Switching method and device for panel equipment and computer readable storage medium

By monitoring the status of the main panel device and broadcasting the status information of the slave panel devices, a new main panel device is elected, which solves the problem of uncontrolled smart devices caused by main panel failure, realizes dynamic backup and seamless switching of the smart home system, and improves the stability and reliability of the system.

CN121193554APending Publication Date: 2025-12-23QINGDAO HAIER INTELLIGENT HOME APPLIANCE TECHNOLOGY CO LTD
3 Cites 1 Cited by

Patent Information

Application Number
CN202511222710.3
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2025-08-29
Publication Date
2025-12-23

AI Technical Summary

Technical Problem

In a smart home system, when the main panel device malfunctions or cannot operate normally, other normal panel devices cannot automatically take over the functions of the main panel, causing the smart devices to go out of control and affecting the stability and reliability of the system.

Method used

By monitoring the operational status of the main panel device, a new main panel device is elected based on the status information broadcast by the slave panel device, and the master-slave switch is completed, including the calculation of status weight values ​​and the modification of role flags, to ensure seamless switching and dynamic backup.

Benefits of technology

It enables dynamic backup and seamless switching between multiple panel devices, improving the reliability and disaster recovery capabilities of the smart home system and ensuring that users can stably control home devices under any circumstances.

✦ Generated by Eureka AI based on patent content.
Patent Text Reader

Abstract

The invention discloses a switching method and device for panel equipment and a computer readable storage medium, and relates to the technical field of smart home, and the switching method for the panel equipment comprises the steps: carrying out the operation state monitoring of main panel equipment, so as to obtain monitoring information; under the condition that the monitoring information meets the master-slave switching condition, each slave panel device is controlled to broadcast respective state information; according to the respective state information broadcasted by each slave panel device, selecting a new master panel device; and performing master-slave switching operation on the master panel equipment and the new master panel equipment. According to the scheme, the slave panel devices can be triggered to broadcast respective state information when the switching condition is met, the optimal new master panel device is elected based on the state information, and master-slave switching is completed, so that the problem that the intelligent device is out of control due to the failure of the master panel device is solved, dynamic backup and seamless switching among the multiple panel devices are realized, and the switching efficiency is improved. And the reliability and the disaster recovery capability of the smart home system are obviously improved.
Need to check novelty before this filing date? Find Prior Art