Green intelligent variable space residence and space transformation method

By adopting grille frame and partition wall installation groove design in variable space residences, combined with embedded pipelines and magnetic fasteners, the problems of high professional skills requirements and complex space transformation process are solved, and flexibility and convenience are achieved space adjustment and electrical connection stability.

CN119466391APending Publication Date: 2025-02-18CHINA CONSTR THIRD ENG BUREAU GRP CO LTD
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
CN202411567137.5
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-11-05
Publication Date
2025-02-18

AI Technical Summary

Technical Problem

The existing variable space residential technology requires high professional skills for the construction workers, additional learning costs and time are required for residents to adjust space, and the space transformation process is complex.

Method used

Using a design that combines the grille frame and partition wall installation groove, the partition wall can move in the grooves within the grille frame, achieving flexible spatial layout adjustment. Through the use of embedded pipelines and magnetic fasteners, the transformation process of the power system and the movement and positioning of partition walls are simplified.

Benefits of technology

The stepless change of space and lossless reversible installation are realized, which simplifies the process of residents adjusting space by themselves, improves the flexibility and convenience of space transformation, and maintains the safety and stability of electrical connections.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119466391A_ABST
    Figure CN119466391A_ABST
Patent Text Reader

Abstract

The invention discloses a green intelligent variable space residence and a space transformation method, the variable space residence comprises a grid frame, the grid frame is provided with a plurality of grid rooms, the bottom side of the grid frame is provided with a partition wall mounting groove, and the side wall of the grid frame is provided with pipeline wiring holes communicating the grid rooms with the partition wall mounting groove; the top of the partition wall is arranged in the partition wall mounting groove in a penetrating mode, a power connection input port and a power connection output port are formed in the wall face of the partition wall, and a pre-buried pipeline connected with the power connection input port and the power connection output port is pre-buried in the partition wall; and after the partition wall moves to a preset position, the power connection input port is communicated with the pipeline wiring hole. The problems that the requirement of variable space residences for professional skills of constructors is too high, extra learning cost is needed for follow-up space adjustment of residents, the space conversion period is long, and the process is complex are solved, two persons can be refreshed for eight hours, operation is convenient and efficient, the indoor space is freely and personally DIY, and non-stop upgrading is achieved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the technical field of variable housing, and in particular to a green intelligent variable space housing and a space transformation method. Background Art

[0002] Variable space design makes the space design more flexible and dynamic without destroying the original load-bearing structure of the house. It is based on factors such as family structure, occupation, living standard and personal living habits of the residents. Variable space design can not only divide the use function of the space, but also shape the relationship between people living in it. Its innovation lies in changing the division rules of traditional residential space, replacing the single and rigid space form with a complex space form and a flowing space form, so that the space environment can better adapt to the personalized life needs of contemporary people.

[0003] In the related art, the patent with the announcement number CN113374125A discloses a residential room type that can be changed by the residents themselves, which includes: a basic room type, the basic room type has a large space, and the distance between the load-bearing walls on both sides of the large space is at least two bays, which provides a spatial basis for flexible room division; a movable partition wall body, the partition wall body is modularly designed, wherein the basic room type is provided with a guide rail, and the movable partition wall body moves in the guide rail, wherein the movable partition wall is moved to a predetermined position, and then spliced ​​to partition the bay to form a room, or the movable partition wall is moved back to form a large space. According to the residential room type that can be changed by the residents themselves in this application, the residents can change the residential room type by themselves as needed without additional construction, and the residents can make temporary or permanent changes to the indoor space conveniently and quickly by pushing the movable inner partition wall.

[0004] With respect to the above-mentioned related technologies, the movable partition wall can integrate a high-voltage circuit, and can be provided with a main switch, and can be provided with a high-voltage circuit overload and electric shock protection device. In addition, pipeline through holes can be reserved in the partition wall for later use, for example, the reserved pipeline through holes can be used to arrange weak-voltage pipelines. Although the above method can solve the problem that circuit pipelines need to be rearranged as the indoor space changes to a certain extent, this method requires re-threading and re-connecting of electricity in the partition wall with each change in the layout of the residential space. On the one hand, it requires residents to have corresponding skills, and on the other hand, it is time-consuming and labor-intensive. Summary of the invention

[0005] In order to solve the problems that variable-space housing requires too high professional skills for constructors, residents need additional learning costs for subsequent space adjustments, and the space transformation cycle is long and the process is complicated, the present application provides a green intelligent variable-space housing and a space transformation method.

[0006] The first aspect of the present application provides a green intelligent variable space residence adopting the following technical solution: A green intelligent variable space house, comprising: A grid frame is used to connect with the bottom surface of the top plate, the grid frame has a plurality of grid spaces that are connected vertically, a plurality of partition wall installation grooves that are crisscrossed and interconnected are opened on the bottom side of the grid frame, the partition wall installation grooves surround the circumference of the grid space, and a pipeline routing hole connecting the grid space and the partition wall installation grooves is opened on the side wall of the grid frame; A partition wall, wherein the bottom side of the partition wall is used to abut against the ground, the top of the partition wall is inserted into the partition wall installation groove and the partition wall can move along the extension direction of the partition wall installation groove, the wall surface of the partition wall is provided with an electric input port and an electric output port, and a pre-buried pipeline connecting the electric input port and the electric output port is pre-buried in the partition wall; Wherein, after the partition wall moves to a predetermined position, the power input port is communicated with the pipeline routing hole.

[0007] By adopting the above-mentioned technical solution, stepless spatial changes and lossless reversible installation are achieved. Specifically, the grid frame is connected to the bottom surface of the top plate and is connected to a plurality of partition wall installation grooves that are criss-crossed and interconnected through the bottom side thereof, so that the partition wall can move in a specific direction within these grooves to achieve flexible spatial layout adjustment. The pipeline routing holes in the grid frame in the present application solution are conducive to the routing of indoor air ducts, air-conditioning pipes, water pipes, electric pipes and other pipelines. The pipelines are uniformly integrated in the grid frame, which is conducive to sorting and rearrangement, and improves the convenience of pipeline rearrangement; in the present application solution, after the partition wall is moved to the predetermined position, the power input port is accurately connected to the pipeline routing holes on the side wall of the grid frame, which simplifies the transformation process of the power system and supports quick and convenient changes in the indoor layout while maintaining smooth and safe electrical connections.

[0008] Optionally, a first permanent magnet is embedded in the side of the partition wall facing away from the power input port, the power input port is arranged opposite to the first permanent magnet, and a magnetic fastener can be connected to the pipeline routing hole, and the magnetic fastener is magnetically connected to the first permanent magnet.

[0009] By adopting the above technical solution, the partition wall can be quickly moved to the predetermined position, which simplifies the movement and positioning process of the partition wall, realizes the rapid and accurate installation and disassembly of the partition wall, improves the flexibility and convenience of space transformation, and can further improve the stability of the partition wall in the installation position.

[0010] Optionally, the magnetic fastener is threadedly connected to the inner wall of the pipeline routing hole, and the end of the magnetic fastener can abut against the first permanent magnet.

[0011] By adopting the above technical solution, the position of the partition wall can be further locked by using the magnetic fastener, so that the partition wall can remain stable in the installation position. In addition, the magnetic fastener abuts against the first permanent magnet, which can reduce the damage of the magnetic fastener to the partition wall and realize multiple non-destructive disassembly and assembly of the partition wall. On the other hand, the magnetic fastener is magnetically connected to the first permanent magnet, making the connection of the magnetic fastener to the grid frame more stable.

[0012] Optionally, the module of the partition wall is the same as the module of the grille, the connection between adjacent partition walls is located at the connecting point of multiple partition wall installation grooves, and the pipeline routing hole is arranged in the middle of the grille frame.

[0013] By adopting the above technical solution, when adjacent partition walls are vertically spliced, the splicing gap exposed on the outside can be reduced, thereby improving the appearance of the wall surface. In addition, the partition wall and the grid frame can be accurately matched to ensure that the partition wall can move smoothly on the specified path, and it is convenient for the accurate docking of the pipeline routing hole and the power input port, thereby improving the flexibility and convenience of space transformation. Specifically, the modulus of the partition wall is the same as the modulus between the grids, which makes the partition wall more stable during movement. The connection between adjacent partition walls is located at the connection point of multiple partition wall installation grooves, which ensures the flexible layout of the partition wall. At the same time, the pipeline routing hole is set in the middle of the grid frame to facilitate the rapid access and adjustment of the circuit pipeline, thereby improving the efficiency of space transformation.

[0014] Optionally, the variable space residence also includes a ceiling, and a panel mounting groove is opened at the groove of the partition wall mounting groove, the groove size of the panel mounting groove is larger than the groove size of the partition wall mounting groove, the inner side edge of the ceiling is snapped into the panel mounting groove, the top surface of the ceiling abuts against the bottom side of the grid frame, and the outer side edge of the ceiling can abut against the wall surface of the partition wall.

[0015] By adopting the above technical scheme, no matter whether the grid frame is installed with a partition wall somewhere, the ceiling can be effectively installed to the grid frame bottom side. In addition, the position where the partition wall is installed can further stabilize the installation position of the partition wall by utilizing the ceiling.

[0016] Optionally, a decorative strip installation groove is reserved between the side of the ceiling and the bottom of the panel installation groove. When the partition wall is not inserted into the partition wall installation groove, decorative strips are inserted into adjacent decorative strip installation grooves. The decorative strips seal the gaps between adjacent ceilings, and decorative blocks are sealed between adjacent decorative strips. The ceiling, decorative strips and decorative blocks partition the upper and lower spaces on the bottom side of the grille frame.

[0017] By adopting the above technical solution, no matter how the indoor space layout changes, the partition function of the partition wall, ceiling, decorative strips and decorative blocks can be used to make each space relatively independent, enhance the insulation function of the partition space, help reduce heat loss, and play a role in energy saving and environmental protection. In addition, the ceiling, decorative strips and decorative blocks can be selected in different styles to further decorate the indoor space.

[0018] Optionally, a sound insulation pad is provided between the bottom side of the partition wall and the ground, and when the sound insulation pad is removed, the top of the partition wall can be placed in the panel mounting groove.

[0019] By adopting the above technical solution, the sound insulation effect is enhanced while ensuring that the bottom of the partition wall is in contact with the ground. When the partition wall needs to be removed, after removing the sound insulation pad, the top of the partition wall can be directly placed in the panel installation groove, and then the partition wall can be turned over and removed; the installation of the partition wall is similar. This solution facilitates the flexible movement and non-destructive removal of the partition wall, realizing the rapid transformation of space.

[0020] Optionally, the inner side edge of the ceiling is provided with a serrated elastic clamping portion, and the groove wall of the panel mounting groove is provided with a clamping groove, and the serrated elastic clamping portion is clamped in the clamping groove. When the serrated elastic clamping portion is squeezed, it tends to move toward the outside of the ceiling so that the outer side edge of the ceiling abuts against the wall surface of the partition wall.

[0021] By adopting the above technical solution, the outer side of the ceiling can be closely fitted with the wall surface of the partition wall, thereby enhancing the connection stability among the grid frame, the ceiling and the partition wall, simplifying the installation process and improving the installation efficiency.

[0022] Optionally, the variable space residence also includes a movable kitchen and bathroom, which moves under the grille frame.

[0023] By adopting the above technical solution, since the grille frame can provide routing for air ducts, air conditioning pipes, water pipes, electric pipes and other pipelines, after adjusting the position of the movable kitchen and bathroom, the corresponding pipelines can be quickly laid out, further enhancing the flexibility and ease of use of the residential space, and supporting "non-stop" upgrades and convenient and efficient personalized space customization.

[0024] A space transformation method provided in the second aspect of the present application adopts the following technical solution: A space transformation method, based on the above green intelligent variable space house, comprises the following steps: S1. Dismantle the circuit pipeline connected to the power input port; S2. Unlock the partition wall; S3, moving the partition wall, using the partition wall to partition the indoor space, and rearranging the indoor space; S4, move the partition wall to the predetermined position so that the power input port is connected with the pipeline routing hole; S5, arranging water and electricity pipelines in the grid frame, and reconnecting the circuit pipelines to the power input port.

[0025] By adopting the above technical solution, the space transformation method can realize stepless changes of residential space through simple and convenient operations without the need for professional workers. Specifically, after removing the circuit pipeline connected to the power input port, the lock of the partition wall is released, and the partition wall can be easily moved to rearrange the indoor space. When moving the partition wall, the top of the partition wall can move in the partition wall installation groove in the grid frame, and after moving to the predetermined position, the power input port and the pipeline routing hole are connected. Subsequently, the water and electricity pipelines are combed in the grid frame, and the circuit pipelines are reconnected to the power input port to complete the space transformation process. This method realizes the rapid transformation of free spatial layout and improves the flexibility and utilization efficiency of the space.

[0026] In summary, the present application includes at least one of the following beneficial technical effects: 1. The pipeline routing holes in the grille frame in the present application are conducive to the routing of indoor air ducts, air-conditioning pipes, water pipes, electric pipes and other pipelines. The pipelines are uniformly integrated in the grille frame, which is conducive to sorting and rearrangement, and improves the convenience of pipeline rearrangement; in the present application, after the partition wall is moved to the predetermined position, the power input port is accurately connected with the pipeline routing holes on the side wall of the grille frame, which simplifies the transformation process of the power system and supports quick and convenient changes in the indoor layout while maintaining smooth and safe electrical connections.

[0027] 2. The setting of the first permanent magnet and the magnetic fastener enables the partition wall to be quickly moved to the predetermined position, simplifies the movement and positioning process of the partition wall, realizes the rapid and accurate installation and disassembly of the partition wall, and improves the flexibility and convenience of space transformation; the magnetic fastener can further lock the position of the partition wall so that the partition wall can remain stable in the installation position. In addition, the magnetic fastener abuts against the first permanent magnet, which can reduce the damage of the magnetic fastener to the partition wall on the one hand, realize multiple non-destructive disassembly and assembly of the partition wall, and on the other hand, the magnetic fastener is magnetically connected to the first permanent magnet, making the connection of the magnetic fastener to the grid frame more stable.

[0028] 3. No matter how the layout of the interior space changes, the partition function of partition walls, ceilings, decorative strips and decorative blocks can make each space relatively independent, enhance the insulation function of the partition space, help reduce heat loss, and play a role in energy conservation and environmental protection. In addition, the ceiling, decorative strips and decorative blocks can be selected in different styles to further decorate the interior space.

[0029] 4. It solves the problem that variable space housing requires too high professional skills for constructors, residents need additional learning costs for subsequent space adjustments, and the space transformation cycle is long and the process is complicated.

[0030] 5. This variable space residential system can realize 8-hour renewal for 2 people, convenient and efficient operation, free and personalized DIY indoor space, and realize "non-stop" upgrade. BRIEF DESCRIPTION OF THE DRAWINGS

[0031] Figure 1 It is a schematic diagram of the overall structure of an embodiment of the present application.

[0032] Figure 2 yes Figure 1 Sectional view along line AA.

[0033] Figure 3 yes Figure 2 Schematic diagram of the enlarged portion B.

[0034] Figure 4 yes Figure 2 Enlarged schematic diagram of part C.

[0035] Figure 5 yes Figure 2 Cross-sectional view along line DD.

[0036] Description of reference numerals: 10. Grille frame; 11. Grille room; 12. Partition wall installation slot; 13. Pipeline routing hole; 14. Panel installation slot; 15. Decorative strip installation slot; 20. Partition wall; 21. Power input port; 22. Power output port; 30. Ground; 40. First permanent magnet; 41. Magnetic fastener; 50. Ceiling; 51. Sawtooth elastic clip; 60. Decorative strip; 61. Decorative block; 70. Sound insulation pad. DETAILED DESCRIPTION

[0037] The following will be combined with the attached Figure 1-5 , the technical solutions in the embodiments of the present invention are clearly and completely described. The described embodiments are only possible technical implementations of the present invention, not all possible implementations. Those skilled in the art can completely combine the embodiments of the present invention to obtain other embodiments without creative work, and these embodiments are also within the scope of protection of the present invention. The following is a further detailed description of this application.

[0038] Example 1 Reference Figure 1 and Figure 2, a green intelligent variable space residence provided by an embodiment of the present application, includes a grille frame 10 and a partition wall 20. Among them, the grille frame 10 is used to connect to the bottom surface of the top plate. The grille frame 10 has a plurality of grille compartments 11 that penetrate up and down. A plurality of vertically and horizontally交错 and interconnected partition wall installation grooves 12 are provided on the bottom side of the grille frame 10. The partition wall installation grooves 12 surround the periphery of the grille compartments 11. A pipeline routing hole 13 communicating the grille compartments 11 and the partition wall installation grooves 12 is provided on the side wall of the grille frame 10. The top of the partition wall 20 penetrates into the partition wall installation groove 12 and the partition wall 20 can move along the extending direction of the partition wall installation groove 12. The bottom side of the partition wall 20 is used to abut against the ground 30. A power connection input port 21 and a power connection output port 22 are provided on the wall surface of the partition wall 20.预埋 pipelines connecting the power connection input port 21 and the power connection output port 22 are embedded in the partition wall 20. After the partition wall 20 moves to a predetermined position, the power connection input port 21 is communicated with the pipeline routing hole 13.

[0039] In the solution of the present application, after the partition wall 20 moves to a predetermined position, the power connection input port 21 is accurately docked with the pipeline routing hole 13 on the side wall of the grille frame 10, simplifying the transformation process of the power system and supporting the quick and convenient change of the indoor layout while maintaining the smooth and safe electrical connection. The pipeline routing hole 13 in the grille frame 10 of the solution of the present application is beneficial to the routing of pipelines such as indoor air ducts, air conditioner pipes, water pipes, and electric pipes. The pipelines are uniformly integrated in the grille frame 10, which is beneficial to sorting and re-layout, improving the convenience of pipeline re-layout; among them, the pipelines mainly route at the position of the pipeline routing hole 13 where the partition wall 20 is not installed.

[0040] Specifically, the grille frame 10 is a grid-like structure composed of a plurality of vertically and horizontally交错 arranged grille beams. The grille beams can be spliced with each other or welded. The grille frame 10 can be made of high-strength steel material to ensure its strength and stability. The partition wall installation groove 12 preferably adapts to the shape of the top structure of the partition wall 20. Considering universality, the cross section of the partition wall installation groove 12 is generally in a 冂 shape.

[0041] Refer to Figure 2 and Figure 3 , the pipeline routing hole 13 penetrates the partition wall installation groove 12 and the grille compartment 11 in the horizontal direction. The pipeline routing hole 13 can be a round hole, a square hole, etc. The aperture of the pipeline routing hole 13 is larger than the pipeline with the largest pipe diameter in the pipeline, so that the pipelines can all pass through the pipeline routing hole 13, and the pipelines are arranged by using the pipeline routing hole 13.

[0042] Refer to Figure 1 and Figure 2, wherein the pipelines include air ducts, air conditioning pipes, water pipes, and electric pipes, and the pipelines are formed by splicing multiple sections of pipes. A pipeline routing hole 13 can only pass through one type of pipeline, or can pass through multiple types of pipelines at the same time. When the indoor layout changes and the pipelines in the grid frame 10 need to be rearranged, only the pipelines at the installation position of the partition wall 20 need to be disassembled and reassembled, and the pipelines at other positions can retain the original installation positions. In addition, when the pipeline needs to extend from one space to another, due to the partition effect of the partition wall 20, at this time, the pipeline can bypass the installation position of the partition wall 20 and extend, for example, the pipeline passes through the pipeline routing hole 13 above the door.

[0043] Optionally, the power input port 21 and the power output port 22 are usually designed as circular or rectangular openings, and the opening size can be adjusted according to actual needs, generally 2 cm×2 cm to 5 cm×5 cm. The two opening positions correspond to the pre-buried pipeline route in the partition wall 20, so that the wires can be smoothly connected to the interior of the partition wall 20 from the pipeline routing hole 13 in the grid frame 10 and transmitted to various electrical devices through the pre-buried pipeline.

[0044] Reference Figure 3 When re-adjusting the indoor layout, the partition wall 20 needs to be moved again, and at this time, the power input port 21 of the partition wall 20 needs to be aligned with the pipeline routing hole 13, so as to quickly connect the circuit pipeline on the grid frame 10 with the power input port 21, simplifying the circuit connection process. Therefore, a first permanent magnet 40 is embedded in the side of the partition wall 20 away from the power input port 21, and the power input port 21 is arranged opposite to the first permanent magnet 40. A magnetic fastener 41 can be connected in the pipeline routing hole 13, and the magnetic fastener 41 is magnetically connected to the first permanent magnet 40. Before moving the partition wall 20, the magnetic fastener 41 is first inserted into the pipeline wiring hole 13. During the process of moving the partition wall 20, when the partition wall 20 is felt to be obviously dragged, it means that the pipeline wiring hole 13 is aligned with the power input port 21. At this time, the partition wall 20 can be installed in this position. This solution enables the partition wall 20 to be quickly moved to a predetermined position, simplifies the movement and positioning process of the partition wall 20, and realizes fast and accurate installation and disassembly of the partition wall 20.

[0045] Preferably, the magnetic fastener 41 is threadedly connected to the inner wall of the pipeline wiring hole 13, and the end of the magnetic fastener 41 can abut against the first permanent magnet 40. Optionally, the magnetic fastener 41 is a fastening bolt. The abutment of the magnetic fastener 41 with the first permanent magnet 40 can reduce the damage of the magnetic fastener 41 to the partition wall 20 on the one hand, and realize multiple non-destructive disassembly and assembly of the partition wall 20. On the other hand, the magnetic fastener 41 is magnetically connected to the first permanent magnet 40, so that the connection of the magnetic fastener 41 on the grid frame 10 is more stable, and the partition wall 20 is less likely to move.

[0046] In the present application, adjacent partition walls 20 are directly spliced, and only the magnetic fasteners 41 are used to lock the partition walls 20. At this time, the partition walls 20 are not easy to move, and the gaps between adjacent partition walls 20 are not easy to change, thereby ensuring the sealing of the partition space. In addition, when the partition wall 20 needs to be removed, only the magnetic fasteners 41 need to be removed to move the partition wall 20, thereby improving the flexibility and convenience of space transformation.

[0047] Preferably, the module of the partition wall 20 is the same as the module of the grille room 11, the connection between adjacent partition walls 20 is located at the connection point of multiple partition wall installation grooves 12, and the pipeline routing hole 13 is set in the middle of the grille frame 10. When adjacent partition walls 20 are vertically spliced, the splicing gap exposed to the outside can be reduced, and the wall surface is improved.

[0048] Reference Figure 2 and Figure 3 The variable space residence also includes a ceiling 50, a panel mounting groove 14 is opened at the groove of the partition wall mounting groove 12, the groove size of the panel mounting groove 14 is larger than the groove size of the partition wall mounting groove 12, the inner side edge of the ceiling 50 is clamped in the panel mounting groove 14, the top surface of the ceiling 50 is abutted against the bottom side of the grid frame 10, and the outer side edge of the ceiling 50 can be abutted against the wall surface of the partition wall 20.

[0049] Specifically, the inner side of the ceiling 50 is provided with a sawtooth-shaped elastic clamping part 51, and the groove wall of the panel installation groove 14 is provided with a clamping groove, and the sawtooth-shaped elastic clamping part 51 is clamped in the clamping groove. When the sawtooth-shaped elastic clamping part 51 is squeezed, it has a tendency to move toward the outside of the ceiling 50 so that the outer side of the ceiling 50 abuts against the wall surface of the partition wall 20. This solution enables the outer side of the ceiling 50 to fit closely with the wall surface of the partition wall 20, enhances the connection stability among the grid frame 10, the ceiling 50 and the partition wall 20, simplifies the installation process and improves the installation efficiency.

[0050] Reference Figure 2 and Figure 4 Preferably, a decorative strip mounting groove 15 is reserved between the side of the ceiling 50 and the bottom of the panel mounting groove 14. When the partition wall 20 is not inserted into the partition wall mounting groove 12, a decorative strip 60 is inserted into the adjacent decorative strip mounting groove 15, and the decorative strip 60 seals the gap between adjacent ceilings 50.

[0051] Optionally, the decorative strip 60 is a T-shaped decorative strip. After the T-shaped decorative strip is snapped into the decorative strip installation groove 15, the ceiling 50 is used to buckle the T-shaped decorative strip to complete the installation of the T-shaped decorative strip.

[0052] Reference Figure 2 and Figure 5In the position where the partition wall 20 is not installed, the decorative blocks 61 are sealed and connected between the adjacent decorative strips 60, and the shape of the decorative blocks 61 can be designed according to the shape of the gap to be filled. In this embodiment, the decorative strips 60 and the decorative blocks 61 are both made of elastic material, and the elastic material can be squeezed to fix the decorative strips 60 and the decorative blocks 61 at a predetermined position and make them airtight.

[0053] Among them, the ceiling 50, decorative strips 60 and decorative blocks 61 partition the upper and lower spaces on the bottom side of the grille frame 10. No matter how the indoor space layout changes, the partition function of the partition wall 20, ceiling 50, decorative strips 60 and decorative blocks 61 can make each space relatively independent, enhance the thermal insulation function of the partition space, help reduce heat loss, and play a role in energy saving and environmental protection.

[0054] Reference Figure 1 and Figure 3 A sound insulation pad 70 is arranged between the bottom side of the partition wall 20 and the ground 30. When the sound insulation pad 70 is removed, the top of the partition wall 20 can be placed in the panel installation groove 14. The sound insulation pad 70 is used to improve the sound insulation effect of the partition space on the one hand, and to limit the vertical position of the partition wall 20 on the other hand. When the partition wall 20 needs to be removed, after the sound insulation pad 70 is removed, the top of the partition wall 20 can be directly placed in the panel installation groove 14, and then the partition wall 20 can be turned over and removed; the installation of the partition wall 20 is similar. This solution facilitates the flexible movement and non-destructive removal of the partition wall 20, and realizes the rapid transformation of the space.

[0055] Optionally, the floor 30 may be a detachable floor 30 , and the height of the partition wall 20 may be adjusted by replacing different types of detachable floors 30 .

[0056] In another embodiment, the variable space residence further includes a movable kitchen and bathroom, which moves under the grid frame 10. The movable kitchen and bathroom include a movable kitchen and a movable bathroom, which can be a mobile kitchen and bathroom on the market. After rearranging the indoor space and re-moving the movable kitchen and bathroom, the grid frame 10 for routing air ducts, air conditioning pipes, water pipes, and electric pipes is located above the movable kitchen and bathroom. After adjusting the position of the movable kitchen and bathroom, the corresponding pipelines can be quickly laid out, realizing 8-hour renewal for 2 people, convenient and efficient operation, and reducing the subsequent maintenance costs of the residents for the mechanical system or partition materials.

[0057] The implementation principle of this embodiment is as follows: the entire space is highly utilized through the design of the grid frame 10, and the existence of the grid space 11 makes the internal space more flexible and controllable, and also provides convenient conditions for the subsequent installation of the partition wall 20. At the same time, considering the demand for water and electricity wiring in modern home life, sufficient pipeline routing holes 13 are reserved in the grid frame 10 to ensure that no matter how the partition wall 20 changes, a stable power supply can be maintained, which effectively solves the limitation caused by the inability to adjust the layout of traditional fixed partitions at will.

[0058] Example 2 The difference between this embodiment and the above-mentioned embodiment 1 is that: this embodiment provides a space transformation method, including the following steps: S1. Remove the circuit pipeline connected to the power input port 21.

[0059] Specifically, the construction personnel shall confirm the layout of the required circuit pipelines and record the specific wiring locations that need to be reconnected in the future. The construction personnel may be residents or other personnel, and use manual tools to remove the circuit pipelines connected to the power input port 21, ensuring that the pipelines are protected during the removal process to prevent damage to the pipelines due to improper removal.

[0060] S2. Unlocking the partition wall 20.

[0061] Specifically, the magnetic fastener 41 of the partition wall 20 is manually unlocked, and the sound insulation pad 70 on the bottom side of the partition wall 20 is removed to move the partition wall 20 downward, and then the partition wall 20 is turned over, and the partition wall 20 can be removed.

[0062] S3. Move the partition wall 20, use the partition wall 20 to partition the indoor space, and rearrange the indoor space.

[0063] Specifically, after unlocking, the construction workers install the partition wall 20 at the new position according to the new space layout design, and then manually push and pull the partition wall 20 along the partition wall installation groove 12 on the grid frame 10 until the partition wall 20 reaches the predetermined position.

[0064] S4, moving the partition wall 20 to a predetermined position, so that the power input port 21 is connected with the pipeline routing hole 13.

[0065] Specifically, the interaction between the magnetic fastener 41 and the first permanent magnet 40 can be used to quickly move the partition wall 20 to a certain position, ensuring that the power input port 21 is accurately aligned with the pipeline routing hole 13 of the grid frame 10 and maintains a smooth connection.

[0066] S5, sort out the water and electricity pipelines in the grid frame 10, and reconnect the circuit pipelines to the power input port 21.

[0067] Specifically, some pipelines are removed, and the water and electricity pipelines are arranged and connected reasonably, preferably according to the pre-designed path. The circuit pipeline is reinserted into the power input port 21, and the magnetic fastener 41 is used to firmly connect the partition wall 20 to ensure that the connection of the partition wall 20 is safe and reliable.

[0068] The implementation principle of this embodiment is: through a reasonable space transformation method, the space is quickly adjusted, which greatly reduces the construction time and labor cost. This new variable space residential system can realize 8-hour renewal for 2 people, convenient and efficient operation, and free personalized DIY indoor space.

[0069] The above are all preferred embodiments of the present application, and the protection scope of the present application is not limited thereto. Therefore, any equivalent changes made according to the structure, shape, and principle of the present application should be included in the protection scope of the present application.

Claims

1. A green intelligent variable space residence, characterized in that: include: A grid frame (10) is used to connect to the bottom surface of the top plate, the grid frame (10) has a plurality of grid spaces (11) that are connected vertically, a plurality of partition wall installation grooves (12) that are crisscrossed and interconnected are provided on the bottom side of the grid frame (10), the partition wall installation grooves (12) surround the circumference of the grid space (11), and a pipeline routing hole (13) that connects the grid space (11) and the partition wall installation grooves (12) is provided on the side wall of the grid frame (10); A partition wall (20), wherein the bottom side of the partition wall (20) is used to abut against the ground (30), the top of the partition wall (20) is inserted into the partition wall installation groove (12) and the partition wall (20) can move along the extension direction of the partition wall installation groove (12), the wall surface of the partition wall (20) is provided with an electric input port (21) and an electric output port (22), and a pre-buried pipeline connecting the electric input port (21) and the electric output port (22) is pre-buried in the partition wall (20); Wherein, after the partition wall (20) moves to a predetermined position, the power input port (21) is connected to the pipeline routing hole (13).

2. The green intelligent variable space residence according to claim 1 is characterized by: A first permanent magnet (40) is embedded in the partition wall (20) on a side facing away from the power input port (21); the power input port (21) and the first permanent magnet (40) are arranged opposite to each other; a magnetic fastener (41) can be connected to the pipeline routing hole (13); the magnetic fastener (41) is magnetically connected to the first permanent magnet (40).

3. The green intelligent variable space residence according to claim 2 is characterized by: The magnetic fastener (41) is threadedly connected to the inner wall of the pipeline routing hole (13), and the end of the magnetic fastener (41) can abut against the first permanent magnet (40).

4. The green intelligent variable space residence according to claim 2 is characterized by: The module of the partition wall (20) is the same as the module of the grille room (11), the connection between adjacent partition walls (20) is located at the connection point of multiple partition wall installation grooves (12), and the pipeline wiring hole (13) is arranged in the middle of the grille frame (10).

5. The green intelligent variable space residence according to claim 1 is characterized by: The variable space residence also includes a ceiling (50), a panel mounting groove (14) is provided at the groove opening of the partition wall mounting groove (12), the groove opening size of the panel mounting groove (14) is larger than the groove opening size of the partition wall mounting groove (12), the inner side edge of the ceiling (50) is snap-fitted into the panel mounting groove (14), the top surface of the ceiling (50) is in contact with the bottom side of the grid frame (10), and the outer side edge of the ceiling (50) can be in contact with the wall surface of the partition wall (20).

6. The green intelligent variable space residence according to claim 5 is characterized by: A decorative strip installation groove (15) is reserved between the side of the ceiling (50) and the bottom of the panel installation groove (14); when the partition wall (20) is not inserted into the partition wall installation groove (12), a decorative strip (60) is inserted into the adjacent decorative strip installation groove (15); the decorative strip (60) seals the gap between adjacent ceilings (50); and decorative blocks (61) are sealed and connected between adjacent decorative strips (60); wherein the ceiling (50), the decorative strip (60) and the decorative block (61) partition the upper and lower spaces on the bottom side of the grid frame (10).

7. The green intelligent variable space residence according to claim 5 is characterized by: A sound insulation pad (70) is provided between the bottom side of the partition wall (20) and the ground (30); when the sound insulation pad (70) is removed, the top of the partition wall (20) can be placed in the panel installation groove (14).

8. The green intelligent variable space residence according to claim 5 is characterized by: The inner side edge of the ceiling (50) is provided with a sawtooth-shaped elastic clamping portion (51), the groove wall of the panel mounting groove (14) is provided with a clamping groove, the sawtooth-shaped elastic clamping portion (51) is clamped in the clamping groove, and the sawtooth-shaped elastic clamping portion (51) has a tendency to move toward the outside of the ceiling (50) when squeezed so that the outer side edge of the ceiling (50) abuts against the wall surface of the partition wall (20).

9. The green intelligent variable space residence according to claim 1, characterized in that: The variable space residence also includes a movable kitchen and bathroom, which move under the grid frame (10).

10. A space transformation method, based on the green intelligent variable space residence according to any one of claims 1 to 9, characterized in that: The following steps are involved: S1, removing the circuit pipeline connected to the power input port (21); S2, unlocking the partition wall (20); S3, moving the partition wall (20), using the partition wall (20) to partition the indoor space, and rearranging the indoor space; S4, moving the partition wall (20) to a predetermined position so that the power input port (21) is connected to the pipeline routing hole (13); S5, arranging the water and electricity pipelines in the grid frame (10), and reconnecting the circuit pipelines to the power input port (21).

Citation Information

Patent Citations

  • Residential house type capable of being changed by residents by themselves

    CN113374125A