Gravity type anchoring overlong cableway bridge in alpine and canyon areas of complex wind field and construction method of gravity type anchoring overlong cableway bridge
By installing wind cables and improving the anchorage structure in cableway bridges located in high mountain and canyon areas, the instability of cableway bridges under wind force and the difficulty of anchorage installation were solved, enabling the smooth transportation of construction materials and improving construction safety.
Patent Information
- Application Number
- CN202610003426.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2026-01-05
- Publication Date
- 2026-02-03
AI Technical Summary
In the construction of river channels in high mountain and canyon areas, traditional cableway bridges are prone to swaying and instability under the action of wind, the anchorage is difficult to set, the load-bearing cables are easily entangled and damaged, and materials cannot be transported during the flood season, resulting in low construction safety and efficiency.
The construction method of gravity-anchored ultra-long cableway bridge in complex wind field high mountain canyon area is adopted. The bridge stiffness is increased by setting wind cables at every 1/6 of the span, and steel plate mesh is used to reduce wind resistance. The load-bearing cable anchorage adopts rock anchor cable + reinforced concrete anchor pier + composite steel distribution beam structure. The load-bearing cable anchorage system is wrapped with arc-shaped iron sheet and a safety bend is set to prevent entanglement and slippage.
It improved the safety and stability of the cableway bridge, reduced the risk of wind-induced deformation and instability, enhanced the anchoring force, and ensured the smooth transportation of construction materials and construction safety.
Smart Images

Figure CN121451519A_ABST
Abstract
Description
TECHNICAL FIELD
[0001] The present application relates to a gravity type anchoring super-long cable bridge in a complex wind field high mountain and canyon area and a construction method, and mainly applies to the construction of a river-crossing bridge in a high mountain and canyon area, where the river water is turbulent, the dry season is short, the flood season is long, the effective construction period is short, and the ship cannot transport materials across the river. BACKGROUND
[0002] China has numerous mountains and rivers, and some river channels are located in high mountains and canyons. In addition, the river water is turbulent, the bridge height is generally large, the V-shaped cliff on both sides needs to be crossed, and the construction period of the lower structure of the bridge is only 3-4 months per year due to the influence of the river water storage. The effective construction operation time is short, there is no construction road on the cliff on both sides of the river, the vehicle and mechanical equipment can be transported across the river by the ship in the dry season, the water flow is turbulent in the flood season, the ship cannot cross the river, and the transportation of materials, personnel and small construction machinery cannot be carried out. The traditional construction scheme is to set a temporary cable bridge at the side of the bridge site, which is used for transporting materials, personnel and small construction machinery across the river and personnel into the main pier and the upper structure of each construction operation surface, and conveying concrete by laying concrete conveying pump pipes. In the construction process, the following problems are often faced: (1) Due to the large height difference between the bridge deck and the valley bottom water surface, the high-altitude wind force is large, the high-altitude cable bridge is easy to swing under the action of wind force, and the safety and stability are poor; (2) The rock shore anchor position of the bearing cable on both sides is steep, the transportation of construction materials is difficult, the anchor setting is difficult, and the anchor force is insufficient; (3) The cable bridge deck is a solid plate, which cannot be ventilated, and the high-altitude wind resistance is large; (4) When the bearing cable is fixed in the anchor system, the bearing cable is easy to be cut or bent during winding, which affects the safety; (5) When the bearing cable is stressed, it is not determined whether the end of the bearing cable slips in the anchor system, and the safety hazard cannot be determined by the naked eye.
[0003] The purpose of the present application is to develop a gravity type anchoring super-long cable bridge in a complex wind field high mountain and canyon area and a construction method. A pair of wind cable is symmetrically arranged at every 1 / 6 span position of the cable bridge, the cable is fixed on the shore slope on both banks, the overall rigidity of the bridge is increased by the wind cable structure, the overturning and torsional swing of the cable bridge is prevented, the bridge deck is made of steel plate net, the ventilation property is increased, the wind load is reduced, the wind-induced deformation is reduced, and the wind-induced instability is avoided. The anchor of the bearing cable adopts the structure form of rock anchor cable + reinforced concrete anchor pier + combined steel distribution beam, the anchor force is improved, a layer of arc-shaped iron sheet is wrapped around the combined steel distribution beam to reduce the cutting and bending of the bearing cable, a safety bend is arranged at the end of the bearing cable to improve the safety. SUMMARY
[0004] The purpose of the present application is to solve the deficiencies in the prior art and provide a gravity type anchoring super-long cable bridge in a complex wind field high mountain and canyon area and a construction method.
[0005] To achieve the above technical purposes, the application adopts the following technical solutions: a construction method of a gravity type anchor super-long cable bridge in a complex wind field high mountain and canyon area, comprising the following specific steps: Step one, construction preparation; Step two, rock anchor cable construction; a step is excavated on a rock mass along a position of a measurement line, a rock anchor cable hole position is positioned by lofting, a hole is drilled to a designed anchor hole depth by using a down-the-hole drill, a rock anchor cable is made and installed, the rock anchor cable is inserted into the anchor hole, and micro-expansion anchor cable cement slurry is grouted into the anchor hole; Step three, concrete anchor pier construction; The rock surface at the step is washed clean, a reinforced concrete anchor pier is cast on the rock surface at the step and tightly adheres to the rock layer, a load bearing cable passing hole and a rock anchor cable passing hole are pre-set in the reinforced concrete anchor pier during the reinforced concrete anchor pier casting process, and the rock anchor cable passes through and extends out of the rock anchor cable passing hole on the reinforced concrete anchor pier; Step four, I-beam distribution anchor beam installation; the upper distribution anchor beam and the lower distribution anchor beam of the I-beam are assembled into an integrated body by X-shaped reinforcement in a steel structure factory in advance, front bearing plates and rear standing plates are respectively welded on the two sides of the upper distribution anchor beam and the lower distribution anchor beam, rock anchor cable passing holes are pre-reserved on the front bearing plates and the rear standing plates according to designed positions, and the rock anchor cable passing holes on the front bearing plates and the rear standing plates correspond to the rock anchor cables; after the I-beam distribution anchor beam and the front and rear bearing plates are transported to a construction work position, the integrated body is placed on the reinforced concrete anchor pier, arc-shaped square woods are filled between the rear standing plate and the reinforced concrete anchor pier, the rock anchor cables pass through the rock anchor cable passing holes on the rear standing plate and the front bearing plate in sequence, anchor beam pads are arranged outside the front bearing plate, the ends of the rock anchor cables are fixed on the anchor beam pads through anchor rings, and the I-beam distribution anchor beam is locked by tensioning the rock anchor cables; Step five, load bearing cable installation; The load bearing cable is pulled out and unfolded from a cable reel, the load bearing cable is cut according to a calculated length, the load bearing cable is numbered, and a midspan is marked so as to be used for measuring a midspan gradient when the load bearing cable is erected; the load bearing cable is arranged by using a hoisting machine, the load bearing cable is pulled by a winch and a slide, a weight is hung at the front end of the pulled load bearing cable, after the load bearing cable crosses the river, the load bearing cable is transversely moved to a preset position, one end of the load bearing cable is fixed on the I-beam distribution anchor beam, the load bearing cable on the other side of the river is first tensioned by using a reversing chain, the cable is pulled tight by the winch, and the end of the load bearing cable on the side is also anchored on the I-beam distribution anchor beam; Step six, handrail steel rope installation; The step of excavating the steps on the rock mass on both sides of the river according to the measured position of the line, drilling holes into the embedded steel bars, binding the anchor block reinforcement cage above the embedded steel bars, welding the anchor block reinforcement cage with the embedded steel bars, welding the anchor ring with the anchor block reinforcement cage, and then pouring the concrete of the steel rope concrete anchor block; after the concrete of the steel rope concrete anchor block reaches a certain strength, connecting the handrail steel rope end with the chain hoist together, fixing the chain hoist on the anchor ring, and tightening the handrail steel rope to make the sag of the handrail steel rope consistent with the sag of the bearing cable; Step seven, bridge deck system beam installation; welding the cable bridge entrance frame on the upper distribution anchor beam, laying the channel steel main beam and square wood secondary beam on the bearing cable at uniform intervals; Step eight, bridge deck steel mesh installation; During the laying of the bridge deck system beam, the lower layer of wide-hole steel mesh and the upper layer of fine-hole steel mesh are laid on the channel steel main beam and square wood secondary beam in sequence, the steel pressing plate with flat bean patterns is arranged above the upper layer of fine-hole steel mesh at the position corresponding to the channel steel main beam, and the steel pressing plate with flat bean patterns is fixed on the channel steel main beam by high-strength bolt anchors; Step nine, angle steel guardrail installation; The angle steel guardrail is welded on both sides of each channel steel main beam, the handrail steel rope is fixed on the angle steel guardrail at the top and middle parts of the angle steel guardrail by using the rope clamp, and the close-mesh protective net is hung on the angle steel guardrail and the handrail steel rope for closure; Step ten, wind cable construction.
[0006] As an optimization, the pier column is constructed to the designed height in advance, the specific construction lines of the wind cable anchor, the main cable anchor system, and the rock anchor cable are measured and laid out on the rock mass in the mountain valley according to the design position of the rigid frame bridge and the cable bridge, the measurement control network is established, the permanent level point is set, and the entire cable bridge erection and installation process is controlled; the wind cable, the rock anchor cable, the bearing cable, the handrail steel rope, the anchor device, the profile steel, the steel strand, and the bridge deck steel mesh are prepared in advance.
[0007] As an optimization, the reinforced concrete anchor block is placed on the rock mass, and the allowable bearing capacity is not less than 1200KPa. The reinforced concrete anchor block is enclosed by 10cm thick C30 concrete around.
[0008] As an optimization, the laser reflector is installed at the midspan of the bearing cable in step five, the three coordinates at the midspan are observed by using the total station instrument, the sag is calculated and determined, and it is ensured that the sag of a single bearing cable meets the design requirements and the sags of adjacent bearing cables are also consistent. The sag deviation of each bearing cable is repeatedly checked and adjusted during the construction process to reduce the sag deviation of each bearing cable. The sag error of the bearing cable is not more than ±3cm.
[0009] As preferred, in step five, the I-shaped steel distribution anchor beam and the rear bearing plate and the front bearing plate jointly form an assembly, and an arc-shaped iron sheet is wrapped outside the assembly and connected with the bearing cable; when one end of the bearing cable is fixed on the I-shaped steel distribution anchor beam, the end of the bearing cable on one side of the river bank is passed through the bearing cable through hole, and the bearing cable is wound around the arc-shaped iron sheet outside and fastened by a plurality of cable clamps, and a safety bend is arranged at the end of the bearing cable, and a cable clamp is arranged at the tail of the safety bend to lock.
[0010] As preferred, in step seven, two square wood secondary cross beams are arranged between every two adjacent channel steel main cross beams, the channel steel main cross beams and the square wood secondary cross beams are staggered, the distance between the channel steel main cross beams and the square wood secondary cross beams is 0.5 m, the channel steel main cross beams are fixed with the bearing cables by using rope clamps, and the square wood secondary cross beams are bound with the bearing cables by using steel wires.
[0011] As preferred, in step eight, the lower layer wide-hole steel wire mesh and the upper layer fine-hole steel wire mesh are provided with pressing head steel bars, and the pressing head steel bars are bound and connected with the channel steel main cross beams, the square wood secondary cross beams and the bearing cables.
[0012] As preferred, in step ten, the specific construction method of the wind cable is as follows: a pair of wind cables are symmetrically arranged at every 1 / 6 span position of the cable bridge, eight wind cables are symmetrically arranged on the whole cable bridge, a shackle is arranged at the position corresponding to the wind cable at the two ends of the channel steel main cross beam, one end of the wind cable is connected with the shackle, and the other end is connected with a wind cable anchor, the traction and installation method of the wind cable is the same as that of the bearing cable, and the included angle between the planar projection of the wind cable and the axis of the cable bridge is not less than 45°.
[0013] The complex wind field high mountain and canyon area gravity type anchor super-long cable bridge is constructed by the construction method of the complex wind field high mountain and canyon area gravity type anchor super-long cable bridge.
[0014] The application has the following characteristics and beneficial effects: (1) The application constructs a cable bridge above the river in the complex wind field high mountain and canyon area to assist the construction of the rigid frame bridge and the pier column, solves the problem that there is no construction road on the cliff on both sides of the river, and the water flow is too rapid in the flood season to transport materials, personnel and small construction machinery.
[0015] (2) The application symmetrically arranges a pair of wind cables at every 1 / 6 span position of the cable bridge, fixes the cables on the two bank slopes, increases the overall rigidity of the bridge through the wind cable structure, prevents the overturning and torsional swing of the cable bridge, and improves the safety and stability.
[0016] (3) The cable bridge deck plate of the application adopts a steel wire mesh deck plate, increases the wind permeability, reduces the wind load, reduces the wind-induced deformation and avoids the wind-induced instability.
[0017] (4) The load-bearing cable anchorage of the present invention adopts the structural form of rock anchor cable + reinforced concrete anchor pier + composite steel distribution beam, which has a large overall anchorage force and a large load-bearing capacity of the load-bearing cable.
[0018] (5) The present invention wraps a layer of arc-shaped iron sheet around the combined steel distribution beam in the load-bearing cable anchorage system, which reduces the cuts and bends when the load-bearing cable is wrapped. A safety bend is set at the end of the load-bearing cable, which can promptly and intuitively determine whether the load-bearing cable has slipped, reduce safety hazards, and improve the overall safety of the cableway bridge. Attached Figure Description
[0019] Figure 1 This is an overall structural diagram of the gravity-anchored ultra-long cableway bridge in complex wind field high mountain canyon areas according to the present invention; Figure 2 This is an overall plan view of the gravity-anchored ultra-long cableway bridge in a complex wind field high mountain canyon area according to the present invention; Figure 3 This is a plan view of the cableway bridge load-bearing cable anchorage system of the present invention; Figure 4 This is a structural diagram of the cableway bridge load-bearing cable anchorage system of the present invention; Figure 5 This is a partial enlarged view of the cableway bridge load-bearing cable anchorage system of the present invention; Figure 6 This is a structural diagram of the connection between the I-beam distribution anchor beam and the cable bridge entrance gantry of the present invention; Figure 7 This is a detailed cross-sectional view of the cableway bridge deck system of the present invention; Figure 8 This is a partial plan view of the cableway bridge deck system of the present invention.
[0020] Among them: 1-rigid frame bridge; 2-cableway bridge; 3-wind cable; 4-wind cable anchor; 5-main cable anchor system; 6-rock anchor; 7-pier; 8-river surface; 9-load-bearing cable; 10-I-beam distribution anchor beam; 10-1 upper distribution anchor beam; 10-2 lower distribution anchor beam; 11-front bearing plate; 12-rear bearing plate; 13-anchor cable cement grout; 14-anchor beam pad; 15-anchor ring; 16-load-bearing cable passage hole; 17-reinforced concrete anchor pier; 18-cableway gate frame; 19-arc 20-Rock mass; 21-X-type reinforcing bar; 22-Rebar installation; 23-Steel rope concrete anchor pier; 24-Anchor ring; 25-Chain hoist; 26-Angle steel guardrail; 27-Handrail steel rope; 28-Cable clamp; 29-Channel steel main crossbeam; 30-Square timber secondary crossbeam; 31-Arc-shaped square timber; 32-Safety bend; 33-Lower layer wide-hole steel wire mesh; 34-Upper layer fine-hole steel wire mesh; 35-Rope clamp; 36-Protective net; 37-Brow patterned steel pressure plate; 38-High-strength bolt; 39-Shackle. Detailed Implementation The construction technology of piers and rigid frame bridges, the basic principles and construction technology of rock anchor cables, the assembly and welding technology of upper and lower I-beam distribution anchor beams, the fixing method and quantity of cable clips, the laying method of steel wire mesh, the structural form and installation method of rope clips, the material and structural form of load-bearing cables, the material and structural form of wind cables and handrail steel ropes, the tension and mid-span sag of load-bearing cables, wind cables, and handrail steel ropes, the steel bar binding and welding technology, the welding of various steel plates, the connection method of bolt types, and the concrete pouring technology, etc., will not be repeated here. The focus is on describing the implementation method of the structure involved in this invention.
[0021] like Figure 1 , 2 The diagram shows the overall structure of a gravity-anchored ultra-long cableway bridge in a complex wind field mountain canyon area. It includes a rigid frame bridge 1, a cableway bridge 2, wind cables 3, wind cable anchors 4, a main cable anchor system 5, rock anchors 6, piers 7, and a river surface 8. The cableway bridge 2 is located on the side of the rigid frame bridge 1 and at a certain height above the river surface 8. The cableway bridge 2 mainly assists in the construction of the rigid frame bridge 1 and piers 7. The cableway bridge 2 is mainly composed of the main cable anchor system 5, the bridge deck system, and the wind cable system.
[0022] like Figures 3-6 The diagram shows the cable-stayed bridge's anchorage system. The main cable anchorage system 5 mainly consists of rock anchor cables 6, load-bearing cables 9, I-beam distribution anchor beams 10, upper distribution anchor beams 10-1, lower distribution anchor beams 10-2, front bearing plate 11, rear bearing plate 12, anchor cable cement grout 13, anchor beam pads 14, anchor rings 15, load-bearing cable passage holes 16, reinforced concrete anchor piers 17, cable bridge entrance gantry 18, curved iron sheet 19, rock mass 20, X-type reinforcing links 21, cable clamps 28, and curved square timber 31. The main cable anchorage system 5 is anchored to the rock mass 20 in the high mountain canyon via rock anchor cables 6. The end of the load-bearing cable 9 passes through the main cable anchorage system 6. The cable anchor system 5 is fixed, and steps are excavated on the rock mass 20 and reinforced concrete anchor piers 17 are poured. During the pouring of reinforced concrete anchor piers 17, load-bearing cable passage holes 16 are pre-set to facilitate the winding and passing of load-bearing cables 9. The I-beam distribution anchor beam 10 is divided into upper distribution anchor beam 10-1 and lower distribution anchor beam 10-2. The upper distribution anchor beam 10-1 and lower distribution anchor beam 10-2 are placed on top of each other. The upper distribution anchor beam 10-1 and lower distribution anchor beam 10-2 are connected by X-type reinforcing couplers 21. Multiple X-type reinforcing couplers 21 are evenly spaced. A cable bridge entrance gate frame 18 is welded on the upper distribution anchor beam 10-1.
[0023] Furthermore, a front bearing plate 11 and a rear bearing plate 12 are welded to both sides of the I-beam distribution anchor beam 10. The I-beam distribution anchor beam 10 rests on a reinforced concrete anchor pier 17. An arc-shaped square timber 31 is filled between the rear bearing plate 12 and the reinforced concrete anchor pier 17. The load-bearing cable 9 is wound around the front bearing plate 11 and the rear bearing plate 12. At the connection point between the load-bearing cable 9 and the front bearing plate 11 and the rear bearing plate 12, an arc-shaped iron sheet 19 is wrapped around the load-bearing cable 9. The rock anchor cable 6 passes through... The rear support plate 12 and the front support plate 11 are anchored to the front support plate 11 by anchor rings 15. An anchor beam pad 14 is provided between the anchor ring 15 and the front support plate 11. The load-bearing cable 9 is fixed by cable clips 28 after passing around the support plate. A safety bend 32 is provided at the end of the load-bearing cable 9. Multiple load-bearing cables 9 are evenly spaced. The end of each load-bearing cable 9 is fixed by multiple cable clips 28. At least one cable clip 28 is preset at the tail of the safety bend 32.
[0024] like Figures 7-8 The diagram shows the cableway bridge deck system. The deck system mainly consists of load-bearing cables 9, angle steel guardrails 26, handrail steel ropes 27, channel steel main crossbeams 29, square timber secondary crossbeams 30, lower layer wide-hole steel wire mesh 33, upper layer fine-hole steel wire mesh 34, rope clips 35, protective netting 36, lentil-patterned steel pressure plates 37, high-strength bolts 38, shackles 39, etc. The channel steel main crossbeams 29 and square timber secondary crossbeams 30 are evenly spaced on multiple load-bearing cables 9. Two square timber secondary crossbeams 30 are arranged between adjacent channel steel main crossbeams 29. The distance between the main crossbeam 29 and the secondary crossbeam 30 is 0.5m. The main crossbeam 29 is fixed to the load-bearing cable 9 by rope clips 35, and the secondary crossbeam 30 is bound to the load-bearing cable 9 by wire. A lower layer of wide-hole steel wire mesh 33 and an upper layer of fine-hole steel wire mesh 34 are laid sequentially on the main crossbeam 29 and the secondary crossbeam 30. A lentil-patterned steel pressure plate 37 is installed on the upper layer of fine-hole steel wire mesh 34 at the main crossbeam 29. The lentil-patterned steel pressure plate 37 is connected to the main crossbeam 29 by high-strength bolts 38. Angle steel guardrails 26 are welded to both ends of the main crossbeam 29. Two handrail steel ropes 27 are installed on the upper and lower sides of the angle steel guardrails 26. The handrail steel ropes 27 are connected to the angle steel guardrails 26 by rope clips 35. A protective net 36 is tied to the angle steel guardrails 26.
[0025] like Figure 4 The diagram shows the structural design of the cableway bridge's load-bearing anchorage system, which includes rock mass 20, rebar 22, steel cable concrete anchorage piers 23, anchorage rings 24, chain hoists 25, and handrail steel cables 27. The end of the handrail steel cable 27 is connected to the anchorage ring 24 via the chain hoist 25, which can adjust the tension of the handrail steel cable 27. Steps are excavated on the rock mass 20, and rebar 22 is drilled into the steps. The steel reinforcement cage of the steel cable concrete anchorage piers 23 is welded to the rebar 22, and the anchorage rings 24 are anchored within the steel cable concrete anchorage piers 23.
[0026] like Figure 2 , 7 The cableway bridge deck system diagram shown in Figure -8 illustrates the system, which mainly consists of wind cables 3, wind cable anchors 4, load-bearing cables 9, channel steel main crossbeams 29, and shackles 39. Shackles 39 are installed at both ends of the channel steel main crossbeams 29 at intervals of 1 / 6 of the span. One end of each wind cable 3 is connected to a shackle 39, and the other end is connected to a wind cable anchor 4. The structure of the wind cable anchor 4 is the same as that of the steel cable concrete anchor pier 23 at the end of the handrail steel cable 27. A total of eight wind cables 3 and four wind cable anchors 4 are installed throughout the bridge. The angle between the planar projection of each wind cable 3 and the axis of the cableway bridge 2 is not less than 45°. Each wind cable anchor 4 connects two wind cables 3 simultaneously.
[0027] The construction method for gravity-anchored ultra-long cableway bridges in complex wind field high mountain canyon areas includes the following steps: Step 1: Construction Preparation; The piers 7 were constructed to the designed height in advance. Based on the design positions of the rigid frame bridge 1 and the cableway bridge 2, the lines were measured and laid out. The specific construction lines for the wind cable anchor 4, the main cable anchor system 5, and the rock anchor cable 6 were measured and laid out on the high mountain canyon rock mass 20. A measurement control network was established, permanent benchmarks were set up, and the entire erection and installation process of the cableway bridge 2 was controlled. Materials such as wind cable 3, rock anchor cable 6, load-bearing cable 9, handrail steel rope 27, anchorages, steel sections, steel strands, and bridge deck wire mesh were prepared in advance.
[0028] Step 2: Construction of rock anchor cables; Along the surveyed and laid-out location, steps are excavated on the rock mass 20, and the rock surface is chiseled into an 80° inclined slope with a height of not less than 1.0m. The anchor cable hole positions are re-marked and located. Drill holes to the designed anchor hole depth using a down-the-hole drill, fabricate and install rock anchor cables 6, insert anchor cables 6 into the anchor holes, and inject micro-expansion anchor cable cement grout 13 into the anchor holes. On-site, the drilling depth of rock anchor cables 6 is appropriately adjusted according to the actual drilling and geological sampling conditions to ensure that the anchoring section is fully embedded in the moderately weathered rock layer. During anchoring, the entire bundle should be tensioned to test the pull-out resistance of rock anchor cables 6.
[0029] Step 3: Construction of concrete anchor blocks; The rock surface at the steps was cleaned, and reinforcing bars were tied to the rock surface. Reinforced concrete anchor blocks 17 were then poured tightly against the rock surface. During the pouring of the reinforced concrete anchor blocks 17, pre-drilled holes 16 for load-bearing cables and holes for rock anchor cables. Rock anchor cables 6 pass through the holes on the reinforced concrete anchor blocks 17 and protrude a certain length. The reinforced concrete anchor blocks 17 were placed on the rock mass 20, with a permissible bearing capacity of not less than 1200 kPa. The reinforced concrete anchor blocks 17 were surrounded by 10 cm thick C30 concrete to prevent rainwater erosion and reduce the foundation's bearing capacity.
[0030] Step 4: Install the I-beam distribution anchor beam; In the steel structure factory, the upper and lower distribution anchor beams 10-1 and 10-2 of the I-beam are pre-assembled into a single unit using X-type reinforcing couplers 21. Multiple X-type reinforcing couplers 21 are evenly spaced along the axial direction of the I-beam distribution anchor beams. A front bearing plate 11 and a rear bearing plate 12 are welded to both sides of the upper and lower distribution anchor beams 10-1 and 10-2, respectively. Rock anchor cable through holes are pre-drilled at the designed positions on both the front and rear bearing plates 11 and 12. These rock anchor cable through holes are aligned with the rock... The anchor cable 6 corresponds to the structure. After the I-beam distribution anchor beam 10 and the front and rear bearing plates are transported to the construction site, they are placed on the reinforced concrete anchor pier 17. The space between the rear bearing plate 12 and the reinforced concrete anchor pier 17 is filled with arc-shaped square timber 31. The rock anchor cable 6 is passed through the rock anchor cable through holes on the rear bearing plate 12 and the front bearing plate 11 in sequence. Anchor beam pads 14 are set on the outside of the front bearing plate 11. The ends of the rock anchor cables 6 are fixed to the anchor beam pads 14 by anchor rings 15. The I-beam distribution anchor beam 10 is locked by tensioning the rock anchor cable 6.
[0031] Step 5: Install the load-bearing cable; The load-bearing cable 9 is pulled out of the cable reel and unfolded. It is then cut to the calculated length and numbered, with a mark made at the mid-span for measuring the mid-span sag during installation. The load-bearing cable 9 is deployed using a crane and pulled by a winch and guide rail, with controlled release speed. To prevent the cables from tangling during traction, a weight is suspended at the front end of the pulled load-bearing cable 9 to separate it from the traction vector. After crossing the river, the load-bearing cable 9 is moved laterally to the predetermined position. The I-beam distribution anchor beam 10, the rear support plate 12, and the front support plate 11 together form an assembly. A layer of arc-shaped iron sheet 19 is wrapped around the outside of this assembly at the connection point with the load-bearing cable 9. The end of the load-bearing cable 9, located on one side of the riverbank, is passed through the load-bearing cable passage hole 16. After the load-bearing cable 9 is wrapped around the outside of the arc-shaped iron sheet 19 once, it is secured with multiple cable clips 28. A safety bend 32 is set at the end of the heavy cable 9, and a cable clamp 28 is set at the end of the safety bend 32 for locking. On the other side of the riverbank, the heavy cable 9 is tensioned first using a chain hoist, and the steel cables are tightened one by one using a winch. A laser reflector is installed in the middle of the span of the heavy cable 9. The three-dimensional coordinates of the middle span are observed using a total station and the sag is calculated and determined. It is ensured that the sag of a single heavy cable 9 meets the design requirements and that the sags of adjacent heavy cables 9 are also consistent. During the construction process, the sag of each heavy cable 9 is repeatedly checked and adjusted to reduce the sag deviation of each heavy cable 9. The sag error of the installation of the heavy cable 9 is no more than ±3cm. After the sag adjustment is completed, the end of the heavy cable 9 on this side is also anchored on the I-beam distribution anchor beam 10. The anchoring structure is the same as that on the opposite side of the riverbank.
[0032] Step Six: Install handrail steel cables; According to the surveyed and laid-out location, steps are excavated on the rock mass 20 on both sides of the river channel. Holes are drilled in the steps to drive in reinforcing bars 22. Anchorage reinforcement cages are then tied above the reinforcing bars 22 and welded to the reinforcing bars 22. Anchor rings 24 are then welded to the anchorage reinforcement cages. Subsequently, concrete is poured for the steel cable concrete anchorage 23. After the concrete of the steel cable concrete anchorage 23 reaches a certain strength, the end of the handrail steel cable 27 is connected to the chain hoist 25. The chain hoist 25 is fixed to the anchor ring 24, and the handrail steel cable 27 is tightened so that its mid-span sag matches that of the load-bearing cable 9.
[0033] Step 7: Installation of the bridge deck system crossbeams; Weld the cable bridge entrance gantry 18 onto the upper distribution anchor beam 10-1; Lay channel steel main crossbeams 29 and square timber secondary crossbeams 30 at even intervals on the load-bearing cable 9; Lay two square timber secondary crossbeams 30 between every two adjacent channel steel main crossbeams 29; The channel steel main crossbeams 29 and square timber secondary crossbeams 30 are arranged alternately; The distance between the channel steel main crossbeams 29 and the square timber secondary crossbeams 30 is 0.5m; The channel steel main crossbeams 29 and the load-bearing cable 9 are fixed with rope clips 35; The square timber secondary crossbeams 30 and the load-bearing cable 9 are tied with steel wire.
[0034] Step 8: Installation of steel wire mesh on the bridge deck; During the laying of the bridge deck system crossbeams, a lower layer of wide-hole steel wire mesh 33 with a mesh size of 75×50mm and an upper layer of fine-hole steel wire mesh 34 with a mesh size of 25×25mm are laid sequentially on the main crossbeam 29 of the channel steel and the secondary crossbeam 30 of the square timber. The lower layer of wide-hole steel wire mesh and the upper layer of fine-hole steel wire mesh are fixed with clamps as they are laid. The mesh is laid tightly and neatly, with an overlap of no less than 10cm at the ends. Φ16 pressure head steel bars are set at the ends, and pressure heads are set every 1.5m at the ends for positioning. The pressure head steel bars are tied to the main crossbeam 29 of the channel steel, the secondary crossbeam 30 of the square timber, and the load-bearing cable 9 to prevent the steel wire mesh from shifting laterally. A 5mm thick lentil-patterned steel pressure plate 37 is set above the upper layer of fine-hole steel wire mesh 34 at the corresponding position of the main crossbeam 29 of the channel steel. The lentil-patterned steel pressure plate 37 is fixed to the main crossbeam 29 of the channel steel using 16×60mm high-strength bolt anchors 38.
[0035] Step 9: Installation of angle steel guardrail; Angle steel railings 26 with specifications of 50×5mm are welded on both sides of each main crossbeam 29 of channel steel. Handrail steel ropes 27 are located at the top and middle of the angle steel railings 26. The handrail steel ropes 27 are fixed to the angle steel railings 26 using rope clips 35. Dense mesh protective netting 36 is hung on the angle steel railings 26 and handrail steel ropes 27 for enclosure.
[0036] Step 10: Wind cable construction; A pair of wind cables 3 are symmetrically installed at every 1 / 6 span position of the cableway bridge 2, for a total of eight wind cables 3 symmetrically installed throughout the cableway bridge 2. Shackles 39 are installed at the positions corresponding to the wind cables 3 at both ends of the main crossbeam 29 of the channel steel. One end of the wind cable 3 is connected to the shackle 39, and the other end is connected to the wind cable anchor 4. The wind cables 3 are used to increase the wind resistance of the cableway bridge 2. The traction and installation methods of the wind cables 3 are the same as those of the load-bearing cables 9. The wind cables 3 should not be tensioned too tightly, and the angle between the plane projection of the wind cables 3 and the bridge axis should not be less than 45°.
Claims
1. A construction method for gravity-anchored ultra-long cableway bridges in complex wind field high mountain canyon areas, characterized in that... The specific steps include the following: Step 1: Construction Preparation; Step 2, rock anchor cable construction; along the location of the survey line, excavate steps on the rock mass (20), mark the location of the anchor cable hole, drill to the designed anchor hole depth using a down-the-hole drill, make and install the rock anchor cable (6), insert the anchor cable (6) into the anchor hole, and inject micro-expansion anchor cable cement grout (13) into the anchor hole. Step 3: Construction of concrete anchor blocks; Wash the rock surface at the step clean, tie steel bars on the rock surface at the step and pour reinforced concrete anchor (17) close to the rock surface. During the pouring of reinforced concrete anchor (17), pre-set load-bearing cable through hole (16) and rock anchor cable through hole. Rock anchor cable (6) passes through and extends out of the rock anchor cable through hole on the reinforced concrete anchor (17). Step 4: Installation of I-beam distribution anchor beams; In the steel structure factory, the upper distribution anchor beam (10-1) and lower distribution anchor beam (10-2) of the I-beam are assembled into one piece by X-type reinforcing coupler (21). The front bearing plate (11) and the rear bearing plate (12) are welded to both sides of the upper distribution anchor beam (10-1) and the lower distribution anchor beam (10-2), respectively. Rock anchor cable through holes are reserved on the front bearing plate (11) and the rear bearing plate (12) according to the design position. The rock anchor cable through holes on the front bearing plate (11) and the rear bearing plate (12) correspond to the rock anchor cable (6); The I-beam is then installed. After the steel distribution anchor beam (10) and the front and rear bearing plates are transported to the construction site, they are placed on the reinforced concrete anchor pier (17). Arc-shaped square timber (31) is filled between the rear bearing plate (12) and the reinforced concrete anchor pier (17). Rock anchor cables (6) are passed through the rock anchor cable through holes on the rear bearing plate (12) and the front bearing plate (11) in sequence. Anchor beam pads (14) are set on the outside of the front bearing plate (11). The ends of the rock anchor cables (6) are fixed on the anchor beam pads (14) through the anchor rings (15). The I-beam distribution anchor beam (10) is locked by tensioning the rock anchor cables (6). Step 5: Install the load-bearing cable; Pull the load-bearing cable (9) out of the cable reel and unfold it. Cut the load-bearing cable (9) according to the calculated length. Number the load-bearing cable (9) and mark it at the mid-span for use in measuring the mid-span sag when erecting the load-bearing cable (9). Use a crane to arrange the load-bearing cable (9). Use a winch and a slide to pull the load-bearing cable (9). Suspend a heavy object at the front end of the pulled load-bearing cable (9). After the load-bearing cable (9) crosses the river, move the load-bearing cable (9) laterally to the preset position. Fix one end of the load-bearing cable (9) to the I-beam distribution anchor beam (10). On the other side of the riverbank, use a chain hoist to tension the load-bearing cable (9) first. Use a winch to tighten the steel cables one by one. Anchor the end of the load-bearing cable (9) on this side to the I-beam distribution anchor beam (10). Step Six: Install handrail steel cables; According to the location of the survey line, steps are excavated on the rock mass (20) on both sides of the river channel. Rebar (22) is driven into the steps through the drilled holes. Anchor pier steel cage is tied above the rebar (22). The anchor pier steel cage is welded to the rebar (22), and the anchor ring (24) is welded to the anchor pier steel cage. Then, the concrete of the steel rope concrete anchor pier (23) is poured. After the concrete of the steel rope concrete anchor pier (23) reaches a certain strength, the end of the handrail steel rope (27) is connected to the chain hoist (25). The chain hoist (25) is fixed on the anchor ring (24). The handrail steel rope (27) is tightened so that the mid-span sag of the handrail steel rope (27) is consistent with the mid-span sag of the load-bearing cable (9). Step 7: Installation of bridge deck system crossbeams; Weld the cable bridge entrance gate frame (18) onto the upper distribution anchor beam (10-1), and lay the channel steel main crossbeam (29) and square timber secondary crossbeam (30) at even intervals on the load-bearing cable (9); Step 8: Installation of steel wire mesh on the bridge deck; During the laying of the bridge deck system crossbeams, a lower layer of wide-hole steel wire mesh (33) and an upper layer of fine-hole steel wire mesh (34) are laid on the main crossbeam (29) of the channel steel and the secondary crossbeam (30) of the square timber. A lentil-patterned steel pressure plate (37) is set at the position corresponding to the main crossbeam (29) of the channel steel above the upper fine-hole steel wire mesh (34). The lentil-patterned steel pressure plate (37) is fixed to the main crossbeam (29) of the channel steel using high-strength bolt anchors (38). Step 9: Installation of angle steel guardrail; Angle steel railings (26) are welded on both sides of each main crossbeam (29) of channel steel. Handrail steel ropes (27) are located at the top and middle of the angle steel railings (26). The handrail steel ropes (27) are fixed to the angle steel railings (26) using rope clips (35). Dense mesh protective nets (36) are hung on the angle steel railings (26) and handrail steel ropes (27) for enclosure. Step 10: Wind cable construction.
2. The construction method for a gravity-anchored ultra-long cableway bridge in a complex wind field high mountain canyon area according to claim 1, characterized in that, The piers (7) were constructed to the designed height in advance. Based on the design positions of the rigid frame bridge (1) and the cableway bridge (2), the specific construction lines of the wind cable anchor (4), the main cable anchor system (5), and the rock anchor cable (6) were measured and laid out on the high mountain canyon rock mass (20). A measurement control network was established, permanent benchmarks were set up, and the entire erection and installation process of the cableway bridge (2) was controlled. Wind cables (3), rock anchor cables (6), load-bearing cables (9), handrail steel ropes (27), anchorages, steel sections, steel strands, and bridge deck wire mesh were prepared in advance.
3. The construction method for a gravity-anchored ultra-long cableway bridge in a complex wind field high mountain canyon area according to claim 1, characterized in that, The reinforced concrete anchor (17) is placed on the rock mass (20) with an allowable bearing capacity of not less than 1200KPa. The reinforced concrete anchor (17) is surrounded by a 10cm thick C30 concrete.
4. The construction method for a gravity-anchored ultra-long cableway bridge in a complex wind field high mountain canyon area according to claim 1, characterized in that, In step five, a laser reflector is installed at the mid-span of the load-bearing cable (9). The three-dimensional coordinates at the mid-span are observed using a total station and the sag is calculated and determined. It is ensured that the sag of a single load-bearing cable (9) meets the design requirements and that the sags of adjacent load-bearing cables (9) are also consistent. During the construction process, the sag is repeatedly checked and adjusted to reduce the sag deviation of each load-bearing cable (9). The sag error of the load-bearing cable (9) installation is no more than ±3cm.
5. The construction method for a gravity-anchored ultra-long cableway bridge in a complex wind field high mountain canyon area according to claim 1, characterized in that, In step five, the I-beam distribution anchor beam (10), the rear support plate (12), and the front support plate (11) together form an assembly. A layer of arc-shaped iron sheet (19) is wrapped around the outside of the assembly where it connects to the load-bearing cable (9). When fixing one end of the load-bearing cable (9) to the I-beam distribution anchor beam (10), the end of the load-bearing cable (9) located on one side of the riverbank is passed through the load-bearing cable passage hole (16). After the load-bearing cable (9) is wrapped around the outside of the arc-shaped iron sheet (19), it is secured by multiple cable clips (28). A safety bend (32) is set at the end of the load-bearing cable (9), and another cable clip (28) is set at the end of the safety bend (32) to lock it.
6. The construction method for a gravity-anchored ultra-long cableway bridge in a complex wind field high mountain canyon area according to claim 1, characterized in that, In step seven, two square timber secondary beams (30) are laid between each pair of adjacent channel steel main beams (29). The channel steel main beams (29) and square timber secondary beams (30) are arranged alternately. The distance between the channel steel main beams (29) and square timber secondary beams (30) is 0.5m. The channel steel main beams (29) and the load-bearing cables (9) are fixed with rope clips (35), and the square timber secondary beams (30) and the load-bearing cables (9) are tied with steel wire.
7. The construction method for a gravity-anchored ultra-long cableway bridge in a complex wind field high mountain canyon area according to claim 1, characterized in that, In step eight, pressure head steel bars are installed on the lower layer wide-hole steel wire mesh (33) and the upper layer fine-hole steel wire mesh (34), and the pressure head steel bars are tied to the channel steel main crossbeam (29), the square timber secondary crossbeam (30), and the load-bearing cable (9).
8. The construction method for a gravity-anchored ultra-long cableway bridge in a complex wind field high mountain canyon area according to claim 1, characterized in that, In step ten, the specific construction method of the wind cable is as follows: a pair of wind cables (3) are symmetrically set at every 1 / 6 span position of the cableway bridge (2), and a total of eight wind cables (3) are symmetrically set in the entire cableway bridge (2). Shackles (39) are set at the positions corresponding to the wind cables (3) at both ends of the main crossbeam (29) of the channel steel. One end of the wind cable (3) is connected to the shackle (39), and the other end is connected to the wind cable anchor (4). The traction and installation method of the wind cable (3) is the same as that of the load-bearing cable (9). The angle between the plane projection of the wind cable (3) and the axis of the cableway bridge (2) is not less than 45°.
9. A gravity-anchored ultra-long cableway bridge in a complex wind field high mountain canyon area, characterized in that: The bridge was constructed using the gravity-anchored ultra-long cableway bridge construction method for complex wind field high mountain canyon areas as described in any one of claims 1-8.
Citation Information
Patent Citations
Construction technology for large-size cableway bridge engineering
CN102877413A
Main cable anchor structure system suitable for pedestrian ropeway bridge and construction method
CN111576210A
Structure for enhancing wind resistance stability of canyon disordered wind field cableway bridge in mountainous area and operation method
CN113308979A
Method for erecting large-span steel strand cable bridge in mountainous area
CN115094769A
Cableway bridge and method suitable for rigid frame bridge concrete horizontal transportation
CN116335014A