Railway passenger car integrated water supply system and railway passenger car
By integrating water supply pipes and valves under the roof of the railcar, multiple water supply and drainage modes are achieved, solving the problems of complex and cumbersome operation of existing water supply systems, and improving water supply efficiency and ease of installation.
Patent Information
- Application Number
- CN202511104046.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2025-08-07
- Publication Date
- 2025-11-04
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
The existing water supply system for rail passenger vehicles has a complex installation structure, is cumbersome to operate, has low water supply efficiency, and cannot meet the switching requirements of various water needs.
The water supply pipeline and valves are integrated and installed under the roof of the rail passenger car. Multiple water supply and drainage modes are realized through the integrated water supply device. The integrated water supply pipeline is connected to the water supply end and the water use end. The integrated water supply device is installed in the crew room, simplifying the installation and operation process.
It reduces installation difficulty and operational complexity, improves water supply efficiency, and realizes a highly functional and easy-to-operate water supply system.
Smart Images

Figure CN120886872A_ABST
Abstract
Description
TECHNICAL FIELD
[0001] The present application belongs to the technical field of water supply for rail passenger cars, and particularly relates to a rail passenger car integrated water supply system and a rail passenger car. BACKGROUND
[0002] The existing water supply device for rail passenger cars is mainly achieved by setting a water tank, a valve and a pipeline in a car compartment. Since there are many water points in the car compartment and only one set of water supply assembly is provided, the water supply capacity is limited, which causes the problem of being unable to normally supply water. Therefore, the water supply system in the car compartment is improved in design, such as the patent with the publication number CN116293465A and the name of a railway passenger car pressurized water supply system. The double-system pressurized water supply is provided, so that the user can switch between multiple functions according to the actual use demand when using. When the water source of the water container is insufficient, water can be supplied through the external underground water source through the water injection pipeline and the second road pressurized water supply system, thereby ensuring the normal water supply demand of the railway passenger car.
[0003] This way installs the valve of the water supply system for the rail passenger car above the roof of the passenger car. According to the requirement of the customer for the double water supply of the water point, water can be supplied to the water point on the passenger car by the water tank, or water can be supplied to the water point on the passenger car from the external water supply point such as the garage under the car and the water tank car. In order to meet the operation function, the valve of the water supply system needs to be manually operated frequently. However, the valves are dispersedly distributed on the roof of the passenger car, so there are problems of complex installation structure, cumbersome operation and low water supply efficiency of the water supply on the passenger car.
[0004] In view of this, how to design a simple installation structure, simple operation and improve the water supply efficiency is the technical problem to be solved by the present application. SUMMARY
[0005] The present application provides a rail passenger car integrated water supply system and a rail passenger car, which realizes the installation and operation efficiency of the rail passenger car integrated water supply system and improves the water supply efficiency of the rail passenger car.
[0006] In order to achieve the above technical purpose, the present application adopts the following technical scheme: In one aspect, the present application provides a rail passenger car integrated water supply system, comprising: a water supply end for supplying water to the rail passenger car; an integrated water supply device installed below the roof of the rail passenger car, the integrated water supply device comprising a plurality of integrated water supply pipelines, the integrated water supply device being connected with the water supply end through the integrated water supply pipelines, and the integrated water supply device realizing a plurality of water supply modes and drainage modes by turning on and off the integrated water supply pipelines; a main water supply pipeline in communication with the integrated water supply pipelines; The water supply end at least includes a toilet room, a tea stove room and a washing room; The toilet room is provided with a toilet water pipeline, the tea stove room is provided with a tea stove water pipeline, and the washing room is provided with a washing water pipeline; The toilet water pipeline, the tea stove water pipeline and the washing water pipeline are connected with the integrated water supply pipeline.
[0007] In some embodiments of the present application, the water supply end includes a water tank and an external water source, and the water tank is arranged on the rail car.
[0008] In some embodiments of the present application, the integrated water supply pipeline includes: A first water supply pipeline, one end of the first water supply pipeline is connected with the water tank, and a first valve is arranged on the first water supply pipeline; A second water supply pipeline, one end of the second water supply pipeline is connected with the end of the first water supply pipeline away from the water tank, the other end of the second water supply pipeline is connected with the main water supply pipeline, and a second valve is arranged on the second water supply pipeline; A third water supply pipeline, one end of the third water supply pipeline is connected with the external water source, the other end of the third water supply pipeline is connected with the second water supply pipeline, and a third valve is arranged on the third water supply pipeline; A fourth water supply pipeline, one end of the fourth water supply pipeline is connected with the third water supply pipeline, the other end of the fourth water supply pipeline is connected with the water tank, and a fourth valve is arranged on the fourth water supply pipeline.
[0009] In some embodiments of the present application, the integrated water supply pipeline further includes a fifth water supply pipeline, the fifth water supply pipeline is respectively communicated with the first water supply pipeline, the second water supply pipeline, the third water supply pipeline and the fourth water supply pipeline, and a fifth valve is arranged on the end of the fifth water supply pipeline away from the communication with the first water supply pipeline, the second water supply pipeline, the third water supply pipeline and the fourth water supply pipeline.
[0010] In some embodiments of the present application, the water supply mode includes: A water tank water supply mode, the first valve and the second valve are opened, and the third valve, the fourth valve and the fifth valve are closed, water in the water tank enters the main water supply pipeline through the first water supply pipeline and the second water supply pipeline, and is supplied to the water end; An external water source water supply mode, the second valve and the third valve are opened, and the first valve, the fourth valve and the fifth valve are closed, water of the external water source enters the main water supply pipeline through the third water supply pipeline and the second water supply pipeline, and is supplied to the water end.
[0011] In some embodiments of the present application, the water supply mode further comprises: The water supply mode of the external water source to the water tank, opening the third valve and the fourth valve, and closing the first valve, the second valve and the fifth valve, the water of the external water source enters the water tank through the third water supply pipeline and the fourth water supply pipeline.
[0012] In some embodiments of the present application, the water drainage mode is: Opening the first valve, the second valve, the third valve, the fourth valve and the fifth valve, draining the water in the first water supply pipeline, the second water supply pipeline, the third water supply pipeline, the fourth water supply pipeline and the main water supply pipeline.
[0013] In some embodiments of the present application, the rail passenger car integrated water supply system further comprises: An operation panel, which is arranged in the rail passenger car, and an operation button is arranged on the operation panel; A controller, which is connected with the first valve, the second valve, the third valve, the fourth valve, the fifth valve and the operation panel respectively.
[0014] In some embodiments of the present application, an overflow device is arranged on the water tank, which is used to prevent the water in the water tank from overflowing.
[0015] In another aspect, the present application provides a rail passenger car, which is provided with the rail passenger car integrated water supply system as described in any one of the above.
[0016] Compared with the prior art, the present application has the advantages and positive effects that: by arranging several water supply pipelines under the roof of the rail passenger car, the water at the water supply end is supplied through the integrated water supply pipelines with different on-off states, so as to realize multiple water supply modes and drainage modes, the integrated water supply device is arranged under the roof of the rail passenger car, which can effectively reduce the installation time of the water supply pipeline valve, reduce the difficulty of climbing operation, and make the maintenance and repair convenient; in addition, the staff can adjust the water supply mode and the drainage mode at the same position, which is functional, practical, simple in structure, easy to operate, and greatly improves the water supply efficiency. BRIEF DESCRIPTION OF DRAWINGS
[0017] In order to more clearly illustrate the technical solutions in the embodiments of the present application or the prior art, the drawings needed to be used in the embodiments or the prior art description will be briefly introduced below. Obviously, the drawings in the following description are some embodiments of the present application, and those skilled in the art can also obtain other drawings according to these drawings without creative labor.
[0018] Figure 1 This is a schematic diagram of an embodiment of the integrated water supply system for rail passenger vehicles according to the present invention; Figure 2 This is a schematic diagram of the integrated water supply device in one embodiment of the integrated water supply system for rail passenger vehicles of the present invention; Figure 3 This is an explanatory diagram of the water supply mode, drainage mode and corresponding valve switches in one embodiment of the integrated water supply system for rail passenger vehicles of the present invention; Figure 4 This is a schematic diagram of the operation panel in one embodiment of the integrated water supply system for rail passenger vehicles of the present invention.
[0019] Explanation of reference numerals in the attached figures: 100. First water supply pipeline; 101. First valve; 200. Second water supply pipeline; 201. Second valve; 300. Third water supply pipeline; 301. Third valve; 400. Fourth water supply pipeline; 401. Fourth valve; 500. Fifth water supply pipeline; 501. Fifth valve; 600. Main water supply pipeline; 701. First toilet water supply pipeline; 702. Toilet; 703. Second toilet water supply pipeline. Water pipes; 704. Squat toilet; 705. Second flush faucet; 706. Water-saving valve; 707. Washbasin; 708. Water pipes for tea stove; 709. Electric tea stove; 710. Water pipes for washing up; 711. Hot and cold water-saving valve; 712. First flush faucet; 713. Drain valve; 800. Water tank; 801. Overflow pipe; 900. Through passage; 901. Water inlet pipe; 902. Water inlet valve. Detailed Implementation
[0020] To make the objectives, technical solutions, and advantages of the embodiments of the present invention clearer, the technical solutions of the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings. Obviously, the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those skilled in the art without creative effort are within the scope of protection of the present invention.
[0021] It should be noted that in the description of this invention, the terms "upper," "lower," "left," "right," "vertical," "horizontal," "inner," and "outer," which indicate directional or positional relationships, are based on the directional or positional relationships shown in the accompanying drawings. These are merely for ease of description and do not indicate or imply that the device or element must have a specific orientation, or be constructed and operated in a specific orientation; therefore, they should not be construed as limitations on this invention. Furthermore, the terms "first" and "second" are used for descriptive purposes only and should not be construed as indicating or implying relative importance.
[0022] In the present application, unless specifically defined and limited otherwise, the terms "mounting", "connected", "connection" and the like should be interpreted broadly, for example, can be fixedly connected, or can be detachably connected, or integrally connected; can be mechanically connected, or can be electrically connected; can be directly connected, or can be indirectly connected through an intermediate medium, or can be internal communication of two elements. For those skilled in the art, the specific meaning of the above terms in the present application can be understood according to the specific circumstances.
[0023] In the present application, unless specifically defined and limited otherwise, the first feature "on" or "under" the second feature can include that the first and second features are in direct contact, or can include that the first and second features are not in direct contact but are in contact through another feature between them. Moreover, the first feature "on", "above" and "over" the second feature includes that the first feature is directly above and obliquely above the second feature, or only indicates that the horizontal height of the first feature is higher than that of the second feature. The first feature "under", "below" and "under" the second feature includes that the first feature is directly below and obliquely below the second feature, or only indicates that the horizontal height of the first feature is less than that of the second feature.
[0024] The following disclosure provides many different embodiments or examples for implementing different structures of the present application. In order to simplify the disclosure of the present application, the components and arrangements of specific examples are described in the following. Of course, they are only examples, and the purpose is not to limit the present application. In addition, the present application can repeatedly refer to numbers and / or letters in different examples, and such repetition is for the purpose of simplification and clarity, which itself does not indicate the relationship between the various embodiments and / or arrangements discussed. In addition, the present application provides examples of various specific processes and materials, but those skilled in the art can realize the application of other processes and / or the use of other materials.
[0025] As Figures 1 to 4 The present application provides a rail passenger car integrated water supply system, which comprises a water supply end, an integrated water supply device, a main water supply pipeline 600 and a water use end. The water supply device is arranged integrally in the present application, which reduces the complexity of the overall structure of the water supply system, facilitates installation, and is convenient to operate, can effectively shorten the time of switching the water supply mode, thereby improving the water supply efficiency. Specifically: The water supply end is used to supply water to the rail passenger car.
[0026] The integrated water supply device is installed below the roof of the rail passenger car. The attendant room has a larger indoor space, so the integrated water supply device can be installed below the roof of the rail passenger car in the attendant room. The integrated water supply device comprises a plurality of integrated water supply pipelines. The integrated water supply device is connected with the water supply end through the integrated water supply pipelines. The integrated water supply device realizes a plurality of water supply modes and drainage modes by switching on and off the integrated water supply pipelines.
[0027] In the prior art, the valves for the water supply system are installed above the roof of the bus. Therefore, the pipes and pipe sections above the roof are scattered in various places and need to be installed and fixed separately. In this application, the integrated water supply device is installed below the roof, which integrates all the installation operations and pipe sections into one location, greatly reducing the difficulty of installation and operation.
[0028] The main water supply pipeline 600 is connected to the integrated water supply pipeline. The main water supply pipeline 600 is laid along the body of the rail vehicle to ensure that all water points inside the vehicle can be connected to the water supply pipeline.
[0029] like Figure 1 As shown, the water supply area includes at least a toilet room, a tea room, and a washroom, specifically: The toilet facilities are equipped with water supply pipes. The toilet facilities include a first toilet stall and a second toilet stall. The water supply pipes include a first toilet water supply pipe 701 and a second toilet water supply pipe 703. The first toilet stall is equipped with a toilet seat 702, which is connected to the main water supply pipe 600 via the first toilet water supply pipe 701. The toilet seat 702 can be flushed after use. The second toilet stall is equipped with a squat toilet 704, a second flushing faucet 705, a water-saving valve 706, and a washbasin. The water-saving valve 706, the second flushing faucet 705, and the squat toilet 704 are all connected to the main water supply pipe 600 via the second toilet water supply pipe 703. The washbasin is located below the water-saving valve 706 and can be flushed after use. Other items can also be washed in the second toilet stall via the second flushing faucet 705 and the water-saving valve 706.
[0030] The tea stove room is equipped with a water supply pipe 708 for tea stoves. An electric tea stove 709 is installed in the tea stove room. The electric tea stove 709 is connected to the main water supply pipe 600 through the water supply pipe 708 for tea stoves. The electric tea stove 709 can heat water for passengers or staff to use.
[0031] The washroom is equipped with a water supply line 710. The washroom includes two sets of hot and cold water-saving valves 711 and a first flushing faucet 712. A washbasin 707 is located below each of the hot and cold water-saving valves 711. The hot and cold water-saving valves 711 and the first flushing faucet 712 are connected to the main water supply line 600 via the water supply line 710. Passengers or staff can use the hot and cold water-saving valves 711 to control the water flow for washing in the washroom, and can also use the first flushing faucet 712 to rinse other items. Used water is drained to the outside of the vehicle through a drain pipe (not shown in the figure) and a drain valve 713 below the washbasin 707.
[0032] When installing, the staff first pre-assembles the various integrated water supply pipelines and the valves thereon to form a modular structure, and then installs the entire modular structure integrally under the roof of the vehicle by welding, screws or the like. Compared with the mode of dispersing the water supply pipelines and valves above the roof of the vehicle, the installation difficulty is greatly reduced, and the installation efficiency is improved; and since the valves are integrally arranged in the attendant room, the staff can be fixed at a certain place to operate, greatly improving the operation and water supply efficiency.
[0033] When in use, the staff adjusts the integrated water supply device according to the different water demand of the water end, controls the on-off of the valves on the integrated water supply pipeline, and realizes different water supply modes by the water supply end to meet the water demand.
[0034] The water supply end includes a water tank 800 and an external water source. The water tank 800 is arranged on the rail car. In the embodiment, the number of water tanks 800 is one. A through passage 900 is arranged below the rail vehicle. The external water source delivers water to the inside of the rail vehicle through the through passage 900. Multiple water injection ports can be arranged on the through passage 900. The water injection ports are connected with the water injection valves 902 and the external water source through the water injection pipelines 901. The external water source injects water into the through passage 900 through the multiple water injection ports and the water injection pipelines 901, which can improve the efficiency of the external water source supplying water to the rail car. When the vehicle is stationary, the external water source supplies water to the vehicle water supply system. The external water source can be a vehicle garage or a water tank truck.
[0035] By the double water supply mode of the water tank 800 and the external water source, the number of water tanks 800 arranged inside the vehicle can be reduced, the load weight of the vehicle body during operation can be reduced, and the transportation efficiency can be improved. When the rail vehicle is stationary, the external water source can supply water or replenish the water tank 800, so as to ensure sufficient water supply for the rail vehicle and avoid the phenomenon of no water supply.
[0036] The water tank 800 is arranged at a high position inside the rail car and is higher than the main water supply pipeline 600, the integrated water supply device and the water end. Such arrangement can provide a larger water pressure and ensure the water outlet of the water end.
[0037] As shown in Figure 1 , Figure 2 The integrated water supply pipeline includes: A first water supply pipeline 100, one end of the first water supply pipeline 100 is connected with the water tank 800, and a first valve 101 is arranged on the first water supply pipeline 100. The first water supply pipeline 100 functions to input the water in the water tank 800 into the integrated water supply device.
[0038] The second water supply pipeline 200 has one end connected with the end of the first water supply pipeline 100 away from the water tank 800, and the other end connected with the main water supply pipeline 600, and is provided with a second valve 201.
[0039] The third water supply pipeline 300 has one end connected with an external water source, and the other end connected with the second water supply pipeline 200, and is provided with a third valve 301. The third water supply pipeline 300 is used to input water in the external water source into the integrated water supply device.
[0040] The fourth water supply pipeline 400 has one end connected with the third water supply pipeline 300, and the other end connected with the water tank 800, and is provided with a fourth valve 401. The fourth water supply pipeline 400 is used to input water in the external water source into the water tank 800 to supply water to the water tank 800.
[0041] The first water supply pipeline 100, the second water supply pipeline 200, the third water supply pipeline 300 and the fourth water supply pipeline 400 are arranged in parallel, which facilitates the assembly of the integrated water supply device and reduces the installation space required by the integrated water supply device.
[0042] In addition, the pipeline interface of the first water supply pipeline 100 connected with the water tank 800 is arranged close to the bottom surface of the water tank 800, so that all the water in the water tank 800 can be input into the integrated water supply device; the pipe opening of the fourth water supply pipeline 400 located inside the water tank 800 is arranged close to the top surface of the water tank 800, so that the problem of poor water supply from the external water source to the water tank 800 under the action of water pressure can be avoided, thereby improving the efficiency of water supply from the external water source to the water tank 800.
[0043] The integrated water supply pipeline further comprises a fifth water supply pipeline 500, which is respectively communicated with the first water supply pipeline 100, the second water supply pipeline 200, the third water supply pipeline 300 and the fourth water supply pipeline 400, and is provided with a fifth valve 501 at one end communicated with the first water supply pipeline 100, the second water supply pipeline 200, the third water supply pipeline 300 and the fourth water supply pipeline 400. The fifth water supply pipeline 500 is used to drain the water in the integrated water supply device.
[0044] The overflow device is arranged on the water tank 800 and is used for preventing water in the water tank 800 from overflowing. The overflow device can be an overflow pipeline 801. One end of the overflow pipeline 801 is connected with the water tank 800, and the other end of the overflow pipeline 801 can be connected with a drain pipeline or directly located outside the vehicle. The opening of the overflow pipeline 801 located inside the water tank 800 is arranged close to the top surface of the water tank 800. In this way, when the water level in the water tank 800 reaches the opening of the overflow pipeline 801, the water can be drained in time, thereby preventing the water in the water tank 800 from overflowing.
[0045] As shown in FIG. 1, according to the on-off of the first water supply pipeline 100, the second water supply pipeline 200, the third water supply pipeline 300, the fourth water supply pipeline 400 and the fifth water supply pipeline 500, different water supply modes can be realized. The water supply modes include: Figure 3 a water tank water supply mode, in which the first valve 101 and the second valve 201 are opened, and the third valve 301, the fourth valve 401 and the fifth valve 501 are closed. At this time, the first water supply pipeline 100, the second water supply pipeline 200 and the main water supply pipeline 600 form a passage. The water in the water tank 800 enters the main water supply pipeline 600 in sequence via the first water supply pipeline 100 and the second water supply pipeline 200, and is supplied to the water end. The water end can be used by opening the valve corresponding to the water end.
[0046] an external water source water supply mode, in which the second valve 201 and the third valve 301 are opened, and the first valve 101, the fourth valve 401 and the fifth valve 501 are closed. At this time, the third water supply pipeline 300, the second water supply pipeline 200 and the main water supply pipeline 600 form a passage. The water of the external water source enters the main water supply pipeline 600 in sequence via the third water supply pipeline 300 and the second water supply pipeline 200, and is supplied to the water end. The water end can be used by opening the valve corresponding to the water end.
[0047] an external water source water supply mode, in which the second valve 201 and the third valve 301 are opened, and the first valve 101, the fourth valve 401 and the fifth valve 501 are closed. At this time, the third water supply pipeline 300, the second water supply pipeline 200 and the main water supply pipeline 600 form a passage. The water of the external water source enters the main water supply pipeline 600 in sequence via the third water supply pipeline 300 and the second water supply pipeline 200, and is supplied to the water end. The water end can be used by opening the valve corresponding to the water end.
[0048] When in a lower temperature environment (usually from October to May each year), in order to avoid the case that the water stored in the pipeline is frozen to cause the pipeline to be damaged when the vehicle is not running, the water in the vehicle pipeline needs to be completely emptied through the drainage mode. The drainage mode is: opening the first valve 101, the second valve 201, the third valve 301, the fourth valve 401 and the fifth valve 501. At this time, the main water supply pipeline 600, the first water supply pipeline 100, the second water supply pipeline 200, the third water supply pipeline 300, the fourth water supply pipeline 400 and the fifth water supply pipeline 500 are all passageways, which can drain the accumulated water in the first water supply pipeline 100, the second water supply pipeline 200, the third water supply pipeline 300, the fourth water supply pipeline 400 and the main water supply pipeline 600 under the action of gravity; In addition, all the valves at the water use end, such as the cold and hot water saving valve 711 in the washroom, the flushing faucet, the drain valve 713, and the water saving valve 706 and the flushing faucet in the toilet, are also opened for drainage to improve the anti-freezing effect.
[0049] The track train floor below the fifth valve 501 is provided with a water leakage tray (not shown in the figure), and the water discharged from the main water supply pipeline 600, the first water supply pipeline 100, the second water supply pipeline 200, the third water supply pipeline 300, the fourth water supply pipeline 400 and the fifth water supply pipeline 500 will enter the drainage pipeline through the water leakage tray for discharge.
[0050] When the first valve 101, the second valve 201, the third valve 301, the fourth valve 401 and the fourth valve 401 are manual valves, when the water supply mode or the drainage mode needs to be adjusted, the staff can manually open or close the corresponding valve.
[0051] The track train integrated water supply system further comprises: An operation panel is arranged in the track train, and an operation button is arranged on the operation panel. The operation panel can set the water supply mode and the drainage mode. The schematic diagram of the operation panel is shown in Figure 4 .
[0052] A controller is connected with the first valve 101, the second valve 201, the third valve 301, the fourth valve 401, the fifth valve 501 and the operation panel. At this time, the first valve 101, the second valve 201, the third valve 301, the fourth valve 401 and the fifth valve 501 are all electric valves. The use of the operation panel controller and the electric valve greatly improves the automation degree of adjusting the water supply mode or the drainage mode, and the operation efficiency is higher than that of the manual operation mode. The improvement of the software method is not involved in the present application, so the control of the controller and the operation panel will not be described here.
[0053] The present application also provides a track train, which is provided with the track train integrated water supply system as described above.
[0054] In the description of the present specification, the description of the term "one embodiment", "some embodiments", "exemplary embodiment", "example", "specific example", or "some examples" or the like means that the specific feature, structure, material or characteristic described in connection with the embodiment or example is included in at least one embodiment or example of the present application. In the present specification, the exemplary description of the above terms does not necessarily refer to the same embodiment or example. Also, the specific feature, structure, material or characteristic described can be combined in any one or more embodiments or examples in an appropriate manner.
[0055] The above embodiments are only used to illustrate the technical solutions of the present application, but not limit the present application; although the present application has been described in detail with reference to the foregoing embodiments, the technical solutions recorded in the foregoing embodiments can still be modified by those of ordinary skill in the art, or some technical features thereof can be replaced by equivalents; and these modifications or replacements do not cause the essence of the corresponding technical solutions to deviate from the spirit and scope of the technical solutions claimed by the present application.
[0056] As far as possible, various aspects and features described and illustrated in the specification can be applied individually, and these individual aspects can be the subject of a divisional application.
Claims
1. An integrated water supply system for rail passenger vehicles, characterized in that, include: The water supply end is used to supply water to the rail passenger vehicles; An integrated water supply device is installed below the top plate of the rail passenger car. The integrated water supply device includes several integrated water supply pipelines. The integrated water supply device is connected to the water supply end through the integrated water supply pipelines. The integrated water supply device realizes multiple water supply modes and drainage modes by opening and closing different integrated water supply pipelines. The main water supply pipeline is connected to the integrated water supply pipeline. The water supply area should include at least a toilet room, a tea room, and a washroom; The toilet room is equipped with toilet water pipes; the tea stove room is equipped with tea stove water pipes; the washroom is equipped with washroom water pipes. The toilet water pipe, the tea stove water pipe, and the wash water pipe are all connected to the integrated water supply pipe.
2. The integrated water supply system for rail passenger vehicles according to claim 1, characterized in that, The water supply end includes a water tank and an external water source, and the water tank is located on the railcar.
3. The integrated water supply system for rail passenger vehicles according to claim 2, characterized in that, The integrated water supply pipeline includes: A first water supply pipeline, one end of which is connected to the water tank, and a first valve is provided on the first water supply pipeline; The second water supply pipeline has one end connected to the end of the first water supply pipeline away from the water tank, and the other end connected to the main water supply pipeline. A second valve is provided on the second water supply pipeline. The third water supply pipeline has one end connected to the external water source and the other end connected to the second water supply pipeline. A third valve is provided on the third water supply pipeline. The fourth water supply pipeline is connected at one end to the third water supply pipeline and at the other end to the water tank. A fourth valve is provided on the fourth water supply pipeline.
4. The integrated water supply system for rail passenger vehicles according to claim 3, characterized in that, The integrated water supply pipeline also includes a fifth water supply pipeline, which is connected to the first water supply pipeline, the second water supply pipeline, the third water supply pipeline and the fourth water supply pipeline respectively. A fifth valve is provided on the end of the fifth water supply pipeline away from the end connected to the first water supply pipeline, the second water supply pipeline, the third water supply pipeline and the fourth water supply pipeline.
5. The integrated water supply system for rail passenger vehicles according to claim 4, characterized in that, The water supply mode includes: In the water tank supply mode, the first valve and the second valve are opened, and the third valve, the fourth valve and the fifth valve are closed. The water in the water tank enters the main water supply pipeline through the first water supply pipeline and the second water supply pipeline and is supplied to the water user. In the external water supply mode, the second valve and the third valve are opened, and the first valve, the fourth valve and the fifth valve are closed. The water from the external water source enters the main water supply pipeline through the third water supply pipeline and the second water supply pipeline and is supplied to the user.
6. The integrated water supply system for rail passenger vehicles according to claim 5, characterized in that, The water supply mode also includes: In the external water source supply mode, the third valve and the fourth valve are opened, and the first valve, the second valve and the fifth valve are closed. Water from the external water source enters the water tank through the third water supply pipeline and the fourth water supply pipeline.
7. The integrated water supply system for rail passenger vehicles according to claim 6, characterized in that, The drainage mode is as follows: Open the first valve, the second valve, the third valve, the fourth valve, and the fifth valve to drain the water from the first water supply pipeline, the second water supply pipeline, the third water supply pipeline, the fourth water supply pipeline, and the main water supply pipeline.
8. The integrated water supply system for rail passenger vehicles according to claim 7, characterized in that, The integrated water supply system for the railcar also includes: The control panel is located inside the railcar and is equipped with operation buttons. The controller is connected to the first valve, the second valve, the third valve, the fourth valve, the fifth valve, and the operation panel, respectively.
9. The integrated water supply system for rail passenger vehicles according to claim 2, characterized in that, The water tank is equipped with an overflow device to prevent water from overflowing from the tank.
10. A rail passenger vehicle, characterized in that, The railcar is equipped with an integrated water supply system as described in any one of claims 1-9.
Citation Information
Patent Citations
Pressurizing water supply system for passenger train
CN116293465A