Management method for model parameters and bill of materials based on Teamcenter
By adopting the model parameters and bill of materials management methods based on Teamcenter platform in the PLM system, the problems of low data management efficiency, lax authority control, and chaotic version management in the existing technology are solved, and the standardization, automation and security of data management are realized, and the efficiency and quality of product data management are improved.
Patent Information
- Application Number
- CN202411912986.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-12-24
- Publication Date
- 2025-04-25
AI Technical Summary
The existing PLM system has problems such as inefficiency, lax authority control, and chaotic version management in the data management and approval process, resulting in irregular data management and insufficient security.
The model parameters and bill of materials management methods based on the Teamcenter platform are adopted to realize the automation and collaborative processing of data management through workflow instance generation and task distribution mechanisms. The method includes receiving project generation instructions, generating workflow instances, distributing tasks, uploading product source files, determining model parameters and BOM data, and performing permission verification, version control and history management.
It realizes the standardization, automation and security of data management, improves the controllability and traceability of data modification, and significantly improves the efficiency and quality of product data management.