Method for establishing and using injection-production well adjustment chart in polymer flooding recovery period of three types of oil layers
By establishing an adjustment chart for injection and production wells during the recovery period of polymer flooding in three types of oil reservoirs, the problem that the adjustment technology for type I oil reservoirs is not applicable to type III oil reservoirs in the existing technology has been solved. This has improved the development effect of polymer flooding in type III oil reservoirs, controlled the water cut recovery rate, and increased the recovery rate.
Patent Information
- Application Number
- CN202411791651.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-12-06
- Publication Date
- 2026-06-09
AI Technical Summary
The existing polymer flooding tracking and adjustment technology for Class I oil layers is not suitable for Class III oil layers and cannot guide the tracking and adjustment of injection and production wells during the water-cut recovery period, resulting in poor polymer flooding development effect in Class III oil layers.
Establish a tracking and adjustment chart for injection and production wells during the recovery period of polymer flooding in three types of oil reservoirs, including adjustment charts for injection wells and production wells. Through fracturing, subdivision adjustment, enrichment, and regional division of reasonable zones, corresponding well adjustments are made based on parameters such as the proportion of fluid absorption thickness, the maximum relative fluid absorption of a single layer, and the degree of production.
It effectively improved the polymer flooding development effect of three types of oil reservoirs, controlled the water cut recovery rate, and increased the reservoir thickness and recovery rate.