Intelligent comprehensive planning system for building mechanical and electrical pipelines based on BIM and artificial intelligence
By applying BIM and artificial intelligence intelligent comprehensive planning system in building electromechanical engineering, the problems of low efficiency and easy collision in traditional pipeline design are solved, efficient pipeline planning and construction are achieved, and project quality and efficiency are significantly improved.
Patent Information
- Application Number
- CN202411889512.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2025-03-03
- Publication Date
- 2025-04-04
AI Technical Summary
The comprehensive design of traditional construction electromechanical pipelines is low and prone to collisions, resulting in delays in construction periods and increased costs, and it is difficult to quickly respond to design changes and carry out effective operation and maintenance.
The intelligent comprehensive planning system of building electromechanical pipelines based on BIM and artificial intelligence is adopted, and the pipeline planning and construction process are optimized through technical means such as multi-source data fusion, AI intelligent collision detection and avoidance, dynamic construction simulation and progress optimization, and operation and maintenance space intelligent evaluation.
Significantly reduce pipeline collisions by more than 90%, reduce rework costs by about 40%, shorten construction period by more than 25%, improve operation and maintenance efficiency by 3 times, and improve the quality and efficiency of construction mechanical and electrical engineering.
Smart Images

Figure FT_1 
Figure FT_2 
Figure FT_3
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of building electromechanical engineering, and in particular to an intelligent integrated planning system for building electromechanical pipelines based on BIM and artificial intelligence. Background Art
[0002] Nowadays, the mechanical and electrical systems of buildings are becoming more and more complex. During construction, water supply and drainage, electrical, ventilation and other professional pipelines are crisscrossed. Traditional pipeline comprehensive design relies on manual comparison of two-dimensional drawings, which is not only inefficient and error-prone, but also common for pipeline collisions at the construction site, resulting in delays in the construction period and a surge in costs. It is also difficult to ensure efficiency during construction, and problems that are prone to occur during specific construction cannot be effectively avoided according to different construction environments; it is also difficult to respond quickly to design changes, and subsequent operation and maintenance are also difficult due to incomplete information and unreasonable spatial layout. Although BIM technology has been applied, it lacks the assistance of deep intelligent algorithms, fails to fully tap the value of data, and is difficult to achieve all-round and dynamic pipeline planning and control. Summary of the invention
[0003] The purpose of the present invention is to provide an intelligent comprehensive planning system for building mechanical and electrical pipelines based on BIM and artificial intelligence, which can enable all parties to optimize the model according to the collision report before construction; the progress of the entire construction process is controlled by means of 4D simulation to ensure better accuracy in the construction process and more efficient and reasonable rapid construction; during the operation and maintenance stage, information can be viewed by scanning the code on the mobile terminal, and construction information can be mastered in real time according to actual needs; feedback can be collected regularly, and the adaptability of the system can be improved by using iterative AI algorithms to ensure that the system runs more safely and reliably. In the specific use process, pipeline collisions can be reduced by more than 90%, and rework costs can be reduced by about 40%; the construction period can be shortened by more than 25%, and construction resources can be allocated more reasonably; the operation and maintenance efficiency can be increased by 3 times, and the troubleshooting and repair time can be greatly reduced; the quality and benefits of building mechanical and electrical engineering can be improved in all aspects.
[0004] The technical solution of the present invention is as follows: The intelligent comprehensive planning system for building electromechanical pipelines based on BIM and artificial intelligence is characterized by: 1) including a multi-source data fusion module, building a data interface, seamlessly connecting CAD drawings, equipment parameter documents, construction site information and other multi-source data, and importing them into the BIM core database with one click; using data cleaning algorithms to eliminate redundant and erroneous information, ensuring that the basic data of the model is accurate and reliable, and laying a solid foundation for subsequent pipeline planning; first, according to different types of buildings and different building spaces, classify and organize the electromechanical in-depth design layout knowledge, list all electromechanical systems and subsystems under the electromechanical system in the area, and form a single electromechanical in-depth design rule according to a certain system order priority and the respective in-depth design parameters of each system; summarize multiple system priority orders and multiple system in-depth design parameters to form electromechanical in-depth design rules for different spaces under different building types, and classify and store the original BIM model according to the relevant subsystem information of the building electromechanical profession; 2) AI intelligent collision detection and avoidance, implanting deep learning neural network algorithms, and real-time scanning of BIM The spatial position of each pipeline in the model; once a collision risk is found, the avoidance mechanism is automatically activated, and the pipeline direction and elevation are intelligently adjusted according to preset rules (such as pipe diameter, importance, and construction difficulty); and a detailed collision report is generated, including the location, involved pipelines, and adjustment suggestions, which are visually displayed on the operation interface; 3D visualization and tracking of the real-time interaction of personnel, machinery and objects on the entire construction site; 3) Dynamic construction simulation and progress optimization, combined with 4D BIM technology, linking pipeline installation procedures and progress plans; simulating the progress of the project under different construction sequences and resource inputs, and accurately predicting the construction period; in the event of emergencies or design changes, quickly recalculate the simulation, give an optimized construction plan, reduce the risk of delays, and ensure construction continuity; establish a project template on the Revit software, including relevant components of the architecture and structure professions, and system materials, colors and other project information of the electromechanical equipment profession; use the plug-in developed by the Revit software to create BIM models of various professions and determine the initial heights of various electromechanical professions; use the plug-in developed by the Revit software to automatically detect collisions in the BIM models of various professions and generate collision node reports, including collision component information As well as positioning in the project, it can quickly switch to the collision node through positioning; use the plug-in secondary development of Revit software and the generated collision report to optimize and adjust the BIM model and record it; specify the pipeline assembly plan according to the comprehensively optimized BIM model;: classify the cross-sections of model components into three types: points, rectangular sections and circular sections, draw the normals of the cross-section edges and convert them into positioning lines. If the positioning lines of different components intersect, it is determined that there is a collision between the components, and the collision information is passed to the collector. Then the collision check results are output through a list and displayed in the form of a table, which contains the ID, type and axis grid position information of the collision component;4) Intelligent evaluation of operation and maintenance space, development of space analysis algorithms, accurate calculation of operation and maintenance space in each area during the design phase, such as equipment maintenance channel width, clear height, etc.; setting safety thresholds, eye-catching warnings for areas that do not meet the standards, and linkage optimization modules to fine-tune pipeline layout; after completion, operation and maintenance personnel scan the code to retrieve pipeline information to assist in rapid positioning and maintenance. ;
[0005] Furthermore, the model is modified until the electromechanical pipelines displayed by the model meet the requirements of ceiling elevation, fine decoration, construction space, commissioning and maintenance, and the final optimized BIM model is obtained. Based on the final pipe-optimized BIM model, the two-dimensional CAD drawings are exported.
[0006] Furthermore, the final optimized BIM model exports the usage of each pipeline and is handed over to the construction team for material quantity selection. The construction team prefabricates the pipeline according to the optimized CAD drawings.
[0007] Beneficial effects of the present invention: The following beneficial effects can be achieved through the technical solution of the present invention: 1. Before construction, all parties can optimize the model according to the collision report; the progress of the construction is controlled by 4D simulation throughout the construction process to ensure better accuracy in the construction process and more efficient and reasonable rapid construction; in the operation and maintenance stage, the information can be viewed by scanning the code on the mobile terminal, and the construction information can be mastered in real time according to actual needs; feedback can be collected regularly, and the iterative AI algorithm can be used to improve the adaptability of the system to ensure that the system runs more safely and reliably. In the specific use process, it can reduce pipeline collisions by more than 90% and reduce rework costs by about 40%; shorten the construction period by more than 25%, and make the allocation of construction resources more reasonable; the operation and maintenance efficiency is increased by 3 times, and the troubleshooting and repair time is greatly reduced; the quality and benefits of building mechanical and electrical engineering are improved in all aspects. BRIEF DESCRIPTION OF THE DRAWINGS
[0008] Figure 1 It is a partial effect diagram of pipeline distribution in the model information of the present invention; Figure 2 A connection distribution diagram of key nodes of pipeline distribution in the system of the present invention; Figure 3 It is a screenshot of the building information model design in the design system of the present invention; Figure 4 This is a simulation effect diagram of pipeline construction in the system of the present invention; DETAILED DESCRIPTION
[0009] At the start of the project, the design team imported the data into the system. Before construction, all parties optimized the model based on the collision report. During the entire construction process, 4D simulation was used to control the progress. During the operation and maintenance phase, the mobile terminal scanned the code to view the information. Feedback was collected regularly, and the AI algorithm was iterated to improve the adaptability of the system. The intelligent comprehensive planning system for building mechanical and electrical pipelines based on BIM and artificial intelligence is characterized by: 1) Multi-source data fusion module, building a data interface, seamlessly connecting CAD drawings, equipment parameter documents, construction site information and other multi-source data, and one-click importing into BIM Core database; use data cleaning algorithms to remove redundant and erroneous information to ensure that the basic data of the model is accurate and reliable, laying a solid foundation for subsequent pipeline planning; first, classify and organize the knowledge of mechanical and electrical in-depth design arrangement according to different types of buildings and different building spaces, list all mechanical and electrical systems and subsystems under the mechanical and electrical systems in the area, and form a single mechanical and electrical in-depth design rule according to a certain system sequence priority and the respective in-depth design parameters of each system; summarize the priority sequence of multiple systems and the in-depth design parameters of multiple systems to form mechanical and electrical in-depth design rules for different spaces under different building types, and classify and store the original BIM model according to the relevant subsystem information of the building mechanical and electrical profession; cross-professional collaborative cloud platform: build a real-time collaborative working environment on the cloud, and structural designers share BIM models with architectural and mechanical and electrical professionals; built-in instant messaging and annotation functions to facilitate communication of design intent; integrated conflict detection engine to check the design "collision" between different professions in real time, automatically generate coordination strategies, and greatly reduce communication costs and the probability of design rework. 2) AI intelligent collision detection and avoidance, implanted with deep learning neural network algorithm, real-time scanning of the spatial position of each pipeline in the BIM model; once a collision risk is found, the avoidance mechanism is automatically activated, and the pipeline direction and elevation are intelligently adjusted according to preset rules (such as pipe diameter, importance, and construction difficulty); and a detailed collision report is generated, including the location, involved pipelines, and adjustment suggestions, which are visualized on the operation interface; 3D visualization and tracking of the real-time interaction of personnel, machinery and objects on the entire construction site; in the design part, the automatic generation of pipeline configuration with the help of AI can not only avoid conflicts with structural design, but also determine the compatibility of the design drawings of the pipeline configuration with the BIM model to facilitate construction and verification. In the construction part, safety is always the most important consideration. With the help of image recognition systems, potential dangers can be paid attention to at any time; at the same time, using drones and exploration robots to replace workers to enter dangerous areas of the construction site and scan and visualize the construction site is also a safe and efficient way to improve construction efficiency. In terms of management, the usage status, maintenance and renovation schedules, energy consumption, etc. of a building during the decades of use after its completion can all be more effectively predicted and optimally used with the help of AI.3) Dynamic construction simulation and progress optimization, combined with 4DBIM technology, linking pipeline installation procedures and progress plans; simulating the progress of the project under different construction sequences and resource inputs, and accurately predicting the construction period; in case of emergencies or design changes, quickly recalculate the simulation, give an optimized construction plan, reduce the risk of delays, and ensure construction continuity; establish a project template on Revit software, including relevant components of architecture and structure, system materials, colors and other project information of electromechanical equipment; use the plug-in developed by Revit software to create BIM models of various disciplines and determine the initial height of each electromechanical discipline; use the plug-in developed by Revit software to perform automatic collision detection on BIM models of various disciplines, generate collision node reports, including collision component information and positioning in the project, and quickly switch to the collision node through positioning; use the plug-in developed by Revit software and the generated collision report to check the BIM model The model is optimized and adjusted, and recorded; the pipeline assembly plan is specified according to the comprehensively optimized BIM model; the cross-sections of the model components are classified into three types: points, rectangular sections and circular sections, and the normals of the cross-section edges are drawn and converted into positioning lines. If the positioning lines of different components intersect, it is determined that there is a collision between the components, and this collision information is passed to the collector. The collision check results are then output through a list and displayed in the form of a table. The table contains the ID, type and axis network position information of the collision component; 4) Intelligent evaluation of operation and maintenance space, development of spatial analysis algorithms, accurate calculation of the operation and maintenance space of each area in the design stage, such as the width and clear height of the equipment maintenance channel; setting safety thresholds, prominent warnings for non-compliant areas, and linkage optimization modules to fine-tune the pipeline layout; after completion, the operation and maintenance personnel scan the code to retrieve the pipeline information to assist in rapid positioning and maintenance. Before construction, all parties can optimize the model based on the collision report; the progress of the entire construction process is controlled by using 4D simulation to ensure better accuracy in the construction process and more efficient and reasonable rapid construction; during the operation and maintenance stage, information can be viewed by scanning the code on the mobile terminal, and construction information can be mastered in real time according to actual needs; feedback can be collected regularly, and the iterative AI algorithm can be used to improve the adaptability of the system to ensure that the system runs more safely and reliably. In the specific use process, it can reduce pipeline collisions by more than 90% and reduce rework costs by about 40%; shorten the construction period by more than 25%, and make construction resources more reasonably allocated; the operation and maintenance efficiency is increased by 3 times, and the troubleshooting and repair time is greatly reduced; the quality and benefits of building mechanical and electrical engineering are improved in all aspects.
[0010] Calculate the maximum equivalent stress and deformation of the pipeline system: Under load condition j, first number the existing longitudinal seismic supports and lateral seismic supports in the finite element analysis model as 1, 2, ..., n, respectively. Then delete one of the i-th constraint supports in the model, load the model according to the seismic load in step (3), and obtain the maximum equivalent stress σij and maximum deformation δij of the pipeline system after removing the constraint support i. Repeat the above operation to finally obtain the corresponding n maximum equivalent stress values and n maximum deformation values after removing the 1, 2, ..., n-th constraint supports separately. The model component sections are classified into three types: point, rectangular section and circular section. The normal line of the section edge is drawn and converted into a positioning line. If the positioning lines of different components intersect, it is determined that there is a collision between the components. This collision information is passed to the collector, and then the collision check results are output through a list and displayed in the form of a table. The table contains the ID, type and axis network position information of the collision component. The use of secondary development plug-ins to optimize and adjust the model means: using plug-ins can quickly move, align, offset, bend up and down, and other quick operations on the pipeline model components of electromechanical equipment. Compared with the "break-connect-set height-stretch-set height-connect" operation in the original software, it greatly reduces the time for optimization and adjustment and improves efficiency. The various calculation results obtained are analyzed by analyzing the relevant parameter indicators such as the number of bends, the number of remaining collisions, the number of pipes, the length of the pipeline, and the concentration of bends to form a calculation result analysis system, which comprehensively evaluates the advantages and disadvantages of the calculation results for user reference. The calculation results obtained are matched with the information of each component in the original model through the secondary development of the modeling software, and the calculation results are generated into the BIM model of the corresponding modeling software. In a building space of a type of building, it is necessary to list all the electromechanical systems and subsystems in the area, and prioritize all the systems. The priority ranking is combined with the order of small pipes giving way to large pipes, pressure giving way to non-pressure, and general giving way to special rules in the electromechanical deepening design rules, which can be sorted in multiple ways. The deepening design parameters of each system include the minimum spacing of pipelines, pipeline bending height, pipeline bending merging distance, pipeline bending type, pipeline bending angle, pipeline bending width, and pipeline bending height. The detection point cloud composed of detection data points is obtained by AI and the original point cloud is obtained by scanner acquisition; the ISS algorithm is used to extract feature data points from the original point cloud and the detection point cloud respectively, and the feature data points in the detection point cloud are matched with the feature data points in the original point cloud. The matching number and matching mean of the feature data points in the detection point cloud are collected and associated and integrated for effectiveness evaluation and analysis. Avoid possible problems during the construction process and avoid unexpected situations that may occur during construction, which may lead to relatively high construction costs.
[0011] As a preferred option, the intelligent comprehensive planning system for building mechanical and electrical pipelines based on BIM and artificial intelligence is characterized by: 1) including a multi-source data fusion module, building a data interface, seamlessly connecting CAD drawings, equipment parameter documents, construction site information and other multi-source data, and importing them into the BIM core database with one click; using data cleaning algorithms to eliminate redundant and erroneous information, ensuring that the basic data of the model is accurate and reliable, and laying a solid foundation for subsequent pipeline planning; first, according to different types of buildings and different building spaces, the mechanical and electrical in-depth design layout knowledge is classified and sorted, and all mechanical and electrical systems and subsystems under the mechanical and electrical systems in the area are listed, and a single mechanical and electrical in-depth design rule is formed according to a certain system order priority and the in-depth design parameters of each system; summarizing the priority order of multiple systems and the in-depth design parameters of multiple systems, forming mechanical and electrical in-depth design rules for different spaces under different building types, and classifying and storing the original BIM model according to the relevant subsystem information of the building mechanical and electrical profession; cross-professional collaborative cloud platform: building a real-time collaborative working environment on the cloud, and structural designers share BIM with architectural and mechanical and electrical professionals Model; built-in instant messaging and annotation functions to facilitate communication of design intent; integrated conflict detection engine to check the design "collision" between different disciplines in real time, automatically generate coordination strategies, and greatly reduce communication costs and the probability of design rework. 2) AI intelligent collision detection and avoidance, implanted with deep learning neural network algorithm, real-time scanning of the spatial position of each pipeline in the BIM model; once a collision risk is found, the avoidance mechanism is automatically activated, and the pipeline direction and elevation are intelligently adjusted according to preset rules (such as pipe diameter, importance, and construction difficulty); and a detailed collision report is generated, including location, involved pipelines, and adjustment suggestions, which are visually displayed on the operation interface; 3D visualization and tracking of the real-time interaction of personnel, machinery and objects on the entire construction site; in the design part, the automatic generation of pipeline configuration with the help of AI can not only avoid conflicts with structural design, but also determine the compatibility of the design drawing of the pipeline configuration with the BIM model to facilitate construction and verification. In the construction part, safety is always the most important consideration. With the help of image recognition systems, we can always pay attention to potential dangers. At the same time, using drones and exploration robots to replace workers to enter dangerous areas of the construction site and scan and visualize the construction site is also a safe way to improve construction efficiency. In terms of management, after a building is completed and used for decades, its usage status, maintenance and renovation schedules, energy consumption, etc. can all be more effectively predicted and optimally used with the help of AI.3) Dynamic construction simulation and progress optimization, combined with 4D BIM technology, linking pipeline installation procedures and progress plans; simulating the progress of the project under different construction sequences and resource inputs, and accurately predicting the construction period; in case of emergencies or design changes, quickly recalculate the simulation, give an optimized construction plan, reduce the risk of delays, and ensure construction continuity; establish a project template on Revit software, including relevant components of architecture and structure, system materials, colors and other project information of electromechanical equipment; use the plug-in developed by Revit software to create BIM models of various disciplines and determine the initial height of each electromechanical discipline; use the plug-in developed by Revit software to perform automatic collision detection on BIM models of various disciplines, generate collision node reports, including collision component information and positioning in the project, and quickly switch to the collision node through positioning; use the plug-in developed by Revit software and the generated collision report to check the BIM model Optimize and adjust the model and record it; specify the pipeline assembly plan according to the comprehensively optimized BIM model; classify the cross-sections of the model components into three types: points, rectangular sections and circular sections, draw the normals of the cross-section edges and convert them into positioning lines. If the positioning lines of different components intersect, it is determined that there is a collision between the components. This collision information is transmitted to the collector, and then the collision check results are output through a list and displayed in the form of a table. The table contains the ID, type and axis network position information of the collision component; 4) Intelligent evaluation of operation and maintenance space, develop space analysis algorithms, and accurately calculate the operation and maintenance space of each area during the design stage, such as the width and net height of the equipment maintenance channel; set safety thresholds, and provide eye-catching warnings for non-compliant areas, and fine-tune the pipeline layout through the linkage optimization module; after completion, the operation and maintenance personnel scan the code to retrieve the pipeline information to assist in rapid positioning and maintenance. Modify the model until the electromechanical pipelines displayed by the model meet the ceiling elevation, fine decoration modeling requirements, construction space, and debugging and maintenance requirements, and obtain the final optimized BIM model. According to the final pipe comprehensive optimized BIM model, export the two-dimensional CAD drawings.
[0012] As a preferred option, the intelligent comprehensive planning system for building mechanical and electrical pipelines based on BIM and artificial intelligence is characterized by: 1) including a multi-source data fusion module, building a data interface, seamlessly connecting CAD drawings, equipment parameter documents, construction site information and other multi-source data, and importing them into the BIM core database with one click; using data cleaning algorithms to eliminate redundant and erroneous information, ensuring that the basic data of the model is accurate and reliable, and laying a solid foundation for subsequent pipeline planning; first, according to different types of buildings and different building spaces, the mechanical and electrical in-depth design layout knowledge is classified and sorted, and all mechanical and electrical systems and subsystems under the mechanical and electrical systems in the area are listed, and a single mechanical and electrical in-depth design rule is formed according to a certain system order priority and the in-depth design parameters of each system; summarizing the priority order of multiple systems and the in-depth design parameters of multiple systems, forming mechanical and electrical in-depth design rules for different spaces under different building types, and classifying and storing the original BIM model according to the relevant subsystem information of the building mechanical and electrical profession; cross-professional collaborative cloud platform: building a real-time collaborative working environment on the cloud, and structural designers share BIM with architectural and mechanical and electrical professionals Model; built-in instant messaging and annotation functions to facilitate communication of design intent; integrated conflict detection engine to check the design "collision" between different disciplines in real time, automatically generate coordination strategies, and greatly reduce communication costs and the probability of design rework. 2) AI intelligent collision detection and avoidance, implanted with deep learning neural network algorithm, real-time scanning of the spatial position of each pipeline in the BIM model; once a collision risk is found, the avoidance mechanism is automatically activated, and the pipeline direction and elevation are intelligently adjusted according to preset rules (such as pipe diameter, importance, and construction difficulty); and a detailed collision report is generated, including location, involved pipelines, and adjustment suggestions, which are visually displayed on the operation interface; 3D visualization and tracking of the real-time interaction of personnel, machinery and objects on the entire construction site; in the design part, the automatic generation of pipeline configuration with the help of AI can not only avoid conflicts with structural design, but also determine the compatibility of the design drawing of the pipeline configuration with the BIM model to facilitate construction and verification. In the construction part, safety is always the most important consideration. With the help of image recognition systems, we can always pay attention to potential dangers. At the same time, using drones and exploration robots to replace workers to enter dangerous areas of the construction site and scan and visualize the construction site is also a safe way to improve construction efficiency. In terms of management, after a building is completed and used for decades, its usage status, maintenance and renovation schedules, energy consumption, etc. can all be more effectively predicted and optimally used with the help of AI.3) Dynamic construction simulation and progress optimization, combined with 4D BIM technology, linking pipeline installation procedures and progress plans; simulating the progress of the project under different construction sequences and resource inputs, and accurately predicting the construction period; in case of emergencies or design changes, quickly recalculate the simulation, give an optimized construction plan, reduce the risk of delays, and ensure construction continuity; establish a project template on Revit software, including relevant components of architecture and structure, system materials, colors and other project information of electromechanical equipment; use the plug-in developed by Revit software to create BIM models of various disciplines and determine the initial height of each electromechanical discipline; use the plug-in developed by Revit software to perform automatic collision detection on BIM models of various disciplines, generate collision node reports, including collision component information and positioning in the project, and quickly switch to the collision node through positioning; use the plug-in developed by Revit software and the generated collision report to check the BIM model Optimize and adjust the model and record it; specify the pipeline assembly plan according to the comprehensively optimized BIM model; classify the cross-sections of the model components into three types: point, rectangular and circular cross-sections, draw the normal of the cross-section edge and convert it into a positioning line. If the positioning lines of different components intersect, it is determined that there is a collision between the components. This collision information is transmitted to the collector, and then the collision check results are output through a list and displayed in the form of a table. The table contains the ID, type and axis network position information of the collision component; 4) Intelligent evaluation of operation and maintenance space, develop spatial analysis algorithms, and accurately calculate the operation and maintenance space of each area in the design stage, such as the width and clear height of the equipment maintenance channel; set safety thresholds, and provide eye-catching warnings for non-compliant areas, and fine-tune the pipeline layout through the linkage optimization module; after completion, the operation and maintenance personnel scan the code to retrieve the pipeline information to assist in rapid positioning and maintenance. The final optimized BIM model exports the usage of each pipeline and hands it over to the construction team for material quantity. The construction team prefabricates the pipeline according to the optimized CAD drawings.
[0013] The above is a preferred embodiment of the present invention. It should be pointed out that for ordinary technicians in this technical field, several improvements or substitutions can be made without departing from the principles of the present invention. These improvements or substitutions should also be regarded as the scope of protection of the present invention.
Claims
1. Intelligent integrated planning system for building mechanical and electrical pipelines based on BIM and artificial intelligence, characterized by: It includes 1) multi-source data fusion module, building data interface, seamlessly connecting CAD drawings, equipment parameter documents, construction site information and other multi-source data, and importing them into the BIM core database with one click; using data cleaning algorithm to eliminate redundant and erroneous information, ensuring that the basic data of the model is accurate and reliable, and laying a solid foundation for subsequent pipeline planning; first, according to different types of buildings and different building spaces, classify and organize the knowledge of mechanical and electrical in-depth design arrangement, list all mechanical and electrical systems and subsystems under the mechanical and electrical systems in the area, and form a single mechanical and electrical in-depth design rule according to a certain system order priority and the respective in-depth design parameters of each system; summarize the priority order of multiple systems and the in-depth design parameters of multiple systems, form the mechanical and electrical in-depth design rules for different spaces under different building types, and classify and store the original BIM model according to the relevant subsystem information of the building mechanical and electrical profession; 2) AI intelligent collision detection and avoidance, implant deep learning neural network algorithm, and scan the spatial position of each pipeline in the BIM model in real time; Once a collision risk is detected, the avoidance mechanism is automatically activated, and the pipeline direction and elevation are intelligently adjusted according to preset rules (such as pipe diameter, importance, and construction difficulty); a detailed collision report is generated, including the location, involved pipelines, and adjustment suggestions, which are visually displayed on the operation interface; 3D visualization and tracking of the real-time interaction of personnel, machinery, and objects on the entire construction site; 3) Dynamic construction simulation and progress optimization, combined with 4D BIM technology, linking pipeline installation procedures and progress plans; simulating the progress of the project under different construction sequences and resource inputs, and accurately predicting the construction period; in the event of emergencies or design changes, quickly recalculate the simulation, give an optimized construction plan, reduce the risk of delays, and ensure construction continuity; establish a project template on the Revit software, including relevant components of the architecture and structure professions, and system materials, colors, and other project information of the electromechanical equipment profession; use the plug-in secondary development of the Revit software to create BIM models of various professions and determine the initial heights of various electromechanical professions; Use the plug-in developed by Revit software to automatically detect collisions in various professional BIM models, generate collision node reports, including collision component information and positioning in the project, and quickly switch to collision nodes through positioning; use the plug-in developed by Revit software and the generated collision report to optimize and adjust the BIM model, and record it; specify the pipeline assembly plan according to the comprehensively optimized BIM model;: classify the cross-sections of model components into three types: points, rectangular sections and circular sections, draw the normals of the cross-section edges and convert them into positioning lines, if the positioning lines of different components intersect, it is determined that there is a collision between the components, and pass this collision information to the collector, and then output the collision check results through a list and display them in the form of a table, which contains the ID, type and axis network position information of the collision component; 4) Intelligent evaluation of operation and maintenance space, develop space analysis algorithms, and accurately calculate the operation and maintenance space of each area during the design stage, such as the width and clear height of the equipment maintenance channel; Set safety thresholds, issue eye-catching warnings for substandard areas, and use linkage optimization modules to fine-tune pipeline layouts. After completion, operation and maintenance personnel scan the code to retrieve pipeline information to assist in rapid positioning and maintenance.
2. The intelligent comprehensive planning system for building mechanical and electrical pipelines based on BIM and artificial intelligence according to claim 1 is characterized by: Modify the model until the electromechanical pipelines displayed by the model meet the requirements of ceiling elevation, fine decoration, construction space, commissioning and maintenance, and obtain the final optimized BIM model. Then, export the two-dimensional CAD drawings based on the final optimized BIM model.
3. The intelligent comprehensive planning system for building mechanical and electrical pipelines based on BIM and artificial intelligence according to claim 1 is characterized by: The final optimized BIM model exports the usage of each pipeline and is handed over to the construction team for material quantity adjustment. The construction team prefabricates the pipeline according to the optimized CAD drawings.
Citation Information
Cited By
Project management method and system based on AI, electronic equipment and storage medium
CN120031523A
Green building construction method based on BIM modeling
CN120180572A
Automatic pipeline connection method and device in building information model
CN120337474A
Electromechanical pipeline conflict detection and adjustment method and system based on BIM model
CN120781430A
Electromechanical engineering quantity calculation method and system
CN120995658A