Water supply network node water demand initialization method based on dynamic population distribution
By calculating the number of people in the service area of the water supply network node in real time, the problem of cumbersome initialization of water demand in the existing technology and the inability to accurately reflect real-time water use changes is solved, and the accurate initialization of water demand in water supply network nodes in areas with high population mobility is achieved.
Patent Information
- Application Number
- CN202411799433.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-12-09
- Publication Date
- 2025-05-02
AI Technical Summary
The existing water supply pipeline node initialization method has many shortcomings, including cumbersome data links and maintenance, the inability to accurately reflect real-time water use changes, and the inability to accurately reflect water use needs at different times in areas with high population mobility.
The water demand initialization method of water supply pipeline nodes based on dynamic population distribution is adopted. By calculating the number of populations in each online metered water meter service area and the number of populations in each grid unit in real time, combined with the data of the mobile signaling data platform, the dynamic population number of each node service area is accurately determined at each moment, thereby initializing the water demand of water supply pipeline nodes.
It improves the accuracy of population movement analysis, can accurately reflect population dynamics and its impact on water demand, and makes the initialization of node water demand more in line with the actual situation, and is suitable for complex urban water supply systems with high population mobility.