

[0119] 201. Determine the air outlet route of the target air conditioner.

[0120] 202. Determine air outlet operation time information of the target air conditioner.

[0121] 203. Determine a first additional operation time of the target air conditioner for each propagation node according to the air outlet operation time information.

[0122] 204. Obtain scene information of the scene where the target air conditioner is located.

[0123] 205. Classify all propagation nodes of the wind propagation route according to the scene information to obtain a classification result.

[0124] In the embodiment of the present invention, optionally, there is no sequence difference between step 204-step 205 and step 202-step 204, that is, any step in step 204-step 205 may occur before any step in step 202-step 204, or may occur after any step in step 202-step 204, or may occur simultaneously with any step in step 202-step 204, which is not limited in the embodiment of the present invention.

[0125] In an embodiment of the present invention, the classification result may include a first-class propagation node group and a second-class propagation node group, the first-class propagation node group is empty or all propagation nodes in the first-class propagation node group do not have corresponding airflow diffusion areas, the second-class propagation node group is empty or all propagation nodes in the second-class propagation node group have corresponding airflow diffusion areas, and the first-class propagation node group and the second-class propagation node group are not empty at the same time. For example, assuming that the first-class propagation node group is empty, the second-class propagation node group is not empty; assuming that the second-class propagation node group is not empty, the first-class propagation node group is empty.

[0126] In the embodiment of the present invention, when the first type of propagation node group is not empty, step 206 may be triggered to execute; and / or, when the second type of propagation node group is not empty, step 207 may be triggered to execute. Specifically, when the first type of propagation node group is not empty and the second type of propagation node group is empty, only step 206 may be triggered to execute; when the first type of propagation node group is empty and the second type of propagation node group is not empty, only step 207 may be triggered to execute; when the first type of propagation node group is not empty and the second type of propagation node group is not empty, as shown in FIG. Figure 3 As shown, step 206 and step 207 may be triggered to execute.

[0127] 206. Determine a first additional running time as a target additional running time of each propagation node in the first type of propagation node group.

[0128] 207. Determine a second additional running time of the propagation node as a target additional running time of the propagation node according to the airflow diffusion area corresponding to each propagation node in the second type propagation node group and the first additional running time of the propagation node.

[0129] In the embodiment of the present invention, the second additional running time is greater than the first additional running time. Specifically, for each propagation node in the first type of propagation node group, the target additional running time of the propagation node is the first additional running time of the propagation node; for each propagation node in the second type of propagation node group, the target additional running time of the propagation node is the second additional running time of the propagation node.

[0130] 208. Generate target operation control parameters of the target air conditioner according to the target additional operation duration corresponding to each propagation node.

[0131] In the embodiment of the present invention, for other descriptions of step 201 to step 203 and step 208, please refer to the detailed description of step 101 to step 104 in the first embodiment, and the embodiment of the present invention will not be repeated.

[0132] It can be seen that the implementation Figure 3The described method for generating air-conditioning operation control parameters based on air outlet time can determine the air outlet propagation route of the target air-conditioner (the air outlet propagation route includes at least one propagation node), determine the air outlet operation time information of the target air-conditioner, and determine the target additional operation time of the target air-conditioner for each propagation node based on the air outlet operation time information, and generate the target operation control parameters of the target air-conditioner based on the target additional operation time corresponding to each propagation node, and can automatically determine the air outlet propagation route and air outlet operation time information of the target air-conditioner, and can accurately determine the current air outlet effect of the target air-conditioner for each propagation node in the air outlet propagation route based on the air outlet operation time information, which is conducive to improving the accuracy of determining the current air outlet effect of each propagation node, and can quickly and accurately determine the target additional operation time for the propagation node through the current air outlet effect of each propagation node and its expected air outlet effect, or through the current air outlet effect of each propagation node The regional temperature control result brought about by the result can realize accurate and reliable determination of the target additional operation time for the propagation node, which is conducive to improving the flexibility and diversity of determining the target additional operation time for each propagation node, and can also accurately generate the target operation control parameters of the target air conditioner according to the accurate determination of the target additional operation time for each propagation node, which can improve the generation accuracy and flexibility of the operation control parameters of the target air conditioner, and is conducive to improving the accuracy of the subsequent air outlet control of the air outlet propagation route by the target air conditioner based on the accurately generated operation control parameters, and is conducive to accurately controlling the propagation distance of the target air conditioner at each propagation node on the air outlet propagation route, so as to achieve consistent wind speed at each propagation node based on the accurately controlled propagation distance, and then is conducive to improving the comfort of users in the area where the air outlet propagation route is located, and is conducive to meeting the user's demand for intelligent control of the target air conditioner, and is also conducive to improving the user's usage experience and usage stickiness.In addition, the first additional operation time of the target air conditioner for each propagation node can be determined according to the air outlet operation time information, the first additional operation time of the target air conditioner for each propagation node can be accurately determined according to the air outlet operation time information, and all propagation nodes of the air outlet propagation route are classified according to the scene information of the scene in which the target air conditioner is located to obtain a classification result (the classification result includes a first type of propagation node group and a second type of propagation node group), which can improve the classification accuracy and speed of the propagation node. When the first type of propagation node group is not empty, the first additional operation time is determined as the target additional operation time of each propagation node in the first type of propagation node group, which can improve the determination efficiency and speed of the target additional operation time; and / or, when the second type of propagation node group is not empty, according to the airflow diffusion area corresponding to each propagation node in the second type of propagation node group, and the first additional operation time of the propagation node, the second additional operation time of the propagation node is determined as the target additional operation time of the propagation node, which can improve the determination accuracy and reliability of the target additional operation time, and is conducive to improving the determination diversity and flexibility of the target additional operation time based on the diversity of classification results.

[0133] In an optional embodiment, the above step 203 of determining the first additional operation time of the target air conditioner for each propagation node according to the air outlet operation time information may include:

[0134] Determine the continuous air-discharging time and the intermittent air-discharging time of the target air-conditioner according to the air-discharging operation time information;

[0135] Determine the first current air output effect of each propagation node according to the continuous air output time and the intermittent air output time;

[0136] According to a first current air outlet effect of each propagation node and the determined expected air outlet effect of each propagation node, a first additional operation time of the target air conditioner for each propagation node is determined.

[0137] In the embodiment of the present invention, specifically, determining the continuous air outlet time and the intermittent air outlet time of the target air conditioner according to the air outlet operation time information may include:

[0138] Determine the duration of each air outlet operation time according to the start air outlet operation time of each air outlet operation time and the end air outlet operation time of each air outlet operation time included in the air outlet operation time information;

[0139] The air outlet operating time whose duration is greater than or equal to the preset time length is filtered out from all the air outlet operating time, and all the air outlet operating time whose duration is greater than or equal to the preset time length is classified as the continuous air outlet time of the target air conditioner, and all the air outlet operating time whose duration is less than the preset time length is classified as the intermittent air outlet time of the target air conditioner.

[0140] In the embodiment of the present invention, the first current wind output effect includes the first current wind speed condition and the airflow condition. Specifically, the first current wind output effect of each propagation node is determined according to the continuous wind output time and the intermittent wind output time, which may include:

[0141] According to the continuous air outlet time, the intermittent air outlet time and the distance between each propagation node and the target air conditioner, the propagation distance of the air output from the air outlet of the target air conditioner in each propagation node is determined as the air outlet propagation distance of the target air conditioner for the propagation node;

[0142] According to the air outlet propagation distance of the target air conditioner for the propagation node, the current environmental change parameter of the propagation node under the air outlet control of the target air conditioner is determined as the first current air outlet effect of the propagation node.

[0143] It can be seen that this optional embodiment can determine the continuous air outlet time and the intermittent air outlet time of the target air conditioner according to the air outlet operation time information, can accurately determine the continuous air outlet time and the intermittent air outlet time of the target air conditioner, and determine the first current air outlet effect of each propagation node according to the continuous air outlet time and the intermittent air outlet time, can accurately determine the first current air outlet effect of each propagation node, and determine the first additional operation time of the target air conditioner for each propagation node according to the first current air outlet effect of each propagation node and the determined expected air outlet effect of each propagation node, which can improve the accuracy and reliability of determining the first additional operation time.

[0144] In this optional embodiment, as an optional implementation, determining the first additional operation time of the target air conditioner for each propagation node according to the first current air outlet effect of each propagation node and the determined expected air outlet effect of each propagation node may include:

[0145] For each propagation node, compare the first current air outlet effect of the propagation node with the determined expected air outlet effect of the propagation node to obtain an air outlet effect comparison result of the propagation node;

[0146] When the air outlet effect comparison result of the propagation node indicates that the first current air outlet effect of the propagation node has reached the expected air outlet effect of the propagation node, it is determined that the propagation node does not need additional operation of the target air conditioner;

[0147] When the wind outlet effect comparison result of the propagation node indicates that the first current wind outlet effect of the propagation node has not reached the expected wind outlet effect of the propagation node, the corresponding relationship between the wind outlet effect and the operating duration of the propagation node is determined according to the first current wind outlet effect of the propagation node and the current operating duration included in the current operating control parameters of the acquired target air conditioner;

[0148] According to the difference between the first current air outlet effect of the propagation node and the expected air outlet effect of the propagation node, and the correspondence between the air outlet effect and the operation duration of the propagation node, the first additional operation duration of the target air conditioner for the propagation node is determined.

[0149] In an embodiment of the present invention, the expected wind outlet effect may include expected wind speed conditions and airflow conditions, and the expected wind outlet effect of each propagation node may be the wind outlet effect that the user expects to achieve for each propagation node. The expected wind outlet effect may be determined based on the user's regional environmental control requirements for the area where each propagation node is located, wherein the user has corresponding regional environmental control requirements for the area where each propagation node included in the scene where the target air conditioner is located, for example: for the living room area, the user needs the air conditioner to adjust its temperature to 22°C; for the bedroom area, the user needs the air conditioner to adjust its temperature to 24°C; for the kitchen area, the user needs the air conditioner to adjust its temperature to 18°C.

[0150] It can be seen that this optional embodiment can compare the first current air outlet effect of each propagation node and the determined expected air outlet effect of the propagation node to obtain the air outlet effect comparison result of the propagation node, which can improve the accuracy of the determination of the air outlet effect comparison result, and when the air outlet effect comparison result of the propagation node indicates that the first current air outlet effect of the propagation node has reached the expected air outlet effect of the propagation node, it is determined that the propagation node does not need additional operation of the target air conditioner, that is, it is determined that the first additional operation time of the target air conditioner for the propagation node is zero, which can improve the determination speed and efficiency of the first additional operation time, and when the air outlet effect comparison result of the propagation node indicates that the first current air outlet effect of the propagation node has not yet reached the expected air outlet effect of the propagation node, Based on the first current air outlet effect of the propagation node and the current operating duration included in the acquired current operating control parameters of the target air conditioner, the correspondence between the air outlet effect and the operating duration of the propagation node is determined, which can improve the accuracy of determining the correspondence between the air outlet effect and the operating duration. Subsequently, based on the difference between the first current air outlet effect of the propagation node and the expected air outlet effect of the propagation node, and the correspondence between the air outlet effect and the operating duration of the propagation node, the first additional operating duration of the target air conditioner for the propagation node is determined, which can improve the accuracy and reliability of determining the first additional operating duration, and can improve the diversity and flexibility of the method for determining the first additional operating duration according to the diverse air outlet effect comparison results of different propagation nodes.

[0151] In another optional embodiment, the above step 205 classifies all propagation nodes of the wind propagation route according to the scene information to obtain the classification result, which may include:

[0152] According to the scene information and the wind propagation route, the scene information is divided to obtain the area information corresponding to each propagation node;

[0153] For each propagation node, judging whether the surrounding area of ​​the propagation node meets the target conditions for airflow diffusion control according to the area information corresponding to the propagation node;

[0154] When it is determined that the surrounding area of ​​the propagation node meets the target condition, the surrounding area of ​​the propagation node is determined as the airflow diffusion area corresponding to the propagation node;

[0155] When it is determined that the surrounding area of ​​the propagation node does not meet the target condition, determining that there is no corresponding airflow diffusion area for the propagation node;

[0156] All propagation nodes without corresponding airflow diffusion regions among all propagation nodes are classified into the first type of propagation node group, and all propagation nodes with corresponding airflow diffusion regions among all propagation nodes are classified into the second type of propagation node group.

[0157] In an embodiment of the present invention, optionally, the area information corresponding to each propagation node may include the area size of the area corresponding to each propagation node, the area shape of the area, the area area of ​​the area, the device information of the area (such as the type and quantity of smart home appliances, etc.) and the air circulation information of the area, etc., and the embodiment of the present invention is not limited thereto.

[0158] In an embodiment of the present invention, the target condition of airflow diffusion control can be used to indicate whether the surrounding area of ​​the corresponding propagation node meets the demand of being regulated by the target air conditioner. Specifically, for each propagation node, judging whether the surrounding area of ​​the propagation node meets the target condition of airflow diffusion control according to the area information corresponding to the propagation node may include:

[0159] According to the area information corresponding to the propagation node, determine whether the surrounding area of ​​the propagation node has the preset temperature adjustment requirements;

[0160] When it is determined that the surrounding area of ​​the propagation node does not have a temperature adjustment requirement, determining that the surrounding area of ​​the propagation node does not meet the target condition for performing airflow diffusion control;

[0161] When it is determined that the surrounding area of ​​the propagation node has a temperature control demand, based on the area information corresponding to the propagation node and the air outlet facing area of ​​the acquired target air conditioner, it is determined whether there is a surrounding area that is not in the air outlet facing area among all the surrounding areas of the propagation node;

[0162] When it is determined that there is a peripheral area that is not in the wind outlet facing area among all the peripheral areas of the propagation node, it is determined that the peripheral area of ​​the propagation node meets the target condition for performing airflow diffusion control;

[0163] When it is determined that all the surrounding areas of the propagation node are in the wind outlet facing area, it is determined that the surrounding area of ​​the propagation node does not meet the target condition for performing airflow diffusion control.

[0164] It can be seen that this optional implementation method can divide the scene information according to the scene information and the wind propagation route to obtain the area information corresponding to each propagation node, which can improve the accuracy and reliability of the division of the area information corresponding to each propagation node, and according to the area information corresponding to each propagation node, judge whether the surrounding area of ​​the propagation node meets the target conditions for airflow diffusion control to obtain a judgment result. When the judgment result is yes, the surrounding area of ​​the propagation node is determined as the airflow diffusion area corresponding to the propagation node. When the judgment result is no, it is determined that the propagation node does not have a corresponding airflow diffusion area, which can improve the accuracy and reliability of determining whether each propagation node has a corresponding airflow diffusion area. Subsequently, all propagation nodes that do not have corresponding airflow diffusion areas among all propagation nodes are classified into the first type of propagation node group, and all propagation nodes that have corresponding airflow diffusion areas among all propagation nodes are classified into the second type of propagation node group, which can improve the classification accuracy and reliability of all propagation nodes through airflow diffusion areas.

[0165] In another optional embodiment, the above step 207, according to the airflow diffusion area corresponding to each propagation node in the second type propagation node group and the first additional running time of the propagation node, determines the second additional running time of the propagation node as the target additional running time of the propagation node, which may include:

[0166] For each propagation node in the second type of propagation node group, determining the area information of the airflow diffusion region corresponding to the propagation node according to the region information corresponding to the propagation node;

[0167] Determine a second current air outlet effect of the airflow diffusion area corresponding to the propagation node;

[0168] The second additional operation time of the propagation node is determined according to the first additional operation time of the propagation node, the area information of the airflow diffusion region and the second current air outlet effect.

[0169] In an embodiment of the present invention, the second current wind outlet effect of the airflow diffusion area corresponding to each propagation node can be obtained after the first current wind outlet effect of each propagation node is diffused in the airflow diffusion area corresponding to each propagation node. Specifically, the degree of diffusion of the first current wind outlet effect of the propagation node by the airflow diffusion area can be analyzed based on the area information of the airflow diffusion area corresponding to each propagation node, and the second current wind outlet effect of the airflow diffusion area corresponding to the propagation node can be determined based on the diffusion degree and the first current wind outlet effect of the propagation node.

[0170] It can be seen that this optional embodiment can determine the area information of the airflow diffusion area corresponding to each propagation node in the second type of propagation node group based on the area information corresponding to the propagation node, thereby improving the accuracy of determining the airflow diffusion area and thus improving the accuracy of determining the area information of the airflow diffusion area, and automatically determine the second current wind outlet effect of the airflow diffusion area corresponding to the propagation node, as well as determine the second additional operation time of the propagation node based on the first additional operation time of the propagation node, the area information of the airflow diffusion area and the second current wind outlet effect, thereby improving the accuracy and reliability of determining the second additional operation time of each propagation node in the second type of propagation node group.

[0171] Embodiment 3

[0172] See also Figure 4 , Figure 4 1 is a schematic diagram of a structure of a device for generating air-conditioning operation control parameters based on air outlet time disclosed in an embodiment of the present invention. Figure 4 The described device for generating the air-conditioning operation control parameters based on the air outlet time may include a generating device or a generating server, wherein the generating server may include a cloud server or a local server, which is not limited in the embodiment of the present invention. Figure 4 As shown, the device for generating the air-conditioning operation control parameter based on the air outlet time may include:

[0173] The determination module 301 is used to determine the air outlet propagation route of the target air conditioner. The air outlet propagation route includes at least one propagation node, and the propagation node is used to propagate the air outlet output by the target air conditioner.

[0174] The determination module 301 is further used to determine the air outlet operation time information of the target air conditioner, and determine the target additional operation time of the target air conditioner for each propagation node according to the air outlet operation time information.

[0175] The generating module 302 is used to generate target operation control parameters of the target air conditioner according to the target additional operation duration corresponding to each propagation node.

[0176] It can be seen that the implementation Figure 4The described device for generating air-conditioning operation control parameters based on air outlet time can determine the air outlet propagation route of the target air-conditioner (the air outlet propagation route includes at least one propagation node), determine the air outlet operation time information of the target air-conditioner, and determine the target additional operation time of the target air-conditioner for each propagation node based on the air outlet operation time information, and generate the target operation control parameters of the target air-conditioner based on the target additional operation time corresponding to each propagation node, and can automatically determine the air outlet propagation route and air outlet operation time information of the target air-conditioner, and can accurately determine the current air outlet effect of the target air-conditioner for each propagation node in the air outlet propagation route based on the air outlet operation time information, which is conducive to improving the accuracy of determining the current air outlet effect of each propagation node, and can quickly and accurately determine the target additional operation time for the propagation node through the current air outlet effect of each propagation node and its expected air outlet effect, or through the current air outlet effect of each propagation node The regional temperature control result brought about by the result can realize accurate and reliable determination of the target additional operation time for the propagation node, which is conducive to improving the flexibility and diversity of determining the target additional operation time for each propagation node, and can also accurately generate the target operation control parameters of the target air conditioner according to the accurate determination of the target additional operation time for each propagation node, which can improve the generation accuracy and flexibility of the operation control parameters of the target air conditioner, and is conducive to improving the accuracy of the subsequent air outlet control of the air outlet propagation route by the target air conditioner based on the accurately generated operation control parameters, and is conducive to accurately controlling the propagation distance of the target air conditioner at each propagation node on the air outlet propagation route, so as to achieve consistent wind speed at each propagation node based on the accurately controlled propagation distance, and then is conducive to improving the comfort of users in the area where the air outlet propagation route is located, and is conducive to meeting the user's demand for intelligent control of the target air conditioner, and is also conducive to improving the user's usage experience and usage stickiness.

[0177] In an optional embodiment, the determination module 301 determines the target additional operation time of the target air conditioner for each propagation node according to the air outlet operation time information, which may specifically include:

[0178] Determine the first additional operation time of the target air conditioner for each propagation node according to the air outlet operation time information;

[0179] Obtain scene information of the scene where the target air conditioner is located;

[0180] According to the scene information, all propagation nodes of the wind propagation route are classified to obtain the classification results, which include the first-category propagation node group and the second-category propagation node group. The first-category propagation node group is empty or all propagation nodes in the first-category propagation node group do not have corresponding airflow diffusion areas, the second-category propagation node group is empty or all propagation nodes in the second-category propagation node group have corresponding airflow diffusion areas, and the first-category propagation node group and the second-category propagation node group are not empty at the same time;

[0181] When the first type propagation node group is not empty, determining a first additional running time as a target additional running time of each propagation node in the first type propagation node group; and / or,

[0182] When the second type propagation node group is not empty, the second additional running time of the propagation node is determined according to the airflow diffusion area corresponding to each propagation node in the second type propagation node group and the first additional running time of the propagation node, as the target additional running time of the propagation node, and the second additional running time is greater than the first additional running time.

[0183] It can be seen that this optional embodiment can determine the first additional operation time of the target air conditioner for each propagation node according to the air outlet operation time information, can accurately determine the first additional operation time of the target air conditioner for each propagation node according to the air outlet operation time information, and classify all propagation nodes of the air outlet propagation route according to the acquired scene information of the scene in which the target air conditioner is located to obtain a classification result (the classification result includes a first-class propagation node group and a second-class propagation node group), which can improve the classification accuracy and speed of the propagation node. When the first-class propagation node group is not empty, the first additional operation time is determined as the target additional operation time of each propagation node in the first-class propagation node group, which can improve the determination efficiency and speed of the target additional operation time; and / or, when the second-class propagation node group is not empty, according to the airflow diffusion area corresponding to each propagation node in the second-class propagation node group, and the first additional operation time of the propagation node, the second additional operation time of the propagation node is determined as the target additional operation time of the propagation node, which can improve the determination accuracy and reliability of the target additional operation time, and is conducive to improving the determination diversity and flexibility of the target additional operation time based on the diversity classification results.

[0184] In this optional embodiment, as an optional implementation, the determination module 301 determines the first additional operation time of the target air conditioner for each propagation node according to the air outlet operation time information, which may specifically include:

[0185] Determine the continuous air-discharging time and the intermittent air-discharging time of the target air-conditioner according to the air-discharging operation time information;

[0186] Determine a first current wind output effect of each propagation node according to the continuous wind output time and the intermittent wind output time, wherein the first current wind output effect includes a first current wind speed condition and an airflow condition;

[0187] According to a first current air outlet effect of each propagation node and the determined expected air outlet effect of each propagation node, a first additional operation time of the target air conditioner for each propagation node is determined.

[0188] It can be seen that this optional implementation method can determine the continuous air outlet time and the intermittent air outlet time of the target air conditioner according to the air outlet operation time information, can accurately determine the continuous air outlet time and the intermittent air outlet time of the target air conditioner, and determine the first current air outlet effect of each propagation node according to the continuous air outlet time and the intermittent air outlet time, can accurately determine the first current air outlet effect of each propagation node, and determine the first additional operation time of the target air conditioner for each propagation node according to the first current air outlet effect of each propagation node and the determined expected air outlet effect of each propagation node, which can improve the accuracy and reliability of determining the first additional operation time.

[0189] In this optional implementation, optionally, the determination module 301 determines the first additional operation time of the target air conditioner for each propagation node according to the first current air outlet effect of each propagation node and the determined expected air outlet effect of each propagation node, including:

[0190] For each propagation node, compare the first current air outlet effect of the propagation node with the determined expected air outlet effect of the propagation node to obtain an air outlet effect comparison result of the propagation node;

[0191] When the air outlet effect comparison result of the propagation node indicates that the first current air outlet effect of the propagation node has reached the expected air outlet effect of the propagation node, it is determined that the propagation node does not need additional operation of the target air conditioner;

[0192] When the wind outlet effect comparison result of the propagation node indicates that the first current wind outlet effect of the propagation node has not reached the expected wind outlet effect of the propagation node, the corresponding relationship between the wind outlet effect and the operating duration of the propagation node is determined according to the first current wind outlet effect of the propagation node and the current operating duration included in the current operating control parameters of the acquired target air conditioner;

[0193] According to the difference between the first current air outlet effect of the propagation node and the expected air outlet effect of the propagation node, and the correspondence between the air outlet effect and the operation duration of the propagation node, the first additional operation duration of the target air conditioner for the propagation node is determined.

[0194] It can be seen that this optional implementation scheme can also compare the first current air outlet effect of each propagation node and the determined expected air outlet effect of the propagation node to obtain the air outlet effect comparison result of the propagation node, which can improve the accuracy of the determination of the air outlet effect comparison result, and when the air outlet effect comparison result of the propagation node indicates that the first current air outlet effect of the propagation node has reached the expected air outlet effect of the propagation node, it is determined that the propagation node does not need additional operation of the target air conditioner, that is, it is determined that the first additional operation time of the target air conditioner for the propagation node is zero, which can improve the determination speed and efficiency of the first additional operation time, and when the air outlet effect comparison result of the propagation node indicates that the first current air outlet effect of the propagation node has not yet reached the expected air outlet effect of the propagation node , according to the first current air outlet effect of the propagation node and the current operating duration included in the current operating control parameters of the acquired target air conditioner, the correspondence between the air outlet effect and the operating duration of the propagation node is determined, which can improve the accuracy of determining the correspondence between the air outlet effect and the operating duration, and then according to the difference between the first current air outlet effect of the propagation node and the expected air outlet effect of the propagation node, and the correspondence between the air outlet effect and the operating duration of the propagation node, the first additional operating duration of the target air conditioner for the propagation node is determined, which can improve the accuracy and reliability of determining the first additional operating duration, and can improve the diversity and flexibility of the determination method of the first additional operating duration according to the diverse air outlet effect comparison results of different propagation nodes.

[0195] In this optional embodiment, as another optional implementation, the determination module 301 classifies all propagation nodes of the wind propagation route according to the scene information, and the method of obtaining the classification result may specifically include:

[0196] According to the scene information and the wind propagation route, the scene information is divided to obtain the area information corresponding to each propagation node;

[0197] For each propagation node, judging whether the surrounding area of ​​the propagation node meets the target conditions for airflow diffusion control according to the area information corresponding to the propagation node;

[0198] When it is determined that the surrounding area of ​​the propagation node meets the target condition, the surrounding area of ​​the propagation node is determined as the airflow diffusion area corresponding to the propagation node;

[0199] When it is determined that the surrounding area of ​​the propagation node does not meet the target condition, determining that there is no corresponding airflow diffusion area for the propagation node;

[0200] All propagation nodes without corresponding airflow diffusion regions among all propagation nodes are classified into the first type of propagation node group, and all propagation nodes with corresponding airflow diffusion regions among all propagation nodes are classified into the second type of propagation node group.

[0201] It can be seen that this optional implementation method can divide the scene information according to the scene information and the wind propagation route to obtain the area information corresponding to each propagation node, which can improve the accuracy and reliability of the division of the area information corresponding to each propagation node, and according to the area information corresponding to each propagation node, judge whether the surrounding area of ​​the propagation node meets the target conditions for airflow diffusion control to obtain a judgment result. When the judgment result is yes, the surrounding area of ​​the propagation node is determined as the airflow diffusion area corresponding to the propagation node. When the judgment result is no, it is determined that the propagation node does not have a corresponding airflow diffusion area, which can improve the accuracy and reliability of determining whether each propagation node has a corresponding airflow diffusion area. Subsequently, all propagation nodes that do not have corresponding airflow diffusion areas among all propagation nodes are classified into the first type of propagation node group, and all propagation nodes that have corresponding airflow diffusion areas among all propagation nodes are classified into the second type of propagation node group, which can improve the classification accuracy and reliability of all propagation nodes through airflow diffusion areas.

[0202] In this optional embodiment, as another optional implementation, the determination module 301 determines the second additional running time of the propagation node according to the airflow diffusion area corresponding to each propagation node in the second type propagation node group and the first additional running time of the propagation node. The method of using the target additional running time of the propagation node as the propagation node may specifically include:

[0203] For each propagation node in the second type of propagation node group, determining the area information of the airflow diffusion region corresponding to the propagation node according to the region information corresponding to the propagation node;

[0204] Determine a second current air outlet effect of the airflow diffusion area corresponding to the propagation node;

[0205] The second additional operation time of the propagation node is determined according to the first additional operation time of the propagation node, the area information of the airflow diffusion region and the second current air outlet effect.

[0206] It can be seen that this optional implementation can determine the area information of the airflow diffusion area corresponding to each propagation node in the second type of propagation node group based on the area information corresponding to the propagation node, thereby improving the accuracy of determining the airflow diffusion area and thus improving the accuracy of determining the area information of the airflow diffusion area, and automatically determine the second current wind outlet effect of the airflow diffusion area corresponding to the propagation node, as well as determine the second additional operation time of the propagation node based on the first additional operation time of the propagation node, the area information of the airflow diffusion area and the second current wind outlet effect, thereby improving the accuracy and reliability of determining the second additional operation time of each propagation node in the second type of propagation node group.

[0207] In another optional embodiment, the manner in which the determination module 301 determines the air outlet propagation route of the target air conditioner may specifically include:

[0208] Obtain the current operating control parameters of the target air conditioner;

[0209] According to the current operation control parameters, the air outlet propagation route of the target air conditioner is determined.

[0210] It can be seen that this optional embodiment can obtain the current operating control parameters of the target air conditioner, and determine the air outlet propagation route of the target air conditioner based on the current operating control parameters, and can quickly and accurately determine the air outlet propagation route of the target air conditioner based on the acquired current operating control parameters of the target air conditioner, thereby facilitating improving the accuracy of subsequent determination of the target additional operating time based on the accurately determined air outlet propagation route.

[0211] In this optional embodiment, as an optional implementation, the generation module 302 generates the target operation control parameters of the target air conditioner according to the target additional operation time corresponding to each propagation node, which may specifically include:

[0212] The target operation control parameters of the target air conditioner are generated according to the target additional operation time corresponding to each propagation node and the current operation control parameters.

[0213] It can be seen that this optional implementation method can generate the target operation control parameters of the target air conditioner according to the target additional operation time corresponding to each propagation node and the current operation control parameters, and can flexibly and accurately generate the target operation control parameters of the target air conditioner based on the current operation control parameters according to the target additional operation time with diversified values.

[0214] Embodiment 4

[0215] See also Figure 5 , Figure 5 FIG. 1 is a schematic diagram of the structure of another device for generating air-conditioning operation control parameters based on air outlet time disclosed in an embodiment of the present invention. Figure 5 As shown, the device for generating the air-conditioning operation control parameter based on the air outlet time may include:

[0216] A memory 401 storing executable program codes;

[0217] a processor 402 coupled to the memory 401;

[0218] The processor 402 calls the executable program code stored in the memory 401 to execute the steps in the method for generating air-conditioning operation control parameters based on the air outlet time described in the first embodiment of the present invention or the second embodiment of the present invention.

[0219] Embodiment 5

[0220] An embodiment of the present invention discloses a computer storage medium, which stores computer instructions. When the computer instructions are called, they are used to execute the steps in the method for generating air conditioning operation control parameters based on air outlet time described in Embodiment 1 or Embodiment 2 of the present invention.

[0221] Embodiment 6

[0222] An embodiment of the present invention discloses a computer program product, which includes a non-transitory computer-readable storage medium storing a computer program, and the computer program is operable to enable a computer to execute the steps in the method for generating air-conditioning operation control parameters based on air outlet time described in Example 1 or Example 2.

[0223] The device embodiments described above are only illustrative, wherein the modules described as separate components may or may not be physically separated, and the components displayed as modules may or may not be physical modules, i.e., they may be located in one place, or they may be distributed on multiple network modules. Some or all of the modules may be selected according to actual needs to achieve the purpose of the scheme of this embodiment. Those of ordinary skill in the art may understand and implement it without creative work.

[0224] Through the specific description of the above embodiments, those skilled in the art can clearly understand that each implementation method can be implemented by means of software plus a necessary general hardware platform, and of course, it can also be implemented by hardware. Based on such an understanding, the above technical solution can be essentially or partly contributed to the prior art in the form of a software product, and the computer software product can be stored in a computer-readable storage medium, and the storage medium includes a read-only memory (ROM), a random access memory (RAM), a programmable read-only memory (PROM), an erasable programmable read-only memory (EPROM), a one-time programmable read-only memory (OTPROM), an electronically erasable rewritable read-only memory (EEPROM), a compact disc (CD-ROM) or other optical disc storage, magnetic disk storage, magnetic tape storage, or any other computer-readable medium that can be used to carry or store data.

[0225] Finally, it should be noted that the method and device for generating air-conditioning operation control parameters based on air outlet time disclosed in the embodiment of the present invention disclose only the preferred embodiments of the present invention, which are only used to illustrate the technical scheme of the present invention, rather than to limit it. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that the technical schemes described in the aforementioned embodiments can still be modified, or some of the technical features therein can be replaced by equivalents. However, these modifications or replacements do not deviate the essence of the corresponding technical schemes from the spirit and scope of the technical schemes of the embodiments of the present invention.

Claims

1. A method for generating air conditioning operation control parameters based on air outlet time, It is characterized in that The method comprises: Determine an air outlet propagation route of a target air conditioner, wherein the air outlet propagation route includes at least one propagation node, and the propagation node is used to propagate the air outlet output by the target air conditioner; Determine the air outlet operation time information of the target air conditioner, and determine the target additional operation time of the target air conditioner for each of the propagation nodes according to the air outlet operation time information; According to the target additional operation time corresponding to each of the propagation nodes, a target operation control parameter of the target air conditioner is generated.

2. The method for generating air conditioning operation control parameters based on air outlet time according to claim 1, It is characterized in that The step of determining, according to the air outlet operation time information, a target additional operation time of the target air conditioner for each of the propagation nodes includes: Determining, according to the air outlet operation time information, a first additional operation time of the target air conditioner for each of the propagation nodes; Acquire scene information of the scene where the target air conditioner is located; According to the scene information, all propagation nodes of the wind propagation route are classified to obtain a classification result, wherein the classification result includes a first-category propagation node group and a second-category propagation node group, the first-category propagation node group is empty or all propagation nodes in the first-category propagation node group do not have corresponding airflow diffusion areas, the second-category propagation node group is empty or all propagation nodes in the second-category propagation node group have corresponding airflow diffusion areas, and the first-category propagation node group and the second-category propagation node group are not empty at the same time; When the first type of propagation node group is not empty, determining the first additional running time as the target additional running time of each propagation node in the first type of propagation node group; and / or, When the second type of propagation node group is not empty, the second additional running time of the propagation node is determined according to the airflow diffusion area corresponding to each propagation node in the second type of propagation node group and the first additional running time of the propagation node, as the target additional running time of the propagation node, and the second additional running time is greater than the first additional running time.

3. The method for generating air conditioning operation control parameters based on air outlet time according to claim 2, It is characterized in that The step of determining, according to the air outlet operation time information, a first additional operation time of the target air conditioner for each of the propagation nodes includes: Determine the continuous air outlet time of the target air conditioner and the intermittent air outlet time of the target air conditioner according to the air outlet operation time information; Determine a first current wind output effect of each of the propagation nodes according to the continuous wind output time and the intermittent wind output time, wherein the first current wind output effect includes a first current wind speed condition and an airflow condition; According to a first current air outlet effect of each of the propagation nodes and the determined expected air outlet effect of each of the propagation nodes, a first additional operation time of the target air conditioner for each of the propagation nodes is determined.

4. The method for generating air conditioning operation control parameters based on air outlet time according to claim 3, It is characterized in that The determining, according to the first current air outlet effect of each of the propagation nodes and the determined expected air outlet effect of each of the propagation nodes, a first additional operation time of the target air conditioner for each of the propagation nodes comprises: For each of the propagation nodes, compare the first current air outlet effect of the propagation node with the determined expected air outlet effect of the propagation node to obtain an air outlet effect comparison result of the propagation node; When the air outlet effect comparison result of the propagation node indicates that the first current air outlet effect of the propagation node has reached the expected air outlet effect of the propagation node, it is determined that the propagation node does not need additional operation of the target air conditioner; When the wind outlet effect comparison result of the propagation node indicates that the first current wind outlet effect of the propagation node has not reached the expected wind outlet effect of the propagation node, the corresponding relationship between the wind outlet effect and the operating duration of the propagation node is determined according to the first current wind outlet effect of the propagation node and the current operating duration included in the current operating control parameters of the acquired target air conditioner; According to the difference between the first current air outlet effect of the propagation node and the expected air outlet effect of the propagation node, and the correspondence between the air outlet effect and the operation duration of the propagation node, the first additional operation duration of the target air conditioner for the propagation node is determined.

5. The method for generating air-conditioning operation control parameters based on air outlet time according to any one of claims 2 to 4, It is characterized in that The step of classifying all propagation nodes of the wind propagation route according to the scene information to obtain a classification result includes: According to the scene information and the wind propagation route, the scene information is divided to obtain the area information corresponding to each of the propagation nodes; For each of the propagation nodes, judging whether the surrounding area of ​​the propagation node meets the target conditions for airflow diffusion control according to the area information corresponding to the propagation node; When it is determined that the surrounding area of ​​the propagation node meets the target condition, determining the surrounding area of ​​the propagation node as the airflow diffusion area corresponding to the propagation node; When it is determined that the surrounding area of ​​the propagation node does not meet the target condition, determining that the propagation node does not have a corresponding airflow diffusion area; All propagation nodes without corresponding airflow diffusion areas among all the propagation nodes are classified into a first type of propagation node group, and all propagation nodes with corresponding airflow diffusion areas among all the propagation nodes are classified into a second type of propagation node group.

6. The method for generating air-conditioning operation control parameters based on air outlet time according to any one of claims 2 to 4, It is characterized in that The determining, according to the airflow diffusion area corresponding to each propagation node in the second type propagation node group and the first additional running time of the propagation node, the second additional running time of the propagation node as the target additional running time of the propagation node includes: For each propagation node in the second type of propagation node group, determining the area information of the airflow diffusion region corresponding to the propagation node according to the region information corresponding to the propagation node; Determine a second current air outlet effect of the airflow diffusion area corresponding to the propagation node; The second additional operation time of the propagation node is determined according to the first additional operation time of the propagation node, the area information of the airflow diffusion area, and the second current air outlet effect.

7. The method for generating air-conditioning operation control parameters based on air outlet time according to any one of claims 1 to 4, It is characterized in that Determining the air outlet propagation route of the target air conditioner includes: Obtain the current operating control parameters of the target air conditioner; Determining an air outlet propagation route of the target air conditioner according to the current operation control parameter; And, generating the target operation control parameters of the target air conditioner according to the target additional operation duration corresponding to each of the propagation nodes includes: The target operation control parameters of the target air conditioner are generated according to the target additional operation duration corresponding to each of the propagation nodes and the current operation control parameters.

8. A device for generating air conditioning operation control parameters based on air outlet time, It is characterized in that The device comprises: A determination module, used to determine an air outlet propagation route of a target air conditioner, wherein the air outlet propagation route includes at least one propagation node, and the propagation node is used to propagate the air outlet output by the target air conditioner; The determination module is further configured to determine the air outlet operation time information of the target air conditioner, and determine the target additional operation time of the target air conditioner for each of the propagation nodes according to the air outlet operation time information; A generating module is used to generate a target operating control parameter of the target air conditioner according to the target additional operating time corresponding to each of the propagation nodes.

9. A device for generating air conditioning operation control parameters based on air outlet time, It is characterized in that The device comprises: A memory storing executable program code; a processor coupled to the memory; The processor calls the executable program code stored in the memory to execute the method for generating air-conditioning operation control parameters based on air outlet time as described in any one of claims 1-7.

10. A computer storage medium, It is characterized in that The computer storage medium stores computer instructions, and when the computer instructions are called, they are used to execute the method for generating air-conditioning operation control parameters based on air outlet time as described in any one of claims 1-7.

Citation Information

Patent Citations

  • Air conditioner directional air supply method

    CN108119992A

  • Air outlet control method, device, terminal and system of air conditioner

    CN114963444A

  • Ion purification control method and system, computer equipment and storage medium

    CN116007158A

  • Method and device for intelligently controlling air outlet

    CN116792860A

  • Air conditioner wind direction adjusting method and device based on environment information

    CN116951700A